项目范围管理基准计划(baseline)概念开发(conceptual development)配置管理(configuration management)控制系统(control system)成本控制账户(cost control accounts)成本加成合同(cost-plus contracts)可交付成果(deliverable)里程碑(milestone)组织分解结构(organization breakdown structure, OBS)项目收尾(project closeout)项目范围(project scope)责任分配矩阵(responsibility assignment matrix, RAM)范围基准计划(scope baseline)范围蔓延(scope creep)范围管理(scope management)范围报告(scope reporting)范围说明(scope statement)工作说明书(statement of work, SOW)总承包合同(turnkey contracts)工作分解结构代号(WBS codes)工作授权(work authorization)工作分解结构(work breakdown structure, WBS)工作包(work package)项目风险管理可能性和后果分析(analysis of probability and consequences)变更管理(change management)商业风险(commercial risk)应急储备金(contingency reserves)合约/法律风险(contractual/legal risk)控制和文档化(control and documentation)交叉培训(cross-training)执行风险(execution risk)财务风险(financial risk)固定总价合同(fixed-price contract)违约赔偿金(liquidated damage)管理应急金(managerial contingency)指导(mentoring)项目风险(project risk)项目风险分析和管理(project risk analysis and management, PRAM) 风险识别(risk identification)风险管理(risk management)风险缓解策略(risk mitigation strategies)任务应急金(task contingency)技术风险(technical risk)项目团队的建设、冲突和谈判可接近性(accessibility)中止(adjourning)管理上的冲突(administrative conflict)凝聚力(cohesiveness)冲突(conflict)跨职能合作(cross-functional cooperation) 差异化(differentiation)成立阶段(forming stage)挫败(frustration)基于目标的冲突(goal-oriented conflict)互动(interaction)相互依赖(interdependencies)个人之间的冲突(interpersonal conflict)谈判(negotiation)规范化阶段(norming stage)目标(orientation)结果(outcome)实施阶段(performing stage)物理位置上的接近(physical proximity)原则性谈判(principled negotiation)社会心理结果(psychosocial outcomes)中断平衡(punctuated equilibrium)冲突风暴(storming)最高目标(superordinate goals)任务结果(task outcomes)团队建设(team building)信任(trust)虚拟团队(virtual teams)成本估算和预算基于活动的估算(ABC, activity-based costing)自下而上的预算(bottom-up budgeting)应急费用预算(budget contingency)成本估算(cost estimation)赶工(crashing)最终估算(definitive estimates)直接成本(direct costs)加速成本(expedited costs)可行性估算(feasibility estimates)固定成本(fixed costs)间接成本(indirect costs)学习曲线(learning curve)一次性成本(nonrecurring costs)正常成本(normal costs)参数估算(parametric estimation)项目预算(project budget)经常性成本(recurring costs)分阶段预算(time-phased budget)自上而下的预算(top-down budgeting)变动成本(variable costs)项目进度计划:网络、历时估计和关键路径活动,也称任务(activity, or task)双代号网络图法(activity-on-arrow)单代号网络图法(activity-on-node)箭线(Arrow)逆推法(backward pass)β分布(beta distribution)发散活动(burst activity)并行活动(concurrent activities)置信区间(confidence interval)赶工(crashing)关键路径(critical path)关键路径法critical path method ()历时估计(duration estimation)最早开始时间(early start date, ES)事件(event)浮动时差(float, or slack)正推法(forward pass)集合活动(hammock activities)阶梯化活动(laddering activities)最晚开始时间(late start date)汇聚活动(merge activities)网络图(network diagram)节点(node)排好序的活动(ordered activities)路径(path)前置活动(predecessors)计划评审技术(program evaluation and review technique) 项目网络图(project network diagram, PND)项目计划编制(project planning)有限资源进度计划(resource-limited schedule)范围(scope)串行活动(serial activities)后续活动(successors)任务(task)工作分解结构(work breakdown structure)工作包(work package)项目进度计划:滞后、赶工和活动网络活动(也称任务)(activity,也称task)双代号网络图(activity-on-arrow, AOA)单代号网络图(activity-on-node, AON)箭线(Arrow)逆推法(backward pass)赶工(crashing)关键路径(critical path)虚活动(dummy activities)最早开始时间(early start date, ES)事件(event)浮动时差(float, or slack)正推法(forward pass)甘特图(Gantt chart)滞后(lag)最晚开始时间(late start date)汇聚(merge)节点(node)计划评审技术(Program Evaluation and Review Technique, PERT)串行活动(serial activities)后续活动(successors)任务(task,见activity)关键链项目进度计划能力约束缓冲(capacity constraint buffer, CCB)中心极限理论(central limits theorem)普通原因偏差(common cause variation)关键链(critical chain)关键链项目管理(critical chain project management, CCPM)鼓点(drum)鼓点缓冲(drum buffers)多任务处理(multitasking)消极偏差(negative variation)积极偏差(positive variation)特殊原因偏差(special cause variation)学生综合症(student syndrome)约束理论(theory of constraints, TOC)资源管理平衡试探法(leveling heuristics)混合约束型项目(mixed-constraint project)物质约束(physical constraints)资源约束型项目(resource- constrained project)资源约束(resource constraints)资源平衡(resource leveling)资源负载(resource loading)资源负载图(resource-loading charts)资源负载表(resource-loading table)平滑(smoothing)分割活动(splitting activities)时间约束型项目(time-constrained project)项目评估和控制已完成工作实际成本(actual cost of work performed, AC)完工预算(budgeted cost at completion, BAC)控制循环(control cycle)成本绩效指数(cost performance index, CPI)挣值(earned value, EV)挣值管理(earned value management, EVM)里程碑(milestone)计划值(planned value, PV)项目基准计划(project baseline)项目控制(project control)项目S曲线(project S-curve)进度绩效指数(schedule performance index, SPI)进度偏差(schedule variance)跟踪甘特图(tracking Gantt charts)项目收尾和中止仲裁(arbitration)建造-经营-转让(build, operate, transfer, BOT)建造-拥有-经营-转让(build, own, operate, transfer, BOOT)默认索赔(default claims)争议(disputes)提前终止(early termination)特惠索赔(ex-gratia claims)经验教训(lessons learned)自然终止(natural termination)私人主动融资(private finance initiatives, PFIs)项目终止(project termination)附加式终止(termination by addition)绝对式终止(termination by extinction)集成式终止(termination by integration)自灭式终止(termination by starvation)非自然终止(unnatural termination)。

项目管理专业英语-范围规划

项目管理专业英语-范围规划

Scope Planning范围规划Defining and managing the project scope influences the project's overall success.Each project requires a careful balance of tools,data sources,methodologies,processes and procedures,and other factors to ensure that the effort expended on scoping activities is commensurate with the project's size,complexity,and importance.For example,a critical project could merit formal,thorough,and time-intensive scoping activities,while a routine project could require substantially less documentation and scrutiny.The project management team documents these scope management decisions in the project scope management plan.The project scope management plan is a planning tool describing how the team will define the project scope,develop the detailed project scope statement,define and develop the work breakdown structure,verify the project scope,and control the project scope.The development of the project scope management plan and the detailing of the project scope begin with the analysis of information contained in the project charter,the preliminary project scope statement,the latest approved version of the project management plan,historical information contained in the organizational process assets,and any relevant enterprise environmental factors.项目范围的确定与管理影响到项目的整体成功。

项目管理PMP精要(中英文对照)

项目管理PMP精要(中英文对照)

ESSENCE OF PMBOK & PMP EXAM 考试串讲教材))PMBOK及PMP考试精要考试精要((考试串讲教材PROJECT MANAGEMENT KNOWLEDGE AREAS项目管理知识体系 (2)项目生命周期及过程组 (10)PROJECT LIFE CYCLE / PROJECT MANAGEMENT PROCESS GROUPSSCOPE范围管理 (10)HUMAN RESOURCE人力资源管理 (11)COMMUNICATIONS沟通管理 (14)TIME时间管理 (16)COST成本管理 (17)RISK风险管理 (20)QUALITY质量管理 (22)PROCUREMENT采购管理 (22)INTEGRATION整体管理 (19)PROFESSIONAL RESPONSIBILITIES职业道德 (19)POSSIBLE EXAM QUESTIONS考点 (20)1 PROJECT MANAGEMENT KNOWLEDGE AREAS项目管理知识体系Knowledge Areas知识体系Primary Inputs输入Tools & Techniques工具及技术Primary Outputs输出INTEGRATION整体整体制定项目章程 Develop Project Charter 1.合同(如果适用) Contract(When applicable) 2.项目工作说明书 Project statement of work 3.事业环境因素 Enterprise environmental factors  4.组织过程资产组织过程资产 Organizational process assets 1.项目选择方法 Project selection methods  2.项目管理方法论项目管理方法论 Project management methodology  3.项目管理信息系统项目管理信息系统 Project management information system  4.专家判断专家判断 Expert judgment 1.项目章程 Project charter 制定项目初步范围说明书制定项目初步范围说明书 1.项目章程 Project charter 2.项目工作说明书 Project statement of work 3.事业环境因素 Enterprise environmental factors 4.组织过程资产 Organizational process assets 1.项目管理方法系 Project management methodology 2.项目管理信息系统 Project management information system 3.专家判断 Expert judgment 1.项目初步范围说明书项目初步范围说明书Preliminary project scope statement 制定项目管理计划制定项目管理计划 Develop Project management Plan 1.项目初步范围说明书 Preliminary project scope statement 2.项目管理各过程 Project management processes 3.事业环境因素 Enterprise environmental factors 4.组织过程生产 Organizational process assets 1.项目管理方法系 Project management methodology 2.项目管理信息系统 Project management information system 3.专家判断 Expert judgment 1.项目管理计划 Progece management plan 指导与管理项目执行 Direct and Manage Project Execution 1.项目管理计划 Progece management plan 2.批准的纠正措施 Approved corrective actions 3.批准的预防措施 Approved preventive actions 4.批准的变更申请 Approved change requests 5.批准的缺陷补救 Approved defect repair 6.确认的缺陷补救 Validated defect repair 7.行政收尾程序 Administrative closure procedure 1.项目管理方法系 Project management methodology 2.项目管理信息系统 Project management information system 1.可交付成果 Deliverables 2.请求的变更 Requested changes 3.实施的变更请求 Implementde change requests 4.实施的纠正措施 Implementde corrective actions 5.实施的预防措施 Implementde preventive actions 6.实施的缺陷补救 Implementde defect repair 7.工作绩效信息 Work performance information 监控项目工作 Monitor and Control Project Work 1.项目管理计划 Progece management plan 2. 工作绩效信息 Work performance information  3.否决的变更请求否决的变更请求 Rejected change requests 1.项目管理方法系 Project management methodology 2.项目管理信息系统 Project management information system  3.实现价值技术实现价值技术 Eamed value technique(EVT) 4.专家判断 Expert judgment 1.推荐的纠正措施推荐的纠正措施Recommended corrective action  2.推荐的预防措施推荐的预防措施推荐的预防措施Recommended preventive action  3.预测预测 Forecasts 4.推荐的缺陷补救推荐的缺陷补救Recommended defect repair 5.请求的变更 Requested changes 整体变更控制 Integrated Change Control 1.项目管理计划项目管理计划 Progece management plan  2.请求的变更请求的变更 Requested changes  3.工作绩效信息工作绩效信息 Work performance information 4.推荐的纠正措施 Recommended corrective action  5.推荐的预防措施推荐的预防措施 Recommended preventive action  6.推荐的缺陷补救推荐的缺陷补救 Recommended defect repair  7.可交付成果可交付成果 Deliverables 1.项目管理方法系 Project management methodology 2.项目管理信息系统 Project management information system  3.专家判断专家判断 Expert judgment 1.批准的变更申请 Approved change requests 2.否决的变更请求 Rejected change requests 3.项目管理计划(更新) Project management plan(updates) 4.项目范围说明书(更新) Project scope statement(updates) 5.批准的纠正措施 Approved corrective actions 6.批准的预防措施 Approved preventive actions 7.批准的缺陷补救 Approved defect repair 8.确认的缺陷补救 Validated defect repair 9.可交付成果 Deliverables 项目收尾 Close Project 1.项目管理计划 Progece management plan 2.合同文件 Contract documentation 3.事业环境因素 Enterprise environmental factors  4.组织过程资产组织过程资产 Organizational process assets  5.工作绩效信息工作绩效信息 Work performance 1.项目管理方法系 Project management methodology 2.项目管理信息系统 Project management information system  3.专家判断专家判断 Expert judgment 1.行政收尾程序 Administrative closure procedure  2.合同收尾程序合同收尾程序 Contract closure procedure  3.最终产品最终产品,服务或成果 Final product,service or result  4.组织过程资产组织过程资产(更新) 2 information 6.可交付成果 Deliverables Organizational process assets(updates) SCOPE范围范围规划范围规划 1.事业环境因素 Enterprise environmental factors  2.组织过程资产组织过程资产 Organizational process assets 3.项目章程 Project charter 4.项目初步范围说明书 Preliminary project scope statement 5.项目管理计划 Project management plan 1.专家判断 Expert judgment  2.样板样板,表格与标准表格与标准Templates,forms,standards 1.项目范围管理计划 Project scope management plan  范围定义范围定义范围定义 1.组织过程资产 Organizational process assets 2.项目章程 Project charter 3.项目初步范围说明书 Preliminary project scope statement 4.项目范围管理计划 Project scope management plan 5.批准的变更申请 Approved change requests 1.产品分析 Product analysis 2.其他方案识别 Alternatives identification 3.专家判断 Expert judgment 4.利害关系者分析 Stakeholder analysis 1.项目范围说明书Project scope statement 2.请求的变更 Requested changes 3.项目范围管理计划 Project scope management plan 制作工作分解结构 Create WBS 1.组织过程资产 Organizational process assets  2.项目范围说明书项目范围说明书 Project scope statement 3.项目范围管理计划 Project scope management plan 4.批准的变更申请 Approved change requests 1.工作分解结构模板 Work breakdown structure templates  2.分解分解 Decomposition 1.项目范围说明书(更新) Project scope statement(updates)_ 2.工作分解结构 Work breakdown structure 3.工作分解结构词汇表 WBS dictionary 4.范围基准 Scope baseline 5.项目范围管理计划(更新) Project scope management plan(updates) 6.请求的变更 Requested changes  Scope Verification范围核实1.项目范围说明书Project scope statement 2.工作分解结构词汇表 WBS dictionary 3.项目范围管理计划 Project scope management plan 4.可交付成果 Deliverables 1.检查 Inspection 1.验收的可交付成果 Accepted deliverables  2.请求的变更请求的变更 Requested changes 3. 推荐的纠正措施推荐的纠正措施Recommended corrective actions 范围控制 Scope Control 1.项目范围说明书Project scope statement 2.工作分解结构 Work breakdown structure 3.工作分解结构词汇表 WBS dictionary 4.项目范围管理计划 Project scope management plan 5.绩效报告 Performance reports 6.批准的变更申请 Approved change requests 7.工作绩效信息 Work performance information 1.变更控制系统 Change control system  2.偏差分析偏差分析 Variance analysis  3.补充规划补充规划 Replanning  4.配置管理系统配置管理系统 Configuration management system 1.项目范围说明书(更新) Project scope statement(updates) 2.工作分解结构(更新) Work breakdown structure(updates) 3.工作分解结构词汇表(更新) WBS dictionary(updates) 4.范围基准(更新) Scope baseline(updates) 5.请求的变更 Requested changes 6.推荐的纠正措施推荐的纠正措施Recommended corrective action 7.组织过程资产(更新) Organizational process assets(updates) 8.项目管理计划(更新) Project management plan(updates) TIME进度活动定义 Activity Definition 1.事业环境因素 Enterprise environmental factors 2.组织过程资产 Organizational process assets 3.项目范围说明书 Project scope statement 4.工作分解结构 Work breakdown structure 5.工作分解结构词汇表 WBS clictionary 6.项目管理计划 Progece management plan 1.分解 Decomposition 2.样板 Templates 3.滚动式规划 Rolling wave planning 4.专家判断 Expert judgment 5.规划组成部分 Planning componet 1.活动清单Activity list 2.活动属性 Activity attributes 3.里程碑清单 Milestone list 4.请求的变更 Requested changes 活动排序 Activity Sequencing 1.项目范围说明书项目范围说明书 Project scope statament  2.活动清单活动清单 Activity list  3.活动属性活动属性 Activity attributes  4.里程碑清单里程碑清单 Milestons list 1.紧前关系绘图法(PDM) Precedence Diagramming Method(PDM)  2.箭线绘图法箭线绘图法(ADM) Arrow Diagramming Method(ADM) 1.项目进度网络图 Project schedule network diagrams  2.活动清单活动清单(更新) Activity list (updates) 3  5.批准的变更请求批准的变更请求 Approved change requesta 3.进度网络样板进度网络样板 Schedule network tempiates  4.确定依赖关系确定依赖关系 Dependency determination  5.利用时间提前量与滞后量利用时间提前量与滞后量 Applying leads and lags  3.活动属性活动属性(更新) Activity attributes(updates)  4.请求的变更请求的变更 Requesaed changes 活动资源估算Activity Resource Estimating 1.事业环境因素Enterprise environmental factors 2.组织过程资产 Organizational process assets 3.活动清单Activity list 4.活动属性Activity attributes 5.资源可利用情况 Resouce availability 6.项目管理计划Project management l 1.专家判断 Expert judgment 2.多方案分析 Alternatives analysis 3.出版的估算数据 Published estimating data 4.项目管理软件 Project management sortware 5.自上而下的估算 Bottom estimating 1.活动资源要求 Activity resource requirements 2.活动属性(更新) Activity attributes(updates) 3.资源分解结构 Resource breakdown structure 4.资源日历(更新)Resource calendars 5.请求的变更 Requested changes 活动持续时间估算Activity Duration Estimating 1.事业环境因素Enterprise environmental factors  2.组织过程资产组织过程资产Organizational process assets  3.项目范围说明书项目范围说明书 Project scops statement  4.活动清单活动清单 Activity list  5.活动属性活动属性 Activity attributes  6.活动资源要求活动资源要求 Activity resource requirements  7.资源日历资源日历 Resource calendars  8.项目管理计划项目管理计划 Project management plan  ●风险登记册●风险登记册 Risk register  ●活动费用估算●活动费用估算 Activity cost estimates 1.专家判断 Expert judgment 2.类比估算 Analogous estimating 3.参数估算 Parametric estimating 4.三点估算 Three-point estimates 5.后备分析 Reserve analysis 1.活动持续时间估算 Activity duration estimates 2.活动属性 Activity attributes(updates) 制定进度表Schedule Development 1.组织过程资产 Organizational process assets  2.项目范围说明书项目范围说明书Project scope statement  3.活动清单活动清单 Activity list  4.活动属性活动属性 Activity attributes  5.项目进度网络图项目进度网络图 Project schedule network diagrams  6.活动资源要求活动资源要求 Activity resource requirements  7.资源日历资源日历 Resource calendars  8.活动持续时间估算活动持续时间估算 Activity duration estimates  9.项目管理计划项目管理计划 Project management plan  ●风险登记册 Risk register  1.进度网络分析 Schedule network analysisi 2.关键路线法 Critical path method 3.进度压缩 Schsdule compression 4.假设情景分析What-if scenario analysis 5.资源平衡 Resource leveling 6.关键链法 Critical chain method 7.项目管理软件 Project management software 8.应用日历 Applying calendars 9.调整时间提前滞后量 Adjusting leads and lags 10.进度模型 Schedule model  1.项目进度表项目进度表 Project schedule  2.进度模型数据进度模型数据 Schedule model data  3.进度基准进度基准 Schedule baseline  4.资源要求资源要求 Resource requirements(updates)  5.活动属性活动属性(更新) Activity attributes(updates)  6.项目日历项目日历(更新)Project calendar  7.请求的变更请求的变更 Requesaed changes  8.项目管理计划项目管理计划(更新) Project management plan(updates)  ●进度管理计划(更新) Schedule management plan(updates) 进度控制 Schedule Control 1.进度管理计划 schedule management plan  2.进度基准进度基准 Schedule baseline  3.绩效报告绩效报告 Performance reports  4.批准的变更要求批准的变更要求 Approved change requests 1.进度报告进度报告 Progress reporting  2.进度变更控制系统进度变更控制系统 Schedule change control system  3.绩效衡量绩效衡量 Performance measurement  4.项目管理软件项目管理软件 Project management software  5.偏差分析偏差分析 Variance analysisi  6.进度比较横道图进度比较横道图 Schedule comparison bar chars 1. 进度模型数据(更新) Schedule model data(updates) 2. 进度基准(更新) Schedule baseline(updates) 3. 绩效衡量 Performance measurements 4. 请求的变更 Requesaed changes 5.推荐的纠正措施Recommended corrective action 6.组织过程资产(更新) Organizational process assets(updates) 7.活动清单(更新) Activity list(updates) 8.活动属性(更新) Activity attributes(updates) 9.项目管理计划(更新) Project management plan(updates) COST费用费用估算Cost Estimating 1.事业环境因素 Enterprise environmental factors  2.组织过程资产组织过程资产 Organizational process assets 3.项目范围说明书Project scope statement 4. 工作分解结构 Work breakdown structure 1.类比估算 Analogous estimating 2.确定资源费率 Determine resource cost rates 3.自上而下估算 Bottom-up estimating 4.参数估算 Parametric estimating 5.项目管理软件 Project management 1.活动费用估算 Activity cost estimates  2.活动费用估算支持细节活动费用估算支持细节 Activity cost estimate supporting detall  3.请求的变更请求的变更 Requested 4 5 5.工作分解结构词汇表 WBS dictionary 6.项目管理计划 Progece management plan  ●进度管理计划●进度管理计划 Schedule management plan ●人员配备管理计划Staffing management plan ●风险登记册 Risk registor software 6.供货商投标分析 Vendor bid analysis 7.准备金分析 Reserve analysis 8.质量成本 Cost of quality changes 4.费用管理计划(更新) Cost management plan(updates) 费用预算 Cost Budgeting 1.项目范围说明书Project scope statement 2.工作分解结构工作分解结构 Work breakdown structure 3.工作分解结构词汇表工作分解结构词汇表 WBS dictionary 4.活动费用估算活动费用估算 Activity cost estimates 5.活动费用估算支持细节活动费用估算支持细节 Activity cost estimate supporting detall 6.项目进度项目进度 Project schedule 7.资源日历资源日历 Resource calendars 8.合同合同 Contract 9.费用管理计划费用管理计划 Cost management plan  1.费用汇总费用汇总 Cost aggregation 2.储备基金分析储备基金分析 Reserve analysis  3.参数估算参数估算 Parametric esrimating  4.资金限制平衡资金限制平衡 Funding limit reconciliation 1.费用基准 Cost baseline 2.项目资金要求 Project funding requirements 3.项目管理计划(更新) Project management plan(updates) 4.请求的变更 Requested changes 费用控制Cost Control 1.费用基准 Cost baseline 2.项目资金要求项目资金要求 Project funding requirements 3.绩效报告绩效报告 Performance reports 4.工作绩效信息 Work performance information 5.批准的变更申请 Approved change requests 6.项目管理计划 Project management plan 1.费用变更控制系统 Cost change control system 2.绩效衡量分析绩效衡量分析 Performance measurements analysis 3.预测预测 Forecasting 4.项目绩效审核项目绩效审核 Project performance reviews 5.项目管理软件 Project management software 6.偏差管理 Variance management 1.费用估算(更新) Cost estimates(update) 2.费用基准(更新) Cost baseline(update) 3.绩效衡量绩效衡量 Performance measurements 4.预测完工预测完工 5.请求的变更请求的变更 Requested changes 6.推荐的纠正措施推荐的纠正措施Recommended corrective action 7.组织过程资产(更新) Organizational process assets(updates) 8.项目管理计划(更新) Project management plan(updates) RISK 风险风险管理规划 Risk Management Planning 1.事业环境因素 Enterprise environmental factors 2.组织过程资产组织过程资产 Organizational process assets 3.项目范围说明书 Project scope statement 4.项目管理计划 Progece management plan 1.规则会议和分析 Planning meeting and analysis 1.风险管理计划 Risk Management Plan 风险识别Risk Identification 1.事业环境因素 Enterprise environmental factors 2.组织过程生产组织过程生产 Organizational process assets 3.项目范围说明书 Project scope statement 4. 风险管理计划 Risk Management Plan 5. 项目管理计划 Project management plan  1.文件审查文件审查 Documentation reviews 2.信息搜索技术信息搜索技术 Information gathering techniques 3.核对表分析核对表分析 Checklist analysis 4.假设分析假设分析 Assumptions analysis 5.图解技术图解技术 Diagiamming techniques 1.风险登记册 Risk register Qualitative Risk Analysisi 风险定性分析风险定性分析1.组织过程生产 Organizational process assets 2.项目范围说明书 Project scope statement 3. 风险管理计划 Risk Management Plan 4. 风险登记册 Risk register 1.风险概率与影响评估 Risk probability and impact assessment 2.概率和影响矩阵概率和影响矩阵 Probablity and impact matrix 3.风险数据质量评估风险数据质量评估 Risk data quality assessment 4.风险分类风险分类 Risk categorization 5.风险紧迫性评估风险紧迫性评估 Risk urgency assessment 1.风险登记册(更新) Risk register(updates) 定量风险分析 Quantitative Risk Analysis 1.组织过程生产 Organizational process assets 2.项目范围说明书 Project scope statement 3. 风险管理计划 Risk Management Plan 4. 风险登记册 Risk register 5. 项目管理计划 Project management plan ●项目进度管理计划 Project schedule management plan ●项目费用管理计划 Project cost management plan 1.数据收集和表示技术 Data gathering and representation techniques 2.定量风险分析和模型技术 Quantitative risk analysis and modeling techniques 1.风险登记册(更新) Risk register(updates) 风险应对规划 Risk Response Planning 1.风险管理计划 Risk Management Plan 2.风险登记册 Risk register 1.消极风险或威胁的应对策略 Strategies for negative risk or threats 2.积极风险或机会的应对策略积极风险或机会的应对策略 Strategies for 1.风险登记册(更新) Risk register(updates) 2.项目管理计划(更新) Project positive risk or opportunities  3.威胁或机会的应对策略威胁或机会的应对策略 Strategies for both threats and opprtunities  4.应急应对策略应急应对策略 Contingent response strategy management plan(updates)  3.与风险有关的合同协议与风险有关的合同协议 Risk-related contractual agreements 风险监控 Risk Monitoring and Control 1.风险管理计划 Risk Management Plan 2.风险登记册 Risk register 3.批准的变更申请 Approved change requests 4.工作绩效信息 Work performance information 5.绩效报告 Performance reports 1.风险再评估 Risk reassessment  2.风险审计风险审计 Risk audits  3.变差和趋势分析变差和趋势分析 Variance and trend analysis  4.技术绩效分析技术绩效分析 Technical performance measurement  5.储备金分析储备金分析Reserve analysis  6.状态审查会状态审查会 Status meetings 1.风险登记册(更新) Risk register(updates) 2.请求的变更 Requested changes 3.推荐的纠正措施推荐的纠正措施Recommended corrective action 4.推荐的预防措施推荐的预防措施Recommended preventive action 5.组织过程资产(更新) Organizational process assets(updates) 6.项目管理计划(更新) Project management plan(updates) QUALITY质量质量规划 Quality Planning 1.事业环境因素 Enterprise environmental factors 2.组织过程资产 Organizational process assets 3.项目范围说明书Project scope statement 4.项目管理计划 Progece management plan 1.成本效益分析成本效益分析 Cost-benefit analysis  2.基准对照基准对照 Benchmarking  3.试验设计试验设计 Design of experiments  5.质量成本质量成本(COQ) Cost of quality (COQ)  6.其他质量规划工具其他质量规划工具 Additional quality planning tools  1.质量管理计划质量管理计划 Quality management plan  2.质量测量指标质量测量指标 Quality metrics  3.质量核对表质量核对表 Quality checklists  4.过程改进计划过程改进计划 Process improvement plan  5.质量基准质量基准 Quality baseline  6.项目管理计划项目管理计划(更新) Project management plan(updates) 实施质量保证Perform Quality Assurance 1.质量管理计划质量管理计划 Quality management plan  2.质量测量指标质量测量指标 Quality metrics  3.过程改进计划过程改进计划 Process improvement plan 4.工作绩效信息 Work performance information 5.批准的变更申请 Approved change requests 6.质量控制衡量 Quality control measurnments 7.实施的变更请求 Implementde change requests 8.实施的纠正措施 Implementde corrective actions 9.实施的缺陷补救 Implementde defect repair 10.实施的预防措施 Implementde preventive actions  1.质量规划工具与技术质量规划工具与技术 Quality planning tools and techniques  2.质量审计质量审计 Quality audits  3.过程分析过程分析 Process analysis  4.质量控制工具与技术质量控制工具与技术 Quality control tools and techniques  1.请求的变更请求的变更 Requested changes  2.推荐的纠正措施推荐的纠正措施推荐的纠正措施Recommended corrective action 3.组织过程资产(更新) Organizational process assets(updates) 4.项目管理计划(更新) Project management plan(updates) 实施质量监控 Perform Quality Control 1.质量管理计划质量管理计划 Quality management plan  2.质量测量指标质量测量指标 Quality metrics  3.质量核对表质量核对表 Quality checklists  4.组织过程资产组织过程资产 Organizational process assets  5.工作绩效信息工作绩效信息 Work performance information  6.批准的变更请求批准的变更请求 Approved change requests  7.可交付成果可交付成果 Deliverables  1.因果图因果图 Cause and effect diagram  2.控制图控制图 Control charts  3.流程图流程图 Flowcharting  4.直方图直方图 Histogram  5.帕雷托图帕雷托图 Pareto chart  6.趋势图趋势图 Run chart  7.散点图散点图 Scatter diagram  8,统计抽样统计抽样 Statistical sampling  9.检查检查 Inspection  10.缺陷补救审查缺陷补救审查 Defect repair review  1.质量控制衡量质量控制衡量 Quality control measurnments  2.确认的缺陷补救确认的缺陷补救 Validated defect repair  3.质量基准质量基准(更新) Quality baseline(updates)  4.推荐的纠正措施推荐的纠正措施推荐的纠正措施Recommended corrective action  5.推荐的预防措施推荐的预防措施推荐的预防措施Recommended preventive action 6.请求的变更 Requested changes 7.推荐的缺陷补救推荐的缺陷补救Recommended defect repair 8.组织过程资产 Organizational process assets 9.确认的可交付成果 Validated deliverables 10.项目管理计划(更新) Project management plan(updates) HUMAN RESOURCE人力资源人力资源规划人力资源规划 1.事业环境因素 Enterprise environmental factors 2.组织过程资产 Organizational process assets 1.组织机构图和岗位描述组织机构图和岗位描述 Organization charts and position descriptions  2.交际交际 Networking  3.组织理论组织理论 Organization theory  1.角色与职责角色与职责 roles and responsibilities  2.项目组织图项目组织图 Projece organization chares 6 7 3.项目管理计划 Progece management plan ●活动资源需求 Activity resource requirements  3.人员配备管理计划人员配备管理计划 Staffinf management plan 项目团队组建 Acquire Project Team 1.事业环境因素 Enterprise environmental factors 2.组织过程资产 Organizational process assets 3.角色与职责 roles and responsibilities 4.项目组织图 Projece organization chares 5.人员配备管理计划 Staffinf management plan 招聘惯例招聘惯例 1.预分派预分派 Pre-assignment 2.谈判谈判 Negotiation 3.招募招募 Acquisition 4.虚拟团队虚拟团队Virtual teams  1.项目人员分派到位项目人员分派到位 Project staff assignments 2.资源可利用情况资源可利用情况 Resource availability 3.人员配备管理计划人员配备管理计划(更新) Staffinf management plan(updates) 项目团队建设 Develop Project Team 1.项目人员分派 Project staff assignments 2.人员配备管理计划人员配备管理计划 Staffinf management plan 3.资源可利用情况 Resource availability  1.通用管理技能通用管理技能 General management skills 2.培训培训 Training 3.团队建设活动团队建设活动 Team-building activities 4.规则规则 Ground rules 5.集中办公集中办公 Co-location 6.奖励与表彰奖励与表彰 Recognition and rewards 1.团队绩效评估 Team performance assessment 项目团队管理 Manage Project Team  1.组织过程资产组织过程资产 Organizational process assets 2.项目人员分派项目人员分派 Project staff assignments 3.角色与职责角色与职责 roles and responsibilities 4.项目组织图项目组织图 Projece organization chares 5.人员配备管理计划 Staffinf management plan 6.团队绩效考核 Team performance assessment 7.工作绩效信息 Work performance information 8.绩效报告 Performance reports  1.观察与交谈观察与交谈 Observation and conversation 2.项目绩效评估项目绩效评估 Project performance appraisals 3.冲突管理冲突管理 Conflict management 4.问题登记薄问题登记薄 Lssue log 1.请求的变更 Requested changes 2.推荐的纠正措施推荐的纠正措施Recommended corrective action 3.推荐的预防措施推荐的预防措施Recommended preventive action 4.组织过程资产(更新) Organizational process assets(updates) 5.项目管理计划(更新) Project management plan(updates) COMMUNICATIONS 沟通Communications Planning 沟通规划沟通规划1.事业环境因素 Enterprise environmental factors 2.组织过程生产组织过程生产 Organizational process assets 3.项目范围说明书Project scope statement 4.项目管理计划 Progece management plan ● 制约因素 Constraints ● 假设 Assumptions  1.沟通需求分析沟通需求分析 Communications requirements analysls 2.沟通技术沟通技术 Communications technology 1.沟通管理计划 Communications management plan Information Distribution 信息发布发布1. 沟通管理计划 Communications management plan 1.沟通技能 Communications skills 2.信息收集和检索系统 Information gathering and retrieval system 3.信息发布系统 Information distribution methods 4.经验教训总结过程 Lessons learned process 1. 组织过程生产(更新) Organizational process assets(updates) 2. 请求的变更请求的变更 Requested changes Performance Reporting 绩效报告报告1.工作绩效信息 Work performance information 2.绩效衡量 Performance measurements 3.完工预测 Forecasted completion 4.质量控制衡量 Quality control measurnments 5.项目管理计划 Project management plan ●绩效衡量分析 Performance measurements baseline 6.批准的变更申请 Approved change requests 7.可交付成果 Deliverables 1.信息演示工具 Information presentation tools 2.绩效信息收集和汇总 Performance information gathering and compilation 3.状态审查会 Status review meetings 4.工时汇报系统Time reporting systems 5.费用汇报系统Cost reporting systems 1.绩效报告 Performance reports 2.预测 Forecasts 3.请求的变更 Requested changes 4.推荐的纠正措施推荐的纠正措施Recommended corrective action 5.组织过程资产(更新) Organizational process assets(updates) 利害关系者管理 Manage Stakeholders 1.沟通管理计划 Communications management plan 2. 组织过程资产 Organizational process assets 1.沟通方法 Communications methods 2.问题登记薄 lssue logs 1.问题得以解决Resolved issues 2.批准的变更申请 Approved change requests 3.批准的纠正措施 Approved corrective action 4.组织过程资产(更新) Organizational process assets(updates) 5.项目管理计划(更新) Project management plan(updates) PROCUREMENT采购采购规划 Plan Purchases and Acquisitions 1.事业环境因素 Enterprise environmental factors  2.组织过程生产组织过程生产 Organizational process assets 3.项目范围说明书Project scope statement 4.工作分解结构 Work breakdown structure 5.工作分解结构词汇表 WBS clictionary 6.项目管理计划 Progece management plan  ●风险登记册 Risk register  ●与风险有关的合同协议 Risk-related contractual agreements  ●资源要求 Resource requirements ●项目进度计划 Project schedule ●活动费用估算 Activity cost estimate ●费用基准 Cost baseline  1.自制或外购分析自制或外购分析 Make-or-buy analysls  2.专家判断专家判断 Expert judgment  3.合同类型合同类型 Contract types 1.采购管理计划 Procurement management plan 2.合同工作说明书 Contract statement of work 3.自制或外购决策 Maker-or-buy changes 4.请求的变更 Requested changes 发包规划 Plan Contracting 1.采购管理计划 Procurement management plan 2.合同工作说明书 Contract statement of work  3.自制或外购决策自制或外购决策 Maker-or-buy changes 4.项目管理计划 Project management plan ●风险登记册 Risk register  ●与风险有关的合同协议●与风险有关的合同协议 Risk-related contractual agreements  ●资源要求●资源要求 Resource requirements ●项目进度计划 Project schedule ●活动费用估算 Activity cost estimate ●费用基准 Cost baseline 1.标准表格标准表格 Standard forms  2.专家判断专家判断 Expert Judgment 1.采购文件 Procurement documents 2.评估标准 Evaluation criteria 3.合同工作说明书(更新) Contract statement of work(updates) 询价Request Seller Responses 1.组织过程资产 Organizational process assets 2.采购管理计划 Procurement management plan 3.采购文件 Procurement documents  1.招标人会议招标人会议 Bldder conferences  2.刊登广告刊登广告 Advertising  3.制定合格卖方清单制定合格卖方清单 Develop qualifid sellers list 1.合格卖方清单 Qualified sellers list  2.采购文件包采购文件包 Procurement document package  3.建议书建议书 Proposals 卖方选择Select Sellers 1.组织过程资产 Organizational process assets 2.采购管理计划 Procurement management plan 3.评估标准 Evaluation criteria 4.采购文件包 Procurement document package 5.建议书 Proposals 6.合格卖方清单 Qualified sellers list 7.项目管理计划 Project management plan ●风险登记册 Risk register  ●与风险有关的合同协议●与风险有关的合同协议 Risk-related contractual  agreements 1.加权系统加权系统 Weighting system  2.独立估算独立估算 Independent estimates  3.筛选系统筛选系统 Screening system  4.合同谈判合同谈判 negotiation  5.卖方评级系统卖方评级系统 Seller rating systens  6.专家判断专家判断 Expert judgment  7.建议书评估技术建议书评估技术 Proposal evaluation techniques 1.选中的卖方 Selected sellers  2.合同合同 Contract  3.合同管理计划合同管理计划 Contract management plan  4.资源可利用情况资源可利用情况 Resource availability  5.采购管理计划采购管理计划(更新) Procurement management plan(updates)  6.请求的变更请求的变更 Requested changes 合同管理 Contract Administration 1.合同合同 Contract  2.合同管理计划合同管理计划 Contract management plan  3.选中的卖方选中的卖方 Selected sellers 4.绩效报告 Performance reports 5.批准的变更申请 Approved change requests 6.工作绩效信息 Work performance information 1.合同变更控制系统 Contract change control system  2.买方进行的绩效审核买方进行的绩效审核 Buyer-conducted per-formance review  3.检验和审计检验和审计 Inspections and audits  4.绩效报告绩效报告 Performance reporting  5.支付系统支付系统 Payment system  6.索赔管理索赔管理 Claims administration  7.合同档案管理系统合同档案管理系统 Records management system 8.信息技术 Information technology  1.合同文件合同文件 Contract documentation  2.请求的变更请求的变更 Requested changes  3.推荐的纠正措施推荐的纠正措施推荐的纠正措施Recommended corrective action 4.组织过程资产(更新) Organizational process assets(updates) 5.项目管理计划(更新) Project management plan(updates) ●采购管理计划 Procurement management plan ●合同管理计划 Contract management plan 合同收尾 Contract Closure 1.采购管理计划 Procurement management plan 2.合同管理计划 Contract management plan 3.合同文件 Contract documentation 4.合同收尾程序 Contract closure procedure  1.采购审计采购审计 Procurement audits  2.合同档案管理系统合同档案管理系统 Records management system 1.合同收尾Contract closures  2.组织过程资产组织过程资产(更新) Organizational process assets(updates) 8 。

项目管理英语

项目管理英语

项目管理基础英语词汇一、项目管理基础术语项目(Project)运营、操作(Operation)一般管理(General Management)项目管理(Project Management)大型项目(Program)子项目(Subproject)项目阶段(Project Phase)项目生命周期(Project Life Cycle)阶段出口或终止点(Phase exit or kill point)项目利益相关者/项目干系人(Stakeholder)过程(Process)控制(Control)PDCA(P—Plan,计划;D—Do,执行;C—Check,检查;A—Act,处理)项目管理知识体系(Project Management Body Of Knowledge,PMBOK)二、项目整体管理变更控制委员会(Change Control Board,CCB)综合变更控制(Integrated Change Control)配置管理(Configuration Management)经验教训(Lessons Learned)三、项目范围管理可交付成果(Deliverable)项目章程(Project Charter)产品描述(Product Description)约束(Constraint)假设(Assumptions)项目范围(Project Scope)范围变更(Scope Change)范围定义( Scope Definition)范围规划(Scope Planning)范围核实(Scope Verification)范围说明书(Scope Statement)工作分解结构(Work Breakdown Structure,WBS)工作包(Work Package)WBS 字典(WBS Dictionary)三、项目时间管理活动(Activity)虚活动(Activity Description, AD)工期(Duration, DU)项目网络图(Network Diagramming)顺序图法(Precedence Diagramming Method,PDM)箭线图法(Arrow Diagramming Method,ADM)计划评审技术(Program Evaluation and Review Technique,PERT)关键路径法(Critical Path Method,CPM)里程碑(Milestone)最早开始日期(Early Start Date,ES)最早完成日期(Early Finish Date,EF)最晚开始日期(Late Start Date,LS )最晚完成日期(Late Finish Date,LF )浮动时间(Float)资源平衡(Resource Leveling)四、项目人力资源管理组织规划(Organizational Planning)项目经理(Project Manager)项目团队(Project Team)项目型组织(Projectized Organization )项目管理办公室(Project Management Office,PMO)人员招募(Staff Acquisition)团队开发(Team Development)组织分解结构(Organizational Breakdown Structure,OBS)人员管理计划(Staffing Management Plan)权力(Power)责任分配矩阵(Responsibility Assignment Matrix,RAM)存在/相互关系/成长发展(Existence/Relatedness/Growth,ERG)五、项目成本管理净现值(Net Present Value,NPV)净现值率(Net Present Value Ratio,NPVR)资源计划(Resource Planning)成本估算(Cost Estimating)成本预算(Cost Budgets)类比估算(Analogous Estimating)应急储备(Contingency Reserve)S 曲线(S-Curve)挣值(Earned Value, EV)挣值管理(Earned Value Management,EVM)计划工作量的预算成本(Budgeted Cost for Work Scheduled,BCWS)已完成工作量的实际成本(Actual Cost for Work Performed,ACWP)已完工作量的预算成本(Budgeted Cost of Work Performed,BCWP)成本执行指数(Cost Performed Index,CPI)成本偏差(Cost Variance,CV)进度执行指数(Schedule Performed Index,SPI)进度偏差(Schedule Variance,SV)竣工预算(Budget At Completion,BAC)完工尚需估算(Estimate to Completion,ETC)完工时估算(Estimate at Completion,EAC)六、项目采购管理合同(Contract)违约(Breach)终止(Termination)询价(Solicitation)工作说明书(Statement Of Work,SOW)方案邀请书(Request for Proposal,RFP)报价邀请书(request for quotation,RFQ)七、项目质量管理项目质量管理(Project Quality Manager,PQM)质量规划(Quality Planning)质量保障(Quality Assurance)质量控制(Quality Control)返工(Rework)质量功能展开(Quality Function Deployment,QFD)过程决策程序图法(Process Decision Program Chart,PDPC)上控制界限(Upper Control Limit,UCL)下控制界限(Lower Control Limit,LCL)中心线(Central Line,CL)八、项目风险管理风险(Risk)风险识别(Risk Identification)敏感性分析(Sensitivity Analysis)蒙特卡罗分析(Monte Carlo Analysis)应急规划(Contingency Planning)风险回避(Risk Avoidance)风险转移(Risk Transference)竞争优势/竞争劣势/机会/威胁(Strength/Weakness/Opportunity/Threat,SWOT)期望货币值(Expected Money Value,EMV)九、项目沟通管理沟通规划(Communication Planning)信息发布(Information Distribution)绩效报告(Performance Reporting)管理收尾(Administrative Closure)绩效测量基准(Performance Measurement Baseline)沟通障碍(Barriers)请注意,以上列出的仅为部分英文术语,仅供参考。

pmp九大知识点

pmp九大知识点

pmp知识点作为PMP(项目管理专业人士)考试的重要内容,九大知识点指的是PMBOK®指南(《项目管理知识体系指南》)中的九个项目管理知识领域。

这些知识领域被认为是项目管理的核心要素,考试中也会涉及对这些知识点的了解和应用。

以下是九大知识点的简要介绍:1. 项目整合管理(Project Integration Management):涉及项目整体规划、执行、变更控制和收尾等过程,确保项目各个方面协调一致,实现项目目标。

2. 项目范围管理(Project Scope Management):包括确定项目需求、制定项目范围说明书、范围控制和确认等过程,确保项目交付的成果符合需求和范围要求。

3. 项目时间管理(Project Time Management):涉及制定项目工作分解结构(WBS)、编制项目进度计划、时间控制和进度变更管理等过程,确保项目按时完成。

4. 项目成本管理(Project Cost Management):包括估算项目成本、编制项目预算、成本控制和成本变更管理等过程,确保项目经济效益和成本控制。

5. 项目质量管理(Project Quality Management):涉及制定项目质量计划、质量控制和质量保证等过程,确保项目交付的成果符合质量要求。

6. 项目资源管理(Project Resource Management):包括规划项目人力资源、获取、开发和管理项目人力资源等过程,确保项目团队的有效管理和资源利用。

7. 项目沟通管理(Project Communications Management):涉及规划项目沟通、传递项目信息和沟通控制等过程,确保项目相关方之间的有效沟通和信息交流。

8. 项目风险管理(Project Risk Management):包括规划项目风险管理、识别、评估和应对项目风险等过程,确保项目风险被充分考虑和管理。

9. 项目采购管理(Project Procurement Management):涉及规划项目采购管理、执行采购和控制采购等过程,确保项目采购的有效管理和合理运作。

工程项目管理常用英语

工程项目管理常用英语

工程项目管理常用英语一、项目启动阶段常用英语1. Project Initiation(项目启动)- Project Charter(项目章程)- Project Objective(项目目标)- Project Scope(项目范围)- Stakeholder Analysis(利益相关者分析)- Feasibility Study(可行性研究)- Project Kickoff(项目启动)2. Project Planning(项目计划)- Work Breakdown Structure (WBS)(工作分解结构)- Project Schedule(项目进度计划)- Resource Allocation(资源分配)- Risk Assessment(风险评估)- Cost Estimation(成本估算)- Quality Management Plan(质量管理计划)3. Project Execution(项目执行)- Project Team(项目团队)- Project Communication(项目沟通)- Change Management(变更管理)- Issue Tracking(问题追踪)- Progress Monitoring(发展监控)- Deliverable Acceptance(可交付成果验收)4. Project Control(项目控制)- Performance Measurement(绩效测量)- Change Control(变更控制)- Risk Mitigation(风险缓解)- Issue Resolution(问题解决)- Cost Control(成本控制)- Quality Assurance(质量保证)5. Project Closure(项目收尾)- Lessons Learned(经验教训)- Project Review(项目评审)- Project Documentation(项目文档)- Stakeholder Feedback(利益相关者反馈)- Project Handover(项目移交)- Project Closure Report(项目收尾报告)二、常用英语短语和表达- Define project objectives and deliverables.(明确项目目标和可交付成果。

项目管理专业英语-范围定义的依据

项目管理专业英语-范围定义的依据

Scope Definition:Inputs范围定义:依据1 Organizational Process Assets1 组织过程资产2 Project Charter2 项目章程If a project charter is not used in a performing organization,then comparable information needs to be acquired or developed,and used to develop the detailed project scope statement.如果实施组织不使用项目章程,则应取得或提出类似的信息,并用于制定详细的项目范围说明书。

3 Preliminary Project Scope Statement3 项目初步范围说明书If a preliminary project scope statement is not used in a performing organization,then comparable information,including the product scope description,needs to be acquired or developed and used to develop the detailed project scope statement.如果实施组织不使用项目初步范围说明书,则应取得或提出类似的信息,包括产品范围说明书,并用于制定详细的项目范围说明书。

4 Project Scope Management Plan4 项目范围管理计划5 Approved Change Requests5 批准的变更请求Approved change requests can cause a change to project scope,project quality,estimated costs,or project schedule.Changes are often identified and approved while the work of the project is ongoing.批准的变更请求可能会改变项目范围、项目质量、费用估算或项目进度。

(完整版)工程管理专业英语词汇短语

(完整版)工程管理专业英语词汇短语

Part1market demand 市场需求facility 设施the speculative housing market 投机性住宅市场the real estate developer 房地产开发商government agency 政府机构public project 公共项目project management 项目管理the conceptual planning stage 概念规划阶段feasibility 可行性in-house 内部的,内业的the project life cycle 项目生命周期from cradle to grave 从开始到结束knowledge domain 知识领域construction industry 建筑业spectrum 波普,光谱,范围residential housing construction 房屋住宅建设subcontractor 分包商institutional and commercial building construction 办公与商业用房建设specialized industrial construction 专业化工业项目建设infrastructure and heavy construction 重大基础项目建设architectural and engineering(A/E)firm 建筑与工程设计公司consortium 财团,株式会社preliminary design 初步设计general contractor 总承包商on site quality inspection 现场质量监督litigation 法律诉讼shop drawings 施工图constructability 可建造性,可施工性value engineering 价值工程construction contract 施工合同design/construct firm 设计、施工公司turnkey 交钥匙(承发包)模式facility maintenance 设施维护Part2project integration management 项目综合管project scope management 项目范围管理project time management 项目时间管理project cost management 项目成本管理project quality management 项目质量管理project human resource management 项目人力资源管理project communications management 项目沟通管理project risk management 项目风险管理project procurement management 项目采购管理contractual relationships 合同关系changes 工程变更claims 施工索赔mega-projects 巨型项目“functional”organization “职能式”组织“project”organization “项目式”组织suborganizations 次级组织strong matrix-type suborganization 强矩阵式次级组织interpersonal influence 人际间影响力formal authority 正式的授权reward and/or penalty power 奖励和/或惩罚的权利matrix organization 矩阵式组织hierarchical structure 层级结构Part3job-site productivity 工作现场生产率non-productive activities 非生产性工作temporary work stoppage 临时性工作暂停union activities 工作活动performance analysis 绩效分析base labor productivity 基准劳动生产率labor productivity index 劳动力生产指数non-local labor 非当地用工productive labor yield 劳动力产出requisitions 询价purchase orders 订购单subcontracts 分包合同shipping and receiving documents 装船与接收文件invoices 发票bulk materials 大众材料standard off-the-shelf materials 现货材料fabricated members or units 预制构件或单元semi-processed state 半成品状态pre-processed 预加工的pressure vessels 压力容器field assembly 现场装配skilled craftsmen 熟练技工crawler mounting 履带式底盘claim shell 抓铲挖土机`dragline 拉铲挖土机backhoe 反铲挖土机shovel 正铲挖土机bulldozer 推土机rotary-percussion drills 旋转冲击钻bituminous 沥青Part4economic evaluation 经济评价the planning horizon 规划期cash flow profile 现金流量图minimum attractive rate of return(MARR) 最低收益率sensitivity or uncertainty analysis 敏感性或不确定性分析annual benefit 年收益annual cost 年费用net annual cash flow 年净现金流量opportunity cost 机会成本social rate of discount 社会贴现率profit measure利润指标值private corporations 私营股份制公司public agencies 公共机构net future value(NFV) /净终值net present value(NPV) 净现值equivalent uniform annual net value (NUV)等额净年值capital recovery factor 资金回收因子benefit-cost ratio(BCR) 收益-费用比profitability index 盈利指数saving-to-investment ratio(SIR) 存款投资比率absolute numerical measure 绝对指数internal rate of return(IRR) 内部收益率marginal efficiency of capital 边际资本收益return on investment(ROI) 投资收益payback period(PBP) 投资回收期profit maximization利润最大化public sector 公共领域basic principle 基本原理nonnegative 非负的budget constraint 预算限制incremental analysis 追加分析internal rate of return method 内部收益率法Part5Word Bank-financed projects 世界银行融资贷款项目foreign bidders 海外投标人civil works 土木工程I nternational Competitive Bidding(ICB) 竞争性国际招标Limited International Bidding 有限国际招标National Competitive Bidding 国内竞争性招标International Shopping 国际订购Direct Contracting 直接签约General Procurement Notice 通用采购公告prequalification 资格预审bidding documents 招标文件domestic contractors 国内承包商instructions to bidders 投标人须知conditions of contract 合同条件specifications of drawings 技术规范与图纸bill of quantities 工程量清单payment terms 支付条件minutes of the conference 会议纪要pre-bid conferences 标前会议site visits 现场踏勘substantially responsive 实质性响应the lowest evaluated cost 经评审的最低造价Part6the sealed bids 密封的投标报价construction company 建筑公司marketing strategy 市场营销策略long-term goals 长期目标client relationships 客户关系short-term goal 短期目标direct costs estimate 直接费估算mark-up 涨价溢价company or head office overheads 公司或总部管理费unrealistic bids 不切实际的报价owner-contractor agreement 业主与承包商之间订立的合同standard form of agreement 标准合同形式American Institute of Architects(AIA) 美国建筑师协会bonus and penalty clauses 奖励与惩罚条款lump-sum agreement 总价合同changer order 变更单written authorization 书面授权unit-price agreement 单价合同quantity takeoff 工程量清单cost-plus-fee agreements 成本加酬金合同equity partners 股权伙伴rental rates 出租比例percentage fee 百分百酬金合同fixed fee 固定酬金合同changes 工程变更contract award 合同授予changes clause 变更条款publicly financed project 公共融资项目extra work 附加工作the prime contractor 主承包商Part7the International Federation of Consulting Engineering 国际咨询师联合会the FIDIC Conditions of Contract for Constructions FIDIC施工合同条件the General Conditions (FIDIC)通用条件the Particular Conditions (FIDIC)专业条件the Appendix to Tender (FIDIC)投标附录arbitration 仲裁,裁决Dispute Adjudication Board(DBA)争议仲裁委员会Conditions of Contract for Works of Civil Engineering Construction 土木工程施工合同条件Conditions of Contract for Electrical and Mechanical Work 机电安装工程合同条件Conditions of Contract for Design-Build and Turnkey设计-建造于交钥匙合同条件Client/Consultant Model Services Agreement 客户/咨询师服务协议Conditions of Subcontract for Works of Civil Engineering Construction 土木工程分包合同条件Guides to the Use of the Different FIDIC Conditions of Contract 各种FIDIC合同条件应用指南Amicable Settlement of Construction Disputes 施工争端友好解决方式Insurance of Large Civil Engineering Projects 大型土木工程保险The Conditions of Contract for Plant and Design-Build (FIDIC)安装与设计-建造合同The Conditions of Contract for EPC/Turnkey Projects (FIDIC)EPC/交钥匙项目合同条件The Short Form of Contract (FIDIC)简短格式合同The Form of Contract for Dredging and Reclamation Works (FIDIC)疏浚与防洪工程合同格式priced contract with activity schedule 总价合同priced contract with bill of quantities 单价合同target contract with activity schedule 目标总价合同target contract with bill of quantities 目标单价合同cost reimbursable contract 成本补偿合同performance bond 履约保函parent company guarantee 母公司担保advance payment 预付款retention (工程)留置权bonus for early completion 工期提前奖delays damages 误期损害surety 担保financial loan 商业贷款insurance policy 保险政策in breach of contract 合同违约bid bond 投标担保justification (正当的)理由labor and material bond 劳动力与原材料担保lien bond 留置权担保comprehensive general liability insurance 综合责任险professional liability insurance职业责任险workers’compensation insurance 工人补偿险builder’s risk fire insurance 施工方火灾险Part8construction planning 施工计划the choice of technology 施工技术的选择the definition of work tasks 工作任务的定义the estimation of the required resources and durations for individual tasks 所需资源和各项工作持续时间的估算reasoning backward 逆向推理normative problem 规范性问题cost control 成本控制schedule control 进度控制critical path scheduling procedures 关键线路进度控制程序job shop scheduling procedures 工作现场进度控制程序work breakdown 工作分解manufacturing terminology加工制造业术语resource allocations 资源分配fore-runner 先行者laborious and tedious process 复杂和枯燥的过程general models 通用模型databases and information systems 数据库和信息系统the storage and recall of the activities工作活动的存储于记忆manpower 人力,劳动力the duration of the activity 工作活动的持续时间placing concrete on site 现场浇筑混凝土placing forms 支设模板installing reinforcing steel 绑扎钢筋pouring concrete 浇筑混凝土finishing the concrete 混凝土养护removing forms 模板拆除position forms on the cleaning station 在清理场所码放的模板hierarchical structure 层级结构work breakdown structure 工作结构分解precedence relations 先导顺序关系structural integrity结构整体性design drawings 设计图纸milestone events 里程碑事件lag 时间间隔computer based simulation 基于计算机的模拟excavation equipment 开挖机械\Part9critical path method(CPM) 关键路线发predecessor/successor activities先导/后续工作resource constraint 资源约束artificial precedence constraint 人为先导关系约束activity-branch network 双代号网络图dummy activity 虚工作earliest time schedule 最早时间进度latest time schedule 最迟时间进度float 时差,机动时间maneuvering room 可调整的余地free float 自由时差independent float 独立时差total float 总时差inter-relationships 相互关系graphical presentations of project schedules 项目进度的图形表达network diagrams 网络图time-scaled network 时标网络bar or Gantt chart 横道或甘特图horizontal axis 横轴,横坐标vertical axis 纵轴,纵坐标S-curves S型曲线resource graphs 资源图uncertainty associated with the actual durations与实际持续时间相关的不确定性regulatory approval 行政许可adverse weather 不利的天气contingency allowance 应急准备probabilistic perspective概率的角度independent random variables 相互独立的随机变量random fluctuations 随机波动positive correlations正相关over-optimistic 过于乐观的Part10e-construction 工程返工personal injuries 人身伤害conformance 遵守,服从re-evaluation of design decisions设计决策的重要评估tunneling methods 隧道开掘方法actual site conditions 现场的实际状况roadway rehabilitation 公路路面返修quality assurance 质量保证n-site inspections 现场监督检查US Occupational Safety and Health Administration(OSHA)美国职业安全与健康署violation of existing standard 违反现行规范标准employee participation in quality control 质量控制的员工参与statistical methods 统计方法batches of materials 材料批implicit assumption 隐含的假设total quality control 全面质量控制zero defects goal 零缺陷目标quality circles 质量环“optimum”proportion “最佳”的比例non-destructive techniques 非破坏性技术x-ray inspection of welds 焊接的X光检测exhaustive or 100% testing 全数或100%检测lot 母体,总体sampling by attributes 特征抽样sampling by variables 变量抽样direct costs 直接成本indirect costs 间接成本construction accidents 工程事故insurance premiums 保险赔偿unsecured railings 未经保护的围栏on-board electronics面板电子元器件asbestosis 矽肺,石棉肺sewer line 排污管道four lane street 四车道道路Part11construction yard and warehouse management information 施工仓储管理信息concrete pumps 混凝土泵warehouse clerks 仓储管理员daily rental charge 日租金tedious manual task 繁琐的手工作业application programs 应用程序duplicate 复制verbal description 文字描述warehouse inventory database 仓储清单数据库relational data model 关系数据模型data dictionary 数据字典numerical code 数据编码redundancy 冗余aggregate 集料,骨料external models of the information 外部信息模型algebraic theory 代数理论projection 映射advantages of distributed processing 分散式处理的优点dynamic changes in information needs 信息需求的动态变化untidy information 凌乱的信息information flow 信息流preprocessor system 预处理系统independent systems 独立系统geometric information 图形信息。

  1. 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
  2. 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
  3. 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。

Project Scope Management
项目范围管理
Project Scope Management includes the processes required to ensure that the project includes all the work required,and only the work required,to complete the project successfully5.Project scope management is primarily concerned with defining and controlling what is and is not included in the project.
项目范围管理是确保项目包括成功完成项目所需的全部工作,但又只包括必须完成的工作的各个过程。

它主要关心的是确定与控制那些应该与不应该包括在项目之内的过程。

5.1 Scope Planning–creating a project scope management plan that documents how the project scope will be
defined,verified,controlled,and how the work breakdown structure(WBS)will be created and defined.
5.1 范围规划——制定项目范围管理计划,记载如何确定、核实与控制项目范围,以及如何制定与定义工作分解结构(WBS)。

5.2 Scope Definition–developing a detailed project scope statement as the basis for future project decisions.
5.2 范围定义——制定详细的项目范围说明书,作为将来项目决策的根据。

5.3 Create WBS–subdividing the major project deliverables and project work into smaller,more manageable components.
5.3 制作工作分解结构——将项目大的可交付成果与项目工作划分为较小和更易管理的组成部分。

5.4 Scope Verification–formalizing acceptance of the completed project deliverables.
5.4 范围核实——正式验收已经完成的项目可交付成果。

5.5 Scope Control–controlling changes to the project scope.
5.5 范围控制——控制项目范围的变更。

These processes interact with each other and with processes in the other Knowledge Areas as well.Each process can involve effort from one or more persons or groups of persons,based on the needs of the project.Each process occurs at least once in every project and occurs in one or more project phases,if the project is divided into phases.Although the processes are presented here as discrete components with well-defined interfaces,in practice they can overlap and interact in ways not detailed here.
上述过程不仅彼此之间,而且还与其他知识领域过程交互作用。

根据项目需要,每个过程可能涉及一个或多个个人或者集体所付出的努力。

每个过程在每个项目或在多阶段项目中的每一阶段至少出现一次。

虽然在本章中,过程是以界线分明的单个组成部分分开介绍的,但是在实践中,它们却可能以本章未详细介绍的方式交叉重叠与交互作用。

In the project context,the term scope can refer to:
就项目而言,范围这一术语可指:
Product scope.The features and functions that characterize a product,service,or result.
产品范围——产品、服务或成果的特征与功能。

Project scope.The work that needs to be accomplished to deliver a product,service,or result with the specified features and functions.
项目范围——为提供具有规定特征与功能的产品、服务或成果而需要完成的工作。

This chapter focuses on the processes used to manage the project scope.These project scope management processes,and their associated tools and techniques,vary by application area,are usually defined as part of the project life cycle,and are documented in the project scope management plan.The approved detailed project scope statement and its associated WBS and WBS dictionary are the scope baseline for the project.
本章重点是管理项目范围的过程。

项目范围管理各过程,以及有关的工具与技术因应用领域而异,通常将其视为项目生命期的一部分,所有这些均记载于项目范围管理计划之中。

经过批准的详细项目范围说明书,相应的工作分解结构,以及工作分解结构词汇表是项目的范围基准。

A project generally results in a single product,but that product can include subsidiary components,each with its own separate,but interdependent,product scope.For example,a new telephone system would generally include four subsidiary components—hardware,software,training,and implementation.
项目所产生的通常是单项产品,但该产品却可包括若干个从属部分,每个部分都具备其单独却又相互依存的产品范围。

例如,一个新电话系统通常包括4个从属部分,即硬件、软件、培训和实施。

Completion of the project scope is measured against the project management plan,the project scope statement,and its associated WBS and WBS dictionary,but completion of the product scope is measured against the product requirements.Project scope management needs to be well integrated with the other Knowledge Area processes,so that the work of the project will result in delivery of the specified product scope.
项目范围是否完成是以项目管理计划、项目范围说明书、相应的工作分解结构,以及工作分解结构词汇表作为衡量标准,而产品范围是否完成则以产品要求作为衡量标准。

项目范围管理需要与其他知识领域过程很好地结合,这样才能确保项目工作交付规定的产品范围。