国家开放大学理工英语答案完整版

  1. 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
  2. 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
  3. 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。

国家开放大学理工英语

答案

HUA system office room 【HUA16H-TTMS2A-HUAS8Q8-HUAH1688】

F u t u r e H o u s e s

1、---Hello, I'm Harry Potter.

---Glad to meet you. I'm Miller. But __________. . call me Paul.

2、---Are you good at Building Materials, Rose?

---_______. But I will try to study it well this term Not very good

3、Could you please tell me something about the two_______

--- ___________. They arc exchange students of No. 1 Middle School Germans; All right

4、The technological advances made it possible for the middle classes to enjoy what had once been ________ only to the very rich affordable

5、The __________ are eating _________ at the foot of the mountain. sheep, grass

Building a house costs quite a lot of money.Suppose you plan to build a house.Your first step will be to find a right piece of land.Your choice will depend on many different things.You will probably try to find a sunny place, with pleasant surroundings(环境) near shops and bus stops, not too far from your friends and the place where you work.

Next you will find a good builder, and together with the builder you will work out a plan.The builder will draw the plan.It will show the number of rooms, their position and size, and other parts, which must be noticed, such as windows, doors, and electric outlets.The builder will work out how much money is needed to build your house.He will work out the cost of the wood, bricks, the glass, and everything else that must be used in building the house.Later on, when he starts to build, this estimate(预算)must be corrected and revised(修订).His estimate is based on existing prices, but prices of such things may change, and many other things may happen between the time when he makes the estimate and the time when he builds the house.

When the builder gives his estimate, you may wish to change your plan.(You may also wish to change your builder, if his estimate is too high!)You may find that the house you wanted at first costs too much, or that you can spend a little more and add something to your plan.The builder's estimate depends on the plan, but the final plan depends on the builder's estimate.

1.The best title of this passage would be “

C.Planning a House

2.The first thing for a person to build a house is 回答ABC正确获得1.00分中的1.00分.

B.to find a suitable piece of land

3.The phrase “draw a plan” in this passage means 回答ABC正确获得1.00分中的1.00分.

A.making a picture of a building or a room

4.When the builder starts to build a house, his estimate will have to be corrected and revised because 回答ABC正确获得1.00分中的1.00分.

C.The prices of building materials and the expenses(费用)of labor may be different from the

original prices and expenses

5.What is the relationship(关系)between the estimate and the plan 回答ABC正确获得1.00分中的1.00分

C.The estimate and the plan depend on each other.

Modern Bridge

—— Thanks for all the information, Peter. It sounds like you have an interesting job.

—— ______________________________选择一项:

A. Yes, it's very interesting, but stressful, too!

标记题目题干——I’m so excited to meet you. May I introduce myself to you?

B. Sure.

标记题目题干Architect Mayur Kanaiya spoke__________ of the Langkawi Sky Bridge选择一

C. highly

标记题目题干— Which city has _________population, Beijing, Guiyang or Nanchang?

A. the largest

标记题目题干But the Bridge was first _____ to the public, almost one year later, after a series of B. open London's River Thames has twenty-seven bridges. But Tower Bridge, the first bridge over the Thames as you travel to London from the sea, is the most famous of them all. What makes Tower Bridge so exciting Why do visitors come from all over the world to see it

相关文档
最新文档