目录一、各种应急预案共性部分----------------------------------------2二、油罐罐顶火灾应急预案----------------------------------------4三、发油区油罐车装油火灾应急预案----------------------------8四、码头(趸船)装卸油时管线泄漏发生火灾应急预案---13五、质检室火灾应急预案-------------------------------------------18六、配电室火灾应急预案-------------------------------------------22七、油船装卸油发生火灾应急预案-------------------------------25八、防山火应急预案------------------------------------------------29九、比邻单位发生火灾应急预案----------------------------------31十、油罐罐根阀垫片破裂应急预案-------------------------------34 十一、输油管线跑油应急预案------------------------------------37 十二、输油软管跑油应急预案------------------------------------41 十三、油罐罐顶冒油应急预案------------------------------------44 十四、油罐底板漏油应急预案-------------------------------------47 十五、进油输转混油应急预案-------------------------------------51 十六、库区防汛应急预案-------------------------------------------52 十七、油罐吸瘪应急预案-------------------------------------------55 十八、未拔鹤管油罐车启动开走应急预案---------------------58 十九、清罐中毒应急预案-------------------------------------------60 二十、配电盘触电应急预案----------------------------------------62 二十一、发油台溢油应急预案-------------------------------------63一、各种应急预案共性部分1 总则1.1 编制目的油库是易燃、易爆场所,具有一定的危险性,为加强油库的安全防范工作,提高安全管理水平,对可能发生的灾害及突发事件制定有效的抢险救援预案,以确保员工生命安全不受到伤害及最大限度地减少人员伤亡、国家财产损失和社会影响。
1989年山东黄岛油库“8.12’特大火灾事故

1989年山东黄岛油库“8.12’特大火灾事故1989年8月12日9时55分,中国石油总公司管道局胜利输油公司黄岛油库发生特大火灾爆炸事故,19人死亡,100多人受伤,直接经济损失3540万元。
1.基本情况黄岛油库区始建于1973年,胜利油田开采出的原油由东(营)黄(岛)输油线输送到黄岛油库,再由青岛港务局油码头装船运往各地。
黄岛油库原油储存能力760000立方米,成品油储存能力约60000立方米,是我国三大海港输油专用码头之一。
2.事故经过1989年8月12日9时55分,2.3万立方米原油储量的5号混凝土油罐突然爆炸起火。
到下午2时35分,青岛地区西北风,风力增至4级以上,几百米高的火焰向东南方向倾斜。
燃烧了4个多小时,5号罐里的原油随着轻油馏分的蒸发燃烧,形成速度大约每小时1.5米、温度为150—300℃的热波向油层下部传递。
当热波传至油罐底部的水层时,罐底部的积水、原油中的乳化水以及灭火时泡沫中的水汽化,使原油猛烈沸溢,喷向空中,撒落四周地面。
下午3时左右,喷溅的油火点燃了位于东南方向相距5号油罐37米处的另一座相同结构的4号油罐顶部的泄漏油气层,引起爆炸。
炸飞的4号罐顶混凝土碎块将相邻30米处的1号、2号和3号金属油罐顶部震裂,造成油气外漏。
约1分钟后,5号罐喷溅的油火又先后点燃了3号、2号和1号油罐的外漏油气,引起爆燃,整个老罐区陷入一片火海。
失控的外溢原油像火山喷发出的岩浆,在地面上四处流淌。
大火分成三股,一部分油火翻过5号罐北侧1米高的矮墙,进入储油规模为300000立方米全套引进日本工艺装备的新罐区的1号、2号、6号浮顶式金属罐的四周,烈焰和浓烟烧黑3号罐壁,其中2号罐壁隔热钢板很快被烧红;另一部分油火沿着地下管沟流淌,汇同输油管网外溢原油形成地下火网;还有一部分油火向北,从生产区的消防泵房一直烧到车库、化验室和锅炉房,向东从变电站一直引烧到装船泵房、计量站、加热炉。
火海席卷着整个生产区,东路、北路的两路油火汇合成一路,烧过油库1号大门,沿着新港公路向位于低处的黄岛油港烧去。
南疆油库竣工验收报告

中国石化燃料油销售有限公司南疆燃料油库改扩建工程竣工报告编制单位:中国石化燃料油销售有限公司编制日期:二O一三年七月前言中国石化燃料油销售有限公司南疆燃料油库(以下南疆燃料油库)原名为中国石化管道储运分公司塘沽油库3号库,坐落于天津港南疆港区南疆路和临海路之间。
目前,主要办理原油收储、中转业务。
按照中石化总部关于燃料油专业化管理、专业化经营的体制调整方案,在天津成立了中石化燃料油销售天津分公司,为改变缺少燃料油仓储设施的现状,进一步开拓辖区内终端客户及开展海上供油和保税油业务,拓宽燃料油业务内容及灵活程度,制定油库未来使用及改建计划,拟将原中石化管道储运分公司塘沽油库改造为燃料油库,专营保税燃料油、内贸燃料油的收储、调和及中转业务;该油库投用后,可接收海上来油、天津石化及系统内和地方炼厂资源,油品经调和后可以生产出适销对路的燃料油产品,以满足不同行业对燃料油的需求,市场将以天津滨海新区为中心,以港口(天津港、曹妃甸港、黄骅港等)为依托,辐射天津周边(如山东、河北、辽宁等区域)。
第一章工程概况2011年3月中国石化股份有限公司批复《关于燃料油销售有限公司南疆燃料油库改扩建工程可行性研究报告的批复》(石化股份计〔2011〕122号),改扩建工程内容主要为:对原有6座储罐(总罐容11万m3)及综合楼进行检维修外,新建8座储罐(其中0.8万m³内浮顶油罐2座,1万m³拱顶油罐1座,3000m³拱顶油罐3座,3000m ³消防水罐2座),新增库容3.5万m³,改造后总库容达到14.5万m ³。
库区范围内新建附属用房(包括锅炉房、消防泵房、变配电间、食堂、化验室)、输油泵房、公路发油亭、门卫2,以及工艺管道、电器仪表、给排水消防系统等配套工程。
根据天津市交通运输和港口管理局对中国石化燃料油销售有限公司南疆燃料油库改扩建工程下发《港口工程开工备案证》,我单位在滨海新区塘沽建设和管理中心办理完成了设计、勘察、施工和监理的招投标工作,中标的设计单位为天津中德工程设计有限公司、勘察单位为天津市地质工程勘察院、监理单位为天津市石建工程监理有限公司、施工单位为中国石化第四建设公司。
油库

《油库设计与管理》综合复习资料一、填空题1、按照疏水阀的工作原理,疏水阀可分为机械型、恒温型、热动力型三种类型,其中机械型不宜用于寒冷的室外。
α时,定性温度取为油品平2、在油罐管式加热器设计计算中,计算加热器管外壁的放热系数2α时,定性温度取均温度与加热器管外壁温度的算术平均值;在计算储罐内壁的放热系数bi1为油品平均温度与罐内壁温度的算术平均值。
3、总容量为8万方的油库属于二级油库。
4、对于立式固定顶金属油罐,夜间罐内气体空间温度与外界大气温度相比,罐内气体空间温度较高;白天罐内气体空间温度与外界大气温度相比,罐内气体空间温度较高。
5、一般油品电阻率的取值范围为 1010~1012Ω·m 时静电危险性较大。
6、石油产品易燃性的衡量判据是闪点、燃点和自燃点。
7、地下水封石洞库建库的前提条件是具有稳定的地下水位。
8、油罐中常用的管式全面加热器按结构形式可分为分段式和蛇管式两种。
9、浮顶油罐上用于及时排放汇集于浮顶上的雨水的专用附件是中央排水管。
10、油库的真空系统中,与真空泵入口相连接的是真空罐,与真空泵出口相连接的设备是气水分离器。
11、某罐区有直径为28.4米的油罐两座,采用固定式低倍数空气泡沫灭火系统,泡沫液为3%型,l/m2⋅,则每座油罐需设置PC16型泡沫产生器 4 个,要求泡沫混合液供给强度为6.0 min若不考虑扑救流散火,则该整个油库需配置PH32型泡沫比例混合器 2 个。
12、保温管路的热损失率是指单位长度保温管路的热损失与同样条件下不保温管路热损失的比值。
地上保温管路的热损失率的取值范围一般为 0.2~0.5 ,埋地保温管路的热损失率的取值范围一般为不小于0.5 。
13、疏水器的作用是排水阻汽。
14、油库总容量是指所有储罐公称容量之和与桶装油品设计存放量之和。
15、铁路轻油卸油系统中,真空系统的作用可概括为引油灌泵和抽吸油罐车底油16、按照疏水器的工作原理,疏水器可分为机械型、恒温型和热动力型三种类型,其中机械型不宜用于寒冷的室外。
油库设计综合复习重点(上)

第一章1.油库的分级2.油库的分区3.周转系数法确定油库容量各种油品设计容量可由下式求得:(m3)式中::油品的设计容量,m3;G:油品的年周转量,t;:油品储存温度下的密度,t/m3;K:该油品的周转系数;:油罐的利用系数;,一般:轻油罐取0.95,重油罐取0.85,储存重质油品的非金属油罐取0.75。
油罐容量在使用上可分为下面三种情况:4.油库的类型;储存天数法确定油库容量;油品的分类;油库总图设计原则及思路。
这种方法一般用于确定油田原油库、炼厂原油库及炼厂成品油库的容量。
(m3)式中::油品的设计容量,m3;G:油品的年周转量,t;N:油品的储存天数;:油品储存温度下的密度,t/m3;:油罐的利用系数;t:油品的年操作天数。
总图设计原则总图设计,首先实地勘察,深入调查,充分掌握各种有关的设计资料,如地形图、区域环境图及地质、气象、水文、交通、水电等资料和油库经营油品种类、数量及将来发展远景等。
在充分占有、了解和熟悉资料的基础上,可结合油库特点,按下述原则考虑总图布置:(1)便于发放作业。
油库装卸和发放区要尽可能地靠近交通线,使铁路专用线和公路支线较短;(2)库内油品尽量做到单向流动,避免在库内往返交叉;(3)合理分区,以便于各种作业安全生产,避免非生产人员来往于工作区域,特别是储油区和装卸区;(4)库内布置的各种设施,必须符合防火、卫生等有关设计规范,确保油库安全。
同时力求布置紧凑,减少用地;(5)变配电间及锅炉房等辅助设施要尽量靠近主要用电、用汽单位,以节省投资和经营费用;(6)尽可能利用地形进行自流作业;(7)油库对外单位要设置在靠近发放区的地方,以便提货人员联系;(8)考虑到油库的今后发展,应适当留有扩建余地。
第二章1.真空系统组成及作用;输油系统由鹤管、集油管、输油管路和泵组成,其作用是输转油罐车与储油罐内的油品。
真空系统由真空泵、真空罐、气水分离器和真空管路组成,其作用是引油灌泵和收净油罐车底油。
油库建设标准

中国石化销售企业油库建设标准(试行)2004年12月发布 2005年1月实施中国石化股份有限公司油品销售事业部发布编制说明为规范中国石化销售企业所属成品油库新建、改扩建项目的工程管理,采用先进的工艺设备、控制技术和设计理念,充分发挥油库在销售环节的功能,全面提升油库管理水平,以满足成品油市场全面开放后的需求。
结合行业特点,针对销售企业油库普遍存在的主要问题,在总结“试点油库”经验和《中国石化销售企业油库改造设计导则》试行的基础上,我们编制了《中国石化销售企业油库建设标准》,以指导油库新建、改造过程中所涉及的油库规模、铁路收发油、公路发油、管道收发油工作流程以及油品计量、安全监控系统、供配电系统、安全及环保等系统设计方案的确定。
新建及改造后的油库应达到“布局合理、技术先进、安全可靠、管理方便、绿化美化、本质安全、防止污染、确保油品质量”。
本标准归纳了新建、改扩建成品油库需注意的设计要点和建设过程中需执行的国家、行业相关标准、规范。
在符合国家及行业标准、规范的基础上,应严格按本标准执行。
附图部分包括油库工艺流程图、发油棚建筑效果及发油平台布置图及实景照片等,供各单位参考。
鉴于本标准系初次编制,希望各单位在试行过程中,注意积累资料,总结经验,如发现有需要修改和补充之处,请将意见和资料寄送油品销售事业部发展规划处,以便今后修改时参考。
目录1. 总 则 (1)2. 采用的主要标准、规范 (3)3. 总平面布置及建(构)筑物 (5)3.1总平面布置要求3.2建(构)筑物4. 铁路收发油系统 (8)4.1 一般规定4.2 工艺流程4.3 设备选型及安装要求4.4 电气5. 水路收发油系统 (12)5.1 工艺流程5.2 设备选型及安装要求5.3 配套设施6. 公路发油系统 (14)6.1 一般规定6.2 工艺流程6.3 设备选型及安装要求6.4 电气7. 储油罐区 (16)7.1 轻油罐区布置原则7.2 库容的确定7.3 油罐选型7.4工艺管道7.5电气及防雷防静电7.6油罐及管道防腐8. 消防系统 (20)8.1 泡沫灭火系统8.2 消防给水9. 自控系统 (22)9.1 概述9.2 罐群自动计量系统9.3 公路微机发油系统9.4 安全监控系统10.环保 (27)10.1 含油污水处理10.2 给排水11. 标识 (28)11.1 建(构)筑物11.2 管道表面色和标识11.3 油罐表面色和标识11.4 机泵、阀门及管道附件表面色11.5 其他11.6 油罐编号规定附录-1 油罐计量系统简介附图附图-1 发油台鹤管布置图-2 发油亭建筑效果-3 泵棚及发油台实景效果-4 油罐标识效果-5 试点油库分区示意图1、总则1.1为在中国石化销售企业油库新建和改扩建过程中,统一技术要求,统一建设标准,统一形象标识,突出行业特点,特制定本标准。
油库设计与管理复习资料

(5) 集油管和输油管
集油管和输油管的长度及位置,应根据油罐车数和装卸区的平面布置确定;
它们的管径应根据装卸油品的数量、允许卸油时间、油品性质、泵的吸入
能力以及泵房地坪与铁轨的标高等通过工艺计算确定;
它们的布置必须按一定坡度进行敷设,以保证装卸作业结束后,积存在管
路中的油品能自流放空。
(6) 零位油罐和缓冲油罐
布置:①宜集中布置,独立成区 ②位于厂区边缘,且处于全年最小频率风向的上风侧,宜建在 标高最低或最高处,以实现自流装卸 ③采用尽头式布置
股数:①根据油品种类、年装车量、接轨干线的机车牵引能力、地形 情况综合确定
②经营油品较单一的油库及中小型油库采用单股或两股作业线 ③收发作业频繁、油品种类较多、散装粘油收发量大的油库(大
填充油料的设备) 下部卸油
组成:油罐下卸器、输油管路 优点:克服了上部卸油的全部缺点,地面建筑少,对空隐蔽 (2) 装油工艺流程 自流装车流程 凡地形高差可以利用并具备自流装车条件的油库,应尽量采用自流装 车流程。 泵送装车流程 凡地形条件不具备自流装车条件的油库,都采用泵送装车
2、 铁路装卸的主要设施设备 (1) 铁路油罐车 分类:轻油罐车和粘油罐车 组成:罐体、油罐附件、底架和走行部分 轻油罐车 一般涂成银白色,在罐体上由一个进气阀和两个出气阀,以减 少呼吸损耗和保证安全 粘油罐车 运送原油涂成黑色,成品粘油涂成黄色,罐车上大都设有加热 装置和排油装置 技术经济指标: 实际载重量(净载重):油罐车可载重油品的重量,以吨计,可 用油罐车的有效容积乘以装载油品的密 度来计算 标记载重和自重:标记载重代表油罐车上标示的标记载重量 自重标示空罐车自身的重量 净载重系数:油罐车净载重与标记载重加自重之和的比值,是 表示油罐车经济效率的主要指标之一 冷却系数:油罐车油罐表面积与载重量的比值 (2) 铁路专用线 分类:以厂门为界分为厂外线和厂内线(装卸作业线) 装卸作业线的布置和股数
油库设计-毕业设计

摘要本设计是在了解河北唐山市地形、地貌等条件下,综合降雨量、降雪量、风向以及渤海水域水文地质状况,遵循库址选择原则以及考虑对库址的基本要求,在综合生产作业量条件下进行的一次综合性的常规油库设计。
设计过程如下:根据原始资料、数据进行基础设计。
计算出储油罐容积、个数,选择罐型,确定库容。
进行装卸油设施计算:铁路装卸油鹤管数、铁路装卸栈桥长度、装卸作业线长度、汽车油罐车装油鹤管数、桶装作业灌油栓数目及仓库面积、油品水运码头泊位数、消防设施、防火距离和防火堤尺寸。
然后,进行油库平面图的初步布置,再根据布置的情况进行管路水力计算、选泵及校核,然后进行流程和泵房安装设计,最后进行辅助设施计算。
根据石油库设计规范中各构建筑物之间的防火要求并协调上述计算结果,对库区进行平面布置。
图纸的绘制包括南京油库总平面布置图、工艺流程图和内浮顶罐结构简图。
图纸的绘制方式为AutoCAD制图。
本设计对如下内容进行了说明:总图布置、油库工艺流程概述、油罐类型及附件、油库安全技术、储油罐区布置设计。
绘图部分是设计的关键。
设计的思想意图、内容都通过图纸来体现。
油库总图布置是按照最大限度的满足生产需要,缩短工艺管线和运输管线,减少占地和投资,保证安全作业,节约管理费用等原则下进行设计,流程图简单合理并在一定程度上考虑了油库的扩建。
布置图严格按照《石油库设计规范》设计,准确体现了油库泵房、泡沫间、雨水池等设备的尺寸和安装位置。
关键词:油库;平面图;工艺流程;油库泵房ABSTRACTThe designation is main for Tangshan oil depot.It is a conventational designation. It abides by choosing principle of warehouse location and thinks about to fundamental demand of warehouse location.According to the full understanding of the topography and geoly of Tangshan suberb of Hebei besides the work quantity.The designation process are as follows: according to original information and data, storagetanks volume and quantity, Select type and determine the capacity of the depot. Calculate load and unload of the equipment: the number of railway crane loading and unloading oil pipe,the length of bridge, the length of the loading pier ,quay berth number etc.Then the picture of oil depot is originally design.The second step, according to assignable conditions,we will perform pipelines waterpower calcualation,select pumps and inspect.the third step,technology system and pumphouse install designed.According to Fire safety requirements between the buildings in Designing specifications of the oil base, and coordinate the results of the above calculation, carried out on the layout of the reservoir area. Drawing drawings, including the Nanjing depot general layout plans, process maps and the pipeline installation map of oil tank area. Rendering drawings for AutoCAD drawing.The designation’s introduction are as follows:the key plane figure, oil depot technology systerm, fire of oil depot, fireproofing flameproofing, lightingproofing and staticproofing i.e, in addition to works arrangement .The key of this designation is drawing picture.designed intendenced and contents must be embodied by figures. the key plane figure of oil depot must be content to requirement of production at the maxlimitation. it makes technology pipelines and transport pipelines most shorten. pipeline and field should be contract. such as economical investment, insured operation in safety, economical sdminstraction fee, technology system should be both simple and advisable. To some contract , augment of oil depot should be considered.install figure must strictly design according to designed codes.pumphouse of oil depot pipelines, pumps, i.e. these pumpmentsizes, location etc, should be precisely embodied.Key Words:Oil depot;The plane figure;Technology system;Pump house目录前言 (1)1 设计说明 (2)1.1 设计原始数据资料 (2)1.1.1 油库设计的基础数据 (2)1.1.2 油库库址及周围环境 (2)1.1.3 该地区历年统计的自然条件 (4)1.1.4 油品物性一览表 (5)1.2 油库概述 (5)1.2.1 油库的类型和任务 (6)1.2.2 油库的分级和分区 (7)1.2.3 国外油库技术简况 (8)1.3 油库总图布置说明 (10)1.3.1 总图设计原则 (10)1.3.2 库内道路设计 (11)1.3.3 绿化布置 (11)1.4 油库工艺流程说明 (11)1.4.1 制定工艺流程的原则 (11)1.4.2 本油库的主要作业内容 (11)1.4.3 油库中的工艺流程 (11)1.5 油罐类型及附件 (12)1.5.1 油罐类型 (12)1.5.2 储罐附件 (13)1.5.3 浮顶的安装 (14)1.6 油库安全技术 (14)1.6.1 防毒 (15)1.6.2 防火防爆 (16)1.6.3 油库消防技术 (19)1.6.4 防雷 (22)1.6.5 防静电 (24)1.6.6 管线接地说明 (26)1.6.7 照明 (26)1.7 储油罐区布置设计 (26)2 计算说明 (28)2.1 油库容量的确定 (28)2.1.1 油库设计容量的计算公式 (28)2.1.2 参数的确定 (28)2.1.3 罐型和库容计算 (29)2.1.4 油库库容的确定 (30)2.2 装卸油设施计算 (30)2.2.1 各种油品铁路装卸油鹤管数的计算 (30)2.2.2 铁路装卸栈桥长度的计算 (31)2.2.3 装卸作业线长度的计算 (31)2.2.4 汽车油罐车装油鹤管的计算 (32)2.2.5 桶装作业灌油栓数目确定及仓库面积的计算 (33)2.2.6 油品水运码头泊位数计算 (34)2.2.7 消防设施计算 (36)2.2.8 防火堤计算 (37)2.2.9 防火距离的确定 (38)3 专题设计计算 (40)3.1 轻油罐区管路的水利计算、选泵及校核 (40)3.1.1 流量计算 (40)3.1.2 管径计算 (40)3.1.3 泵扬程的确定 (41)3.1.4 选泵及校核 (44)3.2 重油罐区管路的水利计算、选泵及校核 (44)3.2.1 零位罐的确定 (44)3.2.2 管径计算 (45)3.2.3 最大扬程的确定 (46)3.2.4 选泵及校核 (47)结论.................................................................................. 错误!未定义书签。
- 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
- 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
- 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。
中国油库简介各省最大油库上海最大油库上海东方储罐有限公司由中国中化集团公司、上海高桥石油化工公司、香港立丰实业有限公司等共同投资,总投资3750万美元,92年3月正式营运。
一流的设施适应的需求大小储罐54座,总容量立方米,500-35000MT 的配套石化码头。
中石油将与上海方面密切配合,建设目前中国最大规模的石油仓储基地——上海洋山港巨型石油仓储基地。
规划中的仓储基地位于上海南端的长江口,是上海庞大的洋山港港口及码头发展计划的一部分,预计建成后的总储存量超过100万立方米。
该工程预计将于今年年中展开,工期两年,2007年投入使用。
首期工程为40万立方米。
洋山港石油仓储基地是一个纯商业的石油基地,主要用于存储燃料油,而不是原油。
未来投入使用后,油库的来源将是多元化的。
合资公司的注册资本1935万美元,总投资额4837万美元(约合人民币近4亿元)。
中石化上海分公司比较大型的油库目前主要有三个:外高桥油库、杨浦油库和闵行油库,其中外高桥油库最大,总库容在40万立方米左右中石油上海销售分公司透露,坐落于外高桥欧高路的海滨油库是中石油在上海兴建的首座国家一级油库,预计将于2005年建成并投入使用。
该油库建成以后,可储存11万方柴油、10万方燃油以及9万方汽油,合30万方成品油,可以有效缓解上海地区油库的储存压力。
119youku 2005-12-4 15:15广东省最大油库华南地区目前最大的原油储存中转基地茂名石化公司北山岭60万吨原油库中国目前最大的燃油油库曰前在湛江港正式投入使用,该油库由中石油燃料股份有限公司所有,油库库容达到94.5万立方米,将用于燃油发电和燃料油的储存这是中石油在中国沿海投资建设的最大油库,属国家一级燃料油中转库,设计年周转能力800万吨以上。
该油库的二期工程计划将再建3座10万立方米的储油罐,使湛江燃油油库的总储量达到124.5万立方米深圳市光滙石油化工股份有限公司,是光滙集团投资创建的大型石化企业,主要经营石油产品的仓储、码头装卸、海陆运输、油品批发销售及加油站网络开发等业务,是目前深圳市最大的民营石油企业。
公司现拥有一期、二期库容为40万立方米的成品油油库和相配套的华南地区吞吐能力最大的10万吨级石油化工专用码头。
目前正在进行三期60万立方米的油库扩建工程。
经过多年的悉心经营,已经逐步发展成为深圳乃至广东以及东南亚地区库容规模大、吞吐能力强、设备先进、配套完善的油品储运基地。
珠海恒基达鑫国际化工仓储有限公司成立于2001年,库区已建成储罐有:1,500立方米储罐10个,2000立方米储罐7个(其中2个为不锈钢储罐),3,000立方米储罐6个,4,000立方米储罐4个(其中1个为不锈钢储罐),5,000立方米储罐11个,10,000立方米储罐1个,15,000立方米储罐1个,21000立方米储罐2个,37,000立方米储罐2个,43,000立方米储罐2个,公司总占地面积13万多平方米。
目前已建成仓储能力总计为345,000立方米,全部竣工后可达到45万立方米罐容南沙油库是珠三角地区最大的油库,由BP与广州发展实业控股集团股份有限公司(简称广州控股)合资兴建,能储存约36万立方米的柴油、汽油、燃料油和化工产品。
总投资8600万美元,BP持股40%,广州控股持股60%。
该项目还与广州港能源发展有限公司合作,拥有一个8万吨级的码头,可以接收进口的原油和成品油。
中国广东粤海油库的14.3万立方米的重油库中约有10万立方米为保税库。
119youku 2005-12-4 15:16浙江省最大油库:镇海炼化仓储公司中国石化是镇海炼油化工股份有限公司全资子公司,拥有固定资产9.8亿。
2002年共靠泊油轮2250艘次,油品吞吐量达到2300万吨,约为整个宁波港吞吐量的六分之一,其中海上原油中转量居国内第一。
仓储公司现有原油贮罐14座,85万立方米;成品油罐26座,52.6万立方米;液化石油气球罐四座,0.16万立方米,储罐总容量共计137.76万立方米。
另有长输管线13条与镇海炼化相接。
全国最大保税油库中化兴中石油转运(舟山)有限公司岙山基地拥有全国最大的75万立方米保税油库。
1994年12月,中化兴中公司和中化国际实业公司、中化国际石油(巴哈马)有限公司三家共同出资2250万美元,成立舟山中威石油储运有限公司,在岙山基地建设14座总容量为20万立方米的成品油储罐,开展了柴油、汽油、航煤和燃料油等多种成品油的储存转运业务。
2001年5月,中化兴中公司注册成立了中化兴源石油储运(舟山)有限公司,在岙山基地增建7座总容量为38万立方米的储油罐,使岙山基地储罐总容量达到158万立方米。
顺利通过杭州海关等口岸部门的验收后,舟山中石化册子岛原油中转油库2006年3月正式运行。
该油库是目前国内最大的油码头,拥有30万吨级原油码头一座,最大可停靠37.5万吨级油轮,年最大通过能力达2054万吨,一期原油储罐总容量为60万立方米。
它的建成可大幅降低华东区域进口原油运输成本。
福建省最大油库福建泰山石化仓储项目此项在泉州奠基的项目由福建泰山石化仓储有限公司投资兴建,计划於2004年投入运营。
项目占地76万平方米,拥有海岸线820米,将建设总储量为150万立方米的原油、成品油、化工品储罐及与之配套的码头。
其中包括6个泊位,最大泊位可停靠10万吨级以上的大型油轮。
其中,一期投资7.7亿元,建设50万立方米的油罐,使用面积30万平方米。
该项目建成後将成为南方最大的成品油中转基地,同时也加快泉港的大石化建设厦门博坦仓储有限公司成立于1993年,是一家中外合资企业。
其中,中石化下属的厦门市石油集团有限公司占40%的股份,香港的大庆石油有限公司占20%,荷兰ROY AL VOPAK 下属的博坦国际有限公司占40%。
油库总库容为为202,500立方米,14个油罐,可连接货轮,驳船和卡车,吃水为16.0米,2个泊位,罐区储存货品有石油,化工品,附加服务有混合和加热。
地址:福建省厦门市海沧嵩屿贞庵村55号()119youku 2005-12-4 15:16河北省最大油库:中国石化集团石家庄炼油厂厂内储油能力达45万立方米,储气能力0.76万立方米,并建有20万立方米的成品油中转油库、20万立方米原油罐区。
天津塘沽新河油库是华北最大的石油储备调配库,储油在10万吨左右,其上级单位为中国石化集团天津分公司。
119youku 2005-12-4 15:16辽宁省最大油库大龙洋石油有限公司沈阳市苏家屯区陈相屯镇的陈相油库,共投资5600余万元,有12个立式金属浮顶罐,库容近50000 吨黑龙江省最大油库黑龙江省龙都石油销售有限公司(原齐齐哈尔市龙庆石化有限公司)是原国家经贸委(现国家商务部)批准的具有石油成品油批发资格的民营企业。
2000年加盟中国石化集团,是中国石化集团在黑龙江西部地区的成品油批发企业。
同年9月成功的把中国石化的国标成品油陆续投入黑龙江市场,实现了“南油北运”,从而结束了黑龙江地区成品油独家经营的历史。
龙都石油公司是全国成品油仓储能力最大的民营企业之一,同时也是中国石化集团在东北三省油品储量最大的企业。
资产总额3.5亿元,其中固定资产3.2亿元,注册资金1,000万元。
现有员工300人,总部下设四个分公司。
拥有四座国家级标准化油库、三十二座加油站及四百多家联营加油站。
年吞吐能力100万吨以上,成品油总储量m3。
·第一油库位于毗邻内蒙古的龙江县境内(储油能力40000m3 )。
·第二油库位于黑龙江西部中心城市齐齐哈尔市(储油能力15000m3)。
·第三油库位于讷河市境内(储油能力15000m3)。
·第四油库位于黑龙江省经贸中心哈尔滨市(储油能力30000m3)。
119youku 2005-12-4 15:16 江苏省最大油库中油江阴油库占地450亩,现有各类储罐55个,总库容38万立方米,是中国石油系统内第一个通过IS09000质量认证的大型油库。
该油库同时备有2.5万吨级石油石化专用码头,年吞吐量达400多万吨。
1995年,国务院发展研究中心市场经济研究所将储运公司油库收入《中华之最荣誉大典》,享有"长江流域最大的成品油库"之盛誉。
中石化仪征油库容量由现在的50多万立方米将扩为200万立方米容积为50万立方米,现在平均每年输送300多万立方米石油中国石油天然气股份有限公司上海销售苏州分公司(上海燕浦石油工贸公司苏州分公司),并拥有苏州海星、吴江八坼、常熟七星桥(控股)、太仓长江石化(租赁)4座油库,库容50500立方米119youku 2005-12-4 15:16重庆市最大油库中石油重庆伏牛溪油库是兰成渝管道终端的衔接配套油库,位于重庆市西南大渡口区,濒临长江,连接成渝、川黔铁路大通道,公路、铁路、水运条件十分便捷,历来是大西南重要的油品集散地和战略门户。
改扩建后的库容量由原来的8万吨增至18万吨,每年能向整个重庆及周边市场源源不断地输送成品油200多万吨。
119youku 2005-12-4 15:17北京市最大油库中石化长辛店油库改扩建工程在丰台区南岗洼,长辛店油库改扩建完成后,油库容量将比现在增加近6倍。
该油库位于北京市西南部的丰台区南岗洼,始建于1958年,历经三次改扩建,占地204.8亩,库容6.43万立方米。
其改扩建工程今起全面展开,预计2006年8月完工,历时一年。
改扩建后的长辛店油库占地284亩,一期扩容至22万立方米,二期扩容至34万立方米。
119youku 2005-12-4 15:17湖南最大油库中石化长沙油库位于开福区伍家岭新河附近的长沙油库将整体搬迁,是全省最大的油库之一,是全国石油系统中南地区的榜样库,始建于1954年,占地面积4.5万平方米,总容量3.38万立方米,实行微机控制付油,具有水、陆接卸、吞吐油料的能力。
年吞吐量最高达到63万吨新的长沙油库定址长沙市城区最北端的霞凝新港开发区,新库容积为11万至15万立方米,为老库的4倍。
湖北最大油库中石化宜昌公司宜都枝城油库(03油库) 20多立方米三峡库区最大的油库恩施石油分公司巴东油库座油库位于长江三峡巫峡口南岸,设计库容1.9万立方米119youku 2005-12-4 15:18河南省最大油库山东省泰安市东岳大街104号中国石化山东泰山石油股份有限公司公司前身山东石油公司大会堂发分公司,成立于1953年6月。
92年10月始进行股份制改组,同年12月8曰至93年1月8曰发行内部职工股520万股,社会公众股4680万股。
1993年3月8曰,“山东泰山石化股份有限公司有限公司”成立。
同年12月15曰“鲁石化A”在深交所上市。