General Conditions 1. General Provisions

1.1 Definitions In the Conditions of Contract ("these Conditions"), which include Particular Conditions and these General Conditions, the following words and expressions shall have the meanings stated. Words indicating persons or parties include corporations and other legal entities, except where the context requires otherwise.

1.1.1

The Contract 1.1.1.1"Contract" means the Contract Agreement, the Letter of

Acceptance, the Letter of Tender, these Conditions, the

Specification, the Drawings, the Schedules, and the

further documents (if any) which are listed in the Contract

Agreement or in the Letter of Acceptance.

1.1.1.2"Contract Agreement" means the contract agreement (if

any) referred to in Sub-Clause 1.6 [Contract Agreement].

1.1.1.3"Letter of Acceptance" means the letter of formal

acceptance, signed by the Employer, of the Letter of

Tender, including any annexed memoranda comprising

agreements between and signed by both Parties. If there

is no such letter of acceptance, the expression "Letter of

Acceptance" means the Contract Agreement and the date

of issuing or receiving the Letter of Acceptance means the

date of signing the Contract Agreement.

1.1.1.4"Letter of Tender" means the document entitled letter of

tender, which was completed by the Contractor and

includes the signed offer to the Employer for the Works.

1.1.1.5"Specification" means the document entitled specification,

as included in the Contract, and any additions and

modifications to the specification in accordance with the

Contract. Such document specifies the Works.

1.1.1.6"Drawings" means the drawings of the Works, as included

in the Contract, and any additional and modified drawings

issued by (or on behalf of, the Employer in accordance

with the Contract.

1.1.1.7"Schedules" means the document(s) entitled schedules,

completed by the Contractor and submitted with the Letter

of Tender, as included in the Contract. Such document

may include the Bill of Quantities, data, lists, and

schedules of rates and/or prices

1.1.1.8"Tender" means the Letter of Tender and all other

documents which the Contractor submitted with the Letter

of Tender, as included in the Contract.

1.1.1.9 "Appendix to Tender" means the completed pages entitled

appendix to tender which are appended to and form part

of the Letter of Tender.

1.1.1.10 "Bill of Quantities" and "Day work Schedule" mean the

documents so named (if any) which are comprised in the

Schedules.

1.1. 2

Parties and Persons 1.1.2.1 "Party" means the Employer or the Contractor, as the

context requires.

1.1.

2.2 "Employer" means the person named as employer in the

Appendix to Tender and the legal successors in title to this

person.

1.1.

2.3 "Contractor" means the person(s) named as contractor in

the Letter of Tender accepted by the Employer and the

legal successors in title to this person(s).

1.1.

2.4 "Engineer" means the person appointed by the Employer

to act as the Engineer for the purposes of the Contract

and named in the Appendix to Tender, or other person

appointed from time to time by the Employer and noted to

the Contractor under Sub-Clause 3.4 [Replacement of the

Engineer].

1.1.

2.5 "Contractor's Representative" means the person named

by the Contractor in the Contract or appointed from time

to time by the Contractor under Sub-Clause 4.3

[Contractor's Representative], who acts on behalf of the

Contractor.

1.1.

2.6 "Employer's Personnel" means the Engineer, the

assistants referred to in Sub-Clause 3.2 [Delegation by

the Engineer] and all other staff, labour and other

employees of the Engineer and of the Employer; and

any other personnel notified to the Contractor, by the

Employer or the Engineer, as Employer's Personnel. 1.1.2.7 "Contractor's Personnel" means the Contractor's

Representative and all personnel whom the Contractor

utilises on Site, who may include the staff, labour and

other employees of the Contractor and of each

Subcontractor; and any other personnel assisting the

Contractor in the execution of the Works.

1.1.

2.8 "Subcontractor" means any person named in the Contract

as a subcontractor, or any person appointed as a

subcontractor, for a part of the Works; and the legal

successors in title to each of these persons.

1.1.

2.9 "DAB" means the person or three persons so named in

the Contract, or other person(s) appointed under

Sub-Clause 20.2 [Appointment of the Dispute Adjudication

Board] or Sub-Clause 20.3 [Failure to Agree Dispute

Adjudication Board]

1.1.

2.10 "FIDIC" means the international federation of consulting

Engineers.

1.1. 3

Dates, Tests, Periods and Completion 1.1.3.1 "Base Date" means the date 28 days prior to the latest

date for of the Tender

1.1.3.2 "Commencement Date" means the date notified under

Sub-Clause 8.1 (commencement of works)

1.1.3.3 "Time for Completion" means the time for completing the

Works or a Section (as the case may be) under

Sub-Clause 8.2 [Time for Completion], as stated in the

Appendix to Tender (with any extension under Sub

Clause 8.4- [Extension of Time for Completion]),

calculated from the Commencement Date.

1.1.3.4 "Tests on Completion" means the tests which are

specified in the Contract or agreed by both Parties or

instructed as a Variation, and which are carried. out

under Clause 9 [Tests on Completion] before the Works

or a Section (as the case may be) are taken over by the

Employer.

1.1.3.5 "Taking-Over Certificate" means a certificate issued

under Clause 10 [Employer's Taking Over].

1.1.3.6 "Tests after Completion" means the tests (if any) which

are specked in the Contract and which are carried out in

accordance with the provisions of the Particular

Conditions after the Works or a Section (as the case

may be) are taken over by the Employer.

1.1.3.7 "Defects Notification Period" means the period for

notifying defects in the Works or a Section (as the case

may be) under Sub-Clause 11.1 [Completion of

Outstanding Work and Remedying Defects], as stated in

the Appendix to Tender (with any extension under

Sub-Clause 11.3 [Extension of Defects Notification

Period]), calculated from the date on which the Works or

Section is completed as certified under Sub-Clause 10.1

[Taking Over of the Works and Sections].

1.1.3.8 "Performance Certificate" means the certificate issued

under Sub Clause 11.9 [Performance Certificate].

1.1.3.9 "day" means a calendar day and "year" means 365

days.

1.1. 4

Money and Payments

1.1.4.1 "Accepted Contract Amount" means the amount

accepted in the Letter of Acceptance for the execution

and completion of the Works and the

1.1.4.2 "Contract Price" means the price defined in Sub-Clause

14.1 [The Contract Price], and includes adjustments in

accordance with the Contract.

1.1.4.3 "Cost" means all expenditure reasonably incurred (or to

be incurred) by the Contractor, whether on or off the

Site, including overhead and similar charges, but does

not include profit.

1.1.4.4 "Final Payment Certificate" means the payment

certificate issued under Sub-Clause 14.13 [Issue of

Final Payment Certificate].

1.1.4.5 "Final Statement" means the statement defined in

Sub-Clause 14.11 [Application for Final Payment

Certificate].

1.1.4.6 "Foreign Currency" means a currency in which part (or

all) of the Contract Price is payable, but not the Local

Currency.

1.1.4.7 "Interim Payment Certificate" means a payment

certificate issued under Clause 14 [Contract Price and

Payment], other than the Final Payment Certificate.

1.1.4.8 "Local Currency" means the currency of the Country. 1.1.4.9 "Payment Certificate" means a payment certificate

issued under Clause 14 [ Contract Price and Payment ].

1.1.4.10 "Provisional Sum" means a sum (if any) which is

specified in the Contract as a provisional sum, for the

execution of any part of the Works or for the supply of

Plant, Materials or services under Sub-Clause 13.5

[Provisional Sums].

1.1.4.11 "Retention Money" means the accumulated retention

moneys which the Employer retains under Sub-Clause

14.3 [Application for Interim Payment Certificates] and

pays under Sub-Clause 14.9 [Payment of Retention

Money].

1.1.4.12 "Statement" means a statement submitted by the

Contractor as part of an application, under Clause 14

[Contract Price and Payment], for a payment certificate.

1.1. 5

Works and Goods 1.1.5.1 "Contractor's Equipment" means all apparatus,

machinery, vehicles and the remedying of any defects.

However, Contractor Equipment excludes Temporary

Works, Employer’s Equipment (if any), Plant, Materials

and any other things intended to form or forming part of

the pavement works.

1.1.5.2 "Goods" means Contractor's equipment, Materials,

Plant and Temporary Works, or any of them as

appropriate.

1.1.5.3 "Materials,, means things of all kinds (other than Plant)

intended to form or forming part of the Permanent

Works, including the supply-only materials (if any) to be

supplied by the Contractor under the Contract.

1.1.5.4 "Permanent Works" means the permanent works to be

executed by the Contractor under the Contract.

1.1.5.5 "Plant" means the apparatus, machinery and vehicles

intended to form or forming part of the Permanent

Works.

1.1.5.6 "Section" means apart of the Works specified in the

Appendix to Tender as a Section (if any).

1.5.7 "Temporary Works" means all temporary works of every

kind (other than Contractor's Equipment) required on

Site for the execution and completion of the Permanent

Works and the remedying of any defects.

1.1.5.8 "Works" mean the Permanent Works and the Temporary

Works, or either of them as appropriate.

1.1. 6

Other Definitions 1.1.6.1 "Contractor's Documents" means the

calculations, computer programs and other software, drawings, manuals, models and other documents of a

technical nature (if any) supplied by the Contractor

under the Contract.

1.1.6.2 "Country" means the country in which the Site (or most

of it) is located, where the Permanent Works are to be

executed.

1.1.6.3 "Employer's Equipment" means the apparatus,

machinery and vehicles (if any) made available by the

Employer for the use of the Contractor in the execution

of the Works, as stated in the Specification; but does not

include Plant which has not been taken over by the

Employer.

1.1.6.4 "Force Majeure" is defined in Clause 19 [Force Majeure] 1.1.6.5 "Laws" means all national (or state) legislation, statutes,

ordinances and other laws, and regulations and by-laws

of any legally constituted public authority.

1.1.6.6"Performance Security" means the security (or securities, if

any) under Sub-Clause 4.2 [Performance Security].

1.1.6.7 "Site" means the places where the Permanent Works are to

be executed and to which Plant and Materials are to be

delivered, and any other places as may be specified in the

Contract as forming part of the Site.

1.1.6.8 "Unforeseeable" means not reasonably foreseeable by an

experienced contractor by the date for submission of the

T ender.

1.1.6.9 "Variation" means any change to the Works, which is

instructed or approved as a variation under Clause 13

[Variations and Adjustments].

1.2

Interpretation In the Contract, except where the context requires otherwise:

(a) words indicating one gender include all genders;

(b) words indicating the singular also include the plural

and words indicating the plural also include the

singular;

(c) provisions including the word "agree", "agreed" or

"agreement" require the agreement to be recorded in

writing, and

(d) "written" or "in writing" means hand-written, type-written,

printed or electronically made, and resulting in a

permanent record.

The marginal words and other headings shall not be taken into

consideration in the interpretation of these Conditions.

1.3 Communications

Wherever these Conditions provide for the giving or issuing of approvals, certificates, consents, determinations, notices and requests, these communications shall be:

(a) in writing and delivered by hand (against receipt), sent by mail or courier, or transmitted using any of the agreed

systems of electronic transmission as stated in the Appendix to T ender; and

(b) delivered, sent or transmitted to the address for the recipient's communications as stated in the Appendix to

T ender. However:

(i) if the recipient gives notice of another address, communications shall thereafter be delivered accordingly;

and

(ii) if the recipient has not stated otherwise when requesting an approval or consent, it may be sent to the address from which the request was issued.

Approvals, certificates, consents and determinations shall not be unreasonably withheld or delayed. When

a certificate is issued to a Party, the certifier shall send a copy to the other Party. When a notice is issued to

a Party, by the other Parry or the Engineer, a copy shall be sent to the Engineer or the other Party, as the

case may be.

1.4 Law and Language

The Contract shall be governed by the law of the country (or other jurisdiction) stated in the Appendix to

T ender.

If there are versions of any part of the Contract which are written in more than one language, the version which is in the ruling language stated in the Appendix to T ender shall prevail.

The language for communications shall be that stated in the Appendix to Tender. If no language is stated there, the language for communications shall be the language in which the Contract (or most of it) is written.

1.5 Priority of Documents

The documents forming the Contract are to be taken as mutually explanatory of one another. For the purposes of interpretation, the priority of the documents shall be in accordance with the following sequence:

(a) the Contract Agreement (if any),

(b) the Letter of Acceptance,

(c) the Letter of Tender,

(d) the Particular Conditions,

(e) these General Conditions,

(f) the Specification,

(g) the Drawings, and

(h) the Schedules and any other documents forming part of the Contract.

If an ambiguity or discrepancy is found in the documents, the Engineer shall issue any necessary clarification or instruction.

1.6 Contract Agreement

The Parties shall enter into a Contract Agreement within 28 days after the Contractor receives the Letter of Acceptance, unless they agree otherwise. The Contract Agreement shall be based upon the form annexed to the Particular Conditions. The costs of stamp duties and similar charges (if any) imposed by law in connection with entry into the Contract Agreement shall be borne by the Employer.

1.7 Assignment

Neither Party shall assign the whole or any part of the Contract or any benefit or interest in or under the Contract. However, either Party:

(a) may assign the whole or any part with the prior agreement of the other Party, at the sole discretion of such other Party, and

(b) may, as security in favour of a bank or financial institution, assign its right to any moneys due, or to become due, under the Contract.

1.8Care and Supply of Documents

The Specification and Drawings shall be in the custody and care of the Employer. Unless otherwise stated in the Contract, two copies of the Contract and of each subsequent Drawing shall be supplied to the Contractor, who may make or request further copies at the cost of the Contractor.

Each of the Contractor's Documents shall be in the custody and care of the Contractor, unless and until taken over by the Employer. Unless otherwise stated in the Contract, the Contractor shall supply to the Engineer six copies of each of the Contractor's Documents.

The Contractor shall keep, on the Site, a copy of the Contract, publications named in the Specification, the

Contractor's Documents (if any), the Drawings and Variations and other communications given under the Contract. The Employer's Personnel shall have the right of access to all these documents at all reasonable times.

If a Party becomes aware of an error or defect of a technical nature in a document which was prepared for use in executing the Works, the Party shall promptly give notice to the other Party of such error or defect.

1.9 Delayed Drawings or Instructions

The Contractor shall give notice to the Engineer whenever the Works are likely to be delayed or disrupted if any necessary drawing or instruction is not issued to the Contractor within a particular time, which shall be reasonable. The notice shall include details of the necessary drawing or instruction, details of why and by when it should be issued, and details of the nature and amount of the delay or disruption likely to be suffered if it is late.

If the Contractor suffers delay and/or incurs Cost as a result of a failure of the En gineer to issue the notified drawing or instruction within a time which is reasonable and is specified in the notice with supporting details, the Contractor shall give a further notice to the Engineer and shall be entitled subject to Sub-Clause 20.1 [Contractor's Claims] to:

(a)an extension of time for any such delay, if completion is or will be delayed, under Sub-Clause 8.4 [Extension of Time for Completion], and

(b)payment of any such Cost plus reasonable profit, which shall be included in the Contract Pr ice.

After receiving this further notice, the Engineer shall proceed in accordance with Sub Clause 3.5 [Determinations] to agree or determine these matters.

However, if and to the extent that the Engineer's failure was caused by any error or delay by the Contractor, including an error in, or delay in the submission of, any of the Contractor's Documents, the Contractor shall not be entitled to such extension of time, Cost or profit.

1.10 Employer's Use of Contractor's Documents

As between the Parties 'the Contractor shall retain the copyright and other intellectual property rights in the Contractor's Documents and other design documents made by (or on behalf of) the Contractor

The Contractor shall be deemed (by signing the Contract) to give to the Employer a non-terminable transferable non-exclusive royalty-free licence to copy, use and communicate the Contractor's Documents, including making and using modifications of them. This licence shall:

(a)apply throughout the actual or intended working life (whichever is longer) of the relevant parts of the Works,

(b)entitle any person in proper possession of the relevant part of the Works to copy, use and communicate the Contractor's Documents for the purposes of completing, operating, maintaining, altering, adjusting, repairing and demolishing the Works, and

(c)in the case of Contractor's Documents which are in the form of computer programs and other software, permit their use on any computer on the Site and other places as envisaged by the Contract, including replacements of any computers supplied by the Contractor.

The Contractor's Documents and other design documents made by (or on behalf of) the Contractor shall not, without the Contractor's consent, be used, copied or communicated to a third party by (or on behal f of) the Employer for purposes other than those permitted under this Sub-Clause.

1.11 Contractor's Use of Employer's Documents

As between the Parties, the Employer shall retain the copyright and other intellectual property rights in the Specification, the Drawings and other documents made by (or on behalf of) the Employer. The Contractor may, at his cost, copy, use, and obtain communication of these documents for the purposes of the Contract. They shall not, without the Employer's consent, be copied, used or communicated to a third party by the Contractor, except as necessary for the purposes of the Contract.

1.12 Confidential Details

The Contractor shall disclose all such confidential and other information as the Engineer may reasonably require in order to verify the Contractor's compliance with the Contract.

1.13 Compliance with Laws

The Contractor shall, in performing the Contract, comply with applicable Laws. Unless otherwise sated in the Particular conditions:

(a)the Employer shall have obtained (or shall obtain) the planning, zoning or similar permission for the Permanent Works, and any other permissions described in the Specification as having been (or being) obtained by the Employer; and the Employer shall indemnify and hold the Contractor harmless against and from the consequences of any failure to do so; and

(b)the Contractor shall give all notices, pay all taxes, duties and fees, and obtain all permits, licences and approvals, as required by the Laws in relation to the execution and completion of the Works and the remedying of any defects; and the Contractor shall indemnify and hold the Employer harmless against and from the consequences of any failure to do so.

1.14 Joint and Several Liability

If the Contractor constitutes (under applicable Laws) a joint venture, consortium or other unincorporated grouping of two or more persons:

(a)these persons shall be deemed to be jointly and severally liable to the Employer for the performance of the Contract;

(b)these persons shall notify the Employer of their leader who shall have authority to bind the Contractor and each of these persons; and

(c)the Contractor shall not alter its composition or legal status without the prior consent of the Employer.

菲迪克(FIDIC)简明合同格式-中英对照版

菲迪克(FIDIC)文献译丛中英文对照本 国际咨询工程师联合会 编译 中国工程咨询协会 1999年第1版 Agreement协议书 General Conditions通用条件 Rules for Adjudication裁决规则 Notes for Guidance指南注释 Short Form of Contract 简明合同格式 吕文学陈永强翻译 唐萍校译 王川徐礼章唐萍审订 (1999年第1版) (中英文对照本) (译者对译文的准确度承担全部责任, 正式使用发生的争端,以英文原版为准) 机械工业出版社

菲迪克(FIDIC)授权书 I herewith authorize CNAEC to translate FIDIC’s publications (but not the publications as edited by other organizations) into Chinese and publish them. I agree with your statement, as part of the agreement, that you will: a)Provide FIDIC with 10 copies of the translation per document, and b)Make a statement on the inside cover of the translation that the translator takes full responsibility for the accuracy of the translation and that in case of dispute, the original version in English shall prevail. Peter van der TOGT Publications manager [译文] 在此,我授权中国工程咨询协会把FIDIC出版物译成中文并出版(但是,不包括其他组织编写的出版物)。我同意你们的意见,作为协议的一部分,你们应: a)向FIDIC提供每份文件中译本10本; b)在译文的扉页上注明译者对译文的准确度承担全部责任,如果发生争端,以英文原版为准。 出版经理:Peter van der TOGT FIDIC is the French acronym for the International Federation of Consulting Engineers. FIDIC (中译菲迪克)是国际咨询工程师联合会的法文缩写。 FIDIC was founded in 1913 by three national associations of consulting engineers within Europe. The objectives of forming the federation were to promote in common the professional interests of the member associations and to disseminate information of interest to members of its component national associations. 菲迪克(FIDIC)是由欧洲三个国家的咨询工程师协会于1913年成立的。组建联合会的上的是共同促进成员协会的职业利益,以及向其成员协会会员传播有益信息。 Today FIDIC membership numbers more than 60 countries from all parts of the globe and the federation represents most of the private practice consulting engineers in the world. 今天,菲迪克(FIDIC)已有来自全球各地60多个国家成员协会,代表着世界上大多数私人执业咨询工程师。 FIDIC arranges seminars, conferences and other events in the furtherance of its goals: maintenance of high ethical and professional standards; exchange of views and information; discussion of problems of mutual concern among member associations and representatives of the international financial institutions; and development of the consulting engineering industry in developing countries. 菲迪克(FIDIC)举办各类研讨会、会议及其他活动,以促进其目标:维护高的道德和职业标准;交流观点和信息;讨论成员协会和国际金融机构代表共同关心的问题,以及发展中国家工程咨询业的发展。 FIDIC publications include proceedings of various conferences and seminars, information for consulting engineers, project owners and international development agencies, standard pre-qualification forms, contract documents and client/consultant agreements. They are available from the secretariat in Switzerland. 菲迪克(FIDIC)的出版物包括:各类会议和研讨会的文件,为咨询工程师、项目业主和国际开发机构提供的信息,资格预审标准格式,合同文件以及客户与工程咨询单位协议书。这些资料可以从设在瑞士的菲迪克(FIDIC)秘书处得到。 国际咨询工程师联合会 INTERNATIONAL FEDERATION OF CONSULTING ENGINEERS

Fidic 红皮书主要名词中英文对照

1.General Provisions一般规定 Contract 合同 Contract Agreement 合同协议书1.6 Letter of Acceptance 中标函1.1.3 (a. 业主对承包商正式接受函,签字;b.双方商定的其他内容,双方签字) Letter of Tender 投标函(承包商的报价函) Specification 规范 Drawings 图纸 Schedules 明细表 Tender 投标书(a. 投标函;b. 投标者填写的各类明细表,投标保函等) Appendix to Tender 投标函附录 Bill of Quantities 工程量表 Daywork Schedule 计日工表 Parties and Persons 合同双方和人员 Engineer 工程师(natural/legal)(监理) DAB 争端裁决委员会(投标函附录列出) FIDIC 国际咨询工程联合会(International Federation of Consulting Engineers) Dates 日期Tests 检验Periods 期间Completion 竣工 Base Date 基准日期(提交投标书截止日期之前的第28天当天;与调价有关)Commencement Date 开工日期(工程师通知开工的日期) Time for Completion 竣工日期(指时间段,从开工日期开始计算) Tests on Completion 竣工检验 Taking-over Certificate 接收证书(证明工程按照合同实质竣工,进入缺陷通知期) Tests after Completion 竣工后检验 Defects Notification Period 缺陷通知期维修期 Performance Certificate 履约证书 Money and Payments 款项和支付 Accepted Contract Amount 中标合同金额(中标的承包商的投标价格,名义合同价格)Contract Prise 合同价格(a. b.包含根据合同进行的调整) Cost 费用(承包商现场内外全部合理开支,不包括利润) Final Payment Certificate 最终支付证书(承包商将从业主方拿到的最后的一笔工程款) Final Statement 最终报表 Foreign Currency 外币 Interim Payment Certificate 期中支付证书 Local Curency 当地币 Payment Certificate 支付证书(期中和最终) Provisional Sum暂定金额(相当于业主方的备用金)13.5 /14.2 Retention Money 保留金(现金保证金,保证承包商在工程的执行的过程中恰当履约)14.3/14.9 Statement 报表(完成工程量的合同价值及其他相关情况月报竣工报表最终报表) Works and Goods 工程和货物(eg. 材料,永久设备,施工机具…完成的工程火或其一部分)Contractor’s Equipment 承包商设备(承包商的施工机具) Goods 货物 Materials 材料 Permanent Works 永久工程

FIDIC黄皮书中文合同99年版

FIDIC电气与机械工程合同条件 (黄皮书) 第一部分通用条件定义及解释(条款1) 第一部分通用条件工程师和工程师代表(条款2) 第一部分通用条件转让与分包(条款3和4) 第一部分通用条件合同文件(条款5,6,7) 第一部分通用条件承包商的义务(条款8,9,10,11,12,13,14,15和16) 第一部分通用条件业主的义务(条款17) 第一部分通用条件劳务(条款18) 第一部分通用条件工艺和材料(条款19,20,21和22) 第一部分通用条件工程、运送或安装的暂停 第一部分通用条件竣工 第一部分通用条件竣工检验 第一部分通用条件移交 第一部分通用条件移交后的缺陷 第一部分通用条件变更 第一部分通用条件设备的所有权 第一部分通用条件证书与支付 第一部分通用条件索赔 第一部分通用条件外币和汇率 第一部分通用条件暂定金额 第一部分通用条件风险与责任 第一部分通用条件对工程的照管和风险的转移 第一部分通用条件财产损害和人员伤害 第一部分通用条件责任的限度 第一部分通用条件保险 第一部分通用条件不可抗力 第一部分通用条件违约 第一部分通用条件费用和法规的变更 第一部分通用条件关税 第一部分通用条件通知 第一部分通用条件争议与仲裁 第一部分通用条件法律及程序 第二部分专用条件

第一部分通用条件定义及解释(条款1) 定义 1.1在本合同中(如下文所定义),下列措词和用语应具有此处所赋予它们的涵义: 1.1.1“开工日期”是指下列日期中最迟的日期: (a)序言中规定的开工日期,或承包商收到下列付款或通知的日期; (b)支付条件中可能规定的开工之前的预付款; (c)为开始履行合同所需颁发任何进口许可证的通知; (d)关于合同生效所需的任何法律要求已经完成的通知; (e)在第二部分中规定的、作为开工先决条件所需的任何财务和行政管理方面的要求已经完成的通知。 1.1.2“条件”是指本合同条件的序言以及本合同条件的第一部分和第二部分。 1.1.3“合同”是指为实施工程业主和承包商之间达成的协议,包括条件、规范、业主的图纸和承包商的图纸、已标价的和填完的价格表、投标书、中标函以及中标函中明确编入的附加文件。 1.1.4“合同协议书”是指记录业主和承包商之间的合同条款的文件。FIDIC机电工程合同条件附有一个合同协议书的样本。 1.1.5“合同价格”是中标函中规定的、为实施工程而支付给承包商的那笔金额。 1.1.6“承包商”是指其投标书已被业主接受的当事人以及取得承包商资格的法定继承人,但不指承包商的任何受让人(除非业主向意)。 1.1.7“承包商的图纸”是指承包商根据第6条提交的所有的图纸、样品、图样、模型、操作和维修手册。 1.1.8“承包商的设备”是指为工程之目的所需要的任何性质的装置和物品,但不包括工程设备。 1.1.9“承包商的风险”是指第37.3款定义的风险。 1.1.10“缺陷责任证书”是根据第30.11款由工程师颁发给承包商的证书。 1.1.11“缺陷责任期”是指一年或第二部分规定的移交工程后的时间段。在该期间内,承包商根据第30条负责修复好缺陷和损害。 1.1.12“业主”是指序言中指定的当事人以及取得业主资格的法定继承人,但不指业主的任何受让人(除非承包商同意)。 1.1.13“业主的图纸”是指业主或工程师根据合同向承包商提供的所有图纸和资料。 1.1.14“业主的风险”是指第37.2款定义的那些风险。 1.1.15“工程师”是指业主任命的为了合同目的作为工程师去工作并在序言中被指定的人员。 1.1.16“工程师代表”是指工程师根据第 2.2款随时任命的工程师的任何代表。 1.1.17“最终支付书”是指工程师根据第33.10款向业主颁发的证书。 1.1.18“不可抗力”具有第44.1款赋予它的涵义。 1.1.19“外币”是指工程设备安装所在国之外的某一国货币。 1.1.20“严重读取”是指承包商违背最基本的勤勉之则的任何行为或失职,而该规则是一个有责任心的承包商在同样的地位和同样的情况下所应遵循的。 1.1.21“中标函”是指业主对投标书的正式接受函,包括业主与承包商商定的对投标书进行的任何调整或变动。 1.1.22“履约保证”是承包商据第10.1款为恰当地履行合同而提供的保证。 1.1.23“工程设备”是指按合同提供的,安装到工程上的机器、仪器、材料以及所有物品。 1.1.24“进度计划”是指承包商根据第1 2.1款提交的进度计划以及任何批准的对进度计划的修订。 1.1.25“暂定金额”是指根据第36.1款所述的那笔用于进行工作或提供货物或服务的金额。 1.1.26“风险转移日期”是指根据第38.1款将工程损失或损害的风险从承包商处转移给业主的日期。 1.1.27“价格表”是指由承包商连同投标书一起递交的已填完并且已标价的价格表,或其中任何部分或单个的价格表,上述价格表构成合同文件的一部分。 1.1.28“区段”是指合同中专门确定作为区段的工程的一部分。 1.1.29“现场”是指由业主提供或使之可用的、承包商工作所在的或运人工程设备的那个或那些场所以及经业主同意后承包商施工涉及到的、在工程周围的那部分场所(不只是为了通行)。

FIDIC新红皮书全文

FIDIC 施工合同条件 (1999年第一版) 用于业主设计的房屋建筑或工程 通用条件 专用条件编制指南 争端裁决协议书格式 投标函、合同协议书格式 周可荣刘雯 万彩芸王健译 说明:因时间较紧,本译稿未经仔细校对,仅供培训班使用,请勿复印传播。请勿正式引用。

引言 国际咨询工程师联合会(FIDIC)现于1999年出版下列四份新的合同标准格式的第一版: ●施工合同条件(Conditions of Contract for Construction) 推荐用于由雇主设计的、或由其代表—工程师设计的房屋建筑或工程(building or engineering works)。在这种合同形式下,承包商一般都按照雇主提供的设计施工。但工程中的某些土木、机械、电力和/或建造工程也可能由承包商设计。 ●永久设备和设计—建造合同条件(Conditions of Contract for Plant and Design-Build) 推荐用于电力和/或机械设备的提供,以及房屋建筑或工程的设计和实施。在这种合同形式下,一般都是由承包商按照雇主的要求设计和提供设备和/或其它工程(可能包括由土木、机械、电力、和/或建造工程的任何组合形式)。 ●EPC/交钥匙项目合同条件(Conditions of Contract for EPC/Turnkey Projects) 适用于在交钥匙的基础上进行的工厂或其它类似设施的加工或能源设备的提供、或基础设施项目和其它类型的开发项目的实施,这种合同条件所适用的项目(i)对最终价格和施工时间的确定性要求较高,(ii)承包商完全负责项目的设计和施工,雇主基本不参与工作。 在交钥匙项目中,一般情况下由承包商实施所有的设计、采购和建造工作:即在“交钥匙”时,提供一个配备完整、可以运行的设施。 ●合同的简短格式(Short Form of Contract) 推荐用于价值相对较低的建筑或工程。根据工程的类型和具体条件的不同,此格式也适用于价值较高的工程,特别是较简单的、或重复性的、或工期短的工程。在这种合同形式下,一般都是由承包商按照雇主或其代表—工程师提供的设计实施工程,但对于部分或完全由承包商设计的土木、机械、电力、和/或建造工程的合同也同样适用。 建议在国际范围内招标时使用上述格式作为合同基础。在某些国家和地区,特别是当合同条件用于其国内合同时,可能需要对这些格式进行一些改动。FIDIC是按照以英语为官方语言的情况编写的。 在编写本施工合同条件的过程中我们认识到,有许多条款是普遍适用的,但也有一些条款必须根据特定合同的具体情况予以变动。因此,我们将那些对大多数(并非全部)合同都适用的条款编入了通用条件中,以方便使用者将其纳入合同文件。 通用条件和专用条件共同构成了制约合同各方权力和义务的条件。对于每一份具体的合同,都必须编制专用条件,并且必须考虑到通用条件中提到的专用条件中的条款。 本版的通用条件是基于下列情况编写的: (i)期中支付和最终支付将按照测量的数值乘以工程量表中的费率和价格决定; (ii)如果通用条件中的某些词语需要用进一步的数据来说明,那么(除非其描述性很强,因而必须在规范中详细说明外)要参照此数据的条款应编入投标文件 附录中,数据由雇主事先写明或由投标者填入; (iii)如果通用条件中的某条款涉及某一事件,而对此事件不同的合同可能适于采用不同的合同格式,则编写此条款的原则应为; (a)要使用户感到,简单地删去或不引用某些他们不希望采用的规定,比在通用条件中没有包括他们的要求而必须在专用条件中编写附加的条文 更为方便; (b)而在原则(a)不适用的情况下,条款中应包含适用于绝大多数合同的规定。

FIDIC红皮书-施工合同条件__(中英文对照)

Fédération Internationale Des Ingénieurs-Conseils(红皮书--施工合同条件) General Conditions 1.一般规定 General Provisions 1.1 定义 Definitions 在包括专用条件和本通用条件的合同条件(“本合同条件”)中,以下措辞和用语的含义如下所述。除非上下文中另有要求,指当事人和当事各方的词包括公司和其它法律实体。 In the Conditions of Contract ("these Conditions"), which include Particular Conditions and these General Conditions, the following words and expressions shall have the meanings stated. Words indicating persons or parties include corporations and other legal entities, except where the context requires otherwise. 1.1.1 合同 1.1.1 The Contract 1.1.1.1“合同(Contract)”指合同协议书、中标函、投标函、本合同条件、规范、图纸、资料表、以及在合同协议书或中标函中列明的其它进一步的文件(如有时)。 1.1.1.1 "Contract" means the Contract Agreement, the Letter of Acceptance, the Letter of Tender, these Conditions, the Specification, the Drawings, the Schedules, and the further documents (if any) which are listed in the Contract Agreement or in the Letter of Acceptance. 1.1.1.2“合同协议书(Contract Agreement)”指第1.6款【合同协议】中所说明的合同协议(如有时)。 1.1.1.2 "Contract Agreement" means the contract agreement (if any) referred to in Sub-Clause 1.6 [Contract Agreement]. 1.1.1.3“中标函(Letter of Acceptance)”指雇主对投标文件签署的正式接受函,包括其后所附的备忘录(由合同各方达成并签定的协议构成)。在没有此中标函的情况下,“中标函”一词就指合同协议书,颁发或接收中标函的日期就指双方签订合同协议书的日期。 1.1.1.3 "Letter of Acceptance" means the letter of formal acceptance, signed by the Employer, of the Letter of Tender, including any annexed memoranda comprising agreements between and signed by both Parties. If there is no such letter of acceptance, the expression "Letter of Acceptance" means the Contract Agreement and the date of issuing or receiving the Letter of Acceptance means the date of signing the Contract Agreement. 1.1.1.4“投标函(Letter of Tender)”指名称为投标函的文件,由承包商填写,包括已签字的对雇主的工程报价。 1.1.1.4 "Letter of Tender" means the document entitled letter of tender, which was completed by the Contractor and includes the signed offer to the Employer for the Works. 1.1.1.5“规范(Specification)”指合同中名称为规范的文件,及根据合同规定对规范的增加和修改。此文件具体描述了工程。 1.1.1.5 "Specification" means the document entitled specification, as included in the Contract, and any additions and modifications to the specification in accordance with the Contract. Such document specifies the Works. 1.1.1.6“图纸(Drawings)”指合同中规定的工程图纸,及由雇主(或代表)根据合同颁发的对图纸的增加和修改。 1.1.1.6 "Drawings" means the drawings of the Works, as included in the Contract, and any additional and modified drawings issued by (or on behalf of, the Employer in accordance with the Contract. 1.1.1.7“资料表(Schedules)”指合同中名称为资料表的文件,由承包商填写并随投标函提交。此文件可能包括工程量表、数据、列表、及费率和/或单价表。 1.1.1.7 "Schedules" means the document(s) entitled schedules, completed by the Contractor and submitted with the Letter of Tender, as included in the Contract. Such document may include the Bill of Quantities, data, lists, and schedules of rates and/or prices 1.1.1.8“投标文件(Tender)”指投标函和合同中规定的承包商应随投标函提交的其它所有文件。 1.1.1.8 "Tender" means the Letter of Tender and all other documents which the Contractor submitted with the Letter of Tender, as included in the Contract. 1.1.1.9“投标函附录(Appendix to Tender)”指名称为投标函附录并已填写完毕的文件,附于投标函之后并构成投标函的一部分。 1.1.1.9 "Appendix to Tender" means the completed pages entitled appendix to tender which are appended to and form part of the Letter of Tender. 1.1.1.10 “工程量表(Bill of Quantities)”和“计日工计划(Daywork Schedule)”指资料表中如此命名的文件(如有时)。 1.1.1.10 "Bill of Quantities" and "Day work Schedule" mean the documents so named (if any) which are comprised in the

新版FIDIC合同

新编FIDIC合同条件应用中的几个实践性问题 FIDIC合同条件它虽然不是法律,也不是法规,但它是全世界公认的一种国际惯例。它伴随着世纪的进程经历了从产生到发展、不断完善的过程。FIDIC合同条件第1版于1957年、第2版于1963年、第3版于1977年、1988年及1992年作了两次修改,习惯对1988年版称为第4版。1999年国际工程师联合会根据多年来在实践中取得的经验以及专家、学者的建议与意见,在继承以往四版优点的基础上进行重新编写(下称新编FIDC合同条件)。中国工程咨询协会根据菲迪克授权书进行编译、出版,机械工业出版社于2002年5月首次印刷FIDIC合同条件第1版(中、英文对照)。 新编FIDIC合同一套四本:《施工合同条件》、《生产设备和设计—施工合同条件》、《设计采购施工(EPC)/交钥匙工程合同条件》与《简明合同格式》。此外FIDIC组织为了便于雇主选择投标人、招标、评标,出版了《招标程序》,由此形成一个完整的体系。笔者结合从事FIDIC合同条件法律服务的实践,在此提出新编FIDIC合同条件在中国应(适)用中的几个实践性问题,赐教于同仁。 一、新编FIDIC合同条件的应用选择 (一)新编的FIDIC合同条件与旧版本的应用选择 新编《施工合同条件》,用于由雇主或其他代表工程师设计的建筑或工程项目。由承包商按照雇主提出的设计进行工程施工,但该工程可以包含由承包商设计的土木、机械。电气和构筑物的某些部分。《施工合同条件》由通用条件、专用条件编写指南投标函、合同协议书和争端裁决协议书格式构成。通用条件与专用条件各20条。通用条件20条共158款(款下所设的项略),另附录争端裁决协议书一般条件。通用20条款目录分别是:1、一般规定〔1.1定义,1.2解释,1.3通信交 流,1.4法律和语言,1.5文件优先次序,1.6合同协议书, 1.7权益转让,1.8文件的照管和提供,1.9延误的图纸或指示,1.10雇主使用承包商文件, 1.11承包商使用雇主文件,1.12保密事项,1.13遵守法律,1.14共同的和各自的责任〕;2、雇主

FIDIC合同英文版红皮书99版本_secretpart 04_secret

4. The Contractor 4.1 Contractor's General The Contractor shall design (to the extent specified in the Contract), execute and complete the Works in accordance with the Contract and with the Engineer's instructions, and shall remedy any defects in the Works. The Contractor shall provide the Plant and Contractor's Documents specified in the Contract, and all Contractor's Personnel, Goods, consumables and other things and services, whether of a temporary or permanent nature, required in and for this design, execution, completion and remedying of defects. The Contractor shall be responsible for the adequacy, stability and safety of all Site operations and of all methods of construction. Except to the extent specified in the Contract, the Contractor (i) shall be responsible for all Contractor's Documents, Temporary Works, and such design of each item of Plant and Materials as is required for the item to be in accordance with the Contract, and (ii) shall not otherwise be responsible for the design or specification of the Permanent Works. The Contractor shall, whenever required by the Engineer, submit details of the arrangements and methods which the Contractor proposes to adopt for the execution of the Works. No significant alteration to these arrangements and methods shall be made without this having previously been notified to the Engineer. If the Contract specifies that the Contractor shall design any part of the Permanent Works, then unless otherwise stated in the Particular Conditions: If the Contract specifies that the Contractor shall design any part of the Permanent Works, then unless otherwise stated in the Particular Conditions: (a) the Contractor shall submit to the Engineer the Contractor's Documents for this part in accordance with the procedures specified in the Contract; (b) these Contractor's Documents shall be in accordance with the Specification and Drawings, shall be written in the language for communications defined in Sub-Clause 1.4 [Law and Language], and shall include additional information required by the Engineer to add to the, Drawings for co-ordination of each Party's designs; (c) the Contractor shall be responsible for this part and it shall, when the Works are completed, be fit for such purposes for which the part is intended as are specified in the Contract; and (d) prior to the commencement of the Tests on Completion, the Contractor shall submit to the Engineer the "as-built" documents and operation and maintenance manuals in accordance with the Specification and in sufficient detail for the Employer to operate, maintain, dismantle, reassemble, adjust and repair this part of the Works. Such part shall not be considered to be completed for the purposes of taking-over under Sub-Clause 10.1 [Taking Over of the Works and

FIDIC99版红皮书--施工合同条件

FIDIC施工合同条件(1999年第一版) 用于业主设计的房屋建筑或工程通用条件

引言 国际咨询工程师联合会(FIDIC)现于1999年出版下列四份新的合同标准格式的第一版: ●施工合同条件(Conditions of Contract for Construction) 推荐用于由雇主设计的、或由其代表—工程师设计的房屋建筑或工程(building or engineering works)。在这种合同形式下,承包商一般都按照雇主提供的设计施工。但工程中的某些土木、机械、电力和/或建造工程也可能由承包商设计。 ●永久设备和设计—建造合同条件(Conditions of Contract for Plant and Design-Build) 推荐用于电力和/或机械设备的提供,以及房屋建筑或工程的设计和实施。在这种合同形式下,一般都是由承包商按照雇主的要求设计和提供设备和/或其它工程(可能包括由土木、机械、电力、和/或建造工程的任何组合形式)。 ●EPC/交钥匙项目合同条件(Conditions of Contract for EPC/Turnkey Projects) 适用于在交钥匙的基础上进行的工厂或其它类似设施的加工或能源设备的提供、或基础设施项目和其它类型的开发项目的实施,这种合同条件所适用的

项目(i)对最终价格和施工时间的确定性要求较高,(ii)承包商完全负责项目的设计和施工,雇主基本不参与工作。在交钥匙项目中,一般情况下由承包商实施所有的设计、采购和建造工作:即在“交钥匙”时,提供一个配备完整、可以运行的设施。 合同的简短格式(Short Form of Contract) 推荐用于价值相对较低的建筑或工程。根据工程的类型和具体条件的不同,此格式也适用于价值较高的工程,特别是较简单的、或重复性的、或工期短的工程。在这种合同形式下,一般都是由承包商按照雇主或其代表—工程师提供的设计实施工程,但对于部分或完全由承包商设计的土木、机械、电力、和/或建造工程的合同也同样适用。 建议在国际范围内招标时使用上述格式作为合同基础。在某些国家和地区,特别是当合同条件用于其国内合同时,可能需要对这些格式进行一些改动。FIDIC是按照以英语为官方语言的情况编写的。 在编写本施工合同条件的过程中我们认识到,有许多条款是普遍适用的,但也有一些条款必须根据特定合同的具体情况予以变动。因此,我们将那些对大多数(并非全部)合同都适用的条款编入了通用条件中,以方便使用者将其纳入合同文件。 通用条件和专用条件共同构成了制约合同各方权力和义务的条件。对于每一份具体的合同,都必须编制专用条件,并且必须考虑到通用条件中提到的专用条件中的条款。

fidic施工合同条件中英文

fidic施工合同条件中英文 篇一:FIDIC土木工程施工合同条件(红皮书)_中英文 通用条件 General Conditions 1 一般规定 1. General Provisions 定义 Definitions 在包括专用条件和本通用条件的合同条件(“本合同条件”)中,以下措辞和用语的含义如下所述。除非上下文中另有要求,指当事人和当事各方的词包括公司和其它法律实体。 In the Conditions of Contract ("these Conditions"), which include Particular Conditions and these General Conditions, the following words and expressions shall have the meanings stated. Words indicating persons or parties include corporations and other legal entities, except where the context requires otherwise. 合同 The Contract “合同(Contract)”指合同协议书、中标函、投标函、本合同条件、规范、图纸、资料表、以及在合同协议书或中

标函中列明的其它进一步的文件(如有时)。 "Contract" means the Contract Agreement, the Letter of Acceptance, the Letter of Tender, these Conditions, the Specification, the Drawings, the Schedules, and the further documents (if any) which are listed in the Contract Agreement or in the Letter of Acceptance. “合同协议书(Contract Agreement)”指第款【合同协议】中所说明的合同协议(如有时)。 "Contract Agreement" means the contract agreement (if any) referred to in Sub-Clause [Contract Agreement]. “中标函(Letter of Acceptance)”指雇主对投标文件签署的正式接受函,包括其后所附的备忘录(由合同各方达成并签定的协议构成)。在没有此中标函的情况下,“中标函”一词就指合同协议书,颁发或接收中标函的日期就指双方签订合同协议书的日期。 "Letter of Acceptance" means the letter of formal acceptance, signed by the Employer, of the Letter of Tender, including any annexed memoranda comprising agreements between and signed by both Parties. If there is no such letter of acceptance, the expression "Letter

【精品】FIDIC全套完整合同条款条例1999(中英文对照)

FIDIC合同条款 (正规无改) 编 辑 前 可 删 除 此 页 合同特点:内容正规详尽(花费了太多时间) 收取一点点费用请不要介意

FIDIC合同条款1999(中英文对照) Fédération Internationale Des Ingénieurs-Conseils 通用条款 General Conditions 1.一般规定 1.1 定义 在包括专用条件和本通用条件的合同条件(“本合同条件”)中,以下措辞和用语的含义如下所述。除非上下文中另有要求,指当事人和当事各方的词包括公司和其它法律实体。 1.1.1 合同 1.1.1.1“合同(Contract)”指合同协议书、中标函、投标函、本合同条件、规范、图纸、资料表、以及在合同协议书或中标函中列明的其它进一步的文件(如有时)。 1.1.1.2“合同协议书(Contract Agreement)”指第1.6款【合同协议】中所说明的合同协议(如有时)。 1.1.1.3“中标函(Letter of Acceptance)”指雇主对投标文件签署的正式接受函,包括其后所附的备忘录(由合同各方达成并签定的协议构成)。在没有此中标函的情况下,“中标函”一词就指合同协议书,颁发或接收中标函的日期就指双方签订合同协议书的日期。 1.1.1.4“投标函(Letter of Tender)”指名称为投标函的文件,由承包商填写,包括已签字的对雇主的工程报价。 1.1.1.5“规范(Specification)”指合同中名称为规范的文件,及根据合同规定对规范的增加和修改。此文件具体描述了工程。 1.1.1.6“图纸(Drawings)”指合同中规定的工程图纸,及由雇主(或代表)根据合同颁发的对图纸的增加和修改。 1.1.1.7“资料表(Schedules)”指合同中名称为资料表的文件,由承包商填写并随投标函提交。此文件可能包括工程量表、数据、列表、及费率和/或单价表。1.1.1.8“投标文件(Tender)”指投标函和合同中规定的承包商应随投标函提交的其它所有文件。 1.1.1.9“投标函附录(Appendix to Tender)”指名称为投标函附录并已填写完毕的文件,附于投标函之后并构成投标函的一部分。 1.1.1.10 “工程量表(Bill of Quantities)”和“计日工计划(Daywork Schedule)”指资料表中如此命名的文件(如有时)。 1.1.2 当事各方和当事人 1.1. 2.1“一方(Party)”指雇主或承包商(根据上下文而定)。