法兰检验计划书ITP

合集下载

电梯itp检验计划模板

电梯itp检验计划模板

电梯itp检验计划模板英文回答:ITP (Initial Test Plan) for Elevator Inspection.1. Introduction.The purpose of this ITP is to outline the inspection plan for the elevator system to ensure its compliance with safety and performance standards. The inspection will cover all components of the elevator, including the control system, mechanical parts, and safety features.2. Scope.The inspection will be carried out in accordance with the relevant regulations and standards, including but not limited to the local building codes, ASME A17.1/CSA B44 Safety Code for Elevators and Escalators, andmanufacturer's recommendations. The scope of the inspectionwill include the following:Verification of installation and commissioning documentation.Functional testing of the control system.Inspection of mechanical components such as hoist ropes, sheaves, and counterweights.Testing of safety features including overspeed governors, door interlocks, and emergency braking systems.3. Inspection Plan.The inspection will be conducted by a qualified and experienced elevator inspector who is familiar with the specific type and model of the elevator. The inspectionplan will include the following steps:Review of installation and commissioning records.Functional testing of the control system to ensure proper operation of the elevator car, doors, and interlocks.Inspection of mechanical components for signs of wear, corrosion, or damage.Testing of safety features to verify their proper functioning under normal and emergency conditions.4. Reporting.A detailed report will be prepared at the conclusion of the inspection, documenting the findings, any non-conformities, and recommendations for corrective actions. The report will be provided to the building owner orfacility manager for review and further action.5. Conclusion.The ITP for elevator inspection outlines the plan for ensuring the safety and performance of the elevator system. By following this plan, we aim to identify any issues ornon-conformities and take appropriate corrective actions to ensure the safe and reliable operation of the elevator.中文回答:电梯ITP检验计划。

产品质量检验计划ITP

产品质量检验计划ITP

结构件 结构件 结构件 结构件 结构件 结构件 W、R R
目视检查
结构件
焊工印记
目视检查
结构件
CPLEC
项目名称 产品名称 序号 产品/过程名称 流程 焊缝 8 几何尺寸检 查(焊后) 外观质量 天车 图纸编号 工程编号 检验项目 目视检查 量具测量
产品检验测试计划ITP
生产单位 检验/测试/方法 标准/规范/控制程序 应满足图纸、图样、工艺及产品标 准、规范要求 构件的尺寸形状应符合图纸要求 零件相对位置 有装配要求的部位、部件位置 零部件名称、型号、编号、检测标准 及验收标准、部位、数量、焊接型式 相应产品图纸、检测委托、无损检测 通用规程 量具测量 根据无损检测图选择焊缝进行无损 探伤;全熔透焊缝应进行20%UT和 100% MT;验船师可根据实际情况按 一定比例抽取复检;按比例抽检的 焊缝如发现严重缺陷,应对使用同 种工艺焊接的所有焊缝进行100%检 测,探伤结果应符合经批准图纸或 AWS D1.1标准要求 验证方法 检验员签署 验证文件
焊接工艺编制 发放
工艺确认
结构件
变更 7 焊接 CCS确认 焊材烘焙、领用、发放 产品施焊及焊 施焊环境 缝返修 焊接参数监控及记录 焊缝形状尺寸(余高、宽窄、焊角宽 度、棱角度、错边量) 焊后检查(自 焊缝表面质量 检)
工艺确认 CCS确认 焊材管理控制程序; HSE管理程序 操作者确认 焊材领用记录 操作者确认 焊接过程监控记录 WPS 焊缝尺寸应符合图纸要求 焊缝表面不得有裂纹、夹渣、未熔 合、气孔、焊瘤、弧坑和咬边等缺 陷; 筋板端部应满焊圆角,且不应再转 角处更换焊材 操作者确认 操作者确认 自检记录; 工艺流程卡; 操作者确认 质量检验单; CCS报验单 操作者确认

阀门检验计划(ITP)

阀门检验计划(ITP)
1、强度试验
H
2、高压密封
H
3、低压密封
H
4、试验后清理检查
W

包装
1、清洁度检查
W
2、油漆及包装质量检查
W
3、铭牌及标记检查
W
4、装箱检查
W
蝶阀监理检验计划
序号
零部件及
工序名称
监 造 内 容
检验点(R)
见证点(W)
停止点(H)
备注

阀体
1、外观检查
W
2、CA、MP
R
3、无损检查
R
W
4、尺寸及外观检查
W
5、堆焊质量检查
W
6、合金钢、不锈钢PMI检查
H

阀瓣
1、外观检查
W
2、CA、MP
R
3、无损检查
R
W
4、尺寸及外观检查
W
5、堆焊质量检查
W
6、合金钢、不锈钢PMI检查
H

阀杆
1、CA、MP
R
2、无损检验
R
3、尺寸及外观检查
W

装配
1、外观质量及清洁度
W
2、密封面装配质量检查
W
3、传动机构检查
W

水压试验

阀体
1、外观检查
W
2、CA、MP
R
3、无损检查
R
W
4、尺寸及外观检查
W
5、堆焊质量检查
W
6、合金钢、不锈钢PMI检查
H

阀盖
1、外观检查
W
2、CA、MP
R
3、无损检查
R
W

法兰检验与安装方法

法兰检验与安装方法

法兰检验与安装方法1. 打开产品包装检查主件是否与清单或合同中产品相符,清点产品数量。

2. 检验产品表面是否凹坑、划痕、铁锈碎片及油质,法兰面粗糙度不大于6.3μm,如果粗糙度不符,则修整法兰面,检查法兰、螺栓孔等,并清洗法兰面3. 法兰密封面应平整光洁,不得有毛刺及径向沟槽;螺纹法兰的螺纹部分应完整、无损伤;凹凸密封形式的密封面应能自然嵌合,凸面的高度不得低于凹槽的深度。

4. 检查并清洗螺栓、螺帽,应用绝缘油脂涂抹于所有的螺栓及螺帽的螺纹5. 对齐法兰使他们保持同轴心,平行,并小心的安装垫片,禁止在垫片及法兰面上使用润滑剂、油脂、粘合剂,预防避免损坏垫片上的密封圈。

6. 对齐螺栓孔,并用3个穿孔钉各自相隔120度穿入固定法兰(特别针对大型法兰)最少2个穿孔钉各自相隔180度。

7. 插入螺栓、螺帽及垫圈,涂抹过润滑油的螺帽应该首先与不锈钢垫圈装配,预紧螺栓,直到法兰与垫片相互接触8. 使用千分尺、手电筒等工具检验法兰与垫片的间隙,若间隙存在则表明法兰装配没有平行。

9. 若存在间隙,则一点点拧开螺帽,然后重新拧紧直到两片法兰与垫片相接触,这方法对于防止法兰与垫片接触产生对位偏移是必须的;若方法不当也会造成法兰与垫片接触时螺栓载荷过大的情况下破坏垫片的密封圈。

10. 再次按照上述建议的螺栓扭预紧矩(10-15%的螺栓扭矩)拧紧松弛的螺帽,去除穿孔钉换上螺栓、螺帽、垫圈,并以同样的扭矩预紧。

11. 继续螺栓拧紧工作,并把预紧力提升到50%螺栓扭矩;继续拧紧螺栓,直至最终扭矩。

12. 这是一个对于螺栓有效预紧操作的操作规程,尤其针对大口径管道系统。

13. 所有以上操作应当使用扭矩扳手(机械或液压式)或者使用螺栓预紧器。

为确保安装的法兰不渗漏,我们在安装时应注意哪些问题?1、法兰应有足够的强度,紧固时不得变形。

法兰密封面应平整清洁,安装时要认真清理油污和锈斑。

2、密封垫应有良好的耐油和抗老化性能,以及比较好的弹性和机械强度。

ITP计划

ITP计划
每个单元工程
T
W/R
I
1




三查四定(查漏项、隐患、未完,定任务、人员、措施、时间)
整个工程
H
H
H
2
交工验收(质量评估、评定)
整个工程
H
H
H
H
3
交工技术文件(审签齐全,文件完整,数据真实、准确,评定合格)
整个工程
R
R
R
注:I—检查T—试验R—审查(资料 Nhomakorabea查)SW—随机见证和检查W—见证
H—停止S—旁站
每个单元工程
T
W/R
I
17
模板安装验收
每个单元工程
I
H/R
H
18
防雷接地验收
每个单元工程
I
H
I
19
首层(屋面)钢筋验收(设计、质检、监理、施工)
每个单元工程
H
H/R
H
H
20
混凝土浇筑(试压件见证取样送检、砼塌落度试验)
每个单元工程
T/I
W/S
SW
21
主体结构验收(实体检测、施工资料)
每个单元工程
H
H/R
T/R
H/R
H
H
12
回填(地基承载力不小于150Kpa、压实度系数不小于0.97
每个单元工程(每1000m2取三点)
T
H/W
H
13
垫层浇筑(试压件见证取样送检、砼塌落度试验)
每个单元工程
T
W/S
SW
14
支模架验收
每个单元工程
I
H
H
15
进场材料(见证取样送检)

ITP(Inspection and Test Plan检验检测计划)

ITP(Inspection and Test Plan检验检测计划)

1.14
Approval of steel materials 钢材原材料认可
Technical specification,Design drawing 技术规格,设计图纸
AS3678/AS3679/ AS 4100,
1.15
Approval of Blasting abrasive 喷 砂介质认可
Approval of workshop drawing设 计深化认可
EBJ353-TD-MN-SPC 0001 Rev.0
Approval of 3rd party testing laboratory (ITL) 第三方检测实验室认可
BEJ353-TD-MN-SPC 0001 Rev.0 Section 10.2
Before painting starts 装前
Before galvanizing starts 锌前 Before galvanizing starts 锌前
During fabrication
Before fabrication starts 制作前

Mill certificate and 3rd party test certificate 提交钢厂证书及 第三方检
Technical specification技术规格
AS 1627.4
1.16
Approval of paint material 漆材料认可
油 Technical specification技术规格
1.17
Approval of Galvanizer 锌厂家认可
镀 Technical specification技术规格
料证书,外观检查
3679
制作开始前

化工、石油安装检验测试计划(ITP).

化工、石油安装检验测试计划(ITP).

****************项目工艺管道、设备、钢结构安装工程检验和试验计划
*************项目
工艺管道、设备及钢结构安装
检验和试验计划
批准人:_______
审核人:_______
编制人:_______
*************有限公司
*************项目部
年月日
*************项目工艺管道、设备、钢结构安装工程检验和试验计划
1总则
为了实现本项目工艺管道、设备安装、钢结构安装施工的质量目标,严格施工工序控制,确保施工质量,为顾客提供合格、满意的工程,特制定本计划。

2适用范围
本计划仅适用于*************LNG 储备库项目工艺管道、设备安装、钢结构安装。

3编制依据
3.1 质量手册、程序文件等质量管理体系文件
3.2 施工组织设计及质量计划。

3.3 施工承包合同及国家相应的施工验收规范
4检验试验计划。

itp质量控制计划

itp质量控制计划

itp质量控制计划ITP质量控制计划(Inspection and Test Plan)是由质量管理部门制定的一系列检验测试措施,以保证生产的产品或服务达到客户期望的质量标准。

ITP是确定质量控制策略的关键文件,它定义了质量控制过程中的检验、测试和抽样计划,以及实施此计划所需的资源和工作时间。

它可以帮助确定项目质量控制策略,提供对项目质量控制策略的可追溯性,并确保在项目生命周期中实施有效的质量控制。

1.ITP质量控制计划的内容 ITP质量控制计划主要包括以下内容: (1) 确定质量管理系统,包括质量管理组织、质量管理文件、质量方法学和质量参数。

(2) 确定检验、测试和抽样的计划,以及实施这些计划所需的资源和工作时间。

(3) 根据质量控制标准制定检验、测试和抽样规范,以及实施这些规范所需的资源和工作时间。

(4) 定义质量控制标准的检验、测试和抽样项目。

(5) 确定检验、测试和抽样的合格标准,以及实施这些标准所需的资源和工作时间。

(6) 定义项目质量控制策略的可追溯性。

2.ITP质量控制计划的作用 ITP质量控制计划的作用主要有以下几点: (1) 帮助确定项目的质量控制策略,并确保在项目生命周期中实施有效的质量控制。

(2) 提供对项目质量控制策略的可追溯性,以保证生产的产品或服务达到客户期望的质量标准。

(3) 保证质量控制过程中的检验、测试和抽样活动得到有效执行,以便在项目期间及时发现质量问题,并采取有效的纠正措施。

(4) 建立可靠的质量数据库,以便更好地评估质量系统的状态,改进质量管理水平。

3.ITP质量控制计划的实施实施ITP质量控制计划的主要步骤有: (1) 确定质量控制策略。

质量管理部门要结合客户的要求,确定质量控制的目标、策略和细节,以便确定合适的检验、测试和抽样计划。

(2) 制定检验、测试和抽样计划。

质量管理部门要根据客户要求和质量控制策略,制定检验、测试和抽样的计划,以及实施这些计划所需的资源和工作时间。

  1. 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
  2. 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
  3. 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。

法兰检验计划书ITP
1. 引言
本文档旨在描述法兰检验计划书(ITP)的编写规范和内容要求。

法兰是管道连接中常用的一种连接方式,其质量对整个管道系统的安全和稳定运行至关重要。

ITP
是在法兰生产和安装过程中进行质量控制的工具,通过详细描述检验方法和标准,确保法兰的质量符合规定要求。

2. ITP编写规范
ITP是一份详细的文档,应按照以下规范进行编写:
2.1 文档标题和标识
ITP文档的标题应该明确概括其内容,并在文档中的每一页都显示。

此外,还
应包含ITP的唯一标识,以方便追踪和管理。

2.2 目的和范围
ITP文档的开头部分应该清楚地说明其编写的目的和适用范围。

明确目的和范
围可以帮助读者快速了解ITP的作用。

2.3 参考文件
ITP文档应列出所有与法兰检验相关的参考文件和标准,如国家标准、行业规
范等。

这些参考文件是ITP编写的依据,有助于确保质量检验的准确性和可靠性。

2.4 检验过程和标准
ITP文档应详细描述法兰的检验过程和标准。

包括但不限于以下内容: - 检验
前准备:列出检验所需的设备、工具和材料,以及对管道系统的检查和准备工作。

- 检验方法:描述法兰检验的具体步骤和方法,包括外观检查、尺寸测量、材料分
析等。

- 标准要求:列出法兰检验的标准要求,如法兰的尺寸、表面质量、材料成
分等。

- 报告和记录:说明检验结果的记录方式以及如何生成和存档检验报告。

2.5 质量控制
ITP文档应详细描述法兰检验的质量控制措施,包括但不限于以下内容: - 检
验人员的资质要求:列出参与法兰检验的人员的资质要求,如相关证书和培训经历。

- 设备校准和维护:说明对检验设备的校准和定期维护措施,以确保检验的准确性
和可靠性。

- 检验记录和归档:描述检验记录的保存方式和期限要求,以及检验结
果的归档和追踪措施。

3. 总结
本文档对法兰检验计划书(ITP)的编写规范和内容要求进行了阐述。

通过遵循这些规范,可以确保ITP的准确性和可靠性,有效地保证法兰的质量符合要求。

详细的检验过程和标准以及质量控制措施的描述,有助于实施检验工作的规范化和标准化。

ITP作为一份重要的质量控制文档,对于确保法兰的可靠性和安全性具有重要意义。