天然气分布式能源冷热电联产工程溴化锂机组安装施工工法(2)

合集下载

溴化锂直燃机组安装施工方案及流程

溴化锂直燃机组安装施工方案及流程

溴化锂直燃机组安装施工方案及流程英文回答:Installing a lithium bromide direct-fired chiller unit involves several steps and considerations. The process can be divided into three main phases: preparation, installation, and testing.During the preparation phase, it is important to conduct a thorough site survey to assess the suitability of the location for the chiller unit. This includes checking for proper ventilation, access to utilities, and compliance with safety regulations. Any necessary modifications or upgrades to the site should be planned and executed before moving on to the installation phase.In the installation phase, the chiller unit and its components are assembled and connected. This includes mounting the chiller unit on a suitable foundation, connecting the water piping system, electrical wiring, andcontrol systems. It is essential to follow the manufacturer's instructions and guidelines during this process to ensure proper installation and avoid any potential issues.Once the installation is complete, the testing phase begins. This involves conducting various tests to ensure the chiller unit operates correctly and meets performance requirements. These tests may include checking for leaks, verifying proper water flow and temperature control, and testing the electrical and control systems. Any adjustments or repairs needed are made during this phase to ensure optimal performance.After successful testing, the chiller unit is ready for operation. Regular maintenance and monitoring should be carried out to ensure its continued performance and efficiency. This includes routine inspections, cleaning, and replacing any worn-out components. It is also important to train the operators on how to properly use and maintain the chiller unit to prolong its lifespan and prevent any potential issues.中文回答:安装溴化锂直燃机组涉及多个步骤和考虑因素。

溴化锂机组吊装方案

溴化锂机组吊装方案

溴化锂机组吊装方案一、引言本文档旨在提供一种可行的溴化锂机组吊装方案,以确保机组安全、高效地安装到指定位置。

文档分为以下几个部分:项目背景、设备介绍、吊装方案、安全措施和总结。

二、项目背景在某工业厂房建设项目中,需要安装一台溴化锂机组。

溴化锂机组是用于调节空气湿度和温度的装置,其尺寸较大且重量较重,因此需要合理的吊装方案来确保安全。

三、设备介绍溴化锂机组是一种常见的空调设备,通常由蒸发器、冷凝器、循环风机等组件组成。

其尺寸通常为2米高、1.5米宽、1米长,重量约为500千克。

四、吊装方案4.1 前期准备在吊装前,需要进行以下准备工作:1.确定吊装位置:根据施工图纸确定机组的安装位置,并考虑到通风、维修和维护的便利性。

2.确定吊装方式:根据机组的重量和尺寸,选择合适的吊装方式,如起重机吊装或手动托运。

4.2 吊装过程1.清理施工区域:清理安装区域,确保没有障碍物,以确保吊装安全。

2.安装吊装设备:根据选定的吊装方式,安装起重机或准备好手动吊运设备。

3.绑扎机组:将吊装带正确绑扎在机组上,确保绑扎牢固且均匀分布力量,并使用适当的软垫材料以保护机组表面。

4.进行吊装:根据吊装计划,将机组从地面上吊起,并慢慢将其移动到指定位置。

同时,与操作人员保持良好的沟通,确保顺利进行。

5.定位和固定:将机组放置在指定位置后,使用锁紧螺栓或其他固定装置将其稳定固定在地面上,以避免移动或震动。

4.3 安装后工作1.连接管道:根据机组的设计要求,连接必要的管道和电源线。

2.测试和调试:启动机组,测试其功能和性能是否正常。

如有问题,及时调整和修复。

五、安全措施为确保溴化锂机组吊装过程中的安全,需要采取以下措施:1.操作人员应具备相关的吊装操作证书,并具备一定的经验和技能。

2.安装区域应设置明确的标示,并保证无人员进入施工区域。

3.吊装设备应经过检查和维护,确保其正常运行。

4.在吊装过程中,操作人员需时刻保持与指挥人员的沟通,确保吊装动作的协调进行。

溴化锂吸收式冷水机组安装技术—溴化锂吸收式冷水机组的安装

溴化锂吸收式冷水机组安装技术—溴化锂吸收式冷水机组的安装

溴化锂吸收式冷水机组
直燃式溴化锂冷(热)水机组烟囱系统安装
距冷却塔12米以上, 高出周围1米内的 建筑0.6米
钢制烟道外表面保 温,应耐400℃
风门 防爆门
直燃式溴化锂冷(热)水机组试运转
溴化锂吸收式冷水机组
(1)机组的气密性试验 1)压力检漏
试验气体应为干燥洁净的空气或氮气,试验压力筒体侧应为0.15MPa(绝); 试验时缓慢加压至试验压力,并保压24h。试验开始和结束时记下大气压力、环 境温度和机组内部压力,扣除环境温度变化引起的压力变化,机组压力降低小于 66.5Pa(0.5mmHg)为合格。
溴化锂吸收式冷水机组
直燃式溴化锂冷(热)水机组烟囱系统安装
(5)钢制烟道、烟囱应予保温,室外部分应予防水。保温材料按耐热400℃选用,厚度 30~50mm,可用硅酸铝棉、玻璃纤维棉、岩棉等,外包玻璃纤维布;防水材料最好用铝 箔或不锈钢板、镀锌钢板,在其接口处填树脂胶等材料密封。 (6)在直管段较长处设伸缩器,在法兰口垫石棉绳。切不可让膨胀力压在机组上。 (7)烟道内不可避免的会产生凝结水,如不及时排除,会造成钢板腐蚀及烟道结垢,排 水管宜采用水封结构,连续排除凝水。烟囱口务必设防风罩,防雨帽及避雷针。 (8)烟气排气口方位选择:距冷却塔12m以上或高于塔顶2m以上,尽可能不暴露于商 业、文化区,以免影响市容。尽可能让机房人员方便观察,以便于及时了解排烟情况。并 且比周围1m以内的建筑物高出0.6m以上。
溴化锂吸收式冷水机组
溴化锂吸收式冷水机组配套管道的安装
管道应尽量架空或地下敷设,目前常用架空敷设。蒸汽管道至少应有一段架空管道, 以方便安装流量计及其仪表。管道焊接前应做好管道内部的清洁,去除管道内部存在的污 物、杂质。管道连接后应用盲板将与机组接口处的管口封闭,以备进行水压试验。

热电冷三联产

热电冷三联产
第9页/共18页
1.3 热电冷联产的动力机械
• 蒸汽动力
• 蒸汽机、汽轮机
• 内燃机
• 汽油机、柴油机、煤气机、天然气内燃机,双燃料系统内燃机等
• 燃气轮机
• 大燃机(10~150MW),小燃机(800~10,000KW)微燃机 (25~750kw)
• 外燃机 • 燃料电池
• 低温(AFC,PAFC, PEMFC);高温( MCFC, SOFC )
BCHP是信息时代的产物
在工业时代,社会分工细化,以产品定行业,又在同一产品 下优化,其结果必然是规模越大效益越好,即规模效益。而信 息时代最大的力量就是“整合的能力”,将不同领域的问题进 行统一优化,利用优势互补实现协调统一。随着信息的整合能 力的不断加强,社会分工将逐步模糊,人们可以根据自己对各 种需求不断增长的状况,技术进步的速度,以及人类不断提高 的道德观念,根据资源效益、环境效益、社会效益和经济效益 优化出一个最佳效益的规模——“效益规模”,这是人类文明 的必然趋势。BCHP是信息时代的 产物,它的发展打破了传统 的界限,将采暖、热水、电、冷、燃气、水资源合理利用和环 境污染治理统筹考虑,以最小的资金、资源和环境代价,换取 最高的投资效益、能源转换效率和能源设施效能。减少了电网
大型燃气轮机 >25MKW
燃气轮机/燃气内燃机类型 中型燃气轮机15MKW~25MKW
小型微型燃气轮机 <15MKW
燃气轮机/发电机组的选择参数:
1、质量可靠 2、运行稳定 3、燃机热效率和发电效率高
发电机组
详请参看日立H15/H25燃气轮机/发电机 第6页/共18页
燃气轮机
五、供冷供热系统—余热吸收式制冷/蓄冰空调/传 统中央空调
第16页/共18页

天然气分布式能源和燃气热电联产有哪些不同,看到这里你就明白了

天然气分布式能源和燃气热电联产有哪些不同,看到这里你就明白了

天然气分布式能源和燃气热电联产有“十大”不同1、定义不同。

按上面的观点,天然气分布式能源的定义采用国家四部委发布《关于发展天然气分布式能源的指导意见》中的表述,“天然气分布式能源是指利用天然气为燃料,通过冷热电三联供等方式实现能源的梯级利用,综合能源利用效率在70%以上,并在负荷中心就近实现能源供应的现代能源供应方式,是天然气高效利用的重要方式。

与传统集中式供能方式相比,天然气分布式能源具有能效高、清洁环保、安全性好、削峰填谷、经济效益好等优点”。

关于热电联产的定义,小编查阅了国家发改委2011年6月30日发布修改后的《关于发展热电联产的规定》(国家发展和改革委员会令2011年第10号)和国家发展改革委、国家能源局、财政部、住房城乡建设部、环境保护部等五部委2016年发布的《热电联产管理办法》(发改能源〔2016〕617号),遗憾的是两个政府文件中并没有关于热电联产的定义解释。

梦里寻他千百度,历经千辛万苦终于在国家住建部2011年发布的修订版行业术语标准《供热术语标准》(CJJ/T55-2011)找到了相关解释,《供热术语标准》中提到“热电联产是指由热电厂同时生产电能和可用热能的联合生产方式。

”2、两者所生产的二次能源产品不同。

,蓝海能源认为天然气分布式能源主要有冷、热、电三种二次能源产品,讲究的是“温度对口、梯级利用”,也就是说能源充分利用,最大程度地利用能源避免能量浪费。

而热电联产只是对热和电做了要求,《供热术语标准》中关于热电联产的概念也仅仅提到了电能和热能。

同时,根据国家发改委2011年6月30日发布修改后的《关于发展热电联产的规定》(国家发展和改革委员会令2011年第10号),“在进行热电联产项目规划时,应积极发展城市热水供应和集中制冷,扩大夏季制冷负荷,提高全年运行效率”,文中将热电联产项目与热水供应和集中制冷是作了明确区分的。

由此可见,是否供冷也可以作为区分燃气热电联产和天然气分布式能源的一个标志(注:不是唯一的标志)。

溴化锂直燃机组安装施工方案及流程

溴化锂直燃机组安装施工方案及流程

溴化锂直燃机组安装施工方案及流程英文回答:Installation and Construction Plan for Lithium Bromide Direct-fired Chiller Unit.The installation and construction plan for a lithium bromide direct-fired chiller unit involves several steps and considerations. Here is a brief outline of the process:1. Site Preparation: Before starting the installation, the site needs to be prepared. This includes clearing the area, ensuring proper ventilation, and making sure there is adequate space for the chiller unit.2. Equipment Inspection: Before installation, it is essential to inspect the chiller unit and all associated equipment to ensure they are in good working condition. Any damaged or faulty parts should be replaced or repaired.3. Piping and Electrical Work: The next step is to install the necessary piping and electrical connections. This includes connecting the chiller unit to the water supply and return lines, as well as the power supply. It is crucial to follow the manufacturer's guidelines and local building codes during this process.4. Mounting the Chiller Unit: Once the piping and electrical work is complete, the chiller unit can be mounted in its designated location. This may involve using mounting brackets or other support structures. Care should be taken to ensure the unit is securely attached and level.5. Testing and Commissioning: After the chiller unit is mounted, it needs to be tested and commissioned to ensure proper operation. This includes checking for any leaks in the piping, verifying electrical connections, and testing the controls and safety features of the unit. It is important to follow the manufacturer's instructions and guidelines for this step.6. Insulation and Protection: Once the chiller unit istested and commissioned, it should be properly insulated and protected to prevent heat loss and damage. This may involve using insulation materials and protective covers as recommended by the manufacturer.7. Final Checks and Handover: Before completing the installation, a final inspection should be conducted to ensure everything is in order. This includes checking all connections, verifying proper functioning of the chiller unit, and ensuring compliance with safety standards. Once the installation is deemed satisfactory, the unit can be handed over to the client or end-user.中文回答:溴化锂直燃机组安装施工方案及流程。

天然气分布式能源简介

天然气分布式能源简介

天然气分布式能源简介一、天然气分布式能源概念概述所谓“分布式能源”(Distributed Energy Sources)是指分布在用户端的能源综合利用系统。

一次能源以气体燃料为主,可再生能源为辅,利用一切可以利用的资源;二次能源以分布在用户端的热电冷联产为主,其他中央能源供应系统为辅,实现以直接满足用户多种需求的能源梯级利用,并通过中央能源供应系统提供支持和补充。

天然气分布式能源是指利用天然气为燃料,通过冷热电三联供等方式实现能源的梯级利用,综合能源利用效率在 70%以上,并在负荷中心就近实现能源供应的现代能源供应方式,是天然气高效利用的重要方式。

建筑冷热电联产(Building Cooling Heating &Power, BCHP),是解决建筑冷、热、电等全部能源需要并安装在用户现场的能源中心,是利用发电废热制冷制热的梯级能源利用技术,能源利用效率能够提高到80%以上,是当今世界高能效、高可靠、低排放的先进的能源技术手段,被各国政府、设计师、投资商所采纳。

二、国家对天然气分布式能源的政策及未来发展方向2011年10月9日,国家发改委、财政部、住房城乡建设部、国家能源局联合发布《天然气分布式能源指导意见》,分布式能源将由此迎来发展的春天.相应政策主要体现在以下五个方面:规划先行:政府制定天然气分布式能源专项规划,并与城镇燃气、供热发展规划统筹协调。

标准配套:政府部门制定电力并网规程和申办程序、科学合理的环保规定以及配套适用的消防条件。

投资补贴:对分布式能源项目适当给予投资补贴。

政策倾斜:政府土地部门给予优惠价格提供土地。

政府在上网、电价、气价、供热价格等方面给予优惠。

在近期内还可以给予分布式能源设备进口免税优惠。

金融支持:金融系统大力支持分布式能源发展,积极贷款,保证资金供应,在利息上给予一定的优惠政策。

未来5-10年发展方向“十二五”初期启动一批天然气分布式能源示范项目,“十二五”期间建设1000 个左右天然气分布式能源项目,并拟建设 10 个左右各类典型特征的分布式能源示范区域。

溴化锂吸收式制冷机组安装作业指导书

溴化锂吸收式制冷机组安装作业指导书

溴化锂吸收式制冷机组安装工程作业指导书1 本施工工艺适用于以蒸气或热水为热源的单、双效溴化锂吸收式制冷机组的安装。

2 机组就位时应注意不使设备底座变形,并不得损坏设备其他部位。

3 机组就位后,其安装水平应在设备技术文件规定的基准面上测量,其纵、横向安装水平不应大于1/1000。

自检、专检合格后,应填写S2《设备找正找平记录》,安装及检验采用DS3水准仪及0.5/1000条形水平尺。

4 真空泵安装时,应符合下列要求:4.1 抽气连接管应采用真空胶管,并应尽量缩短设备与真空泵间的距离。

4.2 真空泵运转前,用于真空泵油的规格及加油量应符合设备技术文件的规定。

4.3 应进行真空泵抽气性能的检验;在泵的吸入管上应装真空度测量仪,并关闭真空泵与制冷系统连接的阀门,起动真空泵应将加压抽至0.033KPa以下,然后停泵观察真空度测量仪,应无泄漏,如有泄漏应消除。

5 管道的连接应符合设计或设备技术文件的要求,机组内部管道连接前,应将所有管及阀门的铁锈、油脂及污物清除洁净,并应保持清洁和干燥,机组内部管道焊接时,宜采用氩弧焊打底,电焊盖面工艺,否则应在管内加衬套在管外加套管焊接,从而不使焊渣及污物掉入设备内部。

6 系统的气密性试验;6.1 当采用氮气或干燥压缩空气进行试验时,试验压力应为0.2MPa;检查设备、管道无泄漏,而后保压24h(6h后计算压力),按《制冷设备、空气分离设备安装工程施工及验收规范》JBJ30—96中2.6.4公式计算,压力降不应大于0.0665KPa。

6.2 采用氟里昂进行试验时,应先将系统抽真空至0.265KPa,并充入氟里昂气体至0.05MPa,然后再充入氮气或干燥空气至0.15Mpa,而后用电子卤素检漏仪进行检查,其泄漏率不应大于2.03Pame/S。

7 系统抽真空试验抽真空试验应在气密性试验合格后进行,试验时,应将系统内绝对压力抽至0.0665KPa,关闭真空泵上的抽气阀门,保持压力24h,按8.6.1中使用的公式计算,压力的上升不应大于0.0266KPa。

  1. 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
  2. 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
  3. 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。

天然气分布式能源冷热电联产工程溴化锂机组安装施工工法
天然气分布式能源冷热电联产工程溴化锂机组安装施工工法
一、前言天然气分布式能源冷热电联产工程溴化锂机组安装施工工法是一种能够以天然气作为能源源,通过冷热电三联供方式提供能源的工程。

本文将对该工法的特点、适应范围、工艺原理、施工工艺、劳动组织、机具设备、质量控制、安全措施以及经济技术分析进行详细介绍。

二、工法特点 1. 使用天然气作为能源源,具有环保优势;
2. 通过冷热电三联供方式实现高效能源利用;
3. 分布式布局,降低能源传输损耗;
4. 可根据实际需求进行灵活配置,适应
不同场景;5. 溴化锂机组技术先进,效果稳定可靠。

三、适应范围本工法适用于城市居民区、商业综合体、工业园区等需要供热、制冷和电力的场所。

特别适用于能源需求高、使用者分散的区域。

四、工艺原理天然气分布式能源冷热电联产工程溴化锂机组的工艺原理基于溴化锂机组的运行机理。

该机组利用露点调节原理,通过冷却水和溴化锂的反应,实现室内温度的调节。

整个工法的理论依据是在实际工程中通过实施的具体技术措施,通过联产模式达到高效的能源利用。

五、施工工艺1. 安装前准备工作:包括工地布置、材料
检查、施工方案确定等;2. 设备安装:按照设计方案进行天
然气分布式能源冷热电联产工程溴化锂机组的安装;3. 连接
管道:将冷却水、热水、天然气等管道连接到机组,确保管道通畅;4. 安装电气设备:安装机组所需的电气设备,并确保
电气连接正常;5. 调试与试运行:进行机组的调试与试运行,确保机组的运行正常;6. 完善系统:根据实际需求,对系统
进行完善,确保能源的供应满足需求。

六、劳动组织根据施工规模和工艺特点,根据实际需求进行合理的人员组织,确保施工过程的高效顺利。

七、机具设备为了进行天然气分布式能源冷热电联产工程溴化锂机组的安装施工工法,需要配备各种机具设备。

例如起重机、吊装工具、电动工具等,这些机具设备在施工过程中起到重要的作用。

八、质量控制为了确保施工质量达到设计要求,需要进行严格的质量控制。

包括材料质量检查、工艺过程控制、设备运行监测等方面的措施。

九、安全措施在天然气分布式能源冷热电联产工程溴化锂机组安装施工过程中,需要注意安全事项。

特别是对于涉及天然气和电气设备的操作,需要制定详细的操作规程,确保施工过程的安全。

十、经济技术分析通过对天然气分布式能源冷热电联产工程溴化锂机组的施工周期、施工成本和使用寿命进行分析,可以评估该工法的经济技术效益。

十一、工程实例本文介绍了一些工程实例,以进一步说明天然气分布式能源冷热电联产工程溴化锂机组安装施工工法的实际应用效果。

总结:天然气分布式能源冷热电联产工程溴化锂机组安装施工工法是一种高效能源利用的工程方式。

通过对该工法的全方位介绍,读者可以了解该工法的特点、工艺原理、施工工艺、劳动组织、机具设备、质量控制、安全措施和经济技术分析。

同时,通过工程实例的介绍,读者可以更好地理解该工法在实际工程中的应用效果。