Bauer_Junior_ll介绍
Autodesk Factory Design Utilities 工作流教程:从零开始到英雄说明书

IM322819-LFactory Design Utilities Workflow-from Zero to Hero Peter De StrijkerAutodeskCo-presenters:Daniel Lutz Paul MunfordAutodesk AutodeskDescriptionThis introductory hands-on lab will guide you through all the steps of setting up a production facility with Factory Design Utilities, from ideation to imagery, based on a step-by-step guided data set.Speaker(s)Peter De Strijker is an application engineer / industrial manufacturing for Autodesk, Inc. He is responsible for driving the Autodesk manufacturing sales channel in the Benelux region in Europe. Before joining Autodesk, Peter worked as mechanical design engineer at a Belgian marine engine and gearbox manufacturer. He is a graduated engineer with a degree in electro mechanics.User Assets LibraryIt’s important to be able to populate the library with user specific assets. Let’s create one!1.Open the Import Asset function in Inventor Factory Ribbon.Ribbon: Get Started >Factory Launch > Create Asset > Import AssetSelect ...\ AU2019FDUDataset\Design\05-Asset Creation\Robot Controller.ipt and click Open.The model is now loading into the Asset Builder environnement.2.Open the Landing Surface function.Ribbon: Asset Builder > Author > Landing SurfaceSelect the bottom surface of the machine enclosure to define it as the landing surface.In the Landing Surface dialog, click Select Insertion Point and select the two points marked. Click OK to confirm the changes.3.Open the Define Connector function.Ribbon: Asset Builder > Author > Define ConnectorSelect the center of the left-hand edge as the insertion point.Select the red direction arrow and click the left-hand vertical edge of the box to define alignment.Select the blue arrow and select a vertical edge on the model. The blue arrow now points upwards.Press [ENTER] to close the command.4.Create a second connector in the same way.5.Open the Asset Variants function.Ribbon: Asset Builder> Author > Asset VariantsSelect the Width parameters and click the >> button.Using the + button, create three variants with the following values and click OK to close the dialog.6.Open the Asset Properties function.Ribbon: Asset Builder > Author > Asset PropertiesOn the Summary tab, enter Title Robot Controller and Company Autodesk and click OK to confirm your entry.7.Save the design.8.Open the Publish Asset function.Ribbon: Asset Builder > Publish > Publish AssetEnter asset name Robot Controller and select a destination directory. Click OK to confirm your entry.9.Close the part.10.Open file ...\ AU2019FDUDataset\Design\04-Packaging machine\ _0012009310.iamAs you can see, there are over 2.800 parts, too much for an asset so let’s simplify this11.First make sure to fully load the file.12.Open Shrinkwrap functionRibbon: Assemble > Simplification13.Enable “Remove parts by size” and select footplate as reference.14.With this operation, almost 2/3 of the parts are already excluded from simplification15.If you want to include hidden parts again, click Excluded option and select e.g. footplates againin graphical interface.16.Go to the Features tab to remove unnecessary features like holes, filets and chamfers items thesame style.17.Go to the Create tab to convert the simplified model into one single object18.Enable Break link to improve performance19.Open Asset Builder functionRibbon: Factory > Factory Launch20.Define the landings Surface21.Open the Publish asset function.22.Close the assembly.Production Process Analysis – Process Flowchart OPTIONAL23.Make sure the Layout Browser is loaded24.Create a New Layout25.Start Process Analysis in the factory ribbonRibbon: Factory > ToolsOpen ...\ AU2019FDUDataset\Design \06-Process Analysis \ Mannheim_Process - Start.adskfpa26.Activate “View Line Balancing Chart” in View Settings27.Run Simulation28.Note that for example the Rivet Press is most of the time in “Idle” state because it’s waiting formaterials and the Form Press is blocked because the next machine is still processing.29.Note that the total process time to produce 20 shovels is 78 h30.Run a html report to document the current state.31.Select …Rivet Press“ and modify the production parameters from 6 connection elements to 132.In the Process layout, add a buffer with 500 pieces capacity between …Form Press“ and …BeltGrinder“ and reconnect the process33.Run the simulation again and analyse the process impact of the modified machines34.Run a html report to document this process state.35.Open both html reports and compare the results36.Export the Process layout to a DWG fileCreate a New Sub Layout Area37.In Autocad Arch, create a new drawing.38.Make sure the Layout Browser is loaded39.Open in Layout Browser this file ...\ AU2019FDUDataset\Design\01-Data\Mannheim_youtData40.Type XREF in the command line to launch External References Manager41.Attach new XREF “Mannheim_G .dwg” to the drawinge Xref import settings as shown43.The xref will be automatically positioned as shown below44.Select the outline of the xref(1).45.Click the Open Reference command on the Context Ribbon (2).46.Activate the Factory Asset Browser by selecting the Palettes flyout on the Factory Ribbon andClick Asset Browser.47.Open this library folder in the Asset Browser48.Drag and drop Assets from the Asset Library into the layout as shown below49.Click on icon and draw a line as shown below50.Click Open in Inventor Command.51.Click OK on the dialog that displays.52.Click Yes on the Save Notification is necessary.53.The Inventor application will launch and create a 3D version of your 2D layout.54.Let’s wait a few seconds ….this is what you’ll get55.Select Y-merge roller conveyor and place them as shown below, connect with strait conveyors57.Connect the Robot positioning table to the frame connector as shown below58.…and let it snap like this…..plete the layout as shown below61.Finish the sub-layout by adding the below packaging machine and pallet conveyor assets asshown below.62. Open Layer Manager63. Open Import Layers64. ….. and load “Layer_Template_FDU.dwg” from the Documentation folder65. Import should look like this66. Select all conveyors in the layout and assign them to the “Conveyors” layer and continue withother assets Don’t forget to ENTER after each layer assignment67. On the Factory Ribbon, Click the Open in AutoCAD command.68. If prompted to Save the file, Select Yes and Ok to any dialog prompts.69. Click Yes when prompted to open the File in AutoCAD.70.Autocad Xref will be updated with all 3D changed made71.Save this file72.Switch to the o verall.dwg file and update all Xref’s73. Overall Layout is updated with new Xref content.Material Flow74.Open Production A-New xRef75.Open the Material Flow Browser.Ribbon: Factory > Tools > Palettes Flyout > Material Flow76.Click on the Routings ribbon tab.77.Move “Grinder 2” to location closer to powder coating machine and see the impact on time anddistance of the process.78.Close Optimization environment by selecting button below79.Click Open in Inventor Command.80.Open ...\ AU2019FDUDataset\Design\01-Data\Office_01.iam81.In the asset browser, select “Insert Asset Group” and select ...\ AU2019FDUDataset\Design\01-Data\Finished_Layout\ Office_01_Fin.iam82.Position the asset group inside the empty rectangle and confirm83.The main Layout will now contain an office space equipped with a standard set of furniture.84.OPTIONAL85.Insert solid building86.Select file ACAD_A_BUILDING_1.ipt in the 02-Buildings folder87.RMB and select “Insert Grounded at Originyout should look like thisPoint cloud project integration with Recap89.In Factory>Point Cloud tab, select Autodesk Recap90.Create a new project and give it a name and destination91.Import point cloud92.Select Files to Import button93.Browse for file Bestand_3.rcs and openunch project95.Screen should look like this96.Let’s make a discovery flight through the point cloud data97.After the fly through, select Front in the View Cube.98.Change to Orthographic view by selecting99.Box select the top of the point cloud data100.Create a new region101.Hide new region102.Go to Top view, model should look like this103.Clean out the point cloud data like image below104.Make hidden region visible again105.point cloud data should look like image below106.Save the project and switch back to Inventor107.In Factory ribbon, select Attach108.Select the new saved *.rcp project and click anywhere in the layout 109.In the dialog box, insert point cloud project at origin110.Inventor Layout should look like this111.In the point cloud navigator, switch on/off the region.Project Overview Navisworks112.Open the application NavisWorks Manage113.Open the file...\ AU2019FDUDataset\Design\01Data\Finished_Layout\Finished_Layoutv2.nwd114.In the viewpoint ribbon, select “Inside” viewpoint115.Walk around and look around in the facility.116.Let’s check for collisions, select this button117.Add a new test118.Scroll down and Expand the selection boxes and select models as shown119.Run the test120.You will detect a collision121.Let’s markup this error for engineering and save the viewpoint.122.Create a markup123. Add some comment124.Go back to “start” viewpoint125.Access Ribbon command in Animation ribbon126.Record animation while walking through facilityPanorama Shaded visual127.Walk nearby the robot area as shown below.128.In “Render” ribbon pick Render in Cloud option 129.In the option box, pick the following options130.After a short waiting time, this is the result you will see.I hope you liked it?Thank you!。
高三英语试题大全

高三英语试题答案及解析1. Martha Berry was named one of _____ women in the United States.A.the twelve most important B.twelve the most importantC.the most important twelve D.the most twelve important【答案】A【解析】略2.–Will Thursday or Friday _________you?–Either will ________.A.fit; be B.fit; OK C.suit; all right D.suit; do【答案】D【解析】略3.–I have tried very hard to find a solution to the problem, but in vain.–Why not consult with Frank? You see, _______________.A.great minds think alikeB.two heads are better than oneC.a bird in the hand is worth two in the bushD.it’s better to think twice before doing something【答案】B【解析】略4.The time is not far away ______ modern communications will become widespread in China’s vast countryside.A.when B.as C.until D.before【答案】A【解析】略5. --- What do you think of the new manager of your department?--- Oh, he is ________ manager who’s pleasant to work with. I mean, it is ______ pleasure to work with him.A.the; \B.a; a C.a; the D.\; a【答案】 B【解析】略6.—I just can't stop worrying about the result of the English examination.—__ _.There's nothing you can do now but wait.A.Take your time B.Take it easyC.Don't mind D.Don't mention it【答案】B【解析】略7.— It is important for you to find appropriate course at college.—I can't agree more.It's decision that affects the whole family.A.the, the B.an, the C.an, a D.the, a【答案】C【解析】略8. How long do you think ____ the car factory launches a new model?A.will it be until B.it will be before C.will it be when D.it will be that【答案】B【解析】略9.—What is that noise?—Oh, I forgot to tell you that the new machine .A.was tested B.will be tested C.has been tested D.is being tested【答案】D【解析】略10. To enjoy the scenery, Sara would spend long hours on the train ______ travel by air. A.as to B.other than C.instead of D.rather than【答案】D【解析】略11. Only one of the places is ________A.worth to visit B.worth visitingC.worth of visiting D.worth being visited【答案】B【解析】略12. Always read the ___ on the bottle carefully and take the right amount of medicine.A.explanations B.descriptionsC.introductions D.instructions【答案】D【解析】略13. A modern city has been set up in _______ was a wasteland ten years ago.A.what B.which C.that D.where【答案】A【解析】略14. Mike is handsome, kind and full of energy., I can’t speak too highly of him.A.As a result B.By the way C.In a word D.On the contrary【答案】C【解析】略15. Being alone in outer space can be __36__. That is one reason why astronauts on solo space flights were given plenty of work to keep them 37 . They were also in constant communication with people on the earth. 38 , being with people from whom you cannot get away might be even harder than being alone. This is what happens on long submarine(海底)voyages. It will also happen on 39 space flights in the future. Will there be special problems of adjustment under such conditions?Scientists have studied the reactions of men to one another during long submarine voyages. They have also found that the longer the voyage lasts, the more serious the problem of 40 is. When men are 41 together for a long period, they begin to feel 42 . Everyone has little habits of speaking and behaving that are ordinarily acceptable. In the limited space over a long period of time, however, these little habits may become very_ 43 .Apparently, although no one wants to be 44 all the time, everyone needs some degree of privacy. When people are enclosed together, they are in what is called stress situation. That means that they are under an unusual amount of 45 or stress.People who are well-adjusted are able to 46 stress situations better than others. That is one reason why so much care is taken in 47 our astronauts. These men undergo a long period of testing and training. One of the things tested is their behavior under stress, and thus they can do better than ordinary people.【1】A.excited B.frightening C.confusing D.brave【2】A.tired B.asleep C.conscious D.busy【3】A.So far B. After all C.However D.Therefore 【4】A.long B. fast C.dangerous D.direct【5】A.fuel B.entertainment C.adjustment D.health【6】A.shut up B.held up C.brought up D.picked up 【7】A.uneasy B.interested C.comfortable D.excited【8】A.pleasing B.annoying C.common D.valuable【9】A.noisy B.alone C.personal D.sociable 【10】A.emphasis B.conflict C.power D.pressure【11】A.handle B.create C.affect D.investigate 【12】A.becoming B.choosing C.ordering D.promoting【答案】【1】B【2】D【3】C【4】A【5】C【6】A【7】A【8】B【9】B【10】D【11】A【12】B【解析】略16. 25. Jack is making up his mind to get a ticket for the concert ____it means standing in a queue all night.A.as if B.even if C.in case D.as long as【答案】B【解析】略17. You should report any incident, serious or minor it is.A.what B.how C.whether D.however【答案】D【解析】略18. An example of them is fraud, a crime _______ money is stolen by cheating others. A.which B.that C.what D.where【答案】D【解析】略19.第二节阅读下列材料,从所给的六个选项(A、B、C、D和E)中,选出符合各小题要求的最佳选项,并在答题卡上将该项涂黑。
美宝莲介绍幻灯片

美宝莲swot分析之 分析之threaten 美宝莲 分析之
1. 中国本土的日化产品重新占据市场,价格 和市场都比较看好,人们对品牌的认识更加理 性,品牌选择更加自主,也更具个性化。如 BB霜的上市较本土的晚。且本土产品有成本 低等优势。 2. 竞争者的网络营销开展不错,而且效果明 显,很容易将消费者抢夺过去。如:高丝也推 出了彩妆品牌芮谜,并且,网络消费者的品牌 忠诚度不是很高,大部分都会跟随促销活动选 择品牌。 3.缺乏高端品牌,最高单品价格为150元。
美宝莲大事记
• • • • • • 1996美宝莲被欧莱雅集团收购。 1998美宝莲销量稳居中国彩妆市场第一。 2000美宝莲销量稳居美国彩妆市场第一。 2001美宝莲成为澳洲第一彩妆品牌。 2002美宝莲成为世界第一彩妆品牌。 2004美宝莲正式改名为美宝莲纽约。作为一个来自纽约 时尚之都的全球性彩妆品牌,美宝莲纽约当之无愧的引 领着中国及世界彩妆的时尚潮流。 • 2008美宝莲纽约销售超过90个国家和地区。在美的领 域为每一位中国女性提供最适合的美妆产品
赢利—水到渠成
• 随着对中国市场认识的逐步加深, 近年来不论是品牌管理还是渠道建 设,都越来越符合中国国情。在大 众彩妆品市场上,今天的美宝莲已 经占据了市场的绝对主动权。
• 美宝莲纽约自 美宝莲纽约自1917年成立,生产出世界上 年成立, 年成立 第一支现代眼部化妆品,至今已经有了90 第一支现代眼部化妆品,至今已经有了 多年品牌历史。如今, 多年品牌历史。如今,美宝莲纽约已经成 为了一个具有传奇色彩的全球化妆品先驱 公司。在世界90多个国家及城市中 多个国家及城市中, 公司。在世界 多个国家及城市中,美宝 莲纽约已经成为第一个针对女性生产化妆 及护肤品的公司。 及护肤品的公司。
美国特种商品:罗尔集合product Twin Hide-A-Roll浴室纸巾架说明书

S
[151]
TOP VIEW
7-1/32" [179]
MOUNTING HOLES CONCEALED ON REAR WALL
12-1/8" [308]
CL
NOTE
2-1/2" [64]
ALL DIM’S INCH [MM]
ILLUSTRATION FOR REF ONLY AND NTS
FOR CLEANING INSTRUCTIONS SEE APPROPRIATE SECTIONS IN PRODUCT CARE & MAINTENANCE
Roval™ Collection Surface Mounted Sanitary Waste Receptacle shall be Model № 20852 of American Specialties, Inc., 441 Saw Mill River Road, Yonkers, New York 10701-4913
10" [253]
FRONT VIEW
8-5 8" [219]
SIDE VIEW
SPECIFICATION Roval™ Collection Surface Mounted Sanitary Waste Receptacle shall hold 1 gallon (3.8 liters) of waste material. Cabinet full top cover shall be drawn seamless and receptacle body shall be formed seamless and shall have bowed front face and gently radiused front vertical edges to provide added strength and complimentary appearance for modern washroom aesthetics. Full top door shall be 22 gauge type 304 stainless steel alloy 18-8 with satin finish and shall be attached to the cabinet at back with a concealed full-width 9/64" diameter (Ø3.5) heavy-duty stainless steel multi-staked piano hinge. Structural assembly of body and door components shall be of welded construction. Unit shall be 22 gauge type 304 stainless steel alloy 18-8 with satin finish and shall have contoured cover finger lift relief and be protected during shipment with PVC film that is easily removable after installation. Receptacle full top edge is hemmed with return to inside for user and service safety. Receptacle shall have no exposed fastening devices or spot-welded seams. Receptacle shall be screw mounted to wall or partition through concealed keyhole slots provided through rear panel.
德国库伯勒KUBLER公司简介

德国库伯勒KUBLER公司简介:德国库伯勒KUBLER (KUEBLER)公司创始人Fritz Kbler于1960年在他父母的房子里面生产了第一件电子装置之后, Kbler在传感器领域,仪表和过程控制领域就广为人知,公司信条为"凡事细致,为了完成更精确和更卓越的工作",秉承这一理念, 德国库伯勒KUBLER (KUEBLER)的计数器和计时器在机械制造企业里面取得了很大的成功,公司创立近五十年来,以优质、创新和灵活的服务准则,生产的旋转编码器产品,直线测量系统,计数器,计时器以及过程仪表技术赢得了超过五十个国家数千个客户的信任和欣赏,创建了在工业自动化领域内多行业的创新应用,为运动部件的检测,工业物理量测量、显示、计数和控制提供了多种解决方案,整个纽约市的铁路系统应用的都是KUBLER编码器,医院在非常精确的测量应用中大量使用了KUBLER的过程控制器.汽车行业的福特和Hyundai 在他们的物流系统中成功地使用了KUBLER的总线编码器,德国库伯勒KUBLER(KUEBLER)每年投资销售额的15%进行研发,为客户提供满足其个性化需求的性价比更高的产品和解决方案。
主要的应用场合包括:钢铁STEEL,齿轮电机GEARED MOTORS,升降机和电梯;LIFTS AND ELEVATORS,风力发电WIND POWER,医疗技术MEDICAL TECHNOLOGY,能源业ENERGY,包装机械PACKING MACHINES,木工工业WOODWORKING,UV和HV AC…德国库伯勒KUBLER (KUEBLER)编码器及直线测量系统KUBLER产品从微型的增量编码器到绝对式单圈和多圈编码器,并且可以提供ATEX防爆认证产品和重载系列产品,同事提供线性磁性测量系统和拉绳测量系统,目前市场上所有的通用接口和现场总线协议德国库伯勒KUBLER (KUEBLER)都可以支持,更有独有的专利集成技术,集成传感器技术以及安全锁设计SAFETY LOCK和OPTOASIC技术,已经被业内作为新的可靠安全功能的标准。
冰球鞋码对照表

Ice Hockey Skate Size Y10 Y11 Y12 Y13 Y13 1 1 1.5 2 2.5 3 3.5 4 5 5.5 6 6.5 7 7.5 8 8.5 9 9.5 10 10.5 11.5 12 13
Inline Hockey Skate Size Y10 Y11 Y12 Y13 Y13 1 1 1.5 2 2.5 3 3.5 4 5 5.5 6 6.5 7 7.5 8 8.5 9 9.5 10 10.5 11.5 12 13
Easton skates generally fit 1.5 sizes down from your shoe size. For example, if wearing a US 8.0, you would generally wear a 6.5 Eas
MISSION的鞋号和USA的普通鞋号一致。
Skate Size CCM & Reebok USA EU UK CM Y8.5 Y8 Y9.5 Y9 Y10.5 26.5 Y9.5 16.9 Y10 Y11.5 27.5 Y10.5 17.7 Y11 Y12.5 29 Y11.5 18.5 Y12 Y13.5 30.5 Y12.5 19.3 Y13 1.5 31.5 Y13.5 20.1 1 2.5 32.5 1.5 20.9 2 1.5 3
Bauer, CCM, Koho,
Men's US Shoe Size
Mission
Ice Hockey Skate Size Y11 Y12 Y13 1 1.5 2 2.5 3 3.5 4 4.5 5 5.5 6.5 7 7.5 8 8.5 9 9.5 10 10.5 11 11.5 12 13 14 15 Inline Hockey Skate Size Y11 Y12 Y13 1 1.5 2 2.5 3 3.5 4 4.5 5 5.5 6.5 7 7.5 8 8.5 9 9.5 10 10.5 11 11.5 12 13 14 15
惠斯勒 2 型号商品说明书

Serie 2, Forno da incasso, 60 x 60 cm, Acciaio inoxHBF010ER0CAccessori integrati1 x Griglia combinata, 1 x Leccarda universale smaltata Accessori specialiHEZ438201 :HEZ317000 Teglia per pizzaHEZ327000 Pietra per pane e pizzaHEZ333001 Coperchio per leccarda extra profonda HEZ438301 :HEZ625071 Teglia per grigliare adatta a pirolisiHEZ915003 Pirofila in vetro con coperchio 5,4 l. HEZ431002 Accessorio forno Un forno da incasso con funzione ventilata 3D: così ottenete cotture perfette cucinando su tre livelli diversi in contemporanea.Dati tecniciDa incasso / a libera installazione: .....................................Da incasso Sistema di pulizia: ..........................................................................No Dimensioni del vano per l'installazione: 575-597 x 560-568 x 550 mm Dimensioni del prodotto: ....................................595 x 594 x 548 mm Dimensioni del prodotto imballato: ....................670 x 680 x 660 mm Materiale del cruscotto: ...................................................acciaio inox Materiale porta: ..........................................................................vetro Peso netto: ..............................................................................32.5 kg Volume utile: .................................................................................66 l Metodo di cottura: ...........Aria calda dolce, aria calda, riscaldamento superiore/infer., aria calda intensiva, riscaldamento inferiore, grill ventilato, Grill a superficie grande var.Regolazione della temperatura: ..........................................Meccanico Numero di luci interne: (1)Codice EAN: (4242005046874)Number of cavities (2010/30/EC): (1)Classe di efficienza energetica: .........................................................A Energy consumption per cycle conventional (2010/30/EC): ........0.98 kWh/cycleEnergy consumption per cycle forced air convection (2010/30/EC):0.79 kWh/cycleIndice di efficienza energetica (2010/30/CE): ..........................95.2 % Potenza: ..................................................................................3300 W Corrente: .....................................................................................16 A Tensione: ...................................................................................400 V Frequenza: ...........................................................................50; 60 Hz Tipo di spina: ....................................................................senza spina Accessori inclusi: .......1 x Griglia combinata, 1 x Leccarda universale smaltataSerie 2, Forno da incasso, 60 x 60cm, Acciaio inoxHBF010ER0CUn forno da incasso con funzione ventilata 3D: così ottenete cotture perfette cucinando su tre livelli diversi in contemporanea.Tipo di forno e modi di riscaldamento- Volume interno: 66 l- Riscaldamento rapido- Impostazione della temperatura 50 °C - 275 °CSupporto per accessori / Sistema d`estrazione:- Guide telescopiche1-livelliDesign- Illuminazione interna alogenaPuliziaAccessorio:Ambiente e SicurezzaInformazioni tecniche- Dimensioni nicchia (AxLxP): 575 mm - 597 mm x 560 mm - 568 mm x 550 mm- Dimensioni apparecchi (AxLxP): 595 mm x 594 mm x 548 mm- Potenza max. assorb. (elettr.): 3.3 kWSerie 2, Forno da incasso, 60 x 60cm, Acciaio inox HBF010ER0C。
BOBLBEE宝宝贝简介

北京瑞智立为贸易有限公司北京海淀区阜成路115号7号楼1203室BOBLBE ·E 的起源1997年,瑞典的一家体育和娱乐设备的研究设计中心里,诞生了全世界第一款符合人体工程学的硬壳运动防护背包,设计者将它命名为“BOBLBE·E”。
在BOBLBE·E 诞生之前的很多年,乔纳斯·布兰金(Jonas Blanking )的上下班交通工具只有自行车或滚轴轮滑,耗油又污染的汽车已经完全遗忘在车库里。
作为一名具有丰富经验的汽车及体育用品工业设计大师,因为工作需要,他必须随身携带一台笔记本电脑、工作笔记、草图和其他物件往返于市镇之间。
但在路上,因为过于专注运动和思考,他偶尔会忽略背包中的重要物品,结果发生了打湿笔记本,并使电脑外壳破裂的悲剧。
乔纳斯开始尝试寻找一种方法,来解决他遇到的问题。
最简单的方法是买一个更好的背包,但那绝不是乔纳斯的方法。
他把目光对准航空运输业,他们每天运送处理的物品都比其他运输行业更小,但因为寒冷、灰尘、震动、碰撞等等使物品所处环境更加恶劣。
他很快得出结论:重量、工艺和材料是开发一款全新背包的关键。
为了创造出令人满意的结构和防冲击保护罩,乔纳斯研究了航空领域中铝合金和塑料容器的构造,并认真测试如何组装和铆接,螺栓的种类和使用,材料的变化和反应,不同的应力条件和腐蚀性环境,甚至包括如今的青少年对待他们的装备,就像机场的工作人员对待托运的行李等等所有的细节。
最初的设计中并没有决定要把一个坚硬的外壳和柔软的身体结合在一起。
然而,当你与一个装备每天亲密无间的一起生活时,考虑符合人体工程学的外形就是理所当然的了。
完美贴合的硬壳与身体,是初期乔纳斯遇到的最困难及最具挑战性的问题。
经过N 多次模型试验和模拟测试,1996年秋天,终于得到了一个最佳的原型测试结果。
来自航空和汽车工业,一款超常规设计,使用独特材料,被证明是最强有力保护身体,同时兼顾轻量、舒适、符合人体工程学的产品——全球第一只硬壳背包诞生了。
- 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
- 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
- 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。
JUNIOR II型呼吸压缩机介绍
第一级中间压力:65bar第二级中间压力:65bar压缩机油量:360cm ²重量:45kg温度:(+5―+45)°C压缩机最大允许倾角:10°C工作电压力:380V,50Hz功率:2.2KW速度:3000r/min外壳防护等级:IP44充气时间:6.8升瓶约17分钟
德国BAUER呼吸空气压缩机JII3E-H的维护说明JII3EJII3EJII3EJII3E----HHHH高压缩空气充填泵高压缩空气充填泵高压缩空气充填泵高压缩空气充填泵一、产品概况:此压缩机为德国BAUER(宝亚)产品出品,专为压缩空气呼吸器提供气源,本机具有体积小,重量轻,充气量大,噪音低,操作简单,维护方便等优点。
本装置有活性碳吸附,油气分离尘埃过滤之功能,所生产的压缩空气完全符合人体呼吸的卫生标准,带有过压保护,安全性能好,是有毒场所从事危险作业的人员有效保证生命安全的必备设备。
二、技术指标排气量:100L/min公称压力:330bar噪音:99分贝级数:3汽缸数:3第一级汽缸直径:68mm第二级汽缸直径:28mm 第三级汽缸活塞冲程:24mm速度:2300r/min
三、日常维护:
1.定期检查润滑油面,低于下端及时添加。
2.定期更换空气滤芯、活性炭滤芯(一般为一年)。
3.定期检查皮带。
四、维护:
1.建议记录使用时间,以便及时更换滤芯。
建议将所有的维护工作都记录备案,包括维护时间和维护内容。
2.维护规则:进行任何维护工作前都必须切断电源并泄压,只能使用原厂配件,经常在接头处涂肥皂水检查气密性。
3.润滑油:为保证压缩机正常工作并延长使用寿命,请不要更换润滑油的种类。
建议使用BAUER的N22138润滑油(1L),更换周期为每运行1000小时或每年。
4.滤芯:有空气滤芯和活性炭滤芯两种。
当高压管排放出的空气里含有异味或者有油烟时必须更换活性炭滤芯(工作时间不得超过40小时);空气滤芯每20小时检查并用低压干空气吹洗或更换。
5.皮带:V型皮带,每25或30小时检查一下松紧度,当皮带中部承受5公斤的压力时其最大偏离度不应超过5毫米。
6.其他非正常情况配件:有各种各样的O型圈、高压软管、压力表等。