预算员年度述职报告

合集下载

关于预算员述职报告怎么写(三篇)

关于预算员述职报告怎么写(三篇)

关于预算员述职报告怎么写(三篇)(经典版)编制人:__________________审核人:__________________审批人:__________________编制单位:__________________编制时间:____年____月____日序言下载提示:该文档是本店铺精心编制而成的,希望大家下载后,能够帮助大家解决实际问题。

文档下载后可定制修改,请根据实际需要进行调整和使用,谢谢!并且,本店铺为大家提供各种类型的经典范文,如工作报告、合同协议、心得体会、演讲致辞、规章制度、岗位职责、操作规程、计划书、祝福语、其他范文等等,想了解不同范文格式和写法,敬请关注!Download tips: This document is carefully compiled by this editor. I hope that after you download it, it can help you solve practical problems. The document can be customized and modified after downloading, please adjust and use it according to actual needs, thank you!Moreover, our store provides various types of classic sample texts, such as work reports, contract agreements, insights, speeches, rules and regulations, job responsibilities, operating procedures, plans, blessings, and other sample texts. If you want to learn about different sample formats and writing methods, please pay attention!关于预算员述职报告怎么写(三篇)篇一关于预算员述职报告怎么写1000字一、作为一名预算员,我能按照公司的各项规章制度,按时按质地完成公司的各项预算及审核工作。

预算员年终工作述职报告(5篇材料)

预算员年终工作述职报告(5篇材料)

预算员年终工作述职报告(5篇材料)述职报告是任职者陈述自己任职情况,评议自己任职能力,接受上级领导考核和群众监督的一种应用文,具有汇报性、总结性和理论性的特点。

下面就让我带你去看看预算员年终工作述职报告范文5篇,希望能帮助到大家!预算员年终述职报告1____年即将过去,回顾一年来本人工作情况,现简述如下:一、作为一个项目部的预算员,我能按照公司及项目部的各项规章制度,按时按质地完成项目部的各项经营预算工作。

1、对内的工作情况。

按公司的规定要求,每月的月底统计当月的实际施工产值及成本分析情况。

及时参加成本分析会议,对项目部每月的盈亏情况作出分析报告,对于施工阶段的预算书以实际情况按每个楼层每个分项工程进行编制,并打印全部的工料分析,作为定额人工和定额材料下达给生产经理,在实际的施工过程中,根据现场的实际情况,对定额编制的工料含量的高低水平作出适当科学合理化的调整,该定额人工作为工程任务单进行人工的控制和分配的基础,定额材料作为仓库进行定额领料的依据。

平时在工作中总是积极地配合项目经理进行合同管理,参与一些分包合同的洽谈,根据公司的规定并结合项目部的实际情况,起草一些分包合同的草稿,分包合同签订后,对分包合同进行跟踪管理,每月初完成本项目部的上月的实际施工分配任务(包括分包方的粗分配),定额材料的统计,并向公司提交有关的报表,每月月底向公司提交下月的主要材料计划,预计下月的施工产值及各项的耗用成本,编制下月的成本保证措施。

在施工过程中,实行定额领料和成本跟踪控制,为项目部的成本控制提供一些合理化的……此处隐藏18279个字……加准确。

在核对预算工程量过程中,严格按照公司的规定和相应的规范要求,本着实事求是的原则,对所做的每一项工程量都进行仔细的对比及检查,发现问题及时解决,做到“二无”,一无重复算量,二无漏项漏量。

四、工作不足方面今年的工作虽然都能按要求完成,没有影响到其它科室的正常工作,但还是存在着不足。

预算员工作述职报告范文五篇

预算员工作述职报告范文五篇

预算员工作述职报告范文五篇尊敬的各位领导:我于20某某年3月加入某某某某某工作,至今已有某某某某之久,这段时间里在各位领导和同事的帮助下自身业务有了一定的提升,切身实践、学习了很多内容,回顾某某某以来的工作情况我将具体工作内容和自身不足陈述如下。

上场初期,我们在公司成本部领导的组织下,完成了项目前期成本测算工作,编制了项目前期策划书,并对项目在今后施工过程中的成本控制做了总体规划,找出了主要盈亏点、分析了主要盈亏原因,此项工作将会为后期施工成本过程控制奠定基础。

彻底转变了从前无目地施工、不把握重点,在关键环节上不注意成本的预测、控制、核算,使得问题延续而得不到有效解决的工作模式。

从个人执行力方面从前也存在一些不足,比如经常容易产生惰性思维,今后我将会把上级的命令和想法变成行动,把行动变成结果,从而保质保量完成任务,充分发挥主观能动性,摒弃从前战略不清晰、跟踪不及时的工作作风,做到有的放矢。

另外上场以来我们还分阶段学习了“改变工作作风,提高执行力、诚信教育、提高个人素质”四项内容,改变工作作风和提高执行力我已结合自身工作情况,叙述了一些我对以上两点的理解,下面就诚信教育、提高个人素质两方面,讲述一下我个人的见解和看法,首先诚信就是诚实、守信,是忠诚直言,言行一致,是表里如一,遵守诺言,不虚伪欺诈,“言必行,行必果”“一言既出,驷马难追”这些千古流传的古话,都形象的表达了中环民族的传统美德,其次诚信始终用感恩的心对待身边的每一个细节,是我们为人的基础,是我们品德优劣的衡量标准,也是是否受人尊重的基本准绳。

而在当今社会特别是对于我们这样接触面交复杂的施工单位,更要把诚信放在首要位臵,这样一些想要趁机钻空子、投机取巧的施工队伍就不会有机可乘。

以上为本人工作某某以来的工作总结,因时间较短有些问题可能比较片面,工作之中还存在的不足之处敬请各位领导、同事在今后的工作中多加指正。

____年即将过去,回顾一年来本人工作情况,现简述如下:一、作为一个项目部的预算员,我能按照公司及项目部的各项规章制度,按时按质地完成项目部的各项经营预算工作。

预算员年度述职报告

预算员年度述职报告

预算员年度述职报告预算员年度述职报告在日常生活和工作中,报告十分的重要,报告中涉及到专业性术语要解释清楚。

那么报告应该怎么写才合适呢?以下是小编帮大家整理的预算员年度述职报告,欢迎大家借鉴与参考,希望对大家有所帮助。

预算员年度述职报告1我在公司从事预算工作已6年有余。

所做工程项目数量也日益剧增,按使用定额分,使用过贵州省建筑定额、装饰装修装饰定额、市政工程定额、园林定额等。

按结构分有砖混结构、有框架结构、有框剪结构等。

按层数分有单层、多层、高层。

按用途分有工业建筑、民用建筑等。

作为一名预算员并不仅仅局限对定额的熟悉,还包括对施工规范、标准图集、施工工艺的熟悉。

比如说钢筋的弯钩、搭接和锚固长度。

根据规范要求,不同部位,不同砼标号、不同的环境,有不同的搭接和锚固长度。

这对钢筋算量影响较大。

一个框架工程的钢筋仅弯钩、搭接和锚固的钢筋量占钢筋总量的5%~10%左右。

所以掌握施工规范、标准图集对一名造价人员来说相当重要。

现将本人做预算的步骤总结如下:一、接到一份完整的图纸后,不是急于算量,应核对其张数是否与图纸目录相符,仔细阅读图纸,了解工程结构,领会设计意图。

对工程有个详细了解,形成工程基本立体架构,并做好图纸记录。

二、搜集图纸所需的规范、标准图集,并掌握其工作内容。

三、仔细阅读工程的施工组织设计,了解施工部署、施工流向、人员和机械的配置,有助工程定额的套用。

四、选择所需定额和配套的取费文件及有关的通知、调整资料,并对造价信息未注明或者特殊材料、设备进行市场询价。

五、工程量的计算必须按照所选工程定额的计算规则进行计算。

工程量的计算顺序有按施工顺序法计算的既先地下后地上,先室内后室外,先结构,后装修。

有按定额项目顺序计算的,也有按图纸顺序计算的等凭自己的习惯而定。

本人喜欢按施工先后顺序计算,这样思路清晰,工序明确,工艺熟悉。

当然这要求造价人员对工艺比较熟悉,了解施工顺序。

六、套用定额子目,在套用时要注意工作内容是否与施工图纸、规范和标准图集一致,不一致时应调整定额的相关内容。

预算员述职报告格式(精选3篇)

预算员述职报告格式(精选3篇)

预算员述职报告格式(精选3篇)预算员格式篇1一、作为一名预算员,我能按照公司的各项,按时按质地完成公司的各项预算及审核工作。

按公司的规定要求,严格执行公司所签订各类中有关条款,做好工程建设项目预(结)算及审核工作。

严格执行国家在基本建设方面颁布的各项法令,准确执行上级主管部门下达的定额文件及费率、税收等规定,了解定额及取费方面政策及其变化,及时调整避免发生不应有的错误;严格执行公司各个开发项目的投资计划,维护公司的权益。

熟悉图纸及设计变更,及时编制和审查各单位工程的预算及审核工作,及时掌握和了解市场情况,熟悉北京市每月工程造价信息,并多渠道收集其他材料信息,对项目中所用的设备、材料、成品或半成品价格,进行询价工作。

在实际的施工过程中,根据现场的实际情况,对定额编制的工料含量的高低水平作出适当科学合理化的调整,为公司的成本控制提供一些合理化的保证措施,为公司及时提供一些经营资料及数据,及时做好项目的成本核算工作。

及时参加公司的各项会议,负责审查各工程项目的概、预、结算,并书面提交审查意见。

根据公司的规定并结合实际情况,在工作中总是积极地配合项目经理进行合同管理,参与一些承包合同的洽谈,对合同进行跟踪管理,实行成本跟踪控制。

总之,在经营方针上坚持的收入,最低的支出。

及时、准确、实事求是、把握住定额,控制量。

有时遇到一些工作困难,及时向领导联系汇报,以便寻找更好解决问题的办法,争取公司的利润。

二、积极做好工程的审计工作。

做好了工程的审计工作及工程的审核扫尾工作,以及其他各项预结算及审核工作等。

三、服从公司领导的工作安排,积极做好领导安排的其他工作。

本人在工作中,总是以大局为重。

在工作中积极参与公司的其他工程招投标工作和其他的预算工作。

服从公司领导的工作安排,科学、合理地利用时间,既完成了自己的分内工作,又完成了公司安排的其他任务。

四、积极遵守执行公司的各项管理制度的改革,进一步加强工作责任感。

今年以来,公司的各项规章制度得到改善或进一步的完善,本人总是积极响应公司的各项规章制度,以公司的各项规章制度和预算员的职业道德为准则加强工作责任感,及时做好本人的各项工作,为企业做好本人力所能及的服务工作。

年预算员工作述职报告格式范文5篇

年预算员工作述职报告格式范文5篇

年预算员工作述职报告格式范文5篇年预算员工作述职报告格式范文 (1) 岁月流转,时光飞逝,转眼间从毕业到参加工作已经有近2年的时间了。

虽然进入这个行业工作时间不长,但在公司领导及同事们的关心与帮助下,我对建筑行业预算这一块的了解已经有了较全面的了解,对公司的工作环境、管理模式、组织机构、规章制度也有了一定的了解和认识,在思想意识、业务能力等各方面都取得了一定的进步,较好地完成了公司交给的各项工作任务。

为了更好地做好自己今后的工作,总结经验、吸取教训,现将工作以来的情况总结如下:一、认真学习业务技能,积极投身预算工作。

具备良好的政治和业务素质是做好本职工作的前提和必要条件。

作为一名预算员,在工程预算这个领域里,我是一个新人,对所从事行业的认识也比较肤浅,为了提升自身的素质,快速适应企业环境和工作岗位,我积极向同事学习取经,在公司领导和同事的信任和帮助下,不断提高业务技能,尽快适应工作岗位需要,在短时间内迅速融合进了这个大集体,为以后的工作顺利开展奠定了基础。

二、严格按照公司及部门的各项规章制度,按时保质地完成公司安排的各项工作。

进入公司以来,在领导及同事的支持与帮助下,参与完成了各项工程的预算和投标工作,通过亲身参与预算工作的整个过程,使自己对预算有了初步的了解,加深了对预算概念的认识,从而对预算这项工作有了更深的了解。

三、服从公司领导的工作安排,积极做好领导安排的其他工作。

在工作中,我能以大局为重,敬业爱岗,不计较个人得失。

在做好本职工作之余,能服从公司领导的工作安排,对领导交办的其他工作能认真对待,不推脱,不怠慢。

合理有效地利用时间,在完成自己的本职工作的同时,积极主动地协助其他部门和同事开展工作,完成好公司安排的其他任务。

四、积极适应和遵守执行公司的各项管理制度的改革,进一步加强工作责任感。

能积极响应公司的各项规章制度,尊重领导,服从公司领导的管理,以公司各项现行的规章制度和预算员的职业道德为准则严格要求自己,加强工作责任感,及时做好本职工作。

预算员个人述职报告(精选5篇)

预算员个人述职报告(精选5篇)预算员个人述职报告(精选5篇)每一天的时间都非常珍贵,回顾这段时间的工作,有得有失,制定一份述职报告吧。

但是却发现不知道该写些什么,下面是小编为大家整理的预算员个人述职报告(精选5篇),希望能够帮助到大家。

预算员个人述职报告1岁月流转,时光飞逝,转眼间我到公司工作已有三年,回顾这三年来的工作,在公司领导及同事们的关心与帮助下,我对公司的工作环境、管理模式、组织机构、规章制度有了深刻了解和认识,在思想意识、业务能力等各方面都取得了一定的进步,较好地完成了公司交给的各项工作任务,也于学校通过培训顺利取得预算员和二级建造师证书。

为了更好地做好自己今后的工作,总结经验、吸取教训,现将三年来的工作情况总结如下:一、认真学习业务技能,积极投身预算工作具备良好的政治和业务素质是做好本职工作的前提和必要条件。

作为一名预算员,在工程预算这个领域里,我是一个新人,对所从事行业的认识也比较肤浅,为了提升自身的素质,快速适应企业环境和工作岗位,我能勤学好问,积极向同事学习取经,在公司领导和同事的信任和帮助下,不断提高业务技能,尽快适应工作岗位需要,在短时间内迅速融合进了这个大集体,为以后的工作顺利开展奠定了基础。

二、严格按照公司及部门的各项规章制度,按时保质地完成公司安排的各项工作进入公司以来,在领导及同事的支持与帮助下,参与完成了家园工程的预算投标工作,独立完成了住宅楼工程及其他各项工程的预算和投标工作;积极参与了公司的投标报名及开标工作。

通过亲身参与预算工作的整个过程,使自己对预算有了初步的了解,加深了对预算概念的认识,从而对预算这项工作有了更深的了解。

三、服从公司领导的工作安排,积极做好领导安排的其他工作在工作中,我能以大局为重,敬业爱岗,不计较个人得失。

在做好本之工作之余,能服从公司领导的工作安排,对领导交办的其他工作能认真对待,不推脱,不怠慢。

科学、合理地利用时间,在完成自己的本职工作的同时,积极主动地协助其他部门和同事开展工作,完成好公司安排的其他任务。

预算员个人年度工作述职报告

预算员个人年度工作述职报告(经典版)编制人:__________________审核人:__________________审批人:__________________编制单位:__________________编制时间:____年____月____日序言下载提示:该文档是本店铺精心编制而成的,希望大家下载后,能够帮助大家解决实际问题。

文档下载后可定制修改,请根据实际需要进行调整和使用,谢谢!并且,本店铺为大家提供各种类型的经典范文,如演讲稿、总结报告、合同协议、方案大全、工作计划、学习计划、条据书信、致辞讲话、教学资料、作文大全、其他范文等等,想了解不同范文格式和写法,敬请关注!Download tips: This document is carefully compiled by this editor.I hope that after you download it, it can help you solve practical problems. The document can be customized and modified after downloading, please adjust and use it according to actual needs, thank you!In addition, this shop provides you with various types of classic sample essays, such as speech drafts, summary reports, contract agreements, project plans, work plans, study plans, letter letters, speeches, teaching materials, essays, other sample essays, etc. Want to know the format and writing of different sample essays, so stay tuned!预算员个人年度工作述职报告述职报告是社会组织机关和部门的负责人向上级管理机关陈述自己某一阶段工作情况,进行总的回顾,找出内在规律,以指导未来实践的履行职务情况的口头报告。

预算员个人述职报告(多篇)预算员个人述职报告

一、预算员个人述职报告尊敬的领导:我是某公司的预算员,现在我来向您做一份个人述职报告,对我过去一年的工作进行总结与评估,并向您汇报近期的工作计划。

一、2024年度工作总结作为公司财务部门的预算员,我将整个财务预算工作做得相当出色。

以下是我在过去一年中所取得的一些成绩:1.完成了年度预算我对公司的财务预算进行了仔细的分析和研究,制定了年度预算。

在制定预算的过程中,我充分考虑了公司运营和投资的风险及潜在机会,调整了预算数,使公司在经济增长和不确定性的环境中获得了良好的资本效益。

2.追踪预算执行情况我在预算执行过程中,对各项经济指标进行了细致的分析和监控。

并且把实际发生的情况与预算进行了比较,准确地追踪预算执行情况。

同时,我也经常向相关部门反馈预算执行情况的情况,帮助决策层更好地控制并调整成本。

3.优化公司的预算流程我意识到预算是组织财务管理的基础,因此我积极参与公司的预算开发和流程的改善。

我不断优化预算工具,为公司节约了大量的时间和资源。

二、2024年度工作计划针对过去一年的工作体验和今年公司预算的发展方向,我提出了以下计划:1.加强成本控制与预算监管通过对历史数据和行业趋势的判断,预测今年的市场环境,进一步优化公司的财务预算,目标是提高预算的准确度。

在预算执行过程中,我们将进一步加强成本控制,提高财务风控能力,通过预算监管实现预算管理水平和效果的提升。

2.深化预算流程优化继续研究和探索更加高效的预算工具和流程,尽可能提高预算流程的效能和效率。

同时,在优化预算流程的过程中,我们也需要在预算制定过程中的数据收集和财务分析过程中更加全面和深入。

3.推进财务管理信息化我计划进一步推进公司的财务管理信息化。

通过财务系统和数据分析工具的使用,提高财务部门的工作效率与精确度。

这将有助于减少员工手动操作的失误率,并且提高公司的工作效率、降低公司的管理成本。

以上是我近期的工作计划,我将在未来的日子里认真履行公司的职责和义务,发挥专业能力,努力为公司作出更多更有价值的贡献。

预算员年度述职报告

预算员年度述职报告预算员年度述职报告一年即将过去,回顾一年来本人工作情况,现简述如下:一、作为一个项目部的预算员,我能按照公司及项目部的各项规章制度,按时按质地完成项目部的各项经营管理工作。

1、对内的工作情况。

按公司的规定要求,每月的月底统计当月的实际施工产值及成本分析情况。

及时参加成本分析会议,对项目部每月的盈穿越小说网某某某亏情况作出分析报告,对于施工阶段的预算书以实际情况按每个楼层每个分项工程进行编制,并打印全部的工料分析,作为定额人工和定额材料下达给生产经理,在实际的施工过程中,根据现场的实际情况,对定额编制的工料含量的高低水平作出适当科学合理化的调整,该定额人工作为工程任务单进行人工的控制和分配的基础,定额材料作为仓库进行定额领料的依据。

平时在工作中总是积极地配合项目经理进行合同管理,参与一些分包合同的洽谈,根据公司的规定并结合项目部的实际情况,起草一些分包合同的草稿,分包合同签订后,对分包合同进行跟踪管理,每月初完成本项目部的上月的实际施工分配任务(包括分包方的粗分配),定额材料的统计,并向公司提交有关的报表,每月月底向公司提交下月的主要材料计划,预计下月的施工产值及各项的耗用成本,编制下月的成本保证措施。

在施工过程中,实行定额领料和成本跟踪控制,为项目部的成本控制提供一些合理化的保证措施,为项目部及时提供一些经营资料及数据,及时做好项目的成本核算工作。

及时参加项目的会议,按公司的规章制度进行值班等。

2、对外(对业主和监理)的工作情况。

每月月底向业主和监理提交的施工进度报表以作付工程进度款的依据,及时与投资监理核对工程量,进度产值确定后,及时配合项目经理催促业主支付上月的工程进度款。

及时向业主进行工程签证,做好一些索赔工程,特别是一些工程材料的报价,提前向业主和监理报价,以便业主审核后,我施工方材料员能及时采购,使得工程顺利施工。

总之,在经营方针上坚持最高的收入,最低的支出。

对内工作及时、准确、实事求是、把握住定额,控制量,有时并且要留有一定的余量;对外工作资料齐全、用足政策、用足机会,时刻处理好业主、监理与施工方的关系,有时遇到一些工作困难,及时与领导联系汇报,以便寻找更好解决问题的办法,争取公司的最大利润。

  1. 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
  2. 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
  3. 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。

预算员年度述职报告年度述职报告这是一年一度的述职报告,写本年度的履职情况。

下文是预算员年度述职报告,欢迎阅读!预算员年度述职报告一20XX年即将过去,回顾一年来本人工作情况,现简述如下:一、作为一个项目部的预算员,我能按照公司及项目部的各项规章制度,按时按质地完成项目部的各项经营管理工作。

1、对内的工作情况。

按公司的规定要求,每月的月底统计当月的实际施工产值及成本分析情况。

及时参加成本分析会议,对项目部每月的盈穿越小说网***亏情况作出分析报告,对于施工阶段的预算书以实际情况按每个楼层每个分项工程进行编制,并打印全部的工料分析,作为定额人工和定额材料下达给生产经理,在实际的施工过程中,根据现场的实际情况,对定额编制的工料含量的高低水平作出适当科学合理化的调整,该定额人工作为工程任务单进行人工的控制和分配的基础,定额材料作为仓库进行定额领料的依据。

平时在工作中总是积极地配合项目经理进行合同管理,参与一些分包合同的洽谈,根据公司的规定并结合项目部的实际情况,起草一些分包合同的草稿,分包合同签订后,对分包合同进行跟踪管理,每月初完成本项目部的上月的实际施工分配任务(包括分包方的粗分配),定额材料的统计,并向公司提交有关的报表,每月月底向公司提交下月的主要材料计划,预计下月的施工产值及各项的耗用成本,编制下月的成本保证措施。

在施工过程中,实行定额领料和成本跟踪控制,为项目部的成本控制提供一些合理化的保证措施,为项目部及时提供一些经营资料及数据,及时做好项目的成本核算工作。

及时参加项目的会议,按公司的规章制度进行值班等。

2、对外(对业主和监理)的工作情况。

每月月底向业主和监理提交的施工进度报表以作付工程进度款的依据,及时与投资监理核对工程量,进度产值确定后,及时配合项目经理催促业主支付上月的工程进度款。

及时向业主进行工程签证,做好一些索赔工程,特别是一些工程材料的报价,提前向业主和监理报价,以便业主审核后,我施工方材料员能及时采购,使得工程顺利施工。

总之,在经营方针上坚持最高的收入,最低的支出。

对内工作及时、准确、实事求是、把握住定额,控制量,有时并且要留有一定的余量;对外工作资料齐全、用足政策、用足机会,时刻处理好业主、监理与施工方的关系,有时遇到一些工作困难,及时与领导联系汇报,以便寻找更好解决问题的办法,争取公司的最大利润。

二、积极做好工程的审计工作。

做好了xx路的结算送审工作及结清xx花园的审计扫尾工作等。

三、服从公司领导的工作安排,积极做好项目部以外的工作。

本人在工作中,总是以大局为重。

在工作中积极参与公司的招投标工作和其他的预算工作。

无论自己项目部手中的工作多忙,总是服从公司领导的工作安排,当时项目部的事件比较多,本人总是加班加点,合理、科学地利用时间,既完成了项目部的份内事件,又完成了公司本文来源:***安排的任务。

四、积极适应和遵守执行公司的各项管理制度的改革,进一步加强工作责任感。

今年以来,公司的各项规章制度得到改善或进一步的完善,本人总是积极适应这种情况,以公司各项现行的规章制度和预算员的职业道德为准则加强工作责任感,及时做好本人的各项工作,为企业做好本人力所能及的服务工作。

五、利用工作之余的休息时间加强学习。

平时注意收集上海市有关现行的定额资料文件,并加强学习工程量计算的技巧等业务知识。

努力学习计算机知识,提高自己的工作效率。

以上为本人粗略的个人工作小结,请领导审阅,如工作上有不到之处,请领导不吝指出,以便本人及时改正,从而能更好地工作。

预算员年度述职报告二在后勤总公司和维修中心××的关怀和××下,在各班组的支持和帮助下,完成了中心交给我的各项任务。

20XX年8月维修中心成立,至今已有一年的时间。

在这一年的时间里,我的工作是"中心调度"和预算员,作为在办公室岗位的一名工作人员,我要努力到"五勤"、诚心当好"四员"。

"五勤"就是嘴勤、耳勤、脑勤、手勤、腿勤。

"四员"就是为各级××和中心事业当好话务员、信息员、宣传员、服务员。

俗话说"没有最好只有更好"为了把维修中心工作做到更好,在用户心目中形象、地位更高,一年来,我力争做到工作效率更高、更强、更优。

严格遵循中心的各项规章制度及"一站式服务"。

下面,我就这一年的工作情况向各位××、同事作个简要汇报,以接受大家评议。

一、后勤维修中心调度和预算员的主要职责是:1.用户打来电话必须第一时间通知各班组前去维修,如不能及时维修的应通知用户并说明原因,解释清楚。

对于急需维修的工作应立即派人维修。

2."一站式"服务。

一是对于暂时不能维修的应与各班组长协商后,把解决办法通知用户,并尽快解决。

二是用户提出的服务中心解决不了,如能联系上解决单位应马上联系。

3.文明用语、礼貌待人、加强修养,时刻注意自我约束。

4.定期到用户单位调查,并填写《维修中心信息反馈表》。

5.受中心经理委派、处理具体事务和问题,做到各项工作对经理和中心负责。

6.不断了解中心服务中出现的新情况、新问题、重大问题及时向经理报告,并协调有关部门、有关单位处理和解决。

7.及时传达贯彻上级和公司有关会议、文件、批示精神。

8.作为预算员应实事求是,做到不多算、不漏算。

总之,我的主要工作职责归纳起来就是四个字:协调、服务。

二、努力学习、勤奋工作,回报××和同事的关爱向维修中心全体人员学习。

古人说,三人行必有我师。

我觉得,中心的每位同事都是我的老师,他们中有业务高手,有技术尖兵。

正是不断地虚心向他们求教,使我懂得了各种材料的使用、一般问题出现的原因、维修的方法,我自身的素质和工作能力才得以不断提高,工作才能干的更好。

在陈经理的××和指导下,在各个班组对我工作的支持下,使我的业务水平有了很大的提高,即而得到了很多用户的肯定。

不光工作上的帮助,在生活上也给了我许多的关怀。

我能有今天,永远也不会忘记××和同志们的关爱。

我惟一的回报方式就是拼命努力地工作。

我珍惜这份来之不易的工作,珍惜这良好的工作环境,同时,也被中心××和中心全体同志的敬业精神深深感动,他们不怕苦、不怕脏、不怕累,都是我学习的榜样。

说句实在话,工作不仅是我谋生的手段,更是我回报××和同志们的最好方式,也是一个人实现人生价值的惟一选择.三、工作中的不足1.调查了解还不够深入,有些情况没有及时地掌握。

用户的需要就是我们的需要。

2.为基层服务的深度还不够,需进一步加强中心管理,强调服务意识和服务态度,不断提高办事效率和工作能力,为公司及中心的建设、发展做出新的贡献。

四、存在的问题1.电的浪费现象有待采取措施。

2.乱贴乱画现象严重影响了本院的形象,应采取措施并加以处罚。

建议:是否可以制作几个信息栏,以减少乱贴乱画现象。

综上所述,总结一年来的工作,我可以说:自己尽了心,努了力,流了汗。

在平时的工作中,对××交办的工作,保质保量完成;对自己分内的工作也能积极对待,努力完成,做到既不越位,又要到位,更不失职。

在今后的工作中,我会更加积极、努力的工作,以"服务第一"为准绳,为后勤维修中心今后的发展尽自己的绵薄之力。

预算员年度述职报告三我在公司从事预算工作已6年有余。

所做工程项目数量也日益剧增,按使用定额分,使用过贵州省建筑定额、装饰装修装饰定额、市政工程定额、园林定额等。

按结构分有砖混结构、有框架结构、有框剪结构等。

按层数分有单层、多层、高层。

按用途分有工业建筑、民用建筑等。

作为一名预算员并不仅仅局限对定额的熟悉,还包括对施工规范、标准图集、施工工艺的熟悉。

比如说钢筋的弯钩、搭接和锚固长度。

根据规范要求,不同部位,不同砼标号、不同的环境,有不同的搭接和锚固长度。

这对钢筋算量影响较大。

一个框架工程的钢筋仅弯钩、搭接和锚固的钢筋量占钢筋总量的5%~10%左右。

所以掌握施工规范、标准图集对一名造价人员来说相当重要。

现将本人做预算的步骤总结如下:一、接到一份完整的图纸后,不是急于算量,应核对其张数是否与图纸目录相符,仔细阅读图纸,了解工程结构,领会设计意图。

对工程有个详细了解,形成工程基本立体架构,并做好图纸记录。

二、搜集图纸所需的规范、标准图集,并掌握其工作内容。

三、仔细阅读工程的施工组织设计,了解施工部署、施工流向、人员和机械的配置,有助工程定额的套用。

四、选择所需定额和配套的取费文件及有关的通知、调整资料,并对造价信息未注明或者特殊材料、设备进行市场询价。

五、工程量的计算必须按照所选工程定额的计算规则进行计算。

工程量的计算顺序有按施工顺序法计算的既先地下后地上,先室内后室外,先结构,后装修。

有按定额项目顺序计算的,也有按图纸顺序计算的等凭自己的习惯而定。

本人喜欢按施工先后顺序计算,这样思路清晰,工序明确,工艺熟悉。

当然这要求造价人员对工艺比较熟悉,了解施工顺序。

六、套用定额子目,在套用时要注意工作内容是否与施工图纸、规范和标准图集一致,不一致时应调整定额的相关内容。

特别脚手架的套用,一定要领会定额的实质。

七、定额的取费是根据工程的类别和施工现场所在的区域来确定费率和标准。

因此要确定工程是一类、二类、三类工程属于工业建筑还是民用建筑,施工现场是在城市还是乡镇或者其他地区。

这样才能准确确定费率。

八、材料的价格调整一定要依据施工所在城市的造价管理机构发布工程材料造价信息为准。

九、编制说明,一般包括编制依据,编制采用的定额及取费和造价信息第几期。

采用的预算编制软件等内容十、装订成册,加盖相关人员职业资格章,并签字。

通过以上步骤一份完整的预算编制完成了。

这是本人任职造价员以来的理解及自述。