K3+800~K4+000

合集下载

K3 Condor产品系列说明书

K3 Condor产品系列说明书

K3 CondorEffortless weighing of large loads• Very low platform with access ramps.• Only 50 mm in height, faster weighing.• Wide access ramps for stowing without having to manoeuvre.• EP model, suitable for weighing Euro pallets with pallet truck.•C heck and sort products by weight using our 3-colour display..• Customisable ticket or label header and footer, also with date and time.Functions:• Memory for 20 preset tares.• Sum of weighings with totalization.• Memory for 100 items with alphanumerical code.• Piece-counting function with unit weight memory, up to 100 items.• Checkweighing by colour: Set three different colours for easy product sorting by weight.• Customisable ticket or label header and footer, also with date and time.• GMP/GLP, Wireless, USB Direct, EX Link.K3K3K3K3INDUSTRIAL SCALESExternal dimensions (mm)FoldableIts two access ramps are easy to fold to gain space when not in use.Minimal effortThanks to its height of only 50 mm and its wide ramps, you can flexibly load pallets to the scalewith no effort.Special model for Euro palletsOur EP model is especially suitable for weighing Euro pallets, with space for the pallet and the pallet truck.VERIFICATIONK2P INDICATORK3i INDICATORK3i Printer INDICATORK4i INDICATORK2 INDICATORK2E INDICATORK2N INDICATORINDUSTRIAL SCALES(*) For verified units, “M” indicator and Verification certificate have to be included.INDUSTRIAL SCALESIndicator not included.(**) Compatible with Z3, K3, K3i, S2, S3-RS, S5i-RS.(***) Compatible with Z3, K3, K3i, K3i Printer, MK3, MK3 Printer, S2, S3, S5i, S7i.(****) Compatible with K2, K3, K3i, K3i Printer, MK3, MK3 Printer, S2, S3, S5i, S7i.Q2 labelling machine.PR4 printer.COLUMN BRACKETS / BASESCABLESSOFTWARE。

FANUC机床 K参数表

FANUC机床 K参数表

00
生产结束时,M91/M92不停止运转
1
生产结束时,M91/M92停止运转
00
开门不取消屏幕保护
1
开门取消屏幕保护
00
自动侧门调节功能无效[用于调节]
1
自动侧门调节功能有效[用于调节]
00
通过画面设定打开或关闭机内灯
1
用外部信号打开或关闭机内灯
00
用操作盘、画面设定打开程序段跳跃功能
1
用外部信号打开程序段跳跃功能
急停关闭机内清洗冷却剂 刀具重量 3kg 刀具重量 2kg
诊断报警窗口自动显示功能无效 诊断报警窗口自动显示功能有效
简化NC系统画面的配置 不简化NC系统画面的配置 换刀后,不重新启动冷却剂 换刀后,重新启动冷却剂
刀具松开时报警 刀具松开时不报警 奇偶校验按偶数进行 奇偶校验按奇数进行 所有轴互锁信号OFF不停止主轴转动 所有轴互锁信号OFF停止主轴转动 程序保护状态下禁止转塔恢复动作 程序保护状态下可执行转塔恢复动作 接通电源时进行倍率值的初始化 接通电源时不进行倍率值的初始化
00
操作盘上的刀具更换按钮有效
1
操作盘上的刀具更换按钮无效
00
通过操作盘打开单程序功能
1
用外部信号打开单程序段功能
00
通过操作盘打开试运转功能
1
用外部信号打开试运转功能
00
不使用F1位进给
1
使用F2位进给
00
复位时关闭告警级别、破损级别检测输出
1
复位、换刀时关闭告警级别、破损级别检测输出
00
使用AI刀具监控器时告警级别检测、破损级别检测输出有效
M02,M30解除门锁 门锁控制A 门锁控制B

边坡支护(人字形边坡)施工专项方案

边坡支护(人字形边坡)施工专项方案

目录一、编制目的及适用范围 (1)1.1 方案编制目的 (1)1.2 方案适用范围 (1)二、编制依据 (1)三、工程概况 (1)四、施工计划安排 (4)4.1 总体计划安排 (4)4.2 人员组织 (4)4.3 机械设备组织 (5)五、施工工艺流程 (5)5.1 总体施工方案 (5)5.2 混凝土块预制场布置 (5)5.3 脚手架布置 (6)5.4 混凝土块预制 (7)5.5 施工放样 (7)5.6 基槽开挖施工 (7)5.7 砌筑混凝土块施工 (8)5.8 护脚混凝土浇注 (9)5.9 喷播植草 (9)5.9 CF网植草 (9)六、质量控制要点 (10)七、安全控制要点 (11)八、附图 (11)广佛江快速通道江门段工程K3+550~K8+200人字形骨架植草边坡防护专项施工方案一、编制目的及适用范围1.1 方案编制目的为保证广佛江快速通道江门段工程一标段的人字形骨架植草防护施工质量,明确施工作业的工艺流程、操作要点和相应的工艺标准,指导和规范施工。

特制定本方案。

1.2 方案适用范围本方案仅适用于广佛江快速通道江门段工程一标段人字形骨架植草边坡防护施工。

二、编制依据1、《广佛江快速通道江门段工程一标段施工图设计》(第三册、第一分册);2、《公路工程质量检验评定标准》(JTG F80/1-2004);3、《公路路基施工技术规范》(JTG F10-2006);4、《公路工程施工安全技术规程》(JTJ076-95);5、《工程测量规范》(GB50026-2007);6、《全球定位系统(GPS)测量规范》(GB/T18314-2009)7、《公路勘测规范》(JTG C10-2007);8、《公路土工试验规程》(JTG E40-2007);9、《广东省高速公路建设标准化管理规定》、相关标准及技术规范。

三、工程概况广佛江快速通道江门棠下段工程第一项目经理部负责主线1标和2标两个标段的路基、桥涵及相关附属工程施工。

湖北省国道省道交界桩号一览表

湖北省国道省道交界桩号一览表

S106
荷沙线 孝感市 荷沙线 天门市 荷沙线 孝感市 汉宜线 天门市 汉宜线 荆门市 汉宜线
K159+442 91.252 K113+835 70.135
K159+442 91.252 K60+684 K71+018 K113+835 K129+960 K170+840 K183+529 16.984 10.496 42.655 16.125 40.880 12.689
S108
黄土线
K261+363 K326+283 64.920 K326+283 355+493 29.210 K355+493 K362+178 6.685 K0+000 K51+230 51.230 K51+230 K106+759 55.529
第1页
湖北省省道交界桩号一览表
现线路 现线路 编号 名称 行政区 原线路 原行政 名称 名称 等级 武汉市 阳福线 S109 阳福线 黄冈市 阳福线 S110 S111 天孝线 武汉市 天孝线 孝感市 孝天线 省道 县道 县道 省道 省道 省道 国道 K40+610 K0+000 K0+000 K0+000 K0+000 K29+210 K124+569 83.959 K18+400 K26+950 K53+040 K29+210 K54+728 18.400 26.950 44.680 31.900 25.518 K31+900 K68+583 举水桥 /鄂黄长江大桥 K40+610 K0+000 K18+400 K0+000 K0+000 K124+569 K18+400 K45+350 K44+680 K31+900 省道 原起点桩 号 K0+000 市 州 现实际 原止点桩 现起点桩 里程 号 号 (km) K40+610 40.610 K0+000 穿 越 穿 现止点桩 号 K40+610 起止(交界) 行政区名称 点地名 阳逻汽渡南岸 /仙人坟 仙人坟/福田口 天河机场 /界河桥 界河桥/孝感城 区 汉口/新洲 阳逻/举水桥 新洲区 红安县 黄陂区 孝南区 黄陂区 新洲区 新洲区 团风县 黄州区 黄州区 黄州区 黄州区 县道 省道 省道 城市道 路 省道 省道 县道 省道 国主 省道 国道 省道 省道 K0+000 K3+990 K32+900 K2+200 K32+900 K34+900 28.910 2.000 8.900 K0+000 K0+000 K0+000 K0+000 K0+000 K55+710 K4+800 K23+250 K11+490 K16+370 55.710 4.800 23.250 11.490 16.370 K99+693 K194+353 新闸/枫林 鄂黄长江大桥 /新闸 鄂城区 鄂城区 市辖区 市辖区 燕矶、杨叶 西塞 K0+000 K17+210 K0+000 K0+000 K0+000 K0+000 K17+210 K55+710 K4+800 K23+250 K11+490 K16+370 途经主要市镇名称 阳逻、仓埠 太平桥、八里湾、觅儿寺 、高桥、红安、七里坪 天河、祁家湾 祝站、三汊、孝感 谌家矾 汪集、新洲 阳逻、双柳 团风 褚城、黄州 黄州 黄州 黄州 K0+000 K3+990 K32+900 K2+200 K32+900 K34+900 28.910 2.000 8.900 17.210 38.500 4.800 23.250 11.490 16.370 越 县 市 原起点桩 号 K0+000 K40+610 K0+000 K0+000 K0+000 K11+800 K0+000 原止点桩 号 K40+610 区 现实际 里程 (km) 40.610 现起点桩 号 K0+000 K40+610 K0+000 K18+400 K0+000 K11+800 K0+000 K31+900 K41+578 K57+418 K60+668 K66+978 K68+583 K70+783 K99+693 现止点桩 号 K40+610 K124+569 K18+400 K45+350 K11+800 K44+680 K31+900 K41+578 K57+418 K60+668 K66+978 K68+583 K70+783 K99+693 K101+693 鄂黄长江大桥 /新闸 新闸/黄石港 黄石港/西塞 西塞/河口 河口/老渡口 老渡口/富池 富池/枫林 李家桥/纸坊 武东/豹澥互通 中界岭/女儿丘 女儿丘/张家畈 张家畈/关堰口 关堰口/浠水 浠水 /黄石长江大桥 黄石长江大桥 /黄石转盘 黄石转盘/牛角 山/坑头 牛角山 坑头/马叫 栗子坳/土桥 土桥/兰溪 长岭关/牌坊岗 牌坊岗/三里畈 起止(交界) 点地名 阳逻汽渡南岸 /仙人坟 仙人坟/福田口 天河机场 /界河桥 界河桥/孝感城 区 汉口/五湖 五湖/新洲 阳逻/举水桥 举水桥/罗家沟 桥 罗家沟桥 /鄂黄长江大桥

2011-2020湖北省道、国道

2011-2020湖北省道、国道

K113+835 K129+960 16.125 K129+960 K183+529 53.569
东马坊、应城 皂市 钱场、雁门口
S107
汉宜线
天门市 汉宜线 荆门市 汉宜土线
K183+529 K193+853 10.324 K193+853 K261+363 67.510
K139+829 K150+153
K183+529 K193+853 10.324 K193+853 K261+363 67.510
K150+153 K217+663 沙洋大桥/郭场 郭场/伍家岗 黄陂/河口 河口/土岗
K261+363 K362+178 100.815 K217+663 K318+478 K0+000 K51+230 K51+230 51.230 K106+759 55.529 K0+000 K51+230 K51+230 K106+759
S106
荷沙线 孝感市 荷沙线 天门市 荷沙线 孝感市 汉宜线 天门市 汉宜线 荆门市 汉宜线
K159+442 91.252 K113+835 70.135
K159+442 91.252 K60+684 K71+018 K113+835 K129+960 K170+840 K183+529 16.984 10.496 42.655 16.125 40.880 12.689
K0+000 K0+000

路基工程地质条件一览表

路基工程地质条件一览表

路基工程地质条件一览表路基工程地质条件一览表路基工程地质条件一览表路基工程地质条件一览表路基工程地质条件一览表宜安公路边坡坡率及土石含量一览表宜安公路边坡坡率及土石含量一览表宜安公路边坡坡率及土石含量一览表宜安公路边坡坡率及土石含量一览表构造物地基评价一览表地下水与地表水一览表编号:宜安公路A路段施工图设计路基不良地质地段表宜安公路A路段施工图设计路基不良地质地段表宜安公路A路段施工图设计路基不良地质地段表21第二章区域地质概况第一节沿线自然地理一、地形地貌本标段路线桩号为K0+000~K24+320,位于宜春市下浦乡、新坊乡境内,A段路线基本沿袁河支流东河展布,总体地势为北低南高。

全线的地貌类型大致可分为三个大的地貌类型:即发育在起点的溶蚀平原区,中部的冲洪积盆地区,南部的低山丘陵区。

1、溶蚀平原区:位于K0+000~K3+900。

该区地形平坦开阔,起伏小,地面标高一般在82.0~90.0米之间。

受岩溶地质影响,表层覆厚度大,区内多为水田,季节性积水,地表水系较发达。

2、冲洪积盆地区:位于K3+900~K17+250。

本区沿东河呈狭长形展布,地形稍有起起伏,表层覆盖层一般为5~10米,多为水田,地面标高一般在90~180米之间。

东河为本区的主要水系,常年有水。

3、低山丘陵区:位于K17+250~K24+320。

本区地形起伏剧烈,山高林密,侵蚀切割严重,自然坡度一般在24~45度之间。

地形起伏大,地面标高一般在180~487米之间。

下伏基岩为砂质千枚岩及混合岩化花岗片麻岩,风化层厚度大,基岩出露区少。

二、水文气候特征测区主要属于袁河水系,袁河从西向东在路线起点流经本区,河床多呈宽缓“U”字型,宽度一般在100~200米之间,一般发育有一、二级阶地。

据宜春水文观测站历年统计数据,年平均流量43.40米3/秒。

东河为袁河的主要支流之一,属于山区河流,河面宽5~15米,水位易涨易落,路线范围内河床一般呈“U”字型。

弃土场专项施工方案

弃土场专项施工方案

第一章:工程概述 1一、项目概况 1二、工程气象水文 2三、工程任务 2四、编制依据 3第二章:施工部署 3一、施工组织机构 3二、施工管理机构职责 4三、施工组织原则 7四、环境保护管理措施 6五、施工管理水平 8六、弃土场防护工程施工方案 8七、安全保证措施 12八、弃土场环保水保措施 10第三章:协调与地方、政府等单位关系的措施 12一、协调与地方关系 12二、配合好沿线施工队的工作 13三、配合业主做好地方工作 13xx县县城至xx生态文化旅游融合发展先行区连片新村环线公路工程弃土场专项施工方案施工单位:编制日期:2014年10月编制依据1 《xx县县城至xx生态文化旅游融合发展先行区连片新村环线公路工程施工图设计》2 中华人民共和国工程建设标准强制性条文(公里工程部分)2002年版3《公路工程技术标准(JTG B01-2003)》《公路工程施工安全技术规程》JTJ 076 95《公路路基施工规范》(JTG F10—2011)《公路工程施工安全技术规程》(JTJ076-95)《工程建设标准强制性条文》(公路工程部分)。

《中华人民共和国环境保护法》《中华人民共和国水土保持法实施条例》第一章工程概述一、项目概况xx县县城至xx生态文化旅游融合发展先行区连片新村环线公路工程由三段组成,分别是火炬至隆兴段、同盟至五星段、青龙大道延长段。

火炬至隆兴段起于xx县芦阳镇火炬村村委会,起点桩号K0+000,路线沿东北方向利用既有道路线形加宽至骆伙,然后继续沿东北方向展回头线克服高差至骆沟,再转向西北方向利用骆沟至石刀背沟道路线形加宽至石刀背沟桥接X073芦邛路,利用约1.2公里芦邛路至王家村附近后,路线偏离X073芦邛路沿东北方向山脚前行,跨越沫东堰后沿堰布线至钱记鸡场附近,利用现有林区道路及废弃堰道前行绕避红星村居民聚集区及铜鼓庙安置点,之后路线选择有利地形沿升隆堰布线,左转止于xx县xx乡隆兴村山溪沟桥(接X073芦邛路),止点桩号K16+766.51,路线全长16.09902公里。

联想 昭阳K3-IWL 昭阳K4-IWL用户指南

联想 昭阳K3-IWL 昭阳K4-IWL用户指南

昭阳K3-IWL/昭阳K4-IWL 用户指南用前必读使用本文档及其支持的产品之前,请务必先阅读和了解以下信息:•第31页附录A“重要安全信息”•《安全与保修指南》•《设置指南》第一版(2019年4月)©Copyright Lenovo2019.目录关于本文档 (iii)第1章了解计算机 (1)前视图 (1)俯视图 (2)左视图 (3)右视图 (4)功能和规格 (5)USB传输率声明 (6)第2章开始使用您的计算机 (7)Windows10入门 (7)Windows帐户 (7)Windows用户界面 (8)Windows标签 (9)连接到Wi-Fi网络 (9)使用Lenovo Vantage或联想电脑管家 (10)与计算机交互 (13)热键 (13)使用多媒体 (14)使用音频 (14)使用摄像头 (14)连接到外接显示屏 (14)第3章了解您的计算机 (17)管理电源 (17)检查电池状态 (17)为电池充电 (17)检查电池温度 (17)最大限度地延长电池寿命 (17)设置电源按钮行为 (18)设置电源计划 (18)连接启用蓝牙的设备 (18)飞行模式 (18)第4章保护计算机和信息的安全..19使用密码 (19)密码类型 (19)设置管理员密码 (19)更改或删除管理员密码 (19)设置用户密码 (20)启用开机密码 (20)设置硬盘密码 (20)更改或删除硬盘密码 (21)使用指纹读取器(适用于特定型号) (21)使用防火墙和防病毒程序 (21)第5章配置高级设置 (23)UEFI/BIOS (23)UEFI/BIOS设置实用程序是什么 (23)启动UEFI/BIOS设置实用程序 (23)在UEFI/BIOS界面中导航 (23)更改启动顺序 (23)设置系统日期和时间 (24)更改热键模式 (24)启用/禁用always-on (24)更新UEFI/BIOS (24)恢复信息 (25)重置计算机 (25)使用高级选项 (25)Windows自动恢复 (25)制作和使用恢复U盘 (25)第6章帮助和支持 (27)常见问题 (27)自助资源 (28)致电Lenovo (29)联系Lenovo之前 (29)Lenovo客户支持中心 (29)购买附加服务 (30)附录A重要安全信息 (31)附录B辅助功能和人体工程学信息 (43)附录C合规性信息 (47)附录D声明和商标 (59)©Copyright Lenovo2019iii昭阳K3-IWL/昭阳K4-IWL用户指南关于本文档•本文档中插图的外观可能与您的产品不同。

  1. 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
  2. 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
  3. 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。

施工单位:中国水利水电第五工程局有限公司合同号:TZKKQ-SG-06
监理单位:武汉长科工程建设监理有限责任公司编号:

我段施工的太虎路路基土石方工程

表面清理、土石方开挖、路基填筑及压实等施工任务已经全部施工完毕,申请
中间交工,以便进入 施工工序。

亭子口库区道路复建及农田防护工程
中间交工证书

施工单位中国水利水电第五工程局有限公司合同号
TZKKQ-SG-06

施工单位签字申请日期
监理机构签字监理接受人签字接受日期监理单位武汉长科工程建设监理有限责任公司监理机构亭子口库区交通复建和农田防护工程建设监理部中间交工证书内容(桩号、工程划分、工项目、工程数量)K3+800~K4+000 路面结构层施工单位签字日期监理机构对施工单位中间交工证书申请的评述、意见及其结论日期