2020 年软考高级信息系统项目管理师考试英语练习题及答案多套汇总1. Project Quality Management must address the management of the project and the () of the project. While Project Quality Management applies to all projects, regardless of the nature of their product, product quality measures and techniques are specific to the particular type of product produced by the project.A.performanceB.processC.productD.object【答案】C【解析】项目质量管理必须解决项目的管理和项目的管理问题。

尽管项目质量管理适用于所有项目,无论其()的性质如何,但产品质量措施和技术是针对项目生产的特定类型产品的。

A、性能B、过程C、产品D、对象2.() is the budgeted amount for the work actually completedon the schedule activity or WBS component during a given time per i od.A.Planned valueB.Earned valueC.Actual costD.Cost variance【答案】B【解析】()是给定时间段内计划活动或WBS 组件实际完成的工作的预算金额。

A、计划值B、挣值C、实际成本D、成本差异3.() involves comparing actual or planned project practices to those of other projects to generate ideas for improvement and to provide a basis by which to measure performance. These other projects can be within the performing or gani za t i on or outside of it, and can be within the same or in another application area.A.MetricsB.MeasurementC.BenchmarkingD.Baseline【答案】C【解析】()将实际或计划的项目实践与其他项目的实践进行比较,以产生改进意见,并提供衡量绩效的依据。

信息系统项目管理师历年英语试题及模拟试题

信息系统项目管理师历年英语试题及模拟试题

信息系统项目管理师历年英语试题汇总2005年上半年●(66)is a method of constructing a project schedule network diagram that uses boxes or rectangles ,referred to as nodes, to represent activites and connects them with arrows that as ow the dependencies. This method includes following types of dependcies orprecedence relationships:(67)the initiation of the successor activity, depends upon the completion of the predecessor activity(68)the initiation of the successor activity,depends upon the initiation of the predecessor activity(66)A.PDM B.CPM C.PERT D.AOA(67)A.F-S B.F-F C.S-F D.S-S(68)A.F-S B.F-F C.S-F D.S-S●estimating schedule activity costs involves developing an(69)of the cost of the resources needed to complete each schedule activity. Cost estimating includes identifying and considering various costing alternatives. for example, in mostapplication areas, additional work during a design phase is widely held to have the potential for reducing the cost of the execution phase and product oprations. the cost estimating process considers whether the expected savings can offset the cost of the additional design work. cost estmates are generally expressed in units of(70)to facilitate comparisons both within and across projects. the(71)describes important information about prject requirement that is considered duing cost estimating.(69)A.accuracy B.approxination C.specification D.summary(70)A.activity B.work C.currency D.time(71)A.project scope statement B.statement of workC.project management plan D.project policy●The (72)technique involves using projecet characteristics in a mathematical model to predict total project cost.models can be simple or complex.(72) A.cost aggregation B.reserve analysisC.parametric estimating D.funding limit reconciliarion●(73)is a measurable, verifiable work product such as specification. feasibility study report, detail document, or working prototype(73) A.milestone B.deliverable C.etc D.BAC●(74)are individuals and organizations that are actively involved in the project, or whose interests may be affected as a result of project execution or project completion; they may also exert influence over the project and its results.(74) A.controls B.baselinesC.project stakeholders D.project managers●(75)is the process of obtaining the stakeholdrs’formal acceptance of the completed projectscope .verifying the scope includes reviewing deliverables and work results to ensure that all were completed satisfactorily.(75) A.project acceptance B.scope verificationC.scope definition D.WBS Creation2005年下半年●__(66)__ means that every project has a definite beginning and a definite end.(66)A. Project phase B. Unique C. Temporary D. Closure●The __(67)__ defines the phases that connect the beginning of a project to its end.(67)A. schedule B. project life cycle C. temporary D. milestone●__(68)__ are individuals and organizations that are actively involved in the project, or whose interests may be affected as a result of project execution or project completion.(68)A. Project managers B. Project team membersC. SponsorsD. Project stakeholders●The __(69)__ Process Group consists of the processes used to complete the work defined in the project management plan to accomplish the project’s requirements.(69)A. Planning B. Executing?? ???????????C. Monitoring and ControllingD. Closing●The __(70)__ provides the project manager with the authority to apply organizational resources to project activities.(70)A. project management plan B. contractC. project human resource planD. project charter●The __(71)__ describes, in detail, the project’s deliverables and the work required to create those deliverables.(71)A. project scope statement B. project requirementC. project charterD. product specification●The process of __(72)__ schedule activity durations uses information on schedule activity scope of work, required resource types, estimated resource quantities, and resource calendars with resource availabilities.(72)A. estimating B. defining C. planning D. sequencing●PDM includes four types of dependencies or precedence relationships:...__(73)__. The completion of the successor activity depends upon the initiation of the predecessor activity.(73)A. Finish-to-Start B. Finish-to-FinishC. Start-to-StartD. Start-to-Finish●__(74)__ is the budgeted amount for the work actually completed on the schedule activity or WBS component during a given time period.(74)A. Planned value B. Earned valueC. Actual costD. Cost variance●__(75)__ involves comparing actual or planned project practices to those of other projects to generate ideas for improvement and to provide a basis by which to measure performance. These other projects can be within the performing organization or outside of it, and can be within the same or in another application area.(75)A. Metrics B. Measurement C. Benchmarking D. Baseline2006年下半年●(66)from one phase are usually reviewed for completeness and accuracy and approved before work starts on the next phase.(66)A.Process B.Milestone C.Work D.Deliverables●Organizations perform work to achieve a set of objectives.Generally, work can be categorized as either projects or operations, although the two sometimes are (67).(67)A.confused B.same C.overlap D.dissever●In the project management context,(68)includes characteristics of unification, consolidation, articulation, and integrative actions that are crucial to project completion, successfully meeting customer and other stakeholder requirements,and managing expectations.(68)A.integration B.scope C.process D.charter●Project (69)Management includes the processes required to ensure that the project includes all the work required, and only the work required,to complete the project successfully.(69)A.Integration B.Scope C.Configuration D.Requirement●On some projects,especially ones of smaller scope,activity sequencing, activity resource estimating, activity duration estimating, and (70)are so linked that they are viewed as a single process that can be performed by a person over a relatively short period of time.(70)A.time estimating B.cost estimatingC.project planning D.schedule development●In approximating costs,the estimator considers the possible causes ofvariation of the cost estimates,including (71)。

IT项目管理选择题英文版

IT项目管理选择题英文版

IT选择题第一章①Approximately what percentage of the world's gross domestic product is spent on projects?【25percent】②Which of the following is a not a potential advantage of using good project management?【lower cost of capital】③A【project】is a temporary endeavor undertaken to create...④Which of the following is not an attribute of a project?【projects involve little uncertainly】⑤Which of the following is not part of the triple constraint of project management?【meeting communications】⑥【Project management】is the application of knowledge.skills....⑦Project portfolio management addresses【strategic】goals of an organization,while project management addresses【tactical】goals.⑧Several application development projects done for the same functional group might best be managed as part of a【program】⑨Which of the following is not one of the top ten skills or competencies of an effective project manager?【technical skills】⑩What is the certification program called that the Project Management Institute provides?【PMP】第二章11Which of the following is not part of the three-sphere model for systems management 【information】12Which of the four frames of organizations addresses how meetings are run,employee dress codes,and expected works hours【symbolic】13Project in a 【matrix】organizational structure often report to two or more bosses.14Project work is most successful in an organizational culture where all of the following characteristic are high except【control】15A【deliverable】is a product or service...16Which of the following is not a phase of the traditional project life cycle【system analysis】17What is the term used to describe a framework of the phases involved in developing information systems【system development life cycle】18Another name for a phase exit is a【kill】point19The nature of information technology project is different from projects in many other industry because they are very【diverse】20What term is used to describe when an organization acquires good and source from an outside source in another county【offshoring】第三章21 A 【process】is a series of actions directed toward a particular result22【Executing】processes include coordinating people23Which process group normally requires the most resources and time?【Executing】24What methodology was developed in the U.K,defines 45 separate subprocesses,and organizes These into eight process groups?【PRINCE2】25 A work breakdown structure,project schedule,and cost estimates are outputs of【planning】26Which of the following outputs is often complete before initiating a project【business】27Initiating involved develop a project charter,which is part of the project【intergration】28【monitoring and controlling】involves measuring29What type of report do project teams create to reflect on what went right and what went wrong with the project?【lesson-learned report】30Many people use 【templates】第四章:31Which of the following processes is not part of project integration management 【develop the project business case】32What is the last step in the four-stage planning【resource allocation】33Which of the following is not a best practice for new product development projects?【select projects that will take less than two years to provide payback】34 A new government law requires an organization to report data in a new way【directive】35If estimates for total discounted benefits for a project are $120000 and total discounted costs are $10000,what is the estimated return on investment(ROI)?【20 percent】36 A 【project charter】is a document that37Which of the following item is not normally included in a project charter?【a Gantt chart】38【configuration management】ensure that the description39Which of the following is not a suggestion for performing 【minimize change】40What tool and technique is used for all of the other project integration 【expert judgment】第五章41【scope】refers to all the work involved in creating42Which tool or technique for collecting requirements is often the most expensive【interviews】43A【WBS】is a deliverable-oriented grouping of the work44What approach to developing a WBS involves writing down or drawing 【mind mapping】45Assume you have a project with major categories called planning,analysis【2】46Which of the following is not a best practice that can help in avoiding 【don't involve too many users in scope management】47What major restaurant chain terminated a large after spending $170 million【Mcdonald's】48Scope【verification】is often achieved by49Which of following is not a suggestion for improving user 【only have meeting as need】50Project management software helps you develop a【WBS】第六章51What is the first process in planning a project schedule【defining activities】52Predecessors,successors【activity attributes】53As the project management for a software【discretionary】54You cannot start editing a technical report until【finish-to-finish】55Which of the following statements is false?【duration and effort are synonymous terms】56What symbol on a Gantt【a white diamond】57What type of diagram shows planned and actual project schedule 【a Tracking Gantt chart】58【PERT】is a network59Which of the following statement is false【Fast tracking is a technique】60【critical chain scheduling】is a method of scheduling第七章61【cost】is a resource sacrificed or foregone62What is the main goal of project cost management【to complete a project within an approved】63Which of the following is not a key output of project 【a cost management plan】64If a company loses $5 for every $100 in revenue for a certain product【-5 percent】65【Management】reserves allow for future66You are preparing a cost estimate for【parametric】67【project cost budgeting】involves allocating the project68【Earned value analysis】is a project performance measurement technique69If the actual cost for a WBS item is $1500 【the cost variance is $500,which is under budget】70If a project is halfway【it is ahead of schedule and over budget】第八章71【Quality】is the degree to which a set of inherent72What is the purpose of project quality management【to ensure that the project】73【benchmarking】generates74What tool could you use to see if【a scatter diagram】75What tool can you use to determine whether 【a control chart】76Six Sigma's target【3.4】77The seven run rule states【non-random】78What is the preferred order for performing【unit testing,integration testing,system testing】79【Deming】is known for his work on quality control80PMI's OPM3【maturity】。

管理信息系统(英文版第7版)题库chapter extension 02

管理信息系统(英文版第7版)题库chapter extension 02

Experiencing MIS, 7e (Kroenke)Chapter Extension 2 Collaborative Information Systems for Student Projects1) ________ are useful when a team needs to meet on some topic but everyone cannot meet at the same time.A) BlogsB) Discussion forumsC) WikisD) SurveysAnswer: BAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Explain how IS can enhance systems of collaboration and teamwork.Learning Obj: LO 14.1: What are the IS requirements for student project collaborations? Classification: Concept2) Discussion forums are one of the nice-to-have features in a collaboration tool.Answer: TRUEAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Explain how IS can enhance systems of collaboration and teamwork.Learning Obj: LO 14.1: What are the IS requirements for student project collaborations? Classification: Concept3) Why should a team choose to use a collaboration information system?Answer: Collaboration is critical in business, and numerous software vendors and open source developers have created computer programs to facilitate various collaborative tasks. Once a team learns how to use the tools and has developed procedures for using them, teamwork will be easier. The team will no longer need to get everyone together face-to-face. It will no longer lose documents; it will be able to determine who is contributing and who is not. Another reason for using collaboration tools is that it will create better results. Such systems facilitate feedback and iteration. Each team member can produce documents, and others can comment and make revisions to them.AACSB: Information TechnologyDifficulty: 2: ModerateCourse LO: Explain how IS can enhance systems of collaboration and teamwork.Learning Obj: LO 14.1: What are the IS requirements for student project collaborations? Classification: Concept4) Synchronous communication is said to occur if ________.A) communication occurs between people in different time zonesB) there is a flow of communication according to the hierarchical structureC) members of various teams work on the same taskD) all members of a team meet at the same timeAnswer: DAACSB: Information TechnologyDifficulty: 2: ModerateCourse LO: Explain how IS can enhance systems of collaboration and teamwork.Learning Obj: LO 14.2: How can you use collaboration tools to improve team communication? Classification: Concept5) VOICE is a marketing and media firm. One of its corporate policies is the sole use of synchronous communication within the organization. VOICE is expanding its customer base in the coming year and needs to prepare a plan of action. Given its corporate policy regarding communication, which of the following modes are its team members most likely to use?A) emailB) team surveyC) multiparty text chatD) discussion forumAnswer: CAACSB: Reflective ThinkingDifficulty: 3: ChallengingCourse LO: Explain how IS can enhance systems of collaboration and teamwork.Learning Obj: LO 14.2: How can you use collaboration tools to improve team communication? Classification: Application6) ________ occurs when team members do not meet at the same time.A) Asynchronous communicationB) Synchronous communicationC) Procedural communicationD) Nonprocedural communicationAnswer: AAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Explain how IS can enhance systems of collaboration and teamwork.Learning Obj: LO 14.2: How can you use collaboration tools to improve team communication? Classification: Concept7) AKAI One, a multinational company, has centers in four different countries. The heads of the four centers set performance targets every month and work toward achieving them. Given that each center works in a different time zone, which of the following modes of communication should the center heads choose to discuss their monthly targets?A) multiparty text chatB) videoconferencingC) emailD) webinarAnswer: CAACSB: Reflective ThinkingDifficulty: 3: ChallengingCourse LO: Explain how IS can enhance systems of collaboration and teamwork.Learning Obj: LO 14.2: How can you use collaboration tools to improve team communication? Classification: Application8) Morgan's company has outsourced its accounting process to a small firm in India. Morgan needs to discuss some quality control measures with the firm's managers. He conducts the meeting via videoconference. Given the nature of the meeting, it can also be called a(n)________ meeting.A) concurrentB) parallelC) asynchronousD) virtualAnswer: DAACSB: Reflective ThinkingDifficulty: 2: ModerateCourse LO: Explain how IS can enhance systems of collaboration and teamwork.Learning Obj: LO 14.2: How can you use collaboration tools to improve team communication? Classification: Application9) If a virtual meeting is synchronous, participants can interact with each other through________.A) discussion forumsB) videoconferencingC) emailD) team surveysAnswer: BAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Explain how IS can enhance systems of collaboration and teamwork.Learning Obj: LO 14.2: How can you use collaboration tools to improve team communication? Classification: Concept10) ________ are virtual meetings in which attendees view one of the attendees' computer screens for formal and organized presentations.A) Discussion forumsB) Screen-sharing applicationsC) Conference callsD) WebinarsAnswer: DAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Explain how IS can enhance systems of collaboration and teamwork.Learning Obj: LO 14.2: How can you use collaboration tools to improve team communication? Classification: Concept11) ________ is a type of asynchronous communication in which a group member can post an entry, an idea, a comment, or a question, and other group members respond to it later, at their convenience.A) Multiparty text chatB) VideoconferencingC) WebinarD) Discussion forumAnswer: DAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Explain how IS can enhance systems of collaboration and teamwork.Learning Obj: LO 14.2: How can you use collaboration tools to improve team communication? Classification: Concept12) ________ is a type of asynchronous communication where one person creates a list of questions to which other users respond.A) Multiparty text chatB) Team surveyC) WebinarD) WhiteboardAnswer: BAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Explain how IS can enhance systems of collaboration and teamwork.Learning Obj: LO 14.2: How can you use collaboration tools to improve team communication? Classification: Concept13) Asynchronous communication occurs when team members do not meet at the same time. Answer: TRUEAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Explain how IS can enhance systems of collaboration and teamwork.Learning Obj: LO 14.2: How can you use collaboration tools to improve team communication? Classification: Concept14) A face-to-face meeting is an example of asynchronous communication.Answer: FALSEAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Explain how IS can enhance systems of collaboration and teamwork.Learning Obj: LO 14.2: How can you use collaboration tools to improve team communication? Classification: Concept15) Virtual meetings can be synchronous or asynchronous.Answer: TRUEAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Explain how IS can enhance systems of collaboration and teamwork.Learning Obj: LO 14.2: How can you use collaboration tools to improve team communication? Classification: Concept16) Wikis are a virtual meeting in which attendees view one of the attendees' computer screens for a more formal and organized presentation.Answer: FALSEAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Explain how IS can enhance systems of collaboration and teamwork.Learning Obj: LO 14.2: How can you use collaboration tools to improve team communication? Classification: Concept17) Videoconferencing is likely to be less intrusive than text chat.Answer: FALSEAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Explain how IS can enhance systems of collaboration and teamwork.Learning Obj: LO 14.2: How can you use collaboration tools to improve team communication? Classification: Concept18) Email is a tool used for synchronous communication.Answer: FALSEAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Explain how IS can enhance systems of collaboration and teamwork.Learning Obj: LO 14.2: How can you use collaboration tools to improve team communication? Classification: Concept19) In team surveys, one team member creates a list of questions and the other team members respond.Answer: TRUEAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Explain how IS can enhance systems of collaboration and teamwork.Learning Obj: LO 14.2: How can you use collaboration tools to improve team communication? Classification: Concept20) Explain synchronous and asynchronous communications in organizations with examples. Answer: Synchronous communication occurs when all team members meet at the same time. Face-to-face meetings and conference calls are examples of synchronous communication. Asynchronous communication occurs when team members do not meet at the same time. Email, discussion forums, and team surveys are examples of asynchronous communication. Virtual meetings in which participants do not meet in the same place and possibly not at the same time can be both synchronous and asynchronous. If the virtual meeting is synchronous (all meet at the same time), participants can use conference calls, webinars, or multiparty text chat. A webinar is a virtual meeting in which attendees view one of the attendees' computer screens for a more formal and organized presentation. Videoconferencing is another synchronous method. When a team must meet asynchronously, most members try to communicate via email.AACSB: Information TechnologyDifficulty: 2: ModerateCourse LO: Explain how IS can enhance systems of collaboration and teamwork.Learning Obj: LO 14.2: How can you use collaboration tools to improve team communication? Classification: Concept21) Which of the following is a content sharing technique which is least effective for collaborations in which there are many document versions or for which there is a desire for content control?A) email with attachmentsB) Microsoft SharePointC) Google DocsD) file serverAnswer: AAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Explain how IS can enhance systems of collaboration and teamwork.Learning Obj: LO 14.3: How can you use collaboration tools to share content? Classification: Concept22) Which of the following statements is true of shared content with version management?A) Content sharing methods that provide version management cannot accommodate concurrent work.B) Version management systems provide version control.C) Version management makes it impossible to know when and by whom the document was changed.D) Content sharing systems that provide version management can track changes to documents. Answer: DAACSB: Information TechnologyDifficulty: 2: ModerateCourse LO: Explain how IS can enhance systems of collaboration and teamwork.Learning Obj: LO 14.3: How can you use collaboration tools to share content? Classification: Concept23) Which of the following tools helps share content with version management features?A) SkypeB) Google DocsC) emails with attachmentsD) file serverAnswer: BAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Explain how IS can enhance systems of collaboration and teamwork.Learning Obj: LO 14.3: How can you use collaboration tools to share content? Classification: Concept24) Which of the following statements is true of Google Drive?A) Users receive an email when a document is made available to them.B) Documents are stored on the Google Drive server.C) Document revisions are tracked with extensive details of changes made.D) Microsoft Excel documents cannot be uploaded to Google Drive.Answer: AAACSB: Information TechnologyDifficulty: 2: ModerateCourse LO: Explain how IS can enhance systems of collaboration and teamwork.Learning Obj: LO 14.3: How can you use collaboration tools to share content? Classification: Concept25) Which of the following systems provides version control while sharing content?A) Microsoft SharePointB) LinkedInC) emails with attachmentsD) locked files hard disksAnswer: AAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Explain how IS can enhance systems of collaboration and teamwork. Learning Obj: LO 14.3: How can you use collaboration tools to share content? Classification: Concept26) In version control systems, shared documents are placed into shared directories called ________.A) vaultsB) librariesC) workspacesD) recordsAnswer: BAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Explain how IS can enhance systems of collaboration and teamwork. Learning Obj: LO 14.3: How can you use collaboration tools to share content? Classification: Concept27) Which of the following statements is true of Microsoft SharePoint?A) It does not facilitate permission-limited activity.B) It converts shared documents to the Google Docs format.C) It facilitates the continuation of workflow defined for a document even when any of its members disapproves the document.D) It does not allow users to edit a document if it has been checked out by another user. Answer: DAACSB: Information TechnologyDifficulty: 2: ModerateCourse LO: Explain how IS can enhance systems of collaboration and teamwork. Learning Obj: LO 14.3: How can you use collaboration tools to share content? Classification: Concept28) The degree of version management is very high in email with attachments. Answer: FALSEAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Explain how IS can enhance systems of collaboration and teamwork. Learning Obj: LO 14.3: How can you use collaboration tools to share content? Classification: Concept29) Storing documents on servers is better than using email attachments because documents havea single storage location.Answer: TRUEAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Explain how IS can enhance systems of collaboration and teamwork.Learning Obj: LO 14.3: How can you use collaboration tools to share content? Classification: Concept30) Version management systems facilitate tracking changes to documents and provide features and functions to accommodate concurrent work.Answer: TRUEAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Explain how IS can enhance systems of collaboration and teamwork.Learning Obj: LO 14.3: How can you use collaboration tools to share content? Classification: Concept31) Natalie needs to access Google Drive for a project. She does not need to have a Gmail account for that.Answer: FALSEAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Explain how IS can enhance systems of collaboration and teamwork.Learning Obj: LO 14.3: How can you use collaboration tools to share content? Classification: Concept32) Version management systems provide version control.Answer: FALSEAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Explain how IS can enhance systems of collaboration and teamwork.Learning Obj: LO 14.3: How can you use collaboration tools to share content? Classification: Concept33) In version control systems, shared documents are placed in shared directories, sometimes called libraries.Answer: TRUEAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Explain how IS can enhance systems of collaboration and teamwork.Learning Obj: LO 14.3: How can you use collaboration tools to share content? Classification: Concept34) The document checkout feature in SharePoint allows users to simultaneously edit documents. Answer: FALSEAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Explain how IS can enhance systems of collaboration and teamwork.Learning Obj: LO 14.3: How can you use collaboration tools to share content? Classification: Concept35) Workflows cannot be defined on Microsoft SharePoint for multistage business processes. Answer: FALSEAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Explain how IS can enhance systems of collaboration and teamwork.Learning Obj: LO 14.3: How can you use collaboration tools to share content? Classification: Concept36) What is version management and why is it important?Answer: Every collaborative project involves sharing of content. Although email is simple, easy, and readily available, it will not suffice for collaborations in which there are many document versions or for which there is a desire for content control. Storing documents on servers is better than using email attachments because documents have a single storage location. They are not scattered in different team members' email boxes. However, without any version management it will be impossible to know who changed the document and when. Version management is a technique used for sharing electronic content. Systems that provide version management track changes to documents and provide features and functions to accommodate concurrent work. Google Drive and Microsoft One Drive are examples of systems that provide version management.AACSB: Information TechnologyDifficulty: 2: ModerateCourse LO: Explain how IS can enhance systems of collaboration and teamwork.Learning Obj: LO 14.3: How can you use collaboration tools to share content? Classification: Concept37) Explain version control with a simple example.Answer: Version control is the process of limiting the actions that can be taken by a particular user on shared documents. Version management systems improve the tracking of shared content and potentially eliminate problems caused by concurrent document access. They do not, however, provide version control. With version control systems, each team member is given an account with a set of permissions. Shared documents are placed into shared directories, which are sometimes called libraries. Furthermore, document directories can be set up so that users are required to check out documents before they can modify them. When a document is checked out, no other user can obtain it for the purpose of editing it. Once the document has been checked in, other users can obtain it for editing. Microsoft SharePoint is the most popular version control application for general business.AACSB: Information TechnologyDifficulty: 2: ModerateCourse LO: Explain how IS can enhance systems of collaboration and teamwork.Learning Obj: LO 14.3: How can you use collaboration tools to share content? Classification: Concept38) Which of the following statements is true of collaboration tools?A) Team members cannot request SharePoint to send emails when certain events occur.B) Google Drive permits only the uploader to make changes to a task list and does not allow simultaneous edits.C) The standard task list in SharePoint can readily be modified to include user-customized columns using SharePoint.D) Google Drive allows only one user to edit a document at a time.Answer: CAACSB: Information TechnologyDifficulty: 2: ModerateCourse LO: Explain how IS can enhance systems of collaboration and teamwork.Learning Obj: LO 14.4: How can you use collaboration tools to manage tasks? Classification: Concept39) Ashley is part of an interdepartmental project in which members from different departments work on the project and upload their files on Google Drive. Which of the following characteristics should Ashley keep in mind while working on this project?A) Google Drive restricts the edit permission on documents to the creator of tasks.B) Google Drive does not allow simultaneous edits.C) Google Drive deals with video and audio files.D) Google Drive provides version history showing the changes made by users to task lists. Answer: DAACSB: Reflective ThinkingDifficulty: 2: ModerateCourse LO: Explain how IS can enhance systems of collaboration and teamwork.Learning Obj: LO 14.4: How can you use collaboration tools to manage tasks? Classification: Application40) The alerts feature in SharePoint ________.A) sends a team member an email whenever a task is assigned to him or herB) requires team members to check the task list for new tasks every hourC) does not support customization of email requestsD) can send emails only when an existing task is deletedAnswer: AAACSB: Information TechnologyDifficulty: 2: ModerateCourse LO: Explain how IS can enhance systems of collaboration and teamwork.Learning Obj: LO 14.4: How can you use collaboration tools to manage tasks? Classification: Concept41) SharePoint can be configured to send email alerts when certain events occur.Answer: TRUEAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Explain how IS can enhance systems of collaboration and teamwork.Learning Obj: LO 14.4: How can you use collaboration tools to manage tasks? Classification: Concept42) SharePoint includes a built-in content type for managing task lists that provides robust and powerful features.Answer: TRUEAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Explain how IS can enhance systems of collaboration and teamwork.Learning Obj: LO 14.4: How can you use collaboration tools to manage tasks? Classification: Concept43) Explain the importance of Microsoft SharePoint in task management.Answer: Microsoft SharePoint has a robust task management capability. It contains a built-in content type for managing task lists that provides powerful features. The standard task list stores data such as title, assigned to, due date, status, predecessors, and other useful task data. Users can also add their own data to the default format of the task list. With SharePoint, it is possible to filter task lists to show only incomplete tasks, or only tasks that have been completed. Alerts are a feature in SharePoint task lists that can send emails to a team member when certain events occur. If a task is assigned to a person, alerts can send an email. This feature means that team members need not continually check the task list for new tasks.AACSB: Information TechnologyDifficulty: 2: ModerateCourse LO: Explain how IS can enhance systems of collaboration and teamwork.Learning Obj: LO 14.4: How can you use collaboration tools to manage tasks? Classification: Concept44) With the ________ collaboration tool set, a participant should be able to collaborate with his or her team, though he or she will get little support from the software.A) MinimalB) OptimalC) GoodD) ComprehensiveAnswer: AAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Explain how IS can enhance systems of collaboration and teamwork.Learning Obj: LO 14.5: Which collaboration information system is right for your team? Classification: Concept45) With the ________ collaboration tool set, participants have the ability to conduct multiparty audio and video virtual meetings and the support for concurrent access to document, spreadsheet, and presentation files, but they will have to rely on third-party tools to use surveys, wikis, and blogs.A) MinimalB) OptimalC) GoodD) ComprehensiveAnswer: CAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Explain how IS can enhance systems of collaboration and teamwork.Learning Obj: LO 14.5: Which collaboration information system is right for your team? Classification: Concept46) The ________ collaboration tool set has a large set of features, including content management and control, workflow control, online meetings in which participants can view shared whiteboards, applications, and monitors.A) MinimalB) BasicC) GoodD) ComprehensiveAnswer: DAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Explain how IS can enhance systems of collaboration and teamwork.Learning Obj: LO 14.5: Which collaboration information system is right for your team? Classification: Concept47) Which of the following statements is true of collaboration tool sets?A) The Good collaboration tool set has built-in discussion boards.B) The Comprehensive collaboration tool set takes the longest time to learn.C) The Good collaboration tool set includes workflow control as an inbuilt feature.D) The Minimal collaboration tool set allows sharing of video files.Answer: BAACSB: Information TechnologyDifficulty: 2: ModerateCourse LO: Explain how IS can enhance systems of collaboration and teamwork.Learning Obj: LO 14.5: Which collaboration information system is right for your team? Classification: Concept48) Which of the following statements is true of a product power curve for collaborative tool sets?A) A flat line on a power curve means the user is increasing the utility gained from the product.B) At time zero, the ideal power curve is at zero.C) The power curve of a Minimal collaboration tool set rises steadily with time.D) The power curve of a Comprehensive collaboration tool set has a longer flat spot in the beginning.Answer: DAACSB: Information TechnologyDifficulty: 2: ModerateCourse LO: Explain how IS can enhance systems of collaboration and teamwork.Learning Obj: LO 14.5: Which collaboration information system is right for your team? Classification: Concept49) With the Minimal collaboration tool set, a participant should be able to collaborate with his or her team, though he or she will get little support from the software.Answer: TRUEAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Explain how IS can enhance systems of collaboration and teamwork.Learning Obj: LO 14.5: Which collaboration information system is right for your team? Classification: Concept50) The Good collaboration tool set includes content management and control, workflow control, online meetings in which participants can view shared whiteboards, applications, and monitors. Answer: FALSEAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Explain how IS can enhance systems of collaboration and teamwork.Learning Obj: LO 14.5: Which collaboration information system is right for your team? Classification: Concept51) In the product power curve, the Minimal product set has some power at time zero. Answer: TRUEAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Explain how IS can enhance systems of collaboration and teamwork.Learning Obj: LO 14.5: Which collaboration information system is right for your team? Classification: Concept52) While using the Minimal collaboration tool set, it must be ensured that one user's work does not conflict with another's.Answer: TRUEAACSB: Information TechnologyDifficulty: 1: EasyCourse LO: Explain how IS can enhance systems of collaboration and teamwork.Learning Obj: LO 14.5: Which collaboration information system is right for your team? Classification: Concept53) What are the three sets of collaboration tools?Answer: The three sets of collaboration tools are the Minimal, Good, and Comprehensive tool sets. Their features are as follows:1. The Minimal collaboration tool set has the minimum possible set of tools. With this set, a participant should be able to collaborate with his or her team, though he or she will get little support from the software.2. With the Good collaboration tool set, a participant will have the ability to conduct multiparty audio and video virtual meetings, and he or she will also have support for concurrent access to document, spreadsheet, and presentation files.3. The Comprehensive collaboration tool set has a full set of features, including content management and control, workflow control, online meetings in which participants can view shared whiteboards, applications, and monitors.AACSB: Information TechnologyDifficulty: 2: ModerateCourse LO: Explain how IS can enhance systems of collaboration and teamwork.Learning Obj: LO 14.5: Which collaboration information system is right for your team? Classification: Concept。

信息系统项目管理师习题库(附参考答案)

信息系统项目管理师习题库(附参考答案)

信息系统项目管理师习题库(附参考答案)一、单选题(共100题,每题1分,共100分)1、Before a project schedule can be created,the schedule maker should have a(),an effort estimate for each task,and a resource list with availability for each resourceA、planB、software requirements specificatioC、work breakdown structureD、baseline正确答案:C2、()算法采用模拟生物进化的三个基本过程“繁殖(选择)→交叉(重组)→变异(突变)”。

A、蚁群B、人工神经网络C、遗传D、粒子群正确答案:C3、在演示文稿中,插入超级链接时,所链接的目标不能是()。

A、某张幻灯片中的某个对象B、其他应用程序的文档C、另一个演示文稿D、同一演示文稿的某一张幻灯片正确答案:A4、回收的问卷调查表中,很多表都有一些没有填写的项。

处理缺失值的办法有多种,需要根据实际情况选择使用。

对于一般性的缺值项,最常用的有效方法是()A、将缺失的数值以该项己填诸值的平均值代替B、删除含有缺失值的调查表C、填入特殊标志,凡涉及该项的统计则排除这些项值D、用某种统计模型的计算值来代替正确答案:C5、对高级语言源程序进行编译或翻译的过程可以分为多个阶段,解释方式不包含()阶段。

A、语义分析B、词法分析C、语法分析D、目标代码生成正确答案:D6、宏病毒可以感染后缀为()的文件。

A、pdfB、txtC、exeD、xls正确答案:D7、()不属于知识产权保护之列。

A、定理和公式B、专利C、商标D、著作和论文正确答案:A8、因时间紧、任务急、经过评估,某智能监控软件涉及的图像传输速度与精度指标难以满足客户需求,故项目团队欲将该软件开发分包给技术实力很强的企业完成。

项目管理(全英文)试题

项目管理(全英文)试题

一、名词解释(5*2=10)PMI, Project Management Institute, 美国项目管理学会PMP, Project Management Professional, 项目管理专业人员认证PMBOK, Project Management Body of Knowledge, 项目管理知识体系PLC, project life cycle, 项目生命周期RFP, Request for proposal, 需求建议书WBS, Work Breakdown Structure, 工作分解结构CPM, Critical path method, 关键路径法PERT, Project Evaluation and Review Technique, 计划评审技术AOA, Activity-On-Arrow, 双代号网络图法AON, Activity-on-node, 单代号网络图CPI, Cost Performance Index, 成本绩效指数 (挣值(EV)/实际成本(AC)) RAM, Responsibility Assignment Matrix, 职责分配矩阵P&L, Profit and loss损益VAT, value-added tax, 加值税、增值税QA, Quality Assurance, 质量保障二、填空题(5*2=10)。

1. A project is an endeavour to accomplish a specific objective through a unique set of interrelated tasks and the effective utilization of resources.2. A project manager is responsible for planning the work and then work the plan.3. The project life cycle has four phases: initiating, planning, performing, and closing the project.4. Project selection involves evaluating potential projects and then deciding which should move forward to be implemented.5. WBS facilitates evaluation of cost, time, and technical performance of the organization on a project.6. The project network is developed from the information collected for the WBS and is a graphic flow chart of the project job plan.7. In the context of projects, risk is an uncertain event and condition that, if it occurs, has a positive and negative effect on project objectives.8. Milestones are significant project events that mark major accomplishments.9. Two important factors affecting recruitment are the importance of the project and the management structure being used to complete the project.10. The most common method for shortening project time is to assign additional staff and equipment to activities.三.选择题(15*2=30)1. Communications is best described as:A. an exchange of information.B. providing written or oral directions.C. consists of senders and receiversD. effective listening.E. All of the aboveANS: E2. The following types of costs are relevant to making a financial decision except:A. opportunity costsB. direct costsC. sunk costD. unavoidable costsE. None of the aboveANS: C3. Time management is the allocation of time in a project's life cycle through the process of:A. PlanningB. Estimating.C. Scheduling.D. ControllingE. All of the above.ANS: E4. A project element which lies between two events is called:A. An activity.B. A critical path method.C. A slack milestone.D. A timing slot.E. A calendar completion point.ANS: A5. A comprehensive definition of scope management would be:A. Managing a project in terms of its objective through the concept, development, implementation, and termination phases of a project.B. Approval of the scope baseline.C. Approval of the detailed project charter.D. Configuration control.E. Approved detailed planning including budgets, resource allocation,linear responsibility charts and management sponsorship.ANS: A6. Pure Risk differs from Business Risks because Pure Risk's _____ .A. include chances of both profit or loss associated with the business.B. include chances of loss and no chances for profit associated with the business.C. must incur personal loss with business liability.D. must incur business liability associated with loss of pure profit.E. B and CANS: BANS: D7. The most common types of schedules are Gantt charts, milestone charts, line of balance, and:A. Networks.B. Time phased events.C. Calendar integrated activities.D. A and C only.E. B and C only.ANS: A8. In preparing a good project definition, experienced project managers will:A. Concentrate mainly on the end product rather than costs or benefits. These come later.B. Realize that only the "tip of the iceberg" may be showing. As a project manager, you must get beneath it.C. Understand that a project definition/plan is a dynamic rather than static tool, and thus subject to change.D. Try to convert objectives into quantifiable terms.E. All of the aboveANS: E9. Since risk is associated with most projects, the best course of action is to:A. cover all project risks by buying appropriate insuranceB. ignore the risks, since nothing can be done about them and move forward with the project in an expeditious manner.C. avoid projects with clear and present risksD. eliminate all known risks prior to the execution phase of the projectE. identify various risks and implement actions to mitigate their potential impactANS: E10. Risk management allows the project manager and the project team to:A. eliminate most risks during the planning phase of the projectB. identify project risksC. identify impacts of various risksD. plan suitable responsesE. B, C and D onlyANS: E11. Which of the following types of cost are relevant to making financial decisions:A. sunk costB. opportunity costC. material costD. A and C onlyE. B and C onlyANS: E12. Which of the following is often overlooked in achieving effective communication?A. speaking clearlyB. listeningC. interpretingD. maintaining eye contactE. manipulating the conversationANS: B13. The highest degrees of project risk and uncertainty are associated with the following phase of the project:A. conceptualB. executionC. cut-overD. post project evaluationE. A and D onlyANS: A14. The auditing function that provides feedback about the quality of output is referred to as:A. quality control.B. quality planning.C. quality assurance.D. quality improvementE. All of the above.ANS: C15. The sending or conveying of information from one place to another is the process ofA. NetworkingB. TransmittingC. InteractingD. PromotingE. InterfacingANS: B16. Project life cycles provide a better means of measurement of progress and control. The four phases of a project are conceptual development,_____, _____, and _____.A. Preliminary planning, detail planning, closeoutB. Implementation, reporting, terminationC. Development, implementation, terminationD. Execution, reporting, finishingE. Implementation, termination, post-audit reviewANS: C17. All of the following are categories of a milestone in a schedule except:A. End date.B. Contract dates.C. Key events scheduled.D. Imposed dates.E. Task duration.ANS: E18. Uncertainty refers to a situation where:A. the outcomes are known but their probabilities are highB. the outcomes and their probabilities are knownC. neither the outcomes nor their probabilities are knownD. states of nature can change at any timeE. probabilities of various states of nature can change at any timeANS: C19. Excessive flexibility in specifying requirements will _____ the likelihood of time overruns.A. Reduce.B. Eliminate.C. DoubleD. IncreaseE. Not affectANS: D20. Which of the following is closet to Deming's definition of Quality:A. conformance to requirements.B. fitness for use.C. continuous improvement of products and services.D. customer focus.E. All of the above.ANS: C21. The key purpose of project control is to:A. Plan ahead for uncertainties.B. Generate status reports.C. Keep the project on track.D. Develop the project road map.E. All of the above.ANS: C22. Which of the following constitute Juran's "quality trilogy":A. planning, inspection, control.B. planning, improvement, control.C. planning, organization, control.D. product, price, customer.E. design, build, deliver.ANS: B23. Most project (and non-project) managers prefer _____ communications.A. OralB. WrittenC. UpwardD. DownwardE. LateralANS: A24. On a precedence diagram, the arrow between two boxes is called:A. An activity.B. A constraint.C. An event.D. The critical path.E. None of above.ANS: B25. Quality control charts show a characteristic of the product or service against:A. the specification limits.B. customer requirements.C. control limits based on three standard deviations in each direction.D. control limits based on six standard deviations in each direction.E. A and D onlyANS: C26. In the arrow diagramming method (ADM), _____ do not consume time or resources.A. Events.B. Dummy ActivitiesC. Slack elements.D. B and C only.E. All of the above.ANS: A27. Activities with zero time duration are referred to as:A. Critical path activites.B. Noncritical path activities.C. Slack time activities.D. DummiesE. None of above.ANS: D28. In the PDM, common constraints include:A. Start-to-startB. Finish-to-startC. Finish-to-finishD. B and C onlyE. A, B, and C.ANS: E29. Non-verbal communication includes:A. Body movementB. GesturesC. Facial expressionsD. The way we move our handsE. All of the aboveANS: E30. Which one of the following is not an acquisition method?A. advertisingB. invitationC. negotiationD. purchaseE. all are acquisition methodsANS: A31. For communication to occur, there must be:A. Two or more people involvedB. the transmittal of informationC. a communication processD. All of the aboveE. B and C onlyANS: D32. Job continuity would be an example of _____ in Maslow's hierarchy of needs.A. Self-actualizationB. EsteemC. PhysiologicalD. BelongingE. SafetyANS: E四、简单题(2*10=20)。

信息系统项目管理师历年英文考题(2005年上半年-2011年上半年)

信息系统项目管理师历年英文考题(2005年上半年-2011年上半年)

信息系统项目管理师历年英文考题(2005年上半年-2011年上半年)信息系统项目管理师2005年上半年● ___(66)___ is a method of constructing a project schedule network diagram that uses boxes or rectangles, referred to as nodes, to represent activities and connects them with arrows that show the dependencies. This method includes following types of dependencies or precedence relationships: ___(67)___the initiation of the successor activity, depends upon the completion of the predecessor activity. ___(68)___the initiation of the successor activity, depends upon the initiation of the predecessor activity. (66) A.PDM B.CPM C.PERT D.AOA (67) A.F-S B.F-F C.S-F D.S-S (68) A.F-S B.F-F C.S-F D.S-S _(69)___ of the cost of the resources ● estimating schedule activity costs involves developing an __needed to complete each schedule activity. Cost estimating includes identifying and considering various costing alternatives. for example, in most application areas, additional work during a design phase is widely held to have the potential for reducing the cost of the execution phase and product operations. th cost estimating process considers whether the expected savings can offset the cost of the additional design work. cost estimates are generally expressed in units of ___(70)___ to facilitate comparisons both within and across projects. the ___(71)___ describes important information about project requirement that is considered during cost estimating. (69) A.accuracy B.approximation C.specification D.summary (70) A.activity B.work C.currency D.time (71) A.project scope statement B.statement of work C.project management plan D.project policy ● The ___(72)___ technique involves using project characteristics in a mathematical model to predict total project cost. Models can be simple or complex. (72) A.cost aggregation B.reserve analysis C.parametric estimating D.funding limit reconciliation ● ___(73)___ is a measurable, verifiable work product such as specification. feasibility study report, detail document, or working prototype (73) A.milestone B.deliverable C.etc D.BAC olved in the project, or whose ● ___(74)___ are individuals and organizations that are actively invinterests may be affected as a result of project execution or project completion; they may also exert influence over the project and its results. (74) A.controls B.baselines C.project stakeholders D.project managers ● ___(75)___ is the process of obtaining the stakeholders' formal acceptance of the completed project scope .verifying the scope includes reviewing deliverables and work results to ensure that all were completed satisfactorily. (75) A.project acceptance B.scope verification C.scope definition D.WBS Creation 信息系统项目管理师2005年下半年● __(66)__ means that every project has a definite beginning and a definite end. (66)A.Project phase B.Unique C.Temporary D.Closure ● The __(67)__ defines the phases that connect the beginning of a project to its end.  (67)A.schedule B.project life cycle C.temporary estone ● __(68)__ are individuals and organizations that are actively involved in the project, or whose interests may be affected as a result of project execution or project completion.  (68) A.Project managers B.Project team members C.SponsorsD.Project stakeholders  in ● The __(69)__ Process Group consists of the processes used to complete the work definedthe project management plan to accomplish the project's requirements.  (69)A.Planning B.Executing C.Monitoring and Controlling D.Closing ● The __(70)__ provides the project manager with the authority to apply organizational resources to project activities.  (70) A.project management plan B.contract  C.project human resource plan D.project charter ● The __(71)__ describes, in detail, the project's deliverables and the work required to create those deliverables.  (71) A.project scope statement B.project requirement  C.project charter D.product specification ● The process of __(72)__ schedule activity durations uses information on schedule activity scope of work, required resource types, estimated resource quantities, and resource calendars with resource availabilities.  (72)A.estimating B.defining C.planning D.sequencing ● PDM includes four types of dependencies or precedence relationships: ... __(73)__. The completion of the successor activity depends upon the initiation of the predecessor activity. (73) A.Finish-to-Start B.Finish-to-Finish C.Start-to-Start D.Start-to-Finish C.Start-to-Start ● __(74)__ is the budgeted amount for the work actually completed on the schedule activity or WBS component during a giving time period. (74)A.Planned value B.Earned value C.Actual cost D.Cost variance ● __(75)__ involves comparing actual or planned project practices to those of other projects to generate ideas for improvement and to provide a basis by which to measure performance. These other projects can be within the performing organization or outside of it, and can be within the same or in another application area. (75)A.Metrics B.Measurement C.Benchmarking D.Baseline 信息系统项目管理师2006年下半年● (66) from one phas e are usually reviewed for completeness and accuracy and approved before work starts on the next phase. (66)A.Process estone C.Work D .Deliverables ● Organizations perform work to achieve a set of objectives objectives. . Generally, work can be categorized as either projects or operations, although the two sometimes are (67) . (67)A.confused B.same C.overlap D.dissever ● In the project management context, (68) includes characteristics of unification, consolidation, articulation, and integrative actions that are crucial to project completion, successfully meeting customer and other other stakeholder stakeholder requirements, and managing expectations. (68)A.integration B.scope C.process D.charter ● Project (69) Management includes the processes required to ensure that the project includes all the work required, and only the work required, to complete the project successfully. (69)A.Integration B.Scope C.Configuration D.Requirement ● ● On On On some some some projects, projects, projects, especially especially especially ones ones ones of of of smaller smaller smaller scope, scope, scope, activity activity activity sequencing, sequencing, sequencing, activity activity resource estimating, activity duration estimating, and (70) are so so tightly tightly linked that they are viewed as a single process that can be performed performed by by a person over a relatively short period of time. (70)A.time estimating B.cost estimating C.project planning D.schedule development● In approximating costs, the estimator considers the po possible ssible causes of of variation variation of the cost estimates, including (71) 。

信息系统项目管理师专业英语汇编

信息系统项目管理师专业英语汇编

1、活动Activity2、活动定义Activity Definition3、活动描述/说明AD=Activity Description4、活动历时估算Activity Duration Estimating5、箭线网络图(双代号网络图)AOA=Activity-On-Arrow6、节点式网络图(单代号网络图)AON=Activity-on-Node7、已执行工作实际成本ACWP=Actual Cost of Work Performed8、实际完成日期AF=Actual Finish Date9、实际开始日期AS=Actual Start Date10、行政收尾Administrative Closure11、箭线Arrow12、箭线图示法ADM=Arrow Diagramming Method13、逆推计算法Backward Pass14、横道图Bar Chart15、基准计划Baseline16、完工预算BAC=Budget At Completion17、概算Budget Estimate18、已执行预算成本BCWP=Budgeted Cost of Work Performed19、计划执行预算成本BCWS= Budgeted Cost of Scheduled20、日历单位Calendar Unit21、变更控制委员会CCB=Chang Control Board22、沟通规划Communications Planning23、并行工程Concurrent Engineering24、意外费用Contingencies25、意外准备金Contingency Allowance26、意外规划Contingency Planning27、意外储备Contingency Reserve28、合同Contrac t29、合同管理Contract Administration30、合同收尾Contract Close-out31、控制Control32、控制图Control Chart33、纠正措施Corrective Action34、费用预算Cost Budgeting35、费用控制Cost Control36、费用估算Cost Estimating37、质量成本Cost of Quality38、费用绩效指数CPI=Cost Performance Index39、费用偏差CV=Cost Variance40、赶工Crashing41、关键工序Critical Activity42、关键路线Critical Path43、关键路线法CPM=Critical Path Method44、当前完成日期Current Finish Date45、当前开始日期Current Start Date46、数据日期DD=Data Date47、交付物Deliverable48、依赖关系Dependency49、虚活动Dummy Activity50、延续时间DU=Duration51、延续时间压缩Duration Compression52、最早完工日期EF=Early Finish Date53、最早开始日期ES=Early Start Date54、挣值法EV=Earned Value55、挣值分析Earned Value Analysis56、人工量Effort57、估算概算Estimate58、在完成时的费用估算EAC=Estimate At Completion59、到完成时的估算ETC=Estimate To Complete60、单节点事件图Event-on-Node61、例外报告Exception Report62、完成日期Finish Date63、完成到完成关系FF=Finish-to-Finish64、完成到开始关系FS=Finish-to-Start65、时差机动时间浮动时间Float66、顺推计算法Forward Pass67、自由时差FF=Free Float68、职能经理Functional Manager69、职能组织Functional Organization70、甘特图Gantt Chart71、图解评审技术GERT=Graphical Evaluation and Review Technique72、集合工作Hammock73、悬摆Hanger74、信息分发Information Distribution75、立项Initiation76、成本/进度综合报告Integrated Cost/Schedule Reporting77、邀标IFB= Invitation for Bid78、关键事件进度计划Key Event Schedule79、滞后量Lag80、最晚完成日期LF=Late Finish Date81、最晚开始日期LS=Late Start Date82、提前量Lead83、全生命期成本估算Life-cycle Costing84、产品经理Line Manager85、逻辑图Logic Diagram86、逻辑关系Logical Relationship87、回路Loop88、管理储备量Management Reserve89、主进度计划Master Schedule90、矩阵型组织Matrix Organization91、里程碑Milestone92、里程碑进度计划Milestone Schedule93、现代项目管理MPM=Modern Project Management94、监控Monitoring95、蒙托卡罗分析Monte Carlo Analysis96、次关键工作Near-Critical Activity97、网络Network98、网络分析Network Analysis99、网络逻辑Network Logic100、网络路线Network Path101、节点Node102、组织分解结构OBS=Organizational Breakdown Structure 103、组织规划Organizational Planning104、整体变更控制Overall Change Control105、重叠Overlap106、参数估算法Parametric Estimating107、线路Path108、线路时差Path Float109、完成百分比PC=Percent Complete110、执行报告Performance Reporting111、执行机构Performing organization112、计划评审技术图PERT Chart113、计划的完成日期PF=Planned Finish Date114、计划的开始日期PS=Planned Start Date115、优先图示法PDM=Precedence Diagramming Method116、优先关系Precedence Relationship117、紧前工作Predecessor Activity118、采购规划Procurement Planning119、工程Program120、计划评审技术PERT=Program Evaluation and Review Technique 121、项目Project122、项目许可证Project Charter123、项目沟通管理Project Communication Management124、项目费用管理Project Cost Management125、项目人力资源管理Project Human Resource Management126、项目综合管理Project Integration Management127、项目生命周期Project Life Cycle128、项目管理PM=Project Management129、项目管理知识体系PMBOK=Project Management Body of Knowledge 130、项目管理软件Project Management Software131、项目管理团队Project Management Team132、项目经理PM=Project Manager133、项目网络图Project Network Diagram134、项目阶段Project Phase135、项目计划Project Plan136、项目计划开发Project Plan Development137、项目计划实施Project Plan Execution138、项目规划Project Planning139、项目采购管理Project Procurement Management140、项目质量管理Project Quality Management141、项目风险管理Project Risk Management142、项目进度计划Project Schedule143、项目范围管理Project Scope Management144、项目团队成员Project Team Member145、项目时间管理Project Time Management146、项目型组织Project Organization147、质量保证QA=Quality Assurance148、质量控制QC=Quality Control149、质量规划Quality Planning150、剩余持续时间RDU=Remaining Duration151、请求建议书RFP=Request for Proposal152、请求报价单RFQ=Request for Quotation153、储备量Reserve154、资源平衡Resource Leveling155、资源约束进度计划Resource-Limited Schedule156、资源规划Resource Planning157、责任分配矩阵RAM=Responsibility Assignment Matrix 158、责任图Responsibility Chart159、责任矩阵Responsibility Matrix160、保留金Retain age161、突发事件Risk Event162、风险识别Risk Identification163、风险应对控制Risk Response Control164、风险应对开发Risk Response Development165、S曲线S-Curve166、进度计划Schedule167、进度计划分析Schedule Analysis168、进度计划压缩Schedule Compression169、进度计划控制Schedule Control170、进度执行指数SPI=Schedule Performance Index171、进度偏差SV=Schedule Variance172、计划完成日期SF=Scheduled Finish Date 173、计划开始日期SS=Scheduled Start Date 174、范围Scope175、范围基准计划Scope Baseline176、范围变更Scope Change177、范围变更控制Scope Change Control 178、范围定义Scope Definition179、范围规划Scope Planning180、范围验证Scope Verification181、时差Slack182、询价Solicitation183、询价规划Solicitation184、工作人员招募Staff Acquisition185、项目相关者Stakeholder186、开始日期Start Date187、开始到完成关系Start-to-Finish188、开始到开始关系Start-to-Start189、工作说明SOW=Statement of Work 190、子网Subnet191、子网络Subnet Work192、后续工作Successor Activity193、目标完成日期TC=Target Completion Date 194、目标时度计划Target Schedule195、任务Task196、团队建设Team Development197、团队成员Team members198、时标网络图Time-Scaled Network Diagram 199、目标完成日期TF=Target Finish Date200、目标开始日期Ts=Target Start Date201、总时差TF=Total Float202、全面质量管理TQM=Total Quality Management203、权变措施Workaround204、工作分解结构WBS=Work Breakdown Structure 205、工作包Work Package。

  1. 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
  2. 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
  3. 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。

信息系统项目管理师英语模拟题Sample Professional Responsibility exam questions1. While working on an external project your customer asks you to perform some additional tasks that are not included in the formal contract. You should:a. Honor the customer's request as sign of cooperation to ensure future business.b. Refuse the request and report the customer to your sponsorc. Acknowledge the request and advise the customer to submit a formal change requestd. Convene a meeting of the project team and rewrite the scope statement.2.You are managing an internal R&D project. The initial test results are very poor. You are afraid your management might cancel the project, and this could reflect poorly upon you. Verification testing could be done quickly and inexpensively. You should:a. Be the first to recommend canceling the projectb. Inform management about the results and wait for a responsec. Inform management immediately and recommend retesting for verificationd. Withhold the information from management until you perform additional tests to verify the initial results3. During an informal meeting with your project client you are offered a substantial monetary incentive to alter the configuration of the product to meet the client's personal need. This change may result in additional project costs and schedule delays. The appropriate action to take would be:a. Refrain from accepting the offer and advise the customer to submit a request to the change control board.b. Accept the offer and issue an internal configuration change request to the design groupc. Obtain additional information about the request and the customer's personal need before accepting the offer.d. Delay acceptance of the offer until you can ensure that you can protect yourself from any legal liabilities.4. As the project manager for a very large and highly visible project you receive a preliminary press release for your approval before distribution. You are expected to approve the release without comment. Your review identifies a major discrepancy regarding some key project financial estimates that may mislead the intended recipients. As the project manager it is your responsibility to:a. Inform the project sponsor of the discrepancy and refuse to approve the releaseb. Approve the release but send a memo to the sponsor advising that you are aware of the discrepancy and will refer any questions your receive to the sponsorc. Completely rewrite the press release and include the correct informationd. Approve the release as requested5. Your project is running out of cash and significant work remains. You are directed by senior management to instruct your people to use another project's charge numbers while working on your project. You should:a. Follow instructionsb. Inform the corporate auditorsc. Understand the background of management's instructions before taking any actiond. Shut down the project, if possible6. While reviewing the estimates from the functional managers assigned to your project you discover that one cost estimate is clearly higher than those submitted for previous projects. You should:a. Reject the estimate and remove the functional manager from the projectb. Request the supporting details for the estimate to ensure it has been properly prepared.c. Accept the estimate and plan to use the additional funding as a reserve.d. Question each functional manager for information about this estimate.7. You are working in a country where it is customary to exchange gifts between contractor and customer. Your company code of conduct clearly states that you cannot accept gifts from any client. Failure to accept the gift from this client may result in termination of the contract. The action to take in this case would be:a. Provide the customer with a copy of your company code of conduct and refuse the gifts.b. Exchange gifts with the customer and keep the exchange confidentialc. Contact your project sponsor and /or your legal or public relations group for assistance.d. Ask the project sponsor or project executive to exchange gifts.8.During your assignment as project manager you add a new member to your project team. This new teammember was recently hired from a competitor and offers to share a substantial amount of proprietary information from his previous company. This information could put you and your team in a very strong position for future business. You are aware of a non compete clause in the new hire's condition of employment. You should:a. Accept the information and agree to keep it confidential between you and the new hire.b. Review the condition of employment with the new hire and advise her to reconsider the offer.c. Review the information and only accept only what may have a direct impact on the project's financial status.d. Ignore the offer to share and move forward with the project9. You are asked to write a paper for your sponsor so that he/she can present it at a technical meeting. You are informed that his/her name will be the only name on the paper. You should:a. Follow instructionsb. Follow instructions but demand that your name also appearsc. Refuse to follow the instructionsd. Go over the head of your sponsor seeking advice10. An example of a conflict of interest would be:a. As a public official you make a decision about a contract award that will benefit you personallyb. You and a functional manager disagree with a task cost estimatec. Your sponsor decides to cancel your project because it no longer supports the company strategyd. Your personality conflicts with that of a key member of your project team.11. Each of the following describes the use of an ethical approach except:a. Attempting to understand the religious and cultural sensitivities of the country in which you have been assigned.b. Ensuring that personal interest does not interfere with your decision making process.c. Accepting gifts in exchange for favoring one contractor over anotherd. Maintaining confidentiality of sensitive information obtained during the project life cycle.12. To maintain the customer's schedule, massive overtime will be required between Christmas and New Years. Many of your team members have put in for vacation during this time. You should:a. Let the schedule slip and inform the customerb. First give the employees the choice of working overtimec. Make the employees cancel their vacation plans and work overtimed. Hire temporary employees for the overtime13. Which of the following situations describes a violation of the PMP?Professional Code of Conduct?a. Accepting a gift that is within the customary guidelines of the country or province you are currently working in.b. Use of confidential information to advance your position or influence a critical decision.c. Complying with laws and regulations of the state or province in which project management services are providedd. Disclosing information to a customer about a situation that may have an appearance of impropriety.14. In order to balance the needs of the many stakeholders involved in your project the most desirable method to achieve resolution of conflicts would be:a. Compromiseb. Forcingc. Controllingd. Confrontation15. You receive a contract to perform testing for an external client. After contract award, the customer provides you with the test matrix to use for your 16 tests. The vice president for engineering says that the customer's test matrix is wrong, and she will use a different test matrix, which should give better results. This is a violation to the SOW. Suppose your sponsor is also the vice president for engineering. You should:a. Use the customer's test matrixb. Use the engineering test matrix without telling the customerc. Use the engineering test matrix and inform the customerd. Tell your sponsor that you want to set up a meeting with the customer to resolve the conflict16.In order for the project manager to fully and effectively understand a stake holder's personal concerns or grievances it may necessary to:a. Ask for a written description of the problem and submit it through the project officeb. Schedule a project review session with the entire project teamc. Attempt to empathize with the stakeholderd. Involve the project sponsor as an arbitrator17. As the leader of a project team, the project manager may be required to assess the competencies of his or her team members. Occasionally, some weaknesses or areas for improvement will be identified. The project manager should:a. Remove any team members who have demonstrated weaknesses in critical knowledge areasb. Communicate those weaknesses and establish a performance improvement programc. Hire additional resources to compensate for weak areasd. Wait for the team members to fail in an assignment to justify termination.18.You have just changed jobs and discovered that your new employer routinely violates OSHA/EPA and affirmative action requirements on projects. You should:a. Do nothing; it's not your problemb. Start by asking management if they are aware that regulations are being violatedc. Talk to the corporate legal departmentd. Inform the appropriate government agencies about the violations19. The project manager must be an effective communicator to ensure that project stakeholders receive and understand project related information and status. Prior to delivering information to the stakeholders the project manager should attempt to:a. Research and understand the region of experience of the stakeholder before transmitting informationb. Identify only those stakeholders that have a the same background experience as the project managerc. Filter the information to remove any detailsd. Restrict information to specific technical details20. As part of your project plan you must develop an effective method of communication for your multinational team of stakeholders. You have several choices of media available. The appropriate action to take in the development of the communication plans would be to:a. Discuss the available options with the stakeholders and obtain their inputb. Use the standard media that has been in effect for your previous projectsc. Use multiple forms of media to ensure that everyone receives the informationd. Obtain additional funding from the project sponsor and develop a project specific communications infrastructure.21.One of your employees is up for promotion. If the promotion is granted, the employee will be reassigned elsewhere causing a problem for you on your project. You can delay the promotion until your project is completed. You should:a. Support the promotion but work with the employee and the employee's new management to develop a good transition planb. Ask the employee to refuse the promotion until your project is completed.c. Arrange to delay the promotion until the project is completedd. Tell the employee that it is his responsibility to find a suitable replacement so that the project will not suffer.22. The integrity of the project manager is often challenged by stakeholders who attempt to use personal power or influence to change the scope of an agreed upon deliverable. In these situations the project manager's most appropriate response would be:a. Refer the stakeholder to the process for change documented in the approved contract.b. Agree to the change because customer satisfaction is the goal regardless of cost.c. Contact the legal department and suspend all further project workd. Determine the risks and rewards for implementing the change before taking any action.23.During project implementation the client interprets a clause in the contract to mean the he is entitled to a substantial refund for work recently completed. You review the clause and disagree with the client's conclusion. As the project manager which of the following actions should be takena. Disregard the customer's conclusion and continue to process invoicesb. Document the dispute and refer to the provisions of the contract that address interpretations and disputesc. Advise the customer that ambiguous information in contracts is always interpreted in favor of the contractord. Immediately correct the clause to remove any possible misinterpretation by the customer24.Your executives, in appreciation for the success of your project, have given you a $10,000 bonus to belittle on your project, is in your car pool. You should:a. Provide everyone with an equal shareb. Provide everyone a share based upon their performancec. Ask the workers to decide among themselves how the bonus should be subdividedd. Ask the sponsor to make the decision25. Before reporting a perceived violation of an established rule or policy the project manager shoulda. Determine the risks associated with the violationb. Ensure there is a reasonably clear and factual basis for reporting the violationc. Ignore the violation until it actually affects the project resultsd. Convene a committee to review the violation and determine the appropriate response26. Project Managers can contribute to their organization's knowledge base and to the profession of project management most effectively by:a. Developing and implementing a project review and lessons learned processb. Establishing strict guidelines for protecting intellectual propertyc. Promote the use of ad hoc project managementd. Ensuring that all project plans are developed before the project team is formed27. You have been assigned two concurrent projects. Because of the nature of the projects, you have a conflict of interest. You should:a. Do the best you can and tell no oneb. Ask to be removed from one of the projectsc. Ask to be removed from both of the projectsd. Inform your sponsor and ask for his advice28. You receive a contract to perform testing for an external client. After contract award, the customer provides you with the test matrix to use for your 16 tests. The vice president for engineering says that the customer's test matrix is wrong, and she will use a different test matrix, which should give better results. This is a violation to the SOW. You should:a. Use the customer's test matrixb. Use the engineering test matrix without telling the customerc. Use the engineering test matrix and discuss the reasons with the customerd. Ask your sponsor for clarification, assuming that the vice president is not your sponsor29. An effective method for improving an organization's project management knowledge base is through:a. Coaching and mentoringb. Referent powerc. A weak Matrix organizational structured. Fast TrackingAnswer Key1=c 2=d 3=a 4=a 5=c 6=b 7=c 8=b 9=b 10=a 11=c12=b 13=b 14=d 15=d 16=c 17=b 18=b 19=a 20=a 21=a 22=a23=b 24=c 25=b 26=a 27=d 28=d 29=aDisclaimer: These questions are intended for study purposes only. Success on these questions is not indicative of success on the Project Management Professional Certification Examination. This download of the Sample Exam Questions is for your personal use and NOT FOR commercial use. Any unauthorized use or duplication of this document is prohibited!1. A narrative description of products or services to be supplied under contract is called:a. The project plan. B. A statement of work.C. An exception report.D. A Pareto analysis.2. An example of scope verification is:a. Reviewing the performance of an installed software module.B. Managing changes to the project schedule.C. Decomposing the WBS to a work package level.D. Performing a benefit/cost analysis to determine if we should proceed with the pro3. Which of the following is not an example of a source of scope change?A. A variation in government regulations.C. A need to engage in bottom-up cost estimating.D. Introducing technology that was not available when scope was originally defined.4.The subdivision of major project deliverables, as identified in the scope statement, into smaller, more manageable components is called:a. Parametric estimation .B. Scope definition.C. Feasibility analysis.D. Benefit-cost analysis.5. The process of establishing clear and achievable objectives, measuring their achievement, and adjusting performance in accordance with the results of the measurement is called:a. Strategic planning. B. Alternative objectives inventory.C. Management by objectives.D. Contingency planning.6. Configuration management is:a. Used to ensure that the description of the project product is correct and complete.B. The creation of the work breakdown structure.C. The set of procedures developed to assure that project design criteria are met.D. A mechanism to track budget and schedule variances.7. A fundamental tenet of modern quality management holds that quality is most likely to be achieved by:a. Planning it into the project. B. Developing careful mechanisms to inspect for quality.C. Striving to do the best job possible.D. Conducting quality circle activities.8. Your most recent project status report contains the following information: BCWP = 3,000, ACWP = 3,500, and BCWS = 4,000. The schedule variance is:a. + 1,000. B. + 500. C. - 500. D. - 1,000.9. Learning curve theory emphasizes that in producing many goods:a. Cost decreases as production rates increase.B. Average unit cost decreases as more units are produced.C. Materials become cheaper when they are purchased in bulk.D. Laborers become more productive because of technological advances.10. Rearranging resources so that constant resource levels are maintained is called:a. Floating. B. Leveling. C. Restructuring. D. Crashing.11. The _________ is a time-phased budget that will be used to measure and monitor cost performance in the project.A. Work breakdown structure b. Project schedule c. Cost baseline d. Cost budget12. To transfer most of the cost risk to the contractor, the client may use a ___________ contract.A. Cost plus award b. Cost plus incentive fee c. Cost plus fixed fee d. Fixed price13. An appropriate sequence for risk management activities is:a. Risk identification, risk quantification, and risk response development and control.B. Risk identification, risk assessment, and risk planning.C. Risk identification, risk mitigation, and risk management.D. Risk identification, risk elimination, and risk mitigation.14. Theory X holds that:a. Quality improvements lie in the hands of quality circles.B. Profits are tied to meeting schedule deadlines.C. Absenteeism is tied to poor working conditions.D. Workers are inherently unmotivated and need strong guidance.15. All of the following are characteristics of parametric estimating except:a. Historical information. B. Quantifiable. C. Scalable. D. Activity lists.16. Inputs to cost budgeting include all of the following except:a. Cost baselineb. Cost estimatec. Work breakdown structured. Project schedule17. Inputs used during scope planning include all of the following except:a. Constraints. B. Project charter. C. Budget/cost analysis. D. Product description.18. Cost control outputs include all of the following except:a. Estimate at completion. B. Budget updates.C. Revised cost estimates.D. Cost baseline.19. Risk identification outputs include the following except:a. Decision trees. B. Inputs to other processes.C. Risk symptoms.D. Potential risk events.20. Puts into overall change control include all of the following except:a. Project plan.B. Change requests.C. Change control system. D. Performance reports21. Activity duration estimate inputs include all of the following except:a. Resource requirements. B. Basis of estimates. C. Activity lists. D. Constraints.22. All of the following are contract types except:a. Unit-price. B. Make-or-buy. C. Cost reimbursable. D. Lump sum.23. Initiation inputs for a project include all of the following except:a. Product description. B. Strategic plan. C. Project charter. D. Selection criteria.24. Responses to risk threats include all of the following except:a. Avoidance. B. Acceptance. C. Mitigation. D. Rejection.25. The process of performance reporting includes all of the following except _____________.A. Status reporting.B. Progress reporting.C. Forecasting.D. Product analysis26. Constrained optimization methods of project selection include:a. Scoring models. B. Benefit-cost ratios. C. Multi-objective programming algorithms.D. Subjective analyses.27. Which of the following statements concerning contract type is correct?A. A fixed price contract contains the most risk for the buyer.B. Cost reimbursable contracts offer sellers the highest profit potential.C. Lump sum contracts offer sellers the greatest profit potential.D. Unit price contracts are illegal in many jurisdictions.28. A Work Breakdown Structure (WBS) numbering system should allow project staff to:a. Identify the level at which individual WBS elements are found.B. Identify configuration management milestones.C. Estimate the costs of WBS elements.D. Provide project justification.29. All of the following are true quality statements except:a. Quality improvement depends upon better definition and increased awareness of the requirements/specifications.B. Project quality management must address both management of the project and the product of the project.C. Recognition of key actions required of each team member is necessary to meet quality objectives.D. Computer-aided design systems can improve quality, but only at the expense of an increase in the cost of design.30. All of the following are examples of tools often used in cost estimating except:a. Parametric modeling. B. Analogous estimating.C. Bottom-up estimating.D. Activity duration estimates.31. At XYZ Inc., the hourly wage for semi-skilled workers is $14.00. The annual audit shows that fringe benefits cost 30% of basic wages, and that overhead costs ar e 60% of wages plus fringe benefits. What is the loaded” hourly wage for a semi-skilled worker at XYZ Inc.?A. $27.14.B. $28.96.C. $30.03.D. $29.12.32. Of the following estimates, which most accurately reflect the actual cost of the project?A. Conceptual estimates.B. Order of magnitude estimates.C. Preliminary estimates.D. Bottom-up estimates.33. The most crucial time for project risk assessment is:a. When a problem surfaces. B. During the planning phase.C. During the close-out phase.D. After the project schedule has been published.34. When there is uncertainty associated with one or more aspects of the project, one of the first steps to take is to:a. Revise project plan. B. Conduct a risk-benefit analysis.C. Conduct a needs analysis.D. Increase the estimated cost of the project.35. Including a contingency reserve in the project budget is intended to:a. Reduce the probability of scope changes. B. Increase the probability of scope changes.C. Reduce the probability of a cost overrun.D. Increase the probability of a cost overrun.36. Given the information in the following table, what is the expected value from this risk event?Probability Resulta. -10,000. B. - 7,500. C. + 2,500. D. -7,000.37. A contractor is working on a fixed price contract that calls for a single, lump sum payment upon satisfactory completion of the contract. About halfway through the contract, the contractor project manager informs their contract administrator that financial problems are making it difficult for them to pay their employees and subcontractors. The contractor asks for a partial payment for work accomplished. Which of the following actions by the buyer is most likely to cause problems for the project?A. Starting partial payments for work accomplished.B. Making no payments because it would violate the conditions of the contract.C. Paying for work accomplished to date.D. Negotiating a change to the payment conditions in the contract.38. A precise description of a physical item, procedure, or service for implementation of an item or service is called :a. Work package. B. Baseline.C. Product description.D. Work breakdown structure (WBS) element.39. A project should be terminated for all of the following reasons except:a. Lack of team synergy. B. The project no longer meets the company's objectives.C. The resources are not available to complete project activities.D. Project funding has been significantly reduced.40. One common way to compute estimated at completion (EAC) is to take the project budgeted-at-completion and:a. Divide it by the schedule performance index. B. Multiply it by the schedule performance index.C. Multiply it by the cost performance.D. Divide it by the cost performance index.答案:1.B2.A3.C4.B5.C6.A7.A8.D9.B.10.B 11.C 12.D 13.A 14.D 15.D 16.A 17.C 18.D 19.A 20.C21.B 22.B 23.C 24.D 25.D 26.C 27.C 28.A 29.D 30.D 31.D 32.D 33.B 34.B 35.C 36.D 37.B 38.C 39.A 40.D。