路桥专业毕业设计PPT
路桥专业毕业设计(本科、专业)

本课题以盐河(杨庄—武障河)航道整治工程YH-ZMCZ-TJ标朱码二线船闸土建工程为依托,重点研究了桥梁接线道路工程的施工方案,主要包括路基路面工程和挡土墙工程。
论文包括工程简介、施工准备、施工工艺、施工平面布置;其中施工准备从人、材、机及现场“四通一平”等方面说明开工前必备的生产要素,指出该分部工程总体施工思路。
施工工艺以流程图的形式介绍挡土墙工程、路基工程、水稳碎石工程、沥青路面工程各施工工序的先后顺序及逻辑关系。
其他施工方法、技术要求及质量标准则以工序施工为研究对象,对其施工思路、程序、操作要点及规范要求等进行说明。
施工平面布置则对施工现场生产、生活设施进行合理安排,以满足安全有序施工的需要。
本文以本项目施工设计图及公路工程施工技术规范为依据,通过查阅相关施工手册和规范,结合工程实际,编制该分项工程施工方案,全面去考虑各项施工条件,确定合理的施工顺序、施工方法,制定了较有效的技术措施,为现场施工提供参考。
关键词:挡土墙路基水稳碎石沥青路面This topic is based on the channel regulation project of Yanhe(Yangzhuang–Wuzhang River)and the civil work of YH-ZMCZ-TJ standard Zhuma second-tier ship lock,and mainly studies the construction program on the bridge connection road works, including the subgrade and pavement engineering as well as the retaining wall project.The paper includes project description,construction preparation,construction technology and construction layout.The construction preparation explains the necessary production factors before construction from the aspects of people,materials,machines and site"Sitong Yiping",and points out the general construction ideas of each sub-project.The construction introduces the order and logic relations of various constructions like retaining wall project,subgrade engineering,cement-stabilized macadam project and asphalt pavement engineering in the form of flow chart.Other construction methods,technical requirements and quality standards take the process of construction as the research objectives,and conduct explanation on the construction ideas,procedures,operating points and regulatory requirements.The layout of the construction makes reasonable arrangements on the production of construction site and living facilities so as to meet the needs of the safe and orderly construction.Based on the project construction design and road construction technical specification,through consulting the relevant construction manuals and specifications,and combined with engineering practice,this paper formulates the construction program of the sub-projects,comprehensively considers the various construction conditions,determines the reasonable construction order and construction methods,and develops relatively effective measures to provide a reference for the site construction.Keywords:retaining wall project subgrade engineering cement-stabilized macadam project asphalt pavement engineering目录摘要 (1)Abstract (2)1.绪论 (1)1.1引言 (1)1.2编制依据 (1)1.3工程概况 (1)1.4主要工作 (2)2.施工准备 (3)2.1组织准备 (3)2.1.1项目管理组织及人员分工 (3)2.1.2施工组织管理网络 (3)2.2资源准备 (4)2.2.1通讯 (4)2.2.2水源 (4)2.2.3电力 (4)2.2.4设备、人员、材料的到场 (4)2.2.5施工机械及人员投入(本工程施工机械见附一) (4)2.3技术准备 (4)2.3.1组织施工人员以及相关技术人员进一步熟悉、研究并核对设计文件 (4)2.3.2制定施工组织 (5)3.施工方案 (6)3.1总体思路 (6)3.2施工准备 (6)3.2.1施工测量 (6)3.2.2试验 (6)3.2.3材料 (7)3.3南接线道路附属工程---挡土墙施工 (8)3.3.1工程简介 (8)3.3.2工期分配以及施工部署 (8)3.3.3施工方案及技术措施 (8)3.4路基工程 (13)3.4.1工艺流程图 (14)3.4.2填方路基的压实 (14)3.5水稳碎石基层 (16)3.5.1材料要求 (16)3.5.2水泥稳定碎石的级配 (16)3.5.3运料 (17)3.5.4摊铺 (17)3.5.5碾压 (17)3.5.6混凝土的养生 (17)3.6沥青混凝土面层施工 (17)3.6.1购料 (17)3.6.2工艺流程 (17)3.6.3施工准备 (18)3.6.4沥青混凝土拌和 (18)3.6.5沥青混凝土运输 (19)3.6.6沥青混凝土摊铺 (19)3.6.7碾压 (20)3.6.8沥青路面面层病害及防治 (20)3.7中间检查与验收 (21)3.7.1挡土墙 (21)3.7.2路基施工中的检查与验收 (23)3.7.3路面基层、底基层施工的质量要求与检查验收 (23)4.冬、雨季情况下施工措施 (25)4.1冬季施工防护措施 (25)4.2雨季施工防护措施 (26)5.施工保证措施 (28)5.1施工质量保证措施 (28)5.2施工进度保证措施 (29)5.3施工安全文明保证措施 (31)5.3.1安全施工措施 (31)5.3.2文明施工与环境保护 (31)6.施工安全应急预案 (33)6.1编制依据 (33)6.2工程概况 (33)6.3预案的目的和原则 (33)6.3.1应急救援责任制及组织机构 (33)6.3.2应急救援小组的主要职责 (34)6.4安全生产应急预案 (35)6.5事故报告 (44)6.6相关的保障措施 (44)6.7与相关应急预案的衔接关系 (45)6.8应急预案管理的措施和要求 (45)6.9附则 (45)7.结语 (46)致谢 (47)参考文献 (48)附一 (49)附二 (51)附三 (53)1.绪论1.1引言城市道路是人们生活和物资运输必不可少的重要交通基础设施,同时起到了保护环境,为市政工程设施提供场地、城市规划以及建筑艺术设计、防灾救灾等方面的功能。
路桥专业毕业设计(本科、专业)

本课题以盐河(杨庄—武障河)航道整治工程YH-ZMCZ-TJ标朱码二线船闸土建工程为依托,重点研究了桥梁接线道路工程的施工方案,主要包括路基路面工程和挡土墙工程。
论文包括工程简介、施工准备、施工工艺、施工平面布置;其中施工准备从人、材、机及现场“四通一平”等方面说明开工前必备的生产要素,指出该分部工程总体施工思路。
施工工艺以流程图的形式介绍挡土墙工程、路基工程、水稳碎石工程、沥青路面工程各施工工序的先后顺序及逻辑关系。
其他施工方法、技术要求及质量标准则以工序施工为研究对象,对其施工思路、程序、操作要点及规范要求等进行说明。
施工平面布置则对施工现场生产、生活设施进行合理安排,以满足安全有序施工的需要。
本文以本项目施工设计图及公路工程施工技术规范为依据,通过查阅相关施工手册和规范,结合工程实际,编制该分项工程施工方案,全面去考虑各项施工条件,确定合理的施工顺序、施工方法,制定了较有效的技术措施,为现场施工提供参考。
关键词:挡土墙路基水稳碎石沥青路面This topic is based on the channel regulation project of Yanhe(Yangzhuang–Wuzhang River)and the civil work of YH-ZMCZ-TJ standard Zhuma second-tier ship lock,and mainly studies the construction program on the bridge connection road works, including the subgrade and pavement engineering as well as the retaining wall project.The paper includes project description,construction preparation,construction technology and construction layout.The construction preparation explains the necessary production factors before construction from the aspects of people,materials,machines and site"Sitong Yiping",and points out the general construction ideas of each sub-project.The construction introduces the order and logic relations of various constructions like retaining wall project,subgrade engineering,cement-stabilized macadam project and asphalt pavement engineering in the form of flow chart.Other construction methods,technical requirements and quality standards take the process of construction as the research objectives,and conduct explanation on the construction ideas,procedures,operating points and regulatory requirements.The layout of the construction makes reasonable arrangements on the production of construction site and living facilities so as to meet the needs of the safe and orderly construction.Based on the project construction design and road construction technical specification,through consulting the relevant construction manuals and specifications,and combined with engineering practice,this paper formulates the construction program of the sub-projects,comprehensively considers the various construction conditions,determines the reasonable construction order and construction methods,and develops relatively effective measures to provide a reference for the site construction.Keywords:retaining wall project subgrade engineering cement-stabilized macadam project asphalt pavement engineering目录摘要 (1)Abstract (2)1.绪论 (1)1.1引言 (1)1.2编制依据 (1)1.3工程概况 (1)1.4主要工作 (2)2.施工准备 (3)2.1组织准备 (3)2.1.1项目管理组织及人员分工 (3)2.1.2施工组织管理网络 (3)2.2资源准备 (4)2.2.1通讯 (4)2.2.2水源 (4)2.2.3电力 (4)2.2.4设备、人员、材料的到场 (4)2.2.5施工机械及人员投入(本工程施工机械见附一) (4)2.3技术准备 (4)2.3.1组织施工人员以及相关技术人员进一步熟悉、研究并核对设计文件 (4)2.3.2制定施工组织 (5)3.施工方案 (6)3.1总体思路 (6)3.2施工准备 (6)3.2.1施工测量 (6)3.2.2试验 (6)3.2.3材料 (7)3.3南接线道路附属工程---挡土墙施工 (8)3.3.1工程简介 (8)3.3.2工期分配以及施工部署 (8)3.3.3施工方案及技术措施 (8)3.4路基工程 (13)3.4.1工艺流程图 (14)3.4.2填方路基的压实 (14)3.5水稳碎石基层 (16)3.5.1材料要求 (16)3.5.2水泥稳定碎石的级配 (16)3.5.3运料 (17)3.5.4摊铺 (17)3.5.5碾压 (17)3.5.6混凝土的养生 (17)3.6沥青混凝土面层施工 (17)3.6.1购料 (17)3.6.2工艺流程 (17)3.6.3施工准备 (18)3.6.4沥青混凝土拌和 (18)3.6.5沥青混凝土运输 (19)3.6.6沥青混凝土摊铺 (19)3.6.7碾压 (20)3.6.8沥青路面面层病害及防治 (20)3.7中间检查与验收 (21)3.7.1挡土墙 (21)3.7.2路基施工中的检查与验收 (23)3.7.3路面基层、底基层施工的质量要求与检查验收 (23)4.冬、雨季情况下施工措施 (25)4.1冬季施工防护措施 (25)4.2雨季施工防护措施 (26)5.施工保证措施 (28)5.1施工质量保证措施 (28)5.2施工进度保证措施 (29)5.3施工安全文明保证措施 (31)5.3.1安全施工措施 (31)5.3.2文明施工与环境保护 (31)6.施工安全应急预案 (33)6.1编制依据 (33)6.2工程概况 (33)6.3预案的目的和原则 (33)6.3.1应急救援责任制及组织机构 (33)6.3.2应急救援小组的主要职责 (34)6.4安全生产应急预案 (35)6.5事故报告 (44)6.6相关的保障措施 (44)6.7与相关应急预案的衔接关系 (45)6.8应急预案管理的措施和要求 (45)6.9附则 (45)7.结语 (46)致谢 (47)参考文献 (48)附一 (49)附二 (51)附三 (53)1.绪论1.1引言城市道路是人们生活和物资运输必不可少的重要交通基础设施,同时起到了保护环境,为市政工程设施提供场地、城市规划以及建筑艺术设计、防灾救灾等方面的功能。
道路毕业设计答辩ppt课件

坡长是指两个相邻变坡点之间的水平距离,有最大、最小和组合坡长限制。
2018届交通工程专业毕业设计届交通工程专
2018/6
2、竖曲线设计
满月-鸡鸣三级公路B段线形及交通设施设计
竖曲线包括凸形竖曲线和凹形竖曲线,其半径有一般值和极限值,凹曲 线极限值主要是从离心力、夜间行驶前照灯照射,跨线桥下的视距来考 虑;凸曲线限制失重过大和保证纵面行车视距来考虑。
由图和表中数据可知,线 路一交点最小半径比线
路二小,特别是在交点 3处,整体曲线线形没 有线路二好,交点2、 交点3、交点4每相邻交 点之间距离都比线路二
短,因此从几何线形来
说,线路二线形更好。
但线路二整体填挖方比
线路一多,离田地远一 点。
2018届交通工程专业毕业设计届交通工程专
2018/6
三、纵断面设计
满月-鸡鸣三级公路B段线形及交通设施设计
二、主线平面设计
1、地形地势及自然环境分析 2、平面线形初定 3、平面线形对比分析
2018届交通工程专业毕业设计届交通工程专
2018/6
满月-鸡鸣三级公路B段线形及交通设施设计
1、地形地势及自然环境分析
本次选线地形图由老师给定,从地形图可以看出,该段地势相对平缓,为山区丘陵, 等高线最大值与最小值相差70m, 梯田和鱼塘分布较多,松柏树林也较多,农田附近 有水坝、水库等,居民村舍也星罗棋布。此地年降雨量较多,居民以农、林、鱼为 主导,经济相对单一。
满月-鸡鸣三级公路B段 线形及交通设施设计
2018届交通工程专业毕业设计届交通工程专业毕业设计届交通工程专业毕业设计
指设导设指计老计导人师人老:::师李公李:名维名公席维席勇勇
2018/6
桥梁工程毕业答辩ppt课件

横向分布系数的计算
活载布置
内力包络图输出
内力组合值输出
内力组合值输出
钢束估算及其配置
钢束的布置
跨中截面钢束布置
ቤተ መጻሕፍቲ ባይዱ
预制梁端部、梁端钢束锚固
钢束线型
钢束几何信息输入
钢束线型
全桥强度验算
1 承载才干极限形状验算 2 施工阶段应力验算 3 运用阶段应力验算 4 主梁变形验算
行车道板计算
设计标题
预应力混凝土简支T形梁桥设 计〔上部构造〕
一. 设计主要思绪
计算过程
1 尺寸拟定 2 构造内力计算 3 预应力束估算及其配置 4 构造验算
开场 拟定尺寸 内力计算
截面配筋验算
否
能否经过 是
计算终了
主梁纵截面
横截面布置图
截面效率目的ρ检验
截面效率目的:根据设 计阅历,预应力混凝土T 型梁在设计时,检验截 面效率目的取=0.45~ 0.55,且较大者亦较经 济。
汇报终了
赞赏各位教师!
Dr.Bridge V3.0 建模
建模步骤: 〔1〕平面单元划分 〔2〕各单元的建立 〔3〕钢束的输入
〔1〕构造单元划分
〔2〕单元建模
全桥模型
施工阶段模拟
1. 第一施工阶段〔桥梁自重、横隔梁〕
施工阶段模拟
第二施工阶段,包括桥面铺装、人行道、栏杆
运用阶段模拟
a. 横向分布系数的计算 b. 活载的输入
a. 悬臂板〔边梁〕 b. 简支板〔中梁〕
悬臂板
悬臂板计算图示
简支板永久作用
简支板可变作用图示
设计总结
经过本次设计,第一、我加深了对大学中所 学专业的了解,并为可以用所学的知识处理问题 感到高兴。第二、学会了一种设计计算软件,由 于这些计算软件都是相通的,这为我以后不论任 务和学习都有很大协助。