非常实用的英文版作业指导书

非常实用的英文版作业指导书
非常实用的英文版作业指导书

公司名称:` 1. CHECK AMOUNT OF NEJILOCK ON SKEW SCREW.IT SHOULD BE MINIMUM OF HALF FULL

(180 DEGREES) OF SKEW SCREW

1. Get Drive from the conveyor and place it to the Deck Platform.

2. CHECK FOR THE FOLLOWING MAIN PCB ITEM. A. MAIN PCB OPTION PIN SETTING (FOR PATA) B. LABEL BARCODE ON MAIN PCB. IT SHOULD BE SAME WITH RUNNING MODEL 2. Get.Main PCB from Danpla.Start from lower horizontal to upper

C. DETACHED/ MISSING CONDENSER.. slot of Danpla.Visual Inspect for possible defets.

D. MAIN PCB CONNECTOR FOR POSSIBLE DAMAG

E.

3. CHECK FOR PICK UP FFC PIN CONDITION. IT SHOULD BE NO BENT,DENT ,OFFSET PIN AND MUST BE

FULLY INSERTED IN CONNECTOR..3. Insert Pick-Up FFC to MPCB Connector. Make sure that FFC

is fully inserted.

Avoid leaning of hand on the step motor during FFC insertion

that could damage the leadscrew run out

4. CHECK FOR PICK UP FFC. IT SHOULD BE FULLY INSERTED AND LOCKED IN THE CONNECTOR..

5. CHECK PICK UP FFC. IT SHOULD NOT TOUCHING ANY PICK UP PART.

4. Lock the connector of MPCB. Make sure connector reached

its locking point.Then Pass to the next process.

6OS-15C-340(08.03.04)REV:1

1

SSS

All H/H Lines WORKING PROCEDURE CHECK POINTS

INPUT PARTS

TOOLS AND EQUIPMENTS REVISION HISTORY PROCESS

NO

PROCESS NAME MAIN PCB LOADING & FFC INSERTION 09MODEL

ALL MODELS LINE 20-Sep Change Picture,Add process check poiints XXX 221-Dec Improvement of FFC insertion method EARTH RING / WRISTSTRAP 3026-Jan ESTABLISH NEW WORK I FOR H-H SHORTLINE AAA 2

MAIN PCB 1 PC 2REV NO.DATE REASON PIC 1

DECK ASSEMBLY 1 SET 1HAND GLOVES NO.

DESCRIPTION QTY CODE https://www.360docs.net/doc/ee12754709.html, CONTROL / SPECS DRAFTER REVISION 2DATE

21-Dec CHECK APPROVE APPROVE CONTROL DOCUMENT STANDARD NO.EBRY-1426E STEP 01

STEP 02 STEP 03 STEP 04

GOOD

GOOD

NO GOOD GOOD FULLY-LOCKED HALF LOCKED

GOOD NO GOOD GOOD NO GOOD

DAMAGE PIN

相关文档
最新文档