PSPC标准英文
IMO规范中英文关于特涂PSPC.doc

IMO PERFORMANCE STANDARD FOR PROTECTIVE COATING FOR DEDICATED SEA WATER BALLAST TANKS IN ALL TYPES OF SHIPS AND DOUBLE-SIDE SKIN SPACES OF BULK CARRIERS (IMO PSPC)国际海洋组织(IMO)关于所有类型船舶专用海水压载舱和散货船双舷侧处所的保护涂层性能标准(PSPC)(以下简称《涂层性能标准》)IMO PSPC: SCOPE涂层性能标准:适用范围Dedicated sea water ballast tanks in all types of ships of not less than 500 gross tones 不小于500总吨的所有类型船舶专用海水压载舱Double-side skin spaces of bulk carriers of 150 meters in length and upwards 船长不小于150m的散货船双舷侧处所Unclear as to whether FPSOS fall within the standard (Lloyds Register view is probably not) 浮动生产、储油和卸油装置(FPSOS)是否符合标准还不太清楚(英国劳氏船级社认为可能尚不符合)Adoption for Military ships unlikely to be mandatory (USA Navies No, UK MOD Yes) 军用船舶不太可能强制实施该标准(美国海军部不同意,而英国国防部同意)Work on similar standards underway for:类似的标准同样适用于:-Void spaces空舱-Cargo tanks of crude oil and product carriers货船与油轮Targets “useful coating life” of 15 years (Meeting IACS criteria for “good condition):涂层目标使用寿命15年(涂层系统维持“良好”状态的持续时间符合国际船级社协会(IACS)Note: Percentages are of the area under consideration or of the “critical structural area”注意:请考虑面积的百分比率或特定结构面积的百分比率IMO PSPC: CURRENT STATUS涂层性能标准:当前状况Will be adopted at 82nd session of the Maritime Safety Committee (MSC 82) in December 2006 (It is almost certain that no further changes/modifications will be made prior to its introduction)2006年12月海事安全委员会(MSC)第82会议正式通过了《涂层性能标准》(几乎可以肯定的是在该标准出台之前是不会再有任何的变化与修改)Will appear in SOLAS under:《涂层性能标准》部分条款将会出现在《海上人命安全公约》(SOLAS)之中-Chapter II-1: construction –structure, sub diversion and stability, machinery and electrical installations第Ⅱ-Ⅰ章:构造——分舱与稳性、机电设备-Part A-1: structure of shipsA-1部分:船舶结构-Regulation 3-2: “corrosion prevention of dedicated sea water ballast tanks in all types of ships and double-side skin spaces of bulk carri ers”3-2条:所有类型船舶专用海水压载舱和散货船双舷侧处所的防腐蚀IMO PSPC: IMPLEMENTATION DATE涂层性能标准:实施时间New buildings for which building contract is placed on or after 1st July 2008 2008年7月1日及以后签订建造合同的In the absence of a contract the keels of which are laid or which are at a similar stage of construction on or after 1st January 2009无建造合同,则为2009年1月1日以后安放龙骨或处于类似建造阶段的The delivery of which is on or after 1st July 2010在2012年7月1日以后交船的船舶BUT:然而:The International Association of Classification Societies (IACS) have indicated their intention to adopt the standard under their common structural rules (CSR) in January ’07 (CSR only applies to oil tankers and bulk carriers)国际船级社协会(IACS)计划在2007年1月正式通过其《共同结构规范》(CSR),《共同结构规范》仅仅适用于油轮或散装货轮IMO PSPC: SPECIFICATION ISSUES涂层性能标准:规格说明Spec will be 320µ NDFT (nominal dry film thickness) applied in a minimum of 2 coats 名义总干膜厚度(NDFT)320um(至少两度)“90/10” rule will be applied90/10规则Maximum allowable film thickness according to paint manufacturers detailed specification 总干膜厚度最大值依据涂料生产商的详细规范2 stripe coats although the second may be omitted from welded seams only where it can beproven that the NDFT can be met in one焊缝上一度预涂之后,其总干膜厚度足够时,第二度预涂可以省掉Stripe coat must be applied by brush or roller. Roller to be used for scallops, rat holes etc only 必须使用刷子或滚筒进行预涂,滚筒只适用于扇形孔、鼠洞等地方IMO PSPC: SURFACE PREPARATION REQUIREMENTS涂层性能标准:表面处理要求Primary surface preparation (prior to shop primer application)初次表面处理(预涂底漆之前)-Sa2½Sa2.5级-30-75µ surface profile表面处理后的粗糙度均为30-75um-Residual salt levels ≤ 50 mg/m² sodium chloride (ISO 8502-9)水溶性盐含量(相当于氯化钠)≤50mg/m(ISO 8502-9)Steel work preparation to ISO 8501-3 grade P2钢结构处理到ISO 8501-3的P2级-Edges rounded to 2mm radius or subjected to 3 pass grinding边缘的处理要达到半径2mm的圆角或经过三次打磨Secondary surface preparation二次表面处理-Sa2½ on damaged shop primer and welds被破坏的车间底漆和焊缝处达到Sa2.5级-Sa2, removing at least 70% of intact shop primer where the latter has not passed a pre-qualification test如车间底漆未通过涂层合格证明预试验,完整底漆至少要去除70%,达到Sa2级Dust rating灰尘-ISO 8502-3 Density 1 for size class 3, 4 and 5 (0.5mm>)颗粒大小为“3”、“4”或“5”的灰尘分布量为1级,参考标准:ISO 8502-3 -Smaller sizes removed if visible without magnification on the surface to be coated 如不用放大镜,在待涂表面可见的更小颗粒的灰尘应去除Surface preparation after erection合拢后的表面处理-Butt welds St3 or better or Sa2½ where practicable对大接缝为St3,或更好,或可行时为Sa2.5-Small damages up to 2% of total area St3小面积破坏区域不大于总面积的2%时为St3-Contiguous damages over 25m², or over 2% of the total area of the tank, Sa2½ should be applied相邻接的破坏区域的总面积超过25 m2或超过舱室总面积2%, 应为Sa2.5 -Surface profile, residual salt levels and dust rating as at primary and secondary surface preparation stages一、二次表面处理阶段中的表面粗糙度、水溶性盐含量和灰尘IMO PSPC: TECHNICAL SERVICE REQUIREMENTS涂层性能标准:技术服务要求Inspections shall be carried out by “qualified coating inspectors certified to NACE level II, FROSIO level Red or equivalent as verified by the Administration or the recognized organization”涂层检验需由具有NACE II级涂层检验员资格, FROSIO III级检验员资格或主管机关承认的等效资格的涂层检验员检验IMO PSPC: INSPECTION REQUIREMENTS涂层性能标准:检验要求Primary surface preparation (prior to shop primer application)初次表面处理(预涂底漆之前)-Measure and record steel temp, RH, dew point prior to blasting and “at times of sudden cha nges in weather”在喷砂和“天气变化”之前,应测量钢板表面温度、相对湿度和露点,并记录-Check plate surface for soluble salt, oil, grease and other contaminants检查钢板表面,去除溶性盐、油、脂和其它污物-Monitor cleanliness清洁度监控Shop primer thickness车间底漆厚度-If shop primer is compatible with the main coating system, and certified as such, thickness and curing of the zinc silicate must be confirmed to conform with the specified values如果车间底漆与主涂层兼容并得到鉴定认可,那么其硅酸锌车间底漆可和其他的涂层组合使用Block Assembly分段组装-Visual inspection of steel surface treatment, including edge treatment after construction of the block and prior to commencement of secondary surface preparation分段建造完工之后、二次表面处理之前可对钢材表面处理结果进行检验,包括边角的处理-Ensure free from oil, grease or other visual contamination确保除掉油脂或其它可见污物-Visual inspection after blasting/grinding/cleaning喷砂、打磨、清洁之后的检验-Check residual salt levels in at least one location per block prior to application of the first coat of the system第一度油漆之前,每个分段至少检查一处的水溶盐含量-Monitor and record surface temp, RH, dew point during coating application and curing 在喷砂涂层涂装和固化阶段,应监控钢板表面温度、相对湿度和露点,并记录-Check DFT after each coat of paint检查每层涂层的干膜厚度Erection分段合拢-Similar procedure as in block assembly和分段组装的程序一样IMO PSPC: DRY FILM THICKNESS MEASUREMENTS 涂装性能标准:干膜厚度测量IMO PSPC: RESPONSIBILITIES涂装性能标准:责任Inspection of surface preparation and coating processes shall be agreed upon between the ship owner, the shipyard and the coating manufacturer and presented to the Administration or its recognized organization for review. Clear evidence of these inspections shall be reported and be included in the Coating Technical File.表面处理和涂装程序的检验需在船东、船厂和涂料生产商之间达成一致,并提交给主管机关复验。
PSPC是IMO关于新建船舶压载舱防护涂层性能标准

PSPC是IMO关于新建船舶压载舱防护涂层性能标准。
该标准包括涂料、涂层性能标准及造船涂装全过程质量控制要求两部分,要求海水压载舱防护涂层具有预期15年使用寿命,从防护涂层膜厚、涂装施工质量控制、防护涂层性能基本要求、涂层质量评定验收、涂层资格认可试验方法、设备等各环节进行全面控制。
该标准适用于2008年7月1日后签订建造合同、2009年1月1日开始建造及2012年交付使用的所有500吨以上船舶。
目前船舶压载舱涂层主要采用环氧类硬涂层涂装。
根据国外船舶涂料实验室的检测结果,厚膜环氧硬质涂层有良好的附着力和耐模拟摇摆试验舱加速试验性,PSCP将环氧压载舱涂料作为涂料类型加以规定。
相比我国标准,PSPC增加了冷凝试验、耐阴极保护性{HotT ag}、涂层柔韧性要求,且在涂层比重、附着力、与底漆配套等项目上作了更加细致的要求,尤其是耐盐雾、耐盐水、冷凝试验均要通过180天模拟舱试验严格检测。
将环氧压载舱涂料作为涂料类型加以规定,PSPC强制执行将对我国船舶制造成本、制造周期、资源消耗等带来重大影响,且涉及船舶业多方利益,船舶涂料供应商将承担更多责任和保证。
中国环氧树脂行业协会专家介绍表示,压载舱防护涂料在今后开发中,应首先满足附着力和耐模拟摇摆舱腐蚀试验要求,涂层应为硬干、致密状态。
针对PSPC对预处理钢板表面可溶性盐含量较严格的要求,准备压载舱涂料在不同表面盐含量时涂层抗起泡力的技术数据;目前环氧型压载舱涂层质地坚硬但脆性较大,应开发既符合附着力和耐腐蚀加速试验要求又具有一定耐冲击性的涂层。
据中国环氧树脂行业协会专家了解,一些船舶事故是由于压载舱腐蚀导致船体强度下降而造成,压载舱防护涂层是影响船舶安全运营的重要因素。
船舶压载舱保护涂料最大的威胁是在水下开裂,而这种开裂只有一种可能就是海水腐蚀,因此对压载舱进行防腐蚀涂装是非常重要的措施。
免受腐蚀困挠的压载舱能够保证船舶在海上安全行驶,延长船舶的使用寿命。
品质系统常见英文缩写简介

品质系统常见英文缩写简介1.QC : quality control 品质管制2. IQC : incoming quality control 进料品质管制3. OQC: output quality control 出货品质管制4. AQL: acceptable quality level 允收标准5.PQC: process quality control 制程品质管制也称IPQC : in process quality control .6.CQA: customer quality assurance 客户品质保证7. MI: minor defeat 次要缺点8.MA : major defeat 主要缺点9. CR: critical defeat 关键缺点10. SMT: surface mounting technology 表面粘贴技术16. BOM: bill of material 材料清单11. SMD: surface mounting device 表面粘贴设备SMC: surface mounting component 表面粘贴元件12. ECN: engineering change notice 工程变更通知13. DCN: design change notice 设计变更通知14. PCB: printed circuit board 印刷电路板15. PCBA: printed circuit board assembly装配印刷电路板17. BIOS: basically input and output system 基本输入输出系统18. MIL-STD-105E: 美国陆军标准, 也称单次抽样计划.19. ISO: international standard organization 国际标准化组织22 . Icicles : 锡尖20. DRAM: 内存条21. Polarity : 电性23 . Non-wetting : 空焊24. Short circuit: 短路25. Missing component : 缺件26 . Wrong component : 错件27. Excess component: 多件28. Insufficient solder : 锡少29. Excessive solder: 锡多30. Solder residue: 锡渣31. Solder ball: 锡球32. Tombstone : 墓碑33 . Sideward : 侧立34. Component damage: 零件破损35. Gold finger : 金手指36. SOP: standard operation process 标准操作流程37. SIP : standard inspection process 标准检验流程38. The good and not good segregation: 良品和不良品区分39. OBW: on board writer 熸录BIOS40. Simple random sampling: 简单随机抽样41. Histogram: 直方图42. Standard deviation : 标准差43. CIP: Continuous improvement program 44. SPC: Statistical process control 45. Sub-contractors: 分包商46. SQE: Supplier quality engineering 47. Sampling sample: 抽样计划48. Loader: 治具49. QTS: Quality tracking system 品质追查系统50. Debug: 调试51. Spare parts :备用品52 . Inventory report for : 库存表53. Manpower/Tact estimation 工时预算54. Calibration : 校验55. S/N: serial number 序号56. Corrugated pad: 波纹垫57. Takeout tray : 内包装盒58 . Outer box : 外包装箱59 . Vericode : 检验码60 . Sum of square : 平方和61 . Range : 全距62. Conductive bag: 保护袋63. Preventive maintenance :预防性维护64 . Base unit : 基体65. Fixture: 制具66. Probe: 探针67. Host probe : 主探针68 . Golden card : 样本卡69. Diagnostics program: 诊断程序70. Frame : 屏面71 . Lint-free gloves : 静电手套72 .Wrist wrap : 静电手环73 . Target value : 目标值74. Related department : 相关部门75. Lifted solder 浮焊76.plug hole孔塞77. Wrong direction 极性反ponent damage or broken 零件破损79.Unmeleted solder熔锡不良80.flux residue松香未拭81.wrong label or upside down label贴反82.mixed parts机种混装83. Poor solder mask绿漆不良84. oxidize 零件氧化85.stand off height浮高86. IC reverse IC反向87.supervisor课长88. Forman组长89. WI=work instruction作业指导非擦除状态91. Internal notification:内部联络单92. QP: Quality policy品质政策93.QT: Quality target 品质目标94. Trend:推移图95.Pareto:柏拉图96. UCL: Upper control limit管制上限97.LCL:Lower control limit管制下限98. CL: Center line中心线Rolled throughout yield直通率100. PPM: Parts per million 不良率101.DPU: Defects per unit 单位不良率102.Resistor: 电阻103.Capacitor:电容104. Resistor array : 排阻105. Capacitor array: 排容106. DIODE: 二极管107.SOT: 三极管108. Crystal: 震荡器109. Fuse:保险丝110.Bead: 电感111.Connector:联结器112.ADM: Administration Department行政单位113. CE: Component Engineering零件工程114. CSD: Customer Service Department客户服务部115. ID: Industrial Design工业设计116.IE: Industrial Engineering工业工程117. IR: Industrial Relationship工业关系118. ME: Mechanical Engineering机构工程119. MIS :Management Information System资讯部120. MM: Material Management资材121. PCC: Project Coordination/Control专案协调控制122. PD: Production Department生产部123. PE: Product Engineering产品工程124. PM: Product Manager产品经理125. PMC: Production Material Control生产物料管理126. PSC: Project Support & Control产品协调127.Magnesium Alloy:镁合金128. Metal Shearing: 裁剪129.CEM: Contract Electronics Manufacturing 又称电子制造服务企业EMS: Electronics Manufacturing Services130. ERP: Enterprise Resource Planning 企业资源规划SCM+CRM+ERP+EAI=Network direct TM links procurement, production, Logistics and sales采购, 生产, 后勤管理及市场行销的融合EAI: Enterprise application Integrations 企业应用系统整合CRM: Customer Relationship Planning 客户服务规划SCM : Supply chain management 供应链管理131. OJT: On job training 在职培训132.Access Time: 光碟搜寻时间133. B2CEC: Business to consumer electronic commerce 企业对消费者的电子商务B2BEC:Business to business electronic Commerce 企业间的电子商务L:Copper Clad Laminate 铜箔基板135. Intranet: 企业内部通讯网路136. ISP: Internet Service Provider网络服务提供者ICP: Internet Content Provider网络内容提供者137. GSM: Global System for Mobile Communication 泛欧数位式行动电话系统GPS: 全球卫星定位系统138. Home Page: 网路首页139.Video Clip: 影像档140.HTML: 超文标记语言141.Domainname: 网域名称142.IP: 网络网域通讯协定地址143.Notebook:笔记型电脑144.VR:Virtual Reality虚拟实境145.WAP:Wireless Application Protocol 无线应用软体协定146. LAN: Local area network区域网路WWW: World Wide Web世域网WAN: Wide Area Network 广域网路147.3C: Computer, Communication , Consumer electronic 电脑, 通讯, 消费性电子三大产品的整合rmation Supplier Highway:信息高速公路149.UPS:Uninterrupted power system不断电系统150.Processed material: 流程性材料151.Entity/Item:实体152.Quality loop:质量环153.Quality losses: 质量损失154.Corrective action:纠正措施155. Preventive action: 预防措施156.PDCA: Plan/Do/Check/Action计划/实施/检查/处理157. Integrated circuits(IC):集成电路158.Application program:应用程序159.Utilities:实用程序160.Auxiliary storage/Second storage:;辅助存储器161.Silicon chip:硅片162Diskette drive:软驱163.Display screen/Monitor:显示器164.Foreground:前面165.Montherboard:母板166.Mermory board:内存板167.Slot:插槽168.Bus:Data-bus/address-bus/Control bus:总线/数据总线/地址总线/控制总线169.Plotter:绘图170.MPC:Multimedia personal computer多媒体171.Oscillator:振荡器172.Automatic teller terminal:自动终端(出纳)机173.Joystick port:控制端口174.VGA: Video Graphics Array显示卡175.Resolution:分辨率176.Register:寄存器177.ISA: Industry Standard Architecture:工业标准结构178.EISA:Extended Industry Architecture 179.Adapter: 适配器180.Peripheral:外部设备181.Faxmodem:调制解调器181.NIC:Network interface card网络接口卡182.SCSI: Small computer system interface 183.VESA: Video Electronic Standards Association184.SIMM:Single in-line memory module单排座存储器模块(内存条)185.Casing:外箱186.Aluminum:铝质187.Ceramic: 陶瓷的188.Platter:圆盘片189.Actuator:调节器190.Spindle:轴心191.Actuation arm: 存取臂192.Default code: 缺省代码193.Auxiliary port:辅助端口194. Carriage return: 回车195.Linefeed: 换行196.ASCII: American Standard Code for Information Interchange197.Video analog: 视频模拟198.TTL:Transistor- Transistor logic晶体管-晶体管逻辑电路199.Three-prong plug:三芯电插头200.Female connector:连接插座。
PSPC介绍(船厂在用)

PSPC产生背景和制定过程
DE48决定成立涂层性能标准通信组-2004年12月
通信组由中国作为牵头国,由DE副主席、CCS海事处处长向阳任协调人。加入 通信组工作的有8个国家、7个组织:中国、日本、韩国、挪威、利比里亚、 希腊、英国、美国、BIMCO、IACS、ICS、INTERCARGO、INTERTANKO、OCIMF、 CESA.
适用范围、实施时间和基本目标 定义
• “良好”状况
系指A.744 (18) 决议定义的有少量点锈的状况; IACS(共同结构规范): 仅有小的点状锈斑,其分布少于所计 及面积的3%,且无可见的涂层破坏。边缘或焊缝处的锈蚀,其 分布须小于所计及面积内的边缘或焊缝的20%。
• 目标使用寿命
为涂层系统设计寿命的目标值,以年计;
检验协议和涂层技术文件
涂层技术文件(CTF) 主要内容(PSPC/3.4.1): 涂层体系的技术条件、 船厂和船东的涂装工作记录、 涂层系统选择的详细标准、 工作说明书、 检查、维护和修补报告(含营运期内涂层系统的 保养和修补程序) 均应形成文件记入“涂层技术文件”,涂层技 术文件应由主管机关审查。
具有NACE II级检验员资格或FROSIOIII级检验员资格, 或等效资格
涂层检验要求
检验项目
一次表面处理阶段 测量钢板表面温度、相对湿度和露点; 测量钢板表面的可溶性盐分,油、油脂和其他污染物 检查钢板表面的清洁度; 确认车间底漆的材料满足表1中2.3的要求; 测量车间底漆厚度 分段组装阶段 检查边缘的处理, 油、油脂或其他污染物。 检查二次除锈等级。检查钢板表面残留可溶性盐水平,每个分段 至少一点。 监控钢板表面温度、相对湿度和露点 检查涂装过程步骤。 测量DFT 合拢阶段 检查边缘的处理、除锈等级 测量钢板表面温度、相对湿度和露点 检查涂装过程步骤
船舶压载舱涂层破损面积的评估与计算方法中英

合拢接缝涂层破损 butt coating damages 分段间合拢或预合拢时,在合拢接缝的两侧(含反面)由于电焊、火工或装配所引起的涂层破损。
Coating damages of double-side butts after pre-erection or erection, caused by weld, fire, or fabrication.
calculated.
Reserved Wet(or seam) 合拢对接缝
100
200 200
200
Temporary Fitting 临时装配码
图1 合拢接缝涂层破损的面积范围示意图 Figure 1 Figure of butts coating damages
ISO 4628-3:2003 色漆和清漆 涂层老化的评定 表面缺陷数量和大小以及均衡变化程度的评定 第3部分:锈蚀等级的评定
ISO 4628-3:2003 Paints and varnishes—Evaluation of degradation of paint coatings--- Designation of intensity, quantity and size of common types of defect---Part 3: Designation of degree of rusting 3 术语和定义
附录A 涂层破损面积百分比估算对照图片
Annex A
Examples of percentage of coating damages area 涂层破损面积百分比估算对照图片见图A.1~图A.4。 Estimate percentage of coating damages area using the visual examples in Fig.A.1, Fig.A.2, Fig.A.3 and Fig.A.4.
IMO_PSPC介绍(注释)

•
•
IMO PSPC仅适用于钢质船。
For internal use only – not to be circulated outside AkzoNobel
Marine & Protective Coatings
MSC.216(82) 决议 –生效时间
该组织宗旨为促进各国间的航运技术合作,鼓励各国在促进海上 安全,提高船舶航行效率,防止和控制船舶对海洋污染方面采取统 一的标准,处理有关的法律问题。 相关术语
For internal use only – not to be circulated outside AkzoNobel
Marine & Protective Coatings
MSC.216(82) 决议
2006年12月8日通过 国际海上人命安全公约(SOLAS)修正案 SOLAS 公约第II-1/3-2条修订为 所有类型船舶专用海水压载舱和散货船双舷侧处所的保护涂层 …… 1.1 1.2 1.3 …… 2 …… …在建造时,必须按照MSC.215决议中的PSPC要求执行… 该船于2008年7月1日或以后签定建造合同;或 无建造合同,在2009年1月1日或以后安放龙骨或处于类似建造阶段;或 于2012年7月1日或以后交船。
For internal use only – not to be circulated outside AkzoNobel
Marine & Protective Coatings
IMO的简介
国际海事组织 (International Maritime Organization -- IMO) 是 联合国负责海上航行安全和防止船舶造成海洋污染的一个专门 机构,总部设在伦敦。该组织最早成立于1959年1月6日, 原名“政府间海事协商组织”,1982年5月改为现名,现有 163个正式成员(2003年11月)。
pspc标准的由来

pspc标准的由来PSPC标准的由来。
PSPC标准,全称为Personal Software Process for Engineers,是一种由卡内基梅隆大学软件工程研究所开发的软件过程改进方法。
它旨在帮助软件工程师提高其个人和团队的工作效率和质量,从而提高软件产品的质量。
那么,PSPC标准的由来是怎样的呢?首先,PSPC标准的由来可以追溯到20世纪80年代初。
当时,软件工程领域的专家们开始意识到,传统的软件开发方法存在着许多问题,比如项目延期、成本超支、质量不稳定等。
为了解决这些问题,他们开始寻求一种更加科学、系统的软件开发方法。
于是,PSPC标准便应运而生。
其次,PSPC标准的由来还与个人软件过程(PSP)有着密切的关系。
个人软件过程是卡内基梅隆大学软件工程研究所在20世纪90年代初提出的一种软件过程改进方法,旨在帮助软件工程师提高其个人的软件开发能力。
PSPC标准正是在PSP的基础上发展而来的,它不仅包含了PSP的核心理念,还增加了团队合作、项目管理等方面的内容,从而使其更加全面、实用。
此外,PSPC标准的由来还与软件工程领域的发展趋势有关。
随着软件工程领域的不断发展,人们对软件质量和效率的要求也越来越高。
在这样的背景下,PSPC标准应运而生,它为软件工程师提供了一种科学、系统的软件开发方法,使他们能够更加高效、高质量地完成工作。
总的来说,PSPC标准的由来是多方面的,既与软件工程领域的发展趋势有关,也与个人软件过程等先进理念的借鉴和发展有关。
它的出现填补了传统软件开发方法的不足,为软件工程师提供了一种更加科学、系统的软件开发方法,使他们能够更加高效、高质量地完成工作。
可以说,PSPC标准的由来是对软件工程领域的一次重要创新和突破,对软件工程师的工作效率和质量起到了积极的促进作用。
常见质量管理术语英文缩写

【常见质量管理术语英文缩写】1、PDCA:Plan、Do、Check、Action;策划、实施、检查、处置2、PPAP:Production Part Approval Process;生产件批准程序3、APQP:Advanced Product Quality Planning;产品质量先期策划4、FMEA:Potential Failure Mode and Effects Analysis 潜在失效模式及后果分析5、SPC:Statistical Process Control 统计过程控制6、MSA:Measurement System Analysis 测量系统控制7、CP:Control Plan 控制计划8、QSA:Quality System Assessment 质量体系评定9、PPM:Parts Per Million 每百万零件不合格数10、QM:Quality Manua 质量手册11、QP:Quality Procedure 质量程序文件Quality Planning 质量策划Quality Plan 质量计划12、CMK:机器能力指数13、CPK:过程能力指数14、CAD:Computer—Aided Design 计算机辅助能力设计15、OEE:Overall Equipment Effectiveness 设备总效率16、QFD:Quality Function Deployment 质量功能展开17、FIFO:First in, First out 先进先出18、COPS:Customer Oriented Processes 顾客导向过程19、TCQ: Time、Cost、Quality 时间、成本、质量20、MPS:Management Processes 管理性过程21、SPS:Support Processes 支持性过程22、TQM:Total Quality Management 全面质量管理23、PQA:Product Quality Assurance 产品质量保证(免检)24、QP—QC-QI:质量三步曲质量计划-质量控制-质量改进25、QAF:Quality Assurance File 质量保证文件26、QAP:Quality Assurance Plan 质量保证计划27、PFC:Process Flow Chart 过程流程图28、QMS:Quality Management Systems 质量管理体系29、JIT:Just In Time 准时(交货)30、ERP:Enterprise Requirement Planning 企业需求计划31、QC:Quality Control 质量控制32、QA:Quality Audit 质量审核Quality Assurance 质量保证33、IQC:In come Quality Control 进货质量控制34、IPQC:In Process Quality Control 过程质量控制35、FQC:Final Quality Control 成品质量控制36、OQC:Out Quality Control 出货质量控制37、4M1E:Man、Machine、Material、Method、Environment 人、机、料、法、环38、5W1H:Why、What、Who、When、Where、How 为何/做什么/谁做/时间/地点/如何做39、6S:Seiri、Seiton、Seiso、Seiketsu、Shitsuke、Safety 整理、整顿、清扫、清洁、素养、安全40、TRI值:Total Record Injury (三种)可记录工伤值41、SMART精明原则:Specific Measurable Achievable ResultOriented Timed具体的描述、可以测量的、可以通过努力实现的、有结果导向性的、有时间性的【企业常用英文缩写】42、5S : 5S管理43、ABC :作业制成本制度(Activity-Based Costing)44、ABB :实施作业制预算制度(Activity—Based Budgeting)45、ABM : 作业制成本管理 (Activity—Base Management)46、APS : 先进规画与排程系统(Advanced Planning and Scheduling)47、ASP : 应用程序服务供货商(Application Service Provider)48、ATP :可承诺量(Available To Promise)49、AVL : 认可的供货商清单(Approved Vendor List)49、BOM : 物料清单(Bill Of Material)50、BPR :企业流程再造(Business Process Reengineering)51、BSC : 平衡记分卡 (Balanced ScoreCard)52、BTF : 计划生产 (Build To Forecast)53、BTO : 订单生产(Build To Order)54、CPM :要径法 (Critical Path Method)55、CPM :每一百万个使用者会有几次抱怨(Complaint per Million)56、CRM : 客户关系管理(Customer Relationship Management)57、CRP : 产能需求规划 (Capacity Requirements Planning)58、CTO :客制化生产(Configuration To Order)59、DBR :限制驱导式排程法(Drum-Buffer-Rope)60、DMT :成熟度验证(Design Maturing Testing)61、DVT : 设计验证(Design Verification Testing)62、DRP : 运销资源计划(Distribution Resource Planning)63、DSS :决策支持系统 (Decision Support System)64、EC :设计变更/工程变更(Engineer Change)65、EC : 电子商务(Electronic Commerce)66、ECRN : 原件规格更改通知(Engineer Change Request Notice)67、EDI :电子数据交换(Electronic Data Interchange)68、EIS : 主管决策系统(Executive Information System)69、EMC : 电磁相容(Electric Magnetic Capability)70、EOQ :基本经济订购量(Economic Order Quantity)71、ERP :企业资源规划 (Enterprise Resource Planning)72、FAE : 应用工程师(Field Application Engineer)73、FCST : 预估(Forecast)74、FMS :弹性制造系统(Flexible Manufacture System)75、FQC :成品质量管理 (Finish or Final Quality Control)76、IPQC: 制程质量管理(In-Process Quality Control)77、IQC : 进料质量管理(Incoming Quality Control)78、ISO : 国际标准组织 (International Organization for Standardization)79、ISAR:首批样品认可(Initial Sample Approval Request)80、JIT : 实时管理 (Just In Time)81、KM:知识管理 (Knowledge Management)82、 L4L :逐批订购法(Lot—for-Lot)83、LTC : 最小总成本法 (Least Total Cost)84、LUC :最小单位成本(Least Unit Cost)85、MES : 制造执行系统(Manufacturing Execution System)86、MO :制令(Manufacture Order)87、MPS :主生产排程(Master Production Schedule)88、MRO : 请修(购)单(Maintenance Repair Operation)89、MRP :物料需求规划 (Material Requirement Planning)90、MRPII : 制造资源计划(Manufacturing Resource Planning)91、NFCF : 更改预估量的通知Notice for Changing Forecast92、OEM :委托代工 (Original Equipment Manufacture)93、ODM :委托设计与制造 (Original Design & Manufacture)94、OLAP : 在线分析处理(On—Line Analytical Processing)95、OLTP : 在线交易处理(On-Line Transaction Processing)96、OPT :最佳生产技术 (Optimized Production Technology)97、OQC : 出货质量管理(Out—going Quality Control)98、PDCA : PDCA管理循环 (Plan—Do—Check—Action)99、PDM : 产品数据管理系统(Product Data Management)100、PERT :计划评核术(Program Evaluation and Review Technique)91、PO : 订单(Purchase Order)92、POH : 预估在手量(Product on Hand)93、PR : 采购申请Purchase Request94、QA :品质保证(Quality Assurance)95、QC : 质量管理(Quality Control)96、QCC : 品管圈(Quality Control Circle)97、QE : 品质工程(Quality Engineering)98、RCCP :粗略产能规划 (Rough Cut Capacity Planning)99、RMA : 退货验收Returned Material Approval100、ROP :再订购点(Re-Order Point)101、SCM : 供应链管理(Supply Chain Management)102、SFC : 现场控制 (Shop Floor Control)103、SIS :策略信息系统 (Strategic Information System) 104、SO : 订单(Sales Order)105、SOR :特殊订单需求(Special Order Request)106、SPC :统计制程管制(Statistic Process Control) 107、TOC : 限制理论 (Theory of Constraints)108、TPM : 全面生产管理Total Production Management 109、TQC :全面质量管理 (Total Quality Control)110、TQM : 全面品质管理(Total Quality Management)111、WIP :在制品(Work In Process)。
- 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
- 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
- 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。
Generated by Foxit PDF Creator © Foxit Software For evaluation only.
Generated by Foxit PDF Creator © Foxit Software For evaluation only.
Generated by Foxit PDF Creator © Foxit Software For evaluation only.
Generated by Foxit PDF Creator © Foxit Software For evaluation only.
Generated by Foxit PDF Creator © Foxit Software For evaluation only.
Generated by Foxit PDF Creator © Foxit Software For evaluation only.
Generated by Foxit PDF Creator © Foxit Software For evaluation only.
Generated by Foxit PDF Creator © Foxit Software For evaluation only.
Hale Waihona Puke Generated by Foxit PDF Creator © Foxit Software For evaluation only.
Generated by Foxit PDF Creator © Foxit Software For evaluation only.
Generated by Foxit PDF Creator © Foxit Software For evaluation only.
Generated by Foxit PDF Creator © Foxit Software For evaluation only.
Generated by Foxit PDF Creator © Foxit Software For evaluation only.
Generated by Foxit PDF Creator © Foxit Software For evaluation only.
Generated by Foxit PDF Creator © Foxit Software For evaluation only.
Generated by Foxit PDF Creator © Foxit Software For evaluation only.
Generated by Foxit PDF Creator © Foxit Software For evaluation only.
Generated by Foxit PDF Creator © Foxit Software For evaluation only.
Generated by Foxit PDF Creator © Foxit Software For evaluation only.
Generated by Foxit PDF Creator © Foxit Software For evaluation only.
Generated by Foxit PDF Creator © Foxit Software For evaluation only.
Generated by Foxit PDF Creator © Foxit Software For evaluation only.
Generated by Foxit PDF Creator © Foxit Software For evaluation only.
Generated by Foxit PDF Creator © Foxit Software For evaluation only.
Generated by Foxit PDF Creator © Foxit Software For evaluation only.
Generated by Foxit PDF Creator © Foxit Software For evaluation only.
Generated by Foxit PDF Creator © Foxit Software For evaluation only.