地下连续墙_(完整版)

合集下载

(完整版)土木工程专业英语常用词汇

(完整版)土木工程专业英语常用词汇

Part IV:Commonly Used Professional Terms of Civil Engineeringdevelopment organization 建设单位design organization 设计单位construction organization 施工单位reinforced concrete 钢筋混凝土pile 桩steel structure 钢结构aluminium alloy 铝合金masonry 砌体(工程)reinforced ~ 配筋砌体load-bearing ~ 承重砌体unreinforced ~非配筋砌体permissible stress (allowable stress) 容许应力plywood 胶合板retaining wall 挡土墙finish 装修finishing material装修材料ventilation 通风natural ~ 自然通风mechanical ~ 机械通风diaphragm wall (continuous concrete wall) 地下连续墙villa 别墅moment of inertia 惯性矩torque 扭矩stress 应力normal ~ 法向应力shear ~ 剪应力strain 应变age hardening 时效硬化air-conditioning system空调系统(air) void ration(土)空隙比albery壁厨,壁龛a l mery壁厨,贮藏室anchorage length锚固长度antiseismic joint 防震缝architectural appearance 建筑外观architectural area 建筑面积architectural design 建筑设计fiashing 泛水workability (placeability) 和易性safety glass安全玻璃tempered glass (reinforced glass) 钢化玻璃foamed glass泡沫玻璃asphalt沥青felt (malthoid) 油毡riveted connection 铆接welding焊接screwed connection 螺栓连接oakum 麻刀,麻丝tee三通管tap存水弯esthetics美学formwork 模板(工程)shoring 支撑batching 配料slipform construction (slipforming) 滑模施工lfit-slab construction 升板法施工mass concrete 大体积混凝土terrazzo水磨石construction joint 施工缝honeycomb蜂窝,空洞,麻面piled foundation桩基deep foundation 深基础shallow foundation浅基础foundation depth基础埋深pad foundation独立基础strip foundation 条形基础raft foundation筏基box foundation箱形基础BSMT=basement 地下室lift 电梯electric elevatorlift well电梯井escalator 自动扶梯Poisson’s ratio 泊松比μYoung’s modulus , modulus of elasticity 杨氏模量,弹性模量Esafety coefficient 安全系数fatigue failure 疲劳破坏bearing capacity of foundations 地基承载力bearing capacity of a pile 单桩承载力two-way-reinforcement 双向配筋reinforced concrete two-way slabs钢筋混凝土双向板single way slab单向板window blind 窗帘sun blindwind load 风荷载curing 养护watertight concrete 防水混凝土white cement白水泥separating of concrete混凝土离折segregation of concretemortar 砂浆~ joint 灰缝pilaster 壁柱fire rating耐火等级fire brick 耐火砖standard brick标准砖terra cotta 琉璃瓦mosaic 马赛克ceramic mosaic陶瓷锦砖,马赛克,ceramic mosaic tileceramic tile 瓷砖rubble wall毛石墙marble 大理石,大理岩granite 花岗石,花岗岩ready-mixed concrete 商品混凝土,预拌混凝土real estate房地产reinforcement bar 钢筋veinforcement meal, reinforcing bar, reinforcing steel reinforcement cover混凝土保护层reinforcement mat 钢筋网, reinforcing mesh reinforcing ratio 配筋率reinforcement percentagereinforcing work钢筋工程residential building居住建筑rigid foundation刚性基础roof 屋顶,屋盖,屋面; roof board 屋面板; roof garden屋顶花园roof live load 屋面活荷载rustic terrazzo粗面水磨石,水刷石sand cushion砂垫层saw-tooth skylight锯齿形天窗scaffold 脚手架sill窗台silty soil粉质土single door单扇门double door双扇门single reinforcemen单筋tsliding door推拉门sliding window水平推拉窗staircase楼梯间stair rail(ing) 楼梯栏杆,楼梯扶手stair step楼梯踏步stair string (er)楼梯梁stair clearance 楼梯净空高度stair headroom steel forms钢模板store room贮藏室structural drawings结构图soft substratum软弱下卧层sun louver 遮阳板supporting block 支座supporting layer持力层tensile reinforcement 受拉钢筋tensile steel, tension reinforcementterrace roof 平屋顶thermal insulation隔热through ventilation穿堂风timber structure 木结构wood structuretoilet 盥洗间,浴室,厕所,便池tracing paper描图纸lawn 草坪treatment of elevation立面处理drawing board 绘图板triaxial compression test 三轴压缩试验tubular steel scaffolding钢管脚手架uniformly distributed load均布荷载unnotched bar 光面钢; threadbar螺纹钢筋urinal 小便池,小便斗,小便槽valley天沟ventilating skylight 通风天窗waterproof barrier 防水层aquatardTerzaghi bearing capacity theory太沙基承载力理论Terzaghi consolidation theory 太沙基固结理论foundation treatment 地基处理foundation pressure 基底压力span 跨度specific gravity比重quicklime生石灰,氧化钙hydrated lime 熟石灰,消石灰hydration 水化作用plaster of Paris熟石膏portland cement 波特兰水泥,硅酸盐水泥,普通水泥portland blastfurnace slag cement矿渣水泥portland fly-ash cement粉煤灰(硅酸盐)水泥portland-pozzolana cement火山灰质硅酸盐水泥gas-foaming admixture发泡剂retarding admixture缓凝剂water-reducing agent减水剂air-entrained agent 加气剂slump坍落度water-cement ratio水灰比w/carchitectural lighting 建筑采光,建筑照明architectural perspective建筑透视图architectural section 建筑剖面图architectural specifications建筑规范architectural working drawing 建筑施工图architecture sketch建筑草图arc welding 电弧焊stress concentration 应力集中multi storied building 多层建筑settlement of foundation 地基沉降tensile strength抗拉强度compressive strength抗压强度bending strength抗弯强度construction material 建筑材料building material continuous beam连续梁tower crane 塔式起重机,塔吊SPT=standard penetration test 标准贯入度试验wall between two windows窗间墙stability稳定性stress-strain curve应力-应变曲线stress-strain diagram应力-应变图damp-proof coating防潮层osmosis渗透osmotic co-efficient渗透系数osmotic pressure渗透压力finite element method 有限单无法finite-difference method有限差分法finite slice method 条分法deformation 变形displacement位移allowable bearing capacity 容许承载力total and differential settlement 总沉降量和沉降差Mohr’s circle of stress 摩尔应力圆snow laod雪(荷)载bent reinforcement bar 弯起钢筋bent steel 弯起钢筋bent-up bar 弯起钢筋bid 投标,标书bid call招标bid opening开标bidding sheet 标价单bid price 出价,投标价格binding reinforcement 绑扎钢筋blocking course檐口墙,女儿墙parapet (wall) bloodwood 红木redwoodbrick lintel 砖砌过梁brick masonry structure 砖石结构BRKT =bracket 牛腿building height 建筑高度building industrialization建筑工业化building-in fitting 预埋件building law 建筑法building line 建筑红线building module 建筑模数building orientation 建筑物朝向building permits for construction建筑施工执照building equipment 建筑设备building physics建筑物理building rubble 建筑垃圾building storm sewer 房屋雨水管built –in cupboard 壁厨cable structure 悬索结构cable-supported construction悬索结构canopy雨篷cast-in-place concrete 现浇混凝土cast-in-situ concrete 现浇混凝土caterpillar crane 履带式起重机cavity brick空心砖cavity wall空心墙ceiling 顶棚,吊顶,天花板cement floor水泥地面cement mortar水泥砂浆center-to-center中心距(中到中间距)chain-pull switch拉线开关cromatics色彩学city planning城市规划civil architecture民用建筑civil building民用建筑civil engineering土木工程clay brick粘土砖clerestory天窗clerestory windows高侧窗closet 盥洗室,厕所,卫生间coated glass 玻璃幕墙glass curtain wall collapsible loess 湿陷性黄土slumping loess collar tie beam 圈梁combination beam 组合梁combination construction 混合结构shear wall 剪力墙shear strength 抗剪强度transom (门上的)亮子bar 棒,条,杆件,(粗)钢筋beam 梁framework 框架truss桁架statically determinate ~ 静定桁架statically indeterminate ~ 超静定桁架elasticity弹性plasticity塑性stiffness刚度fiexibility挠度bending moment弯矩~ diagram 弯矩图~ envelope弯矩包络线influence line 影响线aggregate 骨料coarse ~ 粗骨料fine ~ 细骨料admixture外加剂concrete mixer混凝土搅拌机paint 油漆density密度viscosity粘度,粘滞性geology地质earth pressure 土压力active ~ 主动土压力coarse sand 粗砂; medium sand中砂; fine sand细砂artificial daylight人工采光artificial illumination人工照明art of architecture建筑艺术seismatic design 抗震设计back view 背立面balcony阳台balustrade 栏杆,扶手bamboo scaffolding竹脚手架band iron扁铁,扁钢bar cutter钢筋切断机bar list钢筋表bar spacing钢筋间距base board踢脚板basic module基本模数BC=building code建筑法规beam-and-column construction梁柱结构(框架结构)beam-and-girder construction主次梁梁格结构beam-and-slab construction梁板结构beam with one overhanging end 悬臂梁cantilever beam, overhanging beambeam with simply supported ends 简支梁simple beam, simple-supported beam, simply supported beambeam with fixed ends 固端梁bending stiffness弯曲刚度bending strength抗弯强度bending stress弯曲应力bend bar 弯起钢筋,弯筋commemorative architecture 纪念性建筑commercial buildings商业建筑物,商业房屋compacted fill 压实填土,夯实填土compacted soil压实土compaction by layers分层填土夯实compaction by rolling 碾压compaction by vibration振动压实compartmentation隔断completion acceptance竣工验收completion date 竣工日期compression bar 受压钢筋compression steel受压钢筋concealed work 隐蔽工程conductor 水落管construction administration 施工管理constructional drawing 施工图,构造图construction and installation work 建筑安装工程construction company 建筑公司construction economics建筑经济construction industry建筑(工)业construction in process 在建工程construction management plan 施工组织设计construction period施工工期construction site 施工现场creep 徐变,蠕变cross wall横墙dark room暗室design development phase 技术设计阶段design scheme设计方案detail drawing 详图,大样图,细部图development area 开发区digestion tank 化粪池septic tank, sewage tank distributed load分布荷载distributing bars 分布钢筋distribution reinforcement分布钢筋BL=dead load 恒载,自重dogleg stair 双折楼梯half turndomestic building居住房屋,住宅door window落地窗dormitory宿舍downspout 雨水管,落水管drain spout, fall pipe, leader pipe, rain conductor, rain leader, rain-water leaderdrip line 滴水线dunny厕所,盥洗室earthquake intensity地震烈度earthquake load 地震荷载earthquake resistant design抗震设计earthwork土石方工程earthwork quantity土方工程量eave 屋檐effective depth 有效高度,有效深度,有效厚度enameled tile 琉璃瓦,釉面砖engineering geological prospecting工程地质勘探expanded joint 伸缩缝,温度缝shrinkage joint, temperature jointfactory building厂房figured glass 图案玻璃,压花玻璃patterned glass fixed window固定窗flat skylight平天窗flexible foundation 柔性基础floor load楼面荷载floor plan楼屋平面图floor-to-ceiling height楼面至顶棚高度,室内净高floor-to-floor height楼面至楼面高度story height层高farmed steel 型钢shape(d) steelfoundation beam 基础梁foundation bed 基础垫层gable 出墙~ wallgalvanized iron 镀锌铁皮,白铁皮general arrangement drawing总体布置图,总平面图general layout 总平面图,总体布置glass fiber reinforced plastics玻璃纤维增强塑料,玻璃钢glued board 胶合板gravel 砾石; ~ cobble 卵石pebble gravel, pebble stoneground engineering地基工程ground floor plan底层平面图groundwater surface 地下水位phreatic (water ) surfacegutter明沟,天沟rain-gutter檐沟,天沟hair 麻刀hempmixed sand 混合砂mechanics of materials 材料力学theoretical mechanics 理论力学elastic mechanics弹性力学structural mechanics结构力学architectural mechanics建筑力学fracture mechanics断裂力学soil mechanics土力学rock mechanics岩石力学fluid mechanics流体力学abrasive floor防滑地板accelerated cement 快凝水泥accelerator促凝剂,速凝剂acceptance of hidden subsurface work 隐蔽工程验收acceptance of tender得标acceptance of work subelements分项工程验收access eye 清扫孔,检查孔access hole 检修孔access plate 检修孔盖板accordion shades 折叠式活动隔断,屏风acid 酸alkali碱acoustical insulation 隔声red cray 红粘土adamic earthadhesive bitumen primer冷底子油administration of the construction contract 施工合同管理aerial ledder消防梯non-bearing wall 非承重墙non-load bearing wall norm for detailed estimates 预算定额norm for preliminary estimates 概算定额norm for estimating labor requirements劳动定额norm for estimating material requirements材料定额open ditch 明沟open trenchoutside finish 外装修partion 隔壁, ~ screen 隔断pea shingle 豆砾石,绿豆砂pipeline gas 管道煤气plastic hinge 塑性铰plinth (wall)勒脚pointing (joints)勾缝pointing masonry勾缝砌体,清水墙porch 门廊,走廊pore water 孔隙水post-tensioning method后张法precast concrete lintel 预制混凝土过梁precast reinforced concrete building预制钢筋混凝土房屋monolithic reinforced concrete building整体式钢筋混凝土房屋prestressed concrete 预应力混凝土pretensioning method先张法protecting cap 安全帽protective cap, safety helmet protecting net 安全网public building公共建筑public comfort station 公共厕所public conveniencepump concrete 泵送混凝土pumping concrete halfpace landing楼梯平台landing platform, stair landing, stair platformhallway门厅,过道hemp thread麻丝high-rise hotel高层旅馆,高层饭店hip 屋脊线hoop reinforcement环筋,箍筋hull core structure筒体结构inside finish内装修jalousie window 百叶窗, louver windowjunior beam 次梁secondary beam, secondary girder main beam 主梁primary beam, primary girder kick strip 踢脚step踏步L & CM=lime and cement mortar石灰水泥砂浆lintol (门窗)过梁lintellongitudinal bar纵向钢筋low-rise building低层建筑LR = living room 起居室,客厅sitting room, parlo(u)rmastic 玛碲脂,树脂,嵌缝料membrane curing薄膜养护metallic tape钢卷尺metal window钢窗mid-span moment跨中弯矩mix(ing) proportion 配合比,混合比mix(ing) ratio mopboard踢脚板mosquito screen 纱窗, screen window。

完整版一桩一柱做法

完整版一桩一柱做法

第18 章支护结构与主体结构相结合及逆作法.接头防渗技术4“两墙合一”地下连续墙既作为基坑施工阶段的挡土挡水结构,也作为结构地下室外墙起着永久的挡土挡水作用,因此其防水防渗要求极高。

地下连续墙单元槽段依靠接头连接,这种接头通常要同时满足受力和防渗要求,但通常地下连续墙接头的位置是防渗的薄弱环节。

对“两墙合一”地下连续墙接头防渗通常可采用以下措施:(1)由于地下连续墙是泥浆护壁成槽,接头混凝土面上必然附着有一定厚度的泥皮(与泥浆指标、制浆材料有关),如不清除,浇筑混凝土时在槽段接头面上就会形成一层夹泥带,基坑开挖后,在水压作用下可能从这些地方渗漏水及冒砂。

为了减少这种隐患,保证连续墙的质量,施工中必须采取有效的措施清刷混凝土壁面。

)采用合理的接头形式。

地下连续墙接头形式按使用接头工具的不同可分为接头管2((锁口管)、接头箱、隔板、工字钢、十字钢板以及改进接头-凹凸型预制钢筋混凝土楔形接头桩等几种常用型式。

根据其受力性能可分为刚性接头和柔性接头。

“两墙合一”地下连续墙采用的接头形式在满足结构受力性能的前提下,应优先选用防水性能更好的刚性接头。

(3)在接头处设置扶壁柱。

通过在地下连续墙连续墙接头处设置扶壁柱来加大地下连续墙外水流的渗流途径,折点多、抗渗性能好。

(4)在接头处采用旋喷桩加固。

地下连续墙施工结束后,在基坑开挖前对槽段接头缝进行三重管旋喷桩加固。

旋喷桩孔位的确定通常以接缝桩中心为对称轴,距连续墙边缘不宜超过1m,钻孔深度宜达基坑开挖面以下1m。

18.3.2 “一柱一桩”施工支护结构的竖向支承系统与主体结构的桩、柱相结合,竖向支承系统一般采用钢立柱插入底板以下的立柱桩的型式。

钢立柱通常为角钢格构柱、钢管混凝土柱或H 型钢柱,立柱桩可以采用钻孔灌注桩或钢管桩等形式。

对于逆作法的工程,在施工时中间支承柱承受上部结构自重和施工荷载等竖向荷载,而在施工结束后,中间支承柱一般外包混凝土后作为正式地下室结构柱的一部分,永久承受上部荷载。

(完整版)建筑施工技术试题之简答题计算题(1)(2)

(完整版)建筑施工技术试题之简答题计算题(1)(2)

建筑施工技术考试题之简答题计算题四、简答题(每题 7 分,共 42 分)1.为什么在雨季施工时,土方边坡要留的宽一点?07.1 雨季进行土方开挖施工对土方边坡有什么影响?答题要点: (1)雨季进行土方边坡施工时,应增加边坡的宽度。

(2)因为雨季施工时,土的含水量增大,抗剪强度降低,容易引起边坡塌方。

42.在土方填筑施工中,为什么要控制填土的含水量?答题要点:填土含水量小时,土颗粒间摩擦力大,不宜被压实;填土含水量大时,土颗粒间孔隙全部被水填充而处于饱和状态,也不宜被压实;只有当填土的含水量适中时,土颗粒间摩擦力由于土中水的润滑作用而减小,填土容易被压实。

18.简述土方工程施工主要特点。

08.7土方工程的施工特点。

11.7 土方工程的施工特点及主要施工内容。

答题要点:工程量大、施工条件复杂。

露天作业,受地区、气候、水文地质等条件影响大等。

21.制定土方工程施工方案的依据是什么? 09.7答题要点:(1)工程类型与规模。

(2)施工现场的工程及水文地质情况。

(3)现有机械设备条件。

(4)工期要求。

23.哪些土料不宜作回填土。

10.1答题要点:含水量大的粘土、冻土,有机物含量大于8%的土,水溶性硫酸盐含量大于5%的土均不得用作回填土料。

19.影响填土压实质量的因素有哪些? 08.7答题要点:影响填土压实质量的因素有很多,其中主要有:填土的含水量、压实功、及铺土厚度。

31.简述流砂现象产生的原因? 12.1答题要点:由于地下水的水力坡度大,即动水压力大,且动水压力的方向与土的重力方向相反,土不仅受水的浮力,而且受动水压力的作用,有向上举的趋势。

当动水压力等于或大于土的浸水密度时,土颗粒处于悬浮状态,发生流砂现象。

13.流砂防治的途径是什么?具体措施有哪些? 08.1/10.7/13.1/13.7答题要点:流砂防治的主要途径是减小或平衡动水压力或改变其方向。

具体措施为:(1)抢挖法。

(2)打钢板桩法。

(3)水下挖土法。

(完整版)深基坑工程事故案例分析.

(完整版)深基坑工程事故案例分析.

液 限
塑 限
塑 性 指 数
液 性 指 数
(m)
W (%)
ρ (g/cm
3)
Gs
e
ωl
ωp
(%) (%)
IP
IL
②2
粘质 粉土
4 30.5 1.90 2.70 0.85
④2
淤泥质 粘土
16 48.6 1.71 2.74 1.37 41.8 22.3 19.5 1.35
淤泥质粉
⑥1
质粘 17 45.2 1.72 2.73 1.30 37.5 21.5 16.0 1.48
地下工程安全管理
地下工程安全管理
地下工程安全管理
地下工程安全管理
地下工程安全管理
地下工程安全管理
地下工程安全管理
2、 杭州地铁深基坑事故的原因分析
2.1 破坏模式分析
根据勘查结果对基坑土体破坏滑动面及地下连续墙破 坏模式进行了分析,并绘制相应的基坑破坏时调查平面图 与施工工况图以及基坑土体滑动面与地下连续墙破坏形态 断面图。
地下工程安全管理
2.3 设计问题
由于基坑设计涉及到多种学科,如土力学、基础工程 、结构力学和原位测试技术等,需要对场地周围环境、施 工条件、工程地质条件、水文地质条件详细了解和掌握, 是一门系统科学,具有复杂性。所以目前基坑支护的设计 方案与措施大多数是偏于保守的,即便如此,如果设计的 人员经验不足,考虑不周,也易引起相应的事故。对522 例基坑事故统计也说明基坑设计的不足,是引发事故的重 要原因。杭州地铁工程在设计方面主要有以下一些问题:
其直接原因是施工单位违规施工、冒险作业、基坑严重超挖;支撑 体系存在严重缺陷且钢管支撑架设不及时;垫层未及时浇筑。监测单位 施工监测失效,施工单位没有采取有效补救措施。

(完整版)分部工程、分项工程划分

(完整版)分部工程、分项工程划分
空调风系统
风管与配件制作,部件制作,风管系统安装,空气处理设备安装,消声设备制作与安装,风管与设备防腐,风机安装,风管与设备绝热,系统调试
净化空调系统
风管与配件制作,部件制作,风管系统安装,空气处理设备安装,消声设备制作与安装,风管与设备防腐,风机安装,风管与设备绝热,高效过滤器安装,系统调试
制冷设备系统
桩基
锚杆静压桩及静力压桩,预应力离心管桩,钢筋混凝土预制桩,钢桩,混凝土灌注桩(成孔、钢筋笼、清孔、水下混凝土灌注)
地下防水
防水混凝土,水泥砂浆防水层,卷材防水层,涂料防水层,金属板防水层,塑料板防水层,涂料防水层,塑料板防水层,细部构造,喷锚支护,利税合式衬砌,地下连续墙,盾构法隧道;渗排水、盲沟排水,遂道、坑道排水;预注浆、后注浆,衬砌裂缝注浆。
单位工程
子单位工程
分部(子分部)工程
室外建筑环境
附属建筑
车棚,围墙,大门,挡土墙,收集站
室外
建筑小品,道路,亭台,连廊,花坛,场坪绿化
室外安装
给排水与采暖
室外给水系统,室外排水系统,室外供热系统
电气
室外供电系统,室外照明系统
考试时间:应用英语08:30-10:00
高数:7-14-11:00--12:30
电源与接地
智能建筑电源,防雷及接地
环境
空间环境,室内空调环境,视觉照明环境,电磁环境
住宅(小区)智能化系统
火灾自动报警及消防动系统,安全防范系统(含电视 临近系统,入侵报警系统,巡更系统、门禁系统、楼宇对讲系统、停车管理系统),物业管理系统(多表现场计量及与远程传输系统、建筑设备监控系统、公共广播系统、小区建筑设备监控系统、物业办公自动化系统),智能家庭信息平台
8

一级建造师《矿业工程》真题「完整版」

一级建造师《矿业工程》真题「完整版」

一级建造师《矿业工程》真题「完整版」一级建造师《矿业工程》真题「完整版」一、单选题1.某土样总质量200g,其中土的质量160g,则其含水率是( )A.20%B.25%C.30%D.35%2.下列关于普通混凝土骨料的说法,错误的是( )A.混凝土骨料包括细骨料(砂子)和粗骨料(石子)B.级配良好的骨料,其粒径分布比较集中C.骨料的坚固性是影响混凝土耐久性的重要因素D.级配良好的骨料,可节省水泥用量3.制造简单,施工方便,工业化程度高的结构是( )A.混凝土结构B.钢结构C.砌体结构D.组合结构4.压实非粘性土,优先选用的压实机械是( )A.平碾B.羊足碾C.打夯机D.振动碾5.矿用导爆的索药芯的主要成分是( )A.TNTB.黑火药C.黑索金D.硝酸铵6.在有瓦斯的掘进工作面,所以爆破炮眼( )A.都必须采用正向装药结构B.都必须采用反向装药结构C.都应采用空气柱装药结构D.宜采用不耦合装药结构7.井筒冻结深度较大时,为减少制冷设备,将井筒分为上下两段,从上而下依次冻结,还冻结方案为( )A.依次冻全深B.局部冻结C.分期冻结D.差异冻结8.某矿井主井井筒净断面积为25㎡,倾角14°:副井井筒净直径为7.0m,倾角90°.改矿井的开拓方式为( )A.立井开拓B.斜井开拓C.平硐开拓D.综合开拓9.矿井施工准备阶段的施工图纸会审工作应由( )支持。

A.设计单位B.施工单位C.监理单位D.建设单位10.缩短矿井井巷工程关键路线的有效方法是( )A.采用井塔及多绳提升机提升B.合理安排井巷工程开工顺序C.优化矿井通风方案,降低井巷通风阻力D.搞好“五通一平”工作11.矿山工程施工阶段进度控制的关键是( )A.优化工期B.落实资源C.组织协调D.处理索赔12.水泥进场时应按规定井巷复验的指标有( )A.强度,安定性B.水化热,强度C.氯化物含量,细度D.氯化物含量,安定性13.在检验钢筋表面质量时,属于一般检查项目的是( )A.表面清洁B.表面裂纹C.表面刻痕D.表面断伤14.属于土钉墙支护工程质量检验的主控项目是( )A.锚杆锁定力B.喷层厚度C.注浆配比D.土钉位置15.生产安全事故发生后,事故现场有关人员应当( )向本单位负责人报告。

高层建筑施工试卷及答案(完整版)

2010-2011高层建筑施工试卷及答案一、填空题(每空2分,共64分)1、根据墙体材料的特点,可以把地下连续墙分为以下三类:即_____,_______,_______。

答:混凝土地下连续墙、水泥固化地下连续墙、水泥土地下连续墙2、土层锚杆设计要考虑的问题包括、、、等。

答:锚杆布置、锚杆承载能力、锚杆的整体稳定性、锚杆尺寸。

3、灌注桩的施工方法,常用的有钻孔灌注桩、、、等。

答:挖孔灌注桩、套管成孔灌注桩、爆扩成孔灌注桩4、大体积混凝土的浇注常采用________、__________、_________、三种方法。

答:(a)全面分层(b)分段分层。

(c)斜面分层5、大体积混凝土在温度应力作用下将产生表面裂缝、贯穿裂缝。

6、滑升模板由____________、__________、__________以及___________等四个部分组成。

答:滑升模板由模板系统、操作平台系统、液压提升系统以及施工精度控制与观测系统等四部分组成P1767、模板的滑升分为_______________、______________和_______________三个阶段。

答:模板的滑升分为初试滑升、正常滑升和完成滑升三个阶段。

8、滑模施工的精度控制主要包括______________和______________。

答:滑模施工的精度控制主要包括:滑模施工的水平度控制和垂直度控制等.9、钢材的品种繁多,性能各异,在钢结构中采用的钢材主要有______和_________二个种类. 答:钢材的品种繁多,性能各异,在钢结构中采用的钢材主要有二个种类,一是碳素结构钢(或称普通碳素钢),二是低合金结构钢.低合金钢因含有锰、钒等合金元素而具有较高的强度。

10、用于高层建筑的钢结构体系有:________、________、________、________、_____等. 答:用于高层建筑的钢结构体系有:框架体系、框架剪力墙体系、框筒体系、组合筒体系、交错钢桁架体系等。

(完整版)最新建筑工程分部分项划分表(最新整理)


卫生器具安装
卫生器具安装,卫生器具给水配件安装,卫生器 具排水管道安装
管道及配件安装,辅助设备及形热器安装,金属
建 筑 给 室内采暖系统 辐射板安装,低温热水地板辐射采暖系统安装,系
水、排水 5
及采暖 室外给水管网
统水压试验及调试,防腐,绝热 给水道管安装,消防水泵接合器及室外消火栓安
装,管沟及井室
联动系统
防联动系统
安全防范系统
电视监控系统,入侵报警系统,巡更系统,出入 口控制(门禁)系统,停车管理系统
7 智能建筑 综合布线系统
缆线敷设和终接,机柜、机架、配线架的安装, 信息插座和光缆芯线终端的安装
集成系统网络,实时数据库,信息安全,功能接 智能化集成系统

电源与接池
智能建筑电源,防雷及接地
环境
9
电梯
设备进场验收,土建交接检验,液压系统,导轨,
液压电梯安装 门系统,轿厢,对重(平衡重),安全部件,悬挂
装置,随机电缆,电气装置,整机安装验收
自动扶梯、自动人 行道安装
设备进场验收,土建交接检验,整机安装验收
细石混凝土防水层,密封材料嵌缝,细部构造
平瓦屋面,油毡瓦屋面,金属板屋面,细部构造
架空屋面,蓄水屋面,种植屋面
序号 分部工程 子分部工程
分项工程
室内给水系统
给水管道及配件安装,室内消火栓系统安装,给 水设备安装,管道防腐,绝热
室内排水系统
排水管道及配件安装,雨水管道及配件安装
室内热水供应系 统
管道及配件安装,辅助设备安装,防腐,绝热
板材隔墙,骨架隔墙,活动隔墙,玻璃隔墙
饰面板安装,饰面砖粘贴
玻璃幕墙,金属幕墙,石材幕墙
水性涂料涂饰,溶剂型涂料涂饰,美术涂饰

(完整版)1章土方工程试题及答案


3)测量放线。人工挖土的基坑,在施工前应根据龙门板桩的轴线,放出基坑的灰
线和水准标志。龙门板桩一般离开坑缘
1.5~2m ,以利保留。不加支撑的基坑,放灰线
时应按要求放出边坡宽度。灰线、标高、轴线应进行复合检查无误后,方可进行挖土
施工。
5.土方开挖应注意:
1)根据土方工程开挖深度和工程量的大小,
选择机械和人工挖土或机械挖土方案。
D.在地下水位以下的土,应采取降水措施后开挖
5.填方工程中,若采用的填料具有不同透水性时,宜将透水性较大的填料
(
)。
A.填在上部
B.填在中间
C.填在下部
D.与透水性小的填料掺杂
6.正铲挖土机的挖土特点是 (
)。
A.后退向下,强制切土 C.后退向下,自重切土
B.前进向上,强制切土 D.直上直下,自重切土
4)计算场地各方格角点的施工高度
5)确定零线
6)计算各方格挖、填土方量
2、截面法
五、计算题
1、解得: 预留回填土量 152.73 m 3,弃土量 267.27 m 3。
2.解得: 179.55 m3; 152.55 m3; 27 m3。
2)如开挖的基坑(槽)比邻近建筑物基础深时,开挖应保持一定的距离和坡度,
以免在施工时影响邻近建筑物的稳定,如不能满足要求,应采取边坡支撑加固措施。
并在施工中进行沉降和位移观测。
3)弃土应及时运出,如需要临时堆土,或留作回填土,堆土坡脚至边坡距离应按 挖坑深度、边坡坡度和土的类别确定,在边坡支护设计时应考虑堆上附加的侧压力。
H )与底宽度( B )之比表示。
四、简答
1、土方工程的特点有: 土方工程的工程量大,施工工期长,施工条件复杂、劳动强度大。

新版精编隧道施工技术考核复习题库完整版(标准答案)

2020年隧道施工技术考核试题【含答案】一、选择题1.爆破效果,验标规定光面爆破或预裂爆破的炮眼痕迹保存率,硬岩不应小于(c),中硬岩不应小于(A),并在开挖轮廓面上均匀分布。

A、60%B、85%C、80%2.对于隧道两相邻开挖洞口间高程测量,当隧道长度大于(C)米时,应根据隧道高程贯通精度的要求,进行隧道高程测量设计。

A)1000B)2000C)50003.地质雷达在连续预报时前后两次重叠长度应大于(B)米。

A)3B)5C)84.地质素描,随开挖进行,一般地段(B)米进行一次。

A)5B)15C)255.隧道门端墙的砌筑与回填应两侧(C)进行,不得对衬砌产生偏压。

A)分开B)同时C)对称6.洞口工程施工应遵循(B)原则来保护生态环境。

A)早出晚进B)早进晚出C)早出晚出7.砂浆锚杆支护时采用的中细砂粒径不宜大于(C)A)1mmB)2mmC)3mm8.以下哪个不属于地下工程基本作业(A)A)监控量测B)支护C)衬砌9.以下哪种施工方法不属于明挖法(C)A)沉管法B)盖挖法C)顶进法10.浅埋偏压隧道洞口加强段的开挖,根据围岩及周边环境条件,严禁采用(B)开挖。

A、中隔壁法B、全断面法C、双侧壁导坑法11.当工地昼夜平均气温连续3d低于(C)度或最低气温低于-3度时,应采取冬季施工措施。

A、0B、3C、512.洞内水平角测量,宜采用(C)法观测。

A)两次照准,一次读数B)一次照准,两次读数C)两次照准,两次读数13.隧道在软卧层地段施工时,为防止塌方,在可能塌方的不良地段采取(B)排水,短开挖、弱爆破、快耐砌等措施。

A、不B、先C、后14.流沙地段隧道施工,隧道结构应采用有(B)的封闭式衬砌。

A、锚喷砼B、抑拱C、先墙后拱15.污浊空气经由隧道上部抽出洞外,新鲜空气由下部压入隧道,再经风管到下道坑工作面,是隧道机械通风中的(C)。

A、抽出或风管通风B、压力或风管通风C、混合式风管通风16.隧道开挖采用台阶法开挖时,下台阶应在喷射混凝土达到设计强度(A)以上时开挖。

  1. 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
  2. 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
  3. 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。
相关文档
最新文档