中联重科泵车电器原理图信号及元件说明

ZOOMLION TRUCK PUMP ELECTRICAL PRINCIPLE DIAGRAM SIGNAL

& ELEMENT DESCRIPTION

第一页遥控系统

Page 1 control system

302:遥控器电源的正极。当电控柜面/遥转换开关拨到遥控侧,并且支腿/臂架转换开关拨到臂架侧时,302号线有电。

302: The anode of remote control power supply. When choosing remote control by panel/remote switch, on condition that

outrigger/boom switch is to the boom side, the cable 302 is with power.

6:遥控器电源的负极。与电控柜内的接地线相连接。

6: The cathode of remote control power supply, connecting to the ground in the electric cabinet.

NA、NB、REL4:遥控器内部开关,当遥控器的发射器开启后,这两个开关闭合。

NA、NB、REL4:internal switch in the remote control, which close when the emitter opened.

101:操作顺回转时,101号线有电流输出,控制顺回转动作,臂架动作的快慢由电流的大小决定。

101:When operation clockwise slewing, the 101 wire should be current output to control clock-wise slewing, the boom movement speed by the current.

102:操作逆回转时,102号线有电流输出,控制逆回转动作。

102: When operation counter-clockwise slewing, the 102 wire should be current output to control counter clock-wise slewing

103:操作一臂上时,103号线有电流输出,控制一臂上动作。

103: When operation the first section boom to up, the 103 wire should be a current output, control the first section to up

104:操作一臂下时,104号线有电流输出,控制一臂下动作。

104: When operation the first section boom to down, the 104 wire should be current output to control the first section up

105:操作二臂上时,105号线有电流输出,控制二臂上动作。

105: when operation the second section boom up, the 105 wire should be current output to control the second section boom up .

106:操作二臂下时,106号线有电流输出,控制二臂下动作。

106: when operation the second section boom down, the 106 wire should be current output to control the second section boom down. 107:操作三臂上时,107号线有电流输出,控制三臂上动作。

107: when operation the third section boom up, the 107 wire should be current output to control the third section boom up .

108:操作三臂下时,108号线有电流输出,控制三臂下动作。

108: when operation the third section boom down, the 108 wire should be current output to control the third section boom down. 109:操作四臂上时,109号线有电流输出,控制四臂上动作。

109: when operation the 4th.section boom up, the 109 wire should be current output to control the 4th.section boom up.

110:操作四臂下时,110号线有电流输出,控制四臂下动作。

110: when operation the 4th.section boom down, the 110 wire should be current output to control the 4th.section boom down.

111:操作五臂上时,111号线有电流输出,控制五臂上动作。

111: when operation 5th.section boom up, the 111 wire should be current output to control the 5th.section boom up.

112:操作五臂下时,112号线有电流输出,控制五臂下动作。

112: when operation 5th.section boom down, the wire 112 should be current output to control 5th.section boom down.

113:操作任何臂架动作时,113号线有24V电压输出,控制电子锁死电磁铁。113: when operation every movement of boom, the 113 wire should be 24V current output to control the solenoid controlled relief valve of the multiplex valve