Process audit checklist
BDH256
Change Level:
Audit Date:
Auditor:
NO.
评价evaluate
1.11.21.31.4NO.
评价evaluation
2.12、设计和过程FMEA/design and process FMEA does the actual material and production flow follow the process flowchart?DFMEA 的零件编号、修订版本、原始日期和审定日期是否正确?
does the DFMEA have the correct Part#, Revision Level, Orig. Date and Rev. Date?
does the floor plan identify the following :all required assembly, process and inspection stations?locations for all raw material, work in process(WIP) and finished product?Is the flowcharts lastest and identified with date?
记录/comments
记录/comments
Part Name:Part Number :文 件 要 求/document questions
是否有最新版平面布置图?
生产过程中,材料和产品流动是否与过程流程图一致?
is there a dated copy of the current floor plan readily available?
操 作 要 求/implementation/process questions
文 件 要 求/document questions
DFMEA (含有设计职责)/DFMEA(if supplier is design responsible)平面布置图上是否有所有装配、生产和检测岗位、原材料、半成品、成品的区域划分?
流程图是否是最新版本的并标注有日期?
Process audit checklist
BDH256
Change Level:
Audit Date:
Auditor:
Part Name:Part Number
:3、控制计划/Control Plan
Process audit checklist
BDH256
Change Level:
Audit Date:
Auditor:
Part Name:Part Number :4、 检验和试验/Inspection and Testing
Process audit checklist
BDH256
Change Level:
Audit Date:Auditor:
Part Name:Part Number :
Process audit checklist
BDH256
Change Level:
Audit Date:
Auditor:
Part Name:Part Number :
Process audit checklist
BDH256
Change Level:
Audit Date:
Auditor:
Part Name:Part Number :
5、产品规范与图纸/Product Specifications & Drawings
Process audit checklist
BDH256
Change Level:
Audit Date:
Auditor:
Part Name:Part Number :
6、过程监控与操作指导书/Process Monitoring & Operator Instructions
Process audit checklist
BDH256
Change Level:
Audit Date:
Auditor:
Part Name:Part Number :
Process audit checklist
BDH256
Change Level:
Audit Date:
Auditor:
Part Name:Part Number :
Process audit checklist
BDH256
Change Level:
Audit Date:
Auditor:
Part Name:Part Number :
7、 Handling and storage
Process audit checklist
BDH256
Change Level:
Audit Date:
Auditor:
Part Name:Part Number :
8、包装与发运规范/Parts Packaging/Shipping Specifications
Process audit checklist
BDH256
Change Level:
Audit Date:Auditor:
Part Name:Part Number :
Process audit checklist
BDH256
Change Level:
Audit Date:
Auditor:
Part Name:Part Number :
9、异常处理
Process audit checklist
BDH256
Change Level:
Audit Date:
Auditor:
Part Name:Part Number :
Process audit checklist
BDH256
Change Level:
Audit Date:
Auditor:
Part Name:Part Number :
Process audit checklist
BDH256
Change Level:
Audit Date:
Auditor:
Part Name:Part Number :
Process audit checklist
BDH256
Change Level:
Audit Date:
Auditor:
Part Name:Part Number :
11、检测量具的评价/Gage & Check Fixture Evaluation
Process audit checklist
BDH256
Change Level:
Audit Date:
Auditor:
Part Name:Part Number :
12、产能验证/Line Speed & Capacity Verified
Process audit checklist
BDH256
Change Level:
Audit Date:
Auditor:
Part Name:Part Number :
Process audit checklist
BDH256
Change Level:
Audit Date:
Auditor:
Part Name:Part Number :