桩基合作合同范本(汇总16篇)
简易桩基合同范本(精选8篇)

简易桩基合同范本(精选8篇)(经典版)编制人:__________________审核人:__________________审批人:__________________编制单位:__________________编制时间:____年____月____日序言下载提示:该文档是本店铺精心编制而成的,希望大家下载后,能够帮助大家解决实际问题。
文档下载后可定制修改,请根据实际需要进行调整和使用,谢谢!并且,本店铺为大家提供各种类型的经典范文,如工作总结、工作计划、合同协议、条据书信、讲话致辞、规章制度、策划方案、句子大全、教学资料、其他范文等等,想了解不同范文格式和写法,敬请关注!Download tips: This document is carefully compiled by this editor. I hope that after you download it, it can help you solve practical problems. The document can be customized and modified after downloading, please adjust and use it according to actual needs, thank you!Moreover, our store provides various types of classic sample texts for everyone, such as work summaries, work plans, contract agreements, document letters, speeches, rules and regulations, planning plans, sentence summaries, teaching materials, other sample texts, etc. If you want to learn about different sample formats and writing methods, please pay attention!简易桩基合同范本(精选8篇)简易桩基合同范本第1篇工程发包方:(甲方)工程承包方:(乙方)为保证工程顺利施工,双方根据《合同·法》、《建筑·法》及相关法律、法规经协商达成以下协议条款:一工程概况工程名称:工程地点:工程内容:二工程承包范围承包范围:三、合同工期1工程施工日期20XX年XX月XX日机械进场。
桩基础工程合同7篇

桩基础工程合同7篇(经典版)编制人:__________________审核人:__________________审批人:__________________编制单位:__________________编制时间:____年____月____日序言下载提示:该文档是本店铺精心编制而成的,希望大家下载后,能够帮助大家解决实际问题。
文档下载后可定制修改,请根据实际需要进行调整和使用,谢谢!并且,本店铺为大家提供各种类型的经典范文,如总结报告、方案大全、心得体会、调查报告、合同协议、条据文书、策划方案、教学资料、作文大全、其他范文等等,想了解不同范文格式和写法,敬请关注!Download tips: This document is carefully compiled by this editor. I hope that after you download it, it can help you solve practical problems. The document can be customized and modified after downloading, please adjust and use it according to actual needs, thank you!Moreover, our store provides various types of classic sample essays, such as summary reports, comprehensive plans, insights, survey reports, contract agreements, documentary evidence, planning plans, teaching materials, comprehensive essays, and other sample essays. If you would like to learn about different sample formats and writing methods, please pay attention!桩基础工程合同7篇只有认真对待写合同这件事,我们的合法权益才会得到保障,合同的签订可以明确双方的权利和义务,从而减少因劳动关系不明确而引发的争议和纠纷,以下是本店铺精心为您推荐的桩基础工程合同7篇,供大家参考。
桩基础工程施工合同与桩基础施工合同范本6篇

桩基础工程施工合同与桩基础施工合同范本6篇篇1桩基础工程施工合同甲方(建设单位):XXXX有限公司乙方(施工单位):XXXX建筑公司根据《中华人民共和国合同法》及相关法律法规,为明确双方在桩基础工程施工过程中的权利和义务,经双方协商一致,签订本合同。
一、工程概况1. 工程名称:XXXX桩基础工程2. 工程地点:XXXX3. 承包范围:本合同段内的桩基础施工4. 承包方式:包工包料二、合同工期1. 开工日期:XXXX年XX月XX日2. 竣工日期:XXXX年XX月XX日3. 合同工期:XX天三、质量标准1. 工程质量标准:符合国家及行业相关质量标准。
2. 验收标准:按照设计图纸及甲方要求进行验收。
四、合同价款与支付方式1. 合同总价款:人民币XXXX元(大写:XXXX)。
2. 支付方式:- 预付款:合同签订后,甲方支付合同总价款的XX%作为预付款。
- 中期款:乙方完成工程量达XX%时,甲方支付合同总价款的XX%。
- 竣工款:乙方完成全部工程量并经甲方验收合格后,甲方支付合同总价款的XX%。
- 质保金:甲方留存合同总价款的XX%作为质保金,保修期满后支付。
3. 税金:乙方提供相应金额的合法发票,甲方负责办理结算手续。
五、双方权利与义务1. 甲方权利与义务:- 提供施工图纸及相关技术资料。
- 负责协调现场施工及与其他单位的配合工作。
- 按合同约定支付工程款。
2. 乙方权利与义务:- 按照设计图纸及甲方要求进行施工。
- 确保施工质量及工期。
- 负责提供施工过程中的相关技术资料。
- 负责保修期内的维修工作。
六、违约责任1. 甲方违约责任:- 未按时支付工程款,乙方有权停工,并由甲方承担违约责任。
2. 乙方违约责任:- 未按时完成工程量,每逾期一天,乙方需支付违约金合同总价款的XX%。
- 施工质量不符合设计要求,乙方需负责返工,并承担相应费用。
- 保修期内未及时维修,乙方需承担相应责任。
七、争议解决本合同在履行过程中如发生争议,双方应首先通过友好协商解决;协商不成的,任何一方均可向甲方所在地有管辖权的人民法院提起诉讼。
桩基工程施工合同范本6篇

桩基工程施工合同范本6篇桩基工程施工合同范本1甲方: (以下简称甲方)乙方: (以下简称乙方)根据《中华人民共和国合同法》和《中华人民共和国建筑法》,结合本工程具体情况,经双方洽商,达成如下合同条款:第一条工程概况1.1工程名称:1.2工程地点:1.3工程内容:桩基施工所用的大型机械的进出场及安装拆卸、桩孔定位放线、破桩头、放点、材料常规试验、桩体浇筑,技术资料整编。
1.4合同单价:1.4.1 CFG桩综合承包包死价(含税3,工程量计算依据施工图纸,即图纸设计根数、图纸设计有效桩长+虚桩长、设计桩径计算混凝土方量。
1.4.2. 由于图纸变更引起的工作量变化,由现场确认并即刻进行签证。
第二条付款方式2.1本工程无预付款2.2桩基工程形象进度完成50%后,支付工程款的20%;桩基完工后,支付工程款的50%;工程检测合格并资料递交甲方后,支付工程款的25%,剩余5%的工程款作为质保金,待主体工程完工后的三个月内付清。
本合同税金采用代扣代缴形式,税率为:3.47%;第三条合同工期3.1计划开工日期:本工程计划以进入现场的日期为开工日期。
3.2本工程工期为:试桩施工天完成,试桩检测完毕后,工程桩程内容。
该工期不含桩基砼凝固期和分次桩基检测期;在工程桩完成后天内完成。
若由于乙方原因导致工期拖延,每拖延一天,乙方应向甲方支付元作为违约金。
3.3本工程上述的施工工期,在实际施工中如遇设计变更增加工作量及不可抗拒力因素影响正常施工时,经甲方确认书面后工期应予以顺延、签证。
3.4本工程结束后三十五天内,乙方向甲方提交工程竣工报告书一式伍份。
第四条材料供应工程所需商品砼均由甲方组织采供,其余与工程相关的内容均由乙方负责。
第五条质量标准乙方施工中应严格按照国家颁发的施工验收规范及工程设计图纸要求进行施工,工程质量经检测应达到合格标准。
乙方保证桩基本身的完整性、内在质量良好、砼强度达标、桩基检测合格。
第六条双方责任事项6.1甲方负责将水、电源引至现场附近,并应满足施工要求;在施工中乙方负责将水、电源引入施工基坑内,并按规定架设线缆、安置配电柜,保证施工安全;施工中所用水、电费均由甲方承担。
- 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
- 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
- 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。
桩基合作合同范本(汇总16篇)(经典版)编制人:__________________审核人:__________________审批人:__________________编制单位:__________________编制时间:____年____月____日序言下载提示:该文档是本店铺精心编制而成的,希望大家下载后,能够帮助大家解决实际问题。
文档下载后可定制修改,请根据实际需要进行调整和使用,谢谢!并且,本店铺为大家提供各种类型的经典范文,如工作总结、工作计划、合同协议、条据书信、讲话致辞、规章制度、策划方案、句子大全、教学资料、其他范文等等,想了解不同范文格式和写法,敬请关注!Download tips: This document is carefully compiled by this editor. I hope that after you download it, it can help you solve practical problems. The document can be customized and modified after downloading, please adjust and use it according to actual needs, thank you!Moreover, our store provides various types of classic sample texts for everyone, such as work summaries, work plans, contract agreements, document letters, speeches, rules and regulations, planning plans, sentence summaries, teaching materials, other sample texts, etc. If you want to learn about different sample formats and writing methods, please pay attention!桩基合作合同范本(汇总16篇)桩基合作合同范本第1篇1、甲方责任:A、会同工程所在地乡镇领导协调地方及周边关系;协调电力架设、水源、料场等,确保三通一平。
B、派驻监理对原材料工程进度工程质量进行监督监控。
C、负责向乙方进行技术交底。
D、负责按合同规定的期限及形式支付工程款。
E、监控乙方资金的使用。
2、乙方责任:A、必须服从甲方及监理人员的技术监督和质量管理。
B乙方委派XXX为项目负责人,XXX为技术负责人,负责现场管理工作。
乙方代表及时向甲方提出开工报告、施工进度计划、交竣工验收资料及按照监理人员的要求整理好必须的内业资料。
C、严格按照设计要求和技术标准要求自行筹措工程所需材料、劳力、机械,自行联络开工前必要的条件,并按照技术规范组织施工,确保工程质量,按合同规定的时间竣工和交付,争创优良工程。
D、保证现场整洁、有序,符合有关规定。
交工前清理现场达到有关规范的要求,承担违犯规定造成的损失。
E、确保项目的安全施工,要加强安全生产教育,杜绝一切事故的发生,出现材料设施工程质量或人身伤亡等安全事故,自行承担责任。
F、建立健全质量管理体系,内部实行自检、互检、专检制度,做好自检记录。
并接受甲方及监理人员的检查指导,对其提出的问题及时解决。
G、完善各种建筑材料的试验和实验规程,积极配合甲方及所派监理人员的实验工作;各分项工程开工前,必须向甲方及监理人员提交砂浆和砼配合比报告,各种实验费用由乙方承担。
H、负责工程成品的保护工作直至竣工验收前。
桩基合作合同范本第2篇1.乙方必须服从甲方的统一指挥、调配、指导及管理,遵守甲方现场的各项管理及规章制度,做到文明施工、安全施工。
2.乙方必须确保进场人员的技术素质,所有工种均持证上岗。
在施工责任期内,未经甲方许可,乙方不得随意更换施工队伍和人员,以保证该项目技术力量和施工队伍的稳定性。
3.乙方必须指定专职管理人员,负责安排施工、生产、人员调配、技术安全工程质量以及生活、计生等工作。
桩基合作合同范本第3篇1工程名称:广西____市桥工程2工程地点:广西阳____市3工程性质:总价承包4、承包工程范围及内容:桥长为38米,桥宽净16米,设计荷载公路Ⅱ级。
工程内容:净防撞栏杆,钢筋砼空心心板桥梁一座5工程造价:经双方商定,本承包合同全部工程造价为元。
6工程期限:根据双方商定,本合同全部工程自20XX年XX月XX 日开工至20XX年XX月XX日竣工,工期77个日历天,逾期完不成本工程,每拖延一天,扣工程款1000元。
桩基合作合同范本第4篇1甲方责任:______(1)负责工地现场的工程质量、安全生产工程进度、配料用料的指挥、监督与管理。
(2)负责安排乙方工作量及现场进度,审核完成工程量,申报预决算,申请拨付工程款。
(3)负责与业主、设计、监理等单位及部门进行工作联系并申报有关文件资料。
甲方(盖章)______法定代表人(签章)______乙方(签章)__________年_____月_____日发包方:(甲方)承建方:(乙方)根据《XXX民法·典》及国家有关法规规定,结合本工程的具体情况,为明确责任,协作配合,确保工程质量、加快工程进度、提高工作效率,经双方协商,达成如下协议,并签订本协议以共同遵守执行。
桩基合作合同范本第5篇1、合同的内容及解释顺序:本合同以下的各个文件应认为是一个整体,彼此应能够相互解释,相互补充,如出现含糊不清或相互矛盾的情况时,以下列次序在先者为准。
(1)合同协议书及附件(含合同谈判中澄清文件)。
(2)中标通知书。
(3)投标书及其附录(含承包人在投标期间递交和确定并经业主同意对有关问题的补充资料和澄清文件等)(4)专用条款(含数据表和招标文件补遗书中与此有关的部分) (5)合同通用条款。
(6)技术规范。
(7)图纸。
(8)标书的工程量清单。
(9)招标书附表(辅助资料表)。
(10)构成本合同组成部分的其他文件。
2、在施工过程中或竣工后,甲乙双方关于合同或起因于合同的纠纷,首先由甲乙双方协商解决,协商不成时由仲裁委·员会予以调解,调解不成时,任何一方均可向法院起诉。
桩基合作合同范本第6篇(一)发包方的权利和义务甲方:部乙方:甲方因工作需要,将厦门现代物流园区5000吨级杂货码头工程水上打砂桩工程分包给乙方施工,为了明确甲乙双方的权利和义务,充分履行各自的职责,经双方充分协商,制订如下合同条款:1、施工地点厦门高崎厦门大桥附近。
2工程数量和施工方式、内容工程数量:水上打砂桩按图纸设计数量预估为71605米。
以最终实际工程数量为准,但不得多于现场工程师确认批复的工程数量。
主要工作内容为水上打砂桩,砂桩直径米,间隔米,正方形布置,水上施打。
所用的中粗砂粒径~㎜的含量大于85%,含泥量≤3%。
乙方自行负责水上打砂桩施工的海事局有关船舶的一切手续办理、打砂桩、材料(砂等)装载、运输、船机设备及人员进退场、临时设施、人员办公等相关费用。
3、分包方式及分包单价分包方式采取包工包料,项目单价承包的方式,承包单价包括工程内容所列项目的全部费用。
分包综合单价水上打砂桩:_____元∕m说明:以上单价均为综合单价,已包括材料、机械、设备、船舶、船舶使用许可证等相关费用、水电、人员的所有费用以及自身应缴纳的税金、地方关系、物价上涨、防洪防台措施费、政府有关规费及其它风险等相关费用。
如需要乙方提供税务转移有关材料时,乙方必须提供。
如甲方代扣税,甲方需向乙方提供已纳税证明。
4、计量与支付每期计量的项目必须是经甲方验收合格的合同工程项目,然后按该项目合格数量进行计量。
其它因施工工艺需要或非甲方原因造成而产生的工程数量不计。
工程预付款:没有工程预付款。
付款方式:为银行转帐,乙方将银行帐号附后。
付款原则和付款计算方法工程进度款A工程进度款实行每月结算一期,按照每一计算期经甲方验收合格的工程项目及数量(其工程数量按照甲乙双方的合同规定计算)计算。
B、每期工程进度款的支付:甲方分管技术员提交每期经甲方验收合格的工程进度数量,经工务审核后送合约部。
由合约部填写《工程任务结算单》,并经有关部门和领导签字确认后凭发票到甲方财务部门办理有关支付手续。
每期进度款支付时,按每期结算总额的85%再扣除应扣的相关费用后的金额付款。
工程竣工结算:在工程全部完成,移交有关竣工资料后,工程进度款支付至90%。
水上打砂桩完成后经验收合格方可办理竣工结算,在办理竣工结算后六个月内由甲方支付给乙方工程余款,余款支付不计利息。
设计变更引起的变化工程数量则按现场工程师确认批复的工程数量计算,其单价不变。
设计变更增加项目由双方协商签订补充协议或甲方通知乙方后再施工,补充协议是本合同的补充,本合同条款对补充合同的工程项目具有同等约束效力。
5.甲方责任:甲方负责办理与监理及业主的一切业务往来。
甲方按本合同条款向乙方支付工程款。
甲方派人员协助乙方现场施工及测量放样。
6乙方责任乙方已对现场和周围环境以及与之有关的承包价进行认真核查。
乙方在开工前应编写详细的施工方案报送甲方,甲方经报业主和监理审批后实施。
并应严格遵守并执行甲方和监理工程师实施的工作指令。
乙方施工项目应符合设计及施工规范要求,自行负责协调周边村庄及运输海域的地方关系,并承担由此产生的所有费用。
乙方应在甲方的指导下做好现场文明施工工作。
乙方必须做好施工现场的环境保护工作,杜绝一切环境污染,若因乙方施工污染造成的一切损失由乙方承担。
乙方作业船只未经甲方同意不得擅自离开工地现场。
7、工期、进度、质量、安全:本合同工程工期工期:60天;开工日期:2006年 9 月 28 日;竣工日期:2006年 11 月 27 日;乙方的施工机械必须于2006年 9 月 26 日前到达本工地现场,并按甲方的要求开工。
乙方施工工期每超一天工期罚款5000元。
遇台风、特大洪水等不可抗力自然灾害的情况工期顺延(按监理业主确认的延长工期)。
进度方面:甲方按工程总进度计划要求向乙方下达周、月进度计划,乙方必须无条件执行。
若乙方因自己原因连续两周,未能完成周计划或未完成月度计划,甲方有权采取必要措施,包括按总承包价的1%进行罚款,收回部分或全部工程量(一旦收回全部工程量,则甲方有权拒付乙方所有的工程款),以维护甲方的整体利益,由此所造成的一切不良后果和经济损失由乙方负责。
质量要求:乙方所施工的工程项目必须达到设计图纸和有关规范要求,砂桩施工及质量检验按照《港口工程地基规范》(JTJ250-9(8)《建筑地基处理技术规范》(JGJ79-200(2)中的相关规定执行。