高海拔特长公路隧道内施工环境测试与分析骆文学【摘要】白茫雪山3#特长公路隧道施工面临高海拔、低温、低含氧量、低气压等问题.为采取必要措施改善施工环境,开展了隧道内O2体积分数、CO体积分数、湿度及温度的现场测试.结果表明:隧道内湿度稳定在80%左右,温度多在10 ℃以上,满足混凝土强度增长要求,但需加强冬季隧道内温度的监测;隧道掘进400 m以后O2体积分数呈线性降低,CO体积分数急剧增大,均不满足规范要求,需加大通风量.%The construction of Baimang xueshan super-long highway tunnel faces the problems of high altitude,low temperature,low oxygen density,low pressure and so on.To take necessary measures to improve the work environment,field tests were carried out to obtain the volume fraction of O2 and CO,humidity and temperature in tunnel.The results show that humidity in tunnel was stable about 80%,and temperature was more than 10 ℃.The humidity and temperature met requirements of concrete strength growth.But it is necessary to strengthen the monitoring of environmental temperature in winter.While the excavation length was over 400 m,the volume fraction of O2 decreased linearly and the volume fraction of CO increased sharply,which could not meet the requirements of specifications.So the ventilation flow must be increased.【期刊名称】《铁道建筑》【年(卷),期】2017(000)007【总页数】3页(P91-93)【关键词】公路隧道;高海拔地区;隧道内施工环境;现场试验;O2体积分数;CO体积分数;湿度;温度【作者】骆文学【作者单位】中铁十二局集团第二工程有限公司,山西太原 030032【正文语种】中文【中图分类】U456白茫雪山3#隧道地处迪庆藏族自治州德钦县白马雪山自然保护区内。

雪山隧道

雪山隧道
雪山隧道-隧道内部
雪山隧道极度恶劣的地质,共有6处断层、98处剪裂带及36处地下涌泉,所以施工人员则戏称为「泡在水里长大的隧道」,也因工程雪山隧道不仅只有西行线及东行线两座主隧道,还包括中间的导坑;雪山隧道主隧道中间每隔350公尺皆设有一个人员逃生出口的连接导坑,并于每1400公尺更设有两座主隧道的车行联络道,共有28座横向的人行联络通道、8座车行联络道,方便在雪山隧道内发生灾难时能让车辆利用对向隧道顺利且快速离开事故现场,加上抽排风系统所挖掘的竖井、通风孔道等大大小小长长短短的隧道组成,因此成为全世界规模最大双孔公路隧道群;雪山隧道内的墙壁更依路段不同绘制了原住民的各族图案,不仅增加景观变化,更可提醒驾驶人所到之路段。
雪山隧道旅游
从雪山隧道开通之后,民众前往宜兰、花莲和台东地区旅游更为方便,台湾东部一日游已不成问题,大溪渔港、桃源谷、草岭古道、北关海潮公园、石盘寮瀑布都是宜兰头城相当著名的旅游景点,但驾驶人需特别注意的是,雪山隧道内禁止变换车道,雪山隧道内虽有照明设备但依规定须强制开大灯,且严格限制行车时速依每路段不同,约在50公里至70公里之间,行车安全距离须保持50公尺以上喔!
地 址:
台北县坪林乡请以现场公告为准,不另行通知!
北宜高速公路简介
北宜高速公路又称蒋渭水高速公路及国道五号,全长约54公里,北起南港系统交流道与国道三号相接,两端分别为台北县南港系统交流道至宜兰县苏澳镇段之间,北宜高速公路全程设有石碇、坪林、头城、宜兰、罗东、苏澳等交流道,还有石碇服务区、头城收费站(2006年9月18日开始收费)、苏澳收费站、南港隧道、石碇隧道、乌涂隧道、彭山隧道、雪山隧道等5座隧道,其中以雪山隧道最受国人瞩目,是台湾旅游景点的新宠儿。
雪山隧道简介
雪山隧道(Hsuehshan Tunnel)为北宜高速公路(国道五号、又称蒋渭水高速公路)之间,隧道全长12.9公里,雪山隧道是台湾最长的公路隧道,目前为亚洲第二长的公路隧道,在世界公路隧道排行第五;雪山隧道正于2006年6月16日正式通车启用,因隧道两端分别为台北县坪林乡至宜兰县头城镇段之间,最初命名为坪林隧道,但隧道穿越雪山山脉故改称『雪山隧道』,雪山隧道的开通让台北到宜兰台2线、台9线的路程,从2小时缩短为50分钟即可到达,让国人在周休假期出门旅游时在交通上更加的便利。

台湾雪山隧道简介

台湾雪山隧道简介
自动照像执法、号角喇叭多
32
导坑贯通(92.10.20)
33
主坑北上线全线贯通(93.3.17)
34
主坑南下线TBM全断面开挖突破镜面(93.8.12)
35
雪山隧道全线贯通(93年9月16日)
36
雪山隧道开挖统计
钻炸法(M) 导坑 北上线 南下线 6,112 12,486 5,603 TBM(M) 5,168 456 3,870
国道五号 南港头城段
全长 31 公里
建设经费601亿元 双向四车道 隧道(双向)11座 占路线长度20.3公里 桥梁(双向)38座 占路线长度6.0公里 交流道3处 行控中心专用道1处 收费站1处 服务区1处 交通控制系统、隧道机电 8 系统及收费系统
1
5
南港系统交流道 南港隧道、石碇隧道 石碇交流道
37
隧道交控系统布设
设 备 布 设 原 则 车辆侦测器 350公尺,紧急停车弯
闭路电视摄影机
车道管制号志 速限可变标志
175公尺,洞口前
350公尺,洞口处 350公尺,洞口前
紧急电话
信息可变标志 公务用无线电 防消用无线电 播音用号角喇叭
175公尺,车、人行横坑内
紧急停车弯下游端、入口前与LCS共架 全线布放 全线布放 50公尺
92.02.24 导坑出现最大涌水量超过300公升/秒
29
雪山隧道施工回顾(一)
80.07.15 80.08.20 82.01.06 82.07.23 85.05.02 85.08.21 85.03.21 85.07.20 86.12.15 导坑开工。 导坑南口钻炸法开始施工。 导坑TBM开始开挖。 雪山隧道主坑开工。 北上线TBM开始开挖。 南下线TBM开始开挖 导坑北口开始施工。 主坑南下线北口开始施工。 北上线南洞口遭遇大涌水(最大涌水量达 750公升/秒),TBM夹埋。

特长隧道施工通风监测预警研究蒋文权

特长隧道施工通风监测预警研究蒋文权

特长隧道施工通风监测预警研究蒋文权发布时间:2021-08-26T03:38:24.398Z 来源:《建筑工人》2021年第6期作者:蒋文权1 蒙荣1 王鹏举2 卯申殷3 万家华2 杨晓谦2 张发亮3张荣1 崔淑丽1[导读] 风量调节办法具体有两种:一是根据调节进风口或出风口的阀门开度,这种办法导致了能源的极大消耗;二是根据变频调速实现风量调节,进而实现环保节能的目的。

本部分主要讲解了变频控制风量的基本原理。

1.云南交投集团公路建设第三工程有限公司 650000;2.云南云岭公路工程注册安全工程师事务所有限公司 650200;3.云南交投普澜高速公路有限公司 665000摘要:现阶段,绝大多数公路隧道工程施工均选用新奥法施工,主要选用钻爆法开挖,出料多选用无轨运输。

在挖掘环节中,为做好稀释工作、清除岩体释放出有害气体、工程爆破形成的炮烟、灰尘、维持良好空气条件,需要对开挖面深入开展通风工作。

特长隧道中,自然风对隧道内的空气置换作用相对来说较小,如果不采取一定的有效措施,一氧化碳浓度值会慢慢上升,当到达相应浓度值时,会严重危害生命安全。

随粉尘浓度值的增多,隧道内的可见度会遭受到相应的干扰,而可见度较低是工程施工安全事故的主要因素。

因而,深入开展特长隧道通风工作监测预警系统的研究是本文的重点。

关键词:特长隧道;通风监测;预警系统;PID1 风量调节技术风量调节办法具体有两种:一是根据调节进风口或出风口的阀门开度,这种办法导致了能源的极大消耗;二是根据变频调速实现风量调节,进而实现环保节能的目的。

本部分主要讲解了变频控制风量的基本原理。

针对风机而言,在额定转速n1和转速n2不同的条件下,可得到出风量Q2与转速Q1之间的关系式,并可用于表示:上式为增量式PID控制算法,本算法需要对控制量进行记忆,但是具有算式中不需要累加、每次只输出控制变化量、手动—自动切换时冲击小等优点。

3 通风监控预警系统设计3.1 系统功能需求(1)根据项目外部空气的污染情况,自动切换清洗、过滤、隔离等通风方式,必要时可手动切换通风方式。

特长隧道施工通风关键控制参数研究

特长隧道施工通风关键控制参数研究

特长隧道施工通风关键控制参数研究发布时间:2021-09-15T05:29:18.964Z 来源:《城镇建设》2021年13期5月作者:白祖应1,侯丁语2,韩孟微2,张发亮1,潘明朋2,程军委1,何强2,高荣清2,蒙荣3 [导读] 隧道通风参数是保证隧道施工安全生产、提高工人劳动安全卫生水平白祖应1,侯丁语2,韩孟微2,张发亮1,潘明朋2,程军委1,何强2,高荣清2,蒙荣31.云南交投普澜高速公路有限公司 6650002.云南云岭公路工程注册安全工程师事务所有限公司 6502003.云南交投集团公路建设第三工程有限公司 650000摘要:隧道通风参数是保证隧道施工安全生产、提高工人劳动安全卫生水平、预防和抵御灾害的重要环节。

随着隧道监控技术的发展,通风安全监控设备在隧道施工中得到广泛应用。

本文研究了澜沧江特长隧道通风关键参数、风量计算及风机优化方法,以供参考。

关键词:特长隧道;通风参数;控制1 工程概况澜沧江隧道属越岭隧道,地形波状起伏,山体自然坡度较陡,坡度一般在25~40°。

隧道穿越区最大标高1257m,最低标高663m,相对高差594m。

隧道进口位于糯扎渡第一村西侧一南北向小型冲沟左侧坡近坡脚处,坡面朝向东,地形较陡,自然坡角约30~40°。

2 混合式通风关键参数确定2.1 风机需风量计算送风风机需风量按如下的公式进行计算:Qs=Q0·(1-β)(-L/100)=1033×(1-0.015)(-3650/100)=1794m3/min 式中:Q0——隧道正洞掌子面需风量,根据计算为1033m3/min;β——风管百米漏风率,1.5%;L——隧道通风极限长度,3650m。

基于CFD理论和FVM计算方法,结合《澜沧江特长隧道混合式施工通风送排风量数值模拟研究》模拟结果计算,当排风风量与送风风量的比值介于1.1~1.3之间,通风效果最佳,此时新风风流以较大风速抵达掌子面,并且以较大面积冲击掌子面,因而排风风机需风量确定为2152m3/min。

公路隧道通风网络理论的研究及应用

公路隧道通风网络理论的研究及应用
却 f
△q
理 , 鬻于可: , 得 是
j l

c j 主 2rqj-
dq / j
1…
’, , ( ) 2 … f 7
式 中分 子部分 应描 述 为 :
△: g 。
a 却 g1 a gf


() 3
=∑ [ q) p ry / 一 J 1 =



自然 分风值 o 为 交通 通 风 力 , 述 为交 通 流所 在 p 描
a g
Q =[ , q …, ] g g , q 。 ,
将式 ( ) 1 用泰 勒公 式 展开 即 :

2 . S
20 0 8年第 3期
1 1
广东公 路勘 察设 计
总第 11 3 期

) 1 ) k ∑襄 删 ’ + q ∑ ÷ ()., + .

如 图 1 的节 点 为 m、 支 为 7的通 风 网 络 , 示 分 1 ,
12 、…表示节点号 ; 、 …表示分 支号 , ① ② 网络 中仅
有交 通 通 风 力 P 作 用 。选 定 一 组 独 立 回路 风 量
1 通 风 网 络基 本 理 论
计 算 理 论 服 从 流 体 力 学 基 本 定 律 。 节 点 风
J=I
2 通风 网 络 中各 种 压 力 源 的 处 理 方 法
通 风 网络 中用得 最普 遍 的是 斯 考 特 一恒 斯 雷
式 中 : P —— 第 支路 交通 通 风力 ;
9 一第 _ 路分 支 风量 ; _ 『 支
— —
第 支 路分 支风 阻 ;
法求解 的 回路法 。 回路 法 是 指 以独立 回路 作 为 具

两安特长隧道高地温条件下施工通风技术研究

两安特长隧道高地温条件下施工通风技术研究

两安特长隧道高地温条件下施工通风技术研究张行道【摘要】Take the long tunnel construction as the background, study on the construction of extra long tunnel under the conditions of high temperature and ventilation. With the increase of the hole depth, the temperature rising, the rapid deterio-ration of environment construction, in the construction process, it combined with the engineering practice, the design of con-struction ventilation in stages, and optimize the design of ventilation and strength the smoke exhaust effect, improve the working environment, and summed up the scientific and effective tunnel construction ventilation technology and reasonable the equipment in the construction of repeated practice, in order to provide a reference for similar engineering construction.%以贵广客运专线两安特长隧道施工为背景,对高地温条件下特长隧道施工通风进行研究。

随着洞深增加,温度不断升高,洞内施工作业环境急剧恶化,在施工过程中,结合工程实际,分阶段进行了施工通风设计,并不断进行优化设计,加强通风排烟效果,不断改善洞内施工作业环境,并在反复的施工实践中总结出科学有效的特长隧道施工通风技术和合理的设备配置,以期为类似工程施工提供可借鉴的经验。

国内特长公路隧道通风系统设计案例介绍与点评

国内特长公路隧道通风系统设计案例介绍与点评

5.包家山隧道
• 阿北线(内蒙古阿荣旗至广西北海)陕西
境小河—安康高速公路
近期(2015年)
交通量(Pcu/d) 长度(m) 行车方向纵坡 (%) 需风量(m3/s) 通风分段 11285 左洞 11200 +0.4%,3355m -1.98%,7845m 615 3
远期(2029年)
31216 右洞 11195 +1.978%,7900m -0.4%,3295m 1647 4
488 2
0.5%(3452) -0.817%(3278)
424 2
11.羊角隧道
送风斜井长度: 595.7m 倾角16.7°
排风斜井长度: 688m 倾角17.4°
点评
• 通风方案基本合理,但考虑到左右洞的需
风量均较小,因此这样的布置略显豪华。 • 其实通过优化,可以将两条通风斜井合并 成一条斜井,以减少工作量。
斜井长度: 763.5m,25° 送风道面积:28.7m2 排风道面积:21.2m2
竖井深度: 156.8m 送风道面积:23.5m2 排风道面积:26.8m2
点评
• 需风量计算结果是偏大的,不论是按照规
范计算的结果还是按照细则结算的结果; • 斜井、竖井均没有考虑左右洞共用是最大 的缺憾,工程量的浪费是在所难免的;如 果考虑共用的话,可以节省两个斜井; • 设置斜井或许是想实现长洞短打、分担主 洞的出渣,但是如此大的纵坡,无法采用 无轨运输,出渣效率是很低的。
3.虹梯关隧道
3.虹梯关隧道
点评
• 通风系统的设置风格类似于秦岭终南山隧道,因 •
此总体而言是完美的; 吹毛求疵找缺陷的话,一是左线隧道是以换气需 风量控制的,分3段通风略显浪费(可以从左洞近 远期的通风风速都很小可以看出);二是1号斜井 与2号斜井、3号斜井与4号斜井是否可以合并,以 减少斜井工程量(通过设置隔板,将1个斜井断面 分割成4个小块,左右2块排风、中间再划分成上 下2块用于送风)。 设置斜井或许是想实现长洞短打、分担主洞的出 渣,但是如此大的纵坡,无法采用无轨运输,出 渣效率是很低的。
  1. 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
  2. 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
  3. 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。

Vr 7. 75 8. 12
图 5 上坡隧道塞车, 竖井无法对该隧道进行充分 通风, 浓度超过安全标准
这是一个非常极端的现象, 西向隧道的通风需 求非常庞大而东向隧道的需求很小。首先, 依前述 的方法迭代调整西向隧道的竖井流量, 发现在上游 第一座竖井位置的烟雾浓度就已经超过了安全标准 ( 0. 0056m- 1, 图 5) , 显示该段通风区间的通风不足, 此时若加强通风设备运转, 所耗去的电量将非常可 观; 若不控制进入该隧道的交通量以减轻负荷( 每条 隧道皆有其最大交通负荷量) , 则必须有其它措施以 维持空气质量, 例如静电集尘可降低烟雾浓度, 或与 通风需求较低 的隧道交换空气以降低 污染物浓度 等。当欲依前述的方法调整出第一座竖井所需流量 时, 发现即使竖井将上游的污浊空气完全排出并打 入等量的新鲜空气, 仍然无法使第二座竖井位置的 烟雾浓度合于安全标准。
0. 0056m- 1) 时的竖井流量, 见图 3。例如第一个通 风竖井 Q sh1 的送风量为 605m3 / s, 其中 240m3 / s 提 供给东向隧道, 365m3/ s 提供给西向隧道, 而排风量 则假设与送风量相同。东向代表由台北到宜兰, 西 向代表由宜兰到台北。另外, 在迭代竖井流量的过 程中, 隧道风速的变化很小, 故可知隧道通风在正常 运作状况下主要是由车行效应所提供的交通风力占
3 隧道污染物分析
3. 1 污染物运动 污染物被排放到空气中, 主要是借着空气的流
动而传递, 另外通风设备( 射流风机、竖井) 及车辆行 驶都将造成周围空气迅速地均匀混合, 程度依状况 而不同。取隧道内壁所围成的一段控制体积分析其 中污染物浓度变化, 以体积百分率来表示污染物浓 度, 空气的进出及内部污染源产生污染物, 都会改变 污染物的浓度。污染物的运动 方程式可以下 式表
# 51 #
公路隧道
用就如同是通风需求大的隧道的额外通风管道, 即 交换空气可分担单孔通风所需的庞大通风负荷。
2 汽车隧道内的空气动力学分析
对隧道内气流进行空气动力学分析之前, 进行
假设: ¹ 一维不可压缩流; º隧道断面积不变; »通
风竖井的排气与进气流量相同。
考虑隧道内壁所围成的区域为控制体积, 流经 隧道内的空气有如一条空气柱, 在连续、不可压缩的
小车排放 CO 基本量
0. 12m3 hr
大车排放烟雾基本量
0m3 hr
小车排放烟雾基本量
125m3 hr
CO 允许浓度
70 p pm
V I 允许浓度
0. 007m- 1
设计浓度比例
0. 8
污染物紊流扩散系数
0m 2 s- 1
隧道坡度
1. 26% - 1. 26%
车速
50km/ h 70km/ h
车速修正因子
表 2 雪山隧道以空气互换辅助竖井通风模拟参数


空气密度 自然风速 隧道全长 隧道断面积 隧道海拔 隧道当量直径 大车流量 小车流量 车道数目 大型车比例 大车阻力等效面积 汽车阻力等效面积 射流风机流量 大车排放 CO 基本量 小车排放 CO 基本量 大车排放烟雾基本量 小车排放烟雾基本量 CO 允许浓度 V I 允许浓度 设计浓度比例 污染物紊流扩散系数 隧道坡度
雪山东、西隧道共用 3 座通风竖井及 3 座空气 互换 管 道, 通 风 竖 井 位 置 分 别 在 1. 85、5. 94、 9. 58km 处( 由西向 东) ; 空气 互换管道 位置分别 在 3. 88、7. 78、11. 20km 处( 由西向东) , 故每两座共同 通风竖井间有一座空气互换管道, 第三座空气互换 管道则位于第三座通风竖井与隧道东边出口间, 系 统如图 2 所示。外界新鲜的空气送风井送入后, 分 成两股气流流入两隧道内与隧道内的空气合并, 然
0. 8 0m 2 s- 1 1. 26% 70km/ h
1. 07 1. 13
1 1. 59
西向隧道 ( 上坡)
692 辆/ h 2316 辆/ h
- 1. 26% 50km/ h
0. 96 1. 1 0. 7
# 54 #
东线隧道 西线隧道
Q sh1 16 332
Q sh2 16 458
Qs h3 16 458
大部份, 隧道内风速主要由交通状况决定。由这些 结果可做出下列结论:
Q sh1 Q sh2 Q s h3 V r
东线隧道 240
240
240
7. 2
西线隧道 365
365
365
8. 6
图 3 下坡隧道塞车, 两隧道共用竖井充分通风的浓度分布
( 1) 改变竖井流量几乎不影响烟雾浓度梯度( 即 斜率) , 但对竖井的排污效果却有相当影响。
( 9)
式中, q0 ) ) ) 每部车的基本排放量, 随车而异;
f i ) ) ) 道路坡度修正因子, 无坡度时值为 1;
f v ) ) ) 车速修正因子, 车速在 60km/ h 时值为
1;
f h ) ) ) 道路高度修正因子, 在海平面时值为 1。
若污染物是烟雾, 则:
q = q0 # f iv # f h # m
# 52 #
2009 年第 4 期( 总第 68 期)
示,
9C 9t
=-
Vr
9C 9x
+
D
9 9
2 2
C x
+
#
Q-
CQ b A r $x
( 8)
等号右边第一项代表污染物向下游传递, 第二
项代表污染物的紊流扩散速率, 第三项代表污染源 产生污染物速率, 第四项代表通风竖井抽出污染物
速率。污染物在隧道中紊流扩散可降低局部最高浓
公路隧道
2009 年第 4 期( 总第 68 期)
台湾雪山特长公路隧道通风系统分析
金文良 编译
( 广东省公路勘察规划设计院有限公司 广州 510507)
摘 要 本文通过空气动力学及污染物运动分析发展程 序模拟台湾雪山隧道内的污 染物浓度分 布。车行上坡 隧
道塞车是雪山隧道的最大通风需求工况, 雪山隧 道通风设计 最大的 特点是将 通风竖 井和空 气互换 管道整 合一体, 故隧 道塞车时的最大通风需求可由相邻隧道共同分担。通风竖井或空气互换处是 隧道内空气 最污浊的 地方, 通 风 设备运作使通风竖井或空气互换处的污染 物浓度 恰能 符合安 全标 准即 可; 通 风竖 井较 空气互 换耗 电但排 污最 有 效, 空气互换对平衡两隧道通风需求差都有优良效 果, 两者功 能类似。本 文模拟 雪山隧 道在数种 不同交 通流状 况 下的通风需求及隧道内的污染物分布。
车速 车速修正因子 道路高度修正因子 道路坡度修正因子 车速- 坡度修正因子
东向隧道 ( 下坡) 1. 2kg m- 3 0ms- 1 12 93 0m 56. 6m2 1 25 m 7. 8m 509 辆/ h 1703 辆/ h 2 车道
23 % 5. 9m2 1. 0m2 0m 3 s- 1 0. 08m3 hr 0. 12m3 hr 0m3 hr 125m3 hr 75 p pm 0. 007m- 1
( 2)
( 1) 隧道两端大气压差所造成的自然风力
Fn =
2QA r ( E+
F+
f
L DH
)Vn
Vn
( 3)
( 2) 交通风力
Ft = 2QA eN + ( V t - V r ) 2 - Q2 A eN - ( V t + V r ) 2
( 4)
( 3) 通风竖井推力
Fs =
QQ b ( K b
Q A
b b
cos
B-
K eV r)
( 5)
( 4) 射流风机升压力
Fj =
nGm QQ
j
(
Qj Aj
-
Vr )
( 6)
( 5) 隧道壁的摩阻损失
Ff =
Q2 A r ( E+
F+
f
L DH
)
V
r
Vr
( 7)
故式( 2) 为 Vr 的函数, 而式( 1) 为一常微分方
程式, 以 4 阶的 Runge- Kut t a 方法可求解。
# 53 #
公路隧道
2009 年第 4 期( 总第 68 期)
东线隧道 西线隧道
Q sh 1 70 175
Q sh2 262 385
Q sh3 240 287
Vr 7. 11 8. 2
图 4 下坡隧道塞车, 两隧道共用竖井 进行最经济 通风的浓度分布
第三种情况: 两隧道各自独立通风, 西向隧道上 坡且车流拥塞( 表 2) 。
关键词 雪山 隧道 通风 竖井
1 引言
我国 台 湾 地 区 建 成 的 北 宜 高 速 公 路, 全 长 31km 路程约有 20km 是 隧道, 其中 最长的公路 隧 道 ) ) ) 雪山隧道长 12. 9km。雪山隧道采用双洞单
向行驶、3 竖井送排式纵向通风( 图 1) 。系统中除了 包含射流风机外, 共用的通风竖井及空气互换管道 的应用将两隧道通风结合为一体, 无论在设计或施 工上都有创新的地方, 受到世界瞩目。
后沿着所进入的隧道顺流行进。当经过空气互换管 道( Int erchange duct ) 时, 则被抽出部份空气流到另 一隧道反向行进, 最后在原先的通风竖井被排出隧 道。当隧道具有坡度时, 车行上坡隧道中的烟雾浓 度较车行下坡隧道高得多, 故在与车行下坡隧道交 换空气时是以较污浊的空气交换到污染较低、较新 鲜的空气, 而车行下坡隧道则正好相反。简单地说, 在两隧道进行空气互换时, 通风需求小的隧道其作
度, 而 降 低 程 度 视 实 际 交 通 状 况 决 定。 本 文 以