施工图预算编制说明模板范文英文回答:Construction budget preparation is an essential process in the construction industry. It involves estimating the costs of all the materials, labor, and equipment requiredfor a construction project. The budget serves as afinancial plan that guides the project from start to finish.To begin with, it is crucial to gather all thenecessary information about the project. This includes the construction drawings, specifications, and any otherrelevant documents. By carefully reviewing these documents, I can identify the scope of work and understand the requirements of the project.Next, I will break down the project into different components or work packages. This allows me to allocate costs to each specific area of the project. For example, if the project involves constructing a building, I will divideit into structural works, electrical works, plumbing works, and so on. By doing this, I can estimate the costs accurately for each component.Once the work packages are identified, I will proceed with the quantity takeoff. This involves measuring and quantifying all the materials required for each work package. For instance, if the project requires concrete, I will calculate the volume of concrete needed based on the drawings and specifications.After completing the quantity takeoff, I will move on to pricing the materials and labor. This involves contacting suppliers and subcontractors to obtain quotesfor the materials and services required. I will also consider factors such as market prices, availability, and quality when determining the costs.In addition to materials and labor, it is essential to include indirect costs and contingencies in the budget. Indirect costs include items such as permits, insurance, and overhead expenses. Contingencies are allowances forunforeseen circumstances or changes in the project scope.Once all the costs are estimated, I will compile them into a comprehensive budget document. This document will include a breakdown of costs for each work package, along with a summary of the total project cost. It is crucial to ensure that the budget is realistic and aligned with the project objectives.中文回答:施工图预算编制是建筑行业中至关重要的过程。

施工图预算编制说明模板范文

施工图预算编制说明模板范文

施工图预算编制说明模板范文英文回答:Construction Drawing Budget Preparation Instructions Template.Purpose:To provide a standardized format for the preparation of construction drawing budgets that ensure accuracy, consistency, and adherence to best practices.Scope:This template applies to all construction drawing budgets prepared for all projects undertaken by the organization.Responsibility:The project manager is responsible for ensuring that construction drawing budgets are prepared according to this template. The estimator is responsible for compiling and finalizing the budget.Procedure:1. Project Definition:Define the project scope and objectives.Gather project documents, including drawings, specifications, and site information.2. Scope of Work:Identify the work items included in the budget.Break down work items into manageable tasks.3. Quantity Take-Off:Determine the quantities of materials and labor required for each task.Use appropriate estimating methods and data.4. Unit Pricing:Obtain unit prices for materials and labor from subcontractors, suppliers, and internal data sources.Consider factors such as market conditions, project location, and delivery schedules.5. Cost Estimation:Multiply quantities by unit prices to calculate the cost of each task.Include direct costs, indirect costs, and a contingency allowance.6. Budget Summary:Summarize the costs of all tasks into a comprehensive budget.Include a breakdown of costs by work item, trade, and account.7. Budget Review and Approval:Review the budget with the project manager, project team, and stakeholders.Obtain approvals and revisions as necessary.Formats:Electronic: Budgets should be prepared using industry-standard spreadsheet software.Printed: Hard copies of budgets should be provided for reference and archival purposes.Documentation:Supporting documentation, such as quantity take-off sheets and vendor quotes, should be maintained for audit purposes.Continuous Improvement:Budget preparation processes should be periodically reviewed and updated to improve efficiency and accuracy.中文回答:施工图预算编制说明模板范文。

施工图预算文件编制说明范文

施工图预算文件编制说明范文

施工图预算文件编制说明范文英文回答:Construction cost estimation is a crucial aspect of the construction project, as it helps in determining the budget and ensuring that the project is financially viable. The preparation of a construction cost estimation document involves several steps and considerations.Firstly, it is important to gather all the necessary information about the project. This includes the architectural drawings, structural plans, and specifications. These documents provide a clear understanding of the scope of work and the materials required for construction.Once the necessary information is gathered, the next step is to quantify the materials and labor required for the project. This involves breaking down the project into different components and estimating the quantities ofmaterials needed for each component. For example, if we are constructing a building, we need to estimate the quantities of bricks, cement, steel, etc.After quantifying the materials, the next step is to determine the cost of these materials. This involves obtaining current market prices for the materials and calculating the total cost based on the quantities estimated. It is important to consider any fluctuations in market prices and make necessary adjustments to the cost estimation.In addition to materials, labor costs also need to be estimated. This includes the cost of skilled and unskilled labor required for the project. The labor cost estimation is based on factors such as the number of workers, their wages, and the duration of the project.Furthermore, it is important to consider other costs such as equipment rental, permits, and overhead expenses. These costs are added to the material and labor costs to get a comprehensive cost estimation for the project.Once all the costs are estimated, it is important to review and analyze the cost estimation to ensure its accuracy and feasibility. This involves comparing the estimated costs with similar projects and making necessary adjustments based on the project's specific requirements.中文回答:施工图预算文件编制是建筑项目中至关重要的一环,它有助于确定预算并确保项目在财务上可行。

预算编制说明范本+

预算编制说明范本+

预算编制说明本项目为***************两阶段施工图设计,本次编制长度为***km,较初步设计路线长度短***km。

一、编制主要依据1.交通部发布的《公路工程基本建设项目概算、概算编制办法》(JTGB06-2007),以下简称《部编办》。

2.交通部发布的《公路工程概算定额》(JTG/T B06-01-2007)、《公路工程预算定额》(JTG/T B06-02-2007)。

3.交通部发布的《公路工程机械台班费用定额》(JTG/T B06-03-2007)。

4.陕西省交通厅陕二○○八年七月十五日发《关于执行交通部公路工程概算概算定额及编制办法的通知》,以下简称《省通知》。

5.施工图设计文件提供的工程设计图及数量。

二、主要费用、费率取定(一).人工费:按《省通知》规定,每工日45.04元。

(二).材料费材料原价根据陕西省交通厅定额站发布的最新二○○九年第一季度宝鸡市及西安市场材料指导价并结合本项目沿线地区实际调查后综合取定。

(三).施工机械使用费按交通部《公路工程机械台班费用定额》(JTG/T B06-03-2007)及陕西省车船使用税标准计算。

(四).其他工程费及间接费按《部编办》及《省通知》的有关规定计列,本项目为一类工程,其中:工地转移费运距按西安至工地300公里计算,主副食补贴综合里程按10公里计。

(五).设备购置费:主要计列收费、超限检测、监控、通信、照明、供配电等服务设施设备购置及隧道的服务、机电部分设备购置,具体详见交通工程部分预算的细部表格。

(六).工具、器具购置费:计列577.7万元养护用工、器具购置费,具体详见交通工程部分预算。

(七).办公及生活用家具购置费:按《部编办》规定计列。

(八).工程建设其他费用1.土地、青苗等补偿和安置补助费:征地拆迁补偿费根据宝鸡市人民政府办公室关于全市高等级公路建设征地拆迁补偿标准的通知,即宝政办函[2008]145号文及国土资发[2004]238号文精神综合取定。

施工图预算编制说明A4

施工图预算编制说明A4

施工图预算编制说明A4(2)中(粗)砂和碎石(4cm内)采用计算单价:中(粗)砂原价为40.0元/m3,汽车运距10km,运费1.2元/t.km,装卸费单价5.0元,装卸一次;碎石(4cm内)原施工图预算说明价为45.0元/m3,汽车运距12km,运费1.2元/t.km,装卸费单价6.0元,装卸一次;柴油7.36元/kg;汽油7.38元/kg;电1.0元/kw.h;水1.8元/t;其他材料采用《定的1.25倍作为材料预算单价)。

额》基价表中价格一.任务依据(3)09表中列出少数材料的供应地点与运输方式,主要用于单位材料预算单价分厦门理工学院土木工程与建筑学院10级土木工程专业课程设计任务书及指导析计算。

书(设计题目:漳州南靖博览园大酒店栈桥工程施工图预算编制)。

(4)本工程中无自采材料的料场与运输方式。

二、路线概况五、其他直接费漳州南靖博览园大酒店栈桥工程(1)雨季施工增加费按雨季7个月,雨量区?的费率计。

道路工程:起点位于与闽发路平交处,路线呈东西走向,终点接入山梅路.道路全(2)本工程所处地无冬季施工问题长175.346m。

1084平方米水泥稳定碎石基层,435平方米水泥混凝土路面。

(3)临时设施费按《福建省补充规定-闽交建(2008)91号》费率计。

桥梁工程:桥面宽度:0.5m(防撞护栏)+7.0m行车道+0.5m(防撞护栏)=8m;本(4)施工辅助费按《福建省补充规定-闽交建(2008)91号》中费率计。

桥采用普通钢筋混凝土板式梁桥,其孔跨布置为(10*10)m,全桥长105.5m。

六、间接费三、编制依据(1)规费按《福建省补充规定-闽交建(2008)91号》费率计。

(1)公路工程预算定额 JTG/T B06-02—2007(2)企业管理费基本费用按《福建省补充规定-闽交建(2008)91号》费率计。

(2)公路工程基本建设项目概算预算编制办法(JTG B06—2007)(3)主副食运费补贴按综合里程5公里计。

施工图预算文件编制说明范文

施工图预算文件编制说明范文

施工图预算文件编制说明范文英文回答:Construction Drawing Budget File Compilation Instructions.The construction drawing budget file is an essential document in the construction process. It provides adetailed breakdown of the estimated costs for materials, labor, and other expenses required for completing a construction project. Here is a sample explanation of how to compile a construction drawing budget file:1. Review the Construction Drawings:Carefully examine the construction drawings to understand the scope of the project. Identify the different components and areas that need to be budgeted for, such as foundations, walls, floors, roofing, electrical systems, plumbing, etc.2. Quantify the Materials:Create a list of all the materials required for each component of the project. This includes items like bricks, cement, steel, wood, electrical wires, pipes, fittings, fixtures, etc. Specify the quantity needed for each item based on the construction drawings.3. Research Material Costs:Research the current market prices for each material. Contact suppliers or refer to price catalogs to determinethe cost per unit for each item. Take into account any discounts or bulk purchase options available.4. Calculate Material Costs:Multiply the quantity required for each material by its respective cost per unit. Sum up the costs for allmaterials to obtain the total material cost for the project.5. Estimate Labor Costs:Determine the number of labor hours required for each component of the project. Consult with experienced professionals or use industry standards to estimate the labor hours. Multiply the labor hours by the hourly rate for the construction workers to calculate the labor cost for each component.6. Include Other Expenses:Consider additional expenses that may arise during the construction process, such as equipment rental, permits, transportation, insurance, and contingency funds. Research and estimate the costs for each item.7. Summarize and Organize:Compile all the cost estimates for materials, labor, and other expenses into a comprehensive budget file. Organize the information in a clear and logical manner, grouping costs by component or area. Include a summarysheet that provides a breakdown of the total estimated cost for the entire project.8. Review and Adjust:Review the budget file to ensure accuracy and completeness. Make adjustments if necessary, considering any changes in material costs, labor rates, or project scope. Seek input from project managers, engineers, or other relevant stakeholders to validate the budget estimates.9. Update and Track:As the project progresses, update the budget file to reflect any changes or deviations from the initial estimates. Track the actual costs incurred and compare them with the budgeted amounts to monitor the project'sfinancial performance.中文回答:施工图预算文件编制说明范文。

预算编制总说明-范本

预算编制总说明-范本
(3)建筑层数和高度: 7#楼4/-1F, 高度为20.1m,层高4.5m; 18#楼32/-2F,高度为97.5m,层高3m; 19#楼30/-1F,高度为90.3m,层高3m; 20#楼28/-1F,高度为85.6m,层高3m; 地下车库-1F,高度为5.2m。
二.工程范围:由招标方xxx项目经过审批的施工图纸。 本预算包括:
四、总造价:Байду номын сангаас。
本预算不包括: 1、所有预留预埋工作。 2、消防设备基础。 3、防火卷帘配电。(从配电室(发电机)低压柜至各消防设备双电源电缆及配管、 双电源箱等) 4、不含防火卷帘、木质防火门、消防水池及消防水箱进水。
三、其他说明: 7#、20#、地下车库含有全部消防系统; 18#、19#无喷淋系统。 7#屋顶无风机。
(1)7#楼、18#楼、19#楼、20#楼及商业部分、地下车库的7个系统: 1、室内外消火栓系统,包括水箱和水泵的安装(含室外管道挖沟及回填); 2、火灾报警及联动系统(含静电地板); 3、应急照明系统(不含柴油发电机组)。 4、喷淋系统。 5、气体灭火。(含气溶胶、手提干粉灭火器) 6、泵房。(包含消防水泵及相关管道阀门的安装) 7、消防配电系统。(从配电室(发电机)低压柜至各消防设备双电源电缆、双电源 箱、消防设备控制箱、控制电缆、配管、钢制线槽等消防强电系统)
一.工程概况:
编制总说明
(1)工程名称:***消防工程 建设单位:***有限公司 建设地点:***号
(2)总建筑面积:91054.56㎡。 本项目由7#商业楼、18#住宅楼、19#住宅楼、20#住宅楼及商业部分、地下车库组 成。其中 7#建筑面积7032.38㎡(纯商业), 18#建筑面积25118.83㎡,(消防控制室位于一层,水箱设在屋顶) 19#建筑面积21778.77㎡, 20#建筑面积22271.89㎡(商业面积2241.95㎡,住宅面积20029.94㎡), 地下车库建筑面积14852.69㎡。车库主要为停车场及设备用房。

施工图预算编制说明

施工图预算编制说明

施工图预算编制说明1.编制范围本工程为西藏自治区拉林铁路7标段水中墩基坑支护工程,本施工图预算依据该工程现阶段的基坑支护设计图纸工程量进行编制。

2.施工图预算指标本工程施工图预算10260.00万元,其中加查1号9#、10#墩基坑支护预算1578.42万元,加查2号8#、9#墩基坑支护预算1603.01万元,加查2号10#墩基坑支护预算303.04万元,加查3号19#、20#墩基坑支护预算1367.38万元,冷达1号1#、2#、3#墩基坑支护预算1935.97万元,冷达2号18#、19#、20#墩基坑支护预算1866.56万元,冷达3号11#、12#、13#墩基坑支护预算1605.62万元。

3.编制原则和依据3.1 编制依据本工程预算编制主要执行水总[2014]429号文“水利部关于发布《水利工程设计概(估)算编制规定》的通知”以及办水总[2016]132号文“水利部办公厅关于印发《水利工程营业税改增值税计价依据调整办法》的通知”。

3.2 编制的定额依据建筑工程:按水利部水总[2002]116号文颁发的《水利建筑工程概算定额》执行。

安装工程:按水利部水建管[1999]523号文颁发的《水利水电设备安装工程概算定额》执行。

施工机械台时费:按水利部水总[2002]116号文颁发的《水利工程施工机械台时费概算定额》执行。

3.3 基础单价依据1、人工预算单价本工程工资区为五类区西藏二类区,人工预算单价计算如下:工长10.92元/工时;高级工10.21元/工时;中级工8.26元/工时;初级工6.29元/工时。

2、施工用电、水、风单价:电价1.0元/度;水价0.55元/m3;风0.2元/m3。

3、主要材料预算价:钢筋、水泥、砂、碎石的材料价格采用西藏自治区拉萨市2016年6月份信息价格水平(除税价)计算;柴油、汽油按发改委最新油料价格文件计算。

油料:柴油7.167元/kg,汽油9.324元/kg钢筋:圆钢2649.57元/t,螺纹钢2735.04元/t水泥:42.5水泥649.57元/t,32.5水泥581.2元/t砂石料:砂72.82元/m3,碎石53.4元/m3主要材料基价如下:柴油2.99元/kg,汽油3.075元/kg,钢筋2560元/t,水泥255元/t,砂石料70元/m3。

  1. 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
  2. 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
  3. 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。

施工图预算编制说明A4(2)中(粗)砂和碎石(4cm内)采用计算单价:中
(粗)砂原价为40.0元/m3,
汽车运距10km,运费1.2元/t.km,装卸费单价5.0元,装卸一次;碎石(4cm内)原施工图预算说明价为45.0元/m3,汽车运距12km,运费1.2元/t.km,装卸费单价6.0元,装卸一次;
柴油7.36元/kg;汽油7.38元/kg;电1.0元/kw.h;水1.8元/t;其他材料采用《定的1.25倍作为材料预算单价)。

额》基价表中价格一.任务依据
(3)09表中列出少数材料的供应地点与运输方式,主要用于单位材料预算单价分厦门理工学院土木工程与建筑学院10级土木工程专业课程设计任务书及指导析计算。

书(设计题目:漳州南靖博览园大酒店栈桥工程施工图预算编制)。

(4)本工程中无自采材料的料场与运输方式。

二、路线概况
五、其他直接费漳州南靖博览园大酒店栈桥工程
(1)雨季施工增加费按雨季7个月,雨量区?的费率计。

道路工程:起点位于与闽发路平交处,路线呈东西走向,终点接入山梅路.道路全
(2)本工程所处地无冬季施工问题长175.346m。

1084平方米水泥稳定碎石基层,435平方米水泥混凝土路面。

(3)临时设施费按《福建省补充规定-闽交建(2008)91号》费率计。

桥梁工程:
桥面宽度:0.5m(防撞护栏)+7.0m行车道+0.5m(防撞护栏)=8m;本
(4)施工辅助费按《福建省补充规定-闽交建(2008)91号》中费率计。

桥采用普通钢筋混凝土板式梁桥,其孔跨布置为(10*10)m,全桥长105.5m。

三、编制依据六、间接费.
(1)规费按《福建省补充规定-闽交建(2008)91号》费率计。

(1)公路工程预算
定额 JTG/T B06-02—2007
(2)企业管理费基本费用按《福建省补充规定-闽交建(2008)91号》费率计。

(2)公路工程基本建设项目概算预算编制办法(JTG B06—2007)
(3)主副食运费补贴按综合里程5公里计。

(3)08部颁预算基价依据
(4)职工探亲路费按《福建省补充规定-闽交建(2008)91号》费率计。

(4)08建管费颁布标准
(5)财务费用按《福建省补充规定-闽交建(2008)91号》费率计。

(5)福建省补
充规定-闽交建(2008)91号
(6)工地转移费按3km计 (6)机械台班分费用采用《公路工程机械台班费用定额》(JTG/T B06-03-2007)
(7)基本费用按福建省补充规定-闽交建(2008)91号》费率计。

进行计算(福建
省车船税标准(普通)2008(不含养路费))。

(8)规费按福建省规定计取:即养老保险费费率18%,失业保险费费率2%,医疗
保险费费率7.7%,住房公积金10%,工伤保险费费率1%。

四、工、料、机费用七、利润和税金 (1)根据福建省住建厅发布的《关于调整建设工程人工预算单位的通知》(闽建筑
(1)利润按直接费与间接费之和扣除规费为基数,按7.00%计列。

[2011]37号文),
确定本工程预算人工工日单价为75元/工日。

根据任务书要求计算
(2)税金按直接费、间接费、利润之和的3.35%计。

后人工单价为:76.2元。

第 1 页共2页
八、设备及工具、器具购置费 (6)桥涵工程-桥台:桥台结构模板均为木模板,混凝土均为路拌法拌制混凝土。


该栈桥工程需购置配电房设备1套,30000元/套。

路灯6盏,2000元/盏。

板式橡(7)桥涵工程-附属设施:全桥采用满堂支架施工,附属设施混凝土均为路拌法拌
胶支座GYZ d400*69型16个(100元/个),GYZF4 d250*54型8个(137.5元/个)。

制混凝土。

九、工程建设其他费用
)本工程永久占地农田4亩,补偿费为4万元,亩。

(1
(2)该路段以机械施工为主,工期6个月(不计物价上涨费)。

(3)建设单位管理费按《编办》要求计取;工程监理费计取费率为2%;设计文件审查费计取费率为0.15%工程勘察设计费为2万元;其他费用按工程情况不计取。

(4)大型专用机械设备购置费,固定资产投资方向调节税,建设期贷款利息,研究试验费,回收金额等本预算不列。

十、主要工、料及造价
本工程需人工3968工日;钢筋197吨;水泥180吨;植草护坡543平方米。

总预算为2412857.71元,其中建筑安装工程费为1986195.54万元。

十一、施工方案选择
(1) 临时工程:临时道路为4.5m宽,长1km;架设角铁横担输电线路(三线橡皮线)200m。

) 路基工程:填土方采用借土方填筑,运距1km,采用夯土机夯实填土;填方边
(2
坡采取破面植草防护,并采用机械液压喷播植草。

(3) 路面工程:路面面层和基层均采用的是路拌水泥混凝土浇筑施工,其中面; 采取机械轨道式摊铺机铺筑层.
(3)桥涵工程-桩基础:采用冲击钻机钻孔成桩,灌注桩混凝土均采用路拌法拌制,灌注时采用泵送法进行灌注;灌注桩钢筋焊接连接主筋。

)桥涵工程-墩身:墩身模板采用钢模板,墩身混凝土采用路拌法拌制,浇筑时(4 采用泵送混凝土浇筑。

(5)桥涵工程-上部结构:上部结构模板均采用木模板,上部结构混凝土均为路拌法拌制混凝土。

页2共页 2 第。