美福电梯的图纸要求1,代码:Code
说明:Description
轿厢净宽:Car width
轿厢净深:Car depth
轿厢高度:Car height
开门净宽:Door open width
开门净高:Door open height
门洞净宽:Door hole width
门洞净高:Door hole height
井道净宽:Shaft width
井道净高:Shaft depth
顶层净高:Top floor height
底坑净深:Pit depth
提升高度:Rising height
机房净宽:Machine room width
机房净深:Machine room depth
机房净高:Machine room height
轿厢轨距:Car gauge
对重轨距:CW gauge
主副轨距:Rail gauge
主轨前距:Main rail distance
额定载荷:Rated capacity
额定速度:Rated speed
最大停站数:Max stops
最大提升高度:Max rising height
最小底坑深度:Min pit depth
最小顶层高度:Main top floor height
电机功率:Motor capacity
电源容量:Power capacity
动力电源:Power supply
照明电源:Light power supply
支撑点受力:Supporting stress
非标说明:Note
轿厢尺寸:Car size
开门形式尺寸:Door Size
2,井道立面图:Shaft Vertical View
底坑受力分布图:Pit stress distribution
顶层吊钩位置图:the top hook locations
门洞留孔图:Door Hole
提升高度:travelling height (TH)
牛腿:haunched beam
吊钩:hook;
在吊钩处标明:marked on the hook
导轨支架每档间隔:ring beam each distance
层高:floor height
砼过梁:concrete beam
客户自理:by customer
门高:door height
弹性圆柱销:elastic cylindrical pin
顶层高:overhead height (OH)
控制柜安装孔(仅在顶层处预留,安装后填补):
controller hole reservation(only top floor reserved fill after installation)
机房地面:machine floor
召唤箱孔:calling box
井道壁:shaft wall
缓冲器墩:buffer basement
爬梯:stairs
3.门洞净尺寸:net door hole height
4.井道右侧立视图:solid view of right side shaft
5.导轨支架连接点(圈梁等)间距每档:the spacing of rail bracket connection point (ring
beam,etc)/each file
6.井道照明间距每盏:shaft lighting spacing / each lamp
7.机房平面布置图:machine room plan
8.排风扇:exhaust fan
9.通风、采光窗:ventilation、lighting window
10.吊钩投影:hook projection
11.井道平面布置图:shaft plan
C向留孔:A direction hole reserved drawing
视图:D view
14.装修后楼面:decorated floor
15.安装完成后二次填充:after installing the second fill 向门洞留孔图:E direction/door hole reserved drawing 17.底坑平面布置图:pit view
请按实际数据填写pls fill in actual data
TR
TH
5层5F
4层4F
3层3F
2层2F
1层1F
-1层-1F
-2层-2F
PD
层站高度(mm)floor height(mm)
_层_站_门_F_S_D
用户签字盖章处:customer signature
日期:date
供方签字盖章处:supply signature
日期:date
合同号:contract No.
设备号:Equip No.
注:本图需双方签章盖章后生效,本图非按比例绘制,请以标注尺寸为准,全部尺寸单位为mm。
Note: this drawing should be signed before using, the drawing is not by scaling, this unit of dimension is mm.
变更记录modify notes
版本V.
标记mark
签名name
日期date
变更内容details of change
项目名称project name
***工程××Project
设计design
电梯土建总体布置图elevator construction drawing
校对check
图号draw No.
审核approve
共1页pages 1
第1页page 1
比例scale
版本V.