投标函附录(Appendix to Tender)转让(Assignment) 进场道路(Access Route)中标合同金额(Accepted Contract Amount)避免干扰(Avoidance of Interference)预付款(Advance Payment) 仲裁(Arbitration)申请期中支付证书(Application for Interim Payment Certificate) 竣工文件(“as built” documents)工程量清单(Bill of Quantities) 基准日期(Base Date)合同(Contract) 合同协议书(Contract Agreement)竣工(Completion) 合同价格(Contract Price)费用(Cost) 开工日期(Commencement Date)承包商的设备(Contractor’s Equipment) 合作(Co-operation) 承包商代表(Contractor’s Representative)承包商的文件(Contractor’s Documents)通信联络(Communications) 承包商(Contractor)承包商的一般义务(Contractor’s General Obligations )承包商人员(Contractor’s Personnel)承包商的现场作业(Contractor’s Operations on Site )开工(Commencement of Works) )雇主责任的终止(Cessation of Employer’s Liability )支付货币(Currencies of Payment) 工程所在国(Country)分包合同(Construction Subcontract)承包商的索赔(Contractor’s Claims)索赔、争端与仲裁(Claim, Disputes and Arbitration)图纸(Drawings) 缺陷通知期(Defects Notification)日期(Dates) 结清证明(Discharge)决定(Determinations) 误期损害赔偿费(Delay Damages)缺陷责任(Defects Liability) 计日工作(Daywork)延误的付款(Delayed Payment) 争议裁决委员会(DAB)业主(Employer) 业主的风险(Employer’s Risks)雇主人员(Employer’s Personnel) 估价(Evaluation)雇主的资金安排(Employer’s Financial Arrangements)雇主的索赔(Employer’s Claims) 工程师(Engineer)业主的设备(Employer’s Equipment)电、水和燃气(Electricity, Water and Gas)竣工时间的延长(Extension of Time)业主的接收(Employer’s Taking Over)最终报表(Final Statement) 不可抗力(Force Majeure)最终付款证书(Final Payment Certificate)外币(Foreign Currency) 化石(Fossils)货物(Goods)工程师指令(Instructions of the Engineers) 解释(Interpretation) 期中支付证书(Interim Payment Certificate) 检验(Inspection) 最终支付证书的签发(Issue of Final Payment Certificate)保险(Insurance) 投保人(insurance applicant)保险单(insurance policy)被保险人(insured)联合被保险人(joint insured)中标函(Letter of Acceptance)投标函(Letter of Tender) 责任限度(Limit of Liability) 当地币(Local Currency) 法律(Laws)计量方法(Method of Measurement)实施方法(Manner of Execution)材料(Materials)指定分包商(Nominated Subcontractor)遗留工作(Outstanding Work)合同当事人(Party) 文件优先次序(Priority of Documents)履约证书(Performance Certificate)支付证书(Payment Certificate) 生产设备(Plant)暂定金额(Provisional Sum) 付款(Payment)进度计划(Programme)永久工程(Permanent Works) 履约担保(Performance Security) 环境保护(Protection of the Environment)许可证,执照或批准(Permits, Licenses or Approvals)保留金的支付(Payment of Retention Money)暂列金额(Provisional Sums) 进度报告(Progress Reports)质量保证(Quality Assurance)保留金(Retention Money) 工程进度(Rate of Progress)现场进入权(Right of Access to the Site) 拒收(Rejection)修补工作(Remedial Work)复工(Resumption of Work)工程师的更换(Replacement of the Engineer)有权变更(Right to Vary)风险与责任(Risks and Responsibility)支付计划表(Schedule of Payments) 样品(Samples)资料表(Schedules) 规范(Specification)竣工报表(Statement at Completion)报表(Statement) 单位工程(Section)分包商(Subcontractor) 现场(Site)放线(Setting Out) 安全措施(Safety Procedures)现场数据(Site Data) 暂时停工(Suspension of Work)现场安保(Security of Site) 职员与劳工(Staff and Labour)投标书(Tender ) 试验(Testing)竣工时间(Time for Completion)竣工试验(Tests on Completion)接收证书(Taking-over Certificate)竣工后试验(Tests after Completion)临时工程(Temporary Works)竣工检验(Tests on Completion)货物运输(Transport of Goods)工程和单位工程的接收(Taking Over of the Works and Sections) 业主提出终止(Termination by Employer )发包商提出终止(Termination by Employer)不可预见(Unforeseeable) 变更(Variation)不可预见的物质条件(Unforeseeable Physical Conditions)变更与调整(Variation and Adjustment)价值工程(Value Engineering)变更程序(Variation Procedure)工程(Works) 工程计量(Works to be Measured)。

FIDIC国际土木建筑工程承包合同(英汉对照)

FIDIC国际土木建筑工程承包合同(英汉对照)

FIDIC国际土木建筑工程承包合同(英汉对照)(一) PART I —GENERAL CONDITIONS of CONTRACT 第一部分-合同条款概述Definitions and Interpretation定义和解释1。

1 Definitions定义 In the Contract (ashereinafter defined) the following words and expression_rs shall have the meanings hereby assigned to them, except where the context otherwise requires :本合同(按下文所定义的)中的下列词和用语,除文中另有要求者外,应具有本条所赋予的含义: a. (i)"Employer” means PHU MY HUNG CORPORATION, a company incorporated and registered at Saigon Parking Way Dist.7 HCMC. Vietnam。

“雇主"是PHU MY HUNG CORPORATION公司在Saigon Parking Way Dist。

7 HCMC。

Vietnam注册登记。

(ii)”Contractor" means the person named as such in Part II of these Conditions and the legal successors in title to such person, but not ( except with the consent of the Employer) any assignee of such person。

承包商是指第二部分指定的当事人以及取得此当事人资格的合法继承人,(除非雇主同意)不指此当事人的任何受让人。

FIDIC国际合同条款中英文对照

FIDIC国际合同条款中英文对照

CONTENTS目录1General Provisions一般规定 (5)1.1Definitions定义 (5)1.2Interpretation解释 (10)1.3Communications通信交流 (11)1.4Law and Language法律和语言 (12)1.5Priority of Document文件优先次序 (12)1.6Contract Agreement合同协议书 (12)1.7Assignment权益转让 (13)1.8Care and Supply of Document文件的照管和提供 (13)1.9Confidentiality保密性 (14)1.10Employer’s Use of Contractor’s Documents雇主使用承包商文件 (14)1.11Contractor’s Use of Employer’s Documents承包商使用雇主文件 (15)1.12Confidential Details保密事项 (15)1.13Compliance with Laws遵守法律 (15)1.14Joint and Several Liability共同的和各自的责任 (16)2The Employer雇主 (16)2.1Right of Access to the Site现场进入权 (16)2.2Permits, Licences or Approves许可、执照或批准 (17)2.3Employer’s personnel雇主人员 (18)2.4Employer’s Financial Arrangements雇主的资金安排 (18)2.5Employer’s Claims雇主的索赔 (18)3The Employer’s Administration雇主的管理 (19)3.1The Employer’s Representative雇主代表 (19)3.2The Employer’s personnel其他雇主人员 (20)3.3Delegated Persons受托人员 (20)3.4Instructions指示 (21)3.5Determinations确定 (21)4The Contractor承包商 (21)4.1The Contractor’s General Obligations承包商的一般义务 (22)4.2Performance security履约担保 (22)4.3Contractor’s Representative承包商代表 (23)4.4Subcontractors分包商 (24)4.5Nominated Subcontractors指定的分包商 (25)4.6Co-operation合作 (25)4.7Setting out放线 (26)4.8Safety procedures安全程序 (26)4.9Quality Assurance质量保证 (27)4.10Site Data现场数据 (27)4.11Sufficiency of the Contract Price合同价格 (28)4.12Unforeseeable Difficulties不可预见的困难 (28)4.13Rights of way and Facilities道路通行权于设施 (28)4.14Avoidance of Interference避免干扰 (29)4.15Access Route进场通路 (29)4.16Transport of Goods货物运输 (30)4.17Contractor’s Equipment承包商设备 (30)4.18Protection of the Environment环境保护 (30)4.19Electricity, Water and Gas电、水和燃气 (31)4.20Employer’s Equipment and Free-Issue Material雇主设备和免费供应的材料 (31)4.21Progress Reports进度报告 (32)4.22Security of the Site现场保安 (33)4.23Contractor’s Operations on Site承包商的现场作业 (34)4.24Fossils化石 (34)5Design设计 (35)5.1General Design Obligations设计义务一般要求 (35)5.2Contractor’s Documents承包商文件 (36)5.3Contractor’s Undertaking承包商的承诺 (37)5.4Technical Standards and Regulations技术标准和法规 (37)5.5Training培训 (38)5.6As-Built Documents竣工文件 (38)5.7Operation and Maintenance Manuals操作和维修手册 (39)5.8Design Error设计错误 (39)6Staff and Labour员工 (39)6.1Engagement of Staff and Labour员工的雇用 (40)6.2Rates of Wages and Conditions of Labour工资标准和劳动条件 (40)6.3Persons in the Service of Employer为雇主服务的人员 (40)6.4Labour Laws劳动法 (40)6.5Working Hours工作时间 (41)6.6Facilities for Staff and Labour为员工提供设施 (41)6.7Health and Safety健康和安全 (41)6.8Contractor’s Superintendence承包商的监督 (42)6.9Contractor’s Personnel承包商人员 (42)6.10Records of contractor’s Personnel and Equipment承包商人员和设备的记录 (43)6.11Disorderly Conduct无序行为 (43)7Plant, Materials and Workmanship生产设备、材料和工艺 (43)7.1Manner of Execution实施方法 (43)7.2Samples样品 (44)7.3Inspection检验 (44)7.4Testing试验 (45)7.5Rejection拒收 (46)7.6Remedial Work修补工作 (46)7.7Ownership of Plant and Materials生产设备和材料的所有权 (47)7.8Royalties土地(矿区)使用费 (47)8Commencement,Delays and Suspension开工、延误和暂停 (48)8.1Commencement of Works工程的开工 (48)8.2Time for Completion竣工时间 (48)8.3Programme进度计划 (49)8.4Extension of Time for Completion竣工时间延长 (50)8.5Delays Caused by Authorities当局造成的延误 (50)8.6Rate of Progress工程进度 (51)8.7Delay Damages误期损害赔偿费 (51)8.8Suspension of Work暂时停工 (52)8.9Consequences of Suspension暂停的后果 (52)8.10Payment for Plant and Materials in Event of Suspension暂停时对生产设备和材料的付款 (53)8.11Prolonged Suspension托长的暂停 (53)8.12Resumption of Work复工 (53)9Tests on Completion竣工试验 (54)9.1Contractor’s Obligations承包商的义务 (54)9.2Delayed Tests延误的试验 (55)9.3Retesting重新试验 (55)9.4Failure to Pass Tests on Completion未能通过竣工试验 (56)10Employer’s Taking Over雇主的接收 (56)10.1Taking Over of the Works and Sections工程和分项工程的接收 (56)10.2Taking Over of Parts of the Works部分工程的接收 (57)10.3Interference with Tests on Completion对竣工试验的干扰 (57)11Defects Liability缺陷责任 (58)11.1Completion of Outstanding Work and Remedying Defects完成扫尾工作和修补缺陷 (58)11.2Cost of Remedying Defects修补缺陷的费用 (59)11.3Extension of Defects Notification Period缺陷通知期的延长 (59)11.4Failure to Remedy Defects未能修补的缺陷 (60)11.5Removal of Defective Work移出有缺陷的工程 (60)11.6Further Tests进一步试验 (61)11.7Right of Access进入权 (61)11.8Contractor to Search承包商调查 (61)11.9Performance Certificate履约证书 (62)11.10Unfulfilled Obligations未履行的义务 (62)11.11Clearance of Site现场清理 (62)12Tests after Completion竣工后试验 (63)12.1Procedure for Tests after Completion竣工后试验的程序 (63)12.2Delayed Tests延误的试验 (64)12.3Retesting重新试验 (64)12.4Failure to Pass Tests after Completion未能通过的竣工后试验 (65)13Variations and Adjustments变更和调整 (66)13.1Right to Vary变更权 (66)13.2Value Engineering价值工程 (66)13.3Variation Procedure变更程序 (66)13.4Payment in Applicable Currencies以适用货币支付 (67)13.5Provisional Sums暂列金额 (67)13.6Daywork计日工作 (68)13.7Adjustments for Changes in Legislation因法律改变的调整 (69)13.8Adjustments for Changes in Cost因成本改变的调整 (70)14Contract price and Payment合同价格和支付 (70)14.1The Contract Price合同价格 (70)14.2Advance payment预付款 (70)14.3Application for Interim Payments期中付款的申请 (72)14.4Schedule of Payments付款价格表 (73)14.5Plant and Materials intended for the Works拟用于工程的生产设备和材料 (73)14.6Interim Payments期中付款 (74)14.7Timing of Payments付款的时间安排 (74)14.8Delayed Payment延误的付款 (75)14.9Payment of Retention Money保留金支付 (75)14.10Statement at Completion施工报表 (76)14.11Application for Final Payment最终付款的申请 (76)14.12Discharge结清证明 (77)14.13Final Payment最终付款 (77)由14.14 Cessation of Employer’s Liability 雇主责任的中止 (78)14.15 Currencies of Payment 支付的货币 (78)15 Termination by Employer 由雇主终止 (79)15.1Notice to Correct 通知改正................................................................................................................79 15.2Termination by Employer 由雇主终止...............................................................................................79 15.3Valuation at Date of Termination 终止日期时的估价..........................................................................81 15.4Payment after Termination 终止后的付款..........................................................................................81 15.5 Employer’s Entitlement to Termination 雇主终止的权利.. (82)16 Suspension and termination by Contractor 承包商暂停和终止 (82)16.1Contractor’s Entitlement to Suspend Work 承包商暂停工作的权利..................................................82 16.2Termination by Contractor 由承包商终止..........................................................................................83 16.3Cessation of Work and Removal of Contractor’s Equipment 停止工作和承包商设备的撤离.............84 16.4 Payment on Termination 终止时的付款 (84)17 Risk and Responsibility 风险和职责 (85)17.1Indemnities 保障...............................................................................................................................85 17.2Contractor’s Care of the Works 承包商对工程的照管.......................................................................86 17.3Employer’s Risks 雇主的风险...........................................................................................................87 17.4Consequence of Employer’s Risks 雇主风险的后果.........................................................................87 17.5Intellectual and Industrial Property Rights 知识产权和工业产权.......................................................88 17.6 Limitation of Liability 责任限度. (89)18 Insurance 保险 (89)18.1General Requirements for Insurances 有关保险的一般要求.............................................................89 18.2Insurance for Works and Contractor’s Equipment 工程和承包商设备的保险....................................91 18.3Insurance against Injury to Persons and Damage to Property 人身伤害和财产损害险.....................93 18.4 Insurance for Contractor’s Personnel 承包商人员的保险 (94)19 Force Majeure 不可抗力 (94)19.1Definition of Force Majeure 不可抗力的定义.....................................................................................95 19.2Notice of Force Majeure 不可抗力的通知.........................................................................................96 19.3Duty to Minimise Delay 将延误减至最小的义务................................................................................96 19.4Consequences of Force Majeure 不可抗力的后果............................................................................96 19.5Force Majeure Affecting Subcontractor 不可抗力影响分包商............................................................97 19.6Optional Termination, Payment and Release 自主选择终止、支付和解除........................................97 19.7 Release from Performance under the Law 根据法律解除履约. (98)20 Claims, Disputes and Arbitration 索赔、争端和仲裁 (98)20.1Contractor’s Claims 承包商的索赔....................................................................................................99 20.2Appointment of the Dispute Adjudication Board 争端裁决委员会的任命.........................................100 20.3Failure to Agreement Dispute Adjudication Board 对争端裁决委员会未能取得一致时....................102 20.4Obtaining Dispute Adjudication Board’s Decision 取得争端裁决委员会的决定...............................102 20.5Amicable Settlement 友好解决........................................................................................................103 20.6Arbitration 仲裁...............................................................................................................................104 20.7Failure to Comply with Dispute Adjudication Board’s Decision 未能遵守争端裁决委员会的决定....105 20.8 Expiry of Dispute Adjudication Board’s Appointment 争端裁决委员会任命期满 (105)1General Provisions一般规定1.1Definitions定义In the Conditions of Contract (“these Conditions”), which include Particular Conditions and these General Conditions, the following words and expressions shall have the meaning stated. Words indicating persons or parties include corporation and other legal entities, except where the context requires otherwise.在合同条件(“本条件”),包括专用条件和通用条件中,下列词语和措辞应具有以下所述的含义.除上下文另有要求外,文中人员或当事各方等词语包括公司和其他合法实体.1.1.1The Contract合同1.1.1.1“Contract” means the Contract Agreement, these Conditions, the Employer’s Requirement,the Tender, and further document (if any) which are listed in the Contract Agreement.“合同”系指合同协议书、本条件、雇主要求、投标书和合同协议书列出的其他文件(如果有).1.1.1.2“Contract Agreement” means the contract agreement referred to in Sub-Clause 1.6[Contract Agreement], including any annexed memoranda.“合同协议书”系指第1.6款[合同协议书]中所述的合同协议书及所附各项备忘录.1.1.1.3“Employer’s requirements” means the document entitled employer’s requirements, asincluded in the Contract, and any additions and modifications to such document in accordance with the Contract. Such document specifies the purpose, scope, and/or design and/or other technical criteria, for the Works.“雇主要求”系指合同中包括的,题为雇主要求的文件,其中列明工程的目标、范围、和(或)设计和(或)其他技术标准,以及按合同对此项文件所作的任何补充和修改.1.1.1.4“Tender” means the Contractor’s signed offer for the Works and all other documents whichthe Contractor submitted therewith (other than these Conditions and Employer’s Requirements, if so submitted), as included in the Contract.“投标书”系指包含在合同中的由承包商提交的为完成工程签署的报价,以及随同提交的所有其他文件(本条件和雇主要求除外,如同时提交).1.1.1.5“Performance Guarantees” and “Schedule of payments” mean the documents so named(if any), as included in the Contract.“履约保证”和“付款计划表”系指合同中包括的具有上述名称的文件(如果有).1.1.2Parties and Persons各方和人员1.1.2.1“Party” means the Employer or the Contractor, as the context requires.“当事方(或一方)”根据上下文需要,或指雇主,或指承包商。

FIDIC红皮书_ 中英文对照

FIDIC红皮书_ 中英文对照

Fédération Internationale Des Ingénieurs-Conseils1.1 测量方法12.2 Method of Measurement除非合同中另有规定,无论当地惯例如何:Except as otherwise stated in the Contract and notwithstanding local practice:(a) 测量应该是测量每部分永久工程的实际净值,以及(a) measurement shall be made of the net actual quantity of each item of the Permanent Works, and(b) 测量方法应符合工程量表或其他适用报表。

(b) the method of measurement shall be in accordance with the Bill of Quantities or other applicable Schedules.1.2 估价12.3 Evaluation除非合同中另有规定,工程师应通过对每一项工作的估价,根据第3.5款【决定】,商定或决定合同价格。

每项工作的估价是用依据上述第12.1款和第12.2款商定或决定的测量数据乘以此项工作的相应价格费率或价格得到的。

Except as otherwise stated in the Contract, the Engineer shall proceed in accordance with Sub-Clause 3.5 [Determinations] to agree ordetermine the Contract Price by evaluating each item of work, applyingthe measurement agreed or determined in accordance with the above Sub-Clauses 12.1 and 12.2 and the appropriate rate or price for the item.对每一项工作,该项合适的费率或价格应该是合同中对此项工作规定的费率或价格,或者如果没有该项,则为对其类似工作所规定的费率或价格。

FIDIC条款中英文对照全文

FIDIC条款中英文对照全文

FOREWORD前言 (补充译文)The terms of the Fourth Edition of the Conditions of Contract for Works of Civil Engineering Construction have been prepared by the Fédération Internationale des Ingénieurs Conseils (FIDIC) and are recommended for general use for the purpose of construction of such works where tenders are invited on an intemational basis. The Conditions, subject to minor modifications, are also suitable for use on domestic contracts.土木工程施工合同条件的第四版已由国际咨询工程师联合会(以下简称为FIDIC)起草完成,并被推荐为以国际性招标为主的同类工程施工的通用条件,如果稍加修改,也适用于国内的招标合同。

The version in English of the Conditions is considered by FIDIC as the official and authentic text for the purpose of translation.本条件的英文版本, FIDIC已将其作为正式的和有效的语言文本,以用于翻译之目的。

In the preparation of the Conditions it was recognised that while there are numerous Clauses which will be generally applicable there are some Clauses which must necessarily vary to take account of the circumstances and locality of the Works. The Clauses of general application have been grouped together in this document and are referred to as Part I - General Conditions. They have been printed in a form which will facilitate their inclusion as printed in the contract documents normally prepared.在对本条件准备的过程中,发现多数条款是可以通用的,同时还考虑到工程所处的不同环境和地区须对某些条款加以必要的改动。

FIDIC国际土木建筑工程承包合同 (中英文 第三部分)

FIDIC国际土木建筑工程承包合同 (中英文 第三部分)

FIDIC国际土木建筑工程承包合同(中英文第三部分)Commencement and Delays开工和延误41。

1 Commencement of Works工程的开工The Contractor shall commence the Works as soon as is reasonably possible after the receipt by him of a notice to this effect from the Engineer,which notice shall be issued within the time stated in the Appendix to Tender after the date of the Letter of Acceptance. Thereafter,the Contractor shall proceed with the Works with due expedition and without delay.承包商在接到工程师有关开工的通知后,应在合理可能的情况下尽快开工,开工通知应在中标函颁发日期之后,在投标书附件中规定的期限内发出。

此后,承包商应迅速且毫不迟延开始工程的施工。

42。

1 Possession of Site and Access Thereto现场占有权及其通道Save insofar as the Contract may prescribe除合同另有规定外:a。

the extent of portions of the Site of which the Contractor is to be given possession from time to time,andb。

the order in which such portions shall be made available to the Contractorand subject to any requirement in the Contract as to the order in which the Works shall be executed,the Employer will,with the Engineer’s Notice to Commence the Works,give to the Contractor possession ofc. so much of the Site,andd. such access as, in accordance with the Contract,is to be provided by the Employeras may be required to enable the Contractor to commence and proceed with the execution of the Works in accordance with the programme referred to in Clause 14 (if any)and otherwise in accordance with such reasonable proposals as the Contractor shall,by notice to the Engineer with a copy to the Employer, make。

FIDIC-条款-中英文对照版

FIDIC-条款-中英文对照版

Fédération Internationale Des Ingénieurs-Conseils通用条件General Conditions1.一般规定General Provisions1.1 定义Definitions在包括专用条件和本通用条件的合同条件(“本合同条件”)中,以下措辞和用语的含义如下所述。

除非上下文中另有要求,指当事人和当事各方的词包括公司和其它法律实体。

In the Conditions of Contract ("these Conditions"), which include Particular Conditions and these General Conditions, the following words and expressions shall have the meanings stated. Words indicating persons or parties include corporations and other legal entities, except where the context requires otherwise.1.1.1 合同1.1.1 The Contract1.1.1.1“合同(Contract)”指合同协议书、中标函、投标函、本合同条件、规范、图纸、资料表、以及在合同协议书或中标函中列明的其它进一步的文件(如有时)。

1.1.1.1 "Contract" means the Contract Agreement, the Letter of Acceptance, the Letter of Tender, these Conditions, the Specification, the Drawings, the Schedules, and the further documents (if any) which are listed in the Contract Agreement or in the Letter of Acceptance.1.1.1.2“合同协议书(Contract Agreement)”指第1.6款【合同协议】中所说明的合同协议(如有时)。

菲迪克(FIDIC)简明合同格式-中英对照版

菲迪克(FIDIC)简明合同格式-中英对照版

菲迪克(FIDIC)文献译丛中英文对照本国际咨询工程师联合会编译中国工程咨询协会1999年第1版Agreement协议书General Conditions通用条件Rules for Adjudication裁决规则Notes for Guidance指南注释Short Form of Contract简明合同格式吕文学陈永强翻译唐萍校译王川徐礼章唐萍审订(1999年第1版)(中英文对照本)(译者对译文的准确度承担全部责任,正式使用发生的争端,以英文原版为准)机械工业出版社菲迪克(FIDIC)授权书I herewith authorize CNAEC to translate FIDIC’s publications (but not the publications as edited by other organizations) into Chinese and publish them.I agree with your statement, as part of the agreement, that you will:a)Provide FIDIC with 10 copies of the translation per document, andb)Make a statement on the inside cover of the translation that the translator takes fullresponsibility for the accuracy of the translation and that in case of dispute, the original version in English shall prevail.Peter van der TOGTPublications manager[译文]在此,我授权中国工程咨询协会把FIDIC出版物译成中文并出版(但是,不包括其他组织编写的出版物)。

  1. 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
  2. 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
  3. 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。

Fidic合同是指国际咨询工程师联合会(Fédération Internationale des Ingénieurs Conseils,简称FIDIC)制定的一系列国际工程合同标准。

以下是FIDIC合同中英文对照的一些常见术语:
1. 业主(Employer):甲方
2. 承包商(Contractor):乙方
3. 工程师(Engineer):监理单位
4. 合同价格(Contract Price):合同总价
5. 合同期限(Contract Time):工期
6. 质量保证(Quality Assurance):质量保证期
7. 付款方式(Payment Method):支付方式
8. 变更指令(Variation Order):变更通知
9. 索赔(Claim):索赔申请
10. 延期(Delay):延期申请
11. 分包(Subcontracting):分包合同
12. 竣工验收(Completion and Acceptance):竣工验收
13. 保留金(Retention Money):保证金
14. 违约金(Penalty):违约金
15. 争议解决(Dispute Resolution):争议解决方式
16. 保险(Insurance):保险责任
17. 环境保护(Environmental Protection):环境保护责任
18. 安全生产(Safety Production):安全生产责任
19. 劳动权益(Labor Rights and Interests):劳动权益保障
20. 信息交流(Information Exchange):信息交流和沟通
以上仅为FIDIC合同中部分常见术语的中英文对照,实际应用时还需根据具体合同条款进行理解和翻译。