文档下载后可定制随意修改,请根据实际需要进行相应的调整和使用,谢谢!并且,本店铺为大家提供各种各样类型的实用资料,如教育随笔、日记赏析、句子摘抄、古诗大全、经典美文、话题作文、工作总结、词语解析、文案摘录、其他资料等等,如想了解不同资料格式和写法,敬请关注!Download tips: This document is carefully compiled by theeditor.I hope that after you download them,they can help yousolve practical problems. The document can be customized andmodified after downloading,please adjust and use it according toactual needs, thank you!In addition, our shop provides you with various types ofpractical materials,such as educational essays, diaryappreciation,sentence excerpts,ancient poems,classic articles,topic composition,work summary,word parsing,copy excerpts,other materials and so on,want to know different data formats andwriting methods,please pay attention!地质勘查安全规定与操作流程详解地质勘查是科学研究和资源开发的重要环节,涉及到复杂的自然环境和潜在的安全风险。

地质勘查项目现场管理制度

地质勘查项目现场管理制度

地质勘查项目现场管理制度一、总则为规范地质勘查项目现场管理,保障勘查工作的安全和顺利进行,提高勘查工作效率,特制定本管理制度。

二、适用范围本管理制度适用于公司所有地质勘查项目现场管理工作。

三、项目组织1. 项目经理:负责组织、协调和管理地质勘查项目全过程的工作。

2. 现场主管:负责具体现场管理工作的组织和执行。

3. 现场工作人员:按照项目要求参与现场勘查工作。

四、现场管理流程1. 项目启动阶段:由项目经理召集相关人员召开启动会议,明确项目目标、工作内容和工期,安排人员任务。

2. 现场布置阶段:根据项目需求布置现场办公室、生活设施和相关设备,确保现场工作的正常进行。

3. 现场管理阶段:现场主管负责现场工作人员的管理、指导和协调,确保勘查工作的安全和高效进行。

4. 现场总结阶段:根据项目进展情况召开总结会议,分析和总结工作过程中的问题并提出解决方案,做好相关工作记录。

五、现场管理要求1. 安全管理:严格执行安全生产规定,加强对勘查现场的安全巡查和隐患排查,确保现场勘查工作的安全进行。

2. 工作纪律:严格执行工作纪律和操作规程,严禁违反规章制度和无组织、无纪律的行为。

3. 环境保护:遵守国家和地方环境保护法规,做好现场环境管理和生态保护工作。

4. 设备管理:合理使用和维护勘查设备和工具,确保设备正常运转和使用寿命。

5. 资料管理:做好现场工作记录和资料管理,及时整理和归档相关信息。

6. 协作配合:加强现场各项工作之间的沟通和协作,确保勘查工作的协调进行。

六、现场管理措施1. 现场巡查:现场主管定期进行现场巡查,做好巡查记录。

2. 安全教育:定期进行安全教育培训,提高现场工作人员的安全意识和自防能力。

3. 管理制度落实:确保各项管理制度的落实执行,严格按照规程要求开展现场工作。

4. 问题反馈:及时发现和处理现场工作中的问题,做好问题反馈和整改工作。

5. 紧急预案:制定现场紧急预案,做好应急措施的准备和预案演练。

矿产勘查工作内容要求及程序

矿产勘查工作内容要求及程序

矿产勘探研究的内容与要求
-矿床开采技术条件
研究内容:
研究岩矿石性质及断层、破碎带、节理裂隙、岩溶、风化带、 泥化带、流砂层的发育程度和分布规律;
测定岩(矿)石力学性质和开采时对人有害的物质成分; 研究矿体及近矿围岩坚固性及露采边坡稳定性; 老窿调查:包括分布范围,译充填情况及其分布界限等; 了解对矿山建设可能有严重影响的断层、滑坡、岩溶塌陷等; 在地震区,应对矿区和外围的地质构造活动性进行研究。

勘探工作程序
-勘探计划与设计的编制 矿区勘探总体设计
指整个矿区勘探的基本安排 大型矿区可采取分期分段分批勘探,分期提交
储量,以满足矿山分期建设的需要;应强调整 体与系统的观点。

勘探工作程序
-勘探计划与设计的编制
矿区勘探总体设计书的内容 :
区域自然经济与地理概况;
区域及矿区地质特征;

矿产勘探研究的内容与要求
研究矿床(区)地质特征和矿山建设范围内矿 体分布情况
勘探并研究矿体的外部形态和内部结构 综合勘探和综合评价 研究矿石的物质成分和选冶性能 研究矿床开采技术条件 研究矿区水文地质条件 研究矿区环境地质条件

矿产勘探研究的内容与要求
-地质特征和矿体分布
1、研究矿床(区)地质特征和矿山建设范围内矿 体分布情况
矿区地表水体的分布及其与地下水的水力联系 和对矿床开采的影响;
老窿的积水情况及对矿床开采的影响; 对构造破碎带、断裂带、溶洞发育带及其含水
性、导水性对矿床充水影响进行评价;

矿产勘探研究的内容与要求
-矿区水文地质条件
根据矿床开拓方案,预计矿坑涌水量; 加强区域水文地质条件研究,了解邻近矿区的
-勘探计划与设计的编制

(完整版)矿山地质勘查工作流程管理

(完整版)矿山地质勘查工作流程管理

矿山地质勘查工作流程管理一、矿山地质勘查工作定义矿山地质勘查是以寻找与评价矿产为主要目的的地质勘查活动,在实际地质工作中,一般将地质勘查分为5个阶段,即区域地质调查、普查、详查、勘探和生产勘探。

本管理流程所指矿山地质勘查工作指委托专业地质勘查单位对水泥用原料的地质勘查工作,涵盖范围主要包括矿山普查、详查与勘探。

二、矿山地质勘查工作实施步骤不论是矿山普查还是详查乃至勘探,其勘查工作按推进程序分以下几个步骤:勘查设计、勘查合同签订、勘查野外地质工作、勘查报告编制、勘查报告评审与备案。

每个步骤内工作主要内容、管理的侧重点各不相同,在程序上环环相扣、缺一不可,最终完成矿山勘查工作,为矿山设计与开采提供地质勘查报告成果依据。

三、矿山勘查设计工作矿山勘查设计工作关系到整个勘查工作的质量与成败,主要体现在经济性、合理性两方面,即应合理的投入、最大限度地查明矿山地质情况,满足勘查阶段对报告质量的要求。

1、设计应遵循国家及行业标准:固体矿产地质勘查规范总则(GB/T 13908-2002)固体矿产资源/储量分类(GB/T 17766-1999)冶金、化工石灰岩及白云岩、水泥原料矿产地质勘查规范(DZ/T 0213-2002)2、勘查设计的编制一般情况下,水泥原料矿山勘查设计应委托具有固体矿山勘查一级资质的地勘单位承担。

承担勘查设计的地质勘查单位应成立设计小组,由地质、测量、水文及工程地质、投资预算等专业人员组成,充分收集矿山前期已有地质资料,含图纸、调查报告、预查报告、评价分析报告、化学分析成果等并与项目业主单位进行沟通交流,了解设计目的、确定勘查范围,拟勘查工作提交资源总量等,依据勘查规范,初步确定矿山勘查类型,提交矿山勘查设计。

矿山勘查设计一般分文、图、表三部分组成。

设计文件主要反映矿山地质基本情况,矿山勘查类型的确定及勘查实施方案、投入的主要工作量、预测勘查后的资源量、矿山勘查工作实施计划、矿山勘查工作费用等。

煤矿地质工工作程序及要求范文

煤矿地质工工作程序及要求范文

煤矿地质工工作程序及要求范文一、引言煤矿地质工作是煤矿开发和生产的基础,对煤矿的勘查、选矿、生产调度等环节起着至关重要的作用。

本文将对煤矿地质工作的程序和要求进行详细阐述,以期提高煤矿地质工作的质量和效率。

二、煤矿地质工作程序1. 勘查程序(1)确定勘查目标:根据煤矿开发的需要,确定勘查的具体目标,包括煤层储量、质量和分布等。

(2)制定勘查方案:编制勘查方案,包括采取的勘查方法、勘查的范围和深度、勘查工期和预算等。

(3)地质勘查工作:按照勘查方案进行地质勘查工作,包括地质勘探、地质钻探、地质测量等。

(4)建立地质档案:整理和归档勘查取得的地质数据和资料,确保数据的保存和查询。

2. 储量评估程序(1)资料整理:整理和汇总勘查取得的地质数据和资料,包括地质测量数据、地质钻探数据等。

(2)储量计算:根据地质数据和资料,运用合适的计算方法,计算煤层储量。

(3)储量估算:依据储量计算结果,结合地质条件,对煤层储量进行估算。

(4)编制储量报告:将储量计算和估算结果编制成储量报告,供相关部门参考。

3. 资源调查程序(1)煤层分布调查:对煤矿区域的煤层进行详细的地质调查,确定煤层的分布范围和品质情况。

(2)矿产资源调查:对煤矿区域的其他矿产资源进行调查,确定其类型、储量和开发价值。

(3)环境调查:对煤矿区域的环境进行调查,包括地质地貌、水文地质和生态环境等。

(4)资源评价:根据调查结果,对煤矿区域的煤炭资源进行评价,确定其开发潜力和经济价值。

4. 煤矿设计程序(1)选址与规划:根据资源调查结果和煤矿开发的需求,确定煤矿的选址和规划方案。

(2)煤矿布置:确定煤矿主要设施的布置,包括矿井、采掘工作面、矿山设施等。

(3)矿山开发方式:确定煤矿的开发方式,包括地下开采、露天开采等。

(4)矿井设计:编制矿井设计方案,包括井筒、沿井巷道、风井、排水等。

(5)安全设计:编制煤矿安全设计方案,包括瓦斯防治、矿山通风、矿山水文等。

(完整版)矿山地质勘查工作流程管理

(完整版)矿山地质勘查工作流程管理

矿山地质勘查工作流程管理一、矿山地质勘查工作定义矿山地质勘查是以寻找与评价矿产为主要目的的地质勘查活动,在实际地质工作中,一般将地质勘查分为5个阶段,即区域地质调查、普查、详查、勘探和生产勘探。

本管理流程所指矿山地质勘查工作指委托专业地质勘查单位对水泥用原料的地质勘查工作,涵盖范围主要包括矿山普查、详查与勘探。

二、矿山地质勘查工作实施步骤不论是矿山普查还是详查乃至勘探,其勘查工作按推进程序分以下几个步骤:勘查设计、勘查合同签订、勘查野外地质工作、勘查报告编制、勘查报告评审与备案。

每个步骤内工作主要内容、管理的侧重点各不相同,在程序上环环相扣、缺一不可,最终完成矿山勘查工作,为矿山设计与开采提供地质勘查报告成果依据。

三、矿山勘查设计工作矿山勘查设计工作关系到整个勘查工作的质量与成败,主要体现在经济性、合理性两方面,即应合理的投入、最大限度地查明矿山地质情况,满足勘查阶段对报告质量的要求。

1、设计应遵循国家及行业标准:固体矿产地质勘查规范总则(GB/T 13908-2002)固体矿产资源/储量分类(GB/T 17766-1999)冶金、化工石灰岩及白云岩、水泥原料矿产地质勘查规范(DZ/T 0213-2002)2、勘查设计的编制一般情况下,水泥原料矿山勘查设计应委托具有固体矿山勘查一级资质的地勘单位承担。

承担勘查设计的地质勘查单位应成立设计小组,由地质、测量、水文及工程地质、投资预算等专业人员组成,充分收集矿山前期已有地质资料,含图纸、调查报告、预查报告、评价分析报告、化学分析成果等并与项目业主单位进行沟通交流,了解设计目的、确定勘查范围,拟勘查工作提交资源总量等,依据勘查规范,初步确定矿山勘查类型,提交矿山勘查设计。

矿山勘查设计一般分文、图、表三部分组成。

设计文件主要反映矿山地质基本情况,矿山勘查类型的确定及勘查实施方案、投入的主要工作量、预测勘查后的资源量、矿山勘查工作实施计划、矿山勘查工作费用等。

地质勘探工作流程及内容

地质勘探工作流程及内容

地质勘探工作流程及内容下载温馨提示:该文档是我店铺精心编制而成,希望大家下载以后,能够帮助大家解决实际的问题。

文档下载后可定制随意修改,请根据实际需要进行相应的调整和使用,谢谢!并且,本店铺为大家提供各种各样类型的实用资料,如教育随笔、日记赏析、句子摘抄、古诗大全、经典美文、话题作文、工作总结、词语解析、文案摘录、其他资料等等,如想了解不同资料格式和写法,敬请关注!Download tips: This document is carefully compiled by the editor. I hope that after you download them, they can help yousolve practical problems. The document can be customized and modified after downloading, please adjust and use it according to actual needs, thank you!In addition, our shop provides you with various types of practical materials, such as educational essays, diary appreciation, sentence excerpts, ancient poems, classic articles, topic composition, work summary, word parsing, copy excerpts,other materials and so on, want to know different data formats and writing methods, please pay attention!地质勘探是一项十分重要且复杂的工作,它涉及到地球科学、地质学、地球化学、矿物学、物理学、数学等方面的知识,是矿产勘查和矿产资源开发的基础。

矿山管理工作流程及内容

矿山管理工作流程及内容

矿山管理工作流程及内容下载温馨提示:该文档是我店铺精心编制而成,希望大家下载以后,能够帮助大家解决实际的问题。

文档下载后可定制随意修改,请根据实际需要进行相应的调整和使用,谢谢!并且,本店铺为大家提供各种各样类型的实用资料,如教育随笔、日记赏析、句子摘抄、古诗大全、经典美文、话题作文、工作总结、词语解析、文案摘录、其他资料等等,如想了解不同资料格式和写法,敬请关注!Download tips: This document is carefully compiled by the editor. I hope that after you download them, they can help yousolve practical problems. The document can be customized and modified after downloading, please adjust and use it according to actual needs, thank you!In addition, our shop provides you with various types of practical materials, such as educational essays, diary appreciation, sentence excerpts, ancient poems, classic articles, topic composition, work summary, word parsing, copy excerpts,other materials and so on, want to know different data formats and writing methods, please pay attention!现代社会对环境保护和资源利用的重视程度逐渐增强,矿山管理作为资源开发的重要环节,扮演着至关重要的角色。

  1. 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
  2. 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
  3. 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。

矿山地质勘查工作流程管理一、矿山地质勘查工作定义矿山地质勘查是以寻找与评价矿产为主要目的的地质勘查活动,在实际地质工作中,一般将地质勘查分为5 个阶段,即区域地质调查、普查、详查、勘探和生产勘探。

本管理流程所指矿山地质勘查工作指委托专业地质勘查单位对水泥用原料的地质勘查工作,涵盖范围主要包括矿山普查、详查与勘探。

二、矿山地质勘查工作实施步骤不论是矿山普查还是详查乃至勘探,其勘查工作按推进程序分以下几个步骤:勘查设计、勘查合同签订、勘查野外地质工作、勘查报告编制、勘查报告评审与备案。

每个步骤内工作主要内容、管理的侧重点各不相同,在程序上环环相扣、缺一不可,最终完成矿山勘查工作,为矿山设计与开采提供地质勘查报告成果依据。

三、矿山勘查设计工作矿山勘查设计工作关系到整个勘查工作的质量与成败,主要体现在经济性、合理性两方面,即应合理的投入、最大限度地查明矿山地质情况,满足勘查阶段对报告质量的要求。

1、设计应遵循国家及行业标准:固体矿产地质勘查规范总则( GB/T 13908-2002 ) 固体矿产资源/ 储量分类( GB/T 17766-1999 ) 冶金、化工石灰岩及白云岩、水泥原料矿产地质勘查规范( DZ/T 0213-2002 )2、勘查设计的编制一般情况下,水泥原料矿山勘查设计应委托具有固体矿山勘查一级资质的地勘单位承担。

承担勘查设计的地质勘查单位应成立设计小组,由地质、测量、水文及工程地质、投资预算等专业人员组成,充分收集矿山前期已有地质资料,含图纸、调查报告、预查报告、评价分析报告、化学分析成果等并与项目业主单位进行沟通交流,了解设计目的、确定勘查范围,拟勘查工作提交资源总量等,依据勘查规范,初步确定矿山勘查类型,提交矿山勘查设计。

矿山勘查设计一般分文、图、表三部分组成。

设计文件主要反映矿山地质基本情况,矿山勘查类型的确定及勘查实施方案、投入的主要工作量、预测勘查后的资源量、矿山勘查工作实施计划、矿山勘查工作费用等。

3、勘查设计的评审勘探设计的评审分内部评审及国土资源管理部门评审两部分。

内部评审:一般情况下,由矿产资源部组织进行,参加单位及成员有: 项目业主单位、矿山设计单位、品质部及工程审计部、集团矿山专业委员会有关成员。

评审工作主要内容为设计的合理性、科学性、设计勘查的预测资源量、资源品质能否满足项目建设需要等方面。

通过研讨,对矿山设计进行优化,最终由地质勘查单位根据评审意见进行设计修改,进行优化,补充与完善,提交设计书报项目业主单位送国土资源管理部门审查。

国土资源管理部门评审:大、中型水泥原料矿山的地质勘查设计一般需由当地省国土资源厅委托储量评审中心等机构成立专家组进行。

专家组成员为矿山资源评审专家库人员,专家组按照地质勘查规范及国家现行资源勘查管理有关政策法规对设计进行评审,对水泥原料矿山重点审查对资源量的控制程度是否合理与满足规范要求,最终形成专家组意见,内地设计单位根据专业组意见对设计进行修改,最终经专家组长审定后,将设计提交省国土资源厅备查,项目业主单位与地勘单位执行。

审查设计的工程量投入及项目费用预算将作为勘查合同签订的主要依据。

四、勘查合同的签订1、地质勘查单位的确定委托地勘单位进行矿山勘查工作,根据前期工作情况可以以邀请招投标及议标两种方式进行。

合同洽谈以工程审计部为主,矿产资源部、业主单位参加。

邀请招投标方式:分设计前及设计后两种情况。

所谓设计前,即邀请有资质、信誉好的三家以上地勘单位对矿山进行勘察设计与报价,最终确定设计方案最合理、工期适当、造价最低的单位为矿山勘查单位;所谓设计后,即项目业主单位提交已确定的勘查设计方案的基础上,邀请三家以上勘查单位对勘查工作进行报价,一般以最低价中标的原则确定地勘单位。

议标方式:由于勘查工作存在普查、详查、勘探的阶段性及渐进性,在勘查许可或到某一勘查阶段已确定勘查单位的情况下,则由勘查单位报价,最终由合同谈判小组结合勘查定额标准,前期勘查合同签订情况,现行市场工程造价情况与勘查单位进行协商,最终以不高于勘查定额标准的总造价作为合同价,与之签订勘查合同。

2、勘查合同主要条款的确定根据《合同法》以及项目实际情况,勘查合同主要条款及内容包括:勘查矿山范围、矿种、投入的实物工程量、双方责任范围、合同工期及造价以及其他双方需约定子项,由于勘查工作对矿山资源认知的不确定性,在合同条款中对方责任中应强调当勘查实施过程情况与设计发生重大变化时(如品位质量与原设计相差太大,不利于矿山使用,矿体规模、资源量与原设计相差太大,矿山规模下降等),地勘单位应及时通知业主单位与矿产资源部,以便数据变化情况对勘查工作进行调整甚至停止勘查工作。

3、勘查合同的报批审定业主公司拟定合同,经办人及公司分管领导、总经理审批签字T区域负责人审批签字(未成立业主公司时,由矿产资源部代理)T工程审计部与矿山资源部会签T股份公司矿山分管领导审批签字T股份公司总经理最终审批T 双方法定代表人签字、双方单位盖合同章、正式签订合同。

报批合同除合同文字条款外,应附矿山总平面工程布置图,工程造价预算及最终条目价表等。

五、勘查野外地质工作勘查野外工作的质量直接关系到矿山勘查报告成果的质量与可信度,勘查野外作业的进度直接关系到报告提交时间及办理矿业权的进度,因此做好勘查野外工作管理十分重要。

1、勘查野外工作应遵循国家及行业标准,包括前面在设计工作章节中应有的国家及行业标准外,还包括:固体矿产勘查原始地质编录规定( DZ/T 0078-1993 )、固体矿产钻探岩矿芯管理通则( DZ/T 0032-1992 )、地质矿产勘查测量规范( DZ/T 0091 )、矿区水文地质、工程地质勘查规范 (GB12719-91)2、矿山勘查野外、检查要点:1) 槽、井、坑探原始地质编录资料质量:工程布置和施工质量达到地质目的;各种地质矿产现象、特征的记录和素描图资料齐全完整、准确,并与实际吻合;样品采集齐全,有代表性,采样方法和规格符合相关要求;采样编录完整、准确无误;样品副样保管完好,注记清晰、无误无漏;对现场编录资料、样品分析测试成果及时进行整理,并及时提交有关原始资料;检、抽查及问题处理及时,记录完整、客观2) 钻探原始地质编录资料质量:布孔和施工质量达到地质目的;各种地质矿产现象、特征的记录和柱状图资料齐全完整、准确,并与实际吻合;样品采集齐全,有代表性,采样方法和规格符合相关要求;采样编录完整、准确无误;岩心及样品副样保管完好,注记清晰、无误无漏;对现场编录资料、样品分析测试成果及时进行整理,并及时提交有关原始资料;检、抽查及问题处理及时,记录完整、客观3)实测地质剖面原始地质编录(路线地质调查原始地质编录参照本项要求):剖面(路线)选择和控制程度达到地质目的;各点位及沿途各种地质矿产现象、特征的记录和素描图资料齐全完整、准确,并与实际吻合;剖面图、柱状图上各项要素齐全、表达准确合理,并与记录相符、与实际吻合;样品采集齐全,有代表性,采样方法和规格符合相关要求;采样编录完整、准确无误;对现场编录资料、样品分析测试成果及时进行整理,并及时提交有关原始资料;检、抽查及问题处理及时,记录完整、客观。

4)地质填图原始地质编录:各种地质矿产现象、特征的记录和素描图资料齐全完整、准确,并与实际吻合;野外手图、实际材料图内容齐全、简明准确,并与记录相符、与实际吻合;样品采集齐全,有代表性,采样方法和规格符合相关要求;采样编录及注记完整、准确无误;对现场编录资料、样品分析测试成果及时进行整理,并及时提交有关原始资料;检、抽查及问题处理及时,记录完整、客观。

5)矿区有关地质图件编录:矿区平面地质(草)图、工程布置图、勘探线剖面图、采样平面图等必要的基本工作图件齐全;各种资料在图件上表示及时、准确;图面美观、简洁、清晰。

6)采样原始地质编录:样品采集符合要求;样品登记表齐全、准确,并与有关图、文相互吻合;样品分析报告整理及时、准确;内、外检样品比例符合要求。

7)矿区水文地质调查原始地质编录:地质观测线、观测点布置合理,标志、标记清楚;资料收集全面、准确,观测点记录翔实;文、图、表齐全、完善、美观、清晰并相互吻合。

8)原始地质编录资料的管理:原始编录资料保管程序及责任明确;原始编录资料修改按程序进行并注明修改原因,批注人及日期;原始编录资料使用得当。

9)质量管理情况:原始资料自检、互检、抽查记录及修改记录齐全;各类技术标准的实施细则齐全;各类工作质量检验标准齐备,其内容齐全、合适,所引用的标准、规范或规定合适;各类矿产勘查工作作业指导书齐全、得当。

3、勘查野外地质工作管理矿产勘查野外地质工作管理工作由项目业主公司负责、矿产资源部对其进行监督与抽查。

项目业主公司应指派有一定矿山地质工作经验的技术人员负责勘查野外工作日常管理工作,根据勘查合同与勘查单位研讨确定具体勘查进度计划安排并监管执行,根据矿山勘查野外工作检查要点对勘查工作质量进行检查,当进度、质量方面存在问题时应及时反映给矿产资源部,并向勘查单位发函,指出问题及整改要求其中重点检查把关的环节有:1)测量范围:检查是否与合同签订范围、面积一致,能否满足开采设计要求。

2)槽探工程布置:是否与设计一致,土方工程量完成情况,是否挖至新鲜基岩并按规格取样,如有位置调整,是否合理等,槽探编号是否真实、完整等。

3)钻探工程布置:是否施工在设计位置,钻孔岩矿芯采取率是否达到规范要求,(岩性三75%矿芯三80沟,岩芯摆放是否存在混乱现象,采样是否采用正规半芯法等。

钻孔孔深是否达到设计要求,如增加或减少孔深是否合理,终孔孔深是否经过大量检测确定等,钻孔编录是否真实、完整、准确等。

4)地质填图等对矿山的地质调查工作是否全面,工作密度及深度是否达到规范要求,原始记录是否完整、真实可靠等。

业主单位现场管理人员对勘查野外工作检查情况应以文字、图表等方式予以记录在案,并提交给公司组织的野外工作验收组。

4、勘查野外工作验收勘查野外工作验收工作分内部验收及国土资源管理部门组织验收,时间上,内部验收在前,国土资源管理部门组织验收在后,只有在内部验收通过后,方可安排国土资源管理部门组织验收。

1)内部验收当勘查单位完成野外地质工作后由勘查单位向业主单位提交申请,说明勘查工作完成情况,全工程量完成情况,质量自评情况等,业主公司应邀请区域矿山专业人员参加,组成验收小组,对照合同及勘查设计及矿山勘查野外检查重点对其进行现场验收,对完成工程量、质量情况进行评定、确定;明确是否完成合同规定野外工作项目与内容,形成验收意见报矿产资源部,有条件时,矿产资源部派人参与其验收工作。

2)国土资源管理部门组织的验收根据目前掌握的情况,大部分省份其国土资源管理部门将组织专家组对勘查项目进行野外工作验收,其验收的要求与内部验收基本相同,其专业性更强,验收工作主要关注实施的勘查工程是否满足对矿山资源的控制与查明,野外工作工程质量等方面,提交验收报告,作为矿山勘查报告评审的依据之一。