01 挡土墙护坡及排水沟施工图 Model (1)

合集下载

某地道路边坡支护及挡土墙施工图纸

某地道路边坡支护及挡土墙施工图纸
路面407411415419423427431435原状土坡线植草护坡按1:1.4坡度放坡按1:1.4坡度放坡植草护坡截水沟EKa=0.52Kaa=0.5X16.9X4.5 X0.52=1002=1.1X3.5X22=84.7G12G=0.5X3.5x1.089X22=41.92=0.5X2.489X22=27.38G34G=0.5X0.472X2.64X22=13.7G=167.7=167.7XCOSa =165.1GN ootG=167.7XsinSa =29.47=100xsin(72.72-10.12-10)=79.44EatnaE=100xcos(71.57-10.49-10)=60.73(165.1+60.73)x0.379.44-29.47=1.35=100xcos(72.72-10)=45.83EazxaE=100xsin(72.72-10)=88.88=2800-1.5XCOt71.57=2.33fX=1.5-2.8xtan10.12=1fZ84.7x0.85+1.76x41.96+27.38X1.3+12.7X1.8+45.83X2.3388.88=3.5c=311.08-88.88165.1=1.35b=b/cosa=2.84oe=1.42-1.35=0.07ev,b/6,p=165.81/2.84(1+6x0.07/2.814)=68maxp=165.1/2.84=58165.1/2.84=58p=max165.81/2.84(1+6x0.07/2.814)=68p=,b/6,vee=1.42-1.35=0.07ob=b/cosa=2.84=1.35165.1311.08-88.88c==1.7100x4.6/396.8x1.95+35.2x0.533+27.5x1.25+13.75x2.5

01 挡土墙护坡及排水沟施工图 Model (1)

01 挡土墙护坡及排水沟施工图 Model (1)

准排水孔设置,孔口用碎石,其后用砾石、粗砂设置。
4、排水沟的排水坡度应大于10%。
5、所有砌石空洞必须填满砂浆。
原 状 土
100
500
#100水泥砂浆 #200块石砌筑
原 状 土
砌石排水沟
300


600
1、护坡的基础必须埋置原状实土层之中,待护坡
原状土层
强度达到80%方能填土,回填表时先填表墙趾,后填表墙背,
原状山坡砌石护坡 500 100 150 500 150 100
一定要分层务实。
2、砌石护用于原状实土山坡削成小于50°坡度后,才能砌
石护面,严禁在填表土上应用。
3、护坡的排水孔预埋设∅100通心竹管,滤水层应对
400
#100水泥砂浆 #200块石砌筑 800~1500 排水孔∅100 每隔20m长设一个
每10m设一个 每15m设一个
排水孔∅10பைடு நூலகம் 每20m长设一个
排水孔∅100 每20m长设一个
30 0
0° D<5
按a<50°削平的原状山坡
h=2000~5000
挡 土 墙 尺 寸 单位:m 墙高h 5.0 4.5 4.0 3.5 3.0 2.5 2.0 1.5 1.0 后置高h1 0.9 0.9 0.9 0.9 0.8 0.8 0.8 0.7 0.7 前趾高h2 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 底宽b 2.9 2.7 2.3 2.1 1.9 1.7 1.6 1.2 1.0 顶宽b1 1.0 1.0 0.8 0.8 0.7 0.6 0.6 0.6 0.6 坡宽b2 1.6 1.4 1.2 1.0 0.9 0.8 0.7 0.6 0.4 趾宽b3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0 0 体积m 3 /m 11.2 9.7 7.4 6.2 4.8 3.7 3.02 1.95 1.33 设一层排水孔 备注 设三层排水孔 设二层排水孔 不设墙趾 砌石排水沟 3 0.17m m(长度)

土方挡土墙护坡工程施工方案3

土方挡土墙护坡工程施工方案3

施工组织设计和施工方案(土方挡土墙护坡工程)目录一、施工方案 (3)二、确保工程质量的技术组织措施 (7)三、主要机具、设备和劳动力配置情况 (9)四、确保文明施工的技术组织措施及环境保护措施 (12)一、施工方案1、工程概括:本工程位于延安市境内,姚永线235号桩、永杨线330号桩、姚永线164号桩、杨姚线30号桩、川南线129高杆桩处存在安全隐患,需要对现存问题进行维修整改。

主要包括:浆砌片块石护坡、挡土墙、排水管、挡土矮墙等2、编制依据国家颁发的现行规范、规程、规则、验标、场坪及挡土墙工程施工定额、概预算编制办法。

现场踏勘调查所获得的有关资料。

我公司拥有的管理水平、劳力设备、技术能力,以及长期从事工程建设所积累的丰富的施工经验。

2、编制范围本次设计范围:回填素土及3:7灰土,,砌筑毛石挡墙,砌筑水渠,浆砌片块石护坡,浇筑混凝土护坡、片石砌筑过水面、铺设波纹管等内容。

3、编制原则严格遵守合同条款的各项要求,根据工程的特点和轻重缓急,分期分批组织施工,在工期安排上尽可能提前完成。

坚持在实事求是的基础上,力求技术先进、科学合理、经济适用的原则。

在确保工程质量标准的前提下,积极采用新技术、新工艺、新机具、新材料、新测试方法。

合理安排施工的程序和顺序,做到布局合理,突出重点,全面展开,平行流水作业、正确选用施工方法,科学组织,均衡生产。

各工序紧密衔接,避免不必要的重复工作,以保证施工连续均衡有序进行。

施工进度安排注意各分项工程间的协调和配合,并充分考虑气候、季节对施工的影响。

结合现场实际情况,因时因地制宜,尽量利用原有设施或就近已有的设施,减少各种临时工程,尽量利用当地合格资源,合理安排运输装卸与储存作业,减少物资运输周转工作量。

坚持自始至终对施工现场全过程严密监控,以科学的方法实行动态管理,并按动静结合的原则,精心进行施工场地规划布置,节约施工临时用地,不占或少占农田,不破坏植被。

严格组织、精心管理,文明施工,创标准化施工现场。

土方挡土墙护坡工程施工方案1

土方挡土墙护坡工程施工方案1

施工组织设计和施工方案(土方挡土墙护坡工程)目录一、施工方案 (3)二、工程质量技术组织措施 (11)三、主要机具、设备和劳动力配置情况 (13)一、施工方案一、工程概况根据线路巡护一队的请示,生产计划科组织工程基建科、安全环保质监科、保卫科进行了现场查看。

二、主要工作量(一)永杨线404#高杆桩附近1、人工配合机械素土回填夯实500m³,黄土外购。

2、人工开挖毛石挡墙基础18m*1.5m*3m,人工3:7灰土回填夯实18m*0.5m*3m,新建毛石挡墙基础18m*1m*3m,新建毛石挡墙18m*(2.5m+1m)/2*3m,毛石挡墙顶部浇筑C20商品混凝土18m*1m*0.1m。

3、人工开挖水渠基础20m*1.2m*1.2m,人工3:7灰土回填夯实20m*1.2m*0.3m,浆砌石水渠基础20m*1.2m*0.3m,浆砌石水渠两侧20m*(0.3m+0.3m)*0.6m,砂浆抹面20m*1.2m。

4、人工种植草籽20m*7m。

三、施工方案第一节、素土回填施工方案1、根据现场实际情况及作业条件,永杨线404#高杆桩附近、永杨线305#高杆桩附近、永杨线415#高杆桩附近、永姚线241#-242#高杆桩附近、)永姚线245#高杆桩附近、永姚线243#高杆桩附近,甲方决定采用素土回填(人工配合机械素土回填夯实),土方为外购土方,土方换填采用分层铺设分层碾压。

2、土方换填施工顺序:槽底清理→检验土料质量→素土回填→分层铺土→碾压密实→找平验收。

3、施工方法:3.1、素土施工前邀请建设单位对土的质量进行检查验收。

3.2、素土回填时,应适当控制含水率。

工地检验方法是对素土的含水量进行试验,3.3、要求达到或接近最佳含水量。

现场的检验方法是用手将素土握成团,两指亲捏即碎为宜。

如土料水分过大或不足时应晾干或洒水湿润。

3.3、基坑(槽)低表面清理干净碾压密实,不能有塑料制品、水等垃圾杂物。

3.4、分层铺素土:每层的素土虚铺厚度为 300mm。

格构梁锚杆挡土墙边坡支护CAD施工图

格构梁锚杆挡土墙边坡支护CAD施工图
叠水水景大树雕塑山顶公园H-0.020CAH-0.250HH-0.200H1户型1.5001.3501.3501.2501.500H1a户型1.480残疾人通道消防车出入口2F大堂入口D 幢街角广场B栋大堂入口市政道路地下车库出入口大堂入口消防车出入口次入口首层架空休闲区大堂入口小区主入口亲水木平台大树欧式亭1.3501.3501.350-0.1001.5001.5001.3501.3501.3502.2500.8002.5502.8502.4501.050-0.101.3501.3501.3502.1501.9501.3501.9502.250BL1.100WL1.4501.9501.650WL1.750BL1.350BL1.45WL1.85-0.45-0.45-0.1001.3501.3501.1000.9002.400水面0.950水面0.850水面0.7502.4501.6502.0501.8502.4501.3501.8502.1502.0501.9501.8501.7501.650WL1.550BL1.5002.1002.3502.3501.6502.2501.150地库入口R20401.3501.4001.5001.3501.3500.9501.601.801.950%%P0.00-0.15-0.452.101.901.5001.3001.700i=2%1.0001.3501.350i=2%1.0001.3501.3501.901.70i=2%1.3001.2001.701.902.101.5001.90i=2%1.2001.350i=2%2.2501.5001.500600600G1户型G2户型G4户型1.3501.3501.3501.3501.6501.6501.3502.051.3501.5001.8001.8001.5001.3501.3501.3501.9001.800

非常细致的护坡及挡土墙施工图

非常细致的护坡及挡土墙施工图
259.79ZK32.05(257.74)7.76(252.03)9.60(250.19)13.30(246.49)3.82(255.97)254.25ZK42.30(251.95)11.60(242.65)4.10(250.15)109%%D04'钻孔间距(m)17.30300%%D∠37%%d(36%%D30')工 程 地 质 剖 面 图比例尺 1:2001──1'236238240242244246248250252254256258260262264266268257.30港城工业园区A片区319国道段边坡治理工程5号挡墙岩土工程勘察项目负责制图审核图号02-1256.38ZK76.40(249.98)8.20(248.18)11.60(244.78)1.55(254.83)255.75ZK84.55(251.20)8.20(247.55)10.10(245.65)13.40(242.35)6.40(249.35)232.51ZK91.63(230.88)11.43(221.08)ZK93.73(228.78)167%%D37'钻孔间距(m)31.1338.11300%%D∠37%%d(26%%D56')工 程 地 质 剖 面 图比例尺 1:2002──2'214216218220222224226228230232234236238240242244246248250252254256258260262264266268270272港城工业园区A片区319国道段边坡治理工程5号挡墙岩土工程勘察项目负责制图审核图号02-2253.85ZK1317.30(236.55)24.40(229.45)20.80(233.05)241.73ZK1410.22(231.51)19.60(222.13)13.90(227.83)238.14ZK158.

110KV变电站挡土墙及护坡

110KV变电站挡土墙及护坡

110k V工业变电站护坡挡土墙施工方案1 10 k V工业变电站项目部20 11年5月2 6日批准:________________________ 年 ____ 月__ 日审核:________________________ 年 ____ 月__ 日编写:________________________ 年 ____ 月__ 日110kV变电站挡土墙及护坡1、工程概况挡土墙及护坡本工程东南北三面挡土墙墙长总计约137m墙体采用MU4(片石砂浆勾缝,墙体厚度0.7M—1.2M,墙体坡度1: 0.35,每隔10- 15M设一道沉降缝,缝宽2cm,内用沥青麻纱塞填。

护面墙顶部高出地面至少10cm挡土墙上部围栏,围栏采用成品栏杆,立柱及竖栏采用全钢方形立柱,墙后用原土夯实。

道两侧3M处采用挂网喷浆处理,锚杆采用© 22螺纹钢长度2500mm间距2500m材2500mm梅花型布置,墙体外部用© 6钢筋网片,钢筋网片用U型卡固定,外部喷射C25砼2、编制依据2.1 《电力建设施工质量验收及评定规程第一部分:土建工程》(DL/T5210.1—2005)2.2 《电力建设施工及验收技术规范建筑工程篇》(建筑工程篇)(SDJ69- 87) 2.3《建筑地基基础工程施工质量验收规范》(GB50202- 2002)2.4 《建筑地基处理技术规范》(JG79—2002J220 —2002)3、作业前的条件和准备3.1技术准备3.1.1组织施工技术人员和主要施工人员审核图纸,会同业主和监理单位进行图纸会审3.1.2施工技术人员编制预算制定施工方案3.1.3提出施工材料预算及委托加工订货3.1.4进行验品评项目划分和业内资料准备3.1.5做好开工前的技术交底和培训工作3.1.6对施工区域进行规划设计,力求科学合理,并制定可行的文明工地管理办法3.2现场准备3.2.1做好测量定位工作3.2.2组织施工机具机械模板钢材棺材的进场和检查维修维护清点工作3.2.3组织材料进场及先期的加工配置工作324对施工平面进行合理的布置做好加工机具的安装325做好施工前的水电路接通铺设工作实行三通一平3.3 材料和设备根据施工图提供材料计划统一报给供应部门由其统一采购机械设备按照施工工程量的需要配备适当的机械机械必须在材料进场前安装调试完成3.4 安全器具施工必备安保用品如安全帽安全带3.5 其它施工完成部分在安装作业前挂警示语牌各专业利用土建结构时办理利用品作业申请单,报项目部负责人审批4. 施工方法及流程安排4.1开挖总体方案本工程护墙基础和围墙基础一起开挖护墙基础开挖深度0.00以下50cm地基为1:5斜坡坡向护墙内侧4.2 施工方法及要求4.2.1挡土墙及护坡施工挡土墙施工填方区基础必须进行强夯处理强夯方法与围墙强夯处理相同。

路基工程(1)最新规范标准

路基工程(1)最新规范标准

第五章路基工程路基工程施工质量验收划分为单位工程、分部工程、分项工程和检验批。

单位工程应按一个完整工程或一个相当规模的施工范围划分,并按下列原则确定:(1)一个区间或一个车站的正线路基为一个单位工程。

(2)一个施工单位担负的路基施工长度为一个单位工程。

(3)特别大型的支挡结构可作为一个单位工程。

分部工程应按一个完整部位或主要结构及施工阶段划分。

分项工程应按工种、工序、材料、施工工艺等划分。

检验批可根据施工及质量控制和验收需要按施工段或部位等划分。

路基工程的分部工程、分项工程和检验批的划分及编号应符合下列各表的规定:路基分部工程、分项工程和检验批的划分及编号(路基单位工程编号0201)原地面平整、碾压检验批质量验收记录表说明主控项目1.设计不作特别处理的地基,经平整、夯压后,其表面应无杂草、树根、腐殖土。

地下水出露处的处理应满足设计要求。

检验数量:施工单位、监理单位全部检查。

检验方法: 观察、核对。

2.当路堤高度小于2.5 m 时,其地基压实质量(除块石类混合料外)应采用双指标控制,压实质量标准应符合下表的规定;不同种类地基土的控制指标应符合下列规定:(1)细粒土和黏砂土,应采用压实系数和地基系数;(2)砂类土(黏砂土除外)应采用相对密度和地基系数;(3)砾石类土和碎石类土,应采用孔隙率和地基系数;(4)块石类混合料,应采用地基系数。

路基基床的压实标准注:① K h 为重型击实试验的压实系数。

② K30 为30 cm 直径荷载板试验得出的地基系数,一般取下沉量为0.125 cm 时的荷载强度。

检验数量:施工单位每100 m 等间距检验 4 个点。

监理单位每200 m 见证检验 2 个点。

检验方法:根据地基土的种类,按下表规定的方法检验。

压实质量的检测方法一般项目1.地面横坡陡于1∶5 时,应按设计在原地面开挖台阶,台阶宽度不小于1 m。

检验数量:施工单位检验9 个点。

检验方法:尺量,水准测量。

换填地基检验批质量验收记录表说明主控项目1.换填所用的填料种类、质量、使用范围应符合设计要求。

  1. 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
  2. 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
  3. 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。

300


6001、护坡ຫໍສະໝຸດ 基础必须埋置原状实土层之中,待护坡
原状土层
强度达到80%方能填土,回填表时先填表墙趾,后填表墙背,
原状山坡砌石护坡 500 100 150 500 150 100
一定要分层务实。
2、砌石护用于原状实土山坡削成小于50°坡度后,才能砌
石护面,严禁在填表土上应用。
3、护坡的排水孔预埋设∅100通心竹管,滤水层应对
400
#100水泥砂浆 #200块石砌筑 800~1500 排水孔∅100 每隔20m长设一个
每10m设一个 每15m设一个
排水孔∅100 每20m长设一个
排水孔∅100 每20m长设一个
30 0
0° D<5
按a<50°削平的原状山坡
h=2000~5000
挡 土 墙 尺 寸 单位:m 墙高h 5.0 4.5 4.0 3.5 3.0 2.5 2.0 1.5 1.0 后置高h1 0.9 0.9 0.9 0.9 0.8 0.8 0.8 0.7 0.7 前趾高h2 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 底宽b 2.9 2.7 2.3 2.1 1.9 1.7 1.6 1.2 1.0 顶宽b1 1.0 1.0 0.8 0.8 0.7 0.6 0.6 0.6 0.6 坡宽b2 1.6 1.4 1.2 1.0 0.9 0.8 0.7 0.6 0.4 趾宽b3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0 0 体积m 3 /m 11.2 9.7 7.4 6.2 4.8 3.7 3.02 1.95 1.33 设一层排水孔 备注 设三层排水孔 设二层排水孔 不设墙趾 砌石排水沟 3 0.17m m(长度)
准排水孔设置,孔口用碎石,其后用砾石、粗砂设置。
4、排水沟的排水坡度应大于10%。
5、所有砌石空洞必须填满砂浆。
原 状 土
100
500
#100水泥砂浆 #200块石砌筑
原 状 土
砌石排水沟