某砖混结构房屋裂缝原因分析

某砖混结构房屋裂缝原因分析
某砖混结构房屋裂缝原因分析

现代房屋墙体裂缝问题及控制措施

浅谈现代房屋墙体裂缝问题及控制措施摘要:随着新型墙体材料的不断开发和应用,混凝土小型空心砌块(以下简称砌块)建筑已得到了工程界普遍认可。无论是砌块砌体结构,还是多、高层框架的填充墙,砌块的使用在不断增加,但砌块墙体的开裂渗漏现象依然存在,本文探讨了砌块墙体的渗漏问题,并提出了对应解决措施。 关键词:房屋墙体裂缝控制 abstract: with the continuous development and application of new wall materials, the building by concrete small hollow block (hereinafter referred to as blocks) has been the generally recognized. whether in block masonry structure, or filling wall of the high-risw and multi-floor framework, the use of the block is increasing, while there has the leakage by crack in the block wall. this paper discusses the the leakage of block wall, and proposes the corresponding solutions. key words: wall of housing; crack;control 中图分类号:tu973+.16文献标识码:a 文章编号:2095-2104(2012) 随着社会的发展,生活水平的提高,人们对居住舒适度的要求也越来越高,房屋的渗漏直接影响了人们对房屋舒适度的要求,所以,在房屋建设前要求人们分析房屋渗漏的原因,做好防治的对策,

层住宅楼砖混结构设计word版

摘要 本次设计做的是滨州山东置业有限公司开发建设的龙溪鑫都21#,23#住宅楼项目,本工程为包括阁楼在内的六层砖混结构,总建筑面积为3485.52㎡。本次毕业设计分为两部分,一部分为工程量计算,另一部分为施工组织设计。工程量计算,各人根据自己的图纸选择一部分进行工程量计算,工程量包括基础,标准层及屋面工程。本工程的基础采用的是筏板基础,施工采用机械大开挖。主要的工程量包括,基础工程,混凝土工程,钢筋工程,模板工程,门窗工程,屋面工程,装饰工程等。施工组织设计部分,根据所学知识主要有工程概况,施工部署,施工准备,施工方法,质量管理保证措施及工期保证措施,安全保证措施,环境、职工健康安全管理措施,及竣工交付使用后的回访工作等。工期则采用倒推法,先确定总工期,在确定各施工过程的劳动力分布情况,及机械使用情况,进而画出施工横道图。另外根据施工平面布置原则,再结合建筑物实际情况,画出施工现场平面图。在本设计中我们认真做好每一部分的工作,这样就能方便工程更全面,更具体的进行施工。总之我们以保证质量,方便施工,便于管理为目标,科学认真的完成本次毕业设计。 关键字:砖混结构,工程量计算,施工组织设计

Abstract This design is made of real estate co.LTD. Development and construction of stream is # 21, # 23 residential projects, six-story brick structure, a total construction area of 3485.52㎡.This graduation design is divided into two parts, one part for the calculation of quantities; the other part is the construction organization design. Calculation of quantity and each part choose according to your drawings of quantities calculation, include base of quantities, standard layer and roofing construction. This project USES a raft foundation, the basis of the construction machinery large excavation. Major of quantities include basic engineering, concrete engineering, reinforcing bar engineering, template engineering, doors and Windows engineering, roofing engineering, decoration engineering, etc. Construction organization design part, based on knowledge engineering general situation, main construction deployment, construction preparation, construction methods, quality management guarantee measures and period guarantee measures, safety guarantee measures, the environment, worker health and safety management measures, and completed delivery after use, pay a return visit work. Backward method, time limit for a project is used to determine the total time limit for a project, in determining the distribution of each construction process of the labor force, and machine usage, and construction crossing plotted on a graph. Another according to the construction plane layout principles, and in combination with the practical situation of buildings, draws the floor plan of construction site. In this design, we seriously do a good job in every part of this can be convenient for engineering a more comprehensive, more specific to the construction. Anyhow we to ensure the quality, convenient construction, easy to management as the goal, scientific and serious to complete the graduation design. Key words:Brick structure,The calculation of quantities,Construction organization design

砌体结构裂缝控制措施

关于砌体结构裂缝控制措施的建议 背景: 日期:2007-11-2 作者:佚名编辑:点击次数:1032 销售价格:免费论文论文编号:lw2278704论文字数:5309 论文属性:职称论文论文地区:论文语种:中文 注释: 收藏:https://www.360docs.net/doc/9317898411.html, google书签雅虎搜藏百度搜藏新浪vivi 和讯网摘poco网摘天极网摘qq书签饭否mister-wong365网摘LiveDiggDiglog 关键词:职称论文 提要:本文在简要总结分析国内外砌体裂缝的性质和裂缝控制原则和措施的基础上,结合我国当前国情,针对性地提出了砌体结构裂缝控制的具体构造措施建议,该措施已引入我院编制的大庆油田砌块建筑构造图集。 关键词:砌体结构裂缝控制措施 1 裂缝的性质 引起砌体结构墙体裂缝的因素很多,既有地基、温度、干缩,也有设计上的疏忽、施工质量、材料不合格及缺乏经验等。根据工程实践和统计资料这类裂缝几乎占全部可遇裂缝的80%以上。而最为常见的裂缝有两大类,一是温度裂缝,二是干燥收缩裂缝,简称干缩裂缝,以及由温度和干缩共同产生的裂缝。 温度裂缝 温度的变化会引起材料的热胀、冷缩,当约束条件下温度变形引起的温度应力足够大时,墙体就会产生温度裂缝。最常见的裂缝是在砼平屋盖房屋顶层两端的墙体上,如在门窗洞边的正八字斜裂缝,平屋顶下或屋顶圈梁下沿砖(块)灰缝的水平裂缝,以及水平包角裂缝(包括女儿墙)。导致平屋顶温度裂缝的原因,是顶板的温度比其下的墙体高得多,而砼顶板的线胀系数又比砖砌体大得多,故顶板和墙体间的变形差,在墙体中产生很大的拉力和剪力。剪应力在墙体内的分布为两端附近较大,中间渐小,顶层大,下部小。温度裂缝是造成墙体早期裂缝的主要原因。这些裂缝一般经过一个冬夏之后才逐渐稳定,不再继续发展,裂缝的宽度随着温度变化而略有变化。 干缩裂缝 烧结粘土砖,包括其它材料的烧结制品,其干缩变形很小,且变形完成比较快。[KG-*2]只要不使用新出窑的砖,一般不要考虑砌体本身的干缩变形引起的附加应力。[KG-*2]但对这类砌体在潮湿情况下会产生较大的湿胀,而且这种湿胀是不可逆的变形。[KG-*2]对于砌块、灰砂砖、粉煤灰砖等砌体,随着含水量的降低,材料会产生较大的干缩变形。〖KG-*2〗如砼砌块的干缩率为0.3~0.45mm/m,它相当于25~40℃的温度变形,可见干缩变形的影响很大。轻骨料块体砌体的干缩变形更大。干缩变形的特征是早期发展比较快,如砌块出窑后放置28d能完成50%左右的干缩变形,以后逐步变慢,几年后材料才能停止干缩。但是

六层住宅楼(砖混结构)

第一章工程概况 一、工程简况 1 .本工程为工程。该楼共,建筑面积约为。 2.本工程主要结构:基础为C30钢筋砼带形基础,C30钢筋砼地梁。砖混结构,层层设置圈梁,构造柱,C25钢筋砼梁、板、柱、楼梯。 3 .安装工程: a. 给排水:管道采用S5系列的PPR给水管,UPVC排水管。成套卫生洁具。 b. 电气:强电为铜芯线、PC硬塑管暗敷。 二、建筑地点及自然条件 本工程位于。地震烈度为七度;场地土类型为粉土;地下水 位埋深为 3.25-3.4 米,场地标准冻土深度为0.6 米。 三、施工条件及特点 1. 施工现场地势较开阔,场地需根据设计标高做适当平整。 2 .施工用电已由建设单位引至现场边,施工便道通畅。 3. 工程特点: 1)工期紧根据招标文件要求,计划开工日期,计划竣工日期。 2)要求高业主对工程质量、工程进度及施工管理等方面都有很高的 要求。 根据上述二大特点,我公司在施工过程中,将克服各种不利因素,以一

流的管理水平,一流的工程质量,一流的工程速度,以优良工程为目标,顺 利完成本工程任务。 四、编制依据: 建设单位提供的有关该工程的施工图 本公司的有关施工、施工质量、安全生产、技术管理等文件 施工现场实地状况 国家现行相关规范及有关规定 第二章施工准备工作计划 一、施工组织机构和职能分工 1.根据本工程的特点和现场条件等,为实现工程“优质、高效、安全、 文明”地完成目标,经我公司慎重研究,决定配备具备丰富施工经验的工程 技术人员和管理人员组成工程项目管理机构。施工过程实行全面质量和安全 管理,实行优化劳动组合,实现一次交验合格率100%,整体工程在合同期内达到优良。 2.该工程设置武强县城镇建筑工程公司武强县卫生监督所办公楼项目 部。现场设项目经理、工程师、技术员、施工员、质检员及“五大员”组成。 技术、质检、材料供应、财务、保卫、后勤等各部门齐备,分工明确,各司 其职。(详见后表) 二、施工准备阶段组织部署 1.开工前,作好充分的施工准备工作:公司一旦中标,即刻组织项目部 工程技术人员仔细查阅施工图纸,会同设计院等有关部门进行会审;修编、 批准施工组织设计并进行交底;按要求修整进场施工道路,达到既不影响总

砖混结构房屋工程施工方案

砖混结构施工方案 一、基础工程本工程施工图中基础采用条形基础,本施工组织设计主要对条形基础进行编制 1.1基础施工 1.施工顺序施工放线——基槽开挖——检查轴线、标高——浇垫层砼——养护——砌条石基础——地圈梁 2.施工工艺 (1)地槽开挖采用人力开挖方式进行,开挖过程中其土石方应及时运至现场指定位置放置,严禁场内土石方乱弃。 (2)地槽开挖施工应有序进行,不得随意切断场内临时排水沟道,开挖某处地槽前应将要切断的临时排水沟道改道后再行施工,以免造成现场排水不畅。 (3)垫层砼浇好后,在垫层上抄平并弹好中心线,经检查合格,做好隐蔽验收资料,再砌条石基础、关模扎筋浇地圈梁。条石基础的组砌要严格按规范和设计图纸的要求施工,施工时,砂浆打座灌缝应密实,组砌得当,收阶合理,不得有松动、通缝,漏灌砂浆等现象。 (4)基础完成后,应及时进行土方回填。 基础工程完成后,用经纬仪放出各条轴线墨线,用水平仪侧出基础设计表面标高,经建设、质检、监理、设计等有关单位共同对基础进行全面验收,作出鉴定并签字后,才能进行主体施工。主体施工前应将开挖基槽剩下的土外运出场,以免影响主体的砌筑。 二、主体结构施工 2.1砖砌体工程 1、砖砌体工程的施工工艺流程 2、施工方法

1)组砌方法:组砌方法应符合规范的规定,同一道墙体严禁有两种以上的砌筑形成,并不得有通缝。砌体宜采用一顺—丁、梅花丁或三顺一丁砌法。砖柱不得采用包心砌法。 2)排砖撂底:按设计要求经测量放出轴线和门窗洞口位置的尺寸线。采用千砖排砖撂底,以砖的模数按测量放线,标出位置尺寸进行排砖撂底,两山墙排丁砖,前后纵墙排条砖。排砖时应严格核对门窗洞口的位置、窗间墙、垛、构造柱的尺寸是否符合排砖的模数。在保证砖砌体灰缝8—10mm的前题下全盘考虑排砖撂底。 排砖时要注意卫生主管道及门窗的开启不受影响,在其洞口处砌体的边缘必须用砖的合理模数,不得出现破活。 3)选砖:砌砖前应选择棱角整齐、无弯曲裂纹、颜色均匀、规格基本一致的砖。 4)盘角:砌筑砖砌体前应先进行盘角,每次盘角高度应以3—5层砖为宜,盘角要及时、准确地用吊线及靠尺检查。若有偏差应随时修整。盘角应严格对照底盘线、皮数杆的竖向标高,水平灰缝要均匀一致。盘角应坚持及时检查和修整,保持新盘角的平整和垂直必须完全符合验评标准规定的允许偏差值,方可挂线砌砖。 5)挂线:砌筑一砖半及其以上厚墙体时,应及时双面挂线进行砌筑。砌一砖厚清水墙与混水墙体的时候。应挂外手线进行砌筑。如果工作面长,几个人使用一根通线时,工作面的中间应设挑线点;此挑线点应以两端盘角点或“起墙”点贯通穿线看齐;水平灰缝应均匀一致,平直通顺。 6)构造柱马牙搓设置:砌体留置马牙搓要求先退后进,应于每层往脚开始先退五皮砖、后挑出五皮砖做马牙搓,搓宽为60mm,搓高为300mm,以保证柱脚为大断面。 7)砌砖:砖砌体的砌筑,应上下错缝,内外搭砌。砌筑时上口拉线采用一铲灰、一块砖、一挤揉的&ldqu 三、一”砌砖法进行作业。 操作方法:砌筑时,首先应将灰打匀打平,砖要放平,垒砌时一定要跟线,左、右相邻要对平,注意做到:“准确的尺码边角正,浆满缝直墙面平。”水平灰缝厚度和竖向灰缝宽度应控制在10mm,但不应小于8mm.砌筑墙时.混水墙严禁半分头集中砌筑出现三皮砖及其三皮砖以上的通缝.砖墙中砖缝搭接不得少于1/4砖长,组砌形式,应根据砌筑部位的受力性能而定.18砖和1/2砖厚墙砌体严禁使用分头砖。 8)留搓:砌体的转角处和交接处及其楼梯间应同时砌筑.如不能同时砌筑而又必须留置的临时间断处,应砌成斜援.实心砖砌体的斜搓长度不应小于高度的2/3.临时间断处加

砖混结构墙体裂缝的原因和防治措施分析

砖混结构墙体裂缝的原因和防治措施分析 本文分析了墙体裂缝的产生原因,阐述了裂缝宽度的标准问题,并提出了在设计、施工中相应采取的防治方法和措施,供大家参考。 标签:砖混结构墙体裂缝分析防治 0 引言 近年来,砖混结构多层住宅工程屡屡发生墙体裂缝。裂缝位置走向不一。有的裂缝由小变大,发展很快;有的裂缝,发展到一定程度后就不再增大,给住户心理造成很大压力。因此分析产生裂缝的原因并做好预防措施,是工程技术人员的一项重要任务.近几年来通过对一些住宅楼的裂缝进行考察、分析、研究,对如何防止墙体裂缝,主要从以下几方面论述,并采取相应措施。 1 产生裂缝的原因分析 1.1 由于基础不均匀沉降造成墙体裂缝对于不均匀的地基,设计中没有把刚度不同的地基进行调整,造成基础不均匀沉降,墙身受较大的剪力作用,主拉应力大于墙体抗拉应力,造成了砌体受主拉应力而破坏,这种裂缝往往是由沉降较小的一边向沉降较大的一边逐渐向上发展. 1.2 由于温度的变化因屋面长时间受阳光幅射,其温度较墙体高出许多,在炎热的夏季,屋面温度是墙体温度的2倍左右,且在相同温度条件下,钢筋混凝土的线膨胀系数是砖砌体线膨胀系数的2倍,它使屋面变形比墙体变形大得多。在屋面变形过程中,产生了很大的推力,作用在墙体顶端的水平推力使墙体与屋面的接触面受剪,剪力与屋盖、挑檐或女儿墙的垂直压力,构成墙体双向应力,当主拉应力大于墙体的抗拉强度时,墙体就会出现裂缝。 在建筑物的端部,垂直压应力很小,则此区域的主拉应力等于最大剪应力,一般砌体的抗拉强度最低,所以在端部容易出现斜裂缝,对于灰缝强度不良的砌体则出现水平裂缝。 1.3 由于块石基础施工质量差,造成墙体裂缝。对于块石基础,在施工过程中没有严格按《施工规范》施工,砌筑块石的砂浆不饱满,或采用堆砌的方法施工,造成块石基础工程质量低劣,楼房交付使用后由于竖向荷载的作用或水平振动荷载的作用,造成块石移位,使整个基础产生不均匀沉降,造成砌体受主拉应力作用而破坏。 1.4 对于寒冷地区,在设计基础埋置深度的过程中,只考虑了结构要求而忽视了基础的冰冻线要求。基础的埋置深度小于该地区的冰冻线,造成基底地基土受冻后膨胀,给基础施加了向上的作用力,当这种作用产生的主拉应力大于墙体的抗拉应力时,导致了墙体裂缝,尤其经过多次冻融循环后,裂缝更加严重。

住宅结构形式的发展——砖混结构

新中国成立前我国住宅建筑多以1—3层的砖混结构为主,二十世纪五十年代末,我国开始试点研究工业化住宅结构体系。1958年开始试点修建全装配式钢筋混凝土结构大板住宅。1975年,根据装配式住宅的建造经验,结合传统的砖混结构,推出了独特的外砖内模结构住宅。1977年试点采用外墙为预制板、内墙为大模板现浇钢筋混凝土墙体的多层住宅。1982年以后,钢筋混凝土结构住宅逐步发展起来,现已成为我国住宅建筑的主要结构形式。2016年,《中 共中央国务院关于进一步加强城市规划建设管理工作的若干意见》指出,我国今后要发展新 型建造方式,大力推广装配式建筑,制定装配式建筑设计、施工和验收规范,实现建筑部件 工厂化生产。 一、砖混结构:新中国成立初期,砖混结构是我国住宅最主要的建造形式。砖混结构是指建 筑物中竖向承重结构的墙、柱等采用砖或者钢筋混凝土,横向承重的梁、楼板、屋面板等采 用钢筋凝土结构。砖混结构是混合结构的一种,是采用砖墙来承重,钢筋混凝土梁柱板等构 件构成的混合结构体系。适合开间深较小,房间面积小,多层或低层的建筑,对于承重墙体 不能改动。 (一)砖混结构主要构件 墙体 习惯上人们把370mm的砖墙称为“三七墙”(一般用作外墙);240mm的砖墙称为“二四墙”(一般用作内墙)。 墙体的主要作用有: (1)承重作用:屋盖和楼板支承在墙上,上层的墙支承在下层的墙上。因此墙体在竖向承 受由屋盖及楼板、墙自身重量的荷载同时还承受风力、地震力等水平方向的荷载。最后把这 些荷载传递到基础和地基上去。 (2)围护作用:墙体可保持建筑物的内部不受风、雨、雪等的侵袭,并起到保温、隔热、 隔声的作用,保证室内有良好的生活和工作环境。

(完整版)多层砖混结构住宅设计毕业设计

以下文档格式全部为word格式,下载后您可以任意修改编辑。 多层砖混结构住宅设计 中文摘要 本工程为多层砖混民用住宅。建筑层数为六层、建筑高度为20.38m,基底占地面积为574.33㎡、总建筑面积3470.0㎡。抗震设防烈度7度、场地类别为Ⅱ类,结构设计使用年限为50年。本工程为二类建筑,耐火等级为二级,工程±0.00同绝对标高13.38m。 结构设计依据国家相关规范进行:计算各楼板和屋面板的恒荷载,同时确定活载值。根据荷载设计值计算出楼面和屋面的配筋。将板上均布荷载传给各墙,然后根据各墙所受荷载及墙体自重,验算墙体抗压承载力。根据抗震设防数据及结构重力荷载代表值,计算出水平地震作用下的各墙承担的剪力,并验算墙体的抗剪承载力。计算出各段基础上部荷载,并由此确定基础类型和配筋。 经过验算,该结构符合安全性、可靠性要求。

[关键词]:砖混结构、承载力、构造措施、基础设计 Abstract This engineering is a multistory building. It is a brick and concrete mixed structure. The building isⅡ.The structureis designed to use 50 years.The engineering is the second type building,itsrefractory ranks the second grade.The engineering s designed elevation is equal to 13.38 of absolute elevation . Structural design accords to the national special codes: first of all,we calcu--late each floor and roof s dead live of slab,and carry live load at same time.According to computation of design load,we can design the concrete reinforcement of floor and roof. Transfer the uniform loading to each wall,than according to the load that wall suffer and self-weight ,we can check the wall s compressive bearing capacity.According to the data of anti-seismic defence and structural representative value of gravity load ,each wall s shear force can be worked out,than we can check the wall s shear bearing capacitypute the load

房屋质量问题墙体裂缝案例

墙体裂缝问题赔偿案例 【案情介绍】 原告王某在被告芜湖金都置业有限责任公司(以下简称金都公司)开发的锦绣天城小区购买商品房一套,在该房屋交付前墙体就已出现多处裂缝,被告未按规定程序对前述裂缝进行修补,在隐瞒前述质量缺陷的情况下将房屋交付原告。原告在入住后不久墙体再次出现多处裂缝,在原告通过有关部门交涉后,被告进行了修补,但因修补仍未能按照施工程序进行,在进行装修后再次出现裂缝。现原告为维护合法权益,诉至本院,请求法院判令: 一、被告依约为墙体裂缝维修; 二、赔偿因墙体裂缝及维修给原告的损失20000元(包括维修费 5000元、维修期间的住宿费3000元、装璜损失12000元); 三、本案诉讼费用由被告承担。 【法院判决】 一、被告芜湖金都置业有限责任公司于本判决生效后三十日内为原告王某购买的位于安徽省芜湖县湾沚镇锦绣城小区13幢2单元1003室房屋的墙体裂缝进行修复; 二、驳回原告王某的其他诉讼请求。 案件受理费150元,由被告芜湖金都置业有限责任公司负担。 【律师分析】

《最高人民法院关于审理商品房买卖合同纠纷案件适用法律若 干问题的解释》第十三条规定:“因房屋质量问题严重影响正常居住使用,买受人请求解除合同和赔偿损失的,应予支持。交付使用的房屋存在质量问题,在保修期内,出卖人应当承担修复责任;出卖人拒绝修复或者在合理期限内拖延修复的,买受人可以自行或者委托他人修复。修复费用及修复期间造成的其他损失由出卖人承担。”本案中,原告房屋出现的墙体裂缝问题,属于服务质量问题的范畴,因此在保修期内负有维修及赔偿损失的责任。被告称原告所购房屋已超过二年的保修期,故不应承担修复义务,法院认为被告在交付房屋时墙体已有裂缝,原告在房屋保修期内也已要求被告修复裂缝,但经被告修复后墙体仍有裂缝,故被告应继续履行修复的义务。 《中华人民共和国合同法》第一百零七条规定:“当事人一方不履行合同义务或者履行合同义务不符合约定的,应当承担继续履行、采取补救措施或者赔偿损失等违约责任。”本案中,双方当事人基于真实的意思表达签订了《商品房买卖合同》,合同规定了开发商对房屋出现的质量问题在保修期内具有的维修责任,对合同双方具有约束力。芜湖金都置业有限责任公司的行为实际上是违反了合同的约定。 原告要求被告赔偿其修复费5000元,因该项请求与要求被告为墙体裂缝修复这一请求重复,故法院对原告该项请求不予支持。原告要求被告赔偿修复期间的住宿费3000元,但是墙体裂缝修复工程量较小,不至影响原告在房屋内居住,故对原告该项请求没有得到法院的支持。原告要求被告赔偿因修复产生装璜损失12000元,法院认为

多层砖混结构住宅楼施工组织设计

多层砖混结构住宅楼施工组织设计 一、原始资料:本工程为某单位的住宅楼3单元5层,位于廊坊市 西郊,总建筑面积为2840㎡。 该工程为砖混结构,基础埋深为1.5m,采用条形砖基础,砖基础中设钢筋混凝土地圈梁,每层设钢筋混凝土圈梁,内外墙交接处和外墙转角处设构造柱,卫生间、厨房、梁及楼梯采用现浇钢筋混凝土,其余楼盖和屋面采用预制钢筋混凝土空心板。 室内地面为水泥砂浆地面,室内装修采用混合砂浆抹灰,仿瓷涂料罩面,外墙采用干粘石。屋面工程采用加气混凝土块保温层,改性沥青卷材防水,上铺架空隔热层。 设备安装及水、电、暖工程等配合土建施工。 二、地质及环境条件: 地形平坦,地下水位位于基底以下2.4m,地下水对建筑物无侵蚀作用,场地内地基承载力为87KN/㎡,本地区土壤最大冻结深度为28cm,雨季为7、8、9三个月,冬季为12月份到第二年的2月份。施工期间主导风向偏南。 建筑施工场地较为狭窄,北面为已建建筑,东面和北面为围墙,中心绿地可以作为施工场地占用。 四、施工技术经济条件 1、预应力空心楼板由工厂预制后汽车运至现场,门窗由工厂 加工制作,然后由汽车运至现场。 2、现场水、电供应均取自城市管网。

3、各种施工机械、运输机具供应根据工程情况调配。 4、现场临时设施均现场搭建,搭建要求参见附表2、附表3。 5、主要项目工程量见附表1: 五、内容和要求 1、施工方案选择 ○1确定施工总施工程序和施工顺序。 ○2划分施工段,确定施工流水方向。 ○3选择施工机械类型及台数。 ○4确定相应分部分项工程的施工方法。 ○5选择脚手架类型。 2、编制施工进度计划 按照确定的施工顺序和需要的资源,组织流水施工编制出单位工工程的施工进度计划。 3、根据进度计划绘制出劳动力需要量曲线。 4、根据确定的施工程序和施工顺序绘制单位工程网络计划(可 以绘制局部网络图)。 5、根据现场条件,进行施工平面图设计。 6、设计说明书。 六、设计成果 1、一号图纸一张:包括施工进度计划;劳动力需要量曲线;网 络计划;施工平面图。 2、说明书:工程概况;施工方案选择;流水参数确定;保证工

某小区砖混结构墙体裂缝处理方案-secret

某小区砖混结构墙体裂缝处理方案-s e c r e t(总3页) 本页仅作为文档页封面,使用时可以删除 This document is for reference only-rar21year.March

墙体裂缝处理方案 1、现场概况:商业1#一层东南角墙体(回迁1#西侧)出现裂缝,裂缝多呈现平行状分布,与地面夹角在45°左右,缝隙最宽一条约4㎜左右,其他缝隙在1㎜之内;二层角部局部开裂,缝隙1㎜。室内地面角部有裂缝,阴雨天外墙向内渗水,影响靠墙部位区域的正常使用。 2、成因分析:沿街商业1#楼(三层,荷载较轻)建成5年,地基土已经完成固结沉降。因东侧新建回迁1#(六层,不包含阁楼和贮藏室),地基状况不好,进行了处理,回填三合土,承受回迁1#楼体压力的反力不均匀分布引起建筑物沉降。大气降水入渗与排泄,使地下水位升降变化,地下水流对土体中空洞、空隙及充填物进行浸润、溶蚀、冲蚀、淘空,加剧填土不均匀沉降和基础下沉。回迁1#楼基础下沉,基底土也下沉,且下沉沿竖向方向影响区域往两侧扩散,因回迁1#与商业1#基础相距100㎜,商业1#基底在回迁1#基底土下沉影响区域内,造成商业1#东侧基础下沉,从而产生沉降差,即基础东西沉降不均匀。基础不均匀沉降引起墙体开裂。 3、墙体裂缝分析:商业1#楼东墙混凝土基础为悬挑结构,外挑1米左右,根据裂缝发展情况判断,裂缝在墙体根部距东墙近2米,商业1#楼基础埋深1.9米,顺砖墙裂缝判断,砖墙裂缝在土内继续向西延伸,距东墙在3米左右,非基础挑梁断裂;土内有1米高砖墙基础,砖基础底部为混凝土条形基础。由于砖基础为完全刚性基础,裂缝向下发展,可能产生裂缝,但底部混凝土条形基础因

(房地产管理)浅谈房屋墙体裂缝问题

浅谈房屋墙体裂缝问题 墙体裂缝是常见的房屋质量问题之一,墙体裂缝的出现,轻微的会影响房屋的美观,造成房屋渗水漏水,严重时则会影响整个房屋结构的承载力,如果不能进行正确地处理的话,甚至会引起房屋倒塌等严重后果。由于这种情况在现实生活中非常普遍,人们对其认识也有不足,笔者认为有必要就该问题加以探讨。 1经常出现的墙体裂缝种类 1.1斜向裂缝。目前绝大多数的新建房屋多为平顶建筑,这类建筑中的墙体裂缝大部分集中在建筑物顶层纵墙的两端(一般在1?2开间的范围内),严重者会发展至房屋两端1/3纵长范围内,且沿建筑物两端大、中间小。特别是在建筑物较长而未设置伸缩缝时,顶层端跨内纵墙会出现斜向裂缝。 1.2垂直裂缝。垂直裂缝又叫竖向裂缝,主要有底层窗下墙的垂直上下方向的裂缝、过梁端部的垂直裂缝,建筑剖面上有错层的墙体裂缝等几种类型。 1.3水平裂缝。在建筑设计时,如果对温度变化对墙体的影响考虑不足,屋面不在同一高度或错层时,常会出现这种裂缝。这种裂缝最常见的是出现在女儿墙的根部,有时发生在屋面板与女儿墙交接处,有时出现在顶层圈梁下2皮砖的灰缝处,圈梁施工采用硬架支撑时易出现这种裂缝。 1.4女儿墙裂缝。采用砖砌女儿墙时,不论女儿墙长短,在转角处均会出现裂缝。若女儿墙较长时,还会在其它地方出现裂缝,女儿墙裂缝的出现会导致防水层的破坏,影响建筑物的使用。 1.5混合裂缝。有时斜向裂缝和水平裂缝会同时出现,形成一种混合 裂缝;也可能出现两个斜向裂缝交叉出现形成“ X”形裂缝,不过这种裂缝出现

的概率相对较小。 2.墙体出现裂缝的原因 2.1温差变形引起的墙体裂缝。这是最常见的一种墙体裂缝。一般材料均有热胀冷缩性质,房屋结构由于周围温度变化引起热胀冷缩变形。钢筋混凝土屋面板和墙体材料是两种性能不同的材料,钢筋混凝土的线膨胀系数约为 10X10-6 ,而砌体墙的线膨胀系数约为5X 10-6。由温度应力引起结构的伸缩值可由下式计算:△[=△ t XaX L 式中:△ L――相应材料的伸缩值; △ t——温差; a——材料线膨胀系数; L -- 结构长度。 在夏季的几个月里,屋面板温度可高达60?70C,而在其下的墙体一般仅为30?35C,温差可达30~40C,加之在相同温差下,钢筋混凝土结构的伸长值要比砖砌体墙大一倍左右。所以在混合结构中,当温度变化时,钢筋混凝土屋盖、楼盖、圈梁与邻接的砖墙伸缩不一,存在着较大的温度变形差,这种变形差的分布是中部小、两端大,由于变形差必然彼此相互牵制而生产温度应力,使房屋结构开裂破坏。 2.2地基沉降不均匀引起的裂缝。房屋的地基在平整过程中,一般都经过高挖低填的工序,因此在房屋建成后都会出现程度不同的地基沉降。如果地基沉降不均匀,沉降大的部位与沉降小的部位,发生相对位移,在墙体中产生剪力和

某小区砖混结构墙体裂缝处理方案_secret

墙体裂缝处理方案 1、现场概况:商业1#一层东南角墙体(回迁1#西侧)出现裂缝,裂缝多呈现平行状分布,与地面夹角在45°左右,缝隙最宽一条约4㎜左右,其他缝隙在1㎜之内;二层角部局部开裂,缝隙1㎜。室内地面角部有裂缝,阴雨天外墙向内渗水,影响靠墙部位区域的正常使用。 2、成因分析:沿街商业1#楼(三层,荷载较轻)建成5年,地基土已经完成固结沉降。因东侧新建回迁1#(六层,不包含阁楼和贮藏室),地基状况不好,进行了处理,回填三合土,承受回迁1#楼体压力的反力不均匀分布引起建筑物沉降。大气降水入渗与排泄,使地下水位升降变化,地下水流对土体中空洞、空隙及充填物进行浸润、溶蚀、冲蚀、淘空,加剧填土不均匀沉降和基础下沉。回迁1#楼基础下沉,基底土也下沉,且下沉沿竖向方向影响区域往两侧扩散,因回迁1#与商业1#基础相距100㎜,商业1#基底在回迁1#基底土下沉影响区域内,造成商业1#东侧基础下沉,从而产生沉降差,即基础东西沉降不均匀。基础不均匀沉降引起墙体开裂。 3、墙体裂缝分析:商业1#楼东墙混凝土基础为悬挑结构,外挑1米左右,根据裂缝发展情况判断,裂缝在墙体根部距东墙近2米,商业1#楼基础埋深1.9米,顺砖墙裂缝判断,砖墙裂缝在土内继续向西延伸,距东墙在3米左右,非基础挑梁断裂;土内有1米高砖墙基础,砖基础底部为混凝土条形基础。由于砖基础为完全刚性基础,裂缝向下发展,可能产生裂缝,但底部混凝土条形基础因有钢筋,且

有地梁,配筋较大,不会开裂。综上所述,裂缝为砖墙裂缝。 商业1#楼墙体主要裂缝目前为3~4㎜宽,继续开裂加大很轻微,用肉眼观察不到,且回迁楼沉降已经基本完成90%以上,后期沉降量很小,影响到商业1#楼会更小。 沉降示意图 4、处理方案的确定:裂缝在砖墙上,裂缝向土内延伸不在挑梁上;裂缝向土内延伸,对结构影响主要是一层墙体裂缝、渗水;一层梁、圈梁仍然为一个整体,一层以上结构几乎没有变化,一层砖墙裂缝对结构稳定性没有大的影响。由此可见,墙柱构件与房屋结构的刚度和强度是足够的,墙体裂缝,不需要加固补强,只要修补裂缝的处理。 5、处理方法:在外墙上沿裂缝两侧150㎜左右弹线,用切割机沿线将墙体抹灰剔除;在裂缝处墙体上切割约20㎜深的“V”

某小区砖混结构墙体裂缝处理方案-secret

某小区砖混结构墙体裂 缝处理方案-s e c r e t -CAL-FENGHAI-(2020YEAR-YICAI)_JINGBIAN

墙体裂缝处理方案 1、现场概况:商业1#一层东南角墙体(回迁1#西侧)出现裂缝,裂缝多呈现平行状分布,与地面夹角在45°左右,缝隙最宽一条约4㎜左右,其他缝隙在1㎜之内;二层角部局部开裂,缝隙1㎜。室内地面角部有裂缝,阴雨天外墙向内渗水,影响靠墙部位区域的正常使用。 2、成因分析:沿街商业1#楼(三层,荷载较轻)建成5年,地基土已经完成固结沉降。因东侧新建回迁1#(六层,不包含阁楼和贮藏室),地基状况不好,进行了处理,回填三合土,承受回迁1#楼体压力的反力不均匀分布引起建筑物沉降。大气降水入渗与排泄,使地下水位升降变化,地下水流对土体中空洞、空隙及充填物进行浸润、溶蚀、冲蚀、淘空,加剧填土不均匀沉降和基础下沉。回迁1#楼基础下沉,基底土也下沉,且下沉沿竖向方向影响区域往两侧扩散,因回迁1#与商业1#基础相距100㎜,商业1#基底在回迁1#基底土下沉影响区域内,造成商业1#东侧基础下沉,从而产生沉降差,即基础东西沉降不均匀。基础不均匀沉降引起墙体开裂。 3、墙体裂缝分析:商业1#楼东墙混凝土基础为悬挑结构,外挑1米左右,根据裂缝发展情况判断,裂缝在墙体根部距东墙近2米,商业1#楼基础埋深1.9米,顺砖墙裂缝判断,砖墙裂缝在土内继续向西延伸,距东墙在3米左右,非基础挑梁断裂;土内有1米高砖墙基础,砖基础底部为混凝土条形基础。由于砖基础为完全刚性基础,裂缝向下发展,可能产生裂缝,但底部混凝土条形基础因

有钢筋,且有地梁,配筋较大,不会开裂。综上所述,裂缝为砖墙裂缝。 商业1#楼墙体主要裂缝目前为3~4㎜宽,继续开裂加大很轻微,用肉眼观察不到,且回迁楼沉降已经基本完成90%以上,后期沉降量很小,影响到商业1#楼会更小。 沉降示意图 4、处理方案的确定:裂缝在砖墙上,裂缝向土内延伸不在挑梁上;裂缝向土内延伸,对结构影响主要是一层墙体裂缝、渗水;一层梁、圈梁仍然为一个整体,一层以上结构几乎没有变化,一层砖墙裂缝对结构稳定性没有大的影响。由此可见,墙柱构件与房屋结构的刚度和强度是足够的,墙体裂缝,不需要加固补强,只要修补裂缝的处理。

砖混结构住宅楼施工组织设计

精品word文档可以编辑(本页是封面) 【最新资料Word版可自由编辑!!】 施工组织设计,施工组织设计范本,施工组织设计方案 砖混结构住宅楼

目录 (1)工程概况及特点 ①工程概况:工程简述、工程规模、工程承包范围、地质及地形状况、交通情况等。 ②工程特点:设计特点、工程特点、自然环境等。 (2)施工现场组织机构 组织机构关系图 (3)施工现场总平面布置图 ①施工现场平面布置图 平面布置要求内容全面,充分利用现场条件,合理布置施工队、材料站、指挥部等。 平面布置图采用A3纸,图面要求线条清晰、标志明确。 (4)施工方案 ①施工准备 简要叙述施工技术资料、材料、通讯、施工场地的准备,施工机械、施工力量的配置,以及生活设施等的准备情况。主要施工机械设备表。 ②施工工序总体安排 ③重要工序的施工方法。 ④工程成本的控制措施为控制成本,提高效益,拟采取的措施。 (5)工期及施工进度计划 用横道图反映各主要施工过程的计划进度。 ③主要安装设备及材料供应计划 ④要求设计图纸交付计划 (6)质量目标、质量保证体系及技术组织措施

①质量目标 用单位工程和分项工程合格率、优良品率表示,欲达到的工程质量等级。 ②质量管理组织机构及主要职责 用框图表示质量管理组织机构,并简要叙述各质量管理部门的主要职责。 ③质量管理的措施 简要叙述质量管理的措施和关键工序的质量控制。 ④质量管理及检验的标准 执行的主要质量标准、规范。 ⑤质量保证技术措施 针对本工程特点,分析质量薄弱环节,拟将采取的技术措施。 (7)安全目标、安全保证体系及技术组织措施 ①安全管理目标 ②安全管理组织机构及主要职责 用框图表示安全管理组织机构,并简要叙述各安全管理部门及人员的主要职责。 ③安全管理制度及办法 ④安全组织技术措施 针对本工程特点,分析安全薄弱环节,拟将采取的技术措施。 ⑤重要施工方案和特殊施工工序的安全过程控制 (8)环境保护及文明施工 ①施工管理、严格保护环境 分析因施工可能引起的环境保护方面的问题,提出环境保护的目标及采取的具体措施。

砖混结构住宅楼施工组织设计方案方案

第一章编制依据及说明 本工程施工组织设计,主要依据目前国家对建设工程质量、工期、安全生产、文明施工、降低噪声、保护环境等一系列的具体化要求,依照《中华人民共和国建筑法》、《建设工程质量管理条例》、《国家现行建筑工程施工与验收技术规范》、《建筑安装工程质量检验评定标准》、《住宅施工图》以及根据政府建设行政主管部门制定的现行工程等有关配套文件,结合本工程实际,进行了全面而细致的编制。

第二章工程概况 本工程建筑面积为4716.1平方米,为六层砖混结构,标准层高2.90米,建筑物高度19.25米,抗震设防烈度为八度,耐火等级二级。 工程做法: 外墙饰面:一层窗台以上为水泥砂浆粉刷,一层窗台以下为水刷豆石,挑沿及局部为水刷石。 内墙饰面:卫、厨采用200×300瓷片,其它为石灰砂粉刷。 楼地面:厕所、厨房为陶瓷铺地砖。其它楼地面为水泥压光。 顶面:抹水泥石膏砂浆,刷106涂料。 屋面:全部为不上人屋面。 地基处理:地基采用强夯,2.3米以下用3:7灰土夯实0.5米厚 基础形式:基础采用钢筋筏板基础。 砌体材料:±0.00以下,用MU10普通机制粘土砖,M10水泥沙浆砌筑,一至六层用MU10普通机制空心砖,M10混合砂浆砌筑。 结构:受力钢筋主筋保护层厚度:基础为35,梁柱为25,板为15。板:卧室板选用陕96G42板,部分板为砼现浇板,砼强度等级:基础砼垫层为C15,其它砼C20。

第三章施工方案 第一节施工准备 施工前组织有关专业技术人员熟悉图纸,组织技术交底。材料供应部门,提出外加工定货单,并提出工料分析和进行图纸会审,进行设计交底。 ①施工机械 第二节施工测量 本工程设施工测量专业小组,为测量小组配备经纬仪一台,水准仪一台。仪器使用前,应经检测。 第三节主要分项工程的施工方法 1.钢筋砼工程 钢筋砼工程包括:模板工程、钢筋工程、砼工程三大工种,施工生产中必须密切配合,统筹安排,合理组织,确保构件的施工质量。 1)施工工序:

住宅内墙面裂缝原因分析

住宅内墙面裂缝原因分析 江都市建设工程质量监督站2010年2月1日 上海市某住宅小区一住宅内墙面裂缝问题见诸报端。据了解,有300多套住宅内墙面出现不同程度的开裂现象。一时间部分业主反映激烈,情绪对立,并要求开发商以房价的10%差价赔偿,成为一个不稳定的社区。事情发生后,政府及所属街道办事处做了大量协调和稳定方面的工作,开发商感到问题棘手,陷于被动。但也积极配合,召开专家研讨会,请质量检测单位进行检测,多次与业主代表协商处理。到目前为止,已经修缮处理200多户。我们对此事进行了调查分析,有些新闻媒体也进行了报道,在此我们谈些看法。 一、房屋质量检测单位的初步结论 该住宅小区房屋是短肢剪力墙结构,填充墙是蒸压加气混凝土砌块砌筑。房屋质量检测单位的检测报告说“经过现场调查,本此检测房屋的墙体裂缝均出现在起围护、分隔作用的砌体填充墙上,分析结果表明墙体裂缝的产生由多种因素造成的。”检测报告列举了8种现象,并简单地分析了一下原因,现摘录如下。 1、钢筋混凝土和砌体结合面处产生界面裂缝; 2、在墙面开槽敷设管线导致出现的裂缝; 3、沿水平灰缝方向的墙面裂缝; 4、墙面不规则粉刷裂缝(龟裂); 5、受温度影响产生裂缝; 6、施工洞留设处洞口填砌与墙体交接处的裂缝; 7、窗框周围的收缩裂缝; 8、室内装璜过程中,在填充墙内予埋管线和更改填充墙处的门洞位置而产生裂缝; 检测单位根据委托方提供的沉降观测资料分析后认为,沉降虽未完全稳定,但沉降量和沉降差异均处规范允许范围内。结论是:各类墙体裂缝对房屋的主题结构安全不会产生影响。我们认为,检测单位的以上结论并无不妥,只不过是仅对实物质量进行的检测而已。 二、关于蒸压加气混凝土砌块 本工程采用的蒸压加气混凝土砌块又称粉煤灰加气混凝土砌块,它在我国的利用已有40多年历史了。主要材料是由含钙材料(水泥石灰),含硅材料(石英砂、粉煤灰)和发气剂(铝粉、双氧水),经过磨细、配料、浇注、切割和蒸压养护(8-15个大气压下养护6-8个小时)等生产工序而成,绝对容重为500±50KG/M2(粘土砖容重为1600-1800 KG/M2),体积吸水率为35%(粘土砖体积吸水率为8-16%),干燥收缩率为0.80MM/M。它的特性就是容重轻,吸水性强,干燥收缩率大,即所谓“疏松多孔,吸水导湿缓慢”的特性。 为了防止蒸压加气混凝土砌块砌体开裂,《施工验收规范》中“9填充墙砌体工程”中有明文规定,笔者归纳有以下5个要点: 1、蒸压加气混凝土砌块产品龄期应超过28d;