国际土木工程建筑承包合同(中英文对照)[页37]国际土木工程建筑承包合同(中英文对照)国际土木工程建筑承包合同(中英文对照)the contractor shall furnish to the engineer such receipts or other vouchers as may be necessary to prove the amounts paid and,before ordering materials,shall submit to the engineer quotations for the same for his approval.承包人应向工程师提供必要的收据或其他凭证以证实其支出,并应在订材料之前,向工程师提交报价单以求批准。

in respect of all work executed on a day-work basis,the contractor shall,during the continuance of such work,deliver each day to the engineer's representative an exact list in duplicate of the names,occupation and time of all workmen employed on such work and a statement,also in duplicate,showing the description and quantity of all materials and plant used thereon or therefor(other than plant which is included in the percentage addition in accordance with the schedule hereinbefore referred to).one copy of each list and statement will,if correct,or when agreed,be signed by the engineer'srepresentative and returned to the contractor.所有按零工计价的工程,在工程进行期间,承包人必须每天向工程师代表提供详细清单,一式两份,注明此种工程雇用的所有零工的姓名、职务和工作时间,以及两份,标明用于工程的材料和设备的规格、数量(按上述细目表纳入增加费用计算内的设备除外)。

国际土木工程建筑承包合同(中英文对照)[页41]

国际土木工程建筑承包合同(中英文对照)[页41]

国际土木工程建筑承包合同(中英文对照)[页41]国际土木工程建筑承包合同(中英文对照)国际土木工程建筑承包合同(中英文对照)施工,包括应由承包人提供的货物、材料或服务。

价格应包括按合同第52条规定用于此种施工或提供的货物、材料或服务的费用。

(b)work to be executed or goods,materials or services to be supplied by a nominated sub-contractor as hereinafter defined.the sum to be paid to the contractor therefor shall be determined and paid in accordance with clause 59(4)hereof.由下文所规定的指定转包人的施工,提供的货物、材料或服务。

由此付给承包人的款项应按本合同第59条第4款的规定确定并支付。

(c)goods and materials to be purchased by the contractor.the sum to be paid to the contractor therefor shall be determined and paid in accordance with clause 59(4)hereof.承包人所购买的货物和材料。

由此支付给承包人的款项应按本合同第59条第4款确定并支付。

(3)the contractor shall,when required by the engineer,produce all quotations,invoices,vouchers and accounts or receipts in connection with expenditure in respect of provisional sums.58.3凡工程师要求,承包人应提供与暂列款有关的开支的所有报价单、发票、凭证、账目或收据。

国际土木工程建筑承包合同(中英文对照)[页50]

国际土木工程建筑承包合同(中英文对照)[页50]

国际土木工程建筑承包合同(中英文对照)[页50]国际土木工程建筑承包合同(中英文对照)国际土木工程建筑承包合同(中英文对照)65.1任何责任,不论属于赔偿或其他,也不论其是有关或涉及工程(以下提及的任何特定风险发生前,已按本第39条宣布为不适用的工程除外)、业主或第三当事人的财产的毁坏或损坏,或有关或涉及人员伤亡,只要是因以下所规定的特定风险导致,承包人慨不负责。

业主必须保证承包人不受上述情况以及由此所引起的任何索赔、诉讼、损害赔偿金、诉讼费、开支和费用的损害。

(2)if the works or any materials on or near in transit to the site,or any other property of thecontractor used or intended to be used for the purposes of the works,shall sustain destruction or damage by reason of any of the said special risks the contractor shall be entitled to payment for:65.2如工程或任何在工地、或从附近运往工地的材料,或承包人其他用于或旨在用于工地的任何财产因上述特定风险受到毁坏或损坏,承包人有权得到以下偿付:(a)any permanent work and for any materials sodestroyed or damaged,因此而被毁坏或损坏的任何永久性工程或材料,and,so far as may be required by the engineer,or as may be necessary for the completion of the works,on the basis of cost plus such profit as the engineer may certify to be reasonable;以及,只要工程师要求,或工程完工所必需,按成本费加上工程师证明合理的利润为基准支付;(b)replacing or making good any such destruction or damage to the works;恢复或补偿工程被如此毁坏或损坏的部分;(c)replacing or making good such materials or other property of the contractor used.intended to be used for the purposes of the works.恢复或补偿承包人用于或旨在于工程的此种材料或其他财产。

国际土木工程建筑承包合同(中英文对照)

国际土木工程建筑承包合同(中英文对照)

国际土木工程建筑承包合同(中英文对照)International Civil Engineering and Construction Contract(中英文对照)1.背景为了实现国际土木工程建筑承包合同的良好执行和管理,特制订本合同。

本合同适用于各种大规模土木建筑工程。

2.定义2.1甲方:指业主或甲方委派的其他代表机构。

2.2乙方:指承包商或乙方委派的其他代表机构。

2.3工程:指甲方委托乙方进行的土木建筑工程。

2.4设计文件:指甲方提供的工程设计、施工图以及其他的相关文件。

2.5标的物:指工程中的物质、设备、设施、建筑物等。

3.委托3.1乙方按照甲方的要求,承担工程的设计、施工、材料采购、设备租赁、运输、安装、调试、试运行等任务。

若有必要,乙方可以委托第三方承担部分或全部任务,但乙方应对承包前的审查及所委托的第三方行为承担全部责任。

3.2乙方不会依据本合同修改甲方提供的设计文件,也不能擅自更改,除非经甲方书面批准。

4.工期4.1合同项下的工程计划将在合同签订后得到制定并以书面形式送交甲方。

乙方在计划实施期间应在任何时间内保证工程按期完工。

4.2若乙方不能按期完工,乙方应向甲方提前一段时间进行书面通知。

此时,甲方可以选择终止本合同。

5.工程造价5.1工程造价包括所有改善、调整和整理前的全部费用。

5.2付款的准确性和即时性至关重要。

甲方按合同规定时间向乙方支付费用。

5.3工程验收结束后,任何由乙方未支付的费用将在合同下注明的时间上按日计算利息,并应由乙方支付。

6.质保和维护6.1合同项下的工程施工完成后,乙方应向甲方交付完整的用户手册和保修计划。

乙方必须对工程进行质保和维护,时间为乙方向甲方提交用户手册之日起至质保期满为止。

6.2甲方有权检查、审核、测试或验收乙方所提供的材料、设备、产品或者服务。

乙方必须尽到其义务,协助甲方进行上述活动。

7.变更7.1若工程发生了变化或必要的修正,甲、乙双方应在书面形式下进行调整,并应就在装置或提供方面所做的任何变化进行重新评估,并以书面形式确认。

国际土木工程建筑承包合同(中英文对照)[页34]

国际土木工程建筑承包合同(中英文对照)[页34]

国际土木工程建筑承包合同(中英文对照)[页34]国际土木工程建筑承包合同(中英文对照)国际土木工程建筑承包合同(中英文对照)50.应工程师的书面要求,承包人应根据工程师的指令,对施工过程或维修期内出现的任何欠缺、不足或缺陷进行检查。

除非根据,此种欠缺、不足或缺陷应由承包人负责,否则上述检查工作的费用由业主承担。

如此种欠缺、不足或缺陷如上所述属于承包人的责任,上述检查费用应由承包人负担,且他应按本合同第49条的规定,自费对其进行修理、修正和补救。

alterations,additions and omissions变更、增加和省略51.(1)the engineer shall make any variation of the form,quality or quantity of the works or any part thereof that may,in his opinion,be necessary and for that purpose,or if for any other reason it shall,in his opinion be desirable,he shall have power to order the contractor to do and the contractor shall do any of the following:51.1如工程师认为必要,他应对整个工程或任何部分的形式、质量或工作量作相应变更,且他有权因其他任何理由,命令承包人作出且承包人必须作出以下变更:(a)increase or decrease the quantity of any work included in the contract,增减合同所规定的工程量,(b)omit any such work,省略任何部分工程,(c) change the character or quality or kind of any such work,改变任何部分工程的特性或质量或类别,(d)change the levels,lines,position and dimensions of any part of the works,and改变任何部分工程的平面、型线、位置和面积,(e)execute additional work of any kind necessary for the completion of the works增加竣工所需的任何额外工程,and no such variation shall in any way vitiate or invalidate the contract,but the value,if any,of all such variations shall be taken into account in ascertaining the amount of the contract price.但此种变更不得以任何方式使合同失效,此种变更所需的一切费用(如果有)应在确定合同价格时予以考虑。

国际土木工程建筑承包合同(中英文对照)[页39]

国际土木工程建筑承包合同(中英文对照)[页39]

国际土木工程建筑承包合同(中英文对照)[页39]国际土木工程建筑承包合同(中英文对照)国际土木工程建筑承包合同(中英文对照)53.4如承包人因工程所需而要进口任何建筑设备,业主必须应承包人要求协助其从政府处得到必要的许可,以便按上述规定清理现场时重新出口此种建筑设备。

(5)the employer will assist the contractor,where required,in obtaining clearance throughthe customs of constructional plant,materials and other things required for the works.53.5业主应在需要时协助承包人为工程所需的建筑设备、材料和其他物品结关。

(6)any other conditions affecting constructional plant,temporary works and materials,shall be set out in part 11 in the clause numbered 53 as may be necessary.53.6其他任何影响建筑设备、临建工程设施和材料的条件必要时应在第二部分的第53条予以规定。

54.the operation of clause 53 hereof shall not be deemed to imply any approval by the engineer of thematerials or other matters referred to therein nor shall it prevent the rejection of any such materials at any time by the engineer.54.本第53条的执行不得视为默示工程师认可该条款所指的材料或其他事项,也不得妨碍工程师在任何时候拒绝使用任何此种材料。

国际土木工程建筑承包合同(中英文对照)[页52]

国际土木工程建筑承包合同(中英文对照)[页52]

国际土木工程建筑承包合同(中英文对照)[页52]国际土木工程建筑承包合同(中英文对照)国际土木工程建筑承包合同(中英文对照)65.7如按上一款规定终止,承包人应迅速从工地移走所有建筑设备,并向其转包人提供同样的转移设施。

(8)if the contract shall be terminated as aforesaid,the contractor shall be paid by the employer,insofar as such amounts or items shall not have already been covered by payments on account made to the contractor,for all work executed prior to the date of termination at the rates and prices provided in the contract and in addition.65.8如果合同如上终止,就承包人所得的暂付款项中尚未包括的在终止之日前已完成工作的款项,业主应按本合同所规定的价格支付给承包人,此外还应支付:(a)the amounts payable in respect of any preliminary items,、far as the work or servicecomprised therein has been carried out or performed,and a proper proportion as certified by the engineer of any such items,the work or service comprised in which has beenpartially carried out or performed.所有有关临时单据应予支付的款项,只要单据所含的工作或服务已经完成,如此种单据所含的工作或服务只完成一部分,则只支付经工程师确认的应予支付的那一部分款项。

国际土木工程建筑承包合同(中英文对照)[页45]

国际土木工程建筑承包合同(中英文对照)[页45]

国际土木工程建筑承包合同(中英文对照)[页45]国际土木工程建筑承包合同(中英文对照)国际土木工程建筑承包合同(中英文对照)certificates and payment证书和付款60.(1)unless otherwise provided,payment shall be made at monthly intervals in accordance with the conditions set out in part ii in the clause numbered 60.60.1除另有规定外,付款应按第二部分第60条的规定,分月进行。

(2)where advances are to be made by the employer to the contractor in respect of constructional plant and materials,the conditions of payment and repayment shall be as set out in part ii in the clause numbered 60.60.2如业主向承包人预付有关建筑设备和材料的款项,付款和还款的条件应在第二部分第60条中予以规定。

(3)if the execution of the works shall necessitate the importation of materials,plant or equipment from a country other than that in which the works are being executed,or if theworks or any part thereof are to be executed by labor imported from any other such country,or if any other circumstances shall render it necessary or desirable,a proportion of the payments to be made under the contract shall be made in the appropriate foreign currencies and in accordance with the provisions of clause 72 hereof.the conditions under which such payments are to be made shall be as set out in part ii in the clause numbered 60.60.3如因施工需从施工所在地国的他国进口材料、设备,或因工程或任何部分工程需由此种他国输入的劳务完成,或因任何其他情况必需或必要,项下的某部分付款需按本合同第72条的规定用有关外汇进行支付,支付条件应按合同第二部分第60条的规定处理。

  1. 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
  2. 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
  3. 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。

国际土木工程建筑承包合同(中英文对照)PART工GENERAL CONDITIONS第一章总则DEFINITIONS AND INTERPRETATION定义和释义1.(1)In the Contract,as hereinafter defined,the following words and expressions shall have the meanings hereby assigned to them,except where the context otherwise requires:1.1在本合同中,除按上下文另具意义者外,下列词语应解释如下:(a)'Employer' means the party named in Part II who will employ the Contractor and the legal successors in title to the Employer,but not,except with the consent of the Contractor,any assignee of the Employer.“业主”指第二章中所指定的雇用承包人的一方或其权利继承人,但不包括业主的受让人,经承包人同意者除外。

(b)“Contractor”means the person or persons,firm or company whose tender has been accepted by the Employerand includes the Contractor’s personal representatives,successors and permitted assigns.“承包人”指标书已被业主接受的某个或某些人、商行或公司,包括其个人代表,继承人和业经认可的受让人。

(c)“Engineer”means the Engineer designated as such in Part II,or other Engineer appointed from time to time by the Employer and notified in writing to the Contractor to act as Engineer for the purposes of the Contract in place of theEngineer、designated.“工程师”指第二章中所指定的工程师,或由业主随时任命且书面通知承包人以代替指定工程师履行合同职责的其他工程师。

(d) 'Engineer’s Representative' means any resident engineer or assistant of the Engineer or any clerk of works appointed from time to time by the Employer or the Engineer to perform the duties set forth in Clause 2 hereof,whose authority shall be notified in writing to the Contractor by the Engineer.“工程师代表”指任何常驻工程技术人员、工程师助手,或由业主或工程师随时任命履行本合同第二条规定职责的任何工程现场监督,其权限应由工程师书面通告承包人。

(e) “Works” shall include both Permanent Works and Temporary Works,“工程”包括永久性工程和临建工程。

(f)“Contract” means the Conditions of Contract,specification,Drawings,priced Bill of Quantities,Schedule of Rates and Prices,if any,Tender,Letter of Acceptance and the Contract Agreement,if completed.“合同”指合同条款、技术规范、图纸、标价的建筑工程清单、单价和价格表(如果有),还可指标书、接受证书以及承包协议(如已完成)。

(g) “Contract Price” means the sum named in the Letter of Acceptance, subject to such additions thereto or deductions therefrom as may be made under the provisions hereinafter contained.“合同价格”指在接受证书中确定的数额,可按本合同以下条款规定增减。

(h)“Constructional Plant' means all appliances or things of whatsoever nature required in or about the execution or maintenance of the Works but does not include materials or other things intended to form or forming part of the Permanent Works.“建筑设备”指工程施工和维修中或有关施工和维修所需的全部设备或物品,不论任何性质,但不包括旨在构成或正在构成永久性工程某一部分的材料或其他物品。

(i)“Temporary Works' means all temporary works of every kind required in or about the execution or maintenance of the Works.“临建工程”指工程施工或维修或有关工程施工或维修所需的各种临时工程。

(j)“Permanent Works”means the permanent works to be executed and maintained in accordance with the Contract.“永久性工程”指按合同将施工和维修的永久工程。

(k)“Specification” means the specification referred to in the Tender and any modification thereof or addition thereto as may from time to time be furnished or approved in writing by the Engineer.“技术规范”指在标书或任何标书更改中提及的规范,或由工程师随时可能增加或书面同意增加的部分。

(1)“Drawings” mea ns the drawings referred to in the Specification and any modification of such drawings approved in writing by the Engineer and such other drawings as may from time to time be furnished or approved in writing by the Engineer.“图纸”指技术规范中规定的图纸,经工程师书面同意对此种图纸所作的任何更改,以及可由工程师随时提供或书面认同的其他图纸。

(m)“Site” means the land and other places on,under,in or through which the Permanent Works or Temporary Works designed by the Engineer are to be executed and any other lands and places provided by the Employer for working space or any other purpose as may be apecifically designated in the Contract as forming part of the Site.“工地”指工程师设计的永久性或临建工程施工所需的土地及其他场地,包括地面、地下、在之上或通过部分,以及由业主所提供的用作临时储存或其他目的的其他土地或场所,只要能按合同明文规定构成工地的组成部分。

(n)“Approved” means approved in wri ting,including subsequent written confirmation ofprevious verbalapproval and“approval' means approval in writing,including as aforesaid.“业经认可”指已经经书面认可,包括过后对口头认可的书面确认,“认可”指书面认可,包括上述规定在内。

(2)Words importing the singular only also include the plural and vice versa where the context requires?1.2按合同上下文所需,单数含义的单词也可具有复数的含义,反之一样。

(3)The headings and marginal notes in these Conditions of Contract shall not be deemed to be part thereof or be taken into consideration in the interpretation or construction thereof or of the Contract.1.3合同条款的标题和边注不得视为合同的一部分,不得用于考虑解释条款或合同。

(4)The word“cost' shall be deemed to include overhead costs whether on or off the Site.1.4“费用”一词应视为含工地上或以外发生的间接费用。

ENGINEER AND ENGINEER’S REP RF.SFNTATIVE工程师及工程师代表2.(1)The Engineer shall carry out such duties in issuing decisions,certificates and orders as are specified in the Contract.In the event of the Engineer being required in terms of his appointment by the Employer to obtain the specific approval of the Employer for the execution of any part of these duties,this shall be set out in Part II of these Conditions.2.1工程师必须按合同明文规定,履行作决断、颁发证书和发出指令等职责。