工程项目管理常用英语

工程项目管理常用英语
工程项目管理常用英语

工艺包process package

工艺设计process design

工艺发表process release

工艺预发表initial process release

工作范围;项目任务范围scope of work ; project scope

工作包work package

工作项work item

任务单项line item

分解结构breakdown structure

工作分解结构work breakdown structure

组织分解机构organizational breakdown structure

项目大项工作分解结构project summary work breakdown structure

承包商标准工作分解结构;工程公司标准工作分解结构contractor's standard work breakdown structure

责任分工矩阵responsibility assignment matrix

风险risk

风险分析risk analysis

风险备忘录risk memorandum

公司本部home office

公司本部服务home office service

公用工程utility

计划plan

项目计划project plan

(项目)设计计划(project)engineering plan

(项目)采购计划(project)procurement plan (项目)施工计划(project)construction plan (项目)开车计划(project)start-up plan

专利patent

专利权patent right

产权技术proprietary technology

专利技术licensed technology

专有技术;技术诀窍know-how

许可证license

专利商;许可方licensor

受许可放;受让方licensee

(技术)转让费;提成费royalty

许可证费license fee

专有技术费know-how fee

专业discipline

工艺process design ; process engineering 系统systems engineering

设备equipment engineering

布置plant layout engineering

管道设计piping design

管道机械piping mechanical engineering 仪表instruments engineering

电气electrical engineering

建筑architectural engineering

土建civil engineering

开车start-up

试车commissioning

投料试车start-up ; test run ; initial operations

性能考核,生产考核performance test run ; performance guarantee tests

用户验收client acceptance

支付条件;付款条件terms of payment ; conditions of payment ; terms and conditions of payment

预付款advance payment ; down payment

按实物进度付款progress payment

按日工程进度付款schedule payment

保留金;扣留款retention money

最终付款final payment

代码;编码code ; number

组码group code

标准分类记帐码;记帐码standard classification of account

numbers[SCAN];account codes ; code of accounts

可编码variable code ; optional variable code

通用型活动码generic activity type(numbers)[GAT]

不可预见费contingency

发表issue ; release

汇票bill of exchange ; draft

议付汇票bill for negotiation

业主owner

用户;客户client

设计;工程设计design ; engineering

设计阶段engineering phase

工艺设计阶段process design phase

基础工程设计阶段basic engineering phase

分析设计阶段analytical engineering phase

平面设计阶段planning engineering phase

详细工程设计阶段detailed engineering phase ; final engineering phase ; production engineering phase

会议meeting

开工会议kick-off meeting

报价开工会议proposal kick-off meeting

用户开工会议client kick-off meeting

项目开工会议project kick-off meeting

设计开工会议project kick-off meeting

施工动员会议construction mobilization meeting

审核会review meeting

合同;承包contract

合同生效日期effective date of the contract

合同终止termination of contract

合同失效frustration of contract

总价合同lump-sum contract[L-S]

(固定)单价合同(fixed) unit price contract

偿付合同;成本加抽筋合同(cost) reimbursable contract ; cost-plus (fee) contract [C-P]

成本加固定酬金合同cost plus fixed fee contract [CPFF]

成本加浮动酬金合同cost plus fluctuating fee contract ; cost plus sliding scale fee contract

目标成本加奖罚合同(target) cost plus fee contract , with bonus or penalty conditions

限定最高价偿付合同;限定最高成本加抽筋合同reimbursable guaranteed maximum price contract [RGMP] ; guarantee maximum cost plus fee contract

承包商contractor

分包商subcontractor

合营企业joint venture [JV]

交货delivery

交货日期delivery date ; date of delivery

交货周期lead time

交货到现场delivery to job-site

交货单delivery note

提货单delivery order

提单bill of lading

交货条件delivery terms

离岸价free on board [FOB]

铁路交货(价);敞车上交货(价) free on rail [FOR] ; free on truck [FOT]

成本加运费(价) cost and freight [CFR] or [C&F]

到岸价cost insurance and freight ; cost insurance freight [CIF]

船边交货(价) free alongside ship [FAS]

货交承运人(价) free carrier [FCA]

工厂交货(价) ex works [EXW]

估算;费用估算estimate ' cost estimate

估算方法类别types of estimate

详细估算(发) detailed estimate ; defined estimate

设备详细估算(发);确切估算(发) defined equipment estimate ; definitive estimate

设备估算equipment estimate

分析估算analysis estimate

报价估算proposal estimate

控制估算control estimate

初期控制估算interim control estimate ; initial control estimate [ICE]

批准的控制估算initial approved cost [IAC]

核定估算check estimate

首次核定估算first check estimate [FCE]

二次核定估算production check estimate [PCE]

人工时估算man-hour estimate

证书;证明书certificate

产地证明书certificate of origin

机械竣工证书mechanical completion certificate

用户验收证书;合同项目验收证书client acceptance certificate (of plant)

材料material

设备equipment

散装材料bulk materials ; commodities

材料分类material class

材料统计material take-off [MTO]

材料表;材料清单bill of materials [BOM]

材料管理material management

材料控制material control

进度;进度表;进度计划schedule

进展;进度;实物进度progress ; physical progress

编制进度计划scheduling ; time scheduling

(项目)初期工作进度计划starter schedule ; early work schedule

项目主进度计划project master schedule ; master project schedule 详细进度计划;详细进度表detailed schedule

网络(图);网络(进度)计划network (diagram)

里程碑网络图milestone network

详细网络图detailed network

关键线路法critical path method [CPM]

关键工序;关键活动critical activity

工序;活动activity

里程碑milestone

进度控制schedule control ; progress control

进度曲线;S曲线progress curve ; "S" curve

资源负荷曲线resource loading curve ; Bell curve

进度提前ahead of schedule

进度拖延schedule delay

违约default

违约通知default notice

(违约)罚款条款penalty clause

违约罚金liquidated damages

运费freight [Frt.] ; carriage

运费付讫freight paid ; carriage free ; carriage paids

运费待收;货到收运费freight collect ; freight to be collected ; freight payable at destination

运费预付freight prepaid ; advance(d) freight

货到付运费;运费未付freight forward ; carriage forward

运费担保函freight indemnity

运费单freight note

运输商;承运商forwarding agent

采购procurement

采买purchasing

催交expediting

检验inspection

运输traffic ; transport

报关单bill of entry

报告report

费用和进展月报告monthly cost and progress report

(项目)进展月报(job) monthly progress report

设计进展月报engineering monthly progress report

项目费用汇总报告project cost summary report

项目实施费用状态报告project operation cost status report

进度报告schedule report

控制索引control index

执行效果报告performance report

劳动生产率报告productivity report

异常报告exception report

材料异常报告material exception report [MER] ; equipment & materials exception report

采购状态报告procurement status report

材料状态报告material status report

请购单和订单状态报告purchase order and requisition status report

供货厂商图纸状态报告vendor drawing status report ; vendor data scheduling status report

检验报告inspection report

(项目)完工报告close-out report

报价;投标bid ; quotation ; proposal ; tender ; offer

讯价文件评审委员会inquiry review committee [IRC]

报价策略会议bid strategy meeting

报价经理proposal manager

投标书;标书;建议书proposal ; quotation ; bid ;tender ;offer

标书评审;报价评审bid evaluation

标书评选表;报价评选表bid tabulation form ; tabulation of bids

谈判negotiation

厂商协调会议;协调会议vendor coordination meeting [VCM] ; coordination meeting

订货合约;定约;成交commitment

订货电传;订货通知telex order ; notification of commitment

订单(即定单);采买订单;订货合同purchase order

签订合同;合同签约contract award

询价;招标inquiry ; invitation to bid

资格预审pre-qualification

合格投标商表;合格供货商表qualified bidders list ; qualified vendors list

询价书;招标文件inquiry(package) ; request for quotation(package) [RFQ]; request for proposal [RFP] ; invitation to bid [ITB]

请购文件;请购单requisition (package) ; requisition documents

采购规格书;采购说明书purchasing specification [PS]

投标者须知;报价须知instructions to bidders [ITB]

变更change

用户变更;合同变更client change ;contract change

待定的用户变更pending client change

认可的用户变更approved client change

用户变更(通知)单;合同变更(通知)单client change notice [CCB] ; contract change order [CCO]

项目变更;内部变更project change ; internal change

项目变更(通知)单;内部变更(通知)单project change notice [PCN] ;internal change order [ICO]

变更申请单;偏差通知单change request ; deviation notice [DN]

质量quality

质量方针quality policy

质量管理quality management

质量策划quality planning

质量控制quality control [QC]

质量保证quality assurance [QA]

质量体系quality system

质量改进quality improvement

质量手册quality manual

质量计划quality plan

图纸drawing

工艺流程图process flow diagram [PFD]

工艺控制图process control diagram [PCD]

管道仪表流程图piping and instrument diagram [PID] [P&ID]

装置布置图plot plan

管道平面设计图piping planning (drawing)

管道平面布置图piping layout drawing

管段图;管道空视图isometric drawing

"批准用于详细工程设计"图纸drawing issued "Approved for Design"

"批准用于施工"图纸drawings issued "Approved for construction" [AFC]

供货厂商先期确认图(纸) advanced certified final drawings [ACF] ; advanced certified vendors' drawings ; preliminary vendor drawings

供货厂商最终确认图(纸) certified final drawings [CF] ; certified vendor drawings[CD]

图表diagram ; chart

直方图histogram

横道图bar ; bar-chart ; Gantt chart

进度趋势展示图schedule trend display chart

费用趋势展示图cost trend display chart

项目;工程项目project

项目实施费用状态报告project execution

项目实施阶段project phase

项目初始阶段initial phase of project execution

施工阶段construction phase

开车阶段start-up phase

项目建设周期project duration's

项目管理project management

项目控制project control

项目组project team

专责项目组task force

项目经理project manager [PM]

项目设计经理project engineering manager [PEM]

项目采购经理project procurement manager [PPM]

项目施工经理project construction manager [PCM]

项目工艺经理project process manager

项目控制经理project controls manager

项目进度计划工程师project scheduling engineer ; project scheduler

项目估算师project estimator

项目费用控制工程师project cost control engineer ; project cost engineer 项目材料控制工程师project material control engineer

项目财务经理project financial manager

项目质量经理project quality manager

项目开车经理project start-up manager

项目安全工程师project safety engineer

项目秘书project secretary

项目控制手段project controlling ; tools for project control

控制基准;执行效果测量基准;实物进度基准control baseline ; performance measurement baseline ; progress baseline

偏差;差异deviation ; variance

执行效果;效绩;性能performance

跟踪tracking ; follow up

监控monitoring

趋势分析;趋势预测trending ; trend projection

偏差预测值projected deviations

预测projection ; forecasting

纠正措施corrective action ; corrective measures

项目综合控制integrated project control

赢得值原理earned value concept [EVC]

计划工作量的预算费用budgeted cost for work scheduled [BCWS]

已完工作量的预算费用budgeted cost for work performed [BCWP]

已完工作量的实耗费用actual cost for work performed [ACWP]

费用差异cost variance [CV]

进度差异schedule variance [SV]

费用指数cost index [CI]

进度指数schedule index [SI]

费用执行效果指数cost performance index [CPI]

进度执行效果指数schedule performance index [SPI]

竣工差异at completion variance [ACV]

竣工预算费用budgeted cost at completion [BAC]

竣工预测费用estimated cost at completion [EAC]

费用;成本cost0m6m

建设总费用total installed cost [TIC]

材料费用;直接材料费用material cost ; direct material cost

设备费用;设备购买费用equipment cost ; purchased cost of equipment

散装材料费用;散装材料购买费用bulk materials cost ; purchased cost of bulk materials ; commodities cost

(直接)材料相关费用(运费和保险费等) cost of material related freight ; insurance , etc.

施工费用construction cost

施工人工费用;施工劳力费用labor cost ; erection labor cost ; construction force cost

设备安装人工费用labor cost associated with equipment

散装材料施工人工费用labor cost associated with bulk materials

人工时估算定额;施工人工时估算定额;标准工时定额standard man-hours ; standard labor man-hours ; standard construction man-hours ; standard hours

劳动生产率;劳动生产率系数labor productivity ; productivity factor ; productivity ratio

修正的人工事估算值adjusted man-hours

人工时单价man-hour rate

施工监督费用;施工监督和管理费用cost of construction supervision ; cost of construction management and supervision ; field administration and direct supervision cost

施工间接费用cost of construction indirect

分包合同费用;现场施工分包合同费用subcontract cost ; field subcontract cost

公司本部(服务)费用home office cost ; cost of home office servers

公司管理费overhead ; home office overheads

非工资费用non-payroll ; home-office expenses

试车费用commissioning activities cost

投料试车费用start-up cost

其他费用other costs

利润;预期利润profit ; expected profit

服务酬金service gains

内部费用转换internal transfer

认可的预计费用anticipated approved cost

费用控制;成本控制cost control

预算(值);项目控制预算budget ; project control budget

预算结余(值);费用结余(值) under-run ; cost under-run

预算超支(值);费用超支(值) over-run ; cost over-run

施工construction

施工工种construction craft

试车准备precommissioning

机械竣工mechanical completion [MC]

界区battery limit [BL]

工艺界区process battery limit ; inside battery limit [ISBL]

界外设施区;辅助设施界区offsite battery limit [OSBL]

工艺装置process section ; process unit

界外设施;辅助设施;通用设施offsite section ; offsite unit ; offsite facilities ; general facilities

保证;担保guarantee ; warranty

性能保证performance guarantees

绝对保证absolute guarantees

违约罚款保证penaltiable guarantees

工作质量保证workmanship guarantees

机械保证;机械担保mechanical guarantees ; mechanical warranties

保函;担保(书) bond

投标保函bid bond

履约保函;履约担保(书);为履约出具的银行保证书performance bond ; performance bank guarantee

预付款保函;为预付款出具的银行保证书advance payment bond ; bank guarantee for advance payment

保证书;保险公司出具的保函surety bond

银行保证书;信用保证书bank guarantee ; letter of guarantee [L/G]

安慰信letter of comfort

保密协议secrecy agreement

保险insurance ; assurance

保险单insurance policy

保险证书insurance certificate

保险费insurance premium

保税货物bonded goods

保税仓库bonded warehouse

信用证letter of credit [L/C]

不可撤销信用证irrevocable L/C

可撤销信用证revocable L/C

即期信用证sight credit ; sight L/C

远期信用证term credit ; term L/C

保兑信用证confirmed L/C

可转让信用证transferable L/C

备用信用证stand-by L/C

信用证提款drawing on L/C

信贷CREDIT

卖方信贷SUPPLIER'S CREDIT [S/C]

买方信贷buyer's credit [B/C]

信贷额度line of credit

项目融资;工程项目筹资project finance

贷款loan

即期贷款demand loan

索赔claim ; claim indemnity

培训training

税;税金tax(es)

所得税income taxes

关税duties

合法避税tax avoidance

程序procedure

项目协调程序project coordination procedure 项目实施程序project execution procedure

项目设计程序project engineering procedure 项目采购程序project procurement procedure

项目检验程序project inspection procedure

项目控制程序project control procedure

变更控制程序change control procedure

预算变更程序budget change procedure

项目试车程序;项目开车程序project commissioning procedure ; project start-up procedure ; project test run procedure

化学清洗程序chemical cleaning procedure

性能考核程序;生产考核程序performance test run procedure ; performance guarantee test procedure

装置验收程序plant acceptance procedure

数据data

条件数据;设计条件supporting data

返回的条件数据;返回的设计条件resultant feedback of data

意向书letter of intent

建筑专业常用英语词汇

建筑专业常用英语词汇

建筑专业常用英语词汇 A design basis 设计依据 计划建议书planning proposals 设计任务书design order 标准规范standards and codes 条件图information drawing 设计基础资料basic data for design 工艺流程图process flowchart 工程地质资料engineering geological data 原始资料original data 设计进度schedule of design B stage of design 设计阶段 方案scheme, draft 草图sketch 会谈纪要summary of discussion 谈判negotiation 可行性研究feasibility study 初步设计preliminary design 基础设计basic design 详细设计detail design 询价图enquiry drawing 施工图working drawing, construction drawing 竣工图as built drawing C climate condition 气象条件 日照sunshine 风玫瑰wind rose 主导风向prevailing wind direction 最大(平均)风速maximum (mean) wind velocity 风荷载wind load 最大(平均)降雨量maximum (mean) rainfall 雷击及闪电thunder and lightning

土建专业常用英文词汇

土建专业常用英文词汇(较完整版) A-frame A型骨架水泥cement 粉煤灰pulverized fuel ash 碎石broken stone cracked sto ne A-truss A型构架供应量supply 外加剂admixture cement additive abrasion 磨耗;磨蚀桩的平面布置pile layo ut 伸缩接头expansion joint 稀释沥青cut back bitumen abrasive cut-off machine 磨切机回填backfill 摩擦角an angle of frictio n 颗粒材料granular fill abrasive grinding machine 磨机(火石机) 颗粒层granular layer 立方码cubic yard abrasive particle 磨粒psi =po und/square inch 英制压力单位Psi具体单位是“lb/in2”, 就是“磅/平方英寸”路堤embankment 粗滤层coarse fliter abso rptio n 吸收ingredients 组成部分,成分,原料;要素,因素job mix formula 工地配合比abutment 桥台;拱座sampling 抽样frequency of test 检测频率 abutting end 邻接端co mpliance with 遵守符合co nform to 遵照符合acceleratio n 加速 in accordance with 依照与…一致wet cohesion 湿粘聚力Asphalt Binder 沥青胶泥 acceleratio n lane 加速车道potholes 坑洞locatio n 现场 acceleratio n pedal 加速器踏板reno mattress 石笼垫层splash pad 冲刷层geo-textile 土工布accelerato r 催凝剂;加速器;催化剂free drainage 自由排水 acceptance criteria 接受准则 access 通路;通道 access door 检修门;通道门 access lane 进出路径 access panel 检修门 access point 入口处;出入通道处 access ramp 入口坡道;斜通道 access ro ad 通路;通道 access shaft 竖井通道 access spiral loop 螺旋式回旋通道 access staircase 通道楼梯 access step 上落踏板;出入踏板 access tunnel 隧道通道 accessible roof 可到达的屋顶;有通道的屋顶 accessory 附件;配件 accident 事故;意外 accidental collapse 意外坍塌 acco mmodate 装设;容纳 accredited private laborato ry 认可私营实验室 accumulato r 储压器;蓄电池 accuracy limit 准确度极限 acetylene cylinder 乙炔气(风煤)樽 acid plant 酸洗设备;酸洗机 acid pump 酸液泵 acid tank 酸液缸 aco ustic co uplant 声耦合剂 aco ustic co upler 声耦合器 aco ustic lining 隔音板

工程项目管理专业英语(下) 汉译英

8 1、The construction contract price includes the direct project cost including field supervision expenses plus the markup imposed by contractors for general overhead expenses and profit. 建设工程合同价格由包括现场管理费在内的直接工程费和承包商添加的包括间接费和利润在内的增加值这两部分组成。 2、Within each of the major categories of construction such as residential housing, commercial buildings, industrial complexes and infrastructure, there are smaller segments which have very different environments with regard to price setting. 在建设工程的每一主要类型中(如居住用房、商业建筑、工业建筑和基础建设),有更小的部分,关于价格的制定有非常不同的环境。 3、However, all pricing arrangements have some common features in the form of the legal documents binding the owner and the supplier(s) of the facility. 约束业主和设备供应商的法律文件形式规定的计价方式是有一些相同之处的。 4、Without addressing special issues in various industry segments, the most common types of pricing arrangements can be described broadly to illustrate the basic principles. 在不考虑各建筑类型不同的情况下,最常用的计价方式可以根据概括介绍如下,并说明其基本原则。 5、The basic structure of the bidding process consists of the formulation of detailed plans and specifications of a facility based on the objectives and requirements of the owner, and the invitation of qualified contractors to bid for the right to execute the project. 招投标过程中的基本结构由根据业主的目标和要求编制实施的详细图纸和技术要求说明书,以及邀请合格的承包商为取得工程施工的权利而投标所组成的。 6、In the private sector, the owner has considerable latitude in selecting the bidders, ranging from open competition to the restriction of bidders to a few favored contractors. 在私营部门,业主在选择投标人有相当大的自由,范围从公开竞争的投标人到将投标人限制在若干个业主所喜欢的投标人。 7、In the public sector, the rules are carefully delineated to place all qualified contractors on an equal footing for competition, and strictly enforced to prevent collusion among contractors and unethical or illegal actions by public officials. 在公共项目领域中,需详细的制定规则,以使所有预审合格的承包商在平等基础上竞争,并严格执行,以防止承包商之间的相互串通和政府官员的不道德或违法行为。 8、In such cases, the contractor is permitted to submit a list of unit prices for those tasks, and the final price used to determine the lowest bidder is based on the lump sum price computed by multiplying the quoted unit price for each specified task by the corresponding quantity in the owner's estimates for quantities. 在这种情况下,允许承包商提交这些任务的分部分项工程量的单价表,而于确定最低投标人的最终价格是基于总投标报价时所用的计算方法,既通过将通过承包商对每一具体

(完整版)土木工程专业英语常用词汇

Part IV:Commonly Used Professional Terms of Civil Engineering development organization 建设单位 design organization 设计单位 construction organization 施工单位 reinforced concrete 钢筋混凝土 pile 桩 steel structure 钢结构 aluminium alloy 铝合金 masonry 砌体(工程)reinforced ~ 配筋砌体load-bearing ~ 承重砌体unreinforced ~非配筋砌体 permissible stress (allowable stress) 容许应力plywood 胶合板 retaining wall 挡土墙 finish 装修 finishing material装修材料 ventilation 通风 natural ~ 自然通风 mechanical ~ 机械通风 diaphragm wall (continuous concrete wall) 地下连续墙 villa 别墅 moment of inertia 惯性矩 torque 扭矩 stress 应力normal ~ 法向应力shear ~ 剪应力 strain 应变 age hardening 时效硬化 air-conditioning system空调系统 (air) void ration(土)空隙比 albery壁厨,壁龛 a l mery壁厨,贮藏室 anchorage length锚固长度 antiseismic joint 防震缝 architectural appearance 建筑外观 architectural area 建筑面积 architectural design 建筑设计 fiashing 泛水 workability (placeability) 和易性 safety glass安全玻璃 tempered glass (reinforced glass) 钢化玻璃foamed glass泡沫玻璃 asphalt沥青 felt (malthoid) 油毡 riveted connection 铆接 welding焊接 screwed connection 螺栓连接 oakum 麻刀,麻丝 tee三通管 tap存水弯 esthetics美学 formwork 模板(工程) shoring 支撑 batching 配料 slipform construction (slipforming) 滑模施工 lfit-slab construction 升板法施工 mass concrete 大体积混凝土 terrazzo水磨石 construction joint 施工缝 honeycomb蜂窝,空洞,麻面 piled foundation桩基 deep foundation 深基础 shallow foundation浅基础 foundation depth基础埋深 pad foundation独立基础 strip foundation 条形基础 raft foundation筏基 box foundation箱形基础 BSMT=basement 地下室 lift 电梯electric elevator lift well电梯井 escalator 自动扶梯 Poisson’s ratio 泊松比μ Young’s modulus , modulus of elasticity 杨氏模量,弹性模量E safety coefficient 安全系数 fatigue failure 疲劳破坏 bearing capacity of foundations 地基承载力bearing capacity of a pile 单桩承载力 two-way-reinforcement 双向配筋 reinforced concrete two-way slabs钢筋混凝土双向板 single way slab单向板 window blind 窗帘sun blind wind load 风荷载 curing 养护 watertight concrete 防水混凝土 white cement白水泥 separating of concrete混凝土离折segregation of concrete mortar 砂浆~ joint 灰缝 pilaster 壁柱 fire rating耐火等级 fire brick 耐火砖 standard brick标准砖

工程项目管理常用英语汇编

工艺包process package 工艺设计process design 工艺发表process release 工艺预发表initial process release 工作范围;项目任务范围scope of work ; project scope 工作包work package 工作项work item 任务单项line item 分解结构breakdown structure 工作分解结构work breakdown structure 组织分解机构organizational breakdown structure 项目大项工作分解结构project summary work breakdown structure 承包商标准工作分解结构;工程公司标准工作分解结构contractor's standard work breakdown structure 责任分工矩阵responsibility assignment matrix 风险risk 风险分析risk analysis 风险备忘录risk memorandum 公司本部home office 公司本部服务home office service 公用工程utility 计划plan 项目计划project plan (项目)设计计划(project)engineering plan

(项目)采购计划(project)procurement plan (项目)施工计划(project)construction plan (项目)开车计划(project)start-up plan 专利patent 专利权patent right 产权技术proprietary technology 专利技术licensed technology 专有技术;技术诀窍know-how 许可证license 专利商;许可方licensor 受许可放;受让方licensee (技术)转让费;提成费royalty 许可证费license fee 专有技术费know-how fee 专业discipline 工艺process design ; process engineering 系统systems engineering 设备equipment engineering 布置plant layout engineering 管道设计piping design 管道机械piping mechanical engineering 仪表instruments engineering 电气electrical engineering 建筑architectural engineering

建筑工程行业英语词汇大全

建筑工程行业英语词汇大全 综合分析判断comprehensive analysis and judgement 变压器transformer 抽芯loose core 过道aisle 三相电容three phase capacitance 芯棒core rod 都市规划与土地开发Urban g and Land Development 社区开发及工业区开发 Community Development and Industry Park Development 开发许可申请Development Permit 土地使用变更计划Land Use Rezoning Plan 主要计划及细部计划Master Plan and Detail Plan 都市计划更新计划Urban Renewal Plan 都市设施Urban Design 建筑设施Architecture Design 大地工程Geotechnical Engineering 工址调查Site Investigation 现地试验与室内试验In-Situ and Laboratory Test 基础工程Foundation Design 深开挖工程及建物保护Deep Excavation and Building Protection

新生地及软弱地层改良Reclamation and Soft Ground Improvement 山坡地开发与水土保持Slope land Development, Soil and Water Conservation 潜盾隧道与岩石隧道Shield Tunnel and Rock Tunnel 大地工程施工顾问Geotechnical Construction Consultant 土壤材料试验Soil and Material 结构工程Structural Engineering 各类钢筋混凝土、预力混凝土、钢结构及钢骨钢筋混凝土结构Structures of R.C., Prestressed Concrete, Steel, and SRC 桥梁、高层建筑、地下结构物、隧道、深开挖挡土结构Bridges, High-Rise Buildings, Underground Structures, Tunnels, Retaining Structures for Deep Excavations 桥梁安全检测、评估及维修补强Bridge Inspection, Assessment, and Rehabilitation 钢结构细部设计及制造图Steel Structural Detail Design and Shop Drawings 厂房工程Industrial Plant 工业厂房-石化工厂、钢厂、电厂、气体厂、科技工业厂房、一般性厂房Industrial Plants--Petroleum and Chemical, Steel, Power, Gas, High-Technical and General Plants 环保设施工厂-垃圾焚化厂、垃圾掩埋场、污水处理厂及相关管线Environment Protecting Plants--Incineration Plants, Garbage Disposal

常用造价英语词汇

常用造价英语词汇 估算/费用估算:estimate/cost estimate; 估算类型:types of estimate; 详细估算:是偏差幅度最小的估算,defined estimate; 设备估算:equipment estimate; 分析估算:analysis estimate; 报价估算:proposal estimate; 控制估算:control estimate; 初期控制估算:interim control estimate/initial control estimate 批准的控制估算:initial approved cost 核定估算:check estimate 首次核定估算:first check estimate 二次核定估算:production check estimate 人工时估算:man hour estimate 材料费用/直接材料费用:material cost/direct material cost 设备费用/设备购买费用:equipment cost/purchased cost of equipment 散装材料费用/散装材料购买费用:bulk material cost/purchased cost of bulk material 施工费用:construction cost 施工人工费用:labor cost/construction force cost 设备安装人工费用:labor cost associated with equipment 散装材料施工安装人工费用:labor cost associated with bulk materials 人工时估算定额:standard man-hours 施工人工时估算定额:standard labor man-hours 标准工时定额:standard hours 劳动生产率:labor productivity/productivity factor/productivity ratio 修正的人工时估算值:adjusted man-hours 人工时单价:man-hours rate 施工监督费用:cost of construction supervision 施工间接费用:cost of construction indirects 分包合同费用/现场施工分包合同费用:subcontract cost/field subcontract cost 公司本部费用:home office cost 公司管理费用:overhead 非工资费用:non payroll 开车服务费用:cost of start-up services 其他费用:other cost 利润/预期利润:profit/expected profit 服务酬金:service gains 风险:risk 风险分析:risk analysis 风险备忘录:risk memorandum 未可预见费:contingency 基本未可预见费:average contingency 最大风险未可预见费:maximum risk contingency 用户变更/合同变更:cilent change/contract change

工程管理专业英语翻译(第二版)徐勇戈

U2-S1什么是项目管理? 建筑项目管理不仅需要对设计和实施过程有所理解,而且需要现代管理知识。建设项目有一组明确的目标和约束,比如竣工日期。尽管相关的技术、组织机构或流程会有所不同,但建设项目同其他一些如航天、医药和能源等准等领域的项目在管理上仍然有共同之处。 一般来说,项目管理和以项目任务为导向的企业宏观管理不同,待项目任务的完成后,项目组织通常也会随之终止。(美国)项目管理学会对项目管理学科有如下定义:项目管理是一门指导和协调人力物力资源的艺术,在项目整个生命周期,应用现代管理技术完成预定的规模、成本、时间、质量和参与满意度目标。 与此形成对照,一般的工商企业管理更广泛地着眼于业务的更加连贯性和连续性。然而,由于这两者之间有足够的相似和差异,使得现代管理技术开发宏观管理可以用于项目管理。 项目管理框架的基本要素可以用图2-1表示。其中,应用宏观管理知识和熟悉项目相关知识领域是不可或缺的。辅助性学科如计算机科学和决策科学也会发挥重要作用。实际上,现代管理实践与各专业知识领域已经吸收应用了各种不同的技术和工具,而这些技术和工具曾一度仅仅被视作属于辅助学科领域。例如,计算机信息系统和决策支持系统是目前常见的宏观管理工具。同样,许多像线性规划和网络分析这样的运算研究工具,现在广泛应用在许多知识和应用领域。因此,图2- 1反映了项目管理框架演变的唯一来源。 具体来说,建设项目管理包含一组目标,该目标可能通过实施一系列服从资源约束的运作来实现。在规模、成本、时间和质量的既定目标与人力、物力和财力资源限制之间存在着潜在冲突。这些冲突应该在项目开始时通过必要的权衡和建立新备选方案来解决。另外,施工项目管理的功能通常包括以下: 1. 项目目标和计划说明书中包括规模、预算安排、进度安排、设置性能需求和项目参与者的界定。 2. 根据规定的进度和规划,通过对劳动力、材料和设备的采购使资源的有效利用最大化。 3. 在项目全过程中,通过对计划、设计、估算、合同和施工的适当协调控制来实施项目各项运作。 4. 设立有效的沟通机制来解决不同参与方之间的冲突。 项目管理学会聚焦九个不同独特领域,这些领域需要项目经理所具有的知识和关注度: 1. 项目宏观管理,确保项目要素有效协调。 2. 项目范围管理,确保所需的所有工作(并且只有所需的工作)。 3. 项目时间管理,提供有效的项目进度。 4. 项目成本管理,确定所需资源和维持预算控制。 5. 项目质量管理,确保满足功能需求。 6 . 项目人力资源管理,有效地开发和聘用项目人员。 7 . 项目沟通管理,确保有效的内部和外部通信。 8. 项目风险管理,分析和规避潜在风险。 9. 项目采购管理,从外部获得必要资源。

建筑专业词汇中英对照(精心整理版)

1DESIGN BASIS 设计依据 计划建议书planning proposals 设计任务书design order 标准规范standards and codes 条件图information drawing 设计基础资料basic data for design 工艺流程图process flowchart 工程地质资料engineering geological data 原始资料original data 设计进度schedule of design 2STAGE OF DESIGN 设计阶段 方案scheme, draft 草图sketch 会谈纪要summary of discussion 谈判negotiation 可行性研究feasibility study 初步设计preliminary design 基础设计basic design 详细设计detail design 询价图enquiry drawing 施工图working drawing, construction drawing 竣工图as built drawing 3CLIMATE CONDITION 气象条件 日照sunshine 风玫瑰wind rose 主导风向prevailing wind direction 最大(平均)风速maximum (mean) wind velocity 风荷载wind load 最大(平均)降雨量maximum (mean) rainfall 雷击及闪电thunder and lightning 飓风hurricane 台风typhoon 旋风cyclone 降雨强度rainfall intensity 年降雨量annual rainfall 湿球温度wet bulb temperature 干球温度dry bulb temperature 冰冻期frost period

建筑结构专业英语词汇

A acceptable quality 合格质量 acceptance lot 验收批量 aciera 钢材 admixture 外加剂 against slip coefficient between friction surface of high-strength bolted connection 高强度螺栓摩擦面抗滑移系数 aggregate 骨料 air content 含气量 air-dried timber 气干材 allowable ratio of height to sectional thickness of masonry wall or column 砌体墙、柱容许高厚比 allowable slenderness ratio of steel member 钢构件容许长细比 allowable slenderness ratio of timber compression member 受压木构件容许长细比allowable stress range of fatigue 疲劳容许应力幅 allowable ultimate tensile strain of reinforcement 钢筋拉应变限值 allowable value of crack width 裂缝宽度容许值 allowable value of deflection of structural member 构件挠度容许值 allowable value of deflection of timber bending member 受弯木构件挠度容许值allowable value of deformation of steel member 钢构件变形容许值 allowable value of deformation of structural member 构件变形容许值 allowable value of drift angle of earthquake resistant structure 抗震结构层间位移角限值 amplified coefficient of eccentricity 偏心距增大系数 anchorage 锚具 anchorage length of steel bar 钢筋锚固长度 approval analysis during construction stage 施工阶段验算 arch 拱 arch with tie rod 拉捍拱 arch—shaped roof truss 拱形屋架

常用工程英语词汇

常用工程英语词汇 Construction Site 建筑工地 Apologize for any inconvenience caused during building operation 对施工期间带来的不便表示歉意。 Danger of death. Keep out. 生命危险,严禁入内。 Danger,building site, keep out 工地危险,禁止入内。 Danger,evacuation 危险,请走开 Dangerous structure, this bridge is unsafe 危险结构,该桥不安全。 Hot work in progress 正在施工 No persons allowed beyond this point 任何人不许越过此处。 Safety footwear.穿安全靴 Safety helmets must be worn on this site 此工地必须戴安全帽。 Site entrance, dangerous 工地入口,危险 Slow, site entrance 工地入口请慢行 This button has been moved for remedial work 该按钮已卸下拿去修理。 This is just for construction personnel 仅供施工人员使用。 This lift is only for construction personal 此电梯仅供施工人员使用。 This work will be completed by the end of this year. Thank you fo r your patience during the inevitable disruption 此工程于年底完工,感谢你施工期间的宽容大度。 We apologize for any inconvenience caused during this works 对施工期间引起的不便表示歉意。 Working overhead 上面在施工

超全建筑专业英语词汇搜集大整理

超全建筑专业英语词汇搜集大整理!全英文出图OK! 来源:秦泽倓的日志 建筑类常见英语词汇 a. DESIGN BASIS 设计依据 b. DESIGN STAGE 设计阶段 c. CLIMATE CONDITION 气象条件 d. GENERAL ROOM NAME 常用房间名称 e. ROOFING & CEILING 屋面及天棚 f. WALL(CLADDING) 墙体(外墙板) g. FLOOR & TRENCH 地面及地沟 h. DOORS 、GLASS、WINDOWS & IRONMONGERY(HARDWARE)门、玻璃、窗及五金件I. STAIRCASE、LANDING & LIFT(ELEVATOR)楼梯、休息平台及电梯 j. BUILDING MATERIAL WORDS AND PHRASES 建筑材料词汇及短语 Bricks and Tiles 砖和瓦 Lime, Sand and Stone 灰、砂和石 Cement, Mortar and Concrete 水泥、砂浆和混凝土 Facing And Plastering Materials 饰面及粉刷材料 Asphalt (Bitumen) and Asbestos 沥青和石棉 Timber 木材 Metallic Materials 金属材料 Non-Ferrous Metal 有色金属 Anti-Corrosion Materials 防腐蚀材料 Building Hardware 建五金 Paint 油漆 k. OTHER ARCHITECTURAL TERMS 其它建筑术语 Discipline 专业 Conventional Terms 一般通用名词 Architectural Physics 建筑物理 Name Of Professional role 职务名称 Drafting 制图 a. DESIGN BASIS 设计依据 计划建议书 planning proposals 设计任务书 design order 标准规范standards and codes 条件图 information drawing 设计基础资料 basic data for design 工艺流程图 process flowchart 工程地质资料 engineering geological data 原始资料 original data

土木建筑工程英语词汇用语及插图

清单第1课 Site Clearance 场地清理 Workmanship 工艺 Preambles To Trades 工程量计算原则 preamble / primbl/ n [C, U] ~ (to sth) opening statement explaining the purpose of the book, document, lecture, etc that follows (书籍﹑文件﹑讲演等的)前言, 序言, 开场白: He launched into his statement without any preamble. 他开门见山地发表言论. 清单第2课 Site Clearance场地平整,场地清理 Wash trough 洗车槽,洗槽,洗涤池,冲洗槽 Booster 美 ['bust] n. 升压机;支持者;扩爆器 booster pump增压泵 sprinkle 美 ['sprkl] n. 撒,洒;少量 vt. 洒;微雨;散置

vi. 洒,撒;下稀疏小雨;喷 sprinkler head喷头,(喷水装置的)喷嘴, stop cock止水阀 outfall排水口,出水口 run-off channel径流通道 hardcore硬底层(碎砖垫层) mesh reinforcement钢筋网 UC Beam工字钢梁 reinforcement bar Y25 at 75mm centers钢筋中心距 crusher run 或crusher run road碎石道路 Consolidate 使固结,巩固,加强 consolidated thickness 压实厚度 cambers, gradients and crossfalls拱形曲面、坡面、横向放坡camber路拱 crown (车道横断面的)路拱顶点

土木工程专业英语常用词汇

土木工程专业英语常用 词汇 Company Document number:WTUT-WT88Y-W8BBGB-BWYTT-19998

Part IV:Commonly Used Professional Terms of Civil Engineering development organization 建设单位 design organization 设计单位 construction organization 施工单位 reinforced concrete 钢筋混凝土 pile 桩 steel structure 钢结构 aluminium alloy 铝合金 masonry 砌体(工程) reinforced ~ 配筋砌体load-bearing ~ 承重砌体 unreinforced ~非配筋砌体 permissible stress (allowable stress) 容许应力plywood 胶合板 retaining wall 挡土墙 finish 装修 finishing material装修材料 ventilation 通风 natural ~ 自然通风 mechanical ~ 机械通风 diaphragm wall (continuous concrete wall) 地下连续墙 villa 别墅 moment of inertia 惯性矩torque 扭矩 stress 应力 normal ~ 法向应力 shear ~ 剪应力strain 应变 age hardening 时效硬化 air-conditioning system空调系统 (air) void ration(土)空隙比 albery壁厨,壁龛 a l mery壁厨,贮藏室 anchorage length锚固长度 antiseismic joint 防震缝 architectural appearance 建筑外观architectural area 建筑面积 architectural design 建筑设计 fiashing 泛水 workability (placeability) 和易性 safety glass安全玻璃 tempered glass (reinforced glass) 钢化玻璃foamed glass泡沫玻璃 asphalt沥青 felt (malthoid) 油毡 riveted connection 铆接 welding焊接 screwed connection 螺栓连接

土建专业常用英文词汇

土建专业常用英文词汇回填;回填土 backfill 回填物料 backfill material 逆火back-fire 本底噪声;背景噪声 background noise 垫板;背板 backing plate 后勤地区;辅助埸地 back-up area 隔板;挡板 baffle 遮挡板 baffle plate 遮挡墙 baffle wall 调节池;均衡槽 balance tank 平衡锤 balance weight 平衡载重 balanced load 平冲器 balancer 平衡水管 balancing pipeline 露台 balcony 滚珠轴承 ball bearing 浮球阀;球形阀;波阀 ball valve 球窝接头 ball-and-socket joint 道碴ballast 竹枝棚架 bamboo scaffolding 带式制动器 band brake 带夹 band clamp 尖啸警报 banshee alarm

钢筋 bar tendon 驳运地点 barging area 营房barrack 管筒;芯管 barrel 方形桩barrette 路障;障碍物 barricade 栏栅;护栏;障碍物;屏障 barrier 路障 barrier block 路闸 barrier gate 阻挡板 barrier plate 基座 base 路面下层;承重层;路基层 base course 基架 base frame 基架绝缘器 base insulator 底板;垫板 base plate 底部密封胶 base sealing 平底板base slab 底座支架 base support 基线;底线;基准线 baseline 基线计划 baseline programme 地库;地窖;地下室 basement 混凝土混和机;配料厂 batching plant 斜桩 batter pile 蓄电池battery

项目管理中常用英语 (2)

项目管理中常用英语(转载学习) 工程项目管理常用英语工艺包 process package 工艺设计process design 工艺发表 process release 工艺预发表initial process release 工作范围;项目任务范围 scope of work; project scope 工作包 work package 工作项work item 任务单项 line item 分解结构 breakdown structure 工作分解结构work breakdown structure 组织分解机构organizationalbreakdown structure 项目大项工作分解结构project summary work breakdown structure 承包商标准工作分解结构;工程公司标准工作分解结构 contractor's st andard work breakdown structure 责任分工矩阵 responsibility assignment matrix 风险risk 风险分析risk analysis 风险备忘录risk memorandum 公司本部 home office 公司本部服务 home office service 公用工程utility 计划plan

项目计划project plan (项目)设计计划 (project)engineering plan (项目)采购计划 (project)procurementplan (项目)施工计划(project)construction plan (项目)开车计划 (project)start-up plan 专利 patent 专利权 patent right 产权技术proprietary technology 专利技术 licensed technology 专有技术;技术诀窍 know-how 许可证 license 专利商;许可方 licensor 受许可放;受让方 licensee (技术)转让费;提成费royalty 许可证费 license fee 专有技术费know-howfee 专业 discipline 工艺 process design ; process engineering 系统 systems engineering 设备equipment engineering 布置 plant layout engineering 管道设计 piping design 管道机械piping mechanical engineering

相关文档
最新文档