项目竣工验收资料模板(1)
项目竣工验收报告标准版模板(10篇)

项目竣工验收报告标准版模板(10篇)(经典版)编制人:__________________审核人:__________________审批人:__________________编制单位:__________________编制时间:____年____月____日序言下载提示:该文档是本店铺精心编制而成的,希望大家下载后,能够帮助大家解决实际问题。
文档下载后可定制修改,请根据实际需要进行调整和使用,谢谢!并且,本店铺为大家提供各种类型的经典范文,如演讲稿、总结报告、合同协议、方案大全、工作计划、学习计划、条据书信、致辞讲话、教学资料、作文大全、其他范文等等,想了解不同范文格式和写法,敬请关注!Download tips: This document is carefully compiled by this editor. I hope that after you download it, it can help you solve practical problems. The document can be customized and modified after downloading, please adjust and use it according to actual needs, thank you!In addition, this shop provides you with various types of classic sample essays, such as speech drafts, summary reports, contract agreements, project plans, work plans, study plans, letter letters, speeches, teaching materials, essays, other sample essays, etc. Want to know the format and writing of different sample essays, so stay tuned!项目竣工验收报告标准版模板(10篇)2023项目竣工验收报告标准版模板(10篇)在项目竣工时大部分人都对写验收报告很是头疼的,随着人们自身素质提升,越来越多人会去使用报告,不同种类的报告具有不同的用途。
施工单位竣工验收报告模板(10篇)

施工单位竣工验收报告模板(10篇)施工单位竣工验收报告模板篇1一、工程概况:1、工程名称:2、工程地点:3、建筑面积及层数:4、质量目标:实现合同规定的合格目标。
5、建设单位:6、监理单位:7、设计单位:8、地质勘察单位:9、施工单位:10、工程特点:该工程层数,结构形式,结构安全等级,结构设计使用年限年。
本地区设防烈度小于6度,因本工程为楼,按重点设防类别进行抗震设计,抗震丙类处理。
本工程混凝土强度等级:孔桩为C30、地梁为C30、一~三层柱为C30,各层梁、板、楼梯为C30、工程于开工,提交验收。
二、该项目工程完成简况:根据参建各方合同约定的内容,工程设计、施工等均按要求的项目完成任务,达到合同的质量等级要求,在本工程设计、施工过程中,严格执行各项法律、法规、质量保证资料、施工管理及建筑材料、构配件和设备的出厂检验报告等档案资料齐全有效。
根据施工图约定的内容,审查完成情况如下:1、完成设计项目情况:基础、主体、室内外装饰工程;给排水工程、消防工程;建筑电气安装工程;屋面工程;经审查基础工程合格、主体工程合格、室内外装饰工程合格、屋面工程合格;给排水工程合格;建筑电气工程合格;消防工程合格。
2、技术档案和施工管理资料:经审查建设前期、施工图设计审查等技术档案齐全;监理技术档案和管理资料齐全;施工技术档案和管理资料齐全。
3、试验报告:经审查主要建筑材料(钢材、水泥、砖、砂、石、防水材料、电气材料等)试验报告齐全,符合要求。
4、工程质量保修书:工程质量保修书已签订,并编制了质量保证书和房屋使用说明书。
三、监督和整改情况:在工程建设的每一分部、分项过程中:建设、设计、监理、施工等单位密切配合,较好地完成了各项工程的检查,检查中严格地把住了质量关,对需要整改的地方,一经提出施工方便立刻认真整改,整改后监理方进行复查验收,达到标准要求后,才能进入下道工序施工。
在施工过程中,监理单位严格按照国家的建筑工程施工质量标准要求施工,配合各参建单位完成了本工程的施工监理任务,工程施工过程中的每一个工序都严格按照监理大纲、监理程序做,保证了工程质量。
竣工验收表格样本

竣工验收表格样本
项目信息
- 项目名称: [项目名称]
- 公司名称: [公司名称]
- 项目负责人: [项目负责人]
- 验收日期: [验收日期]
验收标准
设计要求
- [设计要求1]
- [设计要求2]
- [设计要求3]
施工要求
- [施工要求1]
- [施工要求2]
- [施工要求3]
验收内容
基本信息
- 建筑面积: [建筑面积] - 地址: [地址]
- 建筑用途: [建筑用途]
建筑外观
- [建筑外观1]
- [建筑外观2]
- [建筑外观3]
结构安全
- [结构安全1]
- [结构安全2]
- [结构安全3]
室内装修
- [室内装修1]
- [室内装修2]
- [室内装修3]
空调通风
- [空调通风1]
- [空调通风2]
- [空调通风3]
电气设备
- [电气设备1]
- [电气设备2]
- [电气设备3]
消防设施
- [消防设施1]
- [消防设施2]
- [消防设施3]
验收结论
- 本次竣工验收,项目符合设计要求和施工要求。
- 室内装修、空调通风、电气设备和消防设施均符合相关标准和要求。
- 建筑外观和结构安全经过验收合格。
验收人员
- 项目负责人: [项目负责人]
- 工程监理: [工程监理]
- 建设单位代表: [建设单位代表] 请以上人员签字确认。
2023项目工程竣工验收报告模板(10篇)

2023项目工程竣工验收报告模板(10篇)项目工程竣工验收报告模板篇1一、实施项目回顾__用友ERP-T6系统实施项目从20__年12月28日启动至今,在__软件开发有限公司与__双方领导的大力支持和关心下,用友公司咨询顾问和__项目组关键成员辛勤努力,先后完成了项目培训、业务调研、模拟运行以及切换上线等阶段性项目任务,各阶段工作基本按计划完成。
通过双方项目组共同努力,__T6系统于已正式上线。
目前__各相关业务部门已开始全面应用用友ERP—T6系统的总帐、报表、应付、采购、库存、存货、固定资产、工资等子系统,已完成日常管理工作。
二、项目验收组织为客观评价实施项目的任务完成情况及所取得的成果,合作双方组织成立项目验收小组,共同完成对此次实施工作的验收,小组成员如下:__酒店项目实施成员:__软件公司咨询实施成员:三、实施项目总体评价项目验收小组一致认为,系统运行稳定,计算数据准确、信息传递及时,实现了最初确定的实施目标:同时,项目验收小组一致认为,__T6项目的实施是卓有成效的。
双方项目组把对软件系统的理解与对企业管理的深刻认识有机的结合起来,并应用到整个实施过程中。
通过规范基础管理、统一物料名称和编码、优化部分业务流程、编制全面的系统应用准则和规程,在系统全面应用的基础上有效的促进了企业管理的规范,并将对企业综合管理水平进一步提高产生积极而深远的影响。
综合以上各方面因素,项目验收小组认为__酒店用友ERP—T6系统实施达到了预期效果,符合__软件开发有限公司提出的管理业务信息化、集成化的基本需求,同意接受该软件系统投入正常运行,至此该项目的实施工作基本结束,同意对该项目验收。
此次由__软件开发有限公司实施的用友ERP-T6系统是成功的,在实施项目即将结束之时,对实施项目进行验收是对双方实施项目组工作成果的肯定。
项目验收并不表示双方合作的结束,而是标志着双方合作新阶段的开始。
实施项目验收后,用友公司将一如既往地为__提供技术支持服务。
工程竣工项目验收报告模板

工程竣工项目验收报告模板工程竣工项目验收报告模板篇1一、工程概况本工程为小型农田水利工程,地处榕江县栽麻乡,距县城35公里。
栽麻乡片区设计灌溉面积1410亩,其中新增灌溉面积135亩、改善灌溉面积780亩、恢复灌溉面积495亩、分别位于栽麻一村、栽麻二村、丰登村、高洞村。
由宰南渠道、大应沟渠道、便格渠道、机要渠道、平雪1号渠道、平雪2号渠道引水灌溉农田。
栽麻一村设计灌溉面积355亩,其中改善灌溉面积355亩,由宰南渠道引水灌溉;栽麻二村设计灌溉面积300亩,其中恢复灌溉面积300亩,由大应沟渠道引水灌溉;丰登村设计灌溉面积296亩,其中新增灌溉面积135亩,改善灌溉面积106亩,恢复灌溉面积55亩,由机要渠道引水灌溉;高洞村设计灌溉面积459亩,其中改善灌溉面积319亩,恢复灌溉面积140亩,由便格渠道、平雪1号渠道、平雪2号渠道引水灌溉。
二、工程承包与开竣工时间工程批建后,由榕江县小农水重点县和五小水利工程建设中心作为项目业主负责组织实施。
项目实施方式为:通过自行采购方式,将该工程承包给凯里市鸿达水利水电送变电工程有限责任公司施工,并于20__年8月26日签订工程施工合同。
工程施工合同签订后,凯里市鸿达水利水电送变电工程有限责任公司在当地党委、政府的大力支持和项目业主单位的精心组织与督促下,于20__年9月26日进场正式动工,经项目区广大受益群众的极积配合和施工单位的努力,于20__年6月24日全部完工,工程建设总工期为9个月。
三、工程建成设施及完成工程量该工程在施工过程中严格按照项目实施方案确定的建设目标来组织实施。
1、工程主要建设内容(1)大应沟渠道,干渠(1条):4326.9m(其中250钢管有三处总长42.5m),支渠(1条):360.0m;(2)、宰南渠道,干渠(1条):1036.4m,支渠(7条):1939.9m; (3)、机要渠道,干渠(1条):1562.0m,支渠(1条):172.0m,110PE管安装:1867.0m,63PE管安装:1527.5m;(4)、便格渠道,干渠(1条):916.0m,支渠(2条):820.0m(其中160PE管安装:50.0m);110PE管安装:1867.0m(5)、平雪1号渠道,干渠(1条):1429.0m(其中160PE管安装:15m),支渠(3条):466.0m(其中160PE管安装:75.0m);(6)、平雪2号渠道,干渠(1条):490.7m(其中160PE管安装:23m);(7)、大应沟取水堰,长5.3m; (8)、便格取水堰,长12m; (9)、平雪取水堰,长11.2m;四、工程完建总投资1)、合同工程总价为:贰佰捌拾壹万贰仟玖佰柒拾肆元伍角陆分(¥.56元)。
竣工验收单模板

竣工验收单模板一、项目基本信息。
项目名称,XXX工程。
项目地点,XXX。
建设单位,XXX。
施工单位,XXX。
监理单位,XXX。
二、竣工验收时间。
竣工验收时间,XXXX年XX月XX日。
三、竣工验收内容。
1. 工程质量验收。
a. 结构工程验收。
b. 建筑工程验收。
c. 安装工程验收。
d. 装饰装修工程验收。
2. 工程安全验收。
a. 施工安全验收。
b. 设备安全验收。
c. 交通安全验收。
d. 环境安全验收。
3. 工程环保验收。
a. 噪音污染验收。
b. 废水排放验收。
c. 废气排放验收。
d. 固体废物处理验收。
4. 工程文明验收。
a. 工地文明验收。
b. 办公室文明验收。
c. 工人作业文明验收。
d. 施工设备文明验收。
四、竣工验收结果。
1. 工程质量验收结果。
a. 结构工程合格/不合格。
b. 建筑工程合格/不合格。
c. 安装工程合格/不合格。
d. 装饰装修工程合格/不合格。
2. 工程安全验收结果。
a. 施工安全合格/不合格。
b. 设备安全合格/不合格。
c. 交通安全合格/不合格。
d. 环境安全合格/不合格。
3. 工程环保验收结果。
a. 噪音污染合格/不合格。
b. 废水排放合格/不合格。
c. 废气排放合格/不合格。
d. 固体废物处理合格/不合格。
4. 工程文明验收结果。
a. 工地文明合格/不合格。
b. 办公室文明合格/不合格。
c. 工人作业文明合格/不合格。
d. 施工设备文明合格/不合格。
五、竣工验收意见。
1. 工程质量验收意见。
a. 对合格部分的肯定。
b. 对不合格部分的整改要求。
2. 工程安全验收意见。
a. 对合格部分的肯定。
b. 对不合格部分的整改要求。
3. 工程环保验收意见。
a. 对合格部分的肯定。
b. 对不合格部分的整改要求。
4. 工程文明验收意见。
a. 对合格部分的肯定。
b. 对不合格部分的整改要求。
六、竣工验收结论。
建设工程竣工验收报告模板

建设工程竣工验收报告模板(经典版)编制人:__________________审核人:__________________审批人:__________________编制单位:__________________编制时间:____年____月____日序言下载提示:该文档是本店铺精心编制而成的,希望大家下载后,能够帮助大家解决实际问题。
文档下载后可定制修改,请根据实际需要进行调整和使用,谢谢!并且,本店铺为大家提供各种类型的经典范文,如演讲致辞、总结报告、心得体会、合同协议、条据文书、策划方案、导游词、教学资料、作文大全、其他范文等等,想了解不同范文格式和写法,敬请关注!Download tips: This document is carefully compiled by this editor. I hope that after you download it, it can help you solve practical problems. The document can be customized and modified after downloading, please adjust and use it according to actual needs, thank you!Moreover, our store provides various types of classic sample essays for everyone, such as speeches, summary reports, insights, contract agreements, documentary evidence, planning plans, tour guides, teaching materials, complete essays, and other sample essays. If you want to learn about different formats and writing methods of sample essays, please stay tuned!建设工程竣工验收报告模板建设工程竣工验收报告模板(5篇)世界上的人才其实是无穷无尽的。
项目验收报告模板

XXXX项目验收报告XXXX科技有限公司XXX年XX月文档修订历史记录目录1.项目基本情况 (4)2.项目进度审核 (4)2.1 项目实施进度情况 (4)2.2 项目变更情况 (5)2.2.1、需求变更 (5)2.2.2、里程碑变更 (5)2.3 项目投资费用情况 (5)3.项目验收计划 (5)3.1 项目验收原则 (5)3.2 项目验收方式 (6)3.3 项目验收内容 (6)4.项目验收情况汇总 (7)4.1 项目验收情况汇总表 (7)4.2 项目验收附件明细 (8)5.项目验收资料 (9)5.1 开发单位项目实施总结 (9)5.2 使用单位意见 (10)6.附件 (11)6.1 附件一:功能模块验收单 (11)6.2 附件二:项目文档验收单 (12)1.项目基本情况2.项目进度审核2.1 项目实施进度情况2.2 项目变更情况2.2.1、需求变更2.2.2、里程碑变更2.3 项目投资费用情况3.项目验收计划3.1 项目验收原则1、审查提供验收的各类文档的正确性、完整性和统一性,审查文档是否齐全、合理;2、审查项目功能是否达到了规定的要求;3、审查项目有关服务指标是否达到了要求;4、审查项目投资以及实施进度的情况;5、对项目的技术水平做出评价,并得出项目的验收结论。
3.2 项目验收方式3.3 项目验收内容1、应用系统验收;2、项目文档验收;技术实施方案、功能测试报告和用户使用手册等3、项目服务响应(如售后服务、问题响应等方面)验收。
客户需求问题优化、技术故障处理等售后服务和问题响应。
4.项目验收情况汇总4.1 项目验收情况汇总表4.2 项目验收附件明细1、功能模块验收单(见附件一)。
2、项目文档验收单(见附件二)5.项目验收资料5.1 开发单位项目实施总结5.2 使用单位意见6.附件6.1 附件一:功能模块验收单验收人:验收时间:6.2 附件二:项目文档验收单验收人:验收时间:。
- 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
- 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
- 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。
竣工资料项目名称:**市电子警察系统项目管理号:建设单位:项目负责人20010年8月22、项目培训评价表 (26)23、工程自检汇总表 (27)24、工程内部验收报告 (28)25、速度标定统计表 (29)26、项目竣工内部交接清单 (30)**电子警察项目开工报告**市公安局交通警察大队电子警察项目业主:***年*月*日,中标方——…………………………公司与贵方签署了《**市公安局交通警察大队电子警察项目》的合同。
根据合同规定,********公司成立了**市公安局交通警察大队电子警察项目组,首批项目组成员*月*日已经进驻现场,前期工作已经开展起来,项目组将根据合同中或与业主方所约定的进度与要求,按时保质保量的完成本工程, 届于目前的情况, 特提交此开工报告。
1.主要工作:根据合同中规定乙方的任务与要求,在业主的指导和协助下,并在监理的监督下,按时保质保量得完成《**市公安局交通警察大队电子警察项目》合同。
具体工作如下:1、提供现场的设备及施工,并负责设备的安装与调试。
2、整个系统的联合调试。
2.主要成员:3.项目管理制度与管理流程:●严格按照公司ISO9001 2000 E0版要求进行项目管理。
4.目前进展情况:●*年*月*日,完成路口的实地勘查。
5.下一进度节点:1、在*年*月*日按照要求并根据实际情况,完成一个路口的测试。
2、尽快组织路口的基础施工和杆件基础的制作工作;6.风险点预估:7.需业主方的支持基于以上情况,项目组认为目前已基本具备开工条件,特此申请开工,请业主审核,批准。
**市公安局交通警察大队电子警察项目组项目经理:*年*月*日需甲方签字盖章复印件XX市公安局交巡警支队电子警察项目试运行申请报告XX市公安局交巡警支队:XX市公安局交巡警支队电子警察项目(合同编号:XXXXXX),现已全部完成,系统已可以运行,按合同要求需进行30天的系统试运行,现申请进行系统试运行,时间从XX年X月X日至XX年X月X日。
特此申请,望予以批复************公司2010-10-23(需甲方签字盖章复印件)**项目验收申请****智能交通指挥系统项目实施以来,在各级领导的关心指导下,目前整个项目已经全部顺利完成,(现已经进入系统试运行阶段)。
指挥中心以及各路口设备现在正常使用中。
项目主体工程完成内容如下:1、20套监控设备的安装与调试;2、10个路口的高清闯红灯电子警察设备的安装与调试;3、10套高清卡口设备的安装与调试;4、10套区间测速设备的安装与调试;5、现场设备与中心通讯系统的安装与联调;6、中心内部设备的安装与调试;7、指挥中心运行所需各种线缆的敷设。
上述工程内容我方已全部完成,(并已试运行一个月,整个系统在试运行)期间运行基本正常,现申请****智能交通指挥系统项目整体验收,请予以批准。
承建单位:***********公司(盖章)时间:二0一0年九月三十日提供原件复印件项目实物到货确认单项目名称:**电子警察项目项目管理号:项目经理:(签字)业主单位确认人:(签章)提交日期:提交日期:(设备到货后如果甲方不愿意签设备移交单就让甲方签该表单,签字盖章复印件)工程材料/构配件/设备报审表项目名称:**市公安交警智能交通指挥系统编号:A1.1-2K00001**市公安交通警察大队监控系统项目PELCO设备清单注:有项目监理的情况下,在设备到现场前必须首先向监理申请设备报验,设备到场后由监理及业主当场打开设备包装检查设备,保留设备合格证等随带资料。
实物移交确认清单移交人:确认人:移交日期:确认日期:(项目验收前提交甲方,设备数量必须和合同一致,必须让甲方签字确认)遗留问题汇总表用户单位:建设单位:项目代表:项目代表:日期:日期(验收时如果有暂时处理不了的问题就签该单,不影响项目的验收,有就提交,没有则不用)项目实施备忘录XX 项目工作进度计划表项目名称:**电子警察项目合同工期:**天计划工期:**天日期内容**月 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29勘察设计线圈切割基础开挖、浇铸杆件制作和立杆管道铺设线缆敷设设备安装设备调试后台安装、调试设备试运行项目验收注:工期从施工人员进场之日起计算开工前经公司会议确定后由项目经理提交公司和甲方(给公司的是实际的计划,给甲方提交的按合同要求工期提交)XX 项目现场实际与合同偏差表NO.设备材料名称1电源线2 3 4型号规格 RVV2*1合同要求数量 现场实际需要数量10001500偏差值 500备注 **路口北方向路面塌陷,造成无法 按原计划穿线5 6 7 8 9 10 11 12 13 14项目管理号:序号路口名称1**路口2**路段***电子警察项目现场信息统计表项目负责人:***设备类型设备规 格监控 方向数码+视频) 2 向 4 车闯红灯道测速2向4车 道北向 南西向 东北向 南南向抓 抓拍 拍 车道 位置2 车 尾22车 尾2杆离 最近 线圈 距离 (测 速)杆件 距停 车线 距离停车 线距 红绿 灯距离立杆 数码像机 全景摄像机规 数 摄像 数 摄像 数 格量 机 量 机 量频闪灯机箱安 装方式规数底 抱 格量座 箍●●北东向22向4车 西车3**路段卡口●道西向头2东小计编制:编制日期:审核:审核日期:XX 项目电视监控现场信息统计表项目管理号:序 路口名称号12 3 4 5 6 7 8 9 10 小 计 编制:项目负责人:所机箱安装方路口立杆属式(段)形 设备类型 设备数量区状规格 数量 位置 底座 抱箍域十字球机/枪 机T型路段通讯光端机 规格 光纤接口 光纤芯数SC/FC审核:XX 项目电子警察前端配置表项目管理号:项目负责人:NO. 路口名称设备类 路口号 路口设备 IP型中心 IP监控方向车道限摄像机 IP号速东向西 E-1 10001 192.168.1.10**十字路(E)E-21闯红灯1 192.168.1.8口192.168.2.2 西向东 W-1(W)W-2北向南 N-12测速(N)N-2南向北 S-1(S)S-2备注编制:审核:项目名称 位置: 情况描述:工程量现场确认单项目管理号编号:工程量出现变更时用,首先要上报公司,经领导批准后方可实施,需施工方签字盖章确认,保留原件参加核实人员签字:备注及附件:日期:年月日项目技术联络单NO:2010-JT-00X项目名称:管理号:致:商务部(现场情况和原方案出现变更时以书面形式报请公司商务部,对方案重新设计)签收意见:部门:工程部 经办人: 审核: 日期:部门: 负责人: 日期:反馈信息:部门:负责人: 日期:工程分包项目验收报告项目名称:**市交通警察大队电子警察系统项目合同编号:2010CITEJC0011:施工队工程计划安排及施工人员配备是否到位 2:杆件、机箱、设备安装是否符合要求 3:设备接线、机箱内接线是否符合相关规范要求 4:土建施工是否符合公司土建工程施工及验收规范要求 验 5:隐蔽工程措施是否做好 收 6:安全措施是否符合要求内容以上内容经现场项目经理检查验收 验收范围包括:**个路口、路段的线圈切割及路面恢复、杆件基础的开挖及恢复、机箱基础的 验 开挖及恢复,人行道、车行道及绿化带的开挖及恢复,窨井的制作,设备安装及接线。
收 结 论按照合同要求和相关售后条款对以上路口进行售后服务 备 忘 内 容项目负责人:日期:年月日承包方项目负责人:日期:年月日注:此报告一式两份,我公司与工程承包方各一份。
合同分析统计表1 项目名称:******项目项目管理号:2 项目地点:3 项目甲方:联系方式:4 项目用户:联系方式:5 项目监理:联系方式:6 其他项目关系:7 项目工期:8 合同金额:9 付款方式:验收后首付 30%,验收后付 65%,其余 1 年后付清10 施工界面:甲方取电到机箱11 验收方式:在乙方提交验收报告的 5 日内甲方组织验收12 培训条款:13 售后服务条款:保修一年14特定供货方:深圳中盟(抓拍设备);西安华城(杆 件)联系方式:15 特定施工方:联系方式:16 主要实施内容:17 关键硬件性能指标:18 主要软件功能需求:19 第三方软件接口:20 其它:(项目开始前市场部,商务部需和工程部及项目经理以会员形式讨论项目内容及相关细节,并给项目经 理提供所掌握的项目相关情况)项目培训签到表项目名称:培训主题:培训地点:No.姓名1单位/部门/职务管理号:□□□□SBK-XM□□□培训老师:培训时间: 年 月 日No.姓名单位/部门/职务1621731841952062172282392410251126122713281429项目培训评价表项目名称: 培训主题: 培训时间:年 月 日~ 月 日,总管理号:□□□□SBK-XM□□□合同号:□□□□SBK-JT□□□小时培训老师:主要 培训 内容用户签名:备注 内容项目负责人:日期: 年 月 日工程自检汇总表项目名称: NO. 路口名称1项目管理号:现场自检 白天图片效果 夜间图片效果部门审核 白天图片效果 夜间图片效果现场自检确认人:日期:部门审核人:日期:工程内部验收报告(内部资料提供)NO:项目名称:****电子警察项目速度标定统计表项目名称:项目管理号:说明:1、误差=(系统记录值-运动分析仪记录值)/运动分析仪记录值2、公安部标准:进行实车试验,将非接触式汽车运动分析仪安装在试验车上,在40km/h~140km/h 的速度范围内选取5个测试点进行试验。
受试系统测得的车辆速度与非接触式汽车运动分析仪测得的速度进行比对,当车速在40km/h<V 车<120km/h 的速度范围内,测速误差应在±6%之内;当车速V 车>120km/h 时,测速误差应在±10%之内。
3、备注:现场实施人员必须在每个车道上进行速度测试,并修正系数,直到合格为止。
项目竣工内部交接清单一、 相关信息1、 项目名称:2、 项目管理号:3、 项目负责人:4、 项目实施内容:5、 施工方信息:二、 交接清单移交人:接收人:移交日期:接收日期:。