木结构建筑避雷针及人工接地极方法防雷接地专项施工方案

合集下载

接地防雷施工方案(3篇)

接地防雷施工方案(3篇)

第1篇本项目为某地区接地防雷工程,主要包括以下内容:1. 接地网施工:包括接地网材料采购、接地网设计、接地网施工、接地网验收等。

2. 防雷设施施工:包括避雷针、避雷带、避雷网、避雷器等防雷设施的材料采购、设计、施工、验收等。

3. 接地系统测试:对接地网、防雷设施进行接地电阻测试,确保接地系统符合国家标准。

4. 施工资料整理:整理施工过程中的各项资料,包括施工图纸、施工方案、施工记录、验收报告等。

二、施工准备1. 组织机构成立以项目经理为组长,技术负责人、施工负责人、质量负责人、安全负责人等为成员的施工领导小组,负责工程的全面管理工作。

2. 施工人员根据工程需求,组织具备相应资质的施工人员,并对施工人员进行技术交底和安全教育。

3. 施工材料(1)接地网材料:选用符合国家标准的高质量接地网材料,包括接地扁钢、接地圆钢、接地模块等。

(2)防雷设施材料:选用符合国家标准的高质量避雷针、避雷带、避雷网、避雷器等。

(3)施工工具:准备必要的施工工具,如卷尺、水平尺、焊接设备、切割设备、测试仪器等。

4. 施工设备(1)接地网施工设备:接地网压接设备、焊接设备、切割设备等。

(2)防雷设施施工设备:避雷针安装设备、避雷带安装设备、避雷网安装设备、避雷器安装设备等。

(3)接地系统测试设备:接地电阻测试仪、接地系统测试仪等。

5. 施工图纸及资料熟悉施工图纸,了解工程结构、接地系统、防雷设施等设计要求,确保施工过程中严格按照图纸进行。

三、施工方案1. 接地网施工(1)接地网材料验收:对接地网材料进行验收,确保材料质量符合国家标准。

(2)接地网设计:根据工程需求,设计接地网布局,确定接地网材料规格、数量等。

(3)接地网施工:按照设计图纸,进行接地网施工,包括接地扁钢、接地圆钢、接地模块的安装、焊接等。

(4)接地网验收:对接地网进行接地电阻测试,确保接地电阻符合国家标准。

2. 防雷设施施工(1)防雷设施材料验收:对接雷设施材料进行验收,确保材料质量符合国家标准。

防雷与接地工程施工方案

防雷与接地工程施工方案

防雷与接地工程施工方案一、工程概况本工程是针对某地区建设的一栋高层建筑,为了保障建筑安全和居民生命财产安全,必须进行防雷与接地工程。

本工程的主要内容包括建筑物的防雷装置安装、接地系统的构建和相关设施的调试等。

二、工作内容及施工步骤1. 施工前准备工作1.1 确定施工方案在进行施工前,需要根据建筑物的具体情况,确定防雷与接地的施工方案。

根据建筑物的高度、形状、结构和周边环境等因素,选择合适的防雷设备和接地系统。

1.2 完成施工图纸和材料准备根据施工方案,编制详细的施工图纸,并确定所需的材料和设备。

根据设计要求,准备好各种电缆、接地材料、防雷设备等。

1.3 安全措施在施工前,必须做好施工安全措施。

包括相关施工人员的培训和安全规范的制定。

并做好相关的劳动保护工作,确保施工过程中不会发生安全事故。

2. 防雷装置的安装2.1 安装避雷针根据建筑物的高度和形状,选择合适的避雷针并进行安装。

避雷针的安装位置和数量需要根据设计要求进行安排,确保完整的避雷效果。

2.2 安装接地装置在避雷针的周围,安装接地装置。

接地装置需要与避雷针进行可靠的连接,确保防雷系统的整体可靠性。

2.3 安装防雷设备除了避雷针和接地装置外,还需安装相关的防雷设备,如雷击计数器、避雷带等。

这些设备需要安装在建筑物的关键部位,确保对雷击的及时监测和有效防护。

3. 接地系统的构建3.1 确定接地点根据设计要求,确定建筑物的接地点和数量。

在选择接地点时,要考虑地质条件、土壤电阻率等因素,确保接地系统的良好导电性能。

3.2 掘土铺设导线在确定好接地点后,进行土地的开挖和铺设接地导线。

接地导线需要保持良好的接触性,确保与土壤的良好接地连接。

3.3 地下接地极的安装在完成接地导线的铺设后,进行地下接地极的安装。

地下接地极需要与接地导线进行可靠的连接,并确保良好的接地效果。

4. 系统调试与验收4.1 系统调试在完成防雷装置和接地系统的安装后,需要进行系统的调试和测试。

防雷接地工程施工方案(3篇)

防雷接地工程施工方案(3篇)

第1篇一、工程概况为确保建筑物、设备和人员的安全,减少雷电危害,本工程旨在设计、施工和检测防雷接地系统。

本方案适用于各类建筑物、电力设施及工业设备等防雷接地工程。

二、施工准备1. 勘察:对施工现场进行详细勘察,了解地形、地质、土壤、水文等情况,选择合适的防雷接地方式和材料,制定施工方案和预算。

2. 人员配备:组织具备相关资质的施工队伍,包括电工、焊工、测量员等,并对施工人员进行专业培训。

3. 材料设备:准备防雷接地材料(如接地极、接地线、接地夹等)、测量工具、焊接设备、开挖工具等。

4. 施工图纸:熟悉设计图纸,明确防雷接地系统的设计要求。

三、施工工艺流程1. 开挖:根据设计要求,开挖防雷接地沟槽或坑,注意保护周围环境和设施,防止事故发生。

2. 安装:将防雷接地材料按照设计要求和规范要求,安装在防雷接地沟槽或坑内,确保接地材料的质量和接触良好。

3. 连接:将防雷接地装置与防雷保护体(如防雷针、避雷带、避雷网等)以及被保护对象(如建筑物、设备等)通过接地线或接地带连接起来,确保连接牢固和可靠。

4. 回填:将防雷接地沟槽或坑内的土壤按照规定的比例和顺序,与煤渣、石灰、碳粉等导电材料混合,回填在防雷接地材料上,确保回填的密实度和厚度。

5. 检测:对防雷接地系统进行检测,确保其符合设计要求。

四、施工要点1. 施工过程中,严格遵循设计要求和规范,确保工程质量。

2. 开挖沟槽时,注意保护地下管线和设施,避免损坏。

3. 安装接地材料时,确保接触良好,防止腐蚀或松动。

4. 回填土壤时,注意密实度和厚度,防止空隙或裂缝。

5. 施工完成后,对防雷接地系统进行检测,确保其符合设计要求。

五、质量验收标准1. 防雷接地系统应符合设计要求,确保建筑物、设备和人员的安全。

2. 接地材料质量应符合国家标准,确保接触良好。

3. 施工质量应符合相关规范要求,确保工程质量。

4. 检测结果应符合设计要求,确保防雷接地系统有效。

六、安全保障措施1. 施工过程中,加强现场安全管理,确保施工人员的人身安全。

避雷针施工方案

避雷针施工方案

避雷针施工方案一、背景介绍避雷针是一种用于保护建筑物和其他高耸物体免受雷击的装置。

它通过引导和释放雷电的电荷,将其安全地传导到地面,减少或消除了建筑物和其他设施被雷击的风险。

本文将详细介绍避雷针施工方案,包括施工步骤、材料选择、安装要求等内容。

二、施工步骤1. 前期准备在开始施工之前,需要进行详细的规划和准备工作。

首先,确定避雷针的安装位置,通常应选择在建筑物最高点,以确保最大程度地保护整个建筑物。

其次,进行现场勘测,评估建筑物的结构和周围环境,确保施工过程中的安全性。

2. 材料准备根据实际需要,准备所需的避雷针材料。

常见的避雷针材料包括导体材料、接地设备、支架等。

导体材料通常选择高导电性能的铜或铝材料,接地设备应选择符合国家标准的可靠产品。

3. 安装避雷针导体首先,在建筑物最高点安装避雷针导体。

导体通常由多段组成,每段之间通过连接器连接。

根据建筑物的高度和形状,合理安排导体的长度和数量。

导体的安装应符合国家标准和相关规范,确保导体与建筑物的牢固连接。

4. 接地装置安装接下来,安装避雷针的接地装置。

接地装置的作用是将雷电的电荷安全地引导到地下,以保护建筑物。

接地装置应选择合适的位置,通常与避雷针导体相连接,并与地下的接地网连接。

安装过程中,应确保接地装置与导体的连接牢固可靠。

5. 支架安装最后,安装避雷针的支架。

支架用于支撑避雷针导体,确保其稳定性和垂直度。

支架的安装应符合设计要求,牢固可靠,能够承受风力和其他外力的影响。

三、材料选择1. 导体材料导体材料应具有良好的导电性能和耐腐蚀性能。

常用的导体材料有铜和铝。

铜具有良好的导电性能和耐腐蚀性能,适用于大部分建筑物。

铝具有较轻的重量和良好的导电性能,适用于高层建筑和特殊环境。

2. 接地装置接地装置应选择符合国家标准的可靠产品。

常见的接地装置有接地网、接地棒等。

接地网是一种将雷电电荷引导到地下的装置,通常由导体网格组成。

接地棒是一种将雷电电荷引导到地下的装置,通常由金属材料制成。

避雷针施工方案

避雷针施工方案

避雷针施工方案一、背景介绍随着科技的不断发展,人们对于建筑物的安全性要求也越来越高。

在雷电频繁发生的地区,为了保护建筑物和人员的安全,避雷针的施工变得尤为重要。

本文将详细介绍避雷针施工方案,确保建筑物在雷电天气下具备良好的防护能力。

二、施工原则1. 安全第一:施工过程中,必须严格遵守安全操作规程,确保施工人员的人身安全。

2. 符合规范:避雷针施工必须符合相关国家标准和规范,确保施工质量和效果。

3. 综合考虑:施工方案应综合考虑建筑物的结构特点、周边环境、雷电频率等因素,制定合理的施工方案。

三、施工步骤1. 前期准备(1)确定施工区域:根据建筑物的结构和周边环境,确定避雷针的布置位置。

(2)施工材料准备:准备好符合国家标准的避雷针材料,包括导体材料、接地装置等。

(3)施工人员培训:对施工人员进行必要的培训,确保他们熟悉施工流程和安全操作规程。

2. 安装导体(1)确定导体布置方式:根据建筑物的结构特点和雷电频率,确定导体的布置方式,一般采用垂直布置或水平布置。

(2)安装导体支架:根据导体布置方式,在建筑物上安装导体支架,确保导体的稳固性。

(3)安装导体:根据导体布置方式,将导体固定在导体支架上,并保证导体之间的连接良好。

3. 安装接地装置(1)选择接地位置:根据建筑物的结构和土壤条件,选择合适的接地位置。

(2)准备接地材料:准备好符合国家标准的接地材料,包括接地极、接地线等。

(3)安装接地装置:将接地极安装在选择的接地位置,并与导体连接,确保接地装置的稳固性和导体的良好接地。

4. 完善系统(1)检查连接:检查导体和接地装置的连接是否牢固,确保系统的连通性。

(2)防腐处理:对导体和接地装置进行防腐处理,延长其使用寿命。

(3)标识标牌:在避雷针系统的显眼位置设置标识标牌,方便人员了解系统的存在和位置。

四、质量控制1. 施工记录:施工过程中,及时记录施工情况,包括施工时间、施工人员、使用材料等。

2. 施工检查:在施工过程中,进行必要的现场检查,确保施工符合规范要求。

防雷接地专项施工方案(3篇)

防雷接地专项施工方案(3篇)

第1篇一、工程概况本项目位于我国XX地区,建筑类型为高层住宅,占地面积约为XXX平方米,总建筑面积约为XXX平方米。

由于地处雷电多发区域,为确保建筑及内部设施的安全,特制定本防雷接地专项施工方案。

二、施工依据1. 《建筑物防雷设计规范》(GB 50057-2010)2. 《建筑物接地设计规范》(GB 50065-2011)3. 《建筑电气工程施工质量验收规范》(GB 50303-2015)4. 《建筑防雷装置检测规范》(GB/T 32937-2016)5. 相关国家及地方政策法规三、施工内容1. 防雷装置的安装与施工2. 接地装置的安装与施工3. 防雷检测与验收四、施工准备1. 组织机构- 成立防雷接地施工领导小组,负责施工过程中的组织协调、监督指导等工作。

- 设立施工班组和专业技术人员,明确各自职责。

2. 施工材料- 防雷装置材料:避雷针、避雷带、避雷网、避雷器等。

- 接地装置材料:接地棒、接地线、接地模块等。

- 工具及设备:电焊机、切割机、卷扬机、水准仪、经纬仪等。

3. 施工方案- 根据建筑物的具体情况,制定详细的施工方案,明确施工步骤、质量要求、安全措施等。

五、施工工艺1. 防雷装置施工(1)避雷针安装- 避雷针应选择合格的产品,安装位置应满足规范要求。

- 避雷针与建筑物主体结构的连接应牢固,焊接质量应符合规范要求。

- 避雷针接地引下线应与接地装置连接。

(2)避雷带、避雷网安装- 避雷带、避雷网应采用镀锌钢带或镀锌钢网,安装位置应符合规范要求。

- 避雷带、避雷网应与建筑物主体结构的连接牢固,焊接质量应符合规范要求。

- 避雷带、避雷网应与接地装置连接。

(3)避雷器安装- 避雷器应选择合格的产品,安装位置应符合规范要求。

- 避雷器应与建筑物主体结构的连接牢固,焊接质量应符合规范要求。

- 避雷器应与接地装置连接。

2. 接地装置施工(1)接地棒安装- 接地棒应选择合格的产品,埋设深度应符合规范要求。

防雷接地施工方案例(3篇)

防雷接地施工方案例(3篇)

第1篇一、工程概况本工程位于某城市某区域,占地面积约为10000平方米,建筑高度为30米,为多层住宅楼。

根据《建筑物防雷设计规范》(GB 50057-2010)的要求,本工程属于第二类防雷建筑物。

为确保建筑物的安全运行,降低雷击风险,特制定本防雷接地施工方案。

二、施工依据1. 《建筑物防雷设计规范》(GB 50057-2010)2. 《建筑物接地设计规范》(GB 50057-2010)3. 《建筑电气工程施工质量验收规范》(GB 50203-2014)4. 《防雷装置检测规范》(GB/T 32937-2016)三、施工内容1. 防雷接地系统设计2. 防雷接地系统施工3. 防雷接地系统检测四、施工准备1. 组织机构成立防雷接地施工领导小组,负责施工过程中的组织、协调、监督等工作。

2. 人员配备根据施工内容,配备相应的施工人员,包括电气工程师、施工员、质检员等。

3. 材料设备根据设计要求,准备以下材料设备:(1)接地体:铜排、铜板、铜线等;(2)接地线:铜排、铜线等;(3)接地模块:铜质、钢质等;(4)绝缘子、连接器、接地端子等;(5)施工工具:电焊机、扳手、线切割机等。

4. 施工方案编制根据设计要求,编制详细的施工方案,明确施工步骤、质量要求、安全措施等。

五、施工工艺1. 防雷接地系统设计(1)根据建筑物的防雷等级,确定防雷接地系统的设计参数;(2)选择合适的接地体、接地线和接地模块;(3)绘制防雷接地系统施工图。

2. 防雷接地系统施工(1)接地体施工:1)开挖接地体沟槽,确保沟槽深度符合设计要求;2)铺设接地体,确保接地体与土壤接触良好;3)连接接地体,确保连接牢固可靠;4)回填土壤,确保回填土密实。

(2)接地线施工:1)连接接地线,确保接地线与接地体连接牢固;2)检查接地线绝缘性能,确保绝缘良好;3)连接接地线至建筑物,确保连接牢固可靠。

(3)接地模块施工:1)安装接地模块,确保接地模块与接地体连接牢固;2)检查接地模块绝缘性能,确保绝缘良好;3)连接接地模块至建筑物,确保连接牢固可靠。

木结构建筑避雷针及人工接地极方法防雷接地专项施工方案

木结构建筑避雷针及人工接地极方法防雷接地专项施工方案

木结构建筑避雷针及人工接地极方法防雷接地专项施工方案XXXX五星级水疗度假酒店XXXX五星级水疗度假酒店项目防雷接地专项施工方案编制人:审核人:审批人:XXXX集团XXXX有限公司XXXX五星级水疗度假酒店项目部2016年12月XXXX五星级水疗度假酒店目录第一章工程概况································································································· 3 第一节基本概况······························································································ 3 第二节防雷接地概况························································································ 3 第二章编制依据································································································· 3 第三章施工准备································································································· 4 第一节技术准备······························································································ 4 第二节材料准备······························································································ 4 第三节工器具································································································· 4 第四章施工工艺································································································· 5 第一节屋面防雷施工工艺·················································································· 5 1、避雷针施工要点························································································································5 2、避雷针安装示意图····················································································································5 第二节引下线施工工艺·····················································································7 1、引线线施工要点························································································································7 2、引下线连接示意图····················································································································7 第三节等电位连接施工工艺················································································9 1、总等电位连接示意图················································································································9 2、卫生间等电位连接··················································································································10 3、泳池等电位连接 (11)第四节基础接地施工工艺·················································································12 1、基础接地施工要点··················································································································12 2、基础接地示意图···························································· (12)第五章质量保证措施..........................................................................................14 第一节质量标准.............................................................................................14 第二节应注意的质量问题.................................................................................14 第三节质量记录.............................................................................................15 第六章安全保证措施..........................................................................................16 第七章现场文明体系及施工措施...........................................................................17 第一节绿色施工环境管理方针、目标及工程环境管理体系........................................17 第二节文明施工.............................................................................................17 第三节施工现场垃圾清除安排............................................................................18 第四节环境保护 (18)XXXX五星级水疗度假酒店第一章工程概况第一节基本概况本工程建筑包括总服务区一个,建筑面积3150m2;海滩烧烤活动区一处,房屋面积136 m2;水疗中心一处,房屋面积720 m2;海滩别墅33座,房屋面积2084 m2;环礁湖群柱架空式套房47座,房屋面积2746 m2;花园群柱架控式套房15套,房屋面积836 m2;帝王别墅一座,房屋面积1012m2;皇家别墅2座,房屋面积1060 m2。

  1. 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
  2. 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
  3. 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。

XXXX五星级水疗度假酒店项目防雷接地专项施工方案编制人:审核人:审批人:XXXX集团XXXX有限公司XXXX五星级水疗度假酒店项目部2016年12月目录第一章工程概况 (2)第一节基本概况 (2)第二节防雷接地概况 (2)第二章编制依据 (2)第三章施工准备 (3)第一节技术准备 (3)第二节材料准备 (3)第三节工器具 (3)第四章施工工艺 (3)第一节屋面防雷施工工艺 (3)1、避雷针施工要点 (3)2、避雷针安装示意图 (3)第二节引下线施工工艺 (4)1、引线线施工要点 (4)2、引下线连接示意图 (4)第三节等电位连接施工工艺 (4)1、总等电位连接示意图 (4)2、卫生间等电位连接 (4)3、泳池等电位连接 (4)第四节基础接地施工工艺 (4)1、基础接地施工要点 (4)2、基础接地示意图 (5)第五章质量保证措施 (5)第一节质量标准 (5)第二节应注意的质量问题 (5)第三节质量记录 (6)第六章安全保证措施 (6)第七章现场文明体系及施工措施 (6)第一节绿色施工环境管理方针、目标及工程环境管理体系 (6)第二节文明施工 (7)第三节施工现场垃圾清除安排 (7)第四节环境保护 (8)第一章工程概况第一节基本概况本工程建筑包括总服务区一个,建筑面积3150m²;海滩烧烤活动区一处,房屋面积136 m²;水疗中心一处,房屋面积720 m²;海滩别墅33座,房屋面积2084 m²;环礁湖群柱架空式套房47座,房屋面积2746 m²;花园群柱架控式套房15套,房屋面积836 m²;帝王别墅一座,房屋面积1012m²;皇家别墅2座,房屋面积1060 m²。

强电专业:高压配电系统,变配电系统,UPS系统,照明系统,动力系统,防雷接地系统。

弱电专业:火灾报警系统,有线电视系统,电话网络系统,监控系统,房间背景音乐,客房服务,舞台影院系统等。

给排水专业:给水系统,污废水系统,灌溉系统,海水淡化,游泳池水处理,消防系统,雨水系统。

暖通专业:分体空调和空气冷凝机系统,防排烟系统。

第二节防雷接地概况工程避雷采用避雷针形式,沙滩别墅不设置避雷针,帝王别墅,皇家别墅,总服务区设置避雷针。

本工程配电系统接地型式为TN-S,在每户配电箱进线引入处,PE线做重复接地,并做等点位连接。

第二章编制依据1、工程文件:《开工令》、《总承包工程承诺书》、《投标技术文件》;2、施工图纸:《建筑设计方案》;3、公司有关质量管理、安全管理、现场文明施工管理和各种工序工法的标准程序文件;4、现场条件及周边场地情况。

5、图集及相关规范第三章施工准备第一节技术准备1、施工前,专业工长必须认真研读设计图纸,编制《防雷接地施工方案》,并按要求向监理单位报审;2、防雷接地工程施工前,专业工长必须对施工班组进行全面细致的技术交底。

第二节材料准备防雷与接地工程使用的主要材料为圆钢、镀锌扁钢、电线等,使用材料必须符合设计规定,产品应有材质检验证明及产品出厂合格证。

第三节工器具1、项目根据具体的施工工艺要求准备施工所需的机械,专业工长、安全员负责检查,检查合格方能进场使用。

2、施工主要机械及器具为:第四章施工工艺第一节屋面防雷施工工艺1、避雷针施工要点在建筑屋面下主梁上抱箍生根固定装设DC+45型高压脉冲放电防雷雷接闪针,安装高度均为突出安装位置屋面H=2.00米.整个建筑物均在接闪针防护直击雷保护范围内。

单独明敷一根25X4铜带作为引下线,引下至接地环,接闪针与就近防雷引下线通过暗敷25x4铜母排进行可靠连接,突出屋面的金属物体均采用25x4铜母排就近与接闪针等电位连接,均采用暗敷方式,连接位置做防腐处理。

在易受机械损坏的地方、地上约1.7m至地下0.3m的一段地线应加保护措施,为了减少接触电压的危险,用竹筒将引下线套起来或用绝缘材料缠绕。

2、避雷针安装示意图(1)单套避雷针设备表(2)避雷针基础图(3)避雷针安装图第二节引下线施工工艺1、引线线施工要点单独明敷一根25X4铜带作为引下线,引下线间距不大于18米。

引下线上端与避雷针连接,下端与建造物基础地梁及柱基内的两根主筋连接。

在建造物四角被用作防雷引下线的结构柱距室外地坪0.5上米处预埋接地电阻测试点。

要求采用φ12钢筋跨接,跨接长度不小于6倍直径,双面施焊,焊缝饱满、无遗漏,焊接完毕后及时清除药皮。

2、引下线连接示意图(1)引下线与避雷针连接图(2)引下线固定安装图引下线水平敷设时,支架间距1-1.5m,垂直敷设时1.5-2.0m,转弯处为0.5-1.0m,图中1为引下线,10为固定钩,13为螺丝螺母(3)引下线与接地线连接图第三节等电位连接施工工艺本工程采用总等电位联接,TG配电室总等电位接地端子引线,采用-25x4铜母排引至接地环,并可靠焊接。

TD配电室局部等电位接地端子引线:采用-25x4铜母排引至接地环,并可靠焊接。

局部等电位连接应包括卫生间内金属给排水管道和建筑物钢筋网。

地面内钢筋网与等电位联结线联通,卫生间内等电位端子板的设备位置应方便检修,LEB线均采用BVR-4mm2穿PVC管暗敷设在墙内或地面内。

1、总等电位连接示意图2、卫生间等电位连接卫生间局部等电位连接包括金属给排水管,金属浴盆,建筑物钢筋网,不包括金属地漏、扶手、浴巾架、肥皂盒等孤立之物,地面钢筋网宜与等电位线联通,当墙为混凝土墙时,墙内钢筋网也要与等电位连接线联通。

连接示意图3、泳池等电位连接在游泳池边地面下无钢筋时,应敷设电位均衡导线,间距约为0.6米,最少在两处做横向连接,且与等电位连接端子板连接。

如在地下敷设钢筋时则用板内钢筋,电位均衡导线也可敷设网格150mm*150mm 的钢丝网,相邻钢丝网之间互相连接。

如图所示第四节基础接地施工工艺1、基础接地施工要点(1)本工程沿建筑物四周敷设一圈50平方毫米裸铜线接地环带,室外埋设深度-0.9m。

接地环带与建筑外墙距离不小于3米。

接地环带需与基础主筋应进行电气贯通性连接,形成电气通路, 并与防雷引下线应进行可靠焊接,要求接地电阻要求不大于5Ω。

若实测不满足,可补打接地极,接地极采用外径至少为25毫米的镀锌钢芯,外部是电解铜。

(2)凡正常不带电而当绝缘破坏有可能呈现电压的一切电气设备金属外壳(如电机、配电柜(箱)、金属管道、框架、电缆桥架等)均应可靠接地。

竖向金属管道还应在顶部和底部与防雷接地装置相连。

(3)建筑物所有外墙上的金属门窗、金属内护栏等较大的金属物必须留有焊接钢板与外墙钢筋、引下线等防雷装置电气可靠连接。

(4)室外接地凡焊接处均应刷沥青作防腐处理。

2、基础接地示意图第五章质量保证措施第一节质量标准1、保证项目(1)材料的质量符合设计要求;接地装置的接地电阻值必须符合设计要求。

(2)接至电气设备、器具和可拆卸的其它非带电金属部件接地的分支线,必须直接与接地干线相连,严禁串联连接。

检验方法:实测或检查接地电阻测试记录。

观察检查或检查安装记录。

2、基本项目接地(接零)线敷设:平直、牢固,固定点间距均匀,跨越建筑物变形缝有补偿装置,穿墙有保护管,油漆防腐完整。

焊接连接的焊缝平整、饱满,无明显气孔、咬肉等缺陷;螺栓连接紧密、牢固,有防松措施。

防雷接地引下线的保护管固定牢靠;断线卡子设置便于检测,接触面镀锌或镀锡完整,螺栓等紧固件齐全。

防腐均匀,无污染建筑物。

检验方法:观察检查。

3、允许偏差项目扁钢搭接长度≥2b;(注:b为扁钢宽度。

)扁钢搭接焊接3个棱边。

检验方法:尺量检查和观察检查。

第二节应注意的质量问题1、接地体(1)防腐处理不好,焊接面按质量要求进行纠正,做好防腐处理。

(2)用基础、梁柱钢筋搭接面积不够,应严格按质量要求去做。

(3)在每层的引下线对角钢筋上用黄漆作明显标记,以防引错。

2、支架安装(1) 支架松动。

将支架松动的原因找出来,然后固定牢靠。

(2) 支架间距(或预埋铁件)间距不均匀,直线段不直,超出允许偏差。

重新修改好间距,将直线段校正平直,不得超出允许偏差。

3、防雷引下线暗敷设(1)焊接面不够,焊口有夹渣、咬肉、裂纹、气孔及药皮处理不干净等现象。

应按规范要求修补更改。

(2)漏刷防锈漆,应及时补刷。

(3)主筋错位,应及时纠正。

(4)引下线不垂直,超出允许偏差。

引下线应横平竖直,超差应及时纠正。

4、接地干线安装(1) 扁钢不平直,应重新进行调整。

(2) 接地端子漏垫弹簧垫,应及时补齐。

第三节质量记录1、镀锌扁钢的材质证明及产品出厂合格证。

2、防雷及接地施工预检、自检、隐检记录齐全。

3、设计变更洽商记录、竣工图。

4、防雷接地分项工程质量检验评定记录。

第六章安全保证措施1、电焊工必须持证上岗,入场前进行入场安全教育,合格后方可进场施工。

2、线敷设前,要检查梯子、架子及防护设施,如有损坏和变形及时处理,以免存在隐患。

3、随身携带的工具应放在稳妥地方防止坠落伤人。

4、使用电焊机要有三级漏电保护,禁乱拉乱拽;施焊时要戴好防护面具,以免伤及自身。

5、使用后的电焊条头不得随意丢弃。

6、在大风天气或雨水天气时不要施工以免影响施工质量或安全。

在高处作业时应系好安全带。

7、在顶板施工进行煨管时,应背朝楼内侧操作防止跌落楼下。

8、电焊机接电安装与拆卸必须由有证电工操作,电焊机外壳应有良好的接地,下班时电焊机电源应切断,检查动火现场确认无火星,才能离开现场。

第七章现场文明体系及施工措施第一节绿色施工环境管理方针、目标及工程环境管理体系1、环境方针坚持人文精神,营造绿色建筑,追求人居和施工环境的不断改善!2、环境方针的阐述坚持人文精神。

即遵循以人为本组织施工;利用人类关于环保的基本能力,建立有效运行的环境管理体系。

营造绿色建筑。

即施工过程具有节能、降耗、低污染的特征;建筑材料和施工工艺具有环保型特征。

追求人居和施工环境的不断改善。

即环境管理全过程的环境行为持续改进。

环境管理使建筑用户、施工人员共同受益。

总部宏观控制,项目经理主要领导,总工程师、生产经理和机电经理中间控制,专业责任工程师检查和监控实施过程,形成一个从项目经理部到各分承包方、各专业化公司和作业班组的环境管理网络。

第二节文明施工1、料具管理材料要根据需要分批进现场,以免进料太多,造成拥挤,夜间进场的料具要及时吊至所需部位,不能占用大门口或道路。

根据现场平面布置图,安排机电各种料具应按指定位置存放,并分规格码放整齐、稳固,做到一头齐,一条线。

施工现场的机具保管中,应依据材料性能采取必要的防雨、防潮、防火、防爆、防损坏等措施,贵重物品、易燃、易爆和有毒物品应及时入库,专库专管,加设明显标志,严格执行领退料手续。

涉及机电专用化学品,必须搭设专用库房,并四周全封闭,地面为混凝土全密封,所有油品、用油的机械设备下方设置接油盘,防止油品污染土地。