新增需求单

合集下载

金蝶云星空使用WebAPI来新增单据

金蝶云星空使用WebAPI来新增单据

⾦蝶云星空使⽤WebAPI来新增单据有很多客户需求在后台⾃动⽣成某张单据,⾦蝶云星空提供了WebApi,包含了保存,提交,审核,删除单据的接⼝,下⾯以⽣产订单的保存,提交,审核为例,说明⼀下应⽤WebApi后台⾃动⽣成⽣产订单的功能,下⾯是代码⽰例,其他单据可以根据⽰例代码做相应的修改:using Kingdee.BOS.Core.Bill.PlugIn;using System;using System.Collections.Generic;using System.Linq;using System.Text;using System.Threading.Tasks;using Kingdee.BOS;using Kingdee.BOS.Core.Bill;using Kingdee.BOS.Core.DynamicForm;using Kingdee.BOS.Core.DynamicForm.PlugIn.Args;using Kingdee.BOS.Core.DynamicForm.PlugIn.ControlModel;using Kingdee.BOS.Core.List;using Kingdee.BOS.Core.Metadata;using Kingdee.BOS.Core.Metadata.ControlElement;using Kingdee.BOS.JSON;using Kingdee.BOS.Resource;using Kingdee.BOS.Util;//using Kingdee.BOS.Core.Bill.PlugIn;using Kingdee.BOS.Orm.DataEntity;using Kingdee.BOS.Core.Msg;using Kingdee.BOS.Orm.Drivers;using Kingdee.BOS.App.Data;using Kingdee.BOS.DataEntity;using ponentModel;using Kingdee.BOS.Core.DynamicForm.PlugIn;using System.Data;using Newtonsoft.Json.Linq;using Kingdee.BOS.WebApi.Client;using Newtonsoft.Json;public class DisProOrder : AbstractBillPlugIn{K3CloudApiClient client = new K3CloudApiClient("http://X.X.X.X:XXX/K3Cloud/");//参数是K3/Cloud的URL//传⼊的参数根据需求来⾃⾏修改public void SaveBill(DataSet ds, string OrderQty, string TouLiaoQty,int billno){DataSet dstemp = new DataSet();DataTable dtTemp = new DataTable();string result = "";if (ds.Tables.Count > 0){if (ds.Tables[0].Rows.Count == 0){}else{#region 保存⽣产订单信息try{// 开始构建Web API参数对象// 参数根对象:包含Creator、NeedUpDateFields、Model这三个⼦参数// using Newtonsoft.Json.Linq; // (需引⽤Newtonsoft.Json.dll)JObject jsonRoot = new JObject();// Creator: 创建⽤户jsonRoot.Add("CREATOR", "administrator");// NeedUpDateFields: 哪些字段需要更新?为空则表⽰参数中全部字段,均需要更新jsonRoot.Add("NEEDUPDATEFIELDS", new JArray(""));jsonRoot.Add("NEEDRETURNFIELDS", new JArray(""));jsonRoot.Add("ISDELETEENTRY", "TRUE");jsonRoot.Add("SUBSYSTEMID", "");// Model: 单据详细数据参数JObject model = new JObject();jsonRoot.Add("Model", model);// 开始设置单据字段值// 必须设置的字段:主键、单据类型、主业务组织,各必录且没有设置默认值的字段// 特别注意:字段Key⼤⼩写是敏感的,建议从BOS设计器中,直接复制字段的标识属性过来// 单据主键:必须填写,系统据此判断是新增还是修改单据;新增单据,填0model.Add("FID", "0");JObject basedata = new JObject();//单据编号model.Add("FBillNo", this.View.Model.GetValue("FBillNo").ToString()+billno.ToString("000"));//单据类型if (this.View.Model.GetValue("FBillType").ToString() != ""){basedata = new JObject();DynamicObject BillType = this.View.Model.GetValue("FBillType") as DynamicObject;string BillTypeNO = BillType["number"].ToString();basedata.Add("FNumber", BillTypeNO);model.Add("FBillType", basedata);}//单据⽇期model.Add("FDate", this.View.Model.GetValue("FDate").ToString());//⽣产组织if (this.View.Model.GetValue("FPrdOrgId").ToString() != ""){basedata = new JObject();DynamicObject FPrdOrg = this.View.Model.GetValue("FPrdOrgId") as DynamicObject;string FPrdOrgNO = FPrdOrg["number"].ToString();basedata.Add("FNumber", FPrdOrgNO);model.Add("FPrdOrgId", basedata);}//计划组:FWorkGroupIdif (ds.Tables[0].Rows[0]["FWORKGROUPID"].ToString() != "0"){basedata = new JObject();DynamicObject FWorkGroup = this.View.Model.GetValue("FWorkGroupId") as DynamicObject; string FWorkGroupNO = FWorkGroup["number"].ToString();basedata.Add("FNumber", FWorkGroupNO);model.Add("FWorkGroupId", basedata);}//计划员:FPlannerIDif (ds.Tables[0].Rows[0]["FPLANNERID"].ToString() !="0"){basedata = new JObject();DynamicObject FPlanner = this.View.Model.GetValue("FPlannerID") as DynamicObject;string FPlannerNO = FPlanner["number"].ToString();basedata.Add("FNumber", FPlannerNO);model.Add("FPlannerID", basedata);}//备注model.Add("FDescription", "");//拆单数:F_PAEZ_CHAIDANmodel.Add("F_PAEZ_CHAIDAN", this.View.Model.GetValue("F_PAEZ_CHAIDAN").ToString()); //本单数:F_PAEZ_BENDANmodel.Add("F_PAEZ_BENDAN", OrderQty);//原单数:F_PAEZ_YUANDANmodel.Add("F_PAEZ_YUANDAN", this.View.Model.GetValue("F_PAEZ_YUANDAN").ToString()); //投料数:F_PAEZ_TOULIAOmodel.Add("F_PAEZ_TOULIAO", TouLiaoQty);//是否已拆单:F_PAEZ_Textmodel.Add("F_PAEZ_Text", "是");// 单据类型:必须填写,是基础资料字段// 基础资料类型字段填值,必须再构建⼀个JObject对象,设置基础资料编码// 单据编号:可以忽略,由系统根据编码规则⾃动⽣成//model.Add("FBILLNO", "201602160001");// 开始构建单据体参数:集合参数JArrayJArray entryRows = new JArray();// 把单据体⾏集合,添加到model中,以单据体Key为标识string entityKey = "FTreeEntity";//单据体的标识model.Add(entityKey, entryRows);int rowscount;rowscount = Convert.ToInt32(this.Model.GetEntryRowCount("FTreeEntity"));// 通过循环创建单据体⾏:for (int i = 0; i <= rowscount - 1; i++){// 添加新⾏,把新⾏加⼊到单据体⾏集合JObject entryRow = new JObject();entryRows.Add(entryRow);// 给新⾏,设置关键字段值// 单据体主键:必须填写,系统据此判断是新增还是修改⾏entryRow.Add("FEntryID", "0");//产品类型:FProductTypeentryRow.Add("FProductType", "");//物料:基础资料,填写编码DynamicObject Mat = this.View.Model.GetValue("FMaterialId", i) as DynamicObject;string MatNO = Mat["number"].ToString();//dtTemp = GetMaterialInfo(MatId);basedata = new JObject();basedata.Add("FNumber", MatNO);entryRow.Add("FMaterialId", basedata);//⽣产车间:FWorkShopIDif (ds.Tables[0].Rows[0]["FWORKSHOPID"].ToString() != "0"){basedata = new JObject();DynamicObject FWorkShop = this.View.Model.GetValue("FWorkShopID", i) as DynamicObject; string FWorkShopNO = FWorkShop["number"].ToString();basedata.Add("FNumber", FWorkShopNO);entryRow.Add("FWorkShopID", basedata);}////单位,基础资料,填写编码if (ds.Tables[0].Rows[0]["FUnitId"].ToString() != "0"){basedata = new JObject();DynamicObject FUnit = this.View.Model.GetValue("FUnitId", i) as DynamicObject;string FUnitNO = FUnit["number"].ToString();basedata.Add("FNumber", FUnitNO);entryRow.Add("FUnitId", basedata);}//数量:FQtyentryRow.Add("FQty", OrderQty);//计划开⼯时间:FPlanStartDate (必填项)entryRow.Add("FPlanStartDate", this.View.Model.GetValue("FPlanStartDate", i).ToString()); //计划完⼯时间:FPlanFinishDate (必填项)entryRow.Add("FPlanFinishDate", this.View.Model.GetValue("FPlanFinishDate", i).ToString()); //BOM版本:FBomIdif (ds.Tables[0].Rows[0]["FBomId"].ToString() != "0"){basedata = new JObject();DynamicObject FBom = this.View.Model.GetValue("FBomId", i) as DynamicObject;string FBomNO = FBom["number"].ToString();basedata.Add("FNumber", FBomNO);entryRow.Add("FBomId", basedata);}//批号:FLot//basedata = new JObject();//basedata.Add("FNumber", "");//entryRow.Add("FLot", basedata);//备注:FMemoItementryRow.Add("FMemoItem", "");//⼯艺路线:FRoutingIdif (ds.Tables[0].Rows[0]["FRoutingId"].ToString() != "0"){basedata = new JObject();DynamicObject FRouting = this.View.Model.GetValue("FRoutingId") as DynamicObject;string FRoutingNO = FRouting["number"].ToString();basedata.Add("FNumber", FRoutingNO);entryRow.Add("FRoutingId", basedata);}//仓库:FStockIdif (ds.Tables[0].Rows[0]["FStockId"].ToString() != "0"){basedata = new JObject();DynamicObject FStock = this.View.Model.GetValue("FStockId") as DynamicObject;string FStockNO = FStock["number"].ToString();basedata.Add("FNumber", FStockNO);entryRow.Add("FStockId", basedata);}//// 创建Link⾏集合//JArray linkRows = new JArray();//// 添加到单据体⾏中:Link⼦单据体标识 = 关联主单据体标识(POOrderEntry) + _Link//string linkEntityKey = string.Format("{0}_Link", entityKey);//entryRow.Add(linkEntityKey, linkRows);//// 创建Link⾏://// 如有多条源单⾏,则分别创建Link⾏记录各条源单⾏信息//JObject linkRow = new JObject();//linkRows.Add(linkRow);//// 填写Link⾏上的字段值//// 特别说明:Link⼦单据体上字段的标识,必须在前⾯增加⼦单据体标识//// FFlowId : 业务流程图,可选//string fldFlowIdKey = string.Format("{0}_FFlowId", linkEntityKey);//linkRow.Add(fldFlowIdKey, "");//// FFlowLineId :业务流程图路线,可选//string fldFlowLineIdKey = string.Format("{0}_FFlowLineId", linkEntityKey);//linkRow.Add(fldFlowLineIdKey, "");//// FRuleId :两单之间的转换规则内码,必填//// 可以通过如下SQL语句到数据库获取//// select FID, *//// from T_META_CONVERTRULE//// where FSOURCEFORMID = 'PUR_Requisition'//// and FTARGETFORMID = 'PUR_PurchaseOrder'//// and FDEVTYPE = 0;//string fldRuleIdKey = string.Format("{0}_FRuleId", linkEntityKey);//linkRow.Add(fldRuleIdKey, "605a20be-79f9-4e86-b87c-08fa9dfa98f4");//// FSTableName :必填,源单单据体表格编码,通过如下语句获取://// SELECT FTableNumber//// FROM t_bf_tabledefine//// WHERE fformid = 'PUR_Requisition'//// AND fentitykey = 'FEntity'//// 如果如上语句未返回结果,请到K/3 Cloud中,⼿⼯选单⼀次,后台会⾃动产⽣表格编码//string fldSTableNameKey = string.Format("{0}_FSTableName", linkEntityKey);//linkRow.Add(fldSTableNameKey, "t_Dev_PUR_ReceiveEntry");////通过收料单号获取收料单内码和单据体分录内码//string BillNo = ds.Tables["InStockMatInfo"].Rows[i]["F_DEV_SOURCEBILLNO"].ToString();//string MatId = ds.Tables["InStockMatInfo"].Rows[i]["F_DEV_MATID"].ToString();//string StockId = ds.Tables["InStockMatInfo"].Rows[i]["F_Dev_StockID"].ToString();//string Position = ds.Tables["InStockMatInfo"].Rows[i]["F_Dev_Position"].ToString();//dtTemp = GetData.GetReceiveInfo(BillNo, MatId, StockId, Position);//// FSBillId :必填,源单单据内码//string fldSBillIdKey = string.Format("{0}_FSBillId", linkEntityKey);//linkRow.Add(fldSBillIdKey, dtTemp.Rows[0]["FID"].ToString());//// FSId : 必填,源单单据体⾏内码。

追加申请书

追加申请书

尊敬的领导:您好!首先,我谨代表我单位就我单位近期工作进展及资金需求向贵单位提出追加申请。

在此,衷心感谢贵单位对我单位前期工作的关心与支持。

一、项目背景及进展我单位自成立以来,始终秉承“以人为本、服务社会”的理念,积极开展各项工作。

近年来,在贵单位的关心与支持下,我单位在业务拓展、项目建设等方面取得了显著成绩。

现将我单位近期工作进展及资金需求情况汇报如下:1. 业务拓展方面:我单位紧紧围绕市场需求,积极拓展业务领域,目前已在多个行业形成了较强的竞争优势。

截至本申请之日,我单位新增业务收入XX万元,同比增长XX%。

2. 项目建设方面:我单位高度重视项目建设,已成功启动了XX项目,项目总投资XX万元。

目前,该项目已完成XX%,预计将于XX年XX月竣工验收。

二、资金需求及追加申请原因1. 资金需求:为确保项目顺利进行,我单位需追加资金XX万元,用于以下方面:(1)项目后期建设:包括设备采购、安装调试、人员培训等费用。

(2)市场拓展:加大市场宣传力度,提高品牌知名度。

(3)日常运营:保障单位正常运转,确保员工工资及福利待遇。

2. 追加申请原因:(1)项目进度要求:为确保项目按期完成,需追加部分资金以满足项目后期建设需求。

(2)市场竞争压力:在当前市场竞争激烈的环境下,我单位需加大市场投入,以保持竞争优势。

(3)政策支持:根据国家相关政策,我单位有资格申请追加资金支持。

三、资金使用计划及保障措施为确保追加资金的安全、高效使用,我单位制定了以下资金使用计划及保障措施:1. 资金使用计划:将追加资金按照项目进度、市场拓展、日常运营等方面合理分配,确保资金使用效益最大化。

2. 保障措施:(1)加强财务管理:建立健全财务管理制度,确保资金使用透明、规范。

(2)项目进度监控:对项目进度进行实时监控,确保项目按期完成。

(3)市场拓展效果评估:定期对市场拓展效果进行评估,调整市场策略。

综上所述,我单位在前期工作中取得了显著成绩,为确保项目顺利进行,现向贵单位申请追加资金XX万元。

XXX-项目需求、功能范围确认单模板

XXX-项目需求、功能范围确认单模板

卡 反面疋弓•子艇

诉程 JTfez
心]
(_0
時护弄旳部存謂
流程冒形狀高度弓

判走 手入
显示冈手动燥
_基舞嘩形状
附件一业务流程
1、WEB 端需求功能清单
附件二功能需求范
XXX云平台WEB端需求功能清单
2、移动端需求功能清单
XXX云平台移动端需求功能清单
No.一级模块二级模块
页面(功能)名称功能概述模块名称模块名称
1登录登录登录
2首页落实责任
待办工作列表
待办工作详情历史责任
已办工作列表
已办工作详情得分排名
得分排名
筛选
3我的我的考核记

我的考核分
考核分变更记录信息修改变更密码
3、其他需求功能清单
4、业务角色范
5、系统数据权限
组织架构或是角色中数据权限的划分规则进行说明。

6、系统页面权限
通过可配置实现角色到菜单是否具有可以查看权限,到页面具有(查看和编辑)权限。

(不会具体到页面的功能按钮权限控制)
附件三页面设计风格PC端
1)登录页
2)系统首页
登录页、系统首页。

系统需求变更单

系统需求变更单

系统需求变更单背景在开发系统过程中,随着业务需求的不断变化,我们需要对系统的需求进行调整和变更。

本文档旨在记录和规范系统需求的变更。

变更内容本次需求变更涉及以下内容:1. 新增功能:根据客户反馈,需要在系统中增加一个在线支付功能,以提升用户体验。

2. 修改功能:对现有用户管理模块进行优化,包括提升用户搜索功能和修改用户信息功能的稳定性。

3. 移除功能:由于业务调整,需要移除系统中的消息推送功能,以减少不必要的成本。

影响分析本次需求变更可能对系统的各个模块产生一定的影响,具体如下:1. 新增功能:需要进行支付接口的开发和集成,可能会对系统的性能和稳定性产生一定的影响。

2. 修改功能:对用户管理模块的优化可能需要修改现有的数据库结构和逻辑代码,需注意兼容性和数据一致性的问题。

3. 移除功能:移除消息推送功能后,相关的界面和功能按钮需要进行相应的调整和删除。

需求评审为确保需求变更的合理性和可行性,建议进行需求评审。

请相关开发人员和产品经理对变更内容进行讨论和确认,并记录评审意见和决策结果。

变更计划根据需求变更的复杂程度和影响范围,制定相应的变更计划,包括以下步骤:1. 确定变更的优先级和紧急程度。

2. 制定详细的变更实施计划,包括开发、测试和上线的时间安排。

3. 分配合适的开发资源,确保变更能够按计划完成。

风险控制在进行系统需求变更时,需要注意以下风险:1. 新增功能的开发可能超出预期时间和预算,需进行合理的资源调配和进度控制。

2. 修改功能可能引发现有功能的不稳定性和兼容性问题,需进行充分的测试和验证。

3. 移除功能可能导致用户体验的下降,需进行事先的用户沟通和准备恰当的替代方案。

变更确认需求变更的最终确认应由相关的开发人员、测试人员和产品经理共同进行,确保变更已按计划实施并达到预期效果。

变更记录对每次需求变更的内容、原因、影响和实施情况进行记录,以便后续追溯和分析。

以上是关于系统需求变更的详细内容,请相关人员参考并按照文档要求实施变更。

(完整word版)IT需求申请单

(完整word版)IT需求申请单

XXX企业IT 增援服务申请单NO:申请部门:申请时间:申请人:硬件需求□1. 邮箱故障□ 2. 硬件故障□3. 网络故障□4. 电话故障□5. 软件安装 / 卸载□6 内网邮箱申请□ 7 系统密码改正□8 系统故障□9 硬件购置(程序)申请□ 10. 硬件安装□11.IT 辅助□ 12. 权限改正□13. 外线电话申请□ 14. 外网邮箱申请□ 15. 外网开通申请□16. 其余需硬件说明: 1.在需求种类上打“√”每次只能够填写一项申请。

求2.第 12、 13、 14、 15. 项署名流程:所属课长—所属经理—资讯课课长——总经理类3.其余项署名流程:所属课长——资讯课课长型软件需求□1.ERP 用户改正□ 2.ERP 权限改正□3.ERP 报表改正□4. 数据删除□5. 数目单价改正□6. 新功能模块□ 7. 系统 BUG□8. 数据资料改正□9. 原流程改正□10. 界面款式改正□11. 其余软件说明:署名流程:所属课长—所属经理—资讯课课长——总经理需求说明课长署名:经理署名:异样剖析□程序 Bug□ 人为要素需求受理□ 增添此需求□ 暂缓办理□ 不办理估计工作时数 :预约达成日办理方式□ 内部办理估计办理时间(小时)□ 外包办理估计工作时数 :估计外包花费(元)资讯课意见资讯课课长署名:总经理意见总经理署名:申□特别满意□满意□一般□不满意请人意见申请人署名:注 :1.ERP各系统问题的解决及新增功能以此票据为凭据。

2.系统需求部分 , 请详尽说明需求原由及详细需求内容,能够用附件说明3.软硬系统统异样时 , 请详尽描绘问题情况内容。

4.申请单位对资讯课主管经协调仍有不一样看法,申请单位可签报上司裁示。

需求清单模版

需求清单模版
功能模块 首页 项目管理
功能 项目管理行内检查 行内项目新建流程改造
问题管理
开发行内项目审批流程
功能概述
负责人 难易程度
对行内项目信息的增删改查业务逻辑进行重构和优化

行内项目管理,增加字段,将原有的流程表单,在OA中创建流程并
进行配置,增加总、分、支、事业部、信用卡、内控部
备注

等各类路由表达式
重用程度 高 中

修改类型
工作量 (人天)
新增 3.00
新增 4.00
计划开始时间 计划完成时间 时间完成时间 2020年9月1日 2020年9月3日 2020年9月3日 2020年9月4日 2020年9月7日 2020年9月7日
需求变更说明
新增 5.00
2020年9月8日 2020年9月12日 ############

各部门表单及OA流程的新增与修订计划表模板


与工程部、 计划物控部
共同确认
/ /
乃莲香 /
乃莲香
与工程部、计划 物控部共同确认
乃莲香
2011.11.30
研_小批试产申 请审批
与工程部、 计划物控部
共同确认
与工程部共同确 认
崔文娟
需增加
崔文娟
与工程部、计划 物控部共同确认
乃莲香
工程部做
2012年Q1
2011年Q4 2011.11.30
研_设计变更通 知书审批 与工程部、
/
/
完成时间
备注
/ /
2011.11.30 /
2011.11.30
2011.11.30
2011.11.30 同上
2011.11.30 2011.11.30
2011.11.30
2011/11/25 /
技术服务中心
132
客诉处理跟踪表
客户投诉处理流程
133
售后维修报表
134
客户样机领用单
客户样机提供管理流程
135
样品检验送检单
136
售后服务流程
客户信息跟踪表
137
应用开发管理流程
工作任务单
138
公司三年发展规划
公司战略管理流程
139
内外部情况分析报告
140
**部管理评审输入报告
141
公司管理评审输入报告
163
年度市场活动计划审批流程年度市场活动计划
164
活动执行方案
企业宣传活动审批流程(计划内)
165 市场策划部
活动总结
166
企业宣传活动审批流程(计活划动外申)请表
167
新闻审核发布流程

网站需求变更单

网站需求变更单背景公司目前拥有一个运行良好的网站,然而随着业务的发展,我们发现有一些需求需要进行变更,以提升用户体验和功能完善。

本文档将详细列出这些需求的变更内容。

需求变更列表1. 改进用户注册流程:目前的注册流程较为繁琐,需要填写大量个人信息。

我们希望优化该流程,简化用户注册流程,减少填写信息的项数。

改进用户注册流程:目前的注册流程较为繁琐,需要填写大量个人信息。

我们希望优化该流程,简化用户注册流程,减少填写信息的项数。

2. 新增密码找回功能:当前用户忘记密码时,无法通过网站找回密码。

我们希望添加一个密码找回功能,让用户能够轻松找回并重置密码。

新增密码找回功能:当前用户忘记密码时,无法通过网站找回密码。

我们希望添加一个密码找回功能,让用户能够轻松找回并重置密码。

3. 改进搜索功能:现有的搜索功能仅能按照关键词搜索,结果显示不够准确。

我们希望改进搜索算法,提高搜索结果的准确性和相关性。

改进搜索功能:现有的搜索功能仅能按照关键词搜索,结果显示不够准确。

我们希望改进搜索算法,提高搜索结果的准确性和相关性。

4. 添加社交媒体分享功能:为了增加网站的社交化特性,我们希望在网站上添加社交媒体分享功能,使用户可以方便地分享网站上的内容到各种社交媒体平台。

添加社交媒体分享功能:为了增加网站的社交化特性,我们希望在网站上添加社交媒体分享功能,使用户可以方便地分享网站上的内容到各种社交媒体平台。

5. 改善移动设备适配:当前网站在移动设备上的显示效果不理想,页面布局错乱且不易操作。

我们希望通过改进网站的响应式设计,使其能够更好地适配不同类型的移动设备。

改善移动设备适配:当前网站在移动设备上的显示效果不理想,页面布局错乱且不易操作。

我们希望通过改进网站的响应式设计,使其能够更好地适配不同类型的移动设备。

实施计划我们计划在下个季度开始进行网站需求变更的实施工作。

具体实施计划如下:1. 第一周:与开发团队讨论需求变更的技术可行性和工作量评估。

金蝶K3MRP运算、产品或工序委外实施参考(朱海波)

第一篇:K/3自制件MRP运算实施参考手册1.BOM2.第一次MTO运算,算出11MTO独立需求(MTO运算产生的计划订单需要审核后再次运算才能算出相关需求件的需求单据。

)2.第二次MTO运算,算出21和22的相关需求特别注意:当按“销售预测单”或者“销售订单”或者(“销售预测单”+“销售订单”)来进行MTO运算时,第一次MRP运算产生独立需求件的计划订单(计划),然后将计划订单手动审核(投放,自动产生生产任务单)。

再次MTO运算,产生独立需求件按BOM结构的相关需求件。

计划状态的独立需求件再次进行MTO运算将不产生任何相关需求件需求单据。

删除对应的MRP运算日志,系统将自动删除计划订单,销售订单即可反审核删除。

请按下列步骤操作:1、登陆K3主控台后,依次单击【计划管理】→【物料需求计划】→【MRP日志】,双击【MRP日志-查询】;2、打开【MRP日志查询】窗口,单击相应的MRP运算编号,单击工具条【删除】。

另:系统不允许删除最后一次MRP运算的日志。

解决此问题的方法为:在【物料需求计划】里再进行一次MRP的运算,那么前一次的运算日志就不算是最后一次的运算日志,即可以删除。

1.物料档案1.1P1笔1.1.1订货策略:批对批(LFL)批对批法(LFL, Lot For Lot),表示对每一天的净需求都产生计划订单。

批对批(LFL)同样会考虑最小订货批量、批量增量(批量增量是指物料的最小包装单位或最少生产数量)。

计算公式同上。

对大多数没有特殊要求的物料,可以采用这种方法进行设置。

具体见“金蝶四种订货策略的计算原理及其应用.pdf”1.1.2固定提前期,即生产提前期。

生产提前期体现生产要花费的周期,用来生成建议的开工与完工时间,并将在排程时约束排程期限。

具体见“K3MRP提前期研究.doc”交货日期-运输提前期=建议交货日期(建议完工日期)建议交货日期-固定提前期=建议开工日期1.2P2笔筒1.2.1固定提前期即采购提前期,采购需要花费的周期。

技术需求确认单

技术需求确认单项目名称:[项目名称]
项目描述:[项目描述]
项目目标:[项目目标]
需求确认
1. 功能需求
- [功能需求1]
- [功能需求2]
- [功能需求3]
2. 技术要求
- [技术要求1]
- [技术要求2]
- [技术要求3]
3. 数据需求
- [数据需求1]
- [数据需求2]
- [数据需求3]
时间计划
- 开发开始日期:[开发开始日期] - 开发结束日期:[开发结束日期]
费用估计
- 开发费用:[开发费用]
- 运维费用:[运维费用]
评估和确认
技术评估
- [技术评估1]
- [技术评估2]
- [技术评估3]
风险评估
- [风险评估1]
- [风险评估2]
- [风险评估3]
备注
[备注内容]
确认
- 项目经理签字:[项目经理签字] - 开发人员签字:[开发人员签字]
- 客户确认签字:[客户确认签字]
以上是技术需求确认单的内容,请核对并确认。

如果有任何问题,请及时与我联系。

谢谢!
---
词汇解释:
- 功能需求:项目所要实现的具体功能
- 技术要求:项目所需的技术要求和限制条件
- 数据需求:项目所需的数据源和数据处理要求
- 时间计划:项目预计的开发和完成时间
- 费用估计:项目开发和运维费用的估计
- 技术评估:对项目技术可行性和实施难度的评估
- 风险评估:对项目可能遇到的风险进行评估和预警。

  1. 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
  2. 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
  3. 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。
相关文档
最新文档