桥梁吊篮作业指导书

桥梁吊篮作业指导书
桥梁吊篮作业指导书

新建铁路西安至宝鸡客运专线

桥墩墩顶维修作业平台施工作业指导书

中铁一局西宝客专指挥部

二0一一年十二月·西安

目录

1适用范围·······························································································································- 2 -2设计慨况及编制依据···········································································································- 2 -2.1设计慨况··························································································································· - 2 - 2.2编制依据··························································································································· - 2 - 3验收标准·······························································································································- 2 -

4 作业准备······························································································································- 2 -

5 技术要求······························································································································- 2 -

6 施工程序与工艺流程··········································································································- 2 -6.1施工程序··························································································································· - 2 - 6.2施工工艺··························································································································· - 2 - 7施工要求·······························································································································- 2 -

8 劳动组织······························································································································- 3 -

9 材料要求······························································································································- 3 -

10 机械设备配置····················································································································- 3 -11质量控制及检验·················································································································- 3 -12安全及环水保要求·············································································································- 4 -

- 1 -

1适用范围

适用于西宝铁路客运专线桥墩墩顶维修作业平台施工作业。

2设计慨况及编制依据

2.1设计慨况

墩顶维修平台作为预制梁架设和日后运营过程中桥梁检查的作业平台,其要求的安全可靠性不言而喻。西宝客运专线铁路桥梁的桥墩吊篮在顺线路方向两侧均设置,吊篮采用预埋U型螺栓固定在墩帽上,每个桥墩每侧各设置4个φ20U型螺栓;每侧设置钢格栅板(3个步板I和2个步板II)。

2.2编制依据

2.2.1《高速铁路桥涵施工质量验收标准》(TB10752-2010);

2.2.2《高速铁路桥涵工程施工技术指南》(铁建设【2010】241号);

2.2.3《西宝客专施桥参06》。

3验收标准

3.1材料进场后,品种、规格、质量自检合格报监理工程师验收。

3.2围栏、吊篮连接牢固可靠;

3.3围栏、吊篮的涂装质量满足要求。

3.4吊篮步板安装齐全、完整、稳固。

4 作业准备

4.1 施工设计图纸及有关资料到位后,组织技术人员进行图纸复核,澄清图纸中的技术问题。

4.2 组织施工人员学习、培训相关技术标准和设计图纸等文件,对现场施工人员进行交底培训、考核,合格后持证上岗。对特种施工人员进行安全教育及操作培训,并持证上岗。

5 技术要求

5.1桥墩顶面至地面高度大于4m的桥墩必须安装吊篮。

5.2桥墩附属设施预埋件进行渗锌防腐处理。

6 施工程序与工艺流程

6.1施工程序

6.1.1开始搭设支架, 支架搭设好之后,安装人员开始检查支架预埋螺栓,对位置不符合设计要求的及时进行调整。如有预埋螺栓被破坏时,必须对预埋螺栓从新进行植筋,以满足吊篮安装要求。

6.1.2吊篮部分杆件在加工场加工,严格按照图纸设计尺寸下料加工,吊篮材料由运输车运往安装,墩下由人工配合汽车吊吊装操作平台,人工安装,按照设计图纸进行安装,焊接处必须保证焊缝的饱满度,不能存在掉渣、裂纹等现象。

6.2施工工艺

加工杆件植筋

平整夯实原地面搭设安装支架检查修复预埋螺栓安装吊篮安装步板验收

7施工要求

7.1吊篮在桥墩里的U型螺栓预埋件需经过渗锌防腐处理,其它所有钢构件均采用《铁路钢桥保护涂装》第I套防腐涂装体系。

- 2 -

7.2 U型螺栓N5需在墩帽及墩身施工时预埋其内。如与顶帽内钢筋相抵触,可适当移动顶帽钢筋。必

须保证外漏长度。

7.3对于角钢N1-2,施工时可根据实际位置对其长度进行适当调整;

7.4吊篮部分杆件在加工场加工,严格按照图纸设计尺寸下料加工,吊篮材料由运输车运往安装墩下由人工配合汽车吊吊装操作平台,人工安装,按照设计图纸进行安装,焊接处必须保证焊缝的饱满度,不能存在掉渣、裂纹等现象。、

7.5吊篮安装完成,经监理验收合格后进行步板安装。

8 劳动组织

9 材料要求

9.1钢材全部采用Q235。

9.2吊篮在桥墩里的U型螺栓预埋件均需经过渗锌防腐处理,其他所有钢构件均采用《铁路钢桥保护涂装》第Ⅰ套防腐涂装体系。

10 机械设备配置

表10 吊篮安装施工机械配备表

11.1质量控制

11.1.1构件加工时严格按照技术交底施工。

11.1.2U型螺栓在墩顶预埋时保证足够的长度,必要时与墩身钢筋焊接。外露长度6cm.

11.1.3支架搭设好之后,安装人员开始检查支架预埋螺栓,对位置不符合设计要求的及时进行调整。

如有预埋螺栓被破坏时,必须对预埋螺栓从新进行植筋,以满足吊篮安装要求

- 3 -

11.2验收

11.2.1所用原材,要有出厂合格证书。

11.2.2吊篮安装完成后由质检工程师进行验收合格后报监理工程师验收,并做好原始记录。

12安全及环水保要求

12.1安全要求

12.1.1钢丝绳、提升机、安全锁、各类电器均有产品合格证;

12.1.2安全操作人员均持证上岗;

12.1.3吊篮安装及作业范围内设置防护栏或醒目警示绳、警示牌;

12.1.4进入施工现场必须戴好安全帽,扣好帽带,并正确使用个人劳动防护用具;

12.1.5电气设备的金属外壳以及与电气设备连接的金属构架必须采取保护接地措施;

12.1.6施工现场临时用电均采用“三相五线制”、“一机一箱一闸一漏一锁”要求进行,各施工作业队严格执行;

12.1.7作好文明施工工作,作到工完场清。

12.2环水保要求

现场的建筑垃圾回收并统一处置,不得将垃圾清扫到梁内,更不得抛洒到桥下。

- 4 -

(安全生产)吊篮安全作业指导书

吊篮施工安全作业指导书 一、吊篮安装说明 为保证吊篮施工安全有效,满足质量要求,我方将严格按安全操作方法进行施工,并保证所有上篮人员持操作证上岗。 二、吊篮的安装 将吊船和吊架用货车运至施工现场,并将吊船的吊架、钢丝绳和配重用货梯将其运到屋顶,将吊船的船体部分搬运至屋面;将屋面进行适当的保护后组织安装人员进行吊架安装,安装程序如下: (1)、配重架:先将吊架之吊杆组装完毕后再将吊杆穿入前后支架的方钢管内,上述工作完成后,再将上支架及加强钢丝绳安装到位并将吊架的钢丝绳伸出墙面,之后,再将钢丝绳安装完并将其投放下去。最后,将吊架定位并将配重块安放到后支架上。 (2)、吊船船身:有部分船体可以在地面组装,有部分船体需要运送到裙楼屋面进行组装。先将船体和船架组装完毕后,安装人员必须完成工作的自检和互检程序,并重点检查各连接点的螺栓和弹垫及平垫是否缺少和松动。至此电动吊船的现场组装工作安装就绪。在确认上述工作之后,安装人员将电缆连接到电控箱上并和工地提供的总电源连接上。工作人员在吊船内做完试验后,将钢丝绳穿入到提升机及安全锁内,完成上述工作后,将吊船上下运动3-8次,每次的升高高度为3米左右。然后,各安装人员再次检查各连接点的安装情况。确认后,吊船即可交付使用。关于吊船的具体使用方法及相关的注意事项请参考附后的《吊船使用说明书》。在吊船安装完毕使用之前,必须从屋面后垂下一根独立的安全绳,在安全绳上安装一个自锁器,施工人员在施工中必须将安全带的挂钩扣在安全绳的自锁器上。 三、吊篮的拆卸 吊篮的拆卸工作和安装工作在方法上是一致的,在程序上相反。 吊篮的组装、升降、拆除、维修必须由专业架子工进行。 移位方法:将钢丝绳从提升机和安全锁内抽出,并将钢丝绳抽至屋面;将吊杆整体移位到需要的位置,并将吊船的船体整体移到需要的位置。 第一次安装由吊船公司派1人免费带领及指导施工单位人员安装

桥梁工程作业指导书

桥梁工程作业指导书 青兰高速公路在陕西境内壶口至雷家角全长185.105km,其中桥梁累计总长双幅36697.79m/210座,其结构形式多种,基础多为桩基,下部为柱式墩,薄壁空心墩等,已设计出来的最高墩高52m,上部为20m、25m、30m、40m后张法预制箱梁,13m、20m先张法预制空心板、现浇箱梁和现浇预应力箱梁及大跨度连续刚构黄河大桥(未设计),地质、地形变化多端,桥梁主要跨越河道和沟壑,施工工艺复杂,技术难度大,桥梁工程质量应达到内实外美,满足规范设计要求,为全线达到国优或部(省)优工程,奠定良好基础,因此桥梁施工质量控制要针对每个环节进行,控制好每道工序,规范施工工艺,加强超前、过程控制,有效控制工程质量。按桥梁施工部位,就桥梁施工中一些控制要点和容易出现的问题的薄弱环节作以简要阐述。 一、施工准备 (一)全面熟悉设计图纸,复核设计图纸,针对本标段桥梁结构形式,认真查阅有关规范,准确掌握各分项工程的要求和评定标准。 (二)现场察看桥位和附近的地形地貌,结合设计文件,编制详细的施工组织设计。 (三)根据桥梁设计图纸的结构形式和工程量,结合桥位和附近的地形地貌,工期要求等,编制详细的进度计划。 (四)施工场地应结合地形地貌,遵循便于施工,满足施工要求的原则,统筹安排布臵,拌合场、预制场、钢筋加工棚和堆料场,应避开冲沟出口和滑坡地段,尤其是预制场基底应密实。 (五)做好人员和机械设备进场工作,料源调查工作和材料进场工作。必须配备能满足施工需要的发电机。 二、扩大基础

(一)准确放出基础位臵,根据地形地貌,结合地质情况,合理确定开挖口和坑壁坡度。 (二)在开挖中应注意边坡的稳定性,应尽量采用开挖凿除的办法施工。若需要采用爆破方法施工时,应放小炮严格控制装药量,同时注意炮位与边坡的安全距离,以保证边坡稳定。 (三)若基坑有渗水时,应在开挖面的四周设排水沟,将水汇入集水坑,用水泵排出。 (四)基底开挖面应平整,当基底为坚硬倾斜岩层,且倾斜度较大,应挖成台阶,台阶的宽度不宜小于0.3m,基础开挖到设计面时,表层松散石块要予以清除。 (五)挖至标高的土质基坑不得长期暴露,扰动和浸泡并应及时检查基坑尺寸、高程、基底承载力、符合要求后,应立即进行立模和浇筑混凝土施工。如开挖后实际地质与设计地质不符,基底承载力达不到设计要求,应及时上报,采取措施予以变更。 (六)基础施工必须特别注意几何尺寸,标高及墩(台)身预埋钢筋位臵的准确性和稳固情况,如为片石混凝土,片石强度按设计规定,如设计无要求,片石强度不能小于30mpa、无水锈、污渍,浇筑时应先浇筑一层30cm混凝土,振捣后,摆放片石,依次类推浇筑,摆放片石应注意片石与侧模、片石与片石的距离符合规范要求。 三、桩基 (一)桩位坐标必须认真复核图纸并采取相对位臵量测校核,桩径控制要求每孔采用标准检孔器检查,桩基附近必须设立固定良好的导线点、水准点。敷设于每根桩基,桩底标高采用测绳量测(测绳要用钢尺复核)推算;钻孔记录必须详细记录地质变化情况,确保嵌岩桩嵌入弱(微)风化岩的设计深度,对于斜坡岩,确保嵌入弱(微)风化岩的有

悬挂式吊篮专项施工方案.

悬挂式吊篮专项施工方案 第一节、编制依据 本方案依据工程实际情况及以下规范、文献编制:《高处作业吊篮》(JG/T 5032-93)、《高处作业吊篮安全规则》(JG 5027-92)、《重要用途钢丝绳》GB/T 8918-2006等编制。 第二节、工程概况 江油市富临汽车站灾后汽车站房重建项目工程;工程建设地点:江油市太平镇新华村7组;属于框架结构;地上2层;地下0层;建筑高度:15.5m;标准层层高0m ;总建筑面积:1023.14平方米;总工期:300天。 本工程由四川安汉建设有限公司投资建设,四川海辰工程设计研究有限公司设计,地质勘察,四川康立建设项目管理有限公司监理,四川安汉建设有限公司组织施工;xxx担任项目经理,xxx担任技术负责人。 第三节、吊篮脚手架的结构 吊篮脚手架的设计制作和使用应符合JG/T5032-93《高处作业吊篮》及《编制建筑施工脚手架安全技术的统一规定》、《高处作业吊篮安全规则》(JGJ 5027-1992),并经企业技术负责人和上级主管部门审核批准。 根据本工程实际,吊篮长为2.4m,宽0.7m,高1.2m,每个吊篮由2榀悬挑架提吊,悬挑架采用20a号槽钢加工而成,每榀挑架下面提吊2根承重钢丝绳。吊篮平台悬挂在建筑物顶部的悬挑梁上,可随作业要求进行升降。悬挑梁伸出长度1.5m,后面配重端长2.5m,配重总重量2500kg。 第四节、吊篮计算书

编制说明:本吊篮计算书只对主要受力结构中的钢丝绳、悬挑架等进行计算。对吊篮本身的强度不再进行计算,但使用过程中要保证吊篮平台的强度满足要求,并且严禁超载作业。 一、参数信息 1、构造参数 本工程中使用的吊篮型号为ZLD-500,吊篮的主要参数为: 吊篮尺寸mm:2400×700×1200,悬臂梁的悬挑长度为a=1.5m,悬臂梁的锚固长度为b=2.5m,吊篮用2榀挑架支撑。每个支撑下悬挂2根钢丝绳对吊篮进行提吊。 2、荷载参数 包括吊篮、钢丝绳、提升葫芦等在内的所有固定配件的总重量为600kg,吊篮的锚固措施采用悬挂配重的方式固定,悬挂机构重为336kg,配重重量为2500kg,吊篮额定载重量为550kg。 3、钢丝绳参数 根据《高处作业吊篮安全规则》(JGJ 5027-92)要求,在任何情况下承重钢丝绳的实际直径不应小于6mm。本工程中承重钢丝绳型号为6×19,直径为16mm,钢丝绳的公称抗拉强度为1400N/mm2,该型号的钢丝绳破断拉力总和为Fg =180kN。 二、计算书 1、荷载参数

吊篮使用安全操作规程

吊篮使用安全操作规程 一、作业人员: 1、高处作业吊篮安装、升降、拆卸操作人员必须是经培训合格者,掌握吊篮操作技能;并身体健康和能适应高空作业环境。 2、吊篮上的工作人员必须佩带安全帽、全身式安全带,安全带须系于独立救生绳或稳定的系稳物上。 3、严禁酒后上篮作业。 4、按要求施工,严格遵守安全操作规程。 二、操作前检查: 1、检查悬挂机构、各紧固连接件是否可靠,工作绳是否张紧。 2、检查电源线有无破损,插头是否拧紧,线头是否接牢。 3、检查安全锁是否动作灵敏、锁绳可靠,如有故障必须及时排除后方可使用。 4、按说明书规定检测安全锁的实际锁绳距离,确认合格后方可作业。 5、安全绳应受力预紧绷直。 6、开始吊篮升降时,检查电动机、制动器、限位装置是否工作正常。 三、操作中注意事项

1、电动吊篮在使用过程中,严禁空中上下人员及物料,以防坠人、坠物,上下人员及物料必须在电缆降至地面后进行。 2、吊篮严禁超载(吊篮的载重量包括人员的重量在内),且荷载在平台全长上应基本均匀。当施工高度较高及前梁伸出长度超过规范规定的范围时,平台的载重量必须减少。 3、在正常使用过程中,严禁触动滑降装置及安全锁刹车。悬吊平台两端倾斜超过15cm时应及时调平,否则将严重影响安全锁的使用,操作人员应随时注意吊篮的运行情况,及时消除事故隐患。 4、操作人员在悬吊平台内使用电器设备时,低于500W的电器设备可接在电器箱内的备用电源接线端子上,但高于500W的电器设备严禁接在电器箱内,必须用独立电源供电。 5、在高压线附近作业时,吊篮与高压线及高压装置之间应有足够的安全距离,并应遵守当地电器规程,报有关部门批准,采取防范监督措施后方能使用吊篮。 6、悬吊平台悬挂在空中时,严禁随意拆卸提升机、安全锁、钢丝绳等。 7、吊篮不宜在粉尘、腐蚀性物质或雷电、五级以上大风等环境中使用。 8、不允许在悬吊平台内使用梯子、凳子、垫脚物等进行垫高作业。作业人员必须在地面进出悬吊平台,不得在空中攀缘窗口出人,更不允许从一悬吊平台跨入另一悬吊平台。

桥梁检查梯作业指导书

桥梁检查梯作业指导书 一、检查梯施工方案 检查梯采用加工场集中加工,汽车运输至现场,墩顶检查梯由桥面系施工队伍 负责安装,空心墩内外检查梯由各桥墩施工队自行安装。 二、检查梯加工 1、材料 所有材料型号规格符合设计要求,经检验合格后方可使用。 角钢、钢筋进场后分型号水平堆放,并用方木支垫,方木间距不大于1m,防止变形。角钢、钢筋离地距离不小于0.3m,存放在防雨棚内或采用塑料布覆盖防雨,并标识清楚。 2、加工 (1)下料 各型检查梯下料时长短搭配,减少浪费,下料尺寸允许误差±10mm。 (2)焊接 检查梯角钢接长应先对接焊接牢固后,再用同型号角钢外包或内贴帮焊,要求焊接牢固,焊缝饱满,无气泡、夹渣及焊瘤等质量缺陷。 检查梯踏步钢筋与角钢焊接质量标准参照钢筋与钢板搭接焊要求,即焊缝长度不小于4d(d 为I级钢筋直径),钢筋两侧均焊接饱满,焊缝宽度不小于0.5d且不小于6mm,焊缝高度不小于0.35d且不小于4mm,焊缝无气泡、夹渣及焊瘤等质量缺陷。 (3)防锈 各种检查梯加工后打磨除锈,然后按照《铁路钢桥保护涂装》TB/T 1527-2004第一体系要求涂装:特制红丹酚醛(醇酸)防锈底漆二道,每道干膜最小厚度不小于35μm;灰铝粉石墨或灰云铁醇酸面漆二道,每道干膜最小厚度不小于35μm。防锈涂装要求涂刷均匀,不得漏涂,防雨防潮。 由于运输和安装过程中的焊接可能导致防锈漆膜破损,各种检查梯安装完毕后应对破损部位进行补涂。 (4)堆放 加工好的成品或半成品应分型号水平整齐堆放,防雨防潮,防止变形,并标识清楚。 三、检查梯安装 1、墩台顶检查梯安装 墩顶检查梯由桥面系施工队安装,待架梁后与避车台同时施工。 由于桥台处不设避车台,桥台顶帽检查梯与桥面系人行道角钢支架焊接,底部与顶帽预留孔中的预埋角钢采用φ20螺栓连接,安装就位后采用砂浆填塞预留孔,锚固预埋角钢。桥墩顶检查梯顶部与避车台采用φ20螺栓连接,底部与顶帽预留孔中的预埋角钢采用φ20螺栓连接,安装就位后采用砂浆填塞预留孔,锚固预埋角钢。 2、空心墩外检查梯安装 空心墩外检查梯在施工吊围栏时安装,顶部挂在墩顶N16预埋挂环上,中部和底部分别与N14和N15预埋支撑角钢焊接牢固。N18护圈钢筋可先与检查梯焊接成型,随检查梯起吊安装。 3、空心墩内检查梯安装 空心墩内检查梯随墩身施工逐步安装,顶部与检查平台预埋φ20螺栓连接,中部与N27预埋支撑角钢焊接,底部平稳支撑在下一级检查平台或墩底实体段混凝土上。最后一级检查梯(墩底)如遇变截面处,则可适当将检查梯的内侧一肢延长至变截面或墩底实体段的混凝土面,支撑稳固。

吊篮使用安全操作规程标准范本

操作规程编号:LX-FS-A28136 吊篮使用安全操作规程标准范本 In The Daily Work Environment, The Operation Standards Are Restricted, And Relevant Personnel Are Required To Abide By The Corresponding Procedures And Codes Of Conduct, So That The Overall Behavior Can Reach The Specified Standards 编写:_________________________ 审批:_________________________ 时间:________年_____月_____日 A4打印/ 新修订/ 完整/ 内容可编辑

吊篮使用安全操作规程标准范本 使用说明:本操作规程资料适用于日常工作环境中对既定操作标准、规范进行约束,并要求相关人员共同遵守对应的办事规程与行动准则,使整体行为或活动达到或超越规定的标准。资料内容可按真实状况进行条款调整,套用时请仔细阅读。 (1)吊篮分吊车吊篮和电动吊篮两种。 (2)作业前按照规定穿戴好劳动防护用品。 (3)吊车吊篮: ①吊篮必须牢固承载重量安全系数不得小于8,使用吊篮用四个鼻子,吊装时用四根钢丝绳分别挂在四个鼻子上,每个鼻子承重量最少不低于吊篮总承重量8的安全系数,吊篮周围安全护笼间距不得大于200mm,吊篮底部采用钢板等制作,周围焊有踢脚板高度不低于100mm,防护栏有足够强度,吊篮高度不得低于1200mm。 ②吊篮严禁带病作业严禁使用腐蚀、断裂、开

施工吊篮专项施工方案

上海国际旅游度假区核心区管理中心项目幕墙工程施工吊篮安拆专项施工方案 上海国际旅游度假区核心区 管理中心项目 幕墙工程 施工吊篮安拆专项施工方案 上海旭博幕墙装饰工程有限公司 2015年10月

目录 第一章工程概况 (3) 第二章编制依据 (3) 第三章施工吊篮技术说明 (3) 第四章吊篮安装与调试 (8) 第五章吊篮移位及拆除 (14) 第六章吊篮安全技术措施 (14) 第七章吊篮使用培训及日常维护保养措施 (17) 第八章任何紧急情况的措施及应急预案 (18) 附件1:吊篮的安全验算 附件2:吊篮日常检查表 附件3:吊篮定期检查表 附件4:吊篮安装平面布置图 附件5:吊篮操作使用安全技术交底 附件6:吊篮拆、卸、移位交底 附件7:相关资质证书

第一章工程概况 工程名称:上海国际旅游度假区核心区管理中心项目幕墙工程 工程地址:上海浦东新区南入口大道与航城路交叉口 建设单位:上海申迪(集团)有限公司 监理单位:上海建科工程管理咨询有限公司 总包单位:上海国际旅游度假区工程建设有限公司 幕墙施工单位:上海旭博幕墙装饰工程有限公司 吊篮安装单位:无锡天通建筑机械有限公司 建筑最高标高:44.6米 第二章编制依据 1.国家和行业颁布的有关现行设计和施工规范及标准; 2.《高处作业吊篮》GB19155-2003; 3. 上海国际旅游度假区核心区管理中心幕墙工程图纸; 4.《建筑施工高处作业安全技术规范》JGJ80-91; 5.《建筑施工安全检查标准》JGJ59-2011; 6.《施工现场临时用电安全技术规范》JGJ46-2005; 7.《安全带》GB6095-2009; 8.《钢丝绳夹》GB/T 5976-2006; 9.《起重机钢丝绳保养、维护、安装、检验和报废》GB/T5972-2009; 10.《建筑施工工具式脚手架安全技术规范》JGJ202—2010; 11.《建筑结构荷载规范》GB50009-2012; 第三章施工吊篮技术说明 第一节准备工作 拟采用吊篮型号: ZLP630 拟采用吊篮品牌及厂家:“通天”牌无锡天通建筑机械有限公司 本工程采用的吊篮已通过以下认证:(见附件) 中国工程机械工业产品生产资质证书

桥梁工程施工方法及工艺作业指导书

桥梁工程施工方法及工艺作业指导书 1.1.桩基施工方法及工艺 本工程桩基处黄河阶地区、冲积区及黄土卯区,区域内有人工填土、冲积砂质黄土、冲积细沙及粗圆、细圆砾土,少数地段存在湿陷性黄土及膨胀土。故本工程桩基施工时应需软弱土进行处理,再进行桩基施工。本工程桩基分为钻孔灌注桩形式,φ1.0m、φ1.25m、φ1.5m、φ1.8m四种。根据桩孔的分布、本工程地质条件、设计桩径、桩长等情况,钻孔桩基础可采用冲击钻、旋挖钻钻进,泥浆护壁,导管法灌注水下混凝土。 1.1.1.钻孔桩施工 钻孔灌注桩桩基全面施工前,先选择具有代表性地质特征的地段,进行试验桩施工,取得可靠数据、施工工艺后再全面开工。钻孔灌注桩施工工艺流程见图2.5.2-1。

图2.5.2-1钻孔桩施工工艺流程图 ⑴施工准备 钻孔桩地根据地形、地质、水文资料和桩顶标高等情况结合施工技术的要求,开始准备工作。首先确定钻孔桩位:按照各墩设计桩位,布置基线控制网,采取交会法准确放出桩位。钻孔场地在旱地且施工期间地下水位在原地面以下大于1m者,先平整场地,清除杂物,更换软土,夯填密实。钻孔场地在陡坡时,先挖成平坡。使钻机座于坚实的填土上,以

免产生不均匀沉陷。修通旱地位置便道,为施工机具、材料运送提供便利。 ⑵泥浆制备 在砂类土、碎(卵)石土或黏土夹层中钻孔,采用膨润土泥浆护壁。为提高泥浆粘度和胶体率,在泥浆中掺入适量的碳酸钠、烧碱等,其掺量经试验决定。造浆后要试验全部性能指标,钻孔过程中要随时检验泥浆比重和含砂率,并填写泥浆试验记录表。 泥浆性能指标,按钻孔方法和地质情况确定,符合下列规定: 泥浆比重:旋挖钻机、冲击钻机使用管形钻头钻孔时,入孔泥浆比重为1.1~1.3;冲击钻机使用实心钻头钻孔时,孔底泥浆比重不大于:砂黏土为1.3、卵石层为1.4;岩石为 1.2。特别是在穿越砂层时适当增加泥浆比重,以防塌孔。 含砂率:新制泥浆不大于4%。 胶体率:不小于95%。 PH 值:大于6.5。 泥浆采用优质膨润土造浆。制备及循环分离系统由泥浆搅拌机、泥浆池、泥浆分离器和泥浆沉淀处理器等组成。详见图 2.5.2-2泥浆循环系统平面布置图(以八根桩基排列为例)。 排浆地沟排浆地沟

吊篮操作要求标准范本

操作规程编号:LX-FS-A75939 吊篮操作要求标准范本 In The Daily Work Environment, The Operation Standards Are Restricted, And Relevant Personnel Are Required To Abide By The Corresponding Procedures And Codes Of Conduct, So That The Overall Behavior Can Reach The Specified Standards 编写:_________________________ 审批:_________________________ 时间:________年_____月_____日 A4打印/ 新修订/ 完整/ 内容可编辑

吊篮操作要求标准范本 使用说明:本操作规程资料适用于日常工作环境中对既定操作标准、规范进行约束,并要求相关人员共同遵守对应的办事规程与行动准则,使整体行为或活动达到或超越规定的标准。资料内容可按真实状况进行条款调整,套用时请仔细阅读。 1、建筑物或构筑顶面支撑悬挂机构处的承载强度不得低于1500 kg/m2。如悬挂机构由顶面预埋件承受时,预埋件安全系数不得小于3。 2、提供吊篮使用的电源必须是380V,三相五线制接地电源。 3、距高压线10M范围内严禁使用吊篮。 4、在雨、大雾、大雪、及风速大于 10.8m/s(相当于阵风6级)的恶劣气候环境下,严禁吊篮升空作业。 5、施工范围下方如有道路或通道时,必须在吊篮下方设置警戒线或安全廊,并设置明显警戒标志

吊篮专项施工方案1.2(完整版)

` 保利石佛营幕墙工程 吊篮施工方案 编制: 审核: 审批: 沈阳黎东幕墙装饰有限公司 2012年1月

目录 一、工程概况 (1) 二、编制依据 (1) 三、施工准备 (1) 四、电动吊篮型号及参数 (2) 五、电动吊篮台数及分布 (3) 六、设计说明 (4) 七、电动吊篮的安装流程 (4) 八、电动吊篮的安装、拆除方案 (5) 九、施工验收标准 (9) 十、吊篮的使用及操作规程 (10) 十一、培训及维护、保养 (15) 十二、安全保证措施及安全要求 (16) 十三、吊篮安全计算书 (18) 十四、吊篮平面布置图 (21)

一、编制依据 1、北京保利石佛营工程施工平面图 2、《高处作业吊篮国标》GB 19155―2003 3、《建筑施工高处作业安全技术规范》JGJ80-91 3、《高处作业吊篮使用管理手册》 4、《电动吊篮使用说明书》 二、工程概况 本着安全施工的原则,我司将会选择有着丰富安装经验的吊篮公司,并要求具有北京市城市建设委员会颁发的“北京市建筑施工起重机械设备租赁维修企业资质证书”,通过北京市建委的鉴定。 本工程为商业及住宅混建工程,主楼最高处约62.9米。根据本工程实际施工需要,外墙施工划分为南区和北区共两个施工区,南区内根据主体结构的相似性又可分为两个片区:2#楼、4#楼及6#楼为1个片区;1#楼与3#楼为1个片区。北区内根据主体结构的特性,可把7#楼与8#楼作为1个片区划分;9#楼因主楼部分以涂料为主,根据总进度的安排可以利用脚手架自上而下施工,故可单独划为1个片区。为了满足施工的切实需要和吊篮的充分利用,根据南北区施工时间的先后顺序,我司计划按片区的划分平行施工,又考虑到吊篮的可换性,准备 2#楼、4#楼、6#楼的东、南面优先施工,东、南面施工完毕后,吊篮可立即转移至西、北面继续施工;3#楼的东、南面和1#楼的西、北面同时施工,施工完毕后,3#楼的吊篮可与1#楼的吊篮互换继续施工。在五.一节前完成南区所有的施工工作,五.一后将南区的吊篮转移至北区施工,做到吊篮的充分利用。具体吊篮安装拆卸方案如下: 三、施工准备 1、吊篮进场可根据场地大小,分批进场。要求现场预备 380V 电源。根据现场施工准备,我们开工前组织准备好吊篮机具装置运至现场,组织现场安装、移位人员。 2、对于施工楼顶顶楼防水的保护措施:吊篮运到施工楼顶之前,在需要加设吊篮的部位铺上竹胶扳,以防止防水层的破坏。 3、人员准备

吊篮安全技术操作规程(最新版)

吊篮安全技术操作规程(最新 版) The safety operation procedure is a very detailed operation description of the work content in the form of work flow, and each action is described in words. ( 安全管理 ) 单位:______________________ 姓名:______________________ 日期:______________________ 编号:AQ-SN-0241

吊篮安全技术操作规程(最新版) 吊篮系高空作业设备,吊篮操作人员系高空危险作业,为了您及他人的生命安全,请务必遵守吊篮安全操作规程! 1)吊篮操作人员必须经过培训合格后方上岗。吊篮必须由专人按照操作规程谨慎操作,严禁未经培训人员擅自操作吊篮。 2)严禁吊篮超载作业。 3)使用双机提升的吊篮施工时,应有二名人员操作。施工及操作人员必须配戴安全帽,系好安全绳(带),不得穿着硬底鞋,塑料鞋或其它易滑的鞋子,吊篮内严禁使用梯、凳、搁板等凳高工具,严禁在吊篮中奔跑、纵跳。 4)安全绳应扣在独立救生绳(安全绳)上,独立救生绳严禁固定在吊篮篮体及悬挂机构上; 5)正常施工时,吊篮内载荷应尽量保持均匀,严禁将吊篮用作

起重运输和进行频繁升降运行。 6)施工人员必须在地面进出吊篮,严禁在空中攀缘窗户进出吊篮或攀登栏杆。 7)严禁吊篮悬空拆装。 8)操作人员在吊篮升降运行时应经常注意各机件的运行情况,如发现提升机发热、噪音、钢丝绳断丝、安全锁失效、吊篮两端升降速度不匀、限位开关失灵、操练开关失灵等不正常情况时,应及时回降到地面进行检修,完好后方可继续施工,严禁设备带病运行。 9)施工工期较长时,必须制定吊篮定期检查制度。操作人员每天启动吊篮时应按规定对各机件进行检查。吊篮久置后使用及使用过程中发生安全锁、提升机、电气系统故障或发生断绳等重大事故后,必须由专职检修人员进行检修,其他人员不得擅自任意拆卸检修。 10)悬吊平台在正常使用时,严禁使用电机制动器及安全锁手刹制动,以免引起以外事故。 11)每次使用前,均应在2米以下高处运行2~3次,吊篮工作

铁路桥梁工程作业指导书大全(下)

(十三)模板安装与拆卸作业指导书 1、总则 模板工程在桥梁的预制过程中是一个关键性的工序,模板自身质量和在施工中安拆的好坏对桥梁结构能否满足设计尺寸是一个控制性的工程。 本梁场模板采用钢模板,自身有一定的刚度、强度和稳定性,用槽钢焊成骨架能增加刚度和强度,用钢板作为面板可以提高梁体表面光洁度,有利用于保证灌注梁体混凝土的质量和尺寸精度,可以增加倒用次数等优点。钢模板在施工中便于安装、拆卸和运输,保证结构表面的整体性,能严格控制截面尺寸及各部位尺寸,模板接缝平顺,模面平整,转角光滑,连接孔准确。模板在安装的过程中应整体组拼,组拼后的偏差值符合设计规范和使用要求。 2、编制依据 2.1《时速160公里客货共线铁路预制后张法简支T梁通用参考图》(通桥2005)2101-Ⅰ、通桥(2005)2101-Ⅱ;时速200公里客货共线铁路预制后张法简支T梁角钢支架方案》(通桥(2005)2201-Ⅰ、通桥(2005)2201-Ⅱ、通桥(2005)2201-Ⅲ) 2.2《铁路混凝土强度检验评定标准》(TB10425-94) 2.3《预制后张法预应力混凝土铁路简支梁技术条件》(TB/T3043-2005) 2.4《《客货共线铁路工程施工技术指南》(TZ203—2008) 2.5《铁路混凝土与砌体工程施工规范》(TB10210—2001) 2.6《铁路混凝土与砌体工程施工质量验收规范》(TB10424-2007J283) 2.7《铁路桥涵工程质量验收规范》(TB10415-2003)

3、模板安装与拆卸 3.1模板分为底模、侧模、端模。模板的安装和拆除采用机械与人工相配合的方式进行。 3.2底模 底模直接安放在制梁台座基础上,台座基础地基坚实平整、不沉陷,确保在制梁过程中不发生下沉现象。底模与制梁台座的连接采用预埋在基础上的钢板与底模上的槽钢焊接成一体,底模平整度控制在1.5mm/m以内。由于预施应力时,梁体的弹性压缩及混凝土的徐变、收缩影响,使梁长缩短,32m梁全长为32600mm,24m梁全长为24600mm,16m梁全长为16500mm,在制造底模时,其长度应按考虑压缩量,压缩量的设置按L/1000(L为梁长),即32m 梁的压缩量为32mm、24m梁的压缩量为24mm,16m梁的压缩量为16mm.待梁体张拉完后跟踪测量,再对设定的压缩量根据实际情况进行调整,最后32m 梁压缩量按32mm;24m梁压缩量按24mm设置,亦即32m梁底模全长为32632mm;24m梁底模全长为24624mm,16m梁底模全长为16516mm,在设置底模时,应考虑长钢尺的尺长修正值,修正值的多少根据检定后提供的数据进行调整。同时为减少预应力产生的上拱度,在安装底模时,应在底模上根据设计要求设置一定的反拱度,根据设计图提供的资料,32m梁按45mm设置反拱、24m梁按20mm设置反拱、16梁按10mm设置反拱。反拱的最低点设置在跨中,梁跨内其他位置的反拱根据二次抛物线(近似于折线)进行设置,在支座板中心处全部消除。 32m底模反拱设置:根据Y=aX2+b 当X=0时,Y=-45

吊篮安全操作规程

吊篮安全操作规程 一、操作人员上机前,必须认真学习和掌握规程内容。 二、操作人员年龄必须年满18周岁,初中以上文化程度,身体健康,精神正常,能适应高空作业。 三、操作人员必须经过专业人员的技术培训和考核,合格后颁发吊篮操作证方可上岗。 四、吊篮作业时操作人员必须带好安全帽,系好安全带,并将安全带扣在另外可靠固定在建筑物上部的安全绳上。酒后过度疲劳情绪异常者不得上岗。 五、操作人员必须从地面进出平台,或将平台降至最低点的安全网之上相应楼层,并将吊篮固定在建筑物上,操作人员方可进出平台,不得在空中从一平台跨入另一平台,吊篮操作人员必须有两个人。严禁单人或四人以上操作吊篮。 六、严禁超载运行,载荷应尽量均匀,稳妥地放置,不得对平台施加冲击载荷。 七、吊篮运行时注意观察吊篮上下方向有无障碍物。如开启的窗户,突出的物体等,以免吊篮碰挂发生危险。 八、屋面悬挂装置应水平摆设,工作平台应保持水平状态上下运行。里面悬挂装置安装间距应与吊篮平台长度相等。 九、在高压线附近作业时,吊篮与高压线及高压装置之间应有足够的距离,并应遵守当地电器规程,报有关部门批准采取防患措施后方能使用吊篮。 十、工作平台悬挂在空中时,严禁随意拆卸提升机、安全锁和电控箱。 十一、严禁在吊篮上嬉戏,打闹及向外扔东西。 十二、严禁在粉尘、腐蚀性物质或雷电、五级以上(含五级)大风等环境中使用吊篮。 十三、严禁在工作平台内使用梯子、凳子、踮脚物等进行作业。 十四、不准将吊篮作为载物电梯使用,不允许在吊篮上另设吊具。 十五、吊篮在使用中如发现电机过热、声音异常、卡绳或电器失控等紧急情况时,操作人员应沉着冷静,切断电源,撤离平台,并请专业维修人员检修好后方可使用。 十六、吊篮若要整体移位,必须先将钢丝绳从提升机和安全锁内退出。 十七、作业结束时,应把工作平台落在地面平整处或停在3米以下位置,并与建筑物固定,以防被风刮动造成破坏。 十八、每天下班应关闭总电源及锁好电器控制箱,并将提升机用塑料纸包好,以防雨水渗入。

吊篮专项施工方案

目录 一、工程概况 (2) 二、吊篮简介 (2) 三、吊篮布置 (3) 四、施工准备 (4) 五、安装过程和方法 (6) 六、安装竣工验收 (8) 七、吊篮拆卸 (8) 八、安全措施 (9) 九、环保措施 (10) 十、吊篮稳定性验算 (10) 十一、吊篮使用安全规程 (11)

一、工程概况 工程名称:淮北市人社局装饰改造工程;建设地点:淮北市相山区孟山北路45号;建设单位:淮北市人社局; 施工单位:安徽凯源建设集团有限公司 监理单位:淮北市安居监理公司 建筑概述:室内装修、改造、室外幕墙。建筑面积:2500㎡ 二、高处作业吊篮简介 1、主要技术性能参数如下:

2、吊篮结构原理简介如下: 吊篮整机主要由六部分组成,①悬挂机构、②悬吊平台、③提升装置、④安全装置、⑤电气系统。 ①悬挂机构:架设于建筑物屋面上,由两套独立的钢结构架及钢丝绳组成。钢结构架由钢结构件通过螺栓或销子连接而成。每套悬挂钢结构架的前梁分别悬垂两根钢丝绳,一根为提升机用工作钢丝绳,一根为安全锁用钢丝绳。钢丝绳系吊篮专用镀锌钢丝绳,强度高,耐锈蚀性能好。型号为4×25Fi+PP-Φ8.3,破断拉力不小于51.8kN。钢丝绳使用过程中,按《起重机械用钢丝绳检验和报废实用规范》GB5972的有关规定,对钢丝绳的磨损、锈蚀、短丝、异常变形等进行检验,达到报废标准即更新钢丝绳。 下述计算钢丝绳的安全系数(按极限状态下单根钢丝绳独立承载考虑): 作用在钢丝绳上的拉力F=776-300+630=1106kg 安全系数=51800N ÷(1106kg÷9.8N)=4.78,达到安全要求。 ②悬吊平台:由片式组焊件通过螺栓连接成框型钢结构装置,用以承载作业人员及施工器材。 ③提升装置:每个悬吊平台两端各装有一台提升机。提升机采用电磁制动电机和离心限速装置及手动滑降装置。电磁制动装置在电路故障或断电时,产生制动力矩使平台制动悬吊。离心限速装置能保证平台下滑速度不大于1.5倍额定提升速度。手动滑降装置在电气故障或停电以及紧急情况下操纵吊篮平台下降,具体方法是:用置于提升机手柄内的拨杆插入电磁制动器(电机风罩内)拨叉的孔内,向上抬起拨杆,打开制动器,可使工作平台匀速下滑。 ④安全装置:包括安全锁及安全钢丝绳。安全锁属于防倾斜型,每个平台两端各装有一把及和安全钢丝绳,当工作钢丝绳断裂或平台一端倾坠时,能自动锁住安全钢丝绳防止平台下降。 ⑤电气系统包括电缆、限位器、漏电保护器及其它控制开关。 三、吊篮布置方法

吊篮安全作业指导书.docx

吊篮安全作业指导书 一、吊篮安装说明 为保证吊篮施工安全有效,满足质量要求,我方将严格按安全操作方法进行施工,并保证所有上篮人员持操作证上岗。 二、吊篮的安装 将吊船和吊架用货车运至施工现场,并将吊船的吊架、钢丝绳和配重用货梯将其运到屋顶,将吊船的船体部分搬运至屋面;将屋面进行适当的保护后组织安装人员进行吊架安装,安装程序如下: (1)、配重架:先将吊架之吊杆组装完毕后再将吊杆穿入前后支架的方钢管内,上述工作完成后,再将上支架及加强钢丝绳安装到位并将吊架的钢丝绳伸出墙面,之后,再将钢丝绳安装完并将其投放下去。最后,将吊架定位并将配重块安放到后支架上。 (2)、吊船船身:有部分船体可以在地面组装,有部分船体需要运送到裙楼屋面进行组装。先将船体和船架组装完毕后,安装人员必须完成工作的自检和互检程序,并重点检查各连接点的螺栓和弹垫及平垫是否缺少和松动。至此电动吊船的现场组装工作安装就绪。在确认上述工作之后,安装人员将电缆连接到电控箱上并和工地提供的总电源连接上。工作人员在吊船内做完试验后,将钢丝绳穿入到提升机及安全锁内,完成上述工作后,将吊船上下运动3-8次,每次的升高高度为3米左右。然后,各安装人员再次检查各连接点的安装情况。确认后,吊船即可交付使用。关于吊船的具体使用方法及相关的注意事项请参考附后的《吊船使用说明书》。在吊船安装完毕使用之前,必须从屋面后垂下一根独立的安全绳,在安全绳上安装一个自锁器,施工人员在施工中必须将安全带的挂钩扣在安全绳的自锁器上。 三、吊篮的拆卸 吊篮的拆卸工作和安装工作在方法上是一致的,在程序上相反。 吊篮的组装、升降、拆除、维修必须由专业架子工进行。 移位方法:将钢丝绳从提升机和安全锁内抽出,并将钢丝绳抽至屋面;将吊杆整体移位到需要的位置,并将吊船的船体整体移到需要的位置。 第一次安装由吊船公司派1人免费带领及指导施工单位人员安装 四、电源布置方案 1、此工程电源分为二级电源,其中一级电源设置在一层,由甲方提供,二级电源设置在八层楼面。 2、吊船包括2台提升机电机,每台LTD63提升机电机的功率为1.5kw,每台LTD80提升机电

桥梁工程作业指导书模板

桥梁工程作业指导 书 1

目录............................................................................................. 错误!未定义书签。桥梁篇............................................................................................ 错误!未定义书签。钻孔灌注桩冲击钻机成孔施工作业指导书 ............................... 错误!未定义书签。钻孔灌筑桩旋挖钻机成孔施工作业指导书 ............................... 错误!未定义书签。钻孔桩钢筋笼制作、安装施工作业指导书 .............................. 错误!未定义书签。钻孔灌注桩水下混凝土灌筑施工作业指导书 ........................... 错误!未定义书签。钢板桩围堰施工作业指导书 ....................................................... 错误!未定义书签。无支护基坑明挖施工作业指导书 ............................................... 错误!未定义书签。支撑法基坑明挖施工作业指导书 ............................................... 错误!未定义书签。桥梁基础及承台钢筋制作与安装施工作业指导书 ................... 错误!未定义书签。桥梁基础、承台混凝土灌注施工作业指导书 .......................... 错误!未定义书签。实体墩台作业指导书.................................................................... 错误!未定义书签。空心墩台作业指导书.................................................................... 错误!未定义书签。墩柱钢筋制作、安装施工工艺 .................................................. 错误!未定义书签。预应力混凝土连续梁支架法施工作业指导书 ........................... 错误!未定义书签。预应力混凝土连续箱梁悬臂灌筑法施工作业指导书 ............... 错误!未定义书签。预应力混凝土连续梁钢筋制作、安装施工作业指导书 .......... 错误!未定义书签。连续梁混凝土灌注施工作业指导书 ........................................... 错误!未定义书签。预应力混凝土连续梁张拉施工作业指导书 ............................... 错误!未定义书签。预应力混凝土连续梁预应力孔道真空辅助压浆施工作业指导书错误!未定义书签。

幕墙吊篮专项施工方案.doc

鏉窞浜烘皯鍖婚櫌鈥綇闄㈤儴缁煎悎澶ф ゼ 目录 第一章、编制依据 (2) 第二章、工程概况 (2) 第三章、吊篮施工管理人员组织计划 (3) 第四章、吊篮施工计划 (4) 第一节、吊篮选型 (4) 第二节、吊篮技术参数及组成 (4) 第三节、吊篮布置图 (7) 第五章、吊篮施工安全措施 (11) 第一节、吊篮安装拆卸安全措施 (11) 第二节、安装拆卸人员的安全措施 (15) 第三节、吊篮使用的安全措施 (15) 第四节、吊篮进场的条件 (16) 第五节、日常检查与定期检查 (18) 第六节、临时用电 (20) 第七节、吊篮验收 (23) 第六章、吊篮的计算 (24) 第七章、技术交底 (27) 第八章、应急预案 (31) 第九章、附图、图表及相关附件 (38) 江苏康沃电力科技股份有限公司新建厂区幕墙工程项目高处作 业吊篮安装架设专项施工方案 第一章、编制依据 1.江苏康沃电力科技股份有限公司新建厂区幕墙工程平面、立面图纸 2.《高处作业吊篮》 GB19155—2003 3.《建筑施工工具式脚手架安全技术规范》 JGJ202-2010 4.《建筑工程安全检查标准》 JGJ59-2011 5.《建筑施工高处作业安全技术规范》 JGJ80-91 6.《建筑施工现场临时用电安全技术规范》JGJ46-2005 7.《危险性较大的分部分项工程安全管理办法》(建设部建质 2009 第【 87】号文件) 8.无锡劲马液压机械有限公司生产的《 ZLP系列高处作业吊篮使用说明书》。 第二章、工程概况: 工程名称:江苏康沃电力科技股份有限公司新建厂区幕墙工程 工程地址: 建设单位:江苏康沃动力科技股份有限公司 承包单位:振华集团 ( 昆山 ) 建设工程有限公司

吊篮操作规程

吊蓝操作规程 为确保设备安全、高效的运行,使用方须严格遵照“高处悬挂作业安全规程”及如下规程使用高处作业吊蓝。 1、吊篮操作人员要经过吊篮理论知识、安全操作技能的培训,考核合格并取得有效的证明后方可操作吊篮。不得患有无不适应高处作业的疾病和生理缺陷。 2、在每班作业前,操作人员应当对吊篮进行检查,发现事故隐患或者其他不安全因素时,应当立即处理,排除事故隐患或不安全因素后,方可使用吊篮。 3、乘坐吊蓝的人员须戴好安全帽、系好安全带并将其挂扣在安全绳上。安全带上的自锁钩应扣在单独悬挂于建筑物顶部牢固部位的安全保险绳上。严禁将安全绳、安全带直接固定在吊篮结构上。 4、施工作业时,严禁超过吊篮的额定载荷。作业时,吊篮下方严禁站人,严禁交叉作业。 5、操作人员在作业中有权拒绝违章指挥和强令冒险作业。 6、酒后、过度疲劳、情绪异常者不得上岗。 7、不允许单独一人进行作业。 8、不允许穿拖鞋或塑料底等易滑鞋进行作业。 9、作业人员必须在地面进出工作篮,不得在空中攀缘窗口(首层除外)出入。更不允许作业人员从一悬挂篮跨入另一悬挂篮体。 10、严禁在悬吊平台内使用梯子、凳子、垫脚物等进行垫高作业。 11、利用吊篮进行电焊作业时,严禁用吊篮做电焊接线回路。吊篮内严禁放置氧气瓶、乙炔瓶等易燃易爆品。 12、钢丝绳不得弯曲,不得沾有油污、杂物,不得有焊渣和烧蚀现象,严禁将工作钢丝绳和安全钢丝绳作为电焊低压通电回路。 13、高处作业使用的工具及物品须采取防坠落措施。 14、吊蓝应经有关部门检测合格后方可投入使用。 15、严禁将吊蓝当做材料及人员的垂直运输工具使用并严格控制载荷。 16、施工场所风力大于5级以上,应停止吊篮使用; 17、设备在升降时,吊蓝操作人员须密切注意电缆线是否挂卡在墙面或障碍物上。 18、吊篮出现故障或者发生异常情况时,操作人员应当立即停止使用,消除故障和事故隐患后,方可重新投入使用。 19、每天使用结束后,放松工作钢丝绳,使摆臂式防倾斜安全锁的摆臂处于松弛状态。关闭电源开关,锁好电气箱。露天存放应做好防雨措施,避免雨水进入提升机、安全锁、电器箱。应将设备停放至地面或用绳索将设备固定在建筑物上避免随风晃动。 江苏省水利建设工程有限公司 江津区卧龙沟水库除险加固工程项目经理部

桥梁篇作业指导书

桥梁篇

目录 桥梁篇……………………………………………………………人工挖孔桩施工作业指导书…………………………………………….. 冲击钻灌注作业指导书………………………………………………….. 回旋钻灌注桩作业指导书……………………………………………….. 旋挖钻灌注桩作业指导书……………………………………………….. 承台作业指导书………………………………………………………….. 实体墩台作业指导书…………………………………………………….. 空心墩台作业指导书…………………………………………………….. 高墩翻模作业指导书…………………………………………………….. 移动模架施工作业指导书……………………………………………….. 预制箱梁施工作业指导书……………………………………………….. 整孔箱梁架设施工作业指导书………………………………………….. 支架现浇箱梁施工作业指导书…………………………………………….. 连续梁悬灌施工作业指导书…………………………………………….. 支座安装作业指导书…………………………………………………….. 钢筋加工及焊接作业指导书…………………………………………….. 混凝土养护作业指导书………………………………………………….. 箱梁预应力施工作业指导书……………………………………………..

人工挖孔桩施工作业指导书 1、目的 明确桥梁桩基人工挖孔施工作业的工艺流程、操作要点和相应的工艺标准,指导、规范桩基作业施工。 2、编制依据 《客运专线铁路桥涵工程施工质量验收暂行标准》 《客运专线铁路桥涵工程施工技术指南》 《施工图设计文件》 3、适用范围 适用于无水、少水,孔壁不易坍塌、孔深少于20米的桩基或桩基上半部分。