Fidic 红皮书主要名词中英文对照
FIDIC专用术语中英文对照及关键时间点

1.词汇及名词解释In duplicate一式二份Base date基准日Agree or determine商定或确定The lump sum contract price 以合同价格Advance payment预付款Interest-free loan无息贷款Amortization rate分期摊还比率Interim payments期中付款Schedule of payments付款价格表Instalments 分期付款Rectification or replacement 修正或更换Compounded monthly复利Statement at completion施工报表Written discharge结清证明Deliberate default有意违约Reckless misconduct轻率的不当行为Fixed rates of exchange固定汇率Gratuity赏金Commission回扣Balance余额Reasonably practicable 合理可能情况Indemnities保障Outstanding work扫尾工作Policy保单Copies of the policies 保险单副本Premium保险费The insuring party应投保方Full reinstatement全部复原费用Full force and effect 全面实施和有效Typhoon台风Multiple periods累计Contract agreement合同协议书Tender投标书Performance guarantees履约保证Subcontractor分包商Dab争端裁决委员会Fidic菲迪克(指国际咨询工程师联合会)Base date基准日期(指递交投标书截止前28 天的日期)Commencement date开工日期Tests on completion竣工试验Taking-over certificate接收证书“defects notification period 缺陷通知期限Performance certificate履约证书Final statement最终报表Provisional sum暂列金额Retention money保留金Statement报表Goods货物Permanent works 永久工程Plant生产设备“section分项工程Works工程Performance security履约担保Site现场Variation变更Mail or courier邮寄或信差Approval, certificates, consents and determinations批准、证明、同意和确定Assign转让Confidential秘密Royalty-free免版税Consortium联合体Interim payments期中付款Delegated受托Adequacy, stability and safety完备性、稳定性和安全性Nominated subcontractor指定的分包商Foreseeable预见Setting out放线Sufficiency of the contract price合同价格Nuisance妨害Surface discharges and effluent地面排水及排污Apparatus仪器Visual inspection目视检查Outstanding扫尾Erection安装Trial operation试运行Commissioning投产准备Wreckage残物Fossils化石Review period审核期Rectified修正As-built documents竣工文件Operation and maintenance manuals 操作和维修手册Dismantle拆卸Rates of wages工资标准Recognized good practice公认的良好惯例,Examine, inspect, measure权检查、检验、测量Rejection拒收Extension of time for completion竣工时间延长Expedite progress加快进度Delay damages误期损害赔偿费Deterioration变质Loss or damage损失或损害Outstanding work扫尾工作Remedying defects修补缺陷Performance certificate 履约证书Quotations报价单Invoices, vouchers发票、凭证Duplicate一式二份The outstanding balance of the retention money保留金未付的余额Addendum附录,补遗Undersign文件末尾签名Insert插入,填写In conformity with依照Bind具有约束力Ascertain查明In the capacity of以…的资格Affix签署Prescribe规定Construe解释In witness作为证人,证据Assignee受让人,受托人Specification (技术)规范Pursuant to按照Allocable可分摊的Aggregate总数As appropriate 视情况而定Appliance用具,器具Remedy补救Legal successor合法继承人Tender投标,标书Letter of acceptance 受标通知书Tariff关税Multilateral多变的Treaty条约Enter into force生效Subscribe to签名Apply its rules采用它的规定Oversee监督Preoccupy 关注Mutual共同的Embody包括,体现Liberalize 使…自由化Cope with 应付Implement 贯彻,实施Perplexing 复杂的Proliferate 激增Impose强加Facet方面Interdependence 相互依存Displacement排水量Hatch船舱盖Hull船体Break-buck ship 散货船Hull carriage 托运架Decker甲板层Strongback强基地Conveyor输送设备Roll on/off滚装船Knot节(海里/小时)Congestion拥塞Prohibitive禁止性的Exorbitant过渡的Stilling basin 静水池Waterfront滨水区Congest拥挤Ecology生态学Choke塞满Tideland潮间区Preclude预防,排除Dilute稀释Attach系缚Spring倒缆Hinder阻止Lay绞Galvanize镀锌Nominal标称的,额定的Cushioning缓冲Filament细丝Breasting dolphin 靠船墩Berthing maneuver 靠船Quay实体顺岸式码头Mooring系泊Warehouse仓库Mole堤道码头Tie停泊Lighter驳船Moorage系泊处Berth泊位Trestle栈桥,高架Fender护舷Contrivance 护舷Breakwater 防波堤Scour淘刷Asphalt沥青Crib木笼Caliber质量Rubble抛石Cyclopean 毛石Header丁头石Pile sheet板桩Shaft竖井Dowel销钉Rubble mound 抛石机床Trench沟,地壕Loaded draft 满载吃水Dead weight 载重吨位Turning basin 回转水域Freighter杂货船Tug拖轮Capital资本Throughput中转量Navigational aids航运设施Remote sensing遥感Significant wave height 有效波高Progressive wave推进波Wave crest波顶Wave trough波底Flood-tide涨潮Ebb-tide落潮Tidal range潮差In situ就地Wharf透空顺岸式码头Self-propelled hopper dredge 自航装舱耙吸式挖泥船Trial and error反复试验Grapple dredge抓斗式挖泥船Chain bucker dredge链式挖泥船Hydraulic dredge吸扬式挖泥船Cutterhead pipeline dredge 绞吸式挖泥船Spoil disposal aera 抛泥区Dipper dredge铲斗式挖泥船Pier突码头Gauging station水文站Duly正式的Fluvial dynamics河流动力学Silt up淤积Revetment work护岸工程Bankfull stage漫滩水位Terminal velocity 沉降速度At best至多Cofferdam围堰Screen格栅Embankment填土堤坝,路基Tendon钢筋束Post-tensioned 后张法Abutment支座Crack裂缝Anchorage 锚固 Pre-tensioned先张的Viscosity 粘滞性,粘度 Floodplain 滩涂Chlorine 氯2.关键时间点7天1.Progress Reports shall be submitted monthly thereafter,each within 7 days after the last day of the period to which it relates.以后应每月报告一次,在每次报告期最后一天后7 日内报出。
fidic合同中英文对照

Fidic合同是指国际咨询工程师联合会(Fédération Internationale des Ingénieurs Conseils,简称FIDIC)制定的一系列国际工程合同标准。
以下是FIDIC合同中英文对照的一些常见术语:1. 业主(Employer):甲方2. 承包商(Contractor):乙方3. 工程师(Engineer):监理单位4. 合同价格(Contract Price):合同总价5. 合同期限(Contract Time):工期6. 质量保证(Quality Assurance):质量保证期7. 付款方式(Payment Method):支付方式8. 变更指令(Variation Order):变更通知9. 索赔(Claim):索赔申请10. 延期(Delay):延期申请11. 分包(Subcontracting):分包合同12. 竣工验收(Completion and Acceptance):竣工验收13. 保留金(Retention Money):保证金14. 违约金(Penalty):违约金15. 争议解决(Dispute Resolution):争议解决方式16. 保险(Insurance):保险责任17. 环境保护(Environmental Protection):环境保护责任18. 安全生产(Safety Production):安全生产责任19. 劳动权益(Labor Rights and Interests):劳动权益保障20. 信息交流(Information Exchange):信息交流和沟通以上仅为FIDIC合同中部分常见术语的中英文对照,实际应用时还需根据具体合同条款进行理解和翻译。
FIDIC中英对照

投标函附录(Appendix to Tender)转让(Assignment) 进场道路(Access Route)中标合同金额(Accepted Contract Amount)避免干扰(Avoidance of Interference)预付款(Advance Payment) 仲裁(Arbitration)申请期中支付证书(Application for Interim Payment Certificate) 竣工文件(“as built” documents)工程量清单(Bill of Quantities) 基准日期(Base Date)合同(Contract) 合同协议书(Contract Agreement)竣工(Completion) 合同价格(Contract Price)费用(Cost) 开工日期(Commencement Date)承包商的设备(Contractor’s Equipment) 合作(Co-operation) 承包商代表(Contractor’s Representative)承包商的文件(Contractor’s Documents)通信联络(Communications) 承包商(Contractor)承包商的一般义务(Contractor’s General Obligations )承包商人员(Contractor’s Personnel)承包商的现场作业(Contractor’s Operations on Site )开工(Commencement of Works) )雇主责任的终止(Cessation of Employer’s Liability )支付货币(Currencies of Payment) 工程所在国(Country)分包合同(Construction Subcontract)承包商的索赔(Contractor’s Claims)索赔、争端与仲裁(Claim, Disputes and Arbitration)图纸(Drawings) 缺陷通知期(Defects Notification)日期(Dates) 结清证明(Discharge)决定(Determinations) 误期损害赔偿费(Delay Damages)缺陷责任(Defects Liability) 计日工作(Daywork)延误的付款(Delayed Payment) 争议裁决委员会(DAB)业主(Employer) 业主的风险(Employer’s Risks)雇主人员(Employer’s Personnel) 估价(Evaluation)雇主的资金安排(Employer’s Financial Arrangements)雇主的索赔(Employer’s Claims) 工程师(Engineer)业主的设备(Employer’s Equipment)电、水和燃气(Electricity, Water and Gas)竣工时间的延长(Extension of Time)业主的接收(Employer’s Taking Over)最终报表(Final Statement) 不可抗力(Force Majeure)最终付款证书(Final Payment Certificate)外币(Foreign Currency) 化石(Fossils)货物(Goods)工程师指令(Instructions of the Engineers) 解释(Interpretation) 期中支付证书(Interim Payment Certificate) 检验(Inspection) 最终支付证书的签发(Issue of Final Payment Certificate)保险(Insurance) 投保人(insurance applicant)保险单(insurance policy)被保险人(insured)联合被保险人(joint insured)中标函(Letter of Acceptance)投标函(Letter of Tender) 责任限度(Limit of Liability) 当地币(Local Currency) 法律(Laws)计量方法(Method of Measurement)实施方法(Manner of Execution)材料(Materials)指定分包商(Nominated Subcontractor)遗留工作(Outstanding Work)合同当事人(Party) 文件优先次序(Priority of Documents)履约证书(Performance Certificate)支付证书(Payment Certificate) 生产设备(Plant)暂定金额(Provisional Sum) 付款(Payment)进度计划(Programme)永久工程(Permanent Works) 履约担保(Performance Security) 环境保护(Protection of the Environment)许可证,执照或批准(Permits, Licenses or Approvals)保留金的支付(Payment of Retention Money)暂列金额(Provisional Sums) 进度报告(Progress Reports)质量保证(Quality Assurance)保留金(Retention Money) 工程进度(Rate of Progress)现场进入权(Right of Access to the Site) 拒收(Rejection)修补工作(Remedial Work)复工(Resumption of Work)工程师的更换(Replacement of the Engineer)有权变更(Right to Vary)风险与责任(Risks and Responsibility)支付计划表(Schedule of Payments) 样品(Samples)资料表(Schedules) 规范(Specification)竣工报表(Statement at Completion)报表(Statement) 单位工程(Section)分包商(Subcontractor) 现场(Site)放线(Setting Out) 安全措施(Safety Procedures)现场数据(Site Data) 暂时停工(Suspension of Work)现场安保(Security of Site) 职员与劳工(Staff and Labour)投标书(Tender ) 试验(Testing)竣工时间(Time for Completion)竣工试验(Tests on Completion)接收证书(Taking-over Certificate)竣工后试验(Tests after Completion)临时工程(Temporary Works)竣工检验(Tests on Completion)货物运输(Transport of Goods)工程和单位工程的接收(Taking Over of the Works and Sections) 业主提出终止(Termination by Employer )发包商提出终止(Termination by Employer)不可预见(Unforeseeable) 变更(Variation)不可预见的物质条件(Unforeseeable Physical Conditions)变更与调整(Variation and Adjustment)价值工程(Value Engineering)变更程序(Variation Procedure)工程(Works) 工程计量(Works to be Measured)。
FIDIC红皮书__(中英文对照)

1.1 测量方法12.2 Method of Measurement除非合同中另有规定,无论当地惯例如何:Except as otherwise stated in the Contract and notwithstanding local practice:(a) 测量应该是测量每部分永久工程的实际净值,以及(a) measurement shall be made of the net actual quantity of each item of the Permanent Works, and(b) 测量方法应符合工程量表或其他适用报表。
(b) the method of measurement shall be in accordance with the Bill of Quantities or other applicable Schedules.1.2 估价12.3 Evaluation除非合同中另有规定,工程师应通过对每一项工作的估价,根据第3.5款【决定】,商定或决定合同价格。
每项工作的估价是用依据上述第12.1款和第12.2款商定或决定的测量数据乘以此项工作的相应价格费率或价格得到的。
Except as otherwise stated in the Contract, the Engineer shall proceed in accordance with Sub-Clause 3.5 [Determinations] to agree or determine the Contract Price by evaluating each item of work, applying the measurement agreed or determined in accordance with the above Sub-Clauses 12.1 and 12.2 and the appropriate rate or price for the item.对每一项工作,该项合适的费率或价格应该是合同中对此项工作规定的费率或价格,或者如果没有该项,则为对其类似工作所规定的费率或价格。
FIDIC专用术语中英文对照及关键时间点

1.词汇及名词解释In duplicate一式二份Base date基准日Agree or determine商定或确定The lump sum contract price 以合同价格Advance payment预付款Interest-free loan无息贷款Amortization rate分期摊还比率Interim payments期中付款Schedule of payments付款价格表Instalments分期付款Rectification or replacement 修正或更换Compounded monthly复利Statement at completion施工报表Written discharge结清证明Deliberate default有意违约Reckless misconduct轻率的不当行为Fixed rates of exchange 固定汇率Gratuity赏金Commission回扣Balance余额Reasonably practicable 合理可能情况Indemnities保障Outstanding work扫尾工作Policy保单Copies of the policies 保险单副本Premium保险费The insuring party应投保方Full reinstatement全部复原费用Full force and effect全面实施和有效Typhoon台风Multiple periods累计Contract agreement合同协议书Tender投标书Performance guarantees履约保证Subcontractor分包商Dab争端裁决委员会Fidic菲迪克(指国际咨询工程师联合会) Base date基准日期(指递交投标书截止前28 天的日期)Commencement date开工日期Tests on completion竣工试验Taking-over certificate接收证书“defects notification period缺陷通知期限Performance certificate履约证书Final statement最终报表Provisional sum暂列金额Retention money保留金Statement报表Goods货物Permanent works永久工程Plant 生产设备“section分项工程Works工程Performance security履约担保Site现场Variation变更Mail or courier邮寄或信差Approval, certificates, consents and determinations批准、证明、同意和确定Assign转让Confidential秘密Royalty-free免版税Consortium联合体Interim payments期中付款Delegated受托Adequacy, stability and safety完备性、稳定性和安全性Nominated subcontractor指定的分包商Foreseeable预见Setting out放线Sufficiency of the contract price合同价格Nuisance妨害Surface discharges and effluent地面排水及排污Apparatus仪器Visual inspection目视检查Outstanding扫尾Erection安装Trial operation试运行Commissioning投产准备Wreckage残物Fossils化石Review period审核期Rectified修正As-built documents竣工文件Operation and maintenance manuals 操作和维修手册Dismantle拆卸Rates of wages工资标准Recognized good practice公认的良好惯例,Examine, inspect, measure权检查、检验、测量Rejection拒收Extension of time for completion 竣工时间延长Expedite progress加快进度Delay damages误期损害赔偿费Deterioration变质Loss or damage损失或损害Outstanding work扫尾工作Remedying defects修补缺陷Performance certificate履约证书Quotations报价单Invoices, vouchers发票、凭证Duplicate一式二份The outstanding balance of the retention money保留金未付的余额Addendum附录,补遗Undersign文件末尾签名Insert插入,填写In conformity with 依照Bind具有约束力Ascertain查明In the capacity of 以…的资格Affix签署Prescribe规定Construe解释In witness作为证人,证据Assignee受让人,受托人Specification(技术)规范Pursuant to按照Allocable可分摊的Aggregate总数As appropriate视情况而定Appliance 用具,器具Remedy补救Legal successor合法继承人Tender投标,标书Letter of acceptance 受标通知书Tariff关税Multilateral多变的Treaty条约Enter into force生效Subscribe to签名Apply its rules采用它的规定Oversee监督Preoccupy关注Mutual共同的Embody包括,体现Liberalize使…自由化Cope with应付Implement贯彻,实施Perplexing复杂的Proliferate激增Impose强加Facet方面Interdependence 相互依存Displacement排水量Hatch船舱盖Hull船体Break-buck ship 散货船Hull carriage托运架Decker甲板层Strongback强基地Conveyor输送设备Roll on/off滚装船Knot节(海里/小时)Congestion拥塞Prohibitive 禁止性的Exorbitant过渡的Stilling basin静水池Waterfront滨水区Congest拥挤Ecology生态学Choke塞满Tideland潮间区Preclude预防,排除Dilute稀释Attach系缚Spring倒缆Hinder阻止Lay绞Galvanize镀锌Nominal标称的,额定的Cushioning缓冲Filament细丝Breasting dolphin 靠船墩Berthing maneuver 靠船Quay实体顺岸式码头Mooring系泊Warehouse仓库Mole堤道码头Tie停泊Lighter驳船Moorage系泊处Berth泊位Trestle栈桥,高架Fender护舷Contrivance护舷Breakwater防波堤Scour淘刷Asphalt沥青Crib 木笼Caliber质量Rubble抛石Cyclopean毛石Header丁头石Pile sheet板桩Shaft竖井Dowel销钉Rubble mound 抛石机床Trench沟,地壕Loaded draft满载吃水Dead weight载重吨位Turning basin回转水域Freighter杂货船Tug拖轮Capital资本Throughput中转量Navigational aids航运设施Remote sensing遥感Significant wave height有效波高Progressive wave推进波Wave crest波顶Wave trough波底Flood-tide涨潮Ebb-tide落潮Tidal range潮差In situ就地Wharf透空顺岸式码头Self-propelled hopper dredge 自航装舱耙吸式挖泥船Trial and error反复试验Grapple dredge抓斗式挖泥船Chain bucker dredge链式挖泥船Hydraulic dredge吸扬式挖泥船Cutterhead pipeline dredge 绞吸式挖泥船Spoil disposal aera 抛泥区Dipper dredge 铲斗式挖泥船Pier突码头Gauging station 水文站Duly正式的Fluvial dynamics 河流动力学Silt up淤积Revetment work 护岸工程Bankfull stage漫滩水位Terminal velocity 沉降速度At best至多Cofferdam围堰Screen格栅Embankment填土堤坝,路基Tendon钢筋束Post-tensioned 后张法Abutment支座Crack裂缝Anchorage 锚固Pre-tensioned 先张的Viscosity 粘滞性,粘度Floodplain 滩涂Chlorine 氯2.关键时间点7天1.Progress Reports shall be submitted monthly thereafter, each within 7 daysafter the last day of the period to which it relates.以后应每月报告一次,在每次报告期最后一天后7 日内报出。
(1999新红皮书中英文对照版)FIDIC土木工程施工合同条件

Fédération Internationale Des Ingénieurs-Conseils通用条件General Conditions1.一般规定General Provisions1.1 定义Definitions在包括专用条件和本通用条件的合同条件(“本合同条件”)中,以下措辞和用语的含义如下所述。
除非上下文中另有要求,指当事人和当事各方的词包括公司和其它法律实体。
In the Conditions of Contract ("these Conditions"), which include Particular Conditions and these General Conditions, the following words and expressions shall have the meanings stated. Words indicating persons or parties include corporations and other legal entities, except where the context requires otherwise.1.1.1 合同1.1.1 The Contract1.1.1.1“合同(Contract)”指合同协议书、中标函、投标函、本合同条件、规范、图纸、资料表、以及在合同协议书或中标函中列明的其它进一步的文件(如有时)。
1.1.1.1 "Contract" means the Contract Agreement, the Letter of Acceptance, the Letter of Tender, these Conditions, the Specification, the Drawings, the Schedules, and the further documents (if any) which are listed in the Contract Agreement or in the Letter of Acceptance.1.1.1.2“合同协议书(Contract Agreement)”指第1.6款【合同协议】中所说明的合同协议(如有时)。
FIDIC红皮书_ 中英文对照

Fédération Internationale Des Ingénieurs-Conseils1.1 测量方法12.2 Method of Measurement除非合同中另有规定,无论当地惯例如何:Except as otherwise stated in the Contract and notwithstanding local practice:(a) 测量应该是测量每部分永久工程的实际净值,以及(a) measurement shall be made of the net actual quantity of each item of the Permanent Works, and(b) 测量方法应符合工程量表或其他适用报表。
(b) the method of measurement shall be in accordance with the Bill of Quantities or other applicable Schedules.1.2 估价12.3 Evaluation除非合同中另有规定,工程师应通过对每一项工作的估价,根据第3.5款【决定】,商定或决定合同价格。
每项工作的估价是用依据上述第12.1款和第12.2款商定或决定的测量数据乘以此项工作的相应价格费率或价格得到的。
Except as otherwise stated in the Contract, the Engineer shall proceed in accordance with Sub-Clause 3.5 [Determinations] to agree ordetermine the Contract Price by evaluating each item of work, applyingthe measurement agreed or determined in accordance with the above Sub-Clauses 12.1 and 12.2 and the appropriate rate or price for the item.对每一项工作,该项合适的费率或价格应该是合同中对此项工作规定的费率或价格,或者如果没有该项,则为对其类似工作所规定的费率或价格。
FIDIC红皮书_ 中英文对照

Fédération Internationale Des Ingénieurs-Conseils1.1 测量方法12.2 Method of Measurement除非合同中另有规定,无论当地惯例如何:Except as otherwise stated in the Contract and notwithstanding local practice:(a) 测量应该是测量每部分永久工程的实际净值,以及(a) measurement shall be made of the net actual quantity of each item of the Permanent Works, and(b) 测量方法应符合工程量表或其他适用报表。
(b) the method of measurement shall be in accordance with the Bill of Quantities or other applicable Schedules.1.2 估价12.3 Evaluation除非合同中另有规定,工程师应通过对每一项工作的估价,根据第3.5款【决定】,商定或决定合同价格。
每项工作的估价是用依据上述第12.1款和第12.2款商定或决定的测量数据乘以此项工作的相应价格费率或价格得到的。
Except as otherwise stated in the Contract, the Engineer shall proceed in accordance with Sub-Clause 3.5 [Determinations] to agree ordetermine the Contract Price by evaluating each item of work, applyingthe measurement agreed or determined in accordance with the above Sub-Clauses 12.1 and 12.2 and the appropriate rate or price for the item.对每一项工作,该项合适的费率或价格应该是合同中对此项工作规定的费率或价格,或者如果没有该项,则为对其类似工作所规定的费率或价格。
- 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
- 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
- 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。
1.General Provisions一般规定Contract 合同Contract Agreement 合同协议书1.6Letter of Acceptance 中标函1.1.3 (a. 业主对承包商正式接受函,签字;b.双方商定的其他内容,双方签字)Letter of Tender 投标函(承包商的报价函)Specification 规范Drawings 图纸Schedules 明细表Tender 投标书(a. 投标函;b. 投标者填写的各类明细表,投标保函等)Appendix to Tender 投标函附录Bill of Quantities 工程量表Daywork Schedule 计日工表Parties and Persons 合同双方和人员Engineer 工程师(natural/legal)(监理)DAB 争端裁决委员会(投标函附录列出)FIDIC 国际咨询工程联合会(International Federation of Consulting Engineers)Dates 日期Tests 检验Periods 期间Completion 竣工Base Date 基准日期(提交投标书截止日期之前的第28天当天;与调价有关)Commencement Date 开工日期(工程师通知开工的日期)Time for Completion 竣工日期(指时间段,从开工日期开始计算)Tests on Completion 竣工检验Taking-over Certificate 接收证书(证明工程按照合同实质竣工,进入缺陷通知期)Tests after Completion 竣工后检验Defects Notification Period 缺陷通知期维修期Performance Certificate 履约证书Money and Payments 款项和支付Accepted Contract Amount 中标合同金额(中标的承包商的投标价格,名义合同价格)Contract Prise 合同价格(a. b.包含根据合同进行的调整)Cost 费用(承包商现场内外全部合理开支,不包括利润)Final Payment Certificate 最终支付证书(承包商将从业主方拿到的最后的一笔工程款)Final Statement 最终报表Foreign Currency 外币Interim Payment Certificate 期中支付证书Local Curency 当地币Payment Certificate 支付证书(期中和最终)Provisional Sum暂定金额(相当于业主方的备用金)13.5 /14.2Retention Money 保留金(现金保证金,保证承包商在工程的执行的过程中恰当履约)14.3/14.9 Statement 报表(完成工程量的合同价值及其他相关情况月报竣工报表最终报表)Works and Goods 工程和货物(eg. 材料,永久设备,施工机具…完成的工程火或其一部分)Contractor’s Equipment 承包商设备(承包商的施工机具)Goods 货物Materials 材料Permanent Works 永久工程Plant 永久设备(构成永久工程的一切装置、设备和车辆)Section 区段(分段工程)Temporary Works 临时工程Works 工程Other Definitions 其他定义Contractor’s Documents 承包商的文件(一般不构成合同的一部分)Contry工程所在国Employer’s Equipment 业主的设备(业主想承包商提供)Force Majeure 不可抗力19.LawsPerformance Security 履约保证4.2Site 现场Unforeseeable 不可预见Variation 变更13.Interpretation 解释Communications 通信联络(certifier 签发人批准,证书,许可与决定不得无故扣发或延误) Law and Language (ruling language 主导语言)Priority of Documents 文件的优先次序(规范优先于图纸)Assignment 转让(合同中权利的转让)/novation(合同中义务和责任转让给另一方)Care and Supply of Documents 文件的照管和提供Delayed Drawing or Instructions延误的图纸或指令Employer’s Use of Contractor’s Documents 业主使用承包商的文件Contractor’s Use of Employer’s Documents 承包商使用业主的文件Confidencial Details 保密事项(know-how 技术诀窍不同于patent 专利,不受法律保护)Compliance with Law 遵守法律Joint and Several Liability 共同的及各自的责任(joint venture 联营体/consortium 联合体/grouping团体后而这一般不具备法人性质)2.The Employer 业主Right of Access to the Site进入现场的权利(向承包商提供现场的义务;业主按照投标函附录规定的时间向承包商提供现场)Permits, Licences or Approvals 许可证,执照或批准(业主协助承包商获得业主国文件)Employer’s Personnel 业主的人员Employer’s Financial Arrangements 业主的资金安排Employer’s Claims 业主的索赔3.The Engineer工程师Engineer’s Duties and Authority 工程师的职责和权力(无权更改合同)Delegation by Engineer 工程师的委托(委托人员是否越权,工程师最终决定权,提供证据)Instructions of the Engineers 工程师的指令(是否超出合同规定的工作范围1.3/13)Replacement of the Engineer 工程师的变更(提前42天拟替代人的名字告知承包商,承包商可反对)Determinations 决定(impartial 无偏/fair公平)4.The Contractor承包商Contractor’s General Obligations 承包商的一般义务Performance Security 履约保证(中标后28天内提交业主同时抄报工程师复印件;a. Performance Bank Guarantee 银行开的履约保函,额度为合同额的10%-conditional有条件/unconditional demand无条件b. Surety Bond 担保公司或保险公司开具,额度一般较大;Standby Letter of Credit 备用信用证)Contractor’s Representation 承包商代表(项目经理)Subcontractors 分包商(最终款项结算前总承包商提供Affidavit 宣誓书)Assignment of Benefit of Subcontractor 分包合同权益的转让Cooperation 合作2.1Setting Out 放线(承包商负有核实业主提供的原始数据准确性的义务)Safety Procedure 安全措施Quality Assurance 质量保证(编制一套质量保证体系)ISO9001Sita Data 现场数据(4.12)Sufficiency of the Accepted Contract Amount 中标合同金额的充分性(4.10的进一步规定/4.12)Unforeseeable Physical Conditions 不可预见的外界条件Rights of Way and Facilities 道路通行权与设施使用权(承包商自费;4.15)Avoidance of Interference 避免干扰(承包商承担)Access Route 进场路线(承包商自费)Transport of Goods 货物运输(提前21天通知工程师)Contractor’s Equipment 承包商的设备Protection of Environment 环境保护Electricity, Water and Gas 电水和燃气(承包商自费2.5/3.5)Employer’s Equipment and Free-issue Materials 业主的设备和免费供应的材料(2.5/3.5)Progress Report 进度报告(主要内容有哪些?Non-performance Report违规报告)Security of Site现场保安Contractor’s Site Operation 承包商的现场作业(井条有序)Fossils 化石(4.12不可预见的外部障碍)5.Nominated Subcontractort 指定承包商Definitin of Nominated Subcontractort(13.5)定义Objection to Nomination对指定的反对(反对的理由和条件)Payment to Nominated Subcontractor对指定分包商的付款(13.5暂定金额)Evidence of Payments 付款证据6.Staff and Labour 职员和劳工Engagement of Staff and Labour 雇佣职员和劳工Rates of Wages and Conditions of Labour 工资标准和工作条件(对当地通行的工人工资标准详细调查)Persons in the Service of Employer 正在服务于业主的人员Labour Laws劳动法规Working Hours(加班问题)Facilities for Staff and Labour 为职员和劳工提供设施(承包商提供,除了硬件设施,使用费eg.车辆用油、电话费…呢?)Health and Safety健康和安全Contractor’s Superintendence 承包商的管理工作(Scope /Time /Cost / Human Resource / Risk /Quality / Contract/Communication)Contractor’s Personnel 承包商的人员Records of Contractor’s Personnel and Equipment承包商的人员和设备的记录(每月向工程师提交)Disordely Conduct 妨碍治安行为7.Plant, Materials and Workmanship 工程设备、材料和工艺Manner of Execution 实施方式Samples 样品Inspection检查Testing检验Rejection 拒收Remedial Work 补救工作Ownership of Plant and Materials 工程设备和材料的使用权Royalties 矿产使用费mencement, Delay and Suspension 开工、延误及暂停Commencement of Work 开工(工程师提前7天通知承包商,收到中标函42天内开工;8.6/15.2/2.1)Time for Completion 竣工时间(工期;10.1; 1.1.3.3竣工时间)Programme 进度计划(收到开工通知后的28天内向工程师提交;工程师有意见则在收到后21天内通知承包商;不是合同文件的一部分;8.6/8.8/15.2)Extension of Time for Completion竣工时间的延长(20.1)Delays Caused by Authorities当局引起的延误Rate of Progress 进展速度(业主可根据2.5索赔)Delay Damages 拖期赔偿费(时间=接收证书上书名的实际完工日期- 合同竣工日期;总额不能超过投标函附录中规定的最高限额;damages赔偿费≠penalty罚款;若拖期赔偿费标准明高于业主损失太大或被认为有惩罚性质则可能被法律认定无效)Suspension of Work 暂停工作Consequences of Suspension暂停的后果(3.5)Payment for Plant and Materials in Event of Suspension暂停工作情况下对永久设备和材料的支付Prolonged Suspension持续的暂停(超过84天承包商颗要求工程师允许其复工)Resumption of Work 复工9.Tests on Completion 竣工检验Contractor’s Obligations 承包商的义务(certified report 检验报告)Delayed Tests 延误的检验Retesting 重新检验Failure to Pass Tests on Completion未能通过竣工检验10.Employer’s Taking Over 业主的接收Taking Over of the Works and Sections工程和区段的接收Taking Over of Parts the Works部分工程的接收Interference with Tests on Completion 对竣工检验的干扰(14天,应为承包商准备好开始进行竣工检验的前一天之后的14天)Surface Requiring Reinstatement 地面需要复原(该工作属于扫尾工作应在缺陷通知期中完成,所签发的接收证书一般仅证明工程“基本”竣工,非全面竣工)11.Defects Liability缺陷责任Completion of Outstanding Work and Remedying Defects 完成扫尾工作和修复缺陷(缺陷通知期从接收证书上面注明工程基本完成的那一日期开始的,长度为365天)Cost of Remedying Defects 修复缺陷的费用Extension of Defects Notification Period缺陷通知期的延长(2.5 ;延长的时间不得超过2年)Failure to Remedy Defects 未修复缺陷Removal of Defective Work 移走有缺陷的工作Further Tests 进一步的检验Right of Access 进入权Contractor to Search承包商调查Performance Certificate 履约证书(只有工程师向承包商签发履约证书之后才能认为承包商的义务已经完成;在最后一个缺陷通知期届满后28天内签发,或承包商提交全部承包商文件完成工程并进行检验和修复全部缺陷条件下尽快签发)Unfulfilled Obligations 未履行的义务(如,承包商申请最终支付证书和提交结清单,工程师签发最终支付证书,业主的支付义务,索赔争端解决等)Clearance of Site现场清理(承包商收到履约证书28天内清理,若没有业主可将进行出售或处理,费用承包商承担从所售收入扣取,多退少补)12.Measurement and Evaluation计量和估价Works to be Measured 工程计量Method of Measurement 计量方法Evaluation 估价(一项工作数量变动超过量单或其他明细表的10%,变化量*单价超过中标合同款项0.01%,对单位工作量费用直接影响超1%,该项工作没有在合同中标为“固定单价项”时确定新的单价或价格;)Omissions删减(all-inclusive rate综合单价)13.Variation and Adjustment 变更和调整Right to Vary有权变更Value Engineering 价值工程Variation Procedure 变更程序(工程师签发变更指令前承包商提交建议书:变更实施方法计划,工程总体进度计划因变更xu6进行调整的计划,对变更的费用估计,按12.估价)Payment in Applicable Currencies以适用的货币支付Provisional Sums暂定金额Daywork计日工Adjustment for Change in Legislation因立法变动调整(本款规定仅使用于工程所在国法律变动)Adjustment for Change in Cost 因费用波动调整14.Contract Price and Payment 合同价格和支付The Contract Price合同价格Advance Payment 预付款Application for Interim Payment Certificate 申请期中支付证明Schedule of Payments 支付计划表(季度现金流量计划没有约束力)Plant and Materials Intended for the Works拟用于工程的永久设备和材料Issue of Interim Payment Certificate 期中支付证书的签发Payment支付(进度款为工程师收到承包商的报表后56天支付承包商;最终结算款为业主收到最终支付证书后56天内支付)Delayed Payment 延误的付款(注:合同中不但要规定业主延误支付时要负担的利息,还要规定承包商还有暂停甚至终止合同的权利,否则在工作中可能极为被动)Payment of Retention Money 保留金的支付Statement of Completion 竣工报表Application for Final Payment Certificates 申请最终支付证书(承包商应在收到履约证书后56天内想工程师提交最终报表草案作为结算申请书)Discharge结清单Issue of Final Payment Certificate 最终支付证书的签发Cessation of Employer’s Liability业主责任的终止(Limitation Period诉讼时效)Currencies of Payment支付货币15.Termination by Employer 业主提出终止Notice to Correct 通知改正Termination by Employer 业主提出终止Valuation at Date of Termination 终止日的估价Payment after Termination 终止后的支付Employer’s Entitlement to Termination 业主终止合同的权利16.Suspension and Termination by Contractor承包商提出暂停和终止Contractor’s Entitlement to Suspend Work 承包商暂停工作的权力Termination by Employer 承包商提出终止Cessation of Work and Removal of Contractor’s Equipment停止工作以及撤离承包商的设备Payment on Termination 终止时的支付17.Risks and Responsibility 风险和责任Indemnities 保障Contractor’s Care for the Works承包商对工程的照管Employer’s Risks业主的风险(政治,社会,污染及外力,业主行为)Consequences of Employer’s Risks业主风险的后果Intellectual and Industrial Property Right知识产权和工业产权Limit of Liability责任限度18.Insurance保险General Equipments for Insurance保险的总体要求(insurance policy保险单,insurance applicant 投保人,insured 被保险人,joint insured联合被保险人,endorsement批单,adjuster理赔估算师)Insurance for Works and Contractor’s Equipment工程和承包商的设备保险(Construction All Risks施工一切险,Erection All Risks安装一切险,Employer’s Liability Insurance雇主责任险,Third Party Liability Insurance 第三方责任险)Insurance against Injury to Persons and Damage to Property人员伤亡及财产损害保险Insurance for Contractor’s Personnel承包商人员的保险19.Force Majeure 不可抗力Definition of Force Majeure不可抗力的定义Notice of Force Majeure 不可抗力通知Duty to Minimise Delay有责任将延误降低到最小限度Consequences of Force Majeure不可抗力的后果Force Majeure Affecting Subcontractor不可抗力影响到分包商Optional Termination,Payment and Release 可选择的终止,支付以及解除履约Release from Performance under Law根据法律解除履约20.Claim,Dispute and Arbitration 索赔,争端和仲裁Contractor’s Claims承包商的索赔Appointment of the Dispute Adjudication Board 任命争端裁定委员会Failure to Agree the Dispute Adjudication Board 未能就争端裁定委员会达成协议Obtaining Dispute Adjudication Board’s Decision 获得争端裁定委员会的决定Amicable Settlement 友好解决Arbitration仲裁(ICC International Court Arbitration国际商会国际仲裁院,UNCITRAL Arbitration Rules联合国国际贸易法委员会仲裁规则)Expiry of Dispute Adjudication Board’s Appointment 争端裁定委员会的任期届满。