露天开采的工艺流程英文回答:Surface mining, also known as open-pit mining or opencast mining, is a method of extracting minerals or other geological materials from the Earth's surface. It involves the removal of overlying rock or soil to access the desired resource.The process of surface mining typically begins with the identification of a suitable site for extraction. This involves geological surveys and analysis to determine the presence and quality of the mineral deposits. Once a suitable site is identified, the next step is to plan and design the mine layout.The first step in the actual mining process is the clearing and stripping of vegetation, topsoil, and overburden (the layer of rock or soil overlying the mineral deposit). This is usually done using heavy machinery suchas bulldozers and excavators. The removed material iseither stockpiled for future use or used to reshape the landscape after mining is completed.After the overburden is removed, the mining equipmentis brought in to extract the mineral ore. This typically involves drilling and blasting to break up the rock and loosen the ore. Excavators or draglines are then used to remove the ore from the ground and load it onto trucks or conveyor belts for transportation to the processing plant.Once the ore is transported to the processing plant, it undergoes various processes to extract the desired minerals. These processes can include crushing, grinding, and separating the ore from waste materials. The extracted minerals are then further processed to obtain the final product.One example of a surface mining operation is the extraction of coal. In this case, the overburden is removed to expose the coal seam. The coal is then extracted using excavators or draglines and transported to a processingplant where it is crushed and washed to remove impurities. The final product is then shipped to customers for use in power generation or other applications.中文回答:露天开采,又称露天矿业或露天采矿,是一种从地表提取矿物或其他地质材料的方法。
露天矿开采工艺(最新版)

( 安全技术 )单位:_________________________姓名:_________________________日期:_________________________精品文档 / Word文档 / 文字可改露天矿开采工艺(最新版)Technical safety means that the pursuit of technology should also include ensuring that peoplemake mistakes露天矿开采工艺(最新版)露天矿开采由剥岩、采矿和掘沟三个环节组成,其主要生产工艺程序:穿孔、爆破、矿(岩)的铲装、矿岩的运输及岩石的排卸。
露天开采工艺流程如图4-6所示。
一、穿孔作业及安全要求穿孔作业是露天矿开采的首道工序,其目的是为爆破工作提供装放炸药的孔穴。
穿孔质量的好坏,直接关系到其后的爆破、采装、破碎等工作的效率。
我国露天矿山常用的穿孔凿岩设备按穿孔深度分为浅孔凿岩机和深孔凿岩机。
浅孔凿岩设备主要有凿岩机和凿岩台车。
深孔凿岩机主要有牙轮钻机和潜孔钻机。
1.凿岩机械凿岩机按其动力可分为四种类型,即风动、电动、内燃和液压;按重量分为轻型、中型、重型三种;按工作方式分为手持式、气腿式和柱架导轨式三种。
露天矿山使用的穿孔设备,主要有:(1)牙轮钻机。
(2)潜孔钻机。
(3)火钻。
(4)凿岩台车。
(5)钢丝绳冲击钻机。
2.凿岩机的技术性能(1)牙轮钻机牙轮钻机是我国大型露天矿山广泛使用的一种高效率的穿孔设备。
按穿孔尺寸计算,牙轮钻机穿孔的速度一般为4000~6000m/月,最高可达10000m/月以上;若按台年穿爆量计算,一般为400万~600万t,最高可达1200万一1400万t,是钢丝绳冲击钻机的4~5倍。
牙轮钻机的钻孔速度比潜孔钻机约高40%~100%。
从经济效果衡量,牙轮钻机穿孔的成本也最低,大约为钢丝绳冲击钻机的75%,为潜孔钻机的70%。
开采设计方案

开采设计方案背景采矿业是我国的传统行业,也是现在不可或缺的能源资源产业,随着科技的不断进步和人们对环境保护的日益重视,采矿行业的开采方式也在不断演进和更新。
本文将探讨在不同场景下的开采设计方案。
场景一:露天矿山露天矿山是我国开采铜、铁、煤等矿物的主要场所。
目前,对于露天矿山的开采方式,市面上常见的有两种:平面开采和逐层开采。
假设现有一座面积为100万平方米的铜矿山需要采取开采措施,接下来将介绍两种开采方式及其方案设计。
平面开采平面开采是指以矿体的平面形象作为采矿面,对矿山进行整个剖面的开采,适用于矿床较平坦、矿体连续、开采面较大的矿山。
对于面积较大的铜矿山,平面开采是一种比较常用且有效的方式。
其具体开采流程为:1.按照矿山的平面形状确定下巷和采面位置。
2.根据采面的大小和密度确定采掘的工作台方位和倾角,修建工作台。
3.采掘一定深度后将矿物运出。
平面开采的方案优点在于开采过程简单,人工投入较少,适合对于人力、财力有限的中小型企业。
但其缺点是占地面积较大,对于地质环境要求较高。
逐层开采逐层开采是指将较高的开采位置向下挖掉一层后,按照规定坡度或倾角进行掘进,将掘进的矿层储备挖空,再向下一层开采,适用于矿床较深、断层较多、地面地形比较险峻的地区。
对于铜矿山而言,其地形较为复杂,使用逐层开采能更好的适应地质环境。
其具体开采流程为:1.设计出采矿的倾角和延长段长短,并设计出采用的地面支护方法和采矿装备。
2.将开采场地划分为若干个工作面,按照一定规律进行开采。
3.挖空工作面矿层储备,运输至破碎站进行处理,再送往选别厂进行选矿处理。
逐层开采的方案优点在于灵活性高,能够适应各种地形环境,并避免出现矿物浪费等情况。
但其缺点是过程复杂,人工投入和成本较高。
场景二:井下开采相比露天矿山,井下开采的环境更为封闭和复杂,因此需要更加详细的设计方案来适应环境。
本文以煤矿为例,介绍井下开采的设计方案。
煤矿井下采煤法煤矿采煤分为井下采煤和露天采煤两种方式,其中,井下采煤法是指以长墙工作面方式采煤,并结合支护、排风和机电等技术措施,在严苛环境下进行煤炭生产。
露天采矿常用英语词汇中英对照

露天采矿常用英语词汇中英对照文件管理序列号:[K8UY-K9IO69-O6M243-OL889-F88688]露天采矿词汇中英对照安息角 angle of rest 半连续工艺 semi-continuous mining systerm爆堆 blasted stockpile 爆破 blasting 泵房 pump room边帮安全系数 slope safety 变电所 substation 标高elevation表土 surface soil 剥采比 stripping ratio 剥离量 overburden采矿方法 mining method 测绘 survey 层理 bedding 成本 cost车铲比 ratio of trucks 控制爆破 controlled blasting车流密度 density of trucks 穿爆参数 parameter of drilling and blasting初步设计 preliminary design 大块率 rate of agglomcrate大型轮斗挖掘机 large size bucket wheel excavator 断层 fault单斗挖掘机 single-bucker excavator;dipper 导爆管 detonatecap倒堆工艺 overcasting system 等高线 isohypsometric line劳保用品 man-safety 故障 fault;trouble 产量output;production地面生产系统 surface production system 电缆 cable 顶板 roof 端帮 end wall 放炮 shot;blast 服务年限 life time;service time工作帮坡角 angle of working slope 构造 structure;formation褐煤 brown coal 滑坡 slope sliding 机修厂 repairing plant 夹矸 interburden;band 道路质量 quality of road 雷管detonator间断工艺 discontinuous minig system 胶带运输机 belt conveyer 进度计划 schedule 开采境界 mining limits 可采储量 recoverable 孔网参数 parameters of drill hole network 矿区 mining area连续工艺 continuous mining system 露天开采 surface mining 露天矿开采储量 workable surface mine reserves 露头 outcrop履带车 crawler 轮斗挖掘机 bucket wheel excavator明沟排水 open ditch 露天矿设计 surface mine design排土场 pumping area 疏干 dewatering;drainage 洒水 waterspray内排土场 internal dump 排土台阶高度 dumping bench height排水沟 barrel-drain;gutter 平均剥采比 average stripping ratio 平盘宽度 width of bench 平装车 level loading 起爆detonating破碎机 crusher 贫化率 dilution rate 生产能力 production rate欠车 short of car 前装机 front end loader 倾角 dip angle倾斜矿床 dipping ore bed 清理底板 floor cleaning上装车 higher [level]loading 设备效率 equipment efficiency设计任务书 design specification 受料臂 receiving arm 破碎crushing水平推进速度 advancing rate of working face 台阶 bench;level松动爆破 loosening blasting 推进 advance 推土机 dozer松散系数 factor of loose 台阶平盘 bench face 瓦斯 gas台阶坡面角 slope angle of bench 通勤车辆 commuter bus 挖掘机 trencher 外部沟 external ramp 维修保养 maintain外排土场 external dump 位移 displacement 卸载 dumping位置 place;position 下挖深度 depth of lower digging延伸方向 deepening direction 岩石力学 mechanics运输 transport 运输平盘 haulage berm 钻孔 drill hole液压系统 hydra-system 涌水量 water-inflow 炸药 explosive 栈桥 gantry 职业病 industrial 最小抵抗线 minimum burden自卸载重卡车 self-dumping truck 装载设备 loading equipment纵采 digging along strike 最终边帮 final pit slope作业方式 operation pattern 坐标 coordinate 重载 heavy load最小平盘宽度 minimum width of working bench 走向 strike。
露天采矿的工艺流程

露天采矿的工艺流程英文回答:The process of open-pit mining involves several stepsto extract minerals or ores from the earth's surface. Iwill explain the process in detail below.1. Exploration: The first step in open-pit mining is to identify the potential mining site. Geologists and mining engineers conduct surveys and tests to determine the presence and quantity of minerals. This may involvedrilling core samples, analyzing rock formations, and using remote sensing techniques.2. Planning and Permitting: Once a potential miningsite is identified, the next step is to obtain the necessary permits and approvals from regulatory authorities. This involves submitting detailed plans and environmental impact assessments to ensure compliance with safety and environmental regulations.3. Clearing and Stripping: Before mining can begin, the vegetation and topsoil covering the mining area need to be removed. This is done using heavy machinery such as bulldozers and excavators. The removed topsoil is usually stored separately for reclamation purposes after mining is completed.4. Drilling and Blasting: Once the mining area is cleared, holes are drilled into the ground for the placement of explosives. The explosives are then detonated to break up the rock and create a pathway for extraction. This step is crucial in loosening the ore or mineral from the surrounding rock.5. Loading and Hauling: After the blasting, the broken rock or ore is loaded onto large trucks using shovels, loaders, or excavators. These trucks then transport the material to a processing plant or stockpile for further processing.6. Crushing and Grinding: At the processing plant, therock or ore is crushed into smaller pieces to facilitate further processing. This is usually done using crushers and mills. The crushed material is then ground into a fine powder to extract the desired minerals or metals.7. Separation and Concentration: Various techniquessuch as gravity separation, flotation, and magnetic separation are employed to separate the valuable minerals from the waste rock. This step helps in concentrating the desired minerals for further processing.8. Smelting and Refining: Once the desired minerals are separated, they are further processed through smelting and refining processes to obtain the final product. Smelting involves heating the minerals to high temperatures toextract metals, while refining involves purifying themetals to remove impurities.9. Reclamation: After the mining operation is completed, the mining site needs to be restored to its original state. This involves backfilling the pit, regrading the land, andre-vegetating the area. Reclamation aims to minimize theenvironmental impact of mining and restore the land for future use.中文回答:露天采矿的工艺流程涉及几个步骤,以从地表提取矿物或矿石。
露天开采课程设计完美版

学生班级:学生姓名:学号:设计名称:露天矿山开采课程设计起止日期:2011年11月21日至12月11日指导老师:学生班级:学生姓名:课程老师评语表西南科技大学课程设计学生日志第3页目录1.1确定露天开采境界的原则和因素 (5)1.1.1露天开采境界确定的原则 (5)1.1.2影响露天开采境界的主要因素 (6)1.2露天开采境界主要参数的确定 (6)1.2.3开采深度的确定 (6)1.2.2最小底宽 (6)1.2.3露天矿台阶要素与最终边坡角验算 (7)1.2.4绘制露天矿底部周界 (7)1.2.6绘制露天矿开采终了平面图 (7)2、露天开拓方法设计 (8)2.1矿床露天开拓的影响因素 (8)2.2矿床开拓方案的确定 (8)2.2.1选择开拓方案的原则 (8)2.2.2 矿床开拓方案的确定 (8)2.3.1出入沟的布置 (8)3、露天矿主要开采工艺设计 (9)3.1穿孔工作 (9)3.1.1穿孔设备选择 (9)3.1.2穿孔设备数量计算 (9)3.2爆破工作 (10)3.2.1爆破材料 (11)3.2.2爆破方法选择 (11)3.2.3钻孔形式和布孔方式 (11)3.2.4爆破参数的确定 (11)3.2.5装药、填塞、起爆方法 (13)3.2.6爆破网路设计 (14)3.2.7一次爆破量的确定 (15)3.3采装工作 (15)3.3.1 电铲及运输设备类型的选择 (15)3.3.2挖掘机数量确定 (16)3.4采装工作面参数及工作平盘的配线方式 (17)3.4.1台阶高度 (17)3.4.2采区长度 (17)3.4.3采掘带宽度bc (17)3.4.4最小工作平盘宽度及工作平盘宽度 (17)3.4.5平盘配线方式 (18)参考文献 (18)1、露天开采境界的确定1.1确定露天开采境界的原则和因素1.1.1露天开采境界确定的原则露天开采境界确定的原则有以下几点:(1).圈定的露天开采境界要保证露天采场内采出的矿石有盈利,即采用的境界剥采比不大于经济合理剥采比;(2).要充分利用资源,尽可能把较多的矿石圈定在露天开采境界内,发挥露天开采的优越性;(3).所圈定的露天采矿场的帮坡应等于露天边坡稳定所允许的角度,以保证露天采矿场的安全生产;(4).用经济合理剥采比圈定的露天开采范围很大,服务年限太长时,应按矿山一般服务年限确定初期露天开采的深度;(5).下列情况可适当扩大露天开采境界:按境界剥采比不大于经济合理剥采比圈定露天开采境界后,境界外余下的工业矿量不多,经济上不宜再用地下开采;矿石和围岩稳固性差,水文地质条件复杂,水量大,矿石和围岩有自燃危险等,在安全上和技术上不适合于地下开采;(6).下列情况可适当缩小露天开采境界开采境界边缘附近有重要建筑物、构筑物、河流和铁路干线等需要保护或难于迁移至露天采场影响范围之外;(7).当矿体极不规则,沿倾向厚度变化大,矿体上部覆盖层较厚或地形复杂(如境界内有孤立山头等)时,用境界剥采比不大于经济合理剥采比初步确定境界后,再用平均剥采比进行校核;(8).如果基建剥离量大,初期生产剥采比大,则需进行综合技术经济比较,以确定用露天或地下开采;(9).对于特厚的剥采比很小的矿床,有时要根据勘探程度及服务年限确定露天开采境界,而不应该按境界剥采比确定开采境界。
露天采矿工程设计

露天采矿工程设计露天采矿工程设计 (surface mining engineering design)从地表采矿场剥离土岩(废石)采出有用矿物(矿石)的采矿工程设计。
与地下开采相比,露天开采具有资源利用充分、、贫化率低、建设速度快、经济效益好、产量大、劳动条件好、生产安全等优点。
但露天开采剥离量较大,一般为采几倍到十几倍。
随着露天采矿技术的发展,开采深度越来越深,世界最深的美国宾厄姆(Bing han)露天矿采深达800年采出矿岩15721万t,其中矿石3540万t。
中国在20世纪60年代以后相继设计并建设了南芬铁矿、白银厂铜矿铁矿、大冶铁矿、德兴铜矿等露天矿。
设计规模从年采剥矿岩几百万吨到上亿吨,其中矿石2970万t(德兴铜矿);0m到690m(德兴铜矿)。
按产量计,80年代露天开采,铁矿已达90%,有色金属矿约占50%。
冶金辅助原料如菱镁石、白云石、硅石等几乎全部采用露天开采。
露天采矿工艺露天采矿通常采用的方法有;机械法开采、水力开采和采砂船开采。
机械法开采利用电、油料动机械设备进行凿岩、爆破、装载和运输。
中国和世界其他各国绝大多数露天矿均采用机械法开采。
机械法开采能够采、装、运设备,机械化自动化水平高,开采强度大,矿石损失、贫化小,广泛用于开采各种规模、类型的有用矿物机械法开采主要设计范围为:露天矿开采境界设计、露天矿边坡设计、露天矿设计规模确定、露天矿开拓、露天矿采剥方法设计、露天矿硐室爆破设计、露天矿剥离物排弃设计和露天矿水力开采设计等。
(1)露天矿开采境界设计。
由露天矿采场底面,四周边帮和地表平面所限定的可采空间工程设计,是露天采矿工程设成部分。
它关系到矿产资源充分合理利用,影响着矿山生产能力、服务年限、开拓运输方式及矿山经济效益等。
(2)露天矿边坡设计。
根据边坡岩体的工程地质、水文地质和采矿工艺要求,进行安全、经济的边坡设计。
露天矿边,稳定性差、易滑坡,危及人员和设备的安全;过缓则增加剥离量,降低矿山经济效益。
露天矿开采方案比选(模板)

露天煤矿开采方案露天煤矿通常有四种开采工艺,即:单斗—卡车间断开采工艺,轮斗—带式输送机—排土机连续开采工艺、单斗—卡车+破碎站+带式输送机+排土机半连续开采工艺和拉斗铲倒堆开采工艺。
1、轮斗—带式输送机—排土机连续开采工艺轮斗挖掘机对剥离物强度及工作空间要求较高,一般用于剥离厚度较大的第四系松软表土,剥离物抗压强度一般不大于6Mpa。
根据煤矿煤层的覆盖层条件,煤矿不适合采用轮斗—带式输送机—排土机连续开采工艺。
2、拉斗铲倒堆开采工艺拉斗铲倒堆开采工艺适用于近水平或者缓倾斜煤层开采,煤矿煤层倾角较大,开采降深速度较快,剥离物内排条件较差。
结合拉斗铲开采工艺需要具备良好内排条件的技术要求,煤矿明显不适合采用拉斗铲倒堆开采工艺。
3、半连续开采工艺在半连续开采工艺中根据破碎站型式可分为两种:单斗—卡车—半移动式破碎站—带式输送机半连续开采工艺;单斗—自移式破碎机—带式输送机半连续开采工艺。
此两种开采工艺在排土环节均需采用排土机进行排土。
单斗—自移式破碎机—带式输送机半连续开采工艺不宜用于煤矿,其主要原因如下:本开采工艺系统不仅线性参数要求严格,而且对作业空间要求严格。
煤矿为倾斜煤层,降深速度较快,带式输送机移设频繁,无法发挥工艺特点。
本设计不予推荐。
煤矿可采用单斗—卡车—半移动式破碎站—带式输送机半连续开采工艺较,将半移动破碎站至于非工作帮台阶上,利用带式输送机代替汽车运输,成本大大降低。
4、单斗—卡车开采工艺该工艺在我国已有多年的应用实践,其特点如下:(1)拉沟长度短,基建工程量少,建设速度快;(2)工作线长度较短,初期生产剥采比小,初期经济效益好;(3)卡车爬坡能力大,一般可达8%,机动灵活;(4)基本不受岩性影响,适宜各类岩性的矿山地质条件;(5)对气候的适应能力强,适宜冬季长、寒冷的恶劣条件,但是雨季多对汽车运输不利;(5)耗油量大、修理费用多、生产成本偏高。
5、综上所述,依据开采工艺选择的原则并结合煤矿具体条件,可选用的开采工艺如下:(1)单斗—卡车开采工艺;(2)单斗—卡车—半移动破碎站—带式输送机半连续开采工艺。
- 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
- 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
- 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。
Advantages 优势
1. Professional Mining and Coal Preparation Engineering Company (专业 的采、选工程公司) 2. Wide diversity of experience both in design and operation
Belt conveyor towards to spoibank
(通往排土场的胶带运输机)
Working Dumping plough (排土机排土)
Working Dumping plough
(排土机排土)
Dumping arm
(排土臂)
Advatege Vs Disadvantage Continues mining process technology (连 续 开 采 工 艺 的 优 缺 点 )
About HOT Mining 浩特矿业技术简介
HOT Mining provides integrated engineering solutions to coal and minerals.
Our services include underground mining, open cut mining, mineral processing and materials handling. We provide engineering, equipment, project delivery and operations services for coal, iron ore, copper, gold, zinc, silver and other base metals.
3. Semi-continuous mining technology(半连续开采工艺)
Electric shovel—Track-Crusher– Conveyor【电铲—卡车—半移动(固定)破碎站—胶带】
Electric shovel—Crusher– Conveyor(电铲—自移式破碎机——胶带)
Our clients are Anglo Gold Ashanti, Worley Pasons, China Shenhua, Caledon (Xstrata Coal – GRAM China) etc. 客户包括: 中国神华、英美黄金、沃利派森、澳大利亚卡利登煤业(嘉能可-超达煤业为前股东,后由中国广晟收购)。
浩特简介 About HOT
HOT’s engineers have delivered over 60 coal mines and coal washing plant, as well as mineral processing plants. 联合体拥有超过60个煤矿开采及大型煤炭清洁加工项目(选煤厂)的设计、建设及项目交付经验, 以及一些金属选矿项目。
4. Skip the shovel technology(吊斗铲工艺)
1. Continuous mining technology 连续开采工艺
Main equipment of Continuous mining technology (连续开采工艺主要包括以下设备)
1、 Wheel bucket mining system(轮斗采掘系统) 2、 Belt conveyor(胶带运输机) 3、 Reprint machine, Distribution station(转载机、 分流站)
创新项目设计: (降低投资) (增加效率) (减少运行成本) (最严格的健康、安全、环保标准)
4. Experts in complex mining condition (复杂采矿条件工程设计专家) 5. Our Special Intelligent System help our clients to achieve better profit and easier operation management.
Major Open mining Methods - Brief
露天矿开采工艺简介
Main Open pit mining process
露天矿开采工艺主要有以下几种:
1. Continuous mining technology: wheel and bucket ditch dredger--Conveyor (连续开采工艺:轮斗——胶带) 2. Discontinuous mining technology: electric shovel— Track (间断开采工艺:电铲——卡车)
业务板块 Four Major Business - 1
Open Cut Mining
业务板块 Four Major Business - 2
Underground Mining
业务板块 Four Major Business - 3
Process
Coal Washing Plant Screening & Crushing Sands Washing Slime Drying System
Advantage(优点) 1.High degree of automation, high efficiency, strong mining, suitable for the production of large open-pit mine(自动化程度高、生产效率高、开采强度 大,适合于生产规模大的露天矿) 2.Low equipment operation cost. (采运排设备运营 费用较低,成本较低) 3. Electric take place of oil. Tracks can be cut. Not restriction by the oil source and the price.(以电代油 ,可不使用卡车,不受油源和油价的制约.)
HOT has already established branch or office in India, Chile, and Mongolia. And we’re planing To set up an office in Brisbane in 2014. 浩特在印度、智利、蒙古国等主要矿业国家与当地知名服务商建立了办事处或分公司, 并正在筹建布里斯班办公室,预计与2014年成立浩特澳洲公司。
联合体致力于提供世界领先的
煤矿及非煤矿山的采、选服务,服务范围包括从开采到选矿的整套工程技术服务。 HOT Mining is leading in 3D engineering and intelligent operation in coal mining and preparation.
We’re The first company who developed 3D engineering methods successfully in China. There are only 3 companies can provide the cloud-computing based intelligent operation system For CHPP worldwide. HOT is one of them. Based on HOT’s technology, JV can provide first class engineering which is accepted worldwide. 浩特是业内 三维工程和智能运营系统的领导者,在中国最早开发出用于采、选的三维工程设计方法; 世界范围内,仅有3家公司可以提供 基于云计算架构的选矿智能化系统,浩特是其中之一。
4、 Dumping plough(排土机)
Wheel bucket mining system
(轮斗采掘系统)
Material transfer
(物料转载)
Belt conveyor
(胶带输送机)
Distribution station (集中分流站)
Distribution station (集中分流站)
(丰富的设计和运行经验)
3. Innovative project designs • Reduced capital costs • Improved efficiency • Reduced Operating Costs • Highly HSE (Health, Safety, Environment)
DESIGN
3D ENGINEERING 三维工程设计
3D Concept Design
3D Structural Design
3D Detialed Design
DESIGN
3D ENGINEERING 三维工程设计
3D Pit Limits Design
3D Engineering for Open Pit
Open Coal Mining Technology 露天煤矿开采技术
HOT Mining Technology 浩特矿业 成员企业
联系人: 杨 彪 露采工程师
Contact, bryan Yang, Engineer – Open Pit
Email: hhuang@ Web:
业务板块 Four Major Business - 4
Materials Handling
Tube Pipe Conveyor Express Load-Out Station
Scope Our Open Mining Services 露采技术服务
• Engineering studies (from scoping to feasibility) • Mining context definition and mining methods selection • Detailed engineering design (mining, materials handling) • Development and production scheduling • Equipment supply and manpower requirements • Operating cost benchmarking and cost modeling • Open pit to underground transition analysis • Kinds of controlling and monitoring system • Risk analysis and safety management • Operational review and assistance