道路路桥工程中英文对照外文翻译文献
桥梁工程英文参考文献(精选118个最新)

桥梁工程指桥梁勘测、设计、施工、养护和检定等的工作过程,以及研究这一过程的科学和工程技术,它是土木工程的一个分支。
桥梁工程学的发展主要取决于交通运输对它的需要。
以下是搜索整理的关于桥梁工程英文参考文献,欢迎借鉴参考。
桥梁工程英文参考文献一:[1]Liam J. Butler,Weiwei Lin,Jinlong Xu,Niamh Gibbons,Mohammed Z. E. B. Elshafie,Campbell R. Middleton. Monitoring, Modeling, and Assessment of a Self-Sensing Railway Bridge during Construction[J]. Journal of Bridge Engineering,2018,23(10).[2]Reza Akbari. Accelerated Construction of Short Span Railroad Bridges in Iran[J]. Practice Periodical on Structural Design and Construction,2019,24(1).[3]John C. Cleary,Bret M. Webb,Scott L. Douglass,Thomas Buhring,Eric J. Steward. Assessment of Engineering Adaptations to Extreme Events and Climate Change for a Simply Supported Interstate Bridge over a Shallow Estuary: Case Study[J]. Journal of Bridge Engineering,2018,23(12).[4]Keke Peng. Risk Evaluation for Bridge Engineering Based on Cloud-Clustering Group Decision Method[J]. Journal of Performance of Constructed Facilities,2019,33(1).[5]Y. M. Zhang,H. Wang,J. X. Mao,F. Q. Wang,S. T. Hu,X. X. Zhao. Monitoring-Based Assessment of the Construction Influence of Benoto Pile on Adjacent High-Speed Railway Bridge: Case Study[J]. Journal of Performance of Constructed Facilities,2019,33(1).[6]Deshan Shan,Y. H. Chai,Xiaohang Zhou,Inamullah Khan. Tension Identification of Suspenders with Supplemental Dampers for Through and Half-Through Arch Bridges under Construction[J]. Journal of Structural Engineering,2019,145(3).[7]Haofeng Xing,Liangliang Liu,Yong Luo. Effects of Construction Technology on Bearing Behaviors of Rock-Socketed Bored Piles as Bridge Foundations[J]. Journal of Bridge Engineering,2019,24(4).[8]Xiaoming Wang,Pengbo Fei,You Dong,Chengshu Wang. Accelerated Construction of Self-Anchored Suspension Bridge Using Novel Tower-Girder Anchorage Technique[J]. Journal of Bridge Engineering,2019,24(5).[9]Sattar Dorafshan,Kristopher R. Johnson,Marc Maguire,Marvin W. Halling,Paul J. Barr,Michael Culmo. Friction Coefficients for Slide-In Bridge Construction Using PTFE and Steel Sliding Bearings[J]. Journal of Bridge Engineering,2019,24(6).[10]Mustafa Mashal,Alessandro Palermo. Low-Damage Seismic Design for Accelerated Bridge Construction[J]. Journal of Bridge Engineering,2019,24(7).[11]Yeo Hoon Yoon,Sam Ataya,Mark Mahan,Amir Malek,M. Saiid Saiidi,Toorak Zokaie. Probabilistic Damage Control Application: Implementation of Performance-Based Earthquake Engineering in Seismic Design of Highway Bridge Columns[J]. Journal of Bridge Engineering,2019,24(7).[12]Sherif M. Daghash,Qindan Huang,Osman E. Ozbulut. Tensile Behavior and Cost-Efficiency Evaluation of ASTM A1010 Steel for Bridge Construction[J]. Journal of Bridge Engineering,2019,24(8).[13]Dongzhou Huang,Wei-zhen Chen. Cable Structures in Bridge Engineering[J]. Journal of Bridge Engineering,2019,24(8).[14]Fuyou Xu,Haiyan Yu,Mingjie Zhang. Aerodynamic Response of a Bridge Girder Segment during Lifting Construction Stage[J]. Journal of Bridge Engineering,2019,24(8).[15]Elmira Shoushtari,M. Saiid Saiidi,Ahmad Itani,Mohamed A. Moustafa. Design, Construction, and Shake Table Testing of a Steel Girder Bridge System with ABC Connections[J]. Journal of Bridge Engineering,2019,24(9).[16]Upul Attanayake,Haluk Aktan. Procedures and Guidelines for Design of Lateral Bridge Slide Activities[J]. Journal of Bridge Engineering,2019,24(9).[17]Nathan T. Davis,Ehssan Hoomaan,Anil K. Agrawal,Masoud Sanayei,Farrokh “Frank” Jalinoos. Foundation Reuse in Accelerated Bridge Construction[J]. Journal of Bridge Engineering,2019,24(10).[18]Cheng Wen,Hong-xian Zhang. Influence of Material Time-Dependent Performance on the Cantilever Construction of PSC Box Girder Bridge[J]. Journal of Highway and Transportation Research and Development (English Edition),2019,13(2).[19]Hosein Naderpour,Ali Kheyroddin,Seyedmehdi Mortazavi. Risk Assessment in Bridge Construction Projects in Iran Using Monte Carlo Simulation Technique[J]. Practice Periodical on Structural Design and Construction,2019,24(4).[20]Carlos M. Zuluaga,Alex Albert. Preventing falls: Choosing compatible Fall Protection Supplementary Devices (FPSD) for bridge maintenance work using virtual prototyping[J]. Safety Science,2018,108.[21]Zhe Wang,Kai-wei Zhang,Gang Wei,Bin Li,Qiang Li,Wang-jing Yao. Field measurement analysis of the influence of double shield tunnel construction onreinforced bridge[J]. Tunnelling and Underground Space Technology incorporating Trenchless Technology Research,2018,81.[22]Michele Fabio Granata,Giuseppe Longo,Antonino Recupero,Marcello Arici. Construction sequence analysis of long-span cable-stayed bridges[J]. Engineering Structures,2018,174.[23]Mi Zhou,Wei Lu,Jianwei Song,George C. Lee. Application of Ultra-High Performance Concrete in bridge engineering[J]. Construction and Building Materials,2018,186.[24]Erxiang Song,Peng Li,Ming Lin,Xiaodong Liu. The rationality of semi-rigid immersed tunnel element structure scheme and its first application in Hong Kong Zhuhai Macao bridge project[J]. Tunnelling and Underground Space Technology incorporating Trenchless Technology Research,2018,82.[25]Di Zhao,Yixuan Ku. Dorsolateral prefrontal cortex bridges bilateral primary somatosensory cortices during cross-modal working memory[J]. Behavioural Brain Research,2018,350.[26]Jia-Rui Lin,Jian-Ping Zhang,Xiao-Yang Zhang,Zhen-Zhong Hu. Automating closed-loop structural safety management for bridge construction through multisource data integration[J]. Advances in Engineering Software,2019,128.[27]Cunming Ma,Qingsong Duan,Qiusheng Li,Haili Liao,Qi Tao. Aerodynamic characteristics of a long-span cable-stayed bridge under construction[J]. Engineering Structures,2019,184.[28]Wenqin Deng,Duo Liu,Yingqian Xiong,Jiandong Zhang. Experimental study on asynchronous construction for composite bridges with corrugated steel webs[J]. Journal of Constructional Steel Research,2019,157.[29]Li Hui,Faress Hraib,Brandon Gillis,Miguel Vicente,Riyadh Hindi. A Simplified method to minimize exterior girder rotation of steel bridges during deck construction[J]. Engineering Structures,2019,183.[30]Faress Hraib,Li Hui,Miguel Vicente,Riyadh Hindi. Evaluation of bridge exterior girder rotation during construction[J]. Engineering Structures,2019,187.桥梁工程英文参考文献二:[31]Yaojun Ge,Yong Yuan. State-of-the-Art Technology in the Construction of Sea-Crossing Fixed Links with a Bridge, Island, and Tunnel Combination[J]. Engineering,2019,5(1).[32]Mingjie Zhang,Fuyou Xu,Zhanbiao Zhang,Xuyong Ying. Energy budget analysis and engineering modeling of post-flutter limit cycle oscillation of a bridge deck[J]. Journal of Wind Engineering & Industrial Aerodynamics,2019,188.[33]Alberto Leva. PID control education for computer engineering students: A step to bridge a cultural gap[J]. IFAC Journal of Systems and Control,2019,8.[34]Mustafa Mashal,Alessandro Palermo. Emulative seismic resistant technology for Accelerated Bridge Construction[J]. Soil Dynamics and Earthquake Engineering,2019,124.[35]. Science - Geoscience; Studies from Presidency University Provide New Data on Geoscience (Bridge construction and river channel morphology-A comprehensive study of flow behavior and sediment size alteration of the River Chel, India)[J]. Science Letter,2018.[36]. Engineering - Wind Engineering; Studies from Tongji University Update Current Data on Wind Engineering (Flutter performance and improvement for a suspension bridge with central-slotted box girder during erection)[J]. Energy Weekly News,2018.[37]. FirstEnergy Corp.; Mon Power Relocates Transmission Line for Construction of Corridor H Bridge in Tucker County[J]. Energy Weekly News,2018.[38]. Engineering - Wind Engineering; Recent Findings by A. Benidir and Colleagues in Wind Engineering Provides New Insights (The impact of circularity defects on bridge stay cable dry galloping stability)[J]. Energy Weekly News,2018.[39]Ron Stang. Gordie Howe bridge officials announce cost, 74-month construction schedule[J]. Daily Commercial News,2018,91(192).[40]. Biomedical Engineering - Tissue Engineering; Investigators at Skane University Hospital Report Findings in Tissue Engineering (Electrospun nerve guide conduits have the potential to bridge peripheral nerve injuries in vivo)[J]. Biotech Week,2018.[41]. Information Technology - Data Delivery; Researchers from Chung Ang University Provide Details of New Studies and Findings in the Area of Data Delivery (Three-Dimensional Information Delivery for Design and Construction of Prefabricated Bridge Piers)[J]. Computers, Networks & Communications,2018.[42]Anonymous. Construction begins on U.S. side of Presidio International Rail Bridge[J]. Railway Track & Structures,2018,114(11).[43]. Engineering - Structural Engineering; Beijing Jiaotong University Details Findings in Structural Engineering (Scour Risk Analysis of Existing Bridge Pier Based on Inversion Theory)[J]. Computers, Networks & Communications,2018.[44]. Notice of Availability of a Draft Supplemental Environmental Impact Statement for the New U.S. Land Port of Entry in Madawaska, Maine and Madawaska-Edmundston International Bridge Project[J]. The Federal Register / FIND,2018,83(232).[45]. Regulated Navigation Area and Safety Zone: Tappan Zee Bridge Construction Project, Hudson River; South Nyack and Tarrytown, NY[J]. The Federal Register / FIND,2018,83(245).[46]Anonymous. Bronte Construction is awarded $ 5M bridge job[J]. Daily Commercial News,2018,91(242).[47]. Kanazawa University; Proposed engineering method could help make buildings and bridges safer[J]. NewsRx Health & Science,2019.[48]. Notice of Availability of Draft Environmental Assessment for the Proposed Construction of Railroad Bridges Across Sand Creek and Lake Pend Oreille at Sandpoint, Bonner County, Idaho.[J]. The Federal Register / FIND,2019,84(025).[49]Anonymous. Bridge installation moves СТА95th/Dan Ryan Terminal Improvement Project forward[J]. Railway Track & Structures,2018,114(12).[50]Anonymous. Investments made in Hay River fish plant and bridge projects[J]. Daily Commercial News,2019,92(10).[51]. Reclamation work starts on $248m Bahrain bridge[J]. Gulf Construction,2019.[52]. Extension of Comment Period for the Draft Environmental Assessment for the Proposed Construction of Railroad Bridges Across Sand Creek and Lake Pend Oreille at Sandpoint, Bonner County, Idaho[J]. The Federal Register / FIND,2019,84(062).[53]. Notice of Final Federal Agency Actions on the Frank J. Wood Bridge Project in Maine[J]. The Federal Register / FIND,2019,84(071).[54]. Energy - Electric Power; Study Results from Electrical Engineering Department Update Understanding of Electric Power (Development of Dynamic Phasor Based Higher Index Model for Performance Enhancement of Dual Active Bridge)[J]. Energy Weekly News,2019.[55]. Engineering - Wind Engineering; Findings from Southwest Jiaotong University Provides New Data on Wind Engineering (Wind Characteristics Along a Bridge Catwalk In a Deep-cutting Gorge From Field Measurements)[J]. Energy Weekly News,2019.[56]. Work starts on Qatar bridge[J]. Gulf Construction,2019.[57]. Engineering - Wind Engineering; Data from Southeast University Provide New Insights into Wind Engineering (Non-stationary Turbulent Wind Field Simulation of Bridge Deck Using Non-negative Matrix Factorization)[J]. Energy Weekly News,2019.[58]. Engineering - Wind Engineering; Findings from University of Stavanger Update Understanding of Wind Engineering (Aerodynamic Performance of a Grooved Cylinder In Flow Conditions Encountered By Bridge Stay Cables In Service)[J]. Energy Weekly News,2019.[59]. Engineering - Wind Engineering; Study Findings from Hong Kong Polytechnic University Broaden Understanding of Wind Engineering (Buffeting-induced Stress Analysis of Long-span Twin-box-beck Bridges Based On Pod Pressure Modes)[J]. Energy Weekly News,2019.[60]. Engineering - Software Engineering; Researchers' Work from Polytechnic University of Valencia Focuses on Software Engineering (Valencia Bridge Fire Tests: Validation of Simplified and Advanced Numerical Approaches To Model Bridge Fire Scenarios)[J]. Computers, Networks & Communications,2019.桥梁工程英文参考文献三:[61]. Hood River-White Salmon Bridge Replacement Project; Notice of Intent To Prepare a Supplemental Draft Environmental Impact Statement[J]. The Federal Register / FIND,2019,84(100).[62]. Engineering - Wind Engineering; Recent Studies from Southwest Jiaotong University Add New Data to Wind Engineering (Integrated Transfer Function for Buffeting Response Evaluation of Long-span Bridges)[J]. Energy Weekly News,2019.[63]. Engineering - Pipeline Systems Engineering; Recent Findings from W.J. Wang and Co-Authors Provide New Insights into Pipeline Systems Engineering (Wind Tunnel Test Study On Pipeline Suspension Bridge Via Aeroelastic Model With Pi Connection)[J]. Energy Weekly News,2019.[64]Dan O’Reilly. Baudette/ Rainy River International Bridge a construction collaboration at every crossing[J]. Daily Commercial News,2019,92(105).[65]. Archaeology; New Findings on Archaeology Reported by C.P. Dappert-Coonrod et al (Walking In Their Shoes: a Late Victorian Shoe Assemblage From the New Mississippi River Bridge Project In East St. Louis)[J]. Science Letter,2019.[66]Ron Stang. First signs of Gordie Howe bridge construction[J]. Daily Commercial News,2019,92(119).[67]Li Chuntong,Wang Deyu. Knowledge-Based Engineering–based method for containership lashing bridge optimization design and structural improvement with functionally graded thickness plates[J]. Proceedings of the Institution of Mechanical Engineers,2019,233(3).[68]Ashley Delaney,Kari Jurgenson. Building Bridges: Connecting science and engineering with literacy and mathematics[J]. Science and Children,2019,57(1).[69]. Hydrodynamics; Investigators from School of Civil Engineering Report New Data on Hydrodynamics (Effects of Air Relief Openings On the Mitigation of Solitary Wave Forces On Bridge Decks)[J]. Science Letter,2019.[70]. Engineering - Wind Engineering; Reports Summarize Wind Engineering Study Results from Norwegian University of Science and Technology (NTNU) (Ale-vms Methods for Wind-resistant Design of Long-span Bridges)[J]. Energy Weekly News,2019.[71]. Engineering - Engineering Informatics; Reports Summarize Engineering Informatics Study Results from Seoul National University (Xgboost Application On Bridge Management Systems for Proactive Damage Estimation)[J]. Computers, Networks & Communications,2019.[72]. Microscopy; Recent Findings in Microscopy Described by Researchers from Chongqing Jiaotong University (Application of Long-distance Microscope In Crack Detection In Bridge Construction)[J]. Science Letter,2019.[73]Ghosh Soumadwip,Bierig Tobias,Lee Sangbae,Jana Suvamay,L?hle Adelheid,Schnapp Gisela,Tautermann Christofer S,Vaidehi Nagarajan. Engineering Salt Bridge Networks between Transmembrane Helices Confers Thermostability in G-Protein-Coupled Receptors.[J]. Journal of chemical theory and computation,2018.[74]Yainoy Sakda,Phuadraksa Thanawat,Wichit Sineewanlaya,Sompoppokakul Maprang,Songtawee Napat,Prachayasittikul Virapong,Isarankura-Na-Ayudhya Chartchalerm. Production and Characterization of Recombinant Wild Type Uricase from Indonesian Coelacanth ( L. menadoensis ) and Improvement of Its Thermostability by In Silico Rational Design and Disulphide Bridges Engineering.[J]. International journal of molecular sciences,2019,20(6).[75]Johnson Audrey M,Howell Dana M. Mobility bridges a gap in care: Findings from an early mobilisation quality improvement project in acute care.[J]. Journal of clinical nursing,2019.[76]Brzyski Przemys?aw,Grudzińska Magdalena,Majerek Dariusz. Analysis of the Occurrence of Thermal Bridges in Several Variants of Connections of the Wall and the Ground Floor in Construction Technology with the Use of a Hemp-lime Composite.[J]. Materials (Basel, Switzerland),2019,12(15).[77]Hager Keri,Kading Margarette,O'Donnell Carolyn,Yapel Ann,MacDonald Danielle,Albee Jennifer Nelson,Nash Cynthia,Renier Colleen,Dean Katherine,Schneiderhan Mark. Bridging Community Mental Health and Primary Care to Improve Medication Monitoring and Outcomes for Patients With Mental Illness Taking Second-Generation Antipsychotics-HDC/DFMC Bridge Project, Phase 1: Group Concept Mapping.[J]. The primary care companion for CNS disorders,2019,21(4).[78]Mardewi Jamal,M. Jazir Alkas,Supriyadi Yusuf. Study of Pre-Stressed Concrete Girders Planning on Flyover Project Overpass Bridges Mahakam IV Samarinda City[P]. Proceedings of the First International Conference on Materials Engineering and Management - Engineering Section (ICMEMe 2018),2019.[79]Aimin Zhang,Huijun Wu. Analysis of Internal Force in Construction of Asymmetric Continuous Rigid Frame Bridge[P]. Proceedings of the 2019 3rd International Forum on Environment, Materials and Energy (IFEME 2019),2019.[80]Jiang Wei,Sun Litong,Zhang Xiwen. Research on achievement assessment method for course objectives of bridge engineering based on OBE[P]. Proceedings of the 2019 4th International Conference on Social Sciences and Economic Development (ICSSED 2019),2019.[81]Welf Zimmermann,Stefan Kuss. New Composite Construction Method with STEEL/UHPFRC Constructing Railway Bridges[J]. Solid State Phenomena,2019,4809.[82]Michail M. Kozhevnikov,Sofia T. Kozhevnikova,Alexander V. Ginzburg,VitaliyA. Gladkikh. Improving the Efficiency of the Bridges Construction Organization on the Basis of Information Modeling[J]. Materials Science Forum,2018,4717.[83]Xiangmin Yu,Dewei Chen. Innovative Method for the Construction of Cable-Stayed Bridges by Cable Crane[J]. Structural Engineering International,2018,28(4).[84]Chuntong Li,Deyu Wang. Multi-objective optimisation of a container ship lashing bridge using knowledge-based engineering[J]. Ships and Offshore Structures,2019,14(1).[85]Hurley,Taiwo. Critical social work and competency practice: a proposal to bridge theory and practice in the classroom[J]. Social Work Education,2019,38(2).[86]Jamey Barbas,Matthew Paradis. Scalable, Modularized Solutions in the Design and Construction of the Governor Mario M. Cuomo Bridge[J]. Structural Engineering International,2019,29(1).[87]. The 2nd Bridge Engineering Workshop Mexico 2019[J]. Structural Engineering International,2019,29(3).[88]Wei Duan,Guojun Cai,Songyu Liu,Yu Du,Liuwen Zhu,Anand J. Puppala. SPT–CPTU Correlations and Liquefaction Evaluation for the Island and Tunnel Project of the Hong Kong–Zhuhai–Macao Bridge[J]. International Journal of Civil Engineering,2018,16(10).[89]Seungjun Kim,Deokhee Won,Young-Jong Kang. Ultimate Behavior of Steel Cable-Stayed Bridges During Construction[J]. International Journal of Steel Structures,2019,19(3).[90]Shangqu Sun,Shucai Li,Liping Li,Shaoshuai Shi,Jing Wang,Jie Hu,Cong Hu. Slope stability analysis and protection measures in bridge and tunnel engineering: a practical case study from Southwestern China[J]. Bulletin of Engineering Geology and the Environment,2019,78(5).桥梁工程英文参考文献四:[91]Czes?aw Machelski. Effects of Surrounding Earth on Shell During the Construction of Flexible Bridge Structures[J]. Studia Geotechnica et Mechanica,2019,41(2).[92]Fan Dingqiang,Tian Wenjing,Feng Dandian,Cheng Jiahao,Yang Rui,Zhang Kaiquan. Development and Applications of Ultra-high Performance Concrete in Bridge Engineering[J]. IOP Conference Series: Earth and Environmental Science,2018,189(2).[93]Xiaoyi Ma,Hailin Yang. The important role of civilized construction - a case study of flood control measures in a bridge construction of Gansu province, China[J]. IOP Conference Series: Earth and Environmental Science,2018,189(2).[94]Ruixin Huang,Keke Peng,Wen Zhou. Study on Risk Assessment of Bridge Construction Based on AHP-GST Method[J]. IOP Conference Series: Earth and Environmental Science,2018,189(4).[95]HanLin Zhou. Research on Bridge Construction Control Technology Based onMobile Formwork[J]. IOP Conference Series: Earth and Environmental Science,2018,189(2).[96]Jasson Tan,Yen Lei Voo. Working Example on 70m Long Ultra High Performance Fiber-Reinforced Concrete (UHPFRC) Composite Bridge[J]. IOP Conference Series: Materials Science and Engineering,2018,431(4).[97]N R Setiati. The feasibility study of bridge construction plan in Digoel River Province of Papua[J]. IOP Conference Series: Earth and Environmental Science,2019,235(1).[98]Junhua Xiao,Miao Liu,Tieyi Zhong,Guangzhi Fu. Seismic performance analysis of concrete-filled steel tubular single pylon cable-stayed bridge with swivel construction[J]. IOP Conference Series: Earth and Environmental Science,2019,218(1).[99]Zhengwei Feng,Longbin Lin. Discussion on manufacturing technology of steel box girder of cross-line bridge engineering in Xiamen Hele road[J]. IOP Conference Series: Earth and Environmental Science,2019,233(3).[100]Jiann Tsair Chang,Ho Chieh Hsiao. Analytic Hierarchy Process for Evaluation Weights on Occupational Safety and Hygiene Items in the Bridge Construction Site[J]. IOP Conference Series: Earth and Environmental Science,2019,233(3).[101]Yilong Huang,Xilin Yan,Jianying Wu,Guangqiang Peng. Cooperation research between electrode line transversal differential protection and bridge differential protection in HVDC project[J]. IOP Conference Series: Earth and Environmental Science,2019,227(4).[102]Li He,Wenwei Zhu,Shiqiang Mei,Xinji Xie. Checking Calculation Analysis for Construction of Long-span Steel Box Girder Bridges[J]. Journal of Physics: Conference Series,2019,1176(5).[103]Norhidayu Kasim,Mohd Rozaiman Sulaiman,Kamarudin Abu Taib. Utilization of ultra - high performance concrete for bridge construction – a case study of Kg. Seberang Manong to Pekan Manong bridge[J]. IOP Conference Series: Materials Science and Engineering,2019,512(1).[104]Mairizal,Edrizal,Mohammad Ismail,Rosli Mohamad Zin. Identifying occurrences of accident at work place in terms of occupational safety on roads and bridges infrastructure in Indonesia[J]. IOP Conference Series: Materials Science and Engineering,2019,513(1).[105]S T Noor,M S Islam,M Mumtarin,N Chakraborty. Dynamic load test of full-scalepile for the construction and rehabilitation of bridges[J]. IOP Conference Series: Materials Science and Engineering,2019,513(1).[106]P G Kossakowski. Recent Advances in Bridge Engineering – Application of Steel Sheet Piles as Durable Structural Elements in Integral Bridges[J]. IOP Conference Series: Materials Science and Engineering,2019,507(1).[107]R Vrayudha,M Iqbal,M Foralisa. Role Analysis and Mandor Functions on Bridge and Building Construction Projects in District Ogan Komering Ulu[J]. Journal of Physics: Conference Series,2019,1198(8).[108]Fawen Zhu,Jianfeng Zhou,Tianyi Zhu,Baofeng Li. Construction and structure analysis of Yongshun Bridge in Lichuan[J]. IOP Conference Series: Earth and Environmental Science,2019,267(5).[109]Qin Wang,Qiuxin Liu. Study of Mountainous Long Span Prestressed Concrete Box-Girder Bridge Cantilever Construction Safety Monitoring System Based on Multi-Agent System[J]. IOP Conference Series: Earth and Environmental Science,2019,283(1).[110]Jiang Ziqi,Liu Bingwei. Stability analysis of double x-shape arch bridge during construction[J]. IOP Conference Series: Earth and Environmental Science,2019,267(5).[111]Tiedong Qi,Yantao Du,Bo Peng. Sensitivity Analysis of Cantilever Construction Process of Long-Span Continuous V-Structure Composite Bridge[J]. IOP Conference Series: Earth and Environmental Science,2019,267(5).[112]Jie Su,Qian Fang,Dingli Zhang,Xiaokai Niu,Xiang Liu,Yunming Jie,Pier Paolo Rossi. Bridge Responses Induced by Adjacent Subway Station Construction Using Shallow Tunneling Method[J]. Advances in Civil Engineering,2018,2018.[113]Ting-Yu Chen,Lucia Valentina Gambuzza. An Interval-Valued Pythagorean Fuzzy Compromise Approach with Correlation-Based Closeness Indices for Multiple-Criteria Decision Analysis of Bridge Construction Methods[J]. Complexity,2018,2018.[114]Benjamin Kromoser,Thomas Pachner,Chengcheng Tang,Johann Kollegger,Helmut Pottmann,Melina Bosco. Form Finding of Shell Bridges Using the Pneumatic Forming of Hardened Concrete Construction Principle[J]. Advances in Civil Engineering,2018,2018.[115]Lei Yan,Gang Wang,Min Chen,Kefeng Yue,Qingning Li,Belén González-Fonteboa. Experimental and Application Study on Underpinning Engineering of Bridge PileFoundation[J]. Advances in Civil Engineering,2018,2018.[116]Zhifang Lu,Chaofan Wei,Muyu Liu,Xiaoguang Deng,Moacir Kripka. Risk Assessment Method for Cable System Construction of Long-Span Suspension Bridge Based on Cloud Model[J]. Advances in Civil Engineering,2019,2019.[117]Dilendra Maharjan,Elijah Wyckoff,Marlon Agüero,Selene Martinez,Lucas Zhou,Fernando Moreu. Monitoring induced floor vibrations: dance performance and bridge engineering[P]. Smart Structures and Materials + Nondestructive Evaluation and Health Monitoring,2019.[118]Tianshu Li,Devin Harris. Automated construction of bridge condition inventory using natural language processing and historical inspection reports[P]. Smart Structures and Materials + Nondestructive Evaluation and Health Monitoring,2019.以上就是关于桥梁工程英文参考文献的分享,希望对你有所帮助。
桥梁工程中英文对照外文翻译文献

桥梁工程中英文对照外文翻译文献BRIDGE ENGINEERING AND AESTHETICSEvolvement of bridge Engineering,brief reviewAmong the early documented reviews of construction materials and structu re types are the books of Marcus Vitruvios Pollio in the first century B.C.The basic principles of statics were developed by the Greeks , and were exemplifi ed in works and applications by Leonardo da Vinci,Cardeno,and Galileo.In the fifteenth and sixteenth century, engineers seemed to be unaware of this record , and relied solely on experience and tradition for building bridges and aqueduc ts .The state of the art changed rapidly toward the end of the seventeenth cent ury when Leibnitz, Newton, and Bernoulli introduced mathematical formulatio ns. Published works by Lahire (1695)and Belidor (1792) about the theoretical a nalysis of structures provided the basis in the field of mechanics of materials .Kuzmanovic(1977) focuses on stone and wood as the first bridge-building materials. Iron was introduced during the transitional period from wood to steel .According to recent records , concrete was used in France as early as 1840 for a bridge 39 feet (12 m) long to span the Garoyne Canal at Grisoles, but r einforced concrete was not introduced in bridge construction until the beginnin g of this century . Prestressed concrete was first used in 1927.Stone bridges of the arch type (integrated superstructure and substructure) were constructed in Rome and other European cities in the middle ages . Thes e arches were half-circular , with flat arches beginning to dominate bridge wor k during the Renaissance period. This concept was markedly improved at the e nd of the eighteenth century and found structurally adequate to accommodate f uture railroad loads . In terms of analysis and use of materials , stone bridgeshave not changed much ,but the theoretical treatment was improved by introd ucing the pressure-line concept in the early 1670s(Lahire, 1695) . The arch the ory was documented in model tests where typical failure modes were considere d (Frezier,1739).Culmann(1851) introduced the elastic center method for fixed-e nd arches, and showed that three redundant parameters can be found by the us e of three equations of coMPatibility.Wooden trusses were used in bridges during the sixteenth century when P alladio built triangular frames for bridge spans 10 feet long . This effort also f ocused on the three basic principles og bridge design : convenience(serviceabili ty) ,appearance , and endurance(strength) . several timber truss bridges were co nstructed in western Europe beginning in the 1750s with spans up to 200 feet (61m) supported on stone substructures .Significant progress was possible in t he United States and Russia during the nineteenth century ,prompted by the ne ed to cross major rivers and by an abundance of suitable timber . Favorable e conomic considerations included initial low cost and fast construction .The transition from wooden bridges to steel types probably did not begin until about 1840 ,although the first documented use of iron in bridges was the chain bridge built in 1734 across the Oder River in Prussia . The first truss completely made of iron was in 1840 in the United States , followed by Eng land in 1845 , Germany in 1853 , and Russia in 1857 . In 1840 , the first ir on arch truss bridge was built across the Erie Canal at Utica .The Impetus of AnalysisThe theory of structures ,developed mainly in the ninetheenth century,foc used on truss analysis, with the first book on bridges written in 1811. The Wa rren triangular truss was introduced in 1846 , supplemented by a method for c alculating the correcet forces .I-beams fabricated from plates became popular in England and were used in short-span bridges.In 1866, Culmann explained the principles of cantilever truss bridges, an d one year later the first cantilever bridge was built across the Main River in Hassfurt, Germany, with a center span of 425 feet (130m) . The first cantilever bridge in the United States was built in 1875 across the Kentucky River.A most impressive railway cantilever bridge in the nineteenth century was the Fir st of Forth bridge , built between 1883 and 1893 , with span magnitudes of 1 711 feet (521.5m).At about the same time , structural steel was introduced as a prime mater ial in bridge work , although its quality was often poor . Several early exampl es are the Eads bridge in St.Louis ; the Brooklyn bridge in New York ; and t he Glasgow bridge in Missouri , all completed between 1874 and 1883.Among the analytical and design progress to be mentioned are the contrib utions of Maxwell , particularly for certain statically indeterminate trusses ; the books by Cremona (1872) on graphical statics; the force method redefined by Mohr; and the works by Clapeyron who introduced the three-moment equation s.The Impetus of New MaterialsSince the beginning of the twentieth century , concrete has taken its place as one of the most useful and important structural materials . Because of the coMParative ease with which it can be molded into any desired shape , its st ructural uses are almost unlimited . Wherever Portland cement and suitable agg regates are available , it can replace other materials for certain types of structu res, such as bridge substructure and foundation elements .In addition , the introduction of reinforced concrete in multispan frames at the beginning of this century imposed new analytical requirements . Structures of a high order of redundancy could not be analyzed with the classical metho ds of the nineteenth century .The importance of joint rotation was already dem onstrated by Manderla (1880) and Bendixen (1914) , who developed relationshi ps between joint moments and angular rotations from which the unknown mom ents can be obtained ,the so called slope-deflection method .More simplification s in frame analysis were made possible by the work of Calisev (1923) , who used successive approximations to reduce the system of equations to one simpl e expression for each iteration step . This approach was further refined and integrated by Cross (1930) in what is known as the method of moment distributi on .One of the most import important recent developments in the area of anal ytical procedures is the extension of design to cover the elastic-plastic range , also known as load factor or ultimate design. Plastic analysis was introduced with some practical observations by Tresca (1846) ; and was formulated by Sa int-Venant (1870) , The concept of plasticity attracted researchers and engineers after World War Ⅰ, mainly in Germany , with the center of activity shifting to England and the United States after World War Ⅱ.The probabilistic approa ch is a new design concept that is expected to replace the classical determinist ic methodology.A main step forward was the 1969 addition of the Federal Highway Adim inistration (FHWA)”Criteria for Reinforced Concrete Bridge Members “ that co vers strength and serviceability at ultimate design . This was prepared for use in conjunction with the 1969 American Association of State Highway Offficials (AASHO) Standard Specification, and was presented in a format that is readil y adaptable to the development of ultimate design specifications .According to this document , the proportioning of reinforced concrete members ( including c olumns ) may be limited by various stages of behavior : elastic , cracked , an d ultimate . Design axial loads , or design shears . Structural capacity is the r eaction phase , and all calculated modified strength values derived from theoret ical strengths are the capacity values , such as moment capacity ,axial load ca pacity ,or shear capacity .At serviceability states , investigations may also be n ecessary for deflections , maximum crack width , and fatigue .Bridge TypesA notable bridge type is the suspension bridge , with the first example bu ilt in the United States in 1796. Problems of dynamic stability were investigate d after the Tacoma bridge collapse , and this work led to significant theoretica l contributions Steinman ( 1929 ) summarizes about 250 suspension bridges bu ilt throughout the world between 1741 and 1928 .With the introduction of the interstate system and the need to provide stru ctures at grade separations , certain bridge types have taken a strong place in bridge practice. These include concrete superstructures (slab ,T-beams,concrete b ox girders ), steel beam and plate girders , steel box girders , composite const ruction , orthotropic plates , segmental construction , curved girders ,and cable-stayed bridges . Prefabricated members are given serious consideration , while interest in box sections remains strong .Bridge Appearance and AestheticsGrimm ( 1975 ) documents the first recorded legislative effort to control t he appearance of the built environment . This occurred in 1647 when the Cou ncil of New Amsterdam appointed three officials . In 1954 , the Supreme Cou rt of the United States held that it is within the power of the legislature to de termine that communities should be attractive as well as healthy , spacious as well as clean , and balanced as well as patrolled . The Environmental Policy Act of 1969 directs all agencies of the federal government to identify and dev elop methods and procedures to ensure that presently unquantified environmenta l amentities and values are given appropriate consideration in decision making along with economic and technical aspects .Although in many civil engineering works aesthetics has been practiced al most intuitively , particularly in the past , bridge engineers have not ignored o r neglected the aesthetic disciplines .Recent research on the subject appears to lead to a rationalized aesthetic design methodology (Grimm and Preiser , 1976 ) .Work has been done on the aesthetics of color ,light ,texture , shape , and proportions , as well as other perceptual modalities , and this direction is bot h theoretically and empirically oriented .Aesthetic control mechanisms are commonly integrated into the land-use re gulations and design standards . In addition to concern for aesthetics at the sta te level , federal concern focuses also on the effects of man-constructed enviro nment on human life , with guidelines and criteria directed toward improving quality and appearance in the design process . Good potential for the upgrading of aesthetic quality in bridge superstructures and substructures can be seen in the evaluation structure types aimed at improving overall appearance .Lords and lording groupsThe loads to be considered in the design of substructures and bridge foun dations include loads and forces transmitted from the superstructure, and those acting directly on the substructure and foundation .AASHTO loads . Section 3 of AASHTO specifications summarizes the loa ds and forces to be considered in the design of bridges (superstructure and sub structure ) . Briefly , these are dead load ,live load , iMPact or dynamic effec t of live load , wind load , and other forces such as longitudinal forces , cent rifugal force ,thermal forces , earth pressure , buoyancy , shrinkage and long t erm creep , rib shortening , erection stresses , ice and current pressure , collisi on force , and earthquake stresses .Besides these conventional loads that are ge nerally quantified , AASHTO also recognizes indirect load effects such as fricti on at expansion bearings and stresses associated with differential settlement of bridge components .The LRFD specifications divide loads into two distinct cate gories : permanent and transient .Permanent loadsDead Load : this includes the weight DC of all bridge components , appu rtenances and utilities, wearing surface DW nd future overlays , and earth fill EV. Both AASHTO and LRFD specifications give tables summarizing the unit weights of materials commonly used in bridge work .Transient LoadsVehicular Live Load (LL) Vehicle loading for short-span bridges :considera ble effort has been made in the United States and Canada to develop a live lo ad model that can represent the highway loading more realistically than the H or the HS AASHTO models . The current AASHTO model is still the applica ble loading.桥梁工程和桥梁美学桥梁工程的发展概况早在公元前1世纪,Marcus Vitrucios Pollio 的著作中就有关于建筑材料和结构类型的记载和评述。
交通工程专业外文翻译外文文献英文文献

土木工程学院交通工程专业中英文翻译Road Design专业:交通工程英文原文The Basics of a Good RoadWe have known how to build good roads for a long time. Archaeologists have found ancient Egyptian roadsthat carried blocks to the pyramids in 4600 BCE. Later,the Romans built an extensive road system, using the same principles we use today. Some of these roads are still in service.If you follow the basic concepts of road building, you will create a road that will last. The ten commandments of a good road are:(1)Get water away from the road(2)Build on a firm foundation(3)Use the best materials(4)Compact all layers properly(5)Design for traffic loads and volumes(6)Design for maintenance(7)Pave only when ready(8)Build from the bottom up(9)Protect your investment(10)Keep good records1.Get water away from the roadWe can’t overemphasize the importance of good drainage.Engineers estimate that at least 90% of a road’s problems can be related to excess water or to poor waterdrainage. Too much water in any layer of a road’sstructure can weaken that la yer, leading to failure.In the surface layer, water can cause cracks and potholes. In lower layers it undermines support, causing cracks and potholes. A common sign of water in an asphalt road surface is alligator cracking — an interconnected pattern of cracks forming small irregular shaped pieces that look like alligator skin. Edge cracking, frost heaves, and spring breakup of pavements also point to moistureproblems.To prevent these problems remember that water:• flows downhill• needs to flow somepla ce• is a problem if it is not flowingEffective drainage systems divert, drain and dispose of water. To do this they use interceptor ditches and slopes,road crowns, and ditch and culvert systems.Divert —Interceptor ditches, located between the road and higher ground along the road, keep the water from reaching the roadway. These ditches must slope so they carry water away from the road.Drain —Creating a crown in the road so it is higher along the centerline than at the edges encourages water to flow off the road. Typically a paved crown should be 1⁄4" higher than the shoulder for each foot of width from the centerline to the edge. For gravel surfaces the crown should be 1⁄2" higher per foot of width. For this flow path to work, the road surface must be relatively water tight. Road shoulders also must be sloped away from the road to continue carrying the flow away. Superelevations (banking) at the outside of curves will also help drainthe road surface.Dispose —A ditch and culvert system carries water away from the road structure. Ditches should be at least one foot lower than the bottom of the gravel road layer that drains the roadway. They must be kept clean and must be sloped to move water into natural drainage. If water stays in the ditches it can seep back into the road structure and undermine its strength. Ditches should also be protected from erosion by planting grass, or installing rock and other erosion control measures. Erosion can damage shoulders and ditches, clog culverts, undermine roadbeds, and contaminate nearby streams and lakes. Evaluate your ditch and culvert system twice a year to ensure that it works. In the fall, clean out leaves and branches that can block flow. In spring, check for and remove silts from plowing and any dead plant material left from the fall.2.Build on a firm foundationA road is only as good as its foundation. A highway wears out from the top down but falls apart from the bottom. The road base must carry the entire structure and the traffic that uses it.To make a firm foundation you may need to stabilize the roadbed with chemical stabilizers, large stone called breaker run, or geotextile fabric. When you run into conditions where you suspect that the native soil is unstable, work with an engineer to investigate the situation and design an appropriate solution.3.Use the best materialsWith all road materials you “pay now or pay later.” Inferior materials may require extensive maintenance throughout the road’s life. They may also force you to replace the road prematurely.Crushed aggregate is the best material for the base course. The sharp angles of thecrushed material interlock when they are compacted. This supports the pavement and traffic by transmitting the load from particle to particle. By contrast, rounded particles act like ballbearings, moving under loads.Angular particles are more stable than rounded particles.Asphalt and concrete pavement materials must be of the highest quality, designed for the conditions, obtained from established firms, and tested to ensure it meets specifications.4.Compact all layersIn general, the more densely a material is compacted, the stronger it is. Compaction also shrinks or eliminates open spaces (voids) between particles. This means that less water can enter the structure. Water in soil can weaken the structure or lead to frost heaves. This is especially important for unsurfaced (gravel) roads. Use gravel which has a mix of sizes (well-graded aggregate) so smaller particles can fill the voids between larger ones. Goodcompaction of asphalt pavement lengthens its life.5.Design for traffic loads and volumesDesign for the highest anticipated load the road will carry. A road that has been designed only for cars will not stand up to trucks. One truck with 9 tons on a single rear axle does as much damage to a road as nearly 10,000 cars.Rural roads may carry log trucks, milk trucks, fire department pumper trucks, or construction equipment. If you don’t know what specific loads the road will carry, a good rule of thumb is to design for the largest piece of highway maintenance equipment that will be used on the road.A well-constructed and maintained asphalt road should last 20 years without major repairs or reconstruction. In designing a road, use traffic counts that project numbers and sizes of vehicles 20 years into the future. These are only projections, at best, but they will allow you to plan for traffic loadings through a road’s life.6.Design for maintenanceWithout maintenance a road will rapidly deteriorate and fail. Design your roads so they can be easily maintained. This means:• adequate ditches that can be cleaned regularly• culverts that are marked for easy locating in the spring• enough space for snow after it is plowed off the road• proper cross slopes for safet y, maintenance and to avoid snow drifts• roadsides that are planted or treated to prevent erosion• roadsides that can be mowed safelyA rule of thumb for adequate road width is to make it wide enough for a snowplow to pass another vehicle without leaving the travelled way.Mark culverts with a post so they can be located easily.7.Pave only when readyIt is not necessary to pave all your roads immediately. There is nothing wrong with a well-built and wellmaintained gravel road if traffic loads and volume do not require a paved surface. Three hundred vehicles per day is the recommended minimum to justify paving.Don’t assume that laying down asphalt will fix a gravel road that is failing. Before you pave, make sure you have an adequate crushed stone base that drains well and is properly compacted. The recommended minimum depth of crushed stone base is 10" depending on subgrade soils. A road paved only when it is ready will far outperform one that is constructed too quickly.8.Ê Build from the bottom upThis commandment may seem obvious, but it means that you shouldn’t top dress or resurface a road if the problem is in an underlying layer. Before you do any road improvement, locate the cause of any surface problems. Choose an improvement technique that will address the problem. This may mean recycling or removing all road materials down to the native soil and rebuilding everything. Doing any work that doesn’t solve the problem is a waste of money and effort.9.Ê Protect your investmentThe road system can be your municipality’s biggest investment. Just as a home needs painting or a new roof, a road must be maintained. Wisconsin’s severe climate requires more road maintenance than in milder places. Do these important maintenance activities: Surface —grade, shape, patch, seal cracks, control dust, remove snow and iceDrainage —clean and repair ditches and culverts; remove all excess materialRoadside —cut brush, trim trees and roadside plantings, control erosionTraffic service —clean and repair or replace signsDesign roads with adequate ditches so they can be maintained with a motor grader. Clean and grade ditches to maintain proper pitch and peak efficiency. After grading, remove all excess material from the shoulder.10.Keep good recordsYour maintenance will be more efficient with good records. Knowing the road’s construction, life, and repair history makes it much easier to plan and budget its future repairs. Records can also help you evaluate the effectiveness of the repair methods and materials you used.Good record keeping starts with an inventory of the system. It should include the history and surface condition of the roadway, identify and evaluate culverts and bridges, note ditch conditions, shoulders, signs, and such structures as retaining walls and guardrails.Update your inventory each year or when you repair or change a road section. A formal pavement management system can help use these records and plan and budget road improvements.ResourcesThe Basics of a Good Road#17649, UW-Madison, 15 min. videotape. Presents the Ten Commandments of a Good Road. Videotapes are loaned free through County Extension offices.Asphalt PASER Manual(39 pp), Concrete PASER Manual (48 pp), Gravel PASER Manual (32 pp). These booklets contain extensive photos and descriptions of road surfacesto help you understand types of distress conditions and their causes. A simple procedure for rating the condition helps you manage your pavements and plan repairs.Roadware, a computer program which stores and reports pavement condition information. Developed by the Transportation Information Center and enhanced by the Wisconsin Department of Transportation, it uses the PASER rating system to provide five-year cost budgets and roadway repair/reconstruction priority lists.Wisconsin Transportation Bulletin factsheets, available from the Transportation Information Center (T.I.C.).Road Drainage, No. 4. Describes drainage for roadways, shoulders, ditches, and culverts.Gravel Roads, No. 5. Discusses the characteristics of a gravel road and how to maintain one.Using Salt and Sand for Winter Road Maintenance,No. 6. Basic information and practical tips on how to use de-icing chemicals and sand.Culverts—Proper Use and Installation, No. 15. Selecting and sizing culverts, designing, installing and maintaining them.Geotextiles in Road Construction/Maintenance andErosion Control, No. 16. Definitions and common applications of geotextiles on roadways and for erosion control.T.I.C. workshops are offered at locations around the state.Crossroads,an 8-page quarterly newsletter published by the T.I.C. carries helpful articles, workshop information, and resource lists. For more information on any of these materials, contact the T.I.C. at 800/442-4615.中文译文一个良好的公路的基础长久以来我们已经掌握了如何铺设好一条道路的方法,考古学家发现在4600年古埃及使用建造金字塔的石块铺设道路,后来,罗马人使用同样的方法建立了一个庞大的道路系统,这种方法一直沿用到今天。
道路路桥工程中英文对照外文翻译文献

道路路桥工程中英文对照外文翻译文献Asphalt Mixtures: ns。
Theory。
and Principles1.nsXXX industry。
XXX。
The most common n of asphalt is in the n of XXX "flexible" XXX them from those made with Portland cement。
XXX2.XXXXXX the use of aggregates。
XXX。
sand。
or gravel。
and a binder。
XXX for the pavement。
XXX。
The quality of the asphalt XXX to the performance of the pavement。
as it must be able to XXX。
3.PrinciplesXXX。
with each layer XXX layers typically include a subgrade。
a sub-base。
a base course。
and a surface course。
The subgrade is the natural soil or rock upon which the pavement is built。
while the sub-base and base courses provide nal support for the pavement。
The surface course is the layer that comes into direct contact with traffic and is XXX。
In n。
the use of XXX.The n of flexible pavement can be subdivided into high and low types。
道路桥梁专业 中英文对照---毕业设计论文 外文文献翻译

附录一英文翻译原文AUTOMATIC DEFLECTION AND TEMPERATURE MONITORING OFA BALANCED CANTILEVER CONCRETE BRIDGEby Olivier BURDET, Ph.D.Swiss Federal Institute of Technology, Lausanne, SwitzerlandInstitute of Reinforced and Prestressed Concrete SUMMARYThere is a need for reliable monitoring systems to follow the evolution of the behavior of structures over time.Deflections and rotations are values that reflect the overall structure behavior. This paper presents an innovative approach to the measurement of long-term deformations of bridges by use of inclinometers. High precision electronic inclinometers can be used to follow effectively long-term rotations without disruption of the traffic. In addition to their accuracy, these instruments have proven to be sufficiently stable over time and reliable for field conditions. The Mentue bridges are twin 565 m long box-girder post-tensioned concrete highway bridges under construction in Switzerland. The bridges are built by the balanced cantilever method over a deep valley. The piers are 100 m high and the main span is 150 m. A centralized data acquisition system was installed in one bridge during its construction in 1997. Every minute, the system records the rotation and temperature at a number of measuring points. The simultaneous measurement of rotations and concrete temperature at several locations gives a clear idea of the movements induced by thermal conditions. The system will be used in combination with a hydrostatic leveling setup to follow the long-term behavior of the bridge. Preliminary results show that the system performs reliably and that the accuracy of the sensors is excellent.Comparison of the evolution of rotations and temperature indicate that the structure responds to changes in air temperature rather quickly.1.BACKGROUNDAll over the world, the number of structures in service keeps increasing. With the development of traffic and the increased dependence on reliable transportation, it is becoming more and more necessary to foresee and anticipate the deterioration of structures. In particular,for structures that are part of major transportation systems, rehabilitation works need to be carefully planned in order to minimize disruptions of traffic. Automatic monitoring of structures is thus rapidly developing.Long-term monitoring of bridges is an important part of this overall effort to attempt to minimize both the impact and the cost of maintenance and rehabilitation work of major structures. By knowing the rate of deterioration of a given structure, the engineer is able to anticipate and adequately define the timing of required interventions. Conversely, interventions can be delayed until the condition of the structure requires them, without reducing the overall safety of the structure.The paper presents an innovative approach to the measurement of long-term bridge deformations. The use of high precision inclinometers permits an effective, accurate and unobtrusive following of the long-term rotations. The measurements can be performed under traffic conditions. Simultaneous measurement of the temperature at several locations gives a clear idea of the movements induced by thermal conditions and those induced by creep and shrinkage. The system presented is operational since August 1997 in the Mentue bridge, currently under construction in Switzerland. The structure has a main span of 150 m and piers 100 m high.2. LONG-TERM MONITORING OF BRIDGESAs part of its research and service activities within the Swiss Federal Institute of Technology in Lausanne (EPFL), IBAP - Reinforced and Prestressed Concrete has been involved in the monitoring of long-time deformations of bridges and other structures for over twenty-five years [1, 2, 3, 4]. In the past, IBAP has developed a system for the measurement of long-term deformations using hydrostatic leveling [5, 6]. This system has been in successful service in ten bridges in Switzerland for approximately ten years [5,7]. The system is robust, reliable and sufficiently accurate, but it requires human intervention for each measurement, and is not well suited for automatic data acquisition. One additional disadvantage of this system is that it is only easily applicable to box girder bridges with an accessible box.Occasional continuous measurements over periods of 24 hours have shown that the amplitude of daily movements is significant, usually amounting to several millimeters over a couple of hours. This is exemplified in figure 1, where measurements of the twin Lutrive bridges, taken over a period of several years before and after they were strengthened by post-tensioning, areshown along with measurements performed over a period of 24 hours. The scatter observed in the data is primarily caused by thermal effects on the bridges. In the case of these box-girder bridges built by the balanced cantilever method, with a main span of 143.5 m, the amplitude of deformations on a sunny day is of the same order of magnitude than the long term deformation over several years.Instantaneous measurements, as those made by hydrostatic leveling, are not necessarily representative of the mean position of the bridge. This occurs because the position of the bridge at the time of the measurement is influenced by the temperature history over the past several hours and days. Even if every care was taken to perform the measurements early in the morning and at the same period every year, it took a relatively long time before it was realized that the retrofit performed on the Lutrive bridges in 1988 by additional post-tensioning [3, 7,11] had not had the same effect on both of them.Figure 1: Long-term deflections of the Lutrive bridges, compared to deflections measured in a 24-hour period Automatic data acquisition, allowing frequent measurements to be performed at an acceptable cost, is thus highly desirable. A study of possible solutions including laser-based leveling, fiber optics sensors and GPS-positioning was performed, with the conclusion that, provided that their long-term stability can be demonstrated, current types of electronic inclinometers are suitable for automatic measurements of rotations in existing bridges [8].3. MENTUE BRIDGESThe Mentue bridges are twin box-girder bridges that will carry the future A1 motorway from Lausanne to Bern. Each bridge, similar in design, has an overall length of approximately 565 m, and a width of 13.46 m, designed to carry two lanes of traffic and an emergency lane. The bridges cross a deep valley with steep sides (fig. 2). The balanced cantilever design results from a bridge competition. The 100 m high concrete piers were built using climbing formwork, after which the construction of the balanced cantilever started (fig. 3).4. INCLINOMETERSStarting in 1995, IBAP initiated a research project with the goal of investigating the feasibility of a measurement system using inclinometers. Preliminary results indicated that inclinometers offer several advantages for the automatic monitoring of structures. Table 1 summarizes the main properties of the inclinometers selected for this study.One interesting property of measuring a structure’s rotations, is that, for a given ratio of maximum deflection to span length, the maximum rotation is essentially independent from its static system [8]. Since maximal allowable values of about 1/1,000 for long-term deflections under permanent loads are generally accepted values worldwide, developments made for box-girder bridges with long spans, as is the case for this research, are applicable to other bridges, for instance bridges with shorter spans and other types of cross-sections. This is significant because of the need to monitor smaller spans which constitute the majority of all bridges.The selected inclinometers are of type Wyler Zerotronic ±1°[9]. Their accuracy is 1 microradian (μrad), which corresponds to a rotation of one millimeter per kilometer, a very small value. For an intermediate span of a continuous beam with a constant depth, a mid-span deflection of 1/20,000 would induce a maximum rotation of about 150 μrad, or 0.15 milliradians (mrad).One potential problem with electronic instruments is that their measurements may drift overtime. To quantify and control this problem, a mechanical device was designed allowing the inclinometers to be precisely rotated of 180° in an horizontal plane (fig. 4). The drift of each inclinometer can be very simply obtained by comparing the values obtained in the initial and rotated position with previously obtained values. So far, it has been observed that the type of inclinometer used in this project is not very sensitive to drifting.5. INSTRUMENTATION OF THE MENTUE BRIDGESBecause a number of bridges built by the balanced cantilever method have shown an unsatisfactory behavior in service [2, 7,10], it was decided to carefully monitor the evolution of the deformations of the Mentue bridges. These bridges were designed taking into consideration recent recommendations for the choice of the amount of posttensioning [7,10,13]. Monitoring starting during the construction in 1997 and will be pursued after the bridges are opened to traffic in 2001. Deflection monitoring includes topographic leveling by the highway authorities, an hydrostatic leveling system over the entire length of both bridges and a network of inclinometers in the main span of the North bridge. Data collection iscoordinated by the engineer of record, to facilitate comparison of measured values. The information gained from these observations will be used to further enhance the design criteria for that type of bridge, especially with regard to the amount of post-tensioning [7, 10, 11, 12, 13].The automatic monitoring system is driven by a data acquisition program that gathers and stores the data. This system is able to control various types of sensors simultaneously, at the present time inclinometers and thermal sensors. The computer program driving all the instrumentation offers a flexible framework, allowing the later addition of new sensors or data acquisition systems. The use of the development environment LabView [14] allowed to leverage the large user base in the field of laboratory instrumentation and data analysis. The data acquisition system runs on a rather modest computer, with an Intel 486/66 Mhz processor, 16 MB of memory and a 500 MB hard disk, running Windows NT. All sensor data are gathered once per minute and stored in compressed form on the hard disk. The system is located in the box-girder on top of pier 3 (fig. 5). It can withstand severe weather conditions and will restart itself automatically after a power outage, which happened frequently during construction.6. SENSORSFigure 5(a) shows the location of the inclinometers in the main span of the North bridge. The sensors are placed at the axis of the supports (①an d⑤), at 1/4 and 3/4 (③an d④) of the span and at 1/8 of the span for②. In the cross section, the sensors are located on the North web, at a height corresponding to the center of gravity of the section (fig.5a). The sensors are all connected by a single RS-485 cable to the central data acquisition system located in the vicinity of inclinometer ①. Monitoring of the bridge started already during its construction. Inclinometers①,②and③were installed before the span was completed. The resulting measurement were difficult to interpret, however, because of the wide variations of angles induced by the various stages of this particular method of construction.The deflected shape will be determined by integrating the measured rotations along the length of the bridge (fig.5b). Although this integration is in principle straightforward, it has been shown [8, 16] that the type of loading and possible measurement errors need to be carefully taken into account.Thermal sensors were embedded in concrete so that temperature effects could be taken into account for the adjustment of the geometry of the formwork for subsequent casts. Figure 6 shows the layout of thermal sensors in the main span. The measurement sections are located at the same sections than the inclinometers (fig. 5). All sensors were placed in the formwork before concreting and were operational as soon as the formwork was removed, which was required for the needs of the construction. In each section, seven of the nine thermal sensor (indicated in solid black in fig. 6) are now automatically measured by the central data acquisition system.7. RESULTSFigure 7 shows the results of inclinometry measurements performed from the end ofSeptember to the third week of November 1997. All inclinometers performed well during that period. Occasional interruptions of measurement, as observed for example in early October are due to interruption of power to the system during construction operations. The overall symmetry of results from inclinometers seem to indicate that the instruments drift is not significant for that time period. The maximum amplitude of bridge deflection during the observed period, estimated on the basis of the inclinometers results, is around 40 mm. More accurate values will be computed when the method of determination ofdeflections will have been further calibrated with other measurements. Several periods of increase, respectively decrease, of deflections over several days can be observed in the graph. This further illustrates the need for continuous deformation monitoring to account for such effects. The measurement period was .busy. in terms of construction, and included the following operations: the final concrete pours in that span, horizontal jacking of the bridge to compensate some pier eccentricities, as well as the stressing of the continuity post-tensioning, and the de-tensioning of the guy cables (fig. 3). As a consequence, the interpretation of these measurements is quite difficult. It is expected that further measurements, made after the completion of the bridge, will be simpler to interpret.Figure 8 shows a detail of the measurements made in November, while figure.9 shows temperature measurements at the top and bottom of the section at mid-span made during that same period. It is clear that the measured deflections correspond to changes in the temperature. The temperature at the bottom of the section follows closely variations of the air temperature(measured in the shade near the north web of the girder). On the other hand, the temperature at the top of the cross section is less subject to rapid variations. This may be due to the high elevation of the bridge above ground, and also to the fact that, during the measuring period, there was little direct sunshine on the deck. The temperature gradient between top and bottom of the cross section has a direct relationship with short-term variations. It does not, however, appear to be related to the general tendency to decrease in rotations observed in fig. 8.8. FUTURE DEVELOPMENTSFuture developments will include algorithms to reconstruct deflections from measured rotations. To enhance the accuracy of the reconstruction of deflections, a 3D finite element model of the entire structure is in preparation [15]. This model will be used to identify the influence on rotations of various phenomena, such as creep of the piers and girder, differential settlements, horizontal and vertical temperature gradients or traffic loads.Much work will be devoted to the interpretation of the data gathered in the Mentue bridge. The final part of the research project work will focus on two aspects: understanding the very complex behavior of the structure, and determining the most important parameters, to allow a simple and effective monitoring of the bridges deflections.Finally, the research report will propose guidelines for determination of deflections from measured rotations and practical recommendations for the implementation of measurement systems using inclinometers. It is expected that within the coming year new sites will be equipped with inclinometers. Experiences made by using inclinometers to measure deflections during loading tests [16, 17] have shown that the method is very flexible and competitive with other high-tech methods.As an extension to the current research project, an innovative system for the measurement of bridge joint movement is being developed. This system integrates easily with the existing monitoring system, because it also uses inclinometers, although from a slightly different type.9. CONCLUSIONSAn innovative measurement system for deformations of structures using high precision inclinometers has been developed. This system combines a high accuracy with a relatively simple implementation. Preliminary results are very encouraging and indicate that the use of inclinometers to monitor bridge deformations is a feasible and offers advantages. The system is reliable, does not obstruct construction work or traffic and is very easily installed. Simultaneous temperature measurements have confirmed the importance of temperature variations on the behavior of structural concrete bridges.10. REFERENCES[1] ANDREY D., Maintenance des ouvrages d’art: méthodologie de surveillance, PhD Dissertation Nr 679, EPFL, Lausanne, Switzerland, 1987.[2] BURDET O., Load Testing and Monitoring of Swiss Bridges, CEB Information Bulletin Nr 219, Safety and Performance Concepts, Lausanne, Switzerland, 1993.[3] BURDET O., Critères pour le choix de la quantitéde précontrainte découlant de l.observation de ponts existants, CUST-COS 96, Clermont-Ferrand, France, 1996.[4] HASSAN M., BURDET O., FAVRE R., Combination of Ultrasonic Measurements and Load Tests in Bridge Evaluation, 5th International Conference on Structural Faults and Repair, Edinburgh, Scotland, UK, 1993.[5] FAVRE R., CHARIF H., MARKEY I., Observation à long terme de la déformation des ponts, Mandat de Recherche de l’OFR 86/88, Final Report, EPFL, Lausanne, Switzerland, 1990.[6] FAVRE R., MARKEY I., Long-term Monitoring of Bridge Deformation, NATO Research Workshop, Bridge Evaluation, Repair and Rehabilitation, NATO ASI series E: vol. 187, pp. 85-100, Baltimore, USA, 1990.[7] FAVRE R., BURDET O. et al., Enseignements tirés d’essais de charge et d’observations à long terme pour l’évaluation des ponts et le choix de la précontrainte, OFR Report, 83/90, Zürich, Switzerland, 1995.[8] DAVERIO R., Mesures des déformations des ponts par un système d’inclinométrie,Rapport de maîtrise EPFL-IBAP, Lausanne, Switzerland, 1995.[9] WYLER AG., Technical specifications for Zerotronic Inclinometers, Winterthur, Switzerland, 1996.[10] FAVRE R., MARKEY I., Generalization of the Load Balancing Method, 12th FIP Congress, Prestressed Concrete in Switzerland, pp. 32-37, Washington, USA, 1994.[11] FAVRE R., BURDET O., CHARIF H., Critères pour le choix d’une précontrainte: application au cas d’un renforcement, "Colloque International Gestion des Ouvrages d’Art: Quelle Stratégie pour Maintenir et Adapter le Patrimoine, pp. 197-208, Paris, France, 1994. [12] FAVRE R., BURDET O., Wahl einer geeigneten Vorspannung, Beton- und Stahlbetonbau, Beton- und Stahlbetonbau, 92/3, 67, Germany, 1997.[13] FAVRE R., BURDET O., Choix d’une quantité appropriée de précontrain te, SIA D0 129, Zürich, Switzerland, 1996.[14] NATIONAL INSTRUMENTS, LabView User.s Manual, Austin, USA, 1996.[15] BOUBERGUIG A., ROSSIER S., FAVRE R. et al, Calcul non linéaire du béton arméet précontraint, Revue Français du Génie Civil, vol. 1 n° 3, Hermes, Paris, France, 1997. [16] FEST E., Système de mesure par inclinométrie: développement d’un algorithme de calcul des flèches, Mémoire de maîtrise de DEA, Lausanne / Paris, Switzerland / France, 1997.[17] PERREGAUX N. et al., Vertical Displacement of Bridges using the SOFO System: a Fiber Optic Monitoring Method for Structures, 12th ASCE Engineering Mechanics Conference, San Diego, USA, to be published,1998.译文平衡悬臂施工混凝土桥挠度和温度的自动监测作者Olivier BURDET博士瑞士联邦理工学院,洛桑,瑞士钢筋和预应力混凝土研究所概要:我们想要跟踪结构行为随时间的演化,需要一种可靠的监测系统。
路桥工程专业(森工)外语,带翻译

Unit 1 Highway Introduction公路简介(1) Road classification道路分类Road路,道路,公路, highway公路;干道, freeway高速公路;高速干道, expressway高速公路, street街,街道,(2) Road concept道路概念Road layout道路布局,planning 城市规划,土地规划, spacing 间隔, network网状物;网状系统, location位置;场所,所在地, terrain 地形;地势, drainage排水系统,排水设备;下水道, survey 测量,勘测,测绘(3) Road structure道路结构Alignment线型surface面,表面, subgrade路基,地基curvature弯曲, (几何)曲率, gradient 坡度,倾斜度, ditch沟;壕沟,水道,渠道, turnout产量,产额,4) Materials材料Gravel 砂砾,碎石,石子dirt污物;烂泥;灰尘,泥土, soil土,泥土,土壤, asphalt沥青;柏油, cement水泥, concrete 混凝土的, 具体的Rubble毛石,块石, flag薄层,薄层砂岩, stone石,石头,石块, slab石板,厚板,平板;厚片, grout薄泥浆;水泥浆,石灰浆lime石灰, cement水泥,胶结材料Bottom layer底层/intermediate layer中间层/upper layer上层/top layer顶层The Empire帝国/ the Dark Ages黑暗时代/ the Middle Ages中世纪Topograph地形图/topography地形;地形学;地形测量学/topographic地形(学)上的Turnpike收费公路/toll system收费系统/ETC –Electronic Toll Collection电子收费3. Highway types公路类型Freeway高速公路;高速干道: freeway/expressway高速公路Controlled access highway控制进入高速公路Conventional highway传统的公路Highway公路;干道: arterial highway干线公路/bypass旁道,旁路/divided highway双向分隔行驶的公路;双向之间有分车带的公路/through street通过街/through highway通过公路Parkway停车道Scenic highway风景公路Street街,街道: Cul-de-Sac street小路尽头的街道/dead end street尽头街道/frontage street正街/local street地方街道Road路,道路,公路: frontage road街面道路/local road地方道路/toll road 收费道路(bridge桥,桥梁, tunnel隧道,地道)1. Technical termsCross section横断面/ Profile 纵断面(图),剖面(图)/Plan view平面视图Longitudinal section/ Transverse section 纵/横截面Lane/ Multilane/ Multiple lanes行车/多通道/多车道Roadway巷道Through traffic/ Local traffic/ Traffic island通过交通/交通/交通岛MedianRoadbed/ curb/ shoulder路基/ 路边,(人行道旁的)镶边石,边栏/肩Right-of-way 公路用地Surface course表面过程/ Wearing course磨损过程/ Basecourse基层/Flexible pavement柔性路面/ Rigid pavement刚性路面Cohesion凝聚力/ cohesive有粘着力的;凝聚性的;有结合力的Roadbase基层/ Subbase基层Crack/ Break/ Stress/ Distress裂纹/打破/压力/痛苦,窘迫的Modulus of elasticity弹性模量2. Main points1 Geometric Cross Section on Highway几何截面的公路上1.1 Lane巷1.2 Median位数1.3 Outer separation外部分离1.4 Roadbed路基1.5 Roadside路边1.6 Roadway巷1.7 Shoulder肩1.8 Travel way旅行方式Unit 4 Asphalt and Mix Asphalt沥青和沥青混合Technical termsMix/ mixture/ compound混合/混合物/复合Petroleum石油/ crude oil原油/ gasoline汽油/ diesel柴油/ gas可燃气;煤气;沼气/ petrol汽油Bitumen沥青/ bituminous 沥青的;含沥青的/ pitch搭(帐篷);扎(营)/asphalt沥青/ asphaltum沥青/ tar焦油;柏油,沥青Hydrocarbon碳氢化合物/ hydrau液Destructive distillation破坏性蒸馏Disulfate硫酸盐Emulsify乳化/ emulsion乳胶;乳状液/Dilute稀释/ diluents稀释剂/solvent有溶解力的/ cutter stock刀具的库存Oxygen氧,氧气/ oxidize使氧化/ oxidation 氧化(作用)/ oxidization 氧化/ dioxide二氧化物/ hydrogen氢/ sulphur硫磺Waterproof不透水的,防水的Acid/ alkalis/ salt/ alcohol酸/碱/盐/酒精Liquid/ fluid/ liquor/ liquefy液/液/液/液化Semi-solid半固态/ hard-brittle solid硬脆性固体/ water-thin liquidBinder粘结剂,捆缚(或包扎)用具;绳索,带子/ sticky粘的;涂有粘胶物质的;泥泞的/ viscous粘的/ adhesive粘的;粘着的;有粘性的/ viscosity粘质;粘性Hard-surface硬地/ hard-face硬面/ hard-surfaced road坚硬的路Tack coat粘结层Cut-back asphalt稀释沥青Penetration. 针入度Versatility多样化的/ flexibility易曲性;适应性,灵活性;弹性/ durability耐久性/ ability能力;能耐/ capacity 容量, 能力,才能,接受能力,理解力/ compactability紧/Rigidity 坚硬;严格;刚直;死板/ strength强度;(酒等的)浓度/ hardness硬性;硬度/ elastic 有弹性的,有弹力的/ rigid坚硬的;坚固的;不易弯曲的/ modules of elasticity弹性模数/Cold temperature cracking低温开裂/ warm temperature rutting高温车辙Performance 履行;实行;完成,演出/ grade等级;级别;阶段/ Performance Grading性能分级(PG)Aggregate使聚集Bin (贮藏谷物等的)箱子,容器,仓/ dryer干燥剂,催干剂/ pug mill练泥机/ drum鼓状物;圆桶/ tank (贮水,油,气等的)柜,罐,箱,槽latex乳汁;乳胶sulphur extended asphalt硫磺沥青混合料sulphur dioxide二氧化硫hydrogen sulphide硫化氢1. Technical termsStability 稳定,稳定性/ stabilize 使稳定,使稳固/availability有效;有益;可利用性/ available 可利用的,可得到的/Sense 感觉;意识;观念/ sensitivity敏感性;感受性Solubility 可溶性, 溶解度/ soluble 可溶解的/ solution溶解,解答;解决(办法); /Rutting车辙/ rust锈,铁锈;(脑子等的)迟钝;(能力等的)荒废/ tar焦油;柏油,沥青Roadstone石马路By-product副产品/ coke 焦,焦炭,焦煤/ coal gas 煤气/ kerosene煤油,火油Residue 残余,剩余,滤渣,残余物/ residual残留的;剩余的/ remain剩下,余留strengthen 加强;增强;巩固/ strength 力,力量, 强度/ deformation 毁坏;变形/ deform 使变形/ reform 改革,革新,改良elastic有弹性的,有弹力的/elasticity 弹性;弹力/plastic可塑的,塑性的/plasticity 可塑性;适应性;柔软性/chipping碎屑permanent永久的,永恒的;永远的, 固定性的;常在的/ temporary 临时的;暂时的,一时的poise使平衡;使平稳/ Dyne达因/ Newton 牛顿stiffness劲度/ stiff 硬的,僵直的,僵硬的/ stress压力;紧张;应力/ strain拉紧;拖紧;伸张/ fatigue疲劳,劳累Deduce演绎,推论/ deduction 扣除,减除,推论;演绎(法/ composition 构成;构图;成分penetration test渗透测试/ softening point test软化点试验/ ring and ball test环和球试验internal diameter 内部直径/ external diameter外部直径sample样品,样本;例子,实例/ water bath水浴arbitrary反复无常的,任性多变的;独断的,专制的/ pragmatic 实际的;实干的/ pragmatism 实用主义/fluidity 流动性;流状;易变(性)/ segregate分离/ susceptibility敏感性/ susceptible 敏感的, rheology流变学/ rheological 流变rolled asphalt碾压沥青synthetic polymer 合成聚合物/ additive附加的epoxy resin环氧树脂impart to传授/ deter威慑住,吓住;使断念/ deterrent 威慑的;遏制的container terminal集装箱码头/ airfield apron机场停机坪Unit 5 Cement and Concrete水泥和混凝土A. Technical termsCement水泥,胶结材料/ chalk粉笔/ matrix矩阵Cementitious 水泥Calcium钙/ calciferous钙/Lime石灰/ limestone石灰石Silica 硅土,二氧化硅/ silicate硅酸盐Aluminium铝/ alumina氧化铝/ aluminate铝sinter烧结coarse clinker粗水泥熟料calcium aluminate 铝酸钙/ calcium silicate硅酸钙hydrate水合物/ cure治疗/Work工作/ workable 可使用的,可运转的/ workability可使用性Shrinkage收缩/ swell膨胀/ swellable膨胀/ swellability溶胀strain拉紧;拖紧;伸张grout薄泥浆;水泥浆constituent组织/ ingredient成分/ component组成Thermal热的;热量的/ thermal coefficient of expansion热膨胀热系数Compressive strength抗压强度/ tensile strength拉伸强度Compressive压缩/ tensile 拉伸Reinforce加固/ reinforcing bar钢筋/ reinforced concrete钢筋混凝土Stiffness劲度Vulnerable脆弱的Efflorescence 风化/ weather天气/ weathering气候Column 柱/ volume体积/Pressure vessel压力容器1. Technical termsPrestress预应力Crew船员Contract 合同/ contractor承包商Resident engineer驻地工程师Inspector检查员Structural member结构构件Steel strand钢绞线Bridge girder桥主梁Pier cap墩帽Deck slab甲板Pretensioning先张法/ post-tensioning后张法Precast预制/ cast -in-place就地浇Box girder箱梁Predetermined stress预定压力Stretch拉伸/ relax 放松/ shorten 缩短/ induce诱导Duct 输送管;导管/ conduit导水管,导管/ pipe管,导管,输送管/ tube 管;筒/ canal管,道/ vessel 容器Anchor 锚/ Anchorage锚具corrosion腐蚀;侵入rebar钢筋/ reel卷轴tarpaulin 防水油布condense压缩/ condensation冷凝require要求/ requisite必要/ prerequisite不可缺的;事先需要的uniform 制服/ uniformity统一vary使多样化/ various不同的;各种各样的,形形色色的/ variable / variationcamber deflection 上弯翘起挠度creep蠕变Standard Specification 标准规范/ Sampling Guide取样指南Couple一双(对)/ coupler联结器Stir搅拌/ stirrup镫筋,箍筋/Web网络/ flange凸缘/ rib肋,肋骨/ side form形式Flimsy脆弱的Galvanize strip steel 镀锌带钢/ sheet steel钢片Weld焊接;熔接;锻接,使结合/ seam 缝;接缝,缝合处,接合口;裂缝Helical螺旋/helically螺旋形的/ helicopter直升飞机Contra-flexure反向弯曲/ parabolic curve抛物曲线Uplift隆起的Wobble摆动/ twist扭转;扭弯;旋转/ spall破碎Case事实,实例,案件/ Encase装箱Increment增加;增加量;增额Slack松弛的,不紧的;不严的Pressure gauge压力表/ load cell负载单元/ stretcher担架/ dynamometer动力计;力量计;握力计Dead end 尽头;困境/ stressing end强调结束Elongation measurement伸长测量法Spliced strand拼接链Tendon筋腱、预应力钢索、钢筋束Inject注射/ eject 逐出,轰出;喷射,吐出/ injection /ejectionVent通风孔,排气孔/ slut邋遢女子/ inlet valve入口阀Unit 6 Measuring Technology and Equipment测量技术及设备A. Technical termsSurvey测量/ surveyor测量员Horizontal/vertical/plumb/slope/ plan/plane垂直/水平/垂直/倾斜/计划/飞机Elevation高程Odometer 测距仪Circumference 圆周;周长/ circle圆/ circulate流通;传播/ circular 圆Tape带子,线带Tacheometry 视距测量Stadia 视距Theodolite /transit 经纬仪Rod 测杆、标尺Telescope望远镜Topographic survey地形测量Topographic mapping地形测绘Hydrographic mapping水文图Electronic distance measurement(EDM)电子距离测量Terrain地形;地势Electromagnetic电磁(体)的Velocity/speed速度/速度Band传送带;带,细绳Infrared/ ultraviolet 红外/紫外Module/ modulate模块/调节Passive/ active/ positive/ negative 被动/主动/积极/消极Perpendicular/ parallel 垂直/平行Clinometer / abney 测斜仪/水准仪Sextant六分仪/ sexagesimal 六十分数Compass界线;周围,圆规Protractor 量角器Unit 8 The Subgrade Design and Construction Technology路基设计与施工技术A. Technical termsUppermost / top soil 最上面/土壤Embankment / excavation路堤/挖掘Fill / cut填充/切割Foundation建立,创办;基础;基本原则Organic / inorganic / organ / organization有机/无机/机关/组织Imported soil / borrow sources进口/借用来源Dense / density / condense密/密度/凝结Moisture content含水量Classification分类;分级Differ / different / difference / differentiate不同的/不同/不同/分化Cobble / gravel / sand / silt / clay卵石/砾/砂/泥/粘土Fine grained soil细粒土Dry mass / dry matter干质量/干物质Semi-weathered半风化In-situ在原处;在原位置Infer推断Resilient modulus 回弹模量Manual 手的;手工的;用手操作的;体力的Backcalculate 反演计算Overlay覆盖;铺在...上面;镀;压倒Prototype原型;标准;模范Frost冰冻/ thaw融化,融解/ heave举起,拉起, /Guide / guidance / guideline指导/指南/指导方针Expansive soil 膨胀土Bentonitic shale 膨胀土页岩Soil modifier土壤改良剂Culvert阴沟;地下电缆管道;涵洞桥Form / formulate / formulation / formula形式/制定/公式化;规划;构想/公式Title——Highway Subgrade Construction公路路基施工1. Technical termsExcavation挖掘;开凿Borrow pit借土坑Sidestep回避Borrow ditch借沟Dispose / disposal处理/处置Surplus material剩余材料Approach接近,靠近Conforming / nonconforming material合格/不合格材料Top soil / superficial coatTurf 草皮土壤/表层stake mark危险标记subgrade edge路基边缘top of slope / foot of slope顶坡/坡脚berm 便道peg 桩facility 设施silt 泥沙,淤泥/ scour 冲刷permeable有渗透性的;可穿过的/ torrent 急流earthwork 土方量over-excavation挖blast 爆炸,爆破/ fetch soil 取土transverse 横向的;横断的;横切的/ longitudinal excavation纵向开挖hauling牵引backfill 回填self-dumper 自卸车segment / segmental部分;线段side wall侧壁rock filling填石/ borrow filling 借方填筑compaction machine压实机/ rolling passes碾压cut off切断;中断provided 以...为条件;假如(that)bench长凳;长椅;法官席;法官;法庭tamp / tamper 夯具Unit 9 Pavement Design and Construction Technology 路面设计与施工技术A. Technical termsSkid / skidding 打滑/集材/拖曳Free-draining自由排水Standing water站在水Imported/treated material进口/处理材料Platform平台,台Bound/unbound material绑定/绑定材料Bitumen-based material沥青基材料Unbound granular material松散颗粒材料Ingress入口Regular / Regularity /regulate定期/规律/调节Permeable / impermeable / permeability 渗透/渗透/渗透impermeability不渗透性Texture组织,结构,质地Tolerance忍耐,忍耐力;宽容,宽大Deep-seated 根深蒂固/由来已久/顽固的Remedy / remedial / diagnose药物/治疗/诊断Propagate / Propagation / propaganda路床面宣传/传播/宣传Formation 形态,结构Deem 认为Clear-cut 轮廓鲜明的/ 清晰的/ 皆伐Onset 开始Design life设计寿命Roadwork道路工程Discount折扣;打折扣1. Technical termsMacadam碎石Impetus 动力/推动Rubble瓦砾Avenue / street / road 路/街/路Stone Matrix Asphalt (SMA) 沥青玛蹄脂碎石混合料Sprayer喷雾器Gritting machine 铺砂机Mixing plant搅拌设备Spreader散布者;(涂奶油用的)奶油刀Paver摊铺机Roller 滚动物;滚柱;滚筒;滚轴Road binder道路粘合剂Guss asphalt/concrete 摊铺地沥青/混凝土Stone quarry 采石场Wear and tear磨损Unit 10 Highway Alignment Design 公路线形设计A. Technical termsHorizontal/vertical alignment水平/垂直对齐Configuration. 结构;表面配置Safe operating speed安全操作速度Sight distance视距Highway capacity / traffic volume公路容量/交通量tangent正切;切线Superelevation 超高Rate of grade change速度等级变化Horizontal/vertical curve 水平/垂直曲线criteria(判断、批评的)标准,准则,尺度simple circular curve简单的圆曲线spiral transition curve 螺旋缓和曲线compound curve 复合曲线sharp curve锐曲线sharp/slight curvature 急剧的;锋利的;尖的/轻微弯曲swept path扫路centerline. 中线runoff决赛;终投票outline外形;轮廓minimum curve radii最小曲线半径long / length / lengthen长/长度/延长reverse curve 反向曲线superelevation transition超高过渡providing / provided (that) 假如…urban / suburban / rural城市/郊区/农村stopping/passing sight distance停止/超车视距multiple decision point多个决策点sight line瞄准线middle ordinate 中距/正矢no-passing zone禁区1. Technical termsGrade line分数线Crest/sag vertical curve嵴/凹形竖曲线Auxiliary lane辅助车道Maximum/minimum grade最高/最低等级Detrimental有害的warp使变形;使弯曲;Standpoint观点Climbing lane爬坡车道Offset补偿;抵消Ramp exit gore匝道出口高尔Headlight beam前照灯光束Encroach侵犯Ponding water积水Water table地下水位Pavement box路面盒Prism棱柱(体),角柱(体)Balance point平衡点Unit 14 Bridge Introduction 桥梁简介A. Technical termsPipeline / cycle track / pedestrian管道/周期轨道/行人Superstructure / substructure上层建筑/结构Single storey building单层建筑物Handrail扶手/ guardstone守护石Bearing 关系,关联;举止,风度;体态Plan view平面视图Pier墩,墩/abutment桥墩;桥基;桥台;毗邻;接界处/wingwall翼墙/approach接近,靠近/apron 裙板Rivetment 固结Masonry石造工程;石造建筑Retaining wall挡土墙Subsoil / Earthfill地基/填土Well foundation 井筒基础Footpath小径,(乡间)小路Parapet wall 栏杆、女儿墙Topple 倾覆Buckle 受弯屈服Arch bridge 拱桥/Three Gorge三峡/ span墩距;跨度slab bridge / 板桥T-beam T梁bow string girder bridge 弓弦梁桥suspension bridge吊桥Cable-stayed bridge斜拉桥steel bridge桥梁钢rainbow bridge彩虹桥Niagara river 尼亚加拉河Shutter百叶窗;活动遮板Head room头部空间Tie beam系梁Thrust用力推;刺;插;塞;挤出(路)Arch rib 拱肋Suspender / stay吊带/保持Tower塔;塔楼;高楼Orthotropic deck正交异性桥面Continuous girder连续梁Three-dimensional三维Stiffening girder加劲梁Transverse/longitudinal/radial bracing横向/纵向/径向支撑Moment of inertia转动惯量Truss bridge桁架桥Rigid frame bridge刚构桥Axial force轴向力Portal frame门架Clearance清除,清扫;出空;空地;空隙Spandrel braced arch 腹拱、肩拱Trussed arch桁架拱桥1. Technical termsInclement恶劣的Investigation / FBI调查/调查局Reconnaissance侦察;勘察;事先考查Feasibility可行性;可能性Right angle直角Erosion侵蚀;腐蚀Whirl / cross current / scour旋转/交叉电流/冲刷render给予,提供;使得,使成为inerodable strata地层High Flood Level(HFL)高水位Discharge排出(液体,气体等);允许...离开;释放;解雇Waterway航道Pier thickness桥墩厚度High flood大洪水Current meter电流表Velocity rod流速杆Free board自由板Catchment area汇水盆地,汇水区域Watershed转折点;关键时刻;流域Boring 钻孔、钻探Rainfall降雨,下雨;降雨量Span墩距;跨度Culvert涵洞桥Ordinary Flood Level(OFL)普通洪水水位Low Water Level(LWL)低水位Afflux 雍水Head room头部空间Viaduct 高架桥Trestled bent栈桥弯曲Causeway 漫水桥Submersible潜水Cross-drainage横向排水Temporary/ permanent bridge临时/永久性桥Deck/through/semi-through bridge上/下/中承式桥Formation 建造、路床面Pony小马;小型的东西Headway进展Vertical lift bridge 垂直升降桥Bascule bridge开合式桥Swing bridge 旋开式桥Box/pipe/arch culvert盒/管/拱涵Cast iron铸铁;生铁Bearing capacity承载能力Earth cushion地垫Unit 15 Bridge Superstructure桥梁上部结构A. Technical termsWeight limit重量限制supplier供应者Span Arrangement跨径布置Bridge Project Manager大桥项目经理Redundant多余的,过剩的specification 规格;明细单;详细计划书Fracture critical骨折的关键Collapse倒塌;崩溃,瓦解Ability / Inability能力/能力Bolt螺栓stringer纵梁;纵桁span / single-span / multi-span跨度/单跨/连栋continuous spans连续跨越steel/concrete superstructure bridge钢筋混凝土桥梁rolled beam 辊压梁cover plate盖板welded plate girder焊接板梁box girder 箱梁truss扎,捆,缚,绑;用构架支撑cable stayed斜拉tied arch 系杆拱桥vertical/inclined web垂直/斜腹板top/bottom flange plate顶部/底部法兰盘hollow rectangular/trapezoidal section空心的矩形/梯形截面aesthetics美学torsional resistance扭阻力curved bridge曲线桥stringer / floor beam斯特林格/地板梁top/bottom chord顶部/底部和弦vertical/diagonal member垂直/斜成员lateral/sway bracing侧/斜撑axial load/force轴向载荷/力量concrete deck / steel girder混凝土桥面/钢大梁Box beam箱梁Strongback定位板Fabricate / fabrication / fabricator制造/生产/制造Balanced cantilever平衡悬臂Strain gage应变计Homogeneity / non-homogeneity 均匀/非均匀性Erratic 不定、无规律的Deflection偏斜;偏向;挠曲;偏度;挠度Mid-span / middle span / side span跨中/ 中跨/ 边跨Yield出产;结出(果实);产生(效果,收益等)Non-linearity非线性的Prescribe规定,指定Limiting strain极限应变flexure弯曲;弯曲部分,曲率neutral axis中性轴centroid距心lever arm杠杆臂resultant compression/tension/force/load由此产生的压缩/拉伸/ /载荷equivalent stress block等效应力块investigation / FBI调查/调查局under-reinforced / over-reinforced少筋/ 超筋stress intensity应力强度product产品,产物;产量;出产nomenclature学术用语;术语表Unit 16 Bridge Substructure桥梁下部结构A. Technical termsCap-and column type pier柱式墩帽Strut 支撑、加固T-type pierT型Hammerhead pier锤头码头Taper逐渐减少;逐渐变弱Rectangular/oval column矩形或椭圆柱Wall type pier墙式墩Strut and tie model拉压杆模型footing(稳固的)地位;基础single column/multi-column单/多列concentrated load集中荷载wall abutment墙台caisson 沉箱gutter 槽stepped/terraced wall configuration加强/梯田壁配置stub abutment直式桥台integral abutment整体式桥台wingwall 翼墙bridge seat 桥座backwall 背墙stem柄,把,杆approach slab 搭板contour轮廓;轮廓线;外形;结构1. Technical termsSpread footing扩展基础Cofferdam 围堰Negative skin friction / downdrag force负摩/下拉荷载力Friction pile摩擦桩End bearing pile端承桩Drilled caisson钻孔灌注Constructibility可构成性Embedment嵌入Casing箱;盒Confinement curbing约束控制Wire mesh basket 网笼Gabion 枝条筐streambed河床Unit 20 ——Construction Management and Cost Estimate 施工组织与概预算A. Technical termsSchedule 进度表Event / task / action /activity活动/任务/行动/活动Ultimate disposition 最后安排Expense / expenditure / cost费用/费用/成本Recast重铸Uncertainty不确定;不确信;易变;不可靠Production rate / productivity生产效率/生产力Gantt chart / bar chart甘特图表/图表Superimpose叠加Critical Path Method (CPM)关键路径法Critical task关键任务Logic diagram逻辑图Superintendent监督人,监管者Activity-on-the-arrow (AOA)活动箭Activity-on-the-node (AON)节点活动Dummy activity 虚拟工序Early start time / late start time开始时间早/晚开始时间Early finish time / late finish time最早完成时间/最晚完成时间Double line / bold line / color highlighted line / dash line双行线/颜色/大胆突出线/虚线Float / total float / free float 浮动/总时差/自由浮动interfering float 时差Preceding activity / succeeding activity前面的活动/后继活动Title——Construction Cost Estimate 建筑成本预算1. Technical termsBreakdown故障,损坏,崩溃;破裂Parameter / parametric参数/参数Direct/indirect cost直接/间接成本Finance / budget财务/预算Craftman钱包Scheme / schematic计划/方案Unit cost/price单位成本/价格Lump sum总金额Site visit网站访问Checklist核对用的清单Take-off脱下;移去;起飞;休假Overhead / profit / bond费用/利润/债券Escalation / contingence升级/偶然Shift 转移;替换,推卸Craft行业,职业Ownership and operating cost所有权和经营成本Dozer / bulldozer推土机/推土机Vendor 卖主Tax税;税金Markup 售价Similarity / dissimilarity相似/相异Unit 21 Tendering and Contract 投标与合同A. Technical termsTender敏感的,嫩的;柔软的;温柔的,体贴的Bid / bidder招标投标Agreement同意,一致;协定,协议Bond结合力;联结,联系Insurance保险;保险契约Makeup补足;编造;组成Owner / architect / designer / supplier / party业主/建筑师/设计师/供应商/派对Public agency / private company公共部门/私营公司Responsibility职责,任务;义务,负担General/special/technical provision一般/特殊/技术discretion判断力;辨别力;谨慎,考虑周到addenda补遗;追加;附加物Title——Types of construction contracts and bonds建筑合同和担保的类型1. Technical termsNegotiation / renegotiation协商/谈判Arctic / Antarctic北极/南极Cost plus a fixed fee成本加固定费用Cost plus a percentage成本加百分比Incentive刺激;鼓励;动机Thrifty 节约Innovation革新,改革,创新Compensate补偿,赔偿;酬报Procure 获得、实施Popular / popularity / population流行/流行/人口Recoup 收回surety / obligee担保/债权人forfeiture 没收、罚金penal / penalty刑法/处罚underwrite / constraint认购/约束default 违约option选择;选择权;选择自由lien 扣留权、留置权。
道路与桥梁工程中英文对照外文翻译文献

中英文对照外文翻译(文档含英文原文和中文翻译)Bridge research in EuropeA brief outline is given of the development of the European Union, together with the research platform in Europe. The special case of post-tensioned bridges in the UK is discussed. In order to illustrate the type of European research being undertaken, an example is given from the University of Edinburgh portfolio: relating to the identification of voids in post-tensioned concrete bridges using digital impulse radar.IntroductionThe challenge in any research arena is to harness the findings of different research groups to identify a coherent mass of data, which enables research and practice to be better focused. A particular challenge exists with respect to Europe where language barriers are inevitably very significant. The European Community was formed in the 1960s based upon a political will within continental Europe to avoid the European civil wars, which developed into World War 2 from 1939 to 1945. The strong political motivation formed the original community of which Britain was not a member. Many of the continental countries saw Britain’s interest as being purelyeconomic. The 1970s saw Britain joining what was then the European Economic Community (EEC) and the 1990s has seen the widening of the community to a European Union, EU, with certain political goals together with the objective of a common European currency.Notwithstanding these financial and political developments, civil engineering and bridge engineering in particular have found great difficulty in forming any kind of common thread. Indeed the educational systems for University training are quite different between Britain and the European continental countries. The formation of the EU funding schemes —e.g. Socrates, Brite Euram and other programs have helped significantly. The Socrates scheme is based upon the exchange of students between Universities in different member states. The Brite Euram scheme has involved technical research grants given to consortia of academics and industrial partners within a number of the states— a Brite Euram bid would normally be led by an industrialist.In terms of dissemination of knowledge, two quite different strands appear to have emerged. The UK and the USA have concentrated primarily upon disseminating basic research in refereed journal publications: ASCE, ICE and other journals. Whereas the continental Europeans have frequently disseminated basic research at conferences where the circulation of the proceedings is restricted.Additionally, language barriers have proved to be very difficult to break down. In countries where English is a strong second language there has been enthusiastic participation in international conferences based within continental Europe —e.g. Germany, Italy, Belgium, The Netherlands and Switzerland. However, countries where English is not a strong second language have been hesitant participants }—e.g. France.European researchExamples of research relating to bridges in Europe can be divided into three types of structure:Masonry arch bridgesBritain has the largest stock of masonry arch bridges. In certain regions of the UK up to 60% of the road bridges are historic stone masonry arch bridges originally constructed for horse drawn traffic. This is less common in other parts of Europe as many of these bridges were destroyed during World War 2.Concrete bridgesA large stock of concrete bridges was constructed during the 1950s, 1960s and 1970s. At the time, these structures were seen as maintenance free. Europe also has a large number of post-tensioned concrete bridges with steel tendon ducts preventing radar inspection. This is a particular problem in France and the UK.Steel bridgesSteel bridges went out of fashion in the UK due to their need for maintenance as perceived in the 1960s and 1970s. However, they have been used for long span and rail bridges, and they are now returning to fashion for motorway widening schemes in the UK.Research activity in EuropeIt gives an indication certain areas of expertise and work being undertaken in Europe, but is by no means exhaustive.In order to illustrate the type of European research being undertaken, an example is given from the University of Edinburgh portfolio. The example relates to the identification of voids in post-tensioned concrete bridges, using digital impulse radar.Post-tensioned concrete rail bridge analysisOve Arup and Partners carried out an inspection and assessment of the superstructure of a 160 m long post-tensioned, segmental railway bridge in Manchester to determine its load-carrying capacity prior to a transfer of ownership, for use in the Metrolink light rail system..Particular attention was paid to the integrity of its post-tensioned steel elements. Physical inspection, non-destructive radar testing and other exploratory methods were used to investigate for possible weaknesses in the bridge.Since the sudden collapse of Ynys-y-Gwas Bridge in Wales, UK in 1985, there has been concern about the long-term integrity of segmental, post-tensioned concrete bridges which may b e prone to ‘brittle’ failure without warning. The corrosion protection of the post-tensioned steel cables, where they pass through joints between the segments, has been identified as a major factor affecting the long-term durability and consequent strength of this type of bridge. The identification of voids in grouted tendon ducts at vulnerable positions is recognized as an important step in the detection of such corrosion.Description of bridgeGeneral arrangementBesses o’ th’ Barn Bridge is a 160 m long, three span, segmental, post-tensionedconcrete railway bridge built in 1969. The main span of 90 m crosses over both the M62 motorway and A665 Bury to Prestwick Road. Minimum headroom is 5.18 m from the A665 and the M62 is cleared by approx 12.5 m.The superstructure consists of a central hollow trapezoidal concrete box section 6.7 m high and 4 m wide. The majority of the south and central spans are constructed using 1.27 m long pre-cast concrete trapezoidal box units, post-tensioned together. This box section supports the in site concrete transverse cantilever slabs at bottom flange level, which carry the rail tracks and ballast.The center and south span sections are of post-tensioned construction. These post-tensioned sections have five types of pre-stressing:1. Longitudinal tendons in grouted ducts within the top and bottom flanges.2. Longitudinal internal draped tendons located alongside the webs. These are deflected at internal diaphragm positions and are encased in in site concrete.3. Longitudinal macalloy bars in the transverse cantilever slabs in the central span .4. Vertical macalloy bars in the 229 mm wide webs to enhance shear capacity.5. Transverse macalloy bars through the bottom flange to support the transverse cantilever slabs.Segmental constructionThe pre-cast segmental system of construction used for the south and center span sections was an alternative method proposed by the contractor. Current thinking suggests that such a form of construction can lead to ‘brittle’ failure of the ent ire structure without warning due to corrosion of tendons across a construction joint,The original design concept had been for in site concrete construction.Inspection and assessmentInspectionInspection work was undertaken in a number of phases and was linked with the testing required for the structure. The initial inspections recorded a number of visible problems including:Defective waterproofing on the exposed surface of the top flange.Water trapped in the internal space of the hollow box with depths up to 300 mm.Various drainage problems at joints and abutments.Longitudinal cracking of the exposed soffit of the central span.Longitudinal cracking on sides of the top flange of the pre-stressed sections.Widespread sapling on some in site concrete surfaces with exposed rusting reinforcement.AssessmentThe subject of an earlier paper, the objectives of the assessment were:Estimate the present load-carrying capacity.Identify any structural deficiencies in the original design.Determine reasons for existing problems identified by the inspection.Conclusion to the inspection and assessmentFollowing the inspection and the analytical assessment one major element of doubt still existed. This concerned the condition of the embedded pre-stressing wires, strands, cables or bars. For the purpose of structural analysis these elements、had been assumed to be sound. However, due to the very high forces involved,、a risk to the structure, caused by corrosion to these primary elements, was identified.The initial recommendations which completed the first phase of the assessment were:1. Carry out detailed material testing to determine the condition of hidden structural elements, in particularthe grouted post-tensioned steel cables.2. Conduct concrete durability tests.3. Undertake repairs to defective waterproofing and surface defects in concrete.Testing proceduresNon-destructi v e radar testingDuring the first phase investigation at a joint between pre-cast deck segments the observation of a void in a post-tensioned cable duct gave rise to serious concern about corrosion and the integrity of the pre-stress. However, the extent of this problem was extremely difficult to determine. The bridge contains 93 joints with an average of 24 cables passing through each joint, i.e. there were approx. 2200 positions where investigations could be carried out. A typical section through such a joint is that the 24 draped tendons within the spine did not give rise to concern because these were protected by in site concrete poured without joints after the cables had been stressed.As it was clearly impractical to consider physically exposing all tendon/joint intersections, radar was used to investigate a large numbers of tendons and hence locate duct voids within a modest timescale. It was fortunate that the corrugated steel ducts around the tendons were discontinuous through the joints which allowed theradar to detect the tendons and voids. The problem, however, was still highly complex due to the high density of other steel elements which could interfere with the radar signals and the fact that the area of interest was at most 102 mm wide and embedded between 150 mm and 800 mm deep in thick concrete slabs.Trial radar investigations.Three companies were invited to visit the bridge and conduct a trial investigation. One company decided not to proceed. The remaining two were given 2 weeks to mobilize, test and report. Their results were then compared with physical explorations.To make the comparisons, observation holes were drilled vertically downwards into the ducts at a selection of 10 locations which included several where voids were predicted and several where the ducts were predicted to be fully grouted. A 25-mm diameter hole was required in order to facilitate use of the chosen horoscope. The results from the University of Edinburgh yielded an accuracy of around 60%.Main radar sur v ey, horoscope verification of v oids.Having completed a radar survey of the total structure, a baroscopic was then used to investigate all predicted voids and in more than 60% of cases this gave a clear confirmation of the radar findings. In several other cases some evidence of honeycombing in the in site stitch concrete above the duct was found.When viewing voids through the baroscopic, however, it proved impossible to determine their actual size or how far they extended along the tendon ducts although they only appeared to occupy less than the top 25% of the duct diameter. Most of these voids, in fact, were smaller than the diameter of the flexible baroscopic being used (approximately 9 mm) and were seen between the horizontal top surface of the grout and the curved upper limit of the duct. In a very few cases the tops of the pre-stressing strands were visible above the grout but no sign of any trapped water was seen. It was not possible, using the baroscopic, to see whether those cables were corroded.Digital radar testingThe test method involved exciting the joints using radio frequency radar antenna: 1 GHz, 900 MHz and 500 MHz. The highest frequency gives the highest resolution but has shallow depth penetration in the concrete. The lowest frequency gives the greatest depth penetration but yields lower resolution.The data collected on the radar sweeps were recorded on a GSSI SIR System 10.This system involves radar pulsing and recording. The data from the antenna is transformed from an analogue signal to a digital signal using a 16-bit analogue digital converter giving a very high resolution for subsequent data processing. The data is displayed on site on a high-resolution color monitor. Following visual inspection it is then stored digitally on a 2.3-gigabyte tape for subsequent analysis and signal processing. The tape first of all records a ‘header’ noting the digital radar settings together with the trace number prior to recording the actual data. When the data is played back, one is able to clearly identify all the relevant settings —making for accurate and reliable data reproduction.At particular locations along the traces, the trace was marked using a marker switch on the recording unit or the antenna.All the digital records were subsequently downloaded at the University’s NDT laboratory on to a micro-computer.(The raw data prior to processing consumed 35 megabytes of digital data.)Post-processing was undertaken using sophisticated signal processing software. Techniques available for the analysis include changing the color transform and changing the scales from linear to a skewed distribution in order to highlight、突出certain features. Also, the color transforms could be changed to highlight phase changes. In addition to these color transform facilities, sophisticated horizontal and vertical filtering procedures are available. Using a large screen monitor it is possible to display in split screens the raw data and the transformed processed data. Thus one is able to get an accurate indication of the processing which has taken place. The computer screen displays the time domain calibrations of the reflected signals on the vertical axis.A further facility of the software was the ability to display the individual radar pulses as time domain wiggle plots. This was a particularly valuable feature when looking at individual records in the vicinity of the tendons.Interpretation of findingsA full analysis of findings is given elsewhere, Essentially the digitized radar plots were transformed to color line scans and where double phase shifts were identified in the joints, then voiding was diagnosed.Conclusions1. An outline of the bridge research platform in Europe is given.2. The use of impulse radar has contributed considerably to the level of confidence in the assessment of the Besses o’ th’ Barn Rail Bridge.3. The radar investigations revealed extensive voiding within the post-tensioned cable ducts. However, no sign of corrosion on the stressing wires had been found except for the very first investigation.欧洲桥梁研究欧洲联盟共同的研究平台诞生于欧洲联盟。
土木工程 建筑 道桥 外文翻译 外文文献 英文文献 沥青路面结构设计的低成本农村道路

外文文献structural Design of Asphalt Pavement for Low Cost Rural RoadsYuan Goulin(袁国林)1'2' Chen Rongshen(陈荣生)1. College of Transportation, Southeast University, Nanjing 210b9b, China2. College of Civil Engineering, Nanjing University of Technology, Nanjing 210009, ChinaIn developing countries,rural road construction is mostly cumbered by shortage of funds. Engineers concerns most in rural areas is how to build roads which not only cost less but also meet the traffic demands. Especially in vast rural areas of China, there are a great variety of transportation patterns, and the traffic composition is very complex. Compared with other countries,the traffic composition in China rural areas have its own features. Therefore,there is no experience about the rural roads construction for reference. In recent years,the central government of China has increased the strength for rural road construction. At the same time,a lot of researches about rural road construction have been done by researchers in China, and some conclusions about china rural roads have been made. In the authors' opinion,the selection of the pavement structure material is the key measure to reduce the construction cost of rural roads after the route has been determined. Compared with concrete pavement,asphalt pavement relatively costs less and is the first choice for rural roads in China. And then,according to the research achievements about rural roads construction,the authors have done some preliminary researches on the structure design for low-cost asphalt pavements for rural roads.1 Traffic Composition of Rural RoadRural roads include county roads,town roads and village roads.The traffic on rural roads is usually mixed. On a county road, traffic volume is between 300 to 1500 veh/d in average,and in a county with a developed economy,it reaches 1000 to 2 000 veh/d. The traffic volume between county and town is 100 to 300 veh/d,and the traffic volume between towns is usually less than 100 to 300 veh/d. In a mixed traffic flow,trucksaccount for 40% to 70% of the traffic volume, which are mainly light trucks carrying less than 2. 5 tons(including agricultural vehicles such as electro-tricycles,walking tractors etc.)and medium-size trucks of 2. 5 to 5 tons. Most of these light or medium trucks are overloaded. The proportion of heavy truck is less than 9%.On some roads to counties,the proportion of overloaded trucks is 5% to 32 %,while on some county roads connecting to national or provincial trunk highways,the proportion of overloaded vehicles usually amounts to 20% to 32% .The traffic volume on rural roads is not heavy. However,considering the practical situation in China, as well as the exitence of overloaded vehicles,100kN,or BZZ-100 was adopted as standard axle load in the research.The pavement deflection or the flexural-tensile stress at the bottom of asphalt surface is taken as the design parameter. The axle load was calculated in和-the axle weight of an i-level axle in kN and the action frequency;-the axle weight of standard axle in 100 kN and the action frequency;If the distance between axles is less than 3 m,axle loads are calculated asa double-axle or multi-axle loads,andIf the flexural-tensile stress at the bottom of semi-rigid base is taken as the design parameter, the axle load is calculated in accordance with the following formula:If the distance between axles is less than 3m,2 Traffic Volume on Rural RoadsMinibuses are adopted as the standard vehicle for the design of rural roads.Table 1 shows its external dimensions.Table 1 External dimensions of the passenger car mLength Width Height Front overhang Distance between axles Rear overhang6.0 1.8 2.0 0.8 3.8 1.4The typical vehicle types on rural roads are listed in Table 2. And others such as non-power-driven vehicles ,animal-drawn vehicles ,and bicycles can be taken into account in the calculation of traffic volume on rural roads ,in view of their roadside interference.In accordance with the traffic composition and volumes ,rural roads are divided into five grades. The traffic volume of each grade is shown in Table 3. Traffic volume specified in Table 3 was obtained by taking the minibus as the standard vehicle type,and converting different types vehicles according to the vehicle conversion coefficients given in Table 2.In Table 3,()[]ηγγ11365-+=t s e N NNe refers to the cumulative equivalent axle load action frequency;Ns refers to the equivalent axle load action frequency in the designed traffic lane in the beginning operation period of rural roads;y refers to the average annual growth rate of traffic volume;η refers to lane coefficient, and 1.0 for a single lane and 0. 6一0. 7 for a dual lane.3 Strength of RoadbedThe modulus of resilience of roadbed varies greatly. For convenience ,the strength of roadbed can be divided into four classes according to its moisture content and modulus of resilience ,as shown in Table 4.The parameters in Table 5 are determined by combining design principles with practical experience. By applying elastic multilayer theory to the pavement structure specified in Table 5,the influence of Ne on the pavement thickness of rural roads was analyzed ,and the result show that for given h ,h2,E0,the roadbase thickness for neighboring traffic classes changes in a range of 4-5 cm. This result indicates that the classification of traffic volume on rural roads shown in Table 3 is reasonable and feasible in terms of the design and construction of asphalt pavement structures.By using the elastic multilayer theory,the asphalt pavement structure of ordinary rural road in Table 5 is analyzed. When Ne,the cumulative equivalent axle load action frequency,the thickness of road surface(h =3 cm),and the thickness of subbase(h2 = 20 cm ) remain the same , the influence of neighboring roadbed strength classifications on the thickness of roadbase is 3 cm一5 cm. This conclusion indicates that the strength classification of roadbed is reasonable and applicable to the design and construction of asphalt pavement structure.4 Determination of Thicknesses of Asphalt Pavement Structure Sensitivity analysis of the design parameters of roadbed and pavement structures is to find out the relationship between structural strength of asphalt pavement structure and the design parameters of each layer, and determine the most sensitive layer in the pavement structure. The asphalt pavement structure of rural roads is generally composed of a road surface, a roadbase,and a subbase,as shown in Table 6. The pavement structure was analyzed according to elastic multiplayer theory under the double circular uniform load,with an assumption that there is continuous contact between the adjacent layers of the asphalt pavement structure. The basic parameters used in the calculation and analysis of asphalt pavement structure are listed in Table 7. By analyzing the effects of the change of all the parameters of pavement structure on the distortion of the road surface,roadbase,and roadbed , the following conclusions have been drawn.(1)Increasing the thickness of the road surface effectively decreases the road surface deflection,but raises the cost. The comparatively economical and effective method is to increase the thickness of the subbase, which is superior to increasing the thickness of roadbase,while increasing the thickness of the road surface is the last choice.(2)As the thickness of pavement structure increases,the change of road surface deflection will trend to be gentle. When the thickness of road surface reaches a certain value,the variance in the road surface deflection will not be obvious,and then it is ineffective to enhance the bearing capacity of asphalt pavement structure by increasing the thickness of road surface. It is recommended that the thicknesses of the roadbase and the subbase should be equal to or largerthan 18 and 20 cm, respectively,in design of asphalt pavement structures of rural roads. Fig. 1 shows the effects of the changes in the thickness of each layer on road surface deflection.(3)Road surface deflection is very sensitive to the change of modulus of the roadbed. The increase in the modulus of roadbase or subbase is also effective to decrease the deflection of the road surface. On the other hand,the deflection of the road surface decreases gradually when the modulus of the surface increases,being the least effective factor. When the modulus of the road surface increases to a certain value,decrease in road surface deflection is not apparent. Fig. 2 shows the effect of the modulus of each layer on road surface deflection. From the above discussion,we conclude that the most sensitive layer for road surface deflection is subbase,and the next is roadbase. To decrease the road surface deflection of low-cost rural roads,the strength and stability of the roadbed should be enhanced, and the materials with a certain thickness and relatively high density should be used to pave the subbase.The traffic volume or the accumulative equivalent axle load action times(frequency)within the designed life of road is used to determine the type and thickness of the asphalt pavement road surface, and the results are listed in Table 8,where veh/d means the number of the equivalent the passenger cars per day.For a low traffic volume rural road with Ne 500 000,graded broken stones(or gravel)can be used as a flexible base. The flexible base has good strength and effectively prevents reflection cracks of the asphalt pavement road surface, provided the graded broken stones(or gravel ) meets the requirements for high density(degree of compaction ,100%. To ensure the sufficient strength and stability of the flexible base,its thickness is not less than 15 cm,the thickness of the aggregate subbase is not less than 20 cm,A semi-rigid base usually has a good bearing capacity For the rural roads with Ne)500 000,or those with low traffic volumes but relatively,the minimum thickness of semirigid base or subbase is 16-18 cm5 Calculation of the Thickness of Road Surface5.1 Deflection(1)Road surface deflectionRoad surface deflection is a vertical distortion caused by vertical load on the road surface. It not only reflects the whole strength and stiffness of asphalt pavement structure and roadbed,but also has a close internal relation with the service condition of the pavement.(2)Design deflectionThe design deflection is the index representing the stiffness of the pavement structure. It is also the deflection of the pavement which is established according to the accumulative equivalent axle load estimated to pass over a lane in the expected design life, road types, road classification,and the types of road surface and roadbase. The design deflection is not only the main basis for the design thickness of the pavement structure,but also the necessary index for the examination and acceptance of the project. Through theoretical analysis and experimental study,formulas for the design deflection value which are applicable to the pavement structure design of lowcost rural roads are as follows:semi-rigid base:flexible base:where A, is the type coefficient of the road surface. The type coefficient of asphalt concrete road surface is 1.0;that of hot-mix asphalt macadam and that of emulsified asphalt macadam road surface are all 1. 1; and that of asphalt surface treatment road surface is1 .2.(3)Allowable deflectionAllowable deflection is the maximum deflectionallowed at the end of the road's service life under lim-iting conditions in poor season. Through thoreticalanalysis and experimental study,the calculation for-mulas for the allowable deflection of road surfacewhich are applicable to the pavement structure designof low-cost rural roads are as follows}2}:When designing the asphalt pavement structure of low-cost rural roads, we should use formula (6) or (7 ) according to the types of roadbase to determine the thickness of asphalt pavement structure.5.2 Tensile stressBecause the asphalt pavement structure of lowcost rural roads is not substantial enough and the heavy vehicles are allowed to pass over them, the maximum tensile stress should be checked by computing the stresses of the semi-rigid base and subbase. The tensile stress at the bottom of semi-rigid base or subbase,would be less than or equivalent to the allowable tensile stress of the materials of the semirigid base or subbase , namely,For the stabilized aggregate base with an inorganic binder-For the stabilized fine-grained soil base with an inorganic binder:5.3 Pavement thicknessTo make it simple and convenient for engineers to determine the desired thickness of rural road pavement, the curves of the thickness of the roadbase of low-cost rural roads according to typical pavement structures and accumulative frequency of equivalent axle load are shown in Figs. 3,4 and 5.(1)When the accumulative frequency of equivalent axle load is within 500000 times per lane,asphalttreated or asphalt penetrated surfaces with thickness of 1. 5 cm一cm is recommended for road surface. For various accumulative equivalent axle loads and the moduli(Eo)of roadbed,the equivalent thickness of roadbase is shown in Fig. 3.(2)When the accumulative frequency of equivalent axle load is within 500 001)一1 000 000 times per lane,asphalt macadam or asphalt concrete with thickness of 3 cm -5 cm is recommended. For various accumulative equivalent axle loads and moduli(Eo)of roadbed,the equivalent thickness of roadbase is shown in Fig. 4.(3)When the accumulative frequency of equivalent axle load is within 1000 000-2 000 000 times per lane,asphalt concrete road surface of 5 cm-7 cm thick is recommended. For various accumulative equivalent axle loads and moduli(Eo)of roadbed , the equivalent thickness of roadbase is shown in Fig.S.In Figs.3-5,Ld is the designed deflection, Lo is the representative deflection of roadbed,E, is the modulus of resilience of the roadbase,in MPa , Eo is the modulus of resilience of the roadbed,in MPa ,and H, in cm,is the equivalent thickness of the base (roadbase and subbase),which can be obtained through calculation and in-site investigation for a trilevel-pavement roads(including road surface,base and roadbed).If a designed road has four layers,i.e. a subbase is added,according to the regression analysis of the extrapolated results of a number of multi-layer flexible systems and the available research findings,the thickness of the roadbase , h,,in cm, can be calculated from the following equation:6 Concluding RemarksCompared with concrete pavement, asphalt pavements have a lower construction cost, which is suitable for the roads in relatively underdeveloped rural areas in China. The research in this paper proposed a method for structural design of low cost asphalt pavements. The method is to provide an guideline for the design of asphalt pavement structure in rural areas.References[1]Yuan G L , Zhang F , Chen S W , et al. Research on technical indexes of rural highway construction in Jiangsu province [ J ].Highway, 2005(6):135一139(in Chinese).[ 2 ] Research Institute of Highway , the Ministry of Communications. Final Report on Low Cost Inter-township and Rural Road Construction Techniques〔R].Beijing; Resdarch Institute of Highway, 2003(in Chinese). [ 3 ] Liu Q Q. How to reduce the construction cost of the rural highway [ J ] .Journal of Highway and Transportation Research and Development, 2005(2):41一44(in Chinese).[ 4 ] JTG B014-97. Specification for design of highway asphaltpavement[ S ](in Chinese ).[ 5 ] JTG BO1-2003. Technical Standard of Highway Engineering [ S ](in Chinese).[6] Deng X J. Engineering for sub-grade and pavement[ M].2nd ed. Beijing; People's Communications Press, Beijing, 2004(in Chinese ).中文译文沥青路面结构设计的低成本农村道路袁国林1,陈荣生21。
- 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
- 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
- 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。
中英文资料外文翻译(文档含英文原文和中文翻译)原文:Asphalt Mixtures-Applications, Theory and Principles1 . ApplicationsAsphalt materials find wide usage in the construction industry. The use of asphalt as a cementing agent in pavements is the most common of its applications, however, and the one that will be consid ered here.Asphalt products are used to produce flexibl e pavements for highways and airports. The term “fl exible” is used to distinguish these pavements from those made with Portland cement, which are classified as rigid pavements, that is, having beam strength. This distinction is important because it provid es they key to the design approach which must be used for successful flexibl e pavement structures.The flexibl e pavement classification may be further broken d own into high and l ow types, the type usually depending on whether a solid or liquid asphalt product is used. The l ow types of pavement are mad e with the cutback, or emulsion, liquid products and are very widely used throughout this country. Descriptive terminology has been devel oped in various sections of the country to the extent that one pavement type may have several names. However, the general process foll owed in construction is similar for most l ow-type pavements and can be described as one in which the aggregate and the asphalt product are usually applied to the roadbed separately and there mixed or all owed to mix, forming the pavement.The high type of asphalt pavements is made with asphalt cements of some sel ectedpenetration grad e.Fig. ·1 A modern asphalt concrete highway. Should er striping is used as a safely feature.Fig. ·2 Asphalt concrete at the San Francisco International Airport.They are used when high wheel l oads and high volumes of traffic occur and are, therefore, often designed for a particular installation.2 . Theory of asphalt concrete mix designHigh types of flexible pavement are constructed by combining an asphalt cement, often in the penetration grad e of 85 to 100, with aggregates that are usually divided into three groups, based on size. The three groups are coarse aggregates, fine aggregates, and mineral filler. These will be discussed in d etail in later chapter.Each of the constituent parts mentioned has a particular function in the asphalt mixture, and mix proportioning or d esign is the process of ensuring that no function is negl ected. Before these individual functions are examined, however, the criteria for pavement success and failure should be consid ered so that d esign objectives can be established.A successful fl exible pavement must have several particular properties. First, it must be stable, that is to resistant to permanent displacement under l oad. Deformation of an asphalt pavement can occur in three ways, two unsatisfactory and one desirable. Plastic d eformationof a pavement failure and which is to be avoid ed if possible. Compressive deformation of the pavement results in a dimensional change in the pavement, and with this change come a l oss of resiliency and usually a d egree of roughness. This deformation is less serious than the one just described, but it, too, leads to pavement failure. The desirabl e type of deformation is an elastic one, which actually is beneficial to flexibl e pavements and is necessary to their long life.The pavement should be durable and should offer protection to the subgrade. Asphalt cement is not impervious to the effects of weathering, and so the design must minimize weather susceptibility. A durable pavement that does not crack or ravel will probably also protect the roadbed. It must be remembered that fl exible pavements transmit l oads to the subgrad e without significant bridging action, and so a dry firm base is absolutely essential.Rapidly moving vehicl es d epend on the tire-pavement friction factor for control and safety. The texture of the pavement surfaces must be such that an adequate skid resistance is developed or unsafe conditions result. The design procedure should be used to sel ect the asphalt material and aggregates combination which provid es a skid resistant roadway.Design procedures which yield paving mixtures embodying all these properties are not available. Sound pavements are constructed where materials and methods are selected by using time-tested tests and specifications and engineering judgments al ong with a so-call ed design method.The final requirement for any pavement is one of economy. Economy, again, cannot be measured directly, since true economy only begins with construction cost and is not fully determinable until the full useful life of the pavement has been record ed. If, however, the requirements for a stable, durable, and safe pavement are met with a reasonable safety factor, then the best interests of economy have probably been served as well.With these requirements in mind, the functions of the constituent parts can be examined with consideration give to how each part contributes to now-established objectives or requirements. The functions of the aggregates is to carry the l oad imposed on the pavement, and this is accomplished by frictional resistance and interl ocking between the individual pieces of aggregates. The carrying capacity of the asphalt pavement is, then, related to the surface texture (particularly that of the fine aggregate) and the density, or “compactness,”, of the aggregates. Surface texture varies with different aggregates, and while a rough surfacetexture is desired, this may not be available in some l ocalities. Dense mixtures are obtained by using aggregates that are either naturally or artificially “well grad ed”. This means tha t the fine aggregate serves to fill the voids in the coarser aggregates. In addition to affecting density and therefore strength characteristics, the grading also influences workability. When an excess of coarse aggregate is used, the mix becomes harsh and hard to work. When an excess of mineral filler is used, the mixes become gummy and difficult to manage.The asphalt cement in the fl exibl e pavement is used to bind the aggregate particl es together and to waterproof the pavements. Obtaining the proper asphalt content is extremely important and bears a significant influence on all the items marking a successful pavement. A chief objective of all the design methods which have been devel oped is to arrive at the best asphalt content for a particular combination of aggregates.3 . Mix design principl esCertain fundamental principles underlie the design procedures that have been developed. Before these procedures can be properly studied or applied, some consid eration of these principles is necessary.Asphalt pavements are composed of aggregates, asphalt cement, and voids. Consid ering the aggregate alone, all the space between particles is void space. The volume of aggregate voids depends on grading and can vary widely. When the asphalt cement is ad ded, a portion of these aggregate voids is fill ed and a final air-void volume is retained. The retention of thisair-void volume is very important to the characteristics of the mixture. The term air-void volume is used, since these voids are weightless and are usually expressed as a percentage of the total volume of the compacted mixture.An asphalt pavement carries the applied load by particl e friction and interlock. If the particl es are pushed apart for any reason , then the pavement stability is d estroyed. This factor indicates that certainly no more asphalt shoul d be ad ded than the aggregate voids can readily hold. However ,asphalt cement is susceptible to volume change and the pavement is subject to further compaction under use. If the pavement has no air voids when placed, or if it loses them under traffic, then the expanding asphalt will overfl ow in a condition known as bleeding. The l oss of asphalt cement through bl eeding weakens the pavement and also reduces surface friction, making the roadway hazard ous.Fig. ·3 Cross section of an asphalt concrete pavement showing the aggregate framework bound together by asphalt cement.The need for a minimum air-void volume (usually 2 or 3 per cent ) has been established. In addition, a maximum air-void volume of 5 to 7 per cent shoul d not be exceed. An excess of air voids promotes raveling of the pavement and also permits water to enter and speed up the deteriorating processes. Also, in the presence of excess air the asphalt cement hard ens and ages with an accompanying loss of durability and resiliency.The air-void volume of the mix is determined by the d egree of compaction as well as by the asphalt content. For a given asphalt content, a lightly compacted mix will have a large voids volume and a l ower d ensity and a greater strength will result. In the laboratory, the compaction is controlled by using a specified hammer and regulating the number of bl ows and the energy per blow. In the fiel d, the compaction and the air voids are more difficult to control and tests must be made no specimens taken from the compacted pavement to cheek on the d egree of compaction being obtained. Traffic further compact the pavement, andall owance must be mad e for this in the design. A systematic checking of the pavement over an extend ed period is needed to given factual information for a particular mix. A change in density of several per cent is not unusual, however.Asphalt content has been discussed in connection with various facets of the ix design problem. It is a very important factor in the mix design and has a bearing an all the characteristics ld a successful pavement: stability, skid resistance, durability, and economy. As has been mentioned, the various design procedures are intended to provid e a means for selecting the asphalt content . These tests will be consid ered in detail in a future chapter ,butthe relationship between asphalt content and the measurable properties of stability, unit weight, and air voids will be discussed here.Fig.4 Variations in stability, unit weight, and air-void content with asphalt cement content.If the gradation and type of aggregate, the degree of compaction, and the type of asphalt cement are controll ed, then the strength varies in a predictable manner. The strength will increase up to some optimum asphalt content and then decrease with further additions. The pattern of strength variation will be different when the other mix factors are changed, and so only a typical pattern can be predicted prior to actual testing.Unit weight varies in the same manner as strength when all other variabl e are controll ed. It will reach some peak value at an asphalt content near that determined from the strength curve and then fall off with further additions.As already mentioned, the air-void volume will vary with asphalt content. However, the manner of variation is different in that increased asphalt content will d ecrease air-void volume to some minimum value which is approached asymptotically. With still greater additions of asphalt material the particles of aggregate are only pushed apart and no change occurs in air-void volume.In summary, certain principles involving aggregate gradation, air-void volume, asphalt content, and compaction mist be understood before proceeding to actual mix d esign. The proper design based on these principl es will result in sound pavements. If these principles are overl ooked, the pavement may fail by one or more of the recognized modes of failure: shoving, rutting, corrugating, becoming slick when the max is too ‘rich’; raveling, cracking,having low durability when the mix is too ‘l ean’.It should be again emphasized that the strength of flexible is, more accurately, a stabilityand d oes not indicate any ability to bridge weak points in the subgrade by beam strength. No asphalt mixture can be successful unless it rests on top of a properly designed and constructed base structure. This fact, that the surface is no better than the base, must be continually in the minds of those concerned with any aspect of fl exible pavement work.译文:沥青混合料的应用、理论和原则1、应用沥青材料如今在建筑行业广泛使用。