房地产项目设计合同中英文
唐河凯璟国际项目认筹方案(草案) 页脚内容10 房地产项目设计合同 中英文
CONTRACT FOR DESIGN OF MASTERPLANNING 合同编号:Contract No. 甲方(业主)Party A:(Employer) 乙方(设计机构)Party B:(Design company) 丙方(招标机构)Party C:(Tendering company) This CONTRACT (hereinafter, together with all Appendices attached hereto and forming an integral part hereof, called “Contract”) is made between Franshion Properties Co. Ltd. (hereinafter called “Party A”), Integrated Design Associates Limited (hereinafter called “Party B”) and Shanghai International Tendering Co., Ltd. (hereinafter called “Party C”),
本合同(与以下构成本合同不可分割部分的所有附件,统称为合同)于2010年9月 日由置业有限公司(以下简称“甲方”), 综汇建筑设计有限公司(以下称“乙方”)和上海国际招标有限公司(以下称“丙方”)共同签订。
Whereas Party A invited Party B to participate the Design Project of Masterplanning for Project and agreed to pay certain amount of project fee to Party B; Party B agreed to participate the project according to the time schedule and fee proposal of Party A; Party C agreed to act as the agent of Party A to undertake the overseas’ payment under this Contract, all parties agreed to reach an agreement under the terms and conditions as follows: 唐河凯璟国际项目认筹方案(草案) 页脚内容10 鉴于甲方邀请乙方参加本项目总体规划设计,并向乙方支付相应的费用;乙方同意按照甲方的要求的进度和费用参加设计;丙方同意代理甲方完成本合同项下设计费的外汇支付工作,三方达成一致如下:
1.Scope of Works工作范围 Party B shall complete the design work defined in the Scope of Works as Appendix 1 to the Contract.
乙方应根据合同附件一工作范围的规定完成设计工作。
2.Working Schedules工作进度 Party B shall submit the design documents before Sep. 2010. 乙方应在2010年9月 日前递交设计成果文件。
3.Project Fee设计费 Party A shall pay USD50,000.00 to Party B as the completion fee after Party B submitted the design documents.
乙方递交设计成果文件后,甲方向乙方支付设计费伍万美元整。
4.Terms of Payment付款方式 (1) Party A shall payment the project fee within 14 days after Party B had submitted the design documents. Party C will deal with the taxes and overseas payment procedure as follows:
甲方应在乙方递交设计成果文件后14天内向乙方支付设计费。丙方负责处理税务和外汇付款事项,具体程序如下:
After receipt and reviewing of the design documents, Party A shall inform Party B to issue the invoice of project fee. The invoice shall be copied to Party C. 唐河凯璟国际项目认筹方案(草案) 页脚内容10 甲方收到设计成果文件审核无误后,通知乙方开具发票。乙方的发票应拷贝给丙方。乙方应向甲方提供发票,并且拷贝给丙方;
Within one working days after receipt the copy of invoice from Party B, Party C shall issue an payment application document to Party A,the rate is decided by the selling price (USD/RMB) on the day Party C issue the payment application document.
丙方在收到乙方的发票拷贝件后1个工作日内向甲方开具收款收据,汇率按照丙方开具收款收据当日美元兑人民币的卖出价计算;
Party A shall transfer the relevant amount in RMB to Party C within 3 working days after receipt Party C’s application document.
甲方应在收到乙方开具的收据后3个工作内向丙方支付相应的人民币款项,;
Party C shall pay taxes on behalf of Party B within 3 working days upon receipt payment from Party A.
丙方在收到甲方支付的款项后3个工作日内代乙方向税务局缴纳相关的税费。
Party C shall make payment to Party B within 3 working days upon receipt of tax prepaid certificates from the tax authority.
丙方在收到税务局开具的完税凭证后3个工作日内向乙方支付相应的外汇。
(2) Party B authorizes Party C to deal with the local tax issues on behalf of him. Party B shall pay to Party C a service fee of 1.7% of the project fee. The estimated taxes are around 5.8% of the project fee. Therefore a total amount of 7.5% of the project fee plus bank charges will be deducted accordingly. 唐河凯璟国际项目认筹方案(草案) 页脚内容10 乙方委托丙方代其办理在中国境内完税的手续。为此丙方向乙方收取外汇支付总额的1.7%作为代办服务费,另外乙方需要缴纳的税金约为外汇支付总额的5.8%。由此,在丙方向乙方支付外汇时,将扣除7.5%以及银行手续费。
(3) The receiving bank is:乙方指定的收款帐户: 5. Law Governing Contract 本合同的适用法律 This Contract, its meaning and interpretation, and the right and obligation between the Parties shall be governed by relevant laws of the People’s Republic of China.
本合同适用中国人民共和国的相关法律,各方之间的权利和义务受中华人民共和国相关法律的管辖和保护。
6. Language语言 This Contract has been written in Chinese and English Language. If there is any discrepancy between the Chinese version and the English version, Chinese version shall prevail.
本合同以中英文书就。如果中英文版出现矛盾,以中文版为准。
7. Copyright 版权 The copyright of the design documents belongs to Party A and Party B after Party A paid the project fee. Party A has the right to use, duplicate and modify the design documents directly or by its hired or designated third party. Party B and its Personnel shall apply for a written approval from Party A prior to quoting, using or publishing such deliverables, except that such quoting, using or publishing is for non-profit purposes.
甲方支付设计费后,设计成果的版权归甲乙双方共有。甲方有权直接或通过其雇佣或指定的第三方使用、复制、修改上述文件。乙方及其人员若要引用、使用或发表服务的成果需事先经甲方书面同意,但乙方有权将其运用在非赢利性的市场宣传及学术讨论之用途而无需征得甲方的同意。
房地产开发合同,英文
房地产开发合同,英文篇一:某海外房地产项目收购协议(中英文对照)1 开发协议1This development agreement (“Agreement”) is made at [ ] this [ ] day of [ ] Two Thousand and FourteenBY AND BETWEEN本开发协议(“本协议”)由以下双方于2014年___月___日订立。
_______, a company incorporated and registered under theprovisions of the ______ having its registered office at______________ hereinafter referred to as “the Owner” (which expression shall unless it be repugnant to the context or meaning thereof be deemed to mean and include its successors and permitted assigns) of the FIRST PART; ______,一家根据_____规定注册成立的公司,其注册办事处位于______(以下简称甲方的“业主”)(除非与本文件中的上下文或含义矛盾,否则此表述应被视为及包括其继承者及经批准的受让人);AND及_____________, a company incorporated and registered under the provisions of the _____ having its registered office at XXXXherei nafter referred to as “the Developer” (which expression shall unless it be repugnant to the context or meaning thereof be deemed to mean and includes its successors) of the SECOND PART;______,一家根据_____规定注册成立的公司,其注册办事处位于XXX市XX区XXX(以下简称乙方的“开发商”)(除非与本文件中的上下文或含义矛盾,否则此表述应被视为及包括其继承者);The Owner and the Developer are hereinafter collectively referred to as the “Parties” and individually as a “Party”.业主及开发商以下统称为“订约方”,及分别被称为“一方”。
工程设计委托合同 (中英文)
工程设计委托合同(中英文)CONTRACT FOR CONSTRUCTION DESIGN客户方:设计方:双方本着公平、自愿和诚信的原则,经友好协商达成如下条款(包括基本条款以及其他条款两个部分): Under the principles of fairness, free will and good will, IT IS HEREBY AGREED between both parties as follows (the Contract includes two parts, i.e. the General Articles and the Contingent Articles):-1.客户方委托设计方提供的建筑设计服务均以本合同各项条款、附录、附表以及双方为履行本合同相关内容所签订的补充协议等所约定的内容为准,设计方应按照双方的约定和客户方的要求完成― A‖工程设计的各项工作。
本合同的附录、附表、其他条款以及补充协议等附件是本合同不可分割的部分,具有与本协定书同等的法律效力。
The architectural design services that the Client appoints the Designer to provide shall be in compliance with the provisions, appendixes and exhibits of the Contract, as well as with the provisions in the supplementary agreements in conjunction with the execution of the Contract that have entered or may be entered between the parties. The Designer shall carry out the design tasks for ―A‖ Project according to the agreement between both parties as well as the requirements of the Client. Appendixes, exhibits, other articles and supplementary agreements of the Contract are integral part of the Contract, and shall have the same legal binding force with the Contract.2.客户方委托设计方为― A‖工程提供的详细设计服务项目全部列于本合同附表2——《设计服务项目清单》中,同时设计方承诺按照该附表中客户方的要求提供列明的全部服务项目。
2019年建设工程设计合同(中英文)-secret
建设工程设计合同Construction Project Design Contract项目名称:Project Name:项目建设地点:Project Location:合同编号:Contract No.:设计证书等级:Grade of Design License:委托方:Client:承接方:Design Firm:签订日期:Signed on:委托方(甲方):Client (Party A):承接方(乙方):Design Firm (Party B):甲方委托乙方承担XX项目(一期)工程设计,经双方协商一致,签订本合同. Party A entrusts Party B to undertake the design for . This Contract is made by the two parties after their mutual agreement.第一条本合同依据下列文件签订Article1. This Contract is made on the basis of the following documents:1.1《中华人民共和国合同法》、《中华人民共和国建筑法》和《建设工程勘察设计市场管理规定》.1.1 The Contract Law of the People’s Republic of Chin, The building regulations of the People’s Republic of China and The developmental Law of the People’s Republic of China.1.2国家及地方有关建设工程勘察设计管理法规和规章.1.2 Relevant Building & Design Codes and Regulations of the State and of the Shanghai Municipality.1.3建设工程的相关批准文件.1.3 The approval documents that are required for this construction project.第二条本合同工程设计项目的名称、地点、规模、投资、内容及标准Article2. The name, location, size, investment sum, function, design contents and standards:2.1工程项目的名称:XX项目(一期)2.1 Project name:2.2工程项目的地点:2.2 Project location:2.3工程项目的规模:总建筑面积约平方米(其中地下面积约平方米),高度米.2.3 Project size: The total floor area is approximately ㎡(of which the floor area of the underground area is ㎡), the total height is m.2.4工程特征及附注说明:商业办公综合楼2.4 Project features & remarks: A commercial cum office building complex2.5工程项目的投资总额:控制在 亿元人民币以下2.5 Project investment in total: Controlled Within million yuan RMB2.6工程项目的设计内容及标准:红线内的建筑、结构、机电、总体设计(包括3000㎡人防设计,不包括精装修设计、园艺设计和艺术泛光照明等专业设计),施工图设计约为70000㎡(不包括五层到七层的SOHO 区域).2.6 Design requirements and scope of work: The scope of work shall include master planning and building design that are located within the boundary line. For building design it shall comprise of the architectural, structural & M/E work. (including 3,000㎡of Air-raid shelter design, but excluding other specialists’ design, such as the Luxurious Interior Design, Landscaping Design and Facade Flood Lighting Design). The total floor area during the working drawing stage is 70,000㎡(excluding the SOHO Area, which is starting from the fifth floor level to the seventh floor level).第三条 甲方向乙方提交的有关资料及文件(见下表)Article3. Relevant documents which shall be issued by Party A to Party B:第四条乙方向甲方交付的设计文件(见下表)Article4. Design documents which shall be submitted by Party B to Party A (listed as follows):注:设计文件深度按照《建筑工程设计文件编制深度规定》(建设部2003年4月版)执行. Notes: The design documents shall be prepared in compliance with the Regulations on detailrequirements of design documents for construction project (issued by Ministry of construction dated in April, 2003).第五条设计费用及支付方法Article 5. Design fee and the mode of payment:5.1甲方应支付本合同项目的设计费为.(含所有乙方应缴纳的税费及其它政府规定应由乙方交纳的款项)5.1 Party A shall pay the design fee of RMB yuan for this project to Party B (this fee shall include taxes and all other duties that should be paid by Party B as required by the government regulations).5.2支付方法(见下表):5.2 The payment method is (listed as the following):第六条双方责任Article6. Responsibilities of both parties:6.1甲方责任6.1 Responsibilities of Party A:6.1.1甲方按本合同第三条规定的内容,在规定的时间内向乙方提交资料及文件,并对其完整性、正确性及时限负责.甲方提交上述资料及文件超过规定期限15天以内,乙方按本合同第四条规定交付设计文件时间顺延;超过规定期限15天以上时,乙方有权重新确定提交设计文件的时间.6.1.1 According to the contents stated in Article 3 of this Contract, Party A shall submit materials and documents to Party B within the stipulated time as described and shall be responsible for the completeness, correctness and validity of such materials and documents. In the event that Party A has delayed the issuance of such materials and documents, but not exceeding 15 days from the stipulated time, Party B could consequently postpone the submittal of the design documents as stipulated in Article 4 of this Contract. In case that Party A has delayed the issuance of materials and documents for more than 15 days exceeding the stipulated time limit, Party B shall have the right to determine the new date for submitting the design documents.6.1.2甲方变更委托设计项目、规模、条件,或对提交资料作重大修改,以致造成乙方设计需返工时,双方除需另行协商签订补充合同、重新明确有关条款外,甲方应按乙方所耗工作量向乙方支付返工费.6.1.2 If Party A alters greatly the design project, scale, conditions which they have already entrusted to Party B, or the materials provided by Party A is wrong/incompleteor Party A makes major alterations to the approved design and the information given, as a result of which, has caused Party B to redo the design work, or has generated un-necessary abortive works, both parties shall enter into negotiation and to draw up a supplementary contract. Party A shall compensate Party B for the additional work load in accordance to the new agreement.6.1.3在合同履行期间,甲方单方提出解除合同的,乙方已开始设计工作的,甲方应根据乙方已进行的实际工作量支付设计费.6.1.3 Should Party A terminate the Contract during the contractual period, Party A shall pay Party B according to the actual work done.6.1.4甲方在收到乙方付款通知书后30天内,按本合同第五条规定的金额和时间向乙方支付设计费用;在收到付款通知书的60天仍未支付,每逾期支付一天,应承担应支付金额千分之一的逾期违约金.逾期超过30天以上时,乙方有权暂停履行下阶段工作,并书面通知甲方.甲方上级对设计文件部审批或本合同项目停缓建,甲方均应支付应付的设计费.6.1.4 Party A shall pay the design fee to Party B within Thirty (30) days upon receiving the Notice of Payment from Party A according to the amount and the time stipulated in Article 5. In case that such payment is delayed for Sixty (60) days upon receiving the Notice of Payment, then a penalty of 0.1% of the due amount of payment on a daily basis shall be paid by Party A. In case that such payment is delayed for a period over 30 days, Party B shall have the right to suspend their design work for the next phase and shall inform Party A in writing. In case that the management of Party A does not approve the design documents or the construction of the project of this Contract is stopped or.. postponed, Party A shall nevertheless pay the due design fee.6.1.5甲方要求乙方比合同规定时间提前提交设计文件时,甲方应支付赶工费. 6.1.5 If Party A requests Party B to submit the design documents ahead of the stipulated time as mentioned in the Contract, Party A shall make additional payment for fast and immediate service.6.1.6为一方派往现场的工作人员提供工作方便条件.6.1.6 Party A shall provide site office and all relevant office stationary for Party B’s personnel who are being sent to work site during the construction stage.6.1.7甲方应保护乙方的设计版权,未经乙方同意,甲方对乙方交付的设计文件不得复制或向第三方转让或用于本合同外的项目,如发生以上情况,乙方有权索赔.6.1.7 Party A shall protect the design copyright of Party B. Without Party B’s consent, Party A shall not duplicate of transfer to a third party or use the design documents for other projects. If the above-mentioned is happened, Party B shall have the right to claim.6.2乙方责任:6.2 Responsibilities of Party B:6.2.1乙方按本合同第四条规定的内容、时间及份数向甲方交付设计文件.6.2.1 Party B shall submit to Party A the required design documents in right content, time and copies according to the clause of Article 4.6.2.2乙方对设计文件出现的遗漏或错误应在施工前负责修改或补充.由于乙方设计错误造成工程质量事故损失,乙方除负责采取补救措施外,应免收损失部分的设计费,并根据损失程度向甲方偿付赔偿金,赔偿金额根据乙方与保险公司签订的设计责任保险合同计算.6.2.2 Party B shall be responsible for correcting any omission or mistake in their design documents before the construction. If the design mistake made by Party B has caused losses to Party A, Party B shall not only be responsible for taking the remedial measures, but also shall remit the design fee for the part of such losses and shall pay compensation to Party A according to the degree of such loss. The amount of the compensation shall be determined by party B and his insurance company and to be in accordance to the professional indemnity insurance coverage.6.2.3由于乙方自身原因,延误了按本合同第四条规定的设计文件交付时间,每延误一天,应减收该项目应收设计费的千分之一.6.2.3 If it is Party B’s own fault to have delayed the submission of the design documents according to the stipulated time as described in Article 4, Party B shalldeduct 0.1% of the due amount of the design fee on a daily basis for the delay period.6.2.4合同生效后,乙方单方提出解除合同的,乙方应当按照有关规定赔偿甲方损失.6.2.4 After the Contract comes into forces, if Party B proposes to terminate the Contract, Party B shall compensate Party A’s losses according to the releva nt regulations.6.2.5乙方交付设计文件后,应参加甲方及相关职能部门的设计审查会议及根据审查结论负责不超出原定计划任务书范围内的必要调整补充;负责向甲方及施工各单位进行设计交底,处理有关的设计问题和参加竣工验收.乙方应派相关人员参加施工期间的例会.乙方应优化设计以帮助业主将造价控制在预算内.6.2.5 After the design documents has been submitted, Party B shall also attend the approval meetings held by Party A and the relevant competent authorities and shall be responsible for making the necessary adjustments, revisions and supplements which does not exceed the scope of the documents of design requirements as originally defined based on the comments of such meetings. Party B shall be responsible for explaining design details to Party A and the main contractor; and shall be responsible for solving all the relevant design problems and to attend the handing over meeting. Party B shall send the relevant personnel to participate in the regular site meetings suring the construction. Party B should optimize the design to assist Party A in meeting the project budget.6.2.6乙方不得向第三方扩散、泄露、转让甲方提交的产品图纸、技术经济资料.如发生以上情况,甲方有权向乙方索赔.6.2.6 Party B is not allowed to disclose and transfer to a third party any product drawing, technical and economic data etc. which are provided by Party A. In case that the above-mentioned is happened, Party A shall have the right to claim.6.2.7未经甲方同意乙方不得将本项目的设计工作全部或部分转包给第三者.6.2.7 Party B is not allowed to subcontract the design work completely or partially to any third party without the permission of Party A.第七条其他约定Article7. Other provisions7.1甲方要求乙方派专人长期驻施工现场进行配合与解决有关问题时,双方应另行签订技术咨询服务合同.7.1 When Party A requires Party B to send site personnel to the construction site for a long period, the two parties shall negotiate for these additional work and sign a supplementary service Contract.7.2乙方为本合同项目所采用的国家或地方标准图,由甲方自费向有关出版部门购买.7.2 Party A shall pay for all the relevant publications and standard collections of drawings issued by the state and local government which are needed by Party B for the purpose of designing the project.7.3本合同第四条规定乙方交付的设计文件份数超过本合同第四条规定的份数,乙方另收工本费.7.3 If Party B is requested to submit design documents, of which, the number of copies are more than those stipulated in Article 4 of this Contract, Party A shall pay for those additional copies.7.4本工程项目中,建筑材料、设备的加工订货,甲方需要乙方设计人员配合时,所需费用由甲方承担.7.4 If Party A requires Party B to provide personnel to assist them for procurement purposes, such as the procurement of building material, equipments, etc.; the expenses needed shall be borne by Party A.7.5甲方委托乙方承担本合同内容之外的工作服务,另行支付费用.7.5 If Party A entrusts Party B to undertake those work and services which are beyond this Contract, Party A shall pay additional fee.7.6由于不可抗拒因素致使合同无法履行时,双方应及时协商解决.7.6 When this Contract can not be executed because of the unforeseeable natural forces, the two parities shall timely negotiate to solve the problem.7.7本建设工程设计合同在履行过程中发生纠纷,双方应及时协商解决.协商不成时,双方同意由上海市仲裁委员会仲裁.7.7 Both parties shall timely discuss each other for the settlement of any dispute arising during the execution of this Contract. In case that such discussion fails, bothparties have agreed appealing to Shanghai Municipal Arbitration Commission can be accepted.7.8甲方聘请为甲方的顾问,协助甲方进行设计管理和建筑设计咨询.费用由甲方另行支付.7.8 Party A has engaged to act as Party A’s consultants to assist Party A to provide the management and design consultation services. The fee will be paid by Party A directly and separately.7.9本合同未尽事宜,双方可签订补充协议,补充协议与本合同具有同等效力.7.9 Supplementary agreement could be made between the two parties in case that any additional clause shall be added. The supplementary agreement shall have the same effect and power as this Contract.7.10本合同一式八份,甲执四份,乙执三份,政府部门一份.7.10 This Contract shall be made in 8 copies. Party A shall hold 4 copies. Party B shall hold 3 copies. The government authority department shall hold one copy.7.11本合同以中英对照书写,如有矛盾,应以中文文本为准.7.11 This Contract is prepared in both Chinese and English languages, in the event of conflicts in any of the provisions between the two versions; provisions specified in the Chinese language version shall take precedence.7.12本合同双方签章后,在30日内报项目所在地建设行政主管部门备案.双方认为必要时,到项目所在地工商行政管理部门签证.上方履行完合同规定的义务后,本合同即行终止.7.12 This Contract, within 30 days after it has been signed and stamped by both parties, shall be submitted to the local government authority for endorsement. When it is considered necessary, both parties could send this Contract to the local industrial and commercial administration departments for registration. This Contract is to be terminated and expired itself after both parties have performed their duties as stipulated in this Contract.7.13本合同经甲、乙双方盖章签字后自年月日生效.(以下无正文)7.13 This Contract shall come into force beginning from the date when both partieshave stamped it and signed it on month year .委托方单位名称: 承接方单位名称:(盖章) (盖章)Party A: Party B:(Stamp) (Stamp)单位地址: 单位地址:Address: Address:邮政编码: 邮政编码:Post Code: Post Code:电 话:电 话:Tel: Tel:电 传: 电 传:Fax: Fax:开户银行: 开户银行:Name of bank: Name of bank:银行账号: 银行账号:Bank account: Bank account:签订合同代表(签字): 签订合同代表(签字): Contract Signing Representative: Contract Signing Representative:本合同于 年 月 日签于上海.This Contract is signed in Shanghai on (date) (month) (year) . 法定代表人: 法定代表人:Legal Representative: Legal Representative:市勘察设计市场管理部门意见: 市勘察设计市场管理部门意见: (盖章) (盖章)备案日期: 签证日期:年 月 日 年 月 日。
建筑合同(中英版)4篇
建筑合同(中英版)4篇全文共4篇示例,供读者参考篇1Architecture Contract(建筑合同)1. Definition(定义)An architecture contract is a legal agreement between a client and an architect in which the terms and conditions of a construction project are outlined. This contract ensures that both parties understand their roles and responsibilities, as well as the scope of work, budget, and timeline of the project.建筑合同是客户与建筑师之间的法律协议,其中概述了建筑项目的条款和条件。
该合同确保双方了解自己的角色和责任,以及项目的工作范围、预算和时间表。
2. Purpose(目的)The purpose of an architecture contract is to protect the interests of both the client and the architect. By clearly defining the terms and conditions of the project, both parties can avoid misunderstandings and disputes that may arise during the construction process. Additionally, the contract helps toestablish a clear framework for communication anddecision-making throughout the project.建筑合同的目的是保护客户和建筑师双方的利益。
英文地产合同范本
英文地产合同范本在签署任何房地产合同之前,务必仔细阅读合同条款,并寻求专业法律建议,以确保你充分理解合同的内容和法律后果。
房地产合同一、定义本合同中,除非上下文另有要求:1. “公寓”是指位于[公寓详细地址]的公寓单位及其附属物业,包括但不限于花园、停车位等。
2. “卖方”是指拥有公寓产权的个人或公司。
3. “买方”是指购买公寓的个人或公司。
4. “物业”是指公寓及其附属物业。
二、买卖双方的权利和义务1. 卖方应确保其有权出售物业,并向买方提供相关的产权证明文件。
2. 买方应按照合同约定的时间和方式支付购房款项。
3. 双方应共同配合完成物业的过户手续。
三、物业的交付和验收1. 卖方应在合同约定的时间内将物业交付给买方。
2. 买方应在收到物业后及时进行验收,如有问题应及时通知卖方。
3. 双方应在物业交接时签署相关的交接文件。
四、合同的变更和解除1. 本合同生效后,如需要变更或解除合同,应经双方协商一致,并签订书面协议。
2. 如因不可抗力等不可预见、不可避免的原因导致合同无法履行,双方可协商解除合同。
五、违约责任1. 如一方违反本合同约定,给对方造成损失的,应承担相应的违约责任。
2. 违约责任的承担方式包括但不限于支付违约金、赔偿损失等。
六、争议解决本合同在履行过程中如发生争议,双方应协商解决;协商不成的,任何一方均可向有管辖权的人民法院提起诉讼。
七、其他条款1. 本合同自双方签字(或盖章)之日起生效。
2. 本合同一式两份,双方各执一份,具有同等法律效力。
3. 本合同未尽事宜,可由双方另行协商补充。
签署日期:[签署日期]签署地点:[签署地点]卖方(签字):________________买方(签字):________________。
工程项目合同中英文
工程项目合同中英文---项目名称: [roject Name]合同编号: [Contract Numer]甲方(业主): [arty A (Owner)]乙方(承包商): [arty (Contractor)]签订日期: [Date of Signing]签订地点: [lace of Signing]一、项目概述本项目旨在[简述项目目的和范围],包括但不限于[具体建设内容]。
甲乙双方根据平等互利的原则,经友好协商,达成以下合同条款:二、合同价款合同总价为[合同金额],分为[预付款、进度款、结算款等]支付。
具体支付方式如下:1. 预付款:[百分比]%,于[支付条件]后支付。
2. 进度款:按照[进度支付标准]分阶段支付。
3. 结算款:项目竣工验收合格后,支付剩余[百分比]%。
三、工期要求工程计划开工日期为[开工日期],竣工日期为[竣工日期]。
乙方应保证工程质量,按期完成建设任务。
如遇不可抗力因素影响工期,应及时通知甲方并协商解决。
四、质量保证乙方必须按照国际质量标准和相关行业规范执行工程建设,确保工程质量达到[具体标准]。
对于出现的任何质量问题,乙方应负责无偿修复直至满足质量要求。
五、变更与索赔工程变更需双方协商一致,并签订书面变更协议。
对于乙方因变更增加的成本或延误的工期,有权向甲方提出索赔。
甲方应在收到索赔通知后的[天数]内给予答复。
六、争议解决合同执行过程中发生的任何争议,双方应首先通过友好协商解决;协商不成时,可提交至[指定的仲裁机构]进行仲裁,仲裁裁决为终局性,对双方均有约束力。
七、其他条款1. 保密条款:双方应对合同内容及合作过程中获取的信息保密。
2. 违约责任:违反合同约定的一方应承担违约责任,并赔偿对方因此遭受的损失。
3. 附加条款:[如有额外约定,可在此列出]。
八、合同生效本合同自双方授权代表签字盖章之日起生效,一式两份,甲乙双方各执一份。
---roject Name: [roject Name]Contract Numer: [Contract Numer]arty A (Owner): [arty A (Owner)]arty (Contractor): [arty (Contractor)]Date of Signing: [Date of Signing]lace of Signing: [lace of Signing]I. roject OverviewThe urose of this roject is to [riefly descrie the roject ojective and scoe], including ut not limited to [secific construction content]. arty A and arty , ased on the rincile of equality and mutual enefit, have reached the following contract terms through friendly negotiation:II. Contract riceThe total contract rice is [contract amount], divided into [advance ayment, rogress ayment, final ayment, etc.] for ayment. The secific ayment methods are as follows:1. Advance ayment: [ercentage]%, to e aid after [ayment conditions].2. rogress ayment: aid in stages according to [rogress ayment standards].3. Final ayment: After the roject comletion and accetance, ay the remaining [ercentage]%. III. Construction eriodThe lanned start date of the roject is [start date], and the comletion date is [comletion date]. arty shall ensure the quality of the work and comlete the construction task on schedule. Incase of force majeure affecting the construction eriod, arty should inform arty A in a timely manner and resolve it through negotiation.IV. Quality Assurancearty must carry out the construction according to international quality standards and relevant industry norms, ensuring that the quality of the roject meets [secific standards]. For any quality issues that arise, arty shall e resonsile for reairing at no cost until the quality requirements are met.V. Changes and ClaimsAny changes to the roject require mutual agreement y oth arties and a written change agreement. arty has the right to claim for additional costs or delayed construction eriod due to changes. arty A should resond within [numer of days] after receiving the claim notice.VI. Disute ResolutionAny disutes arising during the execution of the contract should e resolved through friendly negotiation y oth arties; if negotiation fails, it can e sumitted to [designated aritration institution] for aritration. The aritration award is final and inding on oth arties.VII. Additional Terms1. Confidentiality Clause: oth arties shall kee the contents of the contract and information otained during cooeration confidential.2. Liaility for reach: The arty who violates the contract shall ear the resonsiility for reach and comensate the other arty for losses suffered as a result.3. Additional Clauses: [If there are additional agreements, they can e listed here].VIII. Effectiveness of the ContractThis contract shall ecome effective uon the date of signing and sealing y the authorized reresentatives of oth arties, in dulicate, with each arty holding one coy.---。
项目工程合同英文
项目工程合同英文工程项目合同是确保项目顺利进行的法律文件,它详细规定了工程的范围、标准、时间表、成本以及双方的权利和义务。
以下是一个基本的工程项目合同英文范本:ROJECT NAME: [roject Name]CONTRACT NUMER: [Contract Numer]EFFECTIVE DATE: [Date]EXIRATION DATE: [Date]ARTIES INVOLVED:Client: [Client's Full Name and Address]Contractor: [Contractor's Full Name and Address]1. SCOE OF WORKThe Contractor agrees to rovide the following services and deliverales as er the secifications outlined in the roject lan attached hereto and made a art of this contract.2. TIMELINEThe roject commencement date is [Start Date] and comletion date is [End Date]. The Contractor shall adhere to the timeline unless otherwise agreed in writing y oth arties.3. COST AND AYMENTThe total roject cost is [Total Cost]. ayment terms are as follows: [Detailed ayment Schedule and Conditions].4. CHANGES AND AMENDMENTSAny modifications to the original scoe, timeline, or cost must e made in writing and agreed uon y oth arties.5. QUALITY ASSURANCEThe Contractor shall ensure all work meets industry standards and client secifications. Quality checks will e erformed at various stages of the roject.6. RIGHTS AND OLIGATIONSoth arties have secific rights and oligations as detailed in this contract. It is essential that these are strictly adhered to for the smooth execution of the roject.7. DISUTE RESOLUTIONIn case of any disutes, the arties shall first attemt to resolve them through negotiation. If unsuccessful, [Disute Resolution Method] shall aly.8. GOVERNING LAWThis contract shall e governed y and construed in accordance with the laws of [Jurisdiction Name].9. TERMINATIONConditions under which this contract may e terminated earlier than the stated exiration date are outlined in Section [Section Numer].10. GENERAL ROVISIONSOther imortant rovisions that aly to the contract include [List of rovisions].IN WITNESS WHEREOF, the arties have executed this contract as of the Effective Date. CLIENT:[Client's Authorized Signatory][Title][Date]CONTRACTOR:[Contractor's Authorized Signatory][Title][Date]此范本涵盖了项目工作范围、时间线、成本与支付方式、变更与修正条款、质量保证、权利与义务、争议解决、适用法律、合同终止以及其他一般性条款。
英文建筑合同范本8篇
英文建筑合同范本8篇篇1This Building Contract is made and entered into on [Date] between [Builder], of [Builder's Address], and [Client], of [Client's Address].1. Definitions and InterpretationIn this Contract, the following words and expressions shall have the meanings assigned to them below:* “Builder” means [Builder's Name], the party engaged to carry out the Building Work;* “Client” means [Client's Name], the party commissionin g the Builder to carry out the Building Work;* “Building Work” means the building work described in Clause 2;* “Contract Price” means the price for the Building Work as set out in Clause 3;* “Commencement Date” means the date on which the Builder commences the Building Work, as notified to the Client in writing;* “Completion Date” means the date on which the Builder completes the Building Work, as notified to the Client in writing;* “Defects Liability Period” means the period of 12 months from the Completion Date, during which the Builder shall remedy any defects in the Building Work;* “Written Agreement” means any written agreement between the parties hereto, whether or not this Contract is varied or brought to an end;* “Force Majeure” means any cause beyond the reasonable control of a party to this Contract, including but not limited to war, riot, fire, explosion, storm, flood, drought, earthquake, or other natural disaster.2. Description of Building WorkThe Builder shall carry out the following building work at the site known as [Site Address]:* [Description of Building Work]3. Contract PriceThe Contract Price for the Building Work is [Contract Price]. This price includes:* [Inclusive Items in Contract Price]The Contract Price does not include:* [Exclusive Items in Contract Price]4. Payment of Contract PriceThe Client shall pay the Contract Price in full prior to the commencement of the Building Work. Payment shall be made by [Payment Method] to the account details provided by the Builder. The Builder shall provide a receipt for all payments made.5. Time for Completion6. Quality of Building Work7. Liability for Damage or Loss篇2This Building Contract is made and entered into between [Name of Employer], hereinafter called "the Employer", of [Address of Employer], and [Name of Contractor], hereinaftercalled "the Contractor", of [Address of Contractor], on this [Date of Contract].1. Definitions and Interpretation1.1 In this Contract, the following words and expressions shall have the meanings assigned to them:* "Site" means the location where the Building Work is to be carried out as described in the Contract Documents.* "Building Work" means the construction, alteration, repair, maintenance or demolition work on any building or structure which is the subject matter of this Contract.* "Contract Documents" means the drawings, specifications, estimates, plans, samples, instructions and other documents issued by the Employer to the Contractor for the execution of the Building Work.* "Employer" means the person or entity who undertakes to pay the Contractor for the Building Work in accordance with the terms of this Contract.* "Contractor" means the person or entity who is engaged by the Employer to carry out the Building Work and who agrees to do so in accordance with the terms of this Contract.* "Workman" means any person employed by the Contractor or its sub-contractors to carry out the Building Work.* "Sub-Contractor" means any person or entity to whom the Contractor sub-contracts any part of the Building Work.* "Tools and Plant" means all plant, machinery, equipment and tools required for the execution of the Building Work.* "Commencement Date" means the date on which the Building Work is commenced in accordance with the terms of this Contract.* "Completion Date" means the date on which the Building Work is completed in accordance with the terms of this Contract.1.2 The Contract Documents shall take precedence over any other documents or agreements between the parties hereto, save as otherwise provided in this Contract. Any reference in the Contract Documents to any act, matter or thing as being done, omitted or having occurred shall be deemed to be a reference to such act, matter or thing having been so done, omitted or occurred as required to be done, omitted or occurred by this Contract.2. The Contract2.1 The Contractor shall carry out the Building Work in accordance with the terms of this Contract and in accordance with all applicable laws, regulations and standards in force from time to time.2.2 The Employer shall pay for the Building Work in accordance with the terms of this Contract.3. The Price and Payment3.1 The Contractor shall submit a detailed estimate of the cost of carrying out the Building Work to the Employer for approval prior to commencing the same. The approved estimate shall form part of this Contract and shall be binding on both parties hereto.3.2 The Employer shall pay for the Building Work in full on completion of the same in accordance with the terms of this Contract.4. Time for Completion4.1 The Contractor shall complete the Building Work within a reasonable time as determined by the Employer from time to time. The Employer may, at its discretion, grant extensions of time for completion in writing.4.2 The Contractor shall notify the Employer immediately upon completion of the Building Work.5. Warranty5.1 The Contractor shall provide a warranty that for a period of [Insert warranty period] years from the Completion Date, the Building Work shall be free from defects in materials and workmanship provided that:* The Building Work is used under normal conditions and in accordance with any instructions provided by the Contractor; and* The Building Work is maintained and stored properly.5.2 If any defect arises within the warranty period due to materials or workmanship, the Contractor shall repair or replace such defect at no additional cost to the Employer.6. Indemnity6.1 The Contractor shall indemnify and keep indemnified the Employer against all actions, claims, demands, losses and damages suffered or incurred by the Employer as a result of or in connection with any injury, death or damage to property caused by or arising out of the carrying out by the Contractor of the Building Work under this Contract.7. Termination7.1 Either party hereto may terminate this Contract immediately upon written notice to the other party if:* The other party commits a material breach of its obligations under this Contract and fails to remedy such breach within a reasonable time as determined by the party terminating; or* An order is made for the winding up of either party's business or either party篇3建筑合同协议书甲方(业主):XXXX,身份证号码:XXXX乙方(承包商):XXXX,身份证号码:XXXX根据《中华人民共和国合同法》及相关法律法规,甲乙双方在平等、自愿、公平、诚实信用的基础上,就乙方承包甲方建筑项目事宜,达成如下协议:一、工程概况1. 工程名称:XXXX建筑项目2. 工程地点:XXXX3. 工程内容:包括但不限于建筑物的设计、施工、装修等4. 承包范围:具体以甲方提供的施工图纸为准5. 承包方式:包工包料,但甲方需自行采购部分材料6. 施工工期:自本合同签订之日起至XXXX年XX月XX日止7. 工程质量:符合国家相关建筑质量标准8. 工程价款:详见本合同附件一《工程报价表》二、甲方权利和义务1. 甲方有权对乙方的施工进度、质量进行监督,并提出合理建议和意见。
建设工程设计合同文本中英文对照
建设工程设计合同文本中英文对照一、合同目的与范围Ojective and Scoe of the Contract:本合同的目的是明确甲乙双方在建设工程设计项目中的权利、义务和责任。
合同范围涵盖了从初步设计到施工图纸的所有阶段。
The urose of this contract is to clarify the rights, oligations, and resonsiilities of oth arties in the construction engineering design roject. The scoe of the contract covers all stages from reliminary design to construction drawings.二、设计要求与标准Design Requirements and Standards:乙方需根据甲方提供的要求和相关法规标准,完成工程设计任务。
设计成果应满足功能需求、安全规范和审美标准。
arty shall comlete the engineering design tasks in accordance with the requirements rovided y arty A and relevant regulatory standards. The design results should meet functional needs, safety secifications, and aesthetic standards.三、设计周期与阶段Design eriod and hases:工程设计将分为三个主要阶段:概念设计、初步设计和施工图设计。
每个阶段的完成时间应在合同中明确规定。
The engineering design will e divided into three main hases: concetual design, reliminary design, and construction drawing design. The comletion time for each hase should e clearly defined in the contract.四、费用支付与结算ayment and Settlement:甲方应按合同约定向乙方支付设计费用。
地产英语合同协议书
地产英语合同协议书这是小编精心编写的合同文档,其中清晰明确的阐述了合同的各项重要内容与条款,请基于您自己的需求,在此基础上再修改以得到最终合同版本,谢谢!地产英语合同协议书甲方(买方):名称:____________________地址:____________________联系方式:________________乙方(卖方):名称:____________________地址:____________________联系方式:________________鉴于甲方愿意购买乙方拥有的地产,乙方愿意出售该地产,双方为明确各自的权利义务,经友好协商,达成如下协议:一、地产描述1.1 乙方出售的地产位于____________________,土地面积为____________________平方米,房屋面积为____________________平方米。
1.2 该地产的用途为____________________,土地使用权期限至____________________年。
二、购买价格2.1 甲方向乙方支付的购买价格为人民币____________________元整(大写:____________________元整)。
2.2 甲方应在签署本合同之日起____________________日内,将购房款支付至乙方指定的账户。
三、交付及过户3.1 乙方应在本合同签署之日起____________________日内,将地产交付给甲方。
3.2 双方应共同办理地产过户手续,过户费用由甲方承担。
四、权利义务4.1 乙方应保证所出售的地产不存在任何法律纠纷和权利瑕疵。
4.2 甲方应按照约定时间支付购房款,并承担过户费用。
五、违约责任5.1 任何一方违反本合同的约定,应承担相应的违约责任,向对方支付违约金,违约金为购房款的____________________%。
六、争议解决6.1 双方因本合同的履行发生争议的,应首先通过友好协商解决;协商不成的,可以向有管辖权的人民法院提起诉讼。
