郯庐断裂带安徽段农村自建房地震安全检测调查张静;贺旭辉;刘运林【摘要】不同于城市住房,农村住房主要由农民自建完成,受建筑技术、条件、施工工艺等限制,农村自建房建筑质量参差不齐,构造措施不到位等,导致存在地震安全隐患.本文通过对郯庐断裂带安徽段农村自建房的房屋结构及分布、地基基础、建筑构造措施及构件强度等抽样进行检测调查,总结分析区域内农村自建房的地震安全性能,为防震减灾提供参考.%Rural buildings, different from urban ones, are mainly self-built. Due to building technology, condition and construction technology, the quality of rural self-built buildings are uneven with improper construction measures, which lead to potential seismic safety hazard. The paper first makes a sample survey of rural self-built buildings in Anhui part of the Tan-Lu Fault Zone on the building structure and distribution, foundation, construction measures and component strength. The paper then summarizes and analyzes the seismic safety performance of rural self-built buildings in the area in order to provide the reference for mitigating earthquake disasters.【期刊名称】《皖西学院学报》【年(卷),期】2018(034)002【总页数】7页(P128-133,146)【关键词】郯庐断裂带;自建房;地震安全;检测【作者】张静;贺旭辉;刘运林【作者单位】六安职业技术学院城市建设学院,安徽六安 237158;皖西学院,安徽六安 237012;安徽建筑大学土木工程学院,安徽合肥 230601【正文语种】中文【中图分类】P315.9郯城-庐江断裂带是欧亚板块内部一个新生代相对活跃的岩石圈断裂系统,是我国20个地震带之一。

合肥市城乡建设局关于进一步加强排水管网建设运维管理的通知

合肥市城乡建设局关于进一步加强排水管网建设运维管理的通知

合肥市城乡建设局关于进一步加强排水管网建设运维管理的通知文章属性•【制定机关】合肥市城乡建设局•【公布日期】2022.04.12•【字号】合大建办通知〔2022〕27号•【施行日期】2022.04.12•【效力等级】地方规范性文件•【时效性】现行有效•【主题分类】水利综合规定正文合肥市城乡建设局关于进一步加强排水管网建设运维管理的通知各有关单位:为进一步加强我市排水管网工程建设运维管理,规范排水管网设计、施工、验收、移交、运维等环节工作,强化全过程管控,以保障排水管网功能的有效发挥。

现就有关事项通知如下:一、设计及审查(一)排水管网工程设计及审查要求。

1、施工图设计。

排水管网工程建设单位应当依据排水专项规划编制排水设计方案。

市政排水管网工程施工图设计须符合排水专项规划,设计前须充分调查沿线小区及单位排水现状,设计时合理设置支管和检查井;同时应包括新建管道与既有管道(检查井)接驳、废弃排水管道处置等内容。

房屋建筑室外排水管网工程设计前应调查周边市政及相邻地块排水管网现状和规划情况;在市政排水管网未覆盖区域,应设计污水处理设施,同时应设计雨、污水预留管,以待市政道路建设时,接入市政道路雨、污水系统。

2、施工图审查。

市政排水管网工程设计方案随主体工程同步报建设主管部门审查,房屋建筑排水管网工程设计方案报排水主管部门审查。

建设单位送审的施工图需包括排水专项设计;施工图审查机构重点审查排水设计方案审查意见落实情况、雨污分流、管道材质、管道接驳等内容;各级建设主管部门应定期对排水管网工程施工图设计审查情况进行监督检查并通报。

(二)排水管网及附属设施设计要求。

1、排水管及检查井设计。

排水管网宜按照规范上限(偏安全)设计,市政排水主管管径应不小于DN500mm,房屋建筑室外排水主管管径应不小于DN300mm。

政府投资类排水管网工程推广使用球墨铸铁管、承插橡胶圈接口钢筋混凝土管等管材。

检查井推广使用混凝土现浇或混凝土成品检查井,加快淘汰砖砌井。

合肥庐阳勘察报告

合肥庐阳勘察报告

合肥庐阳勘察报告一、工程概况拟建场地位于XXX3-1、3-2、3-3地块。

场地XXX,东抵XXX,北近XXX。

场地长约500m,宽约150m。

场地内拟建建(构)筑物分2期进行。

一期拟建芯片生产主厂房、动力站房各1栋,4层工程师办公楼与餐厅、3层行政办公楼各1栋,以及变电站、水塔、油罐等附属设施。

二期拟建生产主厂房、动力站房各1栋及气站、水塔、油罐等,总建筑面积83186m2。

二、勘察目的及技术要求的确定提供详细的工程地质资料,并作出分析、评价和建议。

具体任务如下:本次勘察属详细勘察阶段,目的是为拟建物的地基基础设计、地基处理和地基施工方案⑴查明场地内勘探深度以浅各土层岩性特征、分布规律及工程特性。

⑵提供各地基土层物理力学性质综合指标及地基承载力设计值fd和桩基承载力参数(桩周土极限摩阻力标准值fs、桩端土极限端承力标准值fp)。

⑶明确场地所属地震基本烈度区域及场地类别,判定场地埋深15.0m 以浅地基土地震液化势。

⑷简述场地地形、地貌特征。

⑸调查场地浅部地下水埋藏条件,并评价其对混凝土的腐蚀性。

⑹提供防微振动分析需要的有关土的动力特性参数。

⑺按网格进行场地导电性能测试,为接地、防雷设计提供依据。

⑻评述场地工程地质条件,根据各拟建建(构)筑物特征,对各拟建建(构)筑物基础形式作出评价及建议:对天然地基,建议基础持力层及基底砌置标高;对桩基及复合桩基,建议合理的桩型、桩端持力层、桩长及桩径等,并估算单桩竖向承载力。

对预制桩,评价沉桩可能性。

⑼提供地基变形计算所需岩土参数。

⑽评价水塔、油罐基坑开挖条件,初步建议基坑设计方案,提供基坑围护设计所需岩土参数。

三、执行的主要技术标准1.国家及合肥市标准《工程建设标准强制性条文——房屋建筑部分》;2.合肥市工程建设规范《岩土工程勘察规范》(DGJ08-37-94);3.合肥市工程建设规范《地基基础设计规范》(DGJ08-11-1999);4.合肥市工程建设规范《建筑抗震设计规程》(DGJ08-9-92);5.合肥市工程建设规范《基坑工程设计规程》(DGJ08-61-97);6.合肥市工程建设规范《地基处理技术规范》(DGJ08-40-94);7.合肥市工程建设规范《岩土工程勘察文件编制深度规定》(DGJ08-72-98);8.行业标准《静力触探技术标准》(CECS04:88);9.国家标准《土工试验方法标准》(GB/T50123-1999);10.行业标准《中华人民共和国地质矿产部直流电法工作规范》;11.行业标准《场地微振动测量技术规程》(CECS74:95)。

合肥市市政管线探测技术导则(试行)

合肥市市政管线探测技术导则(试行)

合肥市市政管线探测技术导则(试行)目录第1章总则 (1)1.1 一般规定 (1)1.2 市政管线探测精度 (3)1.3 市政管线探测的工作内容及基本程序 (3)第2章市政管线探测前期工作 (4)2.1 已有市政管线资料的收集与整理 (4)2.2 探查前的技术准备工作 (5)第3章地形图 (6)第4章市政管线探查 (7)4.1 一般规定 (7)4.2 实地调查 (9)4.3 仪器探测 (11)第5章市政管线测量 (14)5.1 一般规定 (14)5.2 控制测量 (14)5.3 已有市政管线测量 (16)5.4 市政管线竣工测量 (16)第6章管线数据库 (17)6.1 建立管线数据库 (17)6.2 管线数据库数据结构 (19)第7章市政管线图的编绘 (27)7.1 一般规定 (27)7.2 综合市政管线图的编绘 (28)7.3 专业市政管线图的编绘 (29)第8章工程监理 (30)8.1 一般规定 (30)8.2 探测工程的监理工作 (30)第9章探测成果质量检查与验收 (32)9.1 一般规定 (32)9.2 检查 (32)9.3 探测质量评定 (33)9.4 验收 (35)9.5 成果提交 (36)9.6 非开挖技术铺设管线成果的提交 (36)第10章管线信息管理系统建立 (38)10.1 一般规定 (32)10.2 系统总体结构与数据标准 (32)10.3 系统的基本功能 (32)10.4 系统的建立与维护 (40)第11章附则 (42)第12章附录 (42)附录A 市政管线的分类 (43)附录B 市政管线探测安全保护规定 (44)附录C 管线点符号图例与代码 (45)附录D 管线探测及明显管线点调查表 (47)附录E 市政管线探查/开挖/明显点监理检查表 (48)附录F 市政管线权属单位代码表 (48)附录G 市政管线探测单位代码表 (49)附录H 合肥城市道路名称代码表 (50)附录I 合肥市城市市政管线探测综合图扯旗注记内容 (51)附录J 点线编码表 (52)第1章总则1.1 一般规定1.1.1城市市政管线探测是城市规划、建设和管理的一项重要基础工作,是市政管线安全运行的保证。

合肥市地下管线普查技术

合肥市地下管线普查技术

合肥市地下管线普查技术规程合肥市城乡建设委员会合肥市地下管线普查领导小组办公室2014年12月目录1总则 (1)1.1一般规定 (1)1.2 测绘基准、成图规格及精度 (2)1.3 地形图 (3)1.4 地下管线探测工作内容与流程 (4)2 地下管线探测前期工作 (6)2.1资料收集 (4)2.2 技术准备 (4)3 管线探查 (6)3.1 一般规定 (6)3.2 实地调查 (8)3.3 管线探查物探方法和技术 (12)3.4 仪器探查 (13)3.5 管线探查草图的绘制 (15)3.6 管线探查成果提交 (16)4 管线测量 (16)4.1 一般规定 (16)4.2 控制测量 (16)4.3 已有地下管线测量 (17)4.4 道路带状地形图测绘 (26)4.5 人防坑道测量 (26)5 管线图编绘 (18)5.1 一般规定 (18)5.2 综合管线图编绘 (20)5.3 专业管线图编绘 (20)5.4 局部放大图编绘 (30)5.5 横断面图编绘 (21)5.6 人防坑道图编绘 (210)5.7 图廓整饰 (210)5.8 管线成果表的编制 (21)5.9 管线图编绘成果提交 (21)6 地下管线信息管理系统建设 (22)6.1 一般规定 (22)6.2 系统总体结构与数据标准 (22)6.3 系统的基本功能 (22)6.4 系统的建立与维护 (24)7 工程监理 (25)7.1 一般规定 (25)7.2 探查作业监理 (26)7.3 测绘作业监理 (26)7.4 计算机成果数据监理 (26)7.5 档案资料监理 (26)8 地下管线探测成果质量检查与验收 (26)8.1 一般规定 (26)8.2 作业单位质检 (26)8.3 监理单位质检 (27)8.4 成果资料验收 (27)8.5 质量评定 (28)8.6 成果资料提交 (30)附录A 地下管线探测作业安全保护规定 (31)附录B 管线成果表 (32)附录C 地下管线探查记录表 (33)附录D 地下管线探查质量检查表 (34)附录E 地下管线权属单位代码表 (35)附录F 地下管线探测单位代码表 (36)附录G 合肥市道路名称代码表 (37)附录H 地下管线开挖检查表 (52)附录I 地下管线探查遗留问题记录表 (53)1 总则1.1一般规定1.1.1 城市地下管线普查是加强城市地下空间规划、建设和管理的一项重要基础工作。

医院对周边房地产的邻避效应研究——以合肥市为例

医院对周边房地产的邻避效应研究——以合肥市为例

医院对周边房地产的邻避效应研究——以合肥市为例摘要公共卫生基础设施如医院、垃圾中转站、垃圾焚烧厂等由于对周围居民负面环境的影响其选址、建设和运行中引发的冲突是我国城市建设中社会的矛盾的主要来源之一。

本文梳理和归纳了邻避设施的内涵、邻避效应形成的原因及解决措施,并以医院为例。

通过对合肥市住房价格的空间差异研究了城市居民对环境邻避设施的负面支付意愿。

研究结果显示,在住宅到医院距离每减少1千米,住宅购买意愿统计率降低 3.6%,表明居民对于医院具有较强的邻避效应。

医院的规模越大,其影响范围越大,居民的邻避效应越强。

建议邻避设施规划时应参考设施的科学间隔距离和居民的心理可接受距离,给予适当的经济补偿,或者在邻避设施附近建立具有正外部性的公共设施基于规划补偿,从而减少邻避设施造成的房地产销售影响。

ABSTRACTConflictions happen a lot between public health infrastructure, such as hospitals, waste incineration plants, etc. Their refuse to transfer stations is one of the main sources of social contradictions in China's urban construction due to its impact on the surrounding environment. This current study combs and summarizes the connotation of neighborhood facilities, the reasons for the formation of neighborhood effects and solutions, and to hospitals as an example. By analyzing the spatial difference of housing price in Hefei City, the negative willingness to pay for the environmental abutment facilities of urban residents were studied. The results show that in the residential to the hospital for each 1 km distance reduction, residential purchase will reduce the statistical rate of 3.6%, indicating that residents for the hospital has a strong neighborhood effect. The larger the scale of the hospital, the greater the scope of its impact, the neighborhood effect of the residents stronger. It is suggested that the planning of neighborhood facilities should be based on the scientific distance of the facilities and the psychological distance of the residents, give appropriate economic compensation, or establish the public facilities with positive externality approximately the adjacent facilities, to reduce the adjacent facilities Resulting in the impact of real estate sales.关键词房地产价格因素;邻避效应;合肥房地产KEY WORDSHospital, Real Estate,Neighborhood Avoidance Effect, Hefei1. 绪论城镇化推动了我国经济的快速增长,同时也带来了城市规模的扩大,对城市的资源配置、配套设施、污染处理等方面提出了更高的要求,对建设现代化城市公共服务设施中的城市治理能力提出了挑战。

最新版综合验收大表

合肥市建筑工程质量验收综合表工程名称监督注册号建设单位监理单位设计单位勘察单位施工单位开工日期竣工日期合肥市建筑质量安全监督站制关于新版质量验收综合表的使用说明为配合新版建筑工程施工质量验收规范在我市的贯彻实施,统一和规范我市房屋建筑工程质量的验收行为,根据中华人民共和国国家标准GB50300-2013《建筑工程施工质量验收统一标准》和安徽省建设厅建管【2002】259号文件《关于印发“安徽省房屋建筑工程和市政基础设施工程竣工验收与备案管理规定”的通知》规定,编制本综合表。

本综合表涵盖了从开工到竣工的整个建设过程中重要专业分项、主要分部及单位(子单位)工程质量的验收记录及结论,是工程质量归档资料的主干。

本表一式五份,由施工单位提供并保管。

工程竣工验收后,建设(监理)、施工、质监等单位各留存一份。

本综合表适用于合肥地区(含开发区)的房屋建筑工程的质量验收,原综合验收表同时废止。

本表与有关专业规范质量验收表、《工程质量竣工验收报告》等配套使用。

本综合表自二〇一六年九月一日起使用。

本综合表具体内容由合肥市建筑质量安全监督站负责解释。

目录施工现场质量管理检查记录合要求后方可开工。

分部分项工程分包情况一览表说明:建设单位严禁支解发包。

计量、测量仪器的检定情况说明:本表可根据现场实际使用仪器情况填写,填写内容为仪器的生产厂家、规格型号、检测单位、检测报告编号和使用有效期等。

主要施工方案目录相应的施工方案。

2、参建各方的人员不得以专家身份参加专家论证会。

2、参建各方的人员不得以专家身份参加专家论证会。

深基坑支护工程验收记录说明:本表验收结论由建设(监理)单位根据验收时各方一致意见如实填写,各方责任主体均应签字盖章。

基槽(坑)验收记录说明:本表验收结论由建设(监理)单位根据验收时各方一致意见如实填写,各方责任主体均应签字盖章。

桩基工程验收记录说明:本表验收结论由建设(监理)单位根据验收时各方一致意见如实填写,各方责任主体均应签字盖章。

合肥建筑工程质量验收监督综合表填写范本

精品整理量程质建筑工合肥市合表监督综验收工程名称监督注册号建设单位监理单位设计单位勘察单位施工单位合肥市建筑工程质量监督站制关于使用新版综合验收表的通知为配合新版建筑工程施工质量验收规范的执行,规范验收过程,特编制新版综合验收表。

本表根据中华人民共和国国家标准GB50300-2001《建筑工程施工质量验收统一标准》和安徽省建设厅建管【2002】259号文件《关于印发“安徽省房屋建筑工程和市政基础设施工程竣工验收与备案管理规定”的通知》所规定的表格内容制定而成。

本综合表涵盖了从开工到竣工的整个建设过程中主要分部及重要专业分项的验收记录及结论,是工程质量归档资料的主干。

本表一式五份,由施工单位提供并保管。

工程竣工验收后,由施工单位整理,施工单位自留一份,另四份交建设、施工、监理、质量监督单位。

新版综合验收表自2003年元月一日起使用,原综合验收表同日废止。

施工项目质量管理检查记录页脚内容.精品整理说明:本表由施工单位填写,总监理工程师(建设单位负责人)进行检查,必须在工程开工前填写以上内容,报质检站审查后方可开工。

页脚内容.精品整理深基坑支护工程验收记录说明:1、本表综合验收结论由建设单位根据验收时各方一致意见如实填写。

页脚内容.精品整理基槽(坑)验收记录说明:1、本表综合验收结论由建设单位根据验收时各方一致意见如实填写。

页脚内容.精品整理桩基工程验收记录说明:1、本表综合验收结论由建设单位根据验收时各方一致意见如实填写。

页脚内容.精品整理基础工程验收记录说明:1、本表综合验收结论由建设单位根据验收时各方一致意见如实填写。

页脚内容.精品整理钢结构/网架工程验收记录页脚内容.精品整理月说明:1、本表验收意见由专业监理工程师或建设单位项目专业负责人填写。

2、本表验收结论由建设(监理)单位根据验收时各方一致意见如实填写。

3、钢结构/网架验收必须经总包单位质量(技术)部门检查同意后方可组织验收。

4、设计单位参加验收人员应为本项目的技术负责人,如另派人员必须是由同等技术资质的同专业人员。

专家库名单 - 合肥市城乡建设委员会

27
王士全
安徽省地矿局327地质队
水文
高工
28
徐永仁
安徽水安建设集团股份有限公司
工程降水及渗水处理
高工
29
沈国红
上海市城市建设设计研究总院
地下结构
教授级高工
30
张中杰
上海市城市建设设计研究总院
地下结构
高工
31
成国保
上海市城市建设设计研究总院
地下结构
高工
32
杨皓东
合肥市工程建设监理公司
结构
高工
33
武朝晖
教授
63
曹伍富
北京市轨道交通建设管理有限公司
隧道及地下工程、岩土工程
高级工程师
64
任世林
中国铁建十六局集团有限公司
隧道及地下工程、岩土工程
高级工程师
65
林美德
中国铁建十六局集团有限公司
隧道工程(盾构)
高工
66
刘建国
深圳市市政设计研究院有限公司
隧道和地下结构
教授级高工
67
王建新
深圳市市政设计研究院有限公司
58
黄美群
北京城建设计研究总院有限责任公司
隧道及地下工程
教授级高工
59
贾永刚
北京城建设计研究总院有限责任公司
隧道及地下工程、岩土工程
高级工程师
60
王元湘
北京城建信捷轨道交通工程咨询有限公司
隧道及地下工程、岩土工程
教授级高工
61
张 弥
北京交通大学
隧道及地下工程、岩土工程
教授
62
王明年
西南交通大学
隧道及地下工程、岩土工程
广州吉元交通工程技术有限公司

关于国有土地权属的调查

合肥市市辖区城镇地籍更新调查与测量技术方案第一部分国有土地权属调查(二期工程)技术方案合肥市国土资源局目录1、权属更新调查1.1作业流程1.2准备工作1.2.1宣传与动员由市地籍更新调查与测量领导小组行文发送到市辖区各单位,并在调查区内张贴地籍更新调查与测量通告,同时通过广播、有线电视等媒体广泛宣传地籍更新调查与测量的目的和重要性,争取各机关、企事业单位和全体市民的理解和积极配合。

同时,在开展地籍调查的区域,以街道为主体,分片召开动员会,参加人员为各社区有关负责人,为地籍调查工作的顺利开展打好基础。

1.2.2学习与培训所有参加作业人员进行地籍调查工作的法律、法规、技术规程、设计书的学习培训,使作业人员充分掌握变更调查方法、技术要求和注意事项,确保调查成果的质量达到规定的要求。

1.2.3工作底图1、市国土局1:1000、1:2000地籍图;2、市测绘院1:500地形图;3、2004年度1:1000航片。

1.2.4调阅地籍档案资料1、按街坊调阅全部地籍档案资料,了解街坊内情况,复印权属调查表及发证附图,有界址点坐标的一并复制,在复印图上标注界线的内、中、外;2、记录指界人信息;3、已发证的宗地用红色签字笔,将批准用地附图统一转绘到工作底图上,并注记地号和单位名称,按规定进行外业核查;4、有用地批文、未领取土地证的宗地用兰色签字笔,将批准用地附图统一转绘到工作底图上,并注记地号和单位名称,按规定进行外业核查;5、已申报、已调查、未发证的宗地重新设宗调查;6、未申报的宗地,动员土地使用者按照规定申报登记,并设宗调查。

1.2.5印制表格印制土地权属更新调查与地籍测量公告、土地权属更新调查与地籍测量通知书、指界通知书、指界委托书、权属调查表、宗地草图。

1.2.6购置权属调查工具和用品购置笔、纸、尺、仪器以及野外作业所需的劳动防护用品。

1.3行政区、街道(乡、镇)和街坊的划分及编码1.3.1行政区的编码行政区采用一位字母码编排,使用现行的四个行政区(庐阳区、蜀山区、包河区、瑶海区)第一个汉字的第一个汉语拼音大写字母为字母码,庐阳区代码为“L”、蜀山区代码为“S”、包河区代码为“B”、瑶海区代码为“Y”,建库时将其与国家行政区划代码表规定的6位数字码相对应。

  1. 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
  2. 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
  3. 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。

合肥市建筑面积和容积率指标计算有关规定
为明确我市建设项目建筑面积和容积率指标计算方法,合肥市规划局和合肥市房地产管理局、合肥
市国土资源局、合肥市监察局根据《建筑工程建筑面积计算规范》(GB/T50353-2005)、《房产测量规范》
(GB/T 17986-2000)、《合肥市城市规划管理技术规定》等有关技术标准,结合我市实际,研究制定本规
定。

一、本规定适用于我市行政区范围内的各类建设项目。
二、建筑面积分为计入容积率建筑面积和不计入容积率建筑面积。计入容积率的总建筑面积计算值为建筑
基地内各栋建筑物地上建筑面积计算值之和;地下空间等建筑面积纳入不计入容积率建筑面积。一般情况
下,建筑面积计算值依据《建筑工程建筑面积计算规范》(GB/T50353-2005)、《房产测量规范》(GB/T
17986-2000)的规定执行,涉及以下内容的,按照下列条款执行:

(一)对高度在2.2米以下(含2.2米)的设备层,可不计算建筑面积和容积率。
(二)在室外地面以上部分的高度不超过1.5米的半地下室纳入不计容积率建筑面积。
(三)住宅层高超过3.6米、办公建筑层高超过3.9米的部分按其层高折算计入容积率,但建筑面
积仍按一层计算。住宅局部共享空间及办公共享空间按一层计算建筑面积和容积率。

(四)在室外地面以上部分的高度超过1.5米的半地下室,其计入容积率建筑面积按下式计算: A’
=K×A

式中:A’—计入容积率建筑面积,K—半地下室地面以上的高度与其层高之比,A—半地下室建
筑面积。

(五)市政公用设施(如为地区服务的变电站、电话局等)因选址困难,设置在其它拟建项目建筑
基地内的,可纳入拟建项目不计容积率建筑面积。

(六)高、多层民用建筑底层设架空层(无围护结构)用作通道、停车、布置绿化小品、居民休闲
设施等共用空间的,其建筑面积可纳入不计容积率建筑面积。架空层不应围合封闭改作他用或出售、出
租。

(七)建筑物的阳台,不论是凹阳台、挑阳台、封闭阳台、不封闭阳台,在计算容积率时均按其水
平投影面积的一半计入容积率,但房产发证面积仍按《房产测量规范》(GB/T 17986-2000)执行。

无顶盖阳台或顶盖投影面积小于阳台围护结构外围水平投影面积二分之一的阳台均可视为露台,不
计算建筑面积和容积率。

阳台是指供使用者进行半室外活动和晾晒衣物的建筑空间,封闭阳台应有围护结构与建筑室内空间
分隔,阳台面积和进深不宜过大。

(八)落地且窗洞高度达到2.2米的飘窗应按其水平投影面积计算建筑面积并计入容积率。
(九)居住类建筑物的入户花园和空中花园应至少有一整面为开敞面,并参照阳台计算规则计算建
筑面积和容积率。

(十)为推进节约集约用地试点市建设,鼓励建设超高层建筑,单体建筑高度超过100米的建筑,
其100米及以上的建筑面积可作为奖励面积,奖励部分不视为对原有规划设计条件的突破。自本规定施行
之日后,新出让土地项目应在设计条件中明确奖励办法,没有明确的不享受奖励政策。本规定施行之日前,
规划设计条件中未作规定的已出让项目,实施容积率奖励需经合肥市规委会和土委会批准。奖励建筑面积
土地价款按办理时的市场评估楼面地价的40%缴纳。

(十一)其他特殊建筑空间,如果《建筑工程建筑面积计算规范》没有明确规定,则根据《房产测
量规范》及房产部门相关规定计算建筑面积,其地上部分应计入容积率。

三、本规定于2010年6月1日起施行。在此之前已批准的建设项目总平面方案、建筑单体方案或建
设工程规划许可证仍按已批准的执行。

四、本规定的有效期为二年。本规定的具体条款由合肥市规划局负责解释。