品质有关英文缩写和不良现象表述
品质术语(英语)

Military-Standard
ห้องสมุดไป่ตู้军用
S I-S IV Special I-Special IV 抽样水准等级
特殊
P/N Part Number 料号
L/N Lot Number 特采 AOD Accept On Deviation 特采 UAI Use As It 首件检查报告
FPIR First Piece Inspection Report 百万分之一
checked by 初审 approved by 核准 department 部门
part number/ P/N 料号
item/group/class 类别
quality 品质 prepared by 制表 notes 说明 finished product 成品 semi-finished product 半成品 packing materials 包材 good product/accepted goods/ accepted parts/good parts 良品 defective product/non-good parts 不良 品 disposed goods 处理品
N Number 样品数
其它品质术语类
QCC Quality Control Circle 品质 圈
QIT Quality Improvement Team 品 质改善小组
PPM Percent Per Million 批号 制程统计品管专类
SPC Statistical Process Control 统 计制程管制
SQC Statistical Quality Control 统 计品质管制
R Range 全距 AR Averary Range 全距平均值
品质系统常见英文缩写简介

品质系统常见英文缩写简介1.QC : quality control 品质管制2. IQC : incoming quality control 进料品质管制3. OQC: output quality control 出货品质管制4. AQL: acceptable quality level 允收标准5.PQC: process quality control 制程品质管制也称IPQC : in process quality control .6.CQA: customer quality assurance 客户品质保证7. MI: minor defeat 次要缺点8.MA : major defeat 主要缺点9. CR: critical defeat 关键缺点10. SMT: surface mounting technology 表面粘贴技术16. BOM: bill of material 材料清单11. SMD: surface mounting device 表面粘贴设备SMC: surface mounting component 表面粘贴元件12. ECN: engineering change notice 工程变更通知13. DCN: design change notice 设计变更通知14. PCB: printed circuit board 印刷电路板15. PCBA: printed circuit board assembly装配印刷电路板17. BIOS: basically input and output system 基本输入输出系统18. MIL-STD-105E: 美国陆军标准, 也称单次抽样计划.19. ISO: international standard organization 国际标准化组织22 . Icicles : 锡尖20. DRAM: 内存条21. Polarity : 电性23 . Non-wetting : 空焊24. Short circuit: 短路25. Missing component : 缺件26 . Wrong component : 错件27. Excess component: 多件28. Insufficient solder : 锡少29. Excessive solder: 锡多30. Solder residue: 锡渣31. Solder ball: 锡球32. Tombstone : 墓碑33 . Sideward : 侧立34. Component damage: 零件破损35. Gold finger : 金手指36. SOP: standard operation process 标准操作流程37. SIP : standard inspection process 标准检验流程38. The good and not good segregation: 良品和不良品区分39. OBW: on board writer 熸录BIOS40. Simple random sampling: 简单随机抽样41. Histogram: 直方图42. Standard deviation : 标准差43. CIP: Continuous improvement program 44. SPC: Statistical process control 45. Sub-contractors: 分包商46. SQE: Supplier quality engineering 47. Sampling sample: 抽样计划48. Loader: 治具49. QTS: Quality tracking system 品质追查系统50. Debug: 调试51. Spare parts :备用品52 . Inventory report for : 库存表53. Manpower/Tact estimation 工时预算54. Calibration : 校验55. S/N: serial number 序号56. Corrugated pad: 波纹垫57. Takeout tray : 内包装盒58 . Outer box : 外包装箱59 . Vericode : 检验码60 . Sum of square : 平方和61 . Range : 全距62. Conductive bag: 保护袋63. Preventive maintenance :预防性维护64 . Base unit : 基体65. Fixture: 制具66. Probe: 探针67. Host probe : 主探针68 . Golden card : 样本卡69. Diagnostics program: 诊断程序70. Frame : 屏面71 . Lint-free gloves : 静电手套72 .Wrist wrap : 静电手环73 . Target value : 目标值74. Related department : 相关部门75. Lifted solder 浮焊76.plug hole孔塞77. Wrong direction 极性反ponent damage or broken 零件破损79.Unmeleted solder熔锡不良80.flux residue松香未拭81.wrong label or upside down label贴反82.mixed parts机种混装83. Poor solder mask绿漆不良84. oxidize 零件氧化85.stand off height浮高86. IC reverse IC反向87.supervisor课长88. Forman组长89. WI=work instruction作业指导非擦除状态91. Internal notification:内部联络单92. QP: Quality policy品质政策93.QT: Quality target 品质目标94. Trend:推移图95.Pareto:柏拉图96. UCL: Upper control limit管制上限97.LCL:Lower control limit管制下限98. CL: Center line中心线Rolled throughout yield直通率100. PPM: Parts per million 不良率101.DPU: Defects per unit 单位不良率102.Resistor: 电阻103.Capacitor:电容104. Resistor array : 排阻105. Capacitor array: 排容106. DIODE: 二极管107.SOT: 三极管108. Crystal: 震荡器109. Fuse:保险丝110.Bead: 电感111.Connector:联结器112.ADM: Administration Department行政单位113. CE: Component Engineering零件工程114. CSD: Customer Service Department客户服务部115. ID: Industrial Design工业设计116.IE: Industrial Engineering工业工程117. IR: Industrial Relationship工业关系118. ME: Mechanical Engineering机构工程119. MIS :Management Information System资讯部120. MM: Material Management资材121. PCC: Project Coordination/Control专案协调控制122. PD: Production Department生产部123. PE: Product Engineering产品工程124. PM: Product Manager产品经理125. PMC: Production Material Control生产物料管理126. PSC: Project Support & Control产品协调127.Magnesium Alloy:镁合金128. Metal Shearing: 裁剪129.CEM: Contract Electronics Manufacturing 又称电子制造服务企业EMS: Electronics Manufacturing Services130. ERP: Enterprise Resource Planning 企业资源规划SCM+CRM+ERP+EAI=Network direct TM links procurement, production, Logistics and sales采购, 生产, 后勤管理及市场行销的融合EAI: Enterprise application Integrations 企业应用系统整合CRM: Customer Relationship Planning 客户服务规划SCM : Supply chain management 供应链管理131. OJT: On job training 在职培训132.Access Time: 光碟搜寻时间133. B2CEC: Business to consumer electronic commerce 企业对消费者的电子商务B2BEC:Business to business electronic Commerce 企业间的电子商务L:Copper Clad Laminate 铜箔基板135. Intranet: 企业内部通讯网路136. ISP: Internet Service Provider网络服务提供者ICP: Internet Content Provider网络内容提供者137. GSM: Global System for Mobile Communication 泛欧数位式行动电话系统GPS: 全球卫星定位系统138. Home Page: 网路首页139.Video Clip: 影像档140.HTML: 超文标记语言141.Domainname: 网域名称142.IP: 网络网域通讯协定地址143.Notebook:笔记型电脑144.VR:Virtual Reality虚拟实境145.WAP:Wireless Application Protocol 无线应用软体协定146. LAN: Local area network区域网路WWW: World Wide Web世域网WAN: Wide Area Network 广域网路147.3C: Computer, Communication , Consumer electronic 电脑, 通讯, 消费性电子三大产品的整合rmation Supplier Highway:信息高速公路149.UPS:Uninterrupted power system不断电系统150.Processed material: 流程性材料151.Entity/Item:实体152.Quality loop:质量环153.Quality losses: 质量损失154.Corrective action:纠正措施155. Preventive action: 预防措施156.PDCA: Plan/Do/Check/Action计划/实施/检查/处理157. Integrated circuits(IC):集成电路158.Application program:应用程序159.Utilities:实用程序160.Auxiliary storage/Second storage:;辅助存储器161.Silicon chip:硅片162Diskette drive:软驱163.Display screen/Monitor:显示器164.Foreground:前面165.Montherboard:母板166.Mermory board:内存板167.Slot:插槽168.Bus:Data-bus/address-bus/Control bus:总线/数据总线/地址总线/控制总线169.Plotter:绘图170.MPC:Multimedia personal computer多媒体171.Oscillator:振荡器172.Automatic teller terminal:自动终端(出纳)机173.Joystick port:控制端口174.VGA: Video Graphics Array显示卡175.Resolution:分辨率176.Register:寄存器177.ISA: Industry Standard Architecture:工业标准结构178.EISA:Extended Industry Architecture 179.Adapter: 适配器180.Peripheral:外部设备181.Faxmodem:调制解调器181.NIC:Network interface card网络接口卡182.SCSI: Small computer system interface 183.VESA: Video Electronic Standards Association184.SIMM:Single in-line memory module单排座存储器模块(内存条)185.Casing:外箱186.Aluminum:铝质187.Ceramic: 陶瓷的188.Platter:圆盘片189.Actuator:调节器190.Spindle:轴心191.Actuation arm: 存取臂192.Default code: 缺省代码193.Auxiliary port:辅助端口194. Carriage return: 回车195.Linefeed: 换行196.ASCII: American Standard Code for Information Interchange197.Video analog: 视频模拟198.TTL:Transistor- Transistor logic晶体管-晶体管逻辑电路199.Three-prong plug:三芯电插头200.Female connector:连接插座。
品质术语英文缩写.

品质术语1.ACC:Accept (允收2.REJ: Reject (拒收3.SPEC: Specification(规格4.ZD: Zero Defect (零缺点5.CRI: Critical Defect (严重缺点6.MAJ:Major Defect (主要缺点7.MIN: Minor Defect (次要缺点8.AQL: Acceptable Quality Level (允许品质水准9.SA: Self Accurance (自主检查10.FAI:Firsh Article Inspection (初件检验11.IPQC:In-Process Quality Control(制程品质管制12.FQC:Final Quality Control(最终品质管制13.IQC:Incoming Quality Control(进料品质管制14.IPQA:In-Process Quality Audit (制程查核15.OBA:Out Box Audit(开箱查核16.OQC:Out Quality Control(出货品质管制17.PPM: Parts Per Million (百万分之几18.TQC: Total Quality Control(全面品质管制19.TQM:Total Quality Management(全面品质管理20.QIT:Quality Improvement Team(品质改善小组21.CAR:Correction Action Report(改善行动报告22.TIP:Tip Innovation Plan(提案改善计划23.QCC:Quality Control Circle(品管图24.Plan(计划 DO(执行 Check(检讨 Action(改善 (戴明循环25.5MIE:Man(人 Machine(机器Material(材料 Method(方法Measurement(测量 Environment(环境26.5WIH:When(何时 Where(何地Who(何人 Whet(何事Why(为何 How(如何27.AWG:American Wire Gauge(美国线规28.CSA:Canadian Standant Association(加拿大标准协会29.UL:Underwriters Laboratories Inc(美国保险协会实验室30.ENG:Engineering Change Notice(工程变更通知书31.FMEA:Failure Mode &Effect Analysis(失效模式分析。
品质系统常见英文缩写简介

品質系統常見英文縮寫簡介1.QC : quality control 品質管制2. IQC : incoming quality control 進料品質管制3. OQC: output quality control 出貨品質管制4. AQL: acceptable quality level 允收標準5.PQC: process quality control 製程品質管制也稱IPQC : in process quality control .6.CQA: customer quality assurance 客戶品質保証7. MI: minor defeat 次要缺點8.MA : major defeat 主要缺點9. CR: critical defeat 關鍵缺點10. SMT: surface mounting technology 表面粘貼技術16. BOM: bill of material 材料清單11. SMD: surface mounting device 表面粘貼設備SMC: surface mounting component 表面粘貼元件12. ECN: engineering change notice 工程變更通知13. DCN: design change notice 設計變更通知14. PCB: printed circuit board 印刷電路板15. PCBA: printed circuit board assembly裝配印刷電路板17. BIOS: basically input and output system 基本輸入輸出系統18. MIL-STD-105E: 美國陸軍標準, 也稱單次抽樣計劃.19. ISO: international standard organization 國際標準化組織22 . Icicles : 錫尖20. DRAM: 內存條21. Polarity : 電性23 . Non-wetting : 空焊24. Short circuit: 短路25. Missing component : 缺件26 . Wrong component : 錯件27. Excess component: 多件28. Insufficient solder : 錫少29. Excessive solder: 錫多30. Solder residue: 錫渣31. Solder ball: 錫球32. Tombstone : 墓碑33 . Sideward : 側立34. Component damage: 零件破損35. Gold finger : 金手指36. SOP: standard operation process 標準操作流程37. SIP : standard inspection process 標準檢驗流程38. The good and not good segregation: 良品和不良品區分39. OBW: on board writer 熸錄BIOS40. Simple random sampling: 簡單隨機抽樣41. Histogram: 直方圖42. Standard deviation : 標準差43. CIP: Continuous improvement program 44. SPC: Statistical process control 45. Sub-contractors: 分包商46. SQE: Supplier quality engineering 47. Sampling sample: 抽樣計劃48. Loader: 治具49. QTS: Quality tracking system 品質追查系統50. Debug: 調試51. Spare parts :備用品52 . Inventory report for : 庫存表53. Manpower/Tact estimation 工時預算54. Calibration : 校驗55. S/N: serial number 序號56. Corrugated pad: 波紋墊57. Takeout tray : 內包裝盒58 . Outer box : 外包裝箱59 . Vericode : 檢驗碼60 . Sum of square : 平方和61 . Range : 全距62. Conductive bag: 保護袋63. Preventive maintenance :預防性維護64 . Base unit : 基體65. Fixture: 制具66. Probe: 探針67. Host probe : 主探針68 . Golden card : 樣本卡69. Diagnostics program: 診斷程序70. Frame : 屏面71 . Lint-free gloves : 靜電手套72 .Wrist wrap : 靜電手環73 . Target value : 目標值74. Related department : 相關部門75. Lifted solder 浮焊76.plug hole孔塞77. Wrong direction 极性反ponent damage or broken 零件破損79.Unmeleted solder熔錫不良80.flux residue松香未拭81.wrong label or upside down label貼反82.mixed parts機種混裝83. Poor solder mask綠漆不良84. oxidize 零件氧化85.stand off height浮高86. IC reverse IC反向87.supervisor課長88. Forman組長89. WI=work instruction作業指導90. B.P.V:非擦除狀態91. Internal notification:內部聯絡單92. QP: Quality policy品質政策93.QT: Quality target 品質目標94. Trend:推移圖95.Pareto:柏拉圖96. UCL: Upper control limit管制上限97.LCL:Lower control limit管制下限98. CL: Center line中心線99.R.T.Y: Rolled throughout yield直通率100. PPM: Parts per million 不良率101.DPU: Defects per unit 單位不良率102.Resistor: 電阻103.Capacitor:電容104. Resistor array : 排阻105. Capacitor array: 排容106. DIODE: 二極管107.SOT: 三極管108. Crystal: 震盪器109. Fuse:保險絲110.Bead: 電感111.Connector:聯結器112.ADM: Administration Department行政單位113. CE: Component Engineering零件工程114. CSD: Customer Service Department客戶服務部115. ID: Industrial Design工業設計116.IE: Industrial Engineering工業工程117. IR: Industrial Relationship工業關係118. ME: Mechanical Engineering機構工程119. MIS :Management Information System資訊部120. MM: Material Management資材121. PCC: Project Coordination/Control專案協調控制122. PD: Production Department生產部123. PE: Product Engineering產品工程124. PM: Product Manager產品經理125. PMC: Production Material Control生產物料管理126. PSC: Project Support & Control產品協調127.Magnesium Alloy:鎂合金128. Metal Shearing: 裁剪129.CEM: Contract Electronics Manufacturing 又稱電子製造服務企業EMS: Electronics Manufacturing Services130. ERP: Enterprise Resource Planning 企業資源規劃SCM+CRM+ERP+EAI=Network direct TM links procurement, production, Logistics and sales採購, 生產, 后勤管理及市場行銷的融合EAI: Enterprise application Integrations 企業應用系統整合CRM: Customer Relationship Planning 客戶服務規劃SCM : Supply chain management 供應鏈管理131. OJT: On job training 在職培訓132.Access Time: 光碟搜尋時間133. B2CEC: Business to consumer electronic commerce 企業對消費者的電子商務B2BEC:Business to business electronic Commerce 企業間的電子商務L:Copper Clad Laminate 銅箔基板135. Intranet: 企業內部通訊網路136. ISP: Internet Service Provider網絡服務提供者ICP: Internet Content Provider網絡內容提供者137. GSM: Global System for Mobile Communication 泛歐數位式行動電話系統GPS: 全球衛星定位系統138. Home Page: 網路首頁139.Video Clip: 影像檔140.HTML: 超文標記語言141.Domainname: 網域名稱142.IP: 網絡網域通訊協定地址143.Notebook:筆記型電腦144.VR:Virtual Reality虛擬實境145.WAP:Wireless Application Protocol 無線應用軟體協定146. LAN: Local area network區域網路WWW: World Wide Web世域網WAN: Wide Area Network 廣域網路147.3C: Computer, Communication , Consumer electronic 電腦, 通訊, 消費性電子三大產品的整合rmation Supplier Highway:信息高速公路149.UPS:Uninterrupted power system不斷電系統150.Processed material: 流程性材料151.Entity/Item:實體152.Quality loop:質量環153.Quality losses: 質量損失154.Corrective action:糾正措施155. Preventive action: 預防措施156.PDCA: Plan/Do/Check/Action計劃/實施/檢查/處理157. Integrated circuits(IC):集成電路158.Application program:應用程序159.Utilities:實用程序160.Auxiliary storage/Second storage:;輔助存儲器161.Silicon chip:硅片162Diskette drive:軟驅163.Display screen/Monitor:顯示器164.Foreground:前面165.Montherboard:母板166.Mermory board:內存板167.Slot:插槽168.Bus:Data-bus/address-bus/Control bus:總線/數據總線/地址總線/控制總線169.Plotter:繪圖170.MPC:Multimedia personal computer多媒體171.Oscillator:振盪器172.Automatic teller terminal:自動終端(出納)機173.Joystick port:控制端口174.VGA: Video Graphics Array顯示卡175.Resolution:分辨率176.Register:寄存器177.ISA: Industry Standard Architecture:工業標準結構178.EISA:Extended Industry Architecture 179.Adapter: 适配器180.Peripheral:外部設備181.Faxmodem:調制解調器181.NIC:Network interface card網絡接口卡182.SCSI: Small computer system interface 183.VESA: Video Electronic Standards Association184.SIMM:Single in-line memory module單排座存儲器模塊(內存條)185.Casing:外箱186.Aluminum:鋁質187.Ceramic: 陶瓷的188.Platter:圓盤片189.Actuator:調節器190.Spindle:軸心191.Actuation arm: 存取臂192.Default code: 缺省代碼193.Auxiliary port:輔助端口194. Carriage return: 回車195.Linefeed: 換行196.ASCII: American Standard Code for Information Interchange197.Video analog: 視頻模擬198.TTL:Transistor- Transistor logic晶體管-晶體管邏輯電路199.Three-prong plug:三芯電插頭200.Female connector:連接插座Welcome To Download !!!欢迎您的下载,资料仅供参考!。
品质管理名词及英文缩写

品质管理名词(中英文对照)QE=品质工程师(Quality Engineer)MSA: Measurement System Analysis 量测系统分析LCL: Lower Control limit 管制下限Control plan 管制计划Correction 纠正Cost down 降低成本CS: customer Sevice 客户中心Data 数据Data Collection 数据收集Description 描述Device 装置Digital 数字Do 执行DOE: Design of Experiments 实验设计Environmental 环境Equipment 设备FMEA: Failure Mode and Effect analysis 失效模式与效果分析FA: Failure Analysis 坏品分析FQA: Final Quality Assurance 最终品质保证FQC: Final Quality control 最终品质控制Gauge system 量测系统Grade 等级Inductance 电感Improvement 改善Inspection 检验IPQC: In Process Quality Control 制程品质控制IQC: Incoming Quality Control 来料品质控制ISO: International Organization for Standardization 国际标准组织LQC: Line Quality Control 生产线品质控制LSL: Lower Size Limit 规格下限Materials 物料Measurement 量测Occurrence 发生率Operation Instruction 作业指导书Organization 组织Parameter 参数Parts 零件Pulse 脉冲Policy 方针Procedure 流程Process 过程Product 产品Production 生产Program 方案Projects 项目QA: Quality Assurance 品质保证QC: Quality Control 品质控制QE: Quality Engineering 品质工程QFD: Quality Function Design 品质机能展开Quality 质量Quality manual 品质手册Quality policy 品质政策Range 全距Record 记录Reflow 回流Reject 拒收Repair 返修Repeatability 再现性Reproducibility 再生性Requirement 要求Residual 误差Response 响应Responsibilities 职责Review 评审Rework 返工Rolled yield 直通率sample 抽样,样本Scrap 报废SOP: Standard Operation Procedure 标准作业书SPC: Statistical Process Control 统计制程管制Specification 规格SQA: Source(Supplier) Quality Assurance 供应商品质保证Taguchi-method 田口方法TQC: Total Quality Control 全面品质控制TQM: Total Quality Management 全面品质管理Traceability 追溯UCL: Upper Control Limit 管制上限USL: Upper Size Limit 规格上限Validation 确认Variable 计量值Verification 验证Version 版本QCC Quality Control Circle 品质圈/QC小组PDCA Plan Do Check Action 计划执行检查总结Consumer electronics 消费性电子产品Communication 通讯类产品Core value (核心价值)Love 爱心Confidence 信心Decision 决心Corporate culture (公司文化)Integration 融合Responsibility 责任Progress 进步QC quality control 品质管理人员FQC final quality control 终点品质管制人员IPQC in process quality control 制程中的品质管制人员OQC output quality control 最终出货品质管制人员IQC incoming quality control 进料品质管制人员TQC total quality control 全面质量管理POC passage quality control 段检人员QA quality assurance 质量保证人员OQA output quality assurance 出货质量保证人员QE quality engineering 品质工程人员FAI first article inspection 新品首件检查FAA first article assurance 首件确认CP capability index 能力指数SSQA standardized supplier quality audit 合格供应商品质评估FMEA failure model effectiveness analysis 失效模式分析AQL Acceptable Quality Level 运作类允收品质水准S/S Sample size 抽样检验样本大小ACC Accept 允收REE Reject 拒收CR Critical 极严重的MAJ Major 主要的MIN Minor 轻微的Q/R/S Quality/Reliability/Service 品质/可靠度/服务P/N Part Number 料号L/N Lot Number 批号AOD Accept On Deviation 特采UAI Use As It 特采FPIR First Piece Inspection Report 首件检查报告PPM Percent Per Million 百万分之一SPC Statistical Process Control 统计制程管制SQC Statistical Quality Control 统计品质管制GRR Gauge Reproducibility & Repeatability 量具之再制性及重测性判断量可靠与否DIM Dimension 尺寸DIA Diameter 直径QIT Quality Improvement Team 品质改善小组ZD Zero Defect 零缺点QI Quality Improvement 品质改善QP Quality Policy 目标方针TQM Total Quality Management 全面品质管理RMA Return Material Audit 退料认可7QCT ools 7 Quality Control Tools 品管七大手法通用之件类ECN Engineering Change Notice 工程变更通知(供应商)ECO Engineering Change Order 工程改动要求(客户)PCN Process Change Notice 工序改动通知PMP Product Management Plan 生产管制计划SIP Standard Inspection Procedure 制程检验标准程序SOP Standard Operation Procedure 制造作业规范IS Inspection Specification 成品检验规范BOM Bill Of Material 物料清单PS Package Specification 包装规范SPEC Specification 规格DWG Drawing 图面系统文件类ES Engineering Standard 工程标准IWS International Workman Standard 工艺标准ISO International Standardization Organization 国际标准化组织GS General Specification 一般规格部类PMC Production & Material Control 生产和物料控制PCC Product control center 生产管制中心PPC Production Plan Control 生产计划控制MC Material Control 物料控制DCC Document Control Center 资料控制中心QE Quality Engineering 品质工程(部)QA Quality Assurance 品质保证处QC Quality Control 品质管制(课)PD Product Department 生产部LAB Laboratory 实验室IE Industrial Engineering 工业工程R&D Research & Design 设计开发部品质部相关职位的工作职责:1 职位名称(IPQC)、OQC、FQC 、IQC直属上级QC组长工作内容:每日工作:1) 参与维护、监督质量体系的运行、组织和管理内部质量审核工作;2) 根据检验计划完成当日首件、巡检、综检出货检工作任务;3) 确认生产单位的自检记录;4) 按SIP及相应流程对待检产品进行检验,检验前以及检验过程中认真核对产品代码、名称,填写检验记录,并提交QC组长;5) 汇总、存档各项质检记录及相关资料;6) 为纠正质量问题,有权暂时停止现场生产,并立即向上级报告;7) 中晚班人员如遇一般外观不良,有权停止现场生产,如遇紧急生产或修模,可电话联络上级作决定;8) 现场不合格产品的确认,初步处理;9) 不合格品处理单和纠正预防措施表的开出,追踪和验证;10) 不合格品处理单和纠正预防措施表做好登录,以便追踪;11) 及时上报批量质量问题,不合格信息的及时传递;12) 向下一班交接检验用具和生产注意点;13) 协助质量主管完成其它质量管理体系方面的工作。
品质常见英文缩写解释

拒收 退料承认书
试生产和生产良率报告
老化实验 供应商发展工程师
制程检验规格 业务经理
标准作业程序 统计过程控制
供应商品质工程师
优势﹐弱点﹐机会﹐威胁 技术经理
全面品质管理
特采
操作指引 过程通过率
零缺陷 柏拉图 层别法 查检表 管制图 散布图 特性要因图 直方图
根据产品的流程制定的评估和预防各工序的风险度, 对风险度较高(Moto 规定60)制程的提出改善方法. 可以分为DFMEA和PFMEA,即设计FMEA和生产 FME.
1,客户要求供应商提交的一种纠正和预防措施报告 格式,需要在客户网上填写, 2,一般客户开具的纠正和预防措施报告也简称为 CAR
涉及工程和制程变更
制程/工程变更申请
产品工程师
潜在失效模式和效果分析
项目经理 物料计划 生产件批准程序 百万分之一 品质保证
品管圈 品质异常通知 品质工程师 以品质为中心的供应商 品质改善小组
序号 英文缩写
英文全称
中文
Description/描述和意义
其他英文缩写
5M1E: 5W1H 8D AC./RE. AOD APQP AQL BOM COC. CP/Cpk data CR CRCPP CRP CRR CS
CS1
CS2
CTQ DCC DOE DPU
e-PAF
FAI data FIFO PFD FQC
Potential Failure Mothed and Effect Analysis
Project Manager Plan Material Production Part Approval Process Percent Per Million Quality Audit Quality Control Circle Quality Deviation Notice Quality Engineer Quality Focus Supplier Quality Improvement Team Quality Manager Quality system Quality Control Chart Reject Returned Material Approval
质量体系中英文缩写与含义

质量管理体系中英文缩写与其解释Abbreviations and their explanations 缩写与其解释Engineering 工程/ Process 工序(制程)4M&1E Man, Machine, Method, Material, Environment 人,机器,方法,物料,环境- 可能导致或造成问题的根本原因AI Automatic Insertion 自动插机ASSY Assembly 制品装配ATE Automatic Test Equipment 自动测试设备BL Baseline 参照点BM Benchmark 参照点BOM Bill of Material 生产产品所用的物料清单C&ED/CAED Cause and Effect Diagram 原因和效果图CA Corrective Action 解决问题所采取的措施CAD Computer-aided Design 电脑辅助设计.用于制图和设计3维物体的软件CCB Change Control Board 对文件的要求进行评审,批准,和更改的小组CI Continuous Improvement 依照短期和长期改善的重要性来做持续改善COB Chip on Board 邦定-线焊芯片到PCB板的装配方法.CT Cycle Time 完成任务所须的时间DFM Design for Manufacturability 产品的设计对装配的适合性DFMEA Design Failure Mode and Effect Analysis 设计失效模式与后果分析--在设计阶段预测问题的发生的可能性并且对之采取措施DFSS Design for Six Sigma 六西格玛(6-Sigma)设计-- 设计阶段预测问题的发生的可能性并且对之采取措施并提高设计对装配的适合性DFT Design for Test 产品的设计对测试的适合性DOE Design of Experiment 实验设计-- 用于证明某种情况是真实的DPPM Defective Part Per Million 根据一百万件所生产的产品来计算不良品的标准DV Design Verification / Design Validation 设计确认ECN Engineering Change Notice 客户要求的工程更改或内部所发出的工程更改文件ECO Engineering Change Order 客户要求的工程更改ESD Electrostatic Discharge 静电发放-由两种不导电的物品一起摩擦而产生的静电可以破坏ICs和电子设备FI Final Inspection 在生产线上或操作中由生产操作员对产品作最后检查F/T Functional Test 测试产品的功能是否与所设计的一样FA First Article / Failure Analysis 首件产品或首件样板/ 产品不良分析FCT Functional Test 功能测试-检查产品的功能是否与所设计的一样FFF Fit Form Function 符合产品的装配,形状和外观及功能要求FFT Final Functional Test 包装之前,在生产线上最后的功能测试FMEA Failure Mode and Effect Analysis 失效模式与后果分析-- 预测问题的发生可能性并且对之采取措施FPY First Pass Yield 首次检查合格率FTY First Test Yield 首次测试合格率FW Firmware 韧体(软件硬化)-控制产品功能的软件HL Handload 在波峰焊接之前,将PTH元件用手贴装到PCB上,和手插机相同I/O Input / Output 输入/ 输出iBOM Indented Bill of Material 内部发出的BOM(依照客户的BOM)ICT In-circuit Test 线路测试-- 用电气和电子测试来检查PCBA短路,开路,少件,多件和错件等等不良IFF Information Feedback Form 情报联络书-反馈信息所使用的一种表格IR Infra-red 红外线KPIV Key Process Input Variable 主要制程输入可变因素-在加工过程中,所有输入的参数/元素,将影响制成品的质量的可变因素KPOV Key Process Output Variable 主要制程输出可变因素-在加工过程中,所有输出的结果,所呈现的产品品质特征。
质量方面英文缩写-不要密码

从事质量多年,但在交流的时候仍会对一些术语(英文简称)搞不清楚,现普及一下部门名称的专有名词QS:Quality system品质系统CS:Coutomer Sevice 客户服务QC:Quality control品质管理IQC:Incoming quality control 进料检验LQC:Line Quality Control 生产线品质控制IPQC:In process quality control 制程检验FQC:Final quality control 最终检验OQC:Outgoing quality control 出货检验QA:Quality assurance 品质保证SQA:Source(supplier) Quality Assurance 供应商品质保证(VQA)CQA:Customer Quality Assurance客户质量保证PQA rocess Quality Assurance 制程品质保证QE:Quality engineer 品质工程CE:component engineering零件工程EE:equipment engineering设备工程ME:manufacturing engineering制造工程TE:testing engineering测试工程PPE roduct Engineer 产品工程IE:Industrial engineer 工业工程ADM: Administration Department行政部RMA:客户退回维修CSDI:检修PC:producing control生管MC:mater control物管GAD: General Affairs Dept总务部A/D: Accountant /Finance Dept会计LAB: Laboratory实验室DOE:实验设计HR:人资PMC:企划RD:研发W/H:仓库SI:客验PD: Product Department生产部PA:采购(PUR: Purchaing Dept)SMT:Surface mount technology 表面粘着技术MFG:Manufacturing 制造MIS:Management information system 资迅管理系统DCC:document control center 文件管制中心厂内作业中的专有名词QT:Quality target品质目标QP:Quality policy目标方针QI:Quality improvement品质改善CRITICAL DEFECT:严重缺点(CR)MAJOR DEFECT:主要缺点(MA)MINOR DEFECT:次要缺点(MI)MAX:Maximum最大值MIN:Minimum最小值DIA iameter直径DIM imension尺寸LCL:Lower control limit管制下限UCL:Upper control limit管制上限EMI:电磁干扰ESD:静电防护EPA:静电保护区域ECN:工程变更ECO:Engineering change order工程改动要求(客户)ECR:工程变更需求单CPI:Continuous Process Improvement 连续工序改善Compatibility:兼容性Marking:标记DWG rawing图面Standardization:标准化Consensus:一致Code:代码ZD:Zero defect零缺点Tolerance:公差Subject matter:主要事项Auditor:审核员BOM:Bill of material物料清单Rework:重工ID:identification识别,鉴别,证明PILOT RUN: (试投产)FAI:首件检查FPIR:First Piece Inspection Report首件检查报告FAA:首件确认SPC:统计制程管制CP: capability index(准确度)CPK: capability index of process(制程能力)PMP:制程管理计划(生产管制计划)MPI:制程分析DAS efects Analysis System 缺陷分析系统PPB:十亿分之一Flux:助焊剂P/N:料号L/N:Lot Number批号Version:版本Quantity:数量Valid date:有效日期MIL-STD:Military-Standard军用标准ICT: In Circuit Test (线路测试)ATE:Automatic Test Equipment自动测试设备MO: Manafacture Order生产单T/U: Touch Up (锡面修补)I/N:手插件P/T:初测F/T: Function Test (功能测试-终测)AS 组立P/K:包装TQM:Total quality control全面品质管理MDA:manufacturing defect analysis制程不良分析(ICT) RUN-IN:老化实验HI-pot:高压测试FMI:Frequency Modulation Inspect高频测试DPPM: Defect Part Per Million(不良率的一种表达方式:百万分之一) 1000PPM即为0.1% Corrective Action: (CAR改善对策)ACC:允收REJ:拒收S/S:Sample size抽样检验样本大小SI-SIV:Special I-Special IV特殊抽样水平等级CON:Concession / Waive特采ISO:国际标准化组织ISA:Industry Standard Architecture工业标准体制结构OBA:开箱稽核FIFO:先进先出PDCA:管理循环Plan do check action计划,执行,检查,总结WIP:在制品(半成品)S/O: Sales Order (业务订单)P/O: Purchase Order (采购订单)P/R: Purchase Request (请购单)AQL:acceptable quality level允收品质水准LQL;Limiting quality level最低品质水准QVL:qualified vendor list合格供应商名册AVL :认可的供货商清单(Approved Vendor List)QCD: Quality cost delivery(品质,交期,成本)MPM:Manufacturing project management制造专案管理KPI:Key performance indicate重要绩效指标MVT:Manufacturing Verification Test制造验证试产Q/R/S:Quality/Reliability/Service质量/可靠度/服务STL:ship to line(料到上线)NTF:No trouble found误判CIP:capacity improvement plan(产能改善计划)MRB:material review board(物料审核小组)MRB:Material reject bill退货单JIT:just in time(即时管理)5S:seiri seiton seiso seiketsu shitsuke(整理,整顿,清扫,清洁,修养)SOP:standard operation process(标准作业程序)SIP:Specification inspection process制程检验规格TOP: Test Operation Process (测试作业流程)WI: working instruction(作业指导书)SMD:surface mounting device(表面粘着原件)FAR:failure aualysis report故障分析报告CAR:Corrective action report改善报告BPR:企业流程再造(Business Process Reengineering)ISAR :首批样品认可(Initial Sample Approval Request)-JIT:实时管理(Just In Time)QCC :品管圈(Quality Control Circle)Engineering Department (工程部)TQEM: Total Quality Environment Management(全面品质环境管理)PD: Production Department (制造)LOG: Logistics (后勤支持)Shipping: (进出口)AOQ:Average Output Quality平均出货质量AOQL:Average Output Quality Level平均出货质量水平FMEA:failure model effectiveness analysis失效模式分析CRB: Change Review Board (工程变更会议)CSA:Customer Simulate Analysis客户模拟分析SQMS:Supplier Quality Management System供应商品质管理系统QIT: Quality Improvement Team 品质改善小组QIP:Quality Improvement Plan品质改善计划CIP:Continual Improvement Plan持续改善计划M.Q.F.S: Material Quality Feedback Sheet (来料品质回馈单) SCAR: Supplier Corrective Action Report (供货商改善对策报告)8D Sheet: 8 Disciplines sheet ( 8D单)PDCA:PDCA (Plan-Do-Check-Action) (管理循环)MPQ: Material Packing Quantity (物料最小包装量)DSCN: Delivery Schedule Change Notice (交期变更通知)QAPS: Quality Assurance Process Sheet (品质工程表)DRP :运销资源计划(Distribution Resource Planning)DSS:决策支持系统(Decision Support System)EC :电子商务(Electronic Commerce)EDI :电子资料交换(Electronic Data Interchange)EIS :主管决策系统(Excutive Information System)ERP:企业资源规划(Enterprise Resource Planning) FMS :弹性制造系统(Flexible Manufacture System)KM :知识管理(Knowledge Management)4L :逐批订购法(Lot-for-Lot)LTC :最小总成本法(Least Total Cost)LUC :最小单位成本(Least Unit Cost)MES :制造执行系统(Manufacturing Execution System) MPS :主生产排程(Master Production Schedule)MRP :物料需求规划(Material Requirement Planning) MRPⅡ:制造资源计划(Manufacturing Resource Planning) OEM :委托代工(Original Equipment Manufacture) ODM :委托设计与制造(Original Design & Manufacture) OLAP:线上分析处理(On-Line Analytical Processing) OLTP:线上交易处理(On-Line Transaction Processing) OPT :最佳生产技术(Optimized Production Technology) PDCA:PDCA管理循环(Plan-Do-Check-Action)PDM:产品数据管理系统(Product Data Management)) RCCP:粗略产能规划(Rough Cut Capacity Planning)SCM :供应链管理(Supply Chain Management)SFC :现场控制(Shop Floor Control)TOC:限制理论(Theory of Constraints)TQC :全面品质管制(Total Quality Control)FYI/R:for your information/reference仅供参考ASAP:尽快S/T:Standard time标准时间TPM:total production maintenance:全面生产保养ESD Wrist strap:静电环IT:information technology信息技术,资讯科学CEO:Chief Executive Officer执行总裁COO:Chief Operaring Officer首席业务总裁SWOT:Strength,Weakness,Opportunity,Threat优势﹐弱点﹐机会﹐威胁Competence:专业能力Communication:有效沟通Cooperation:统御融合Vibration Testing:振动测试IDP:Individual Development Plan个人发展计划MRP:Material Requirement Planning物料需求计划MAT'S:Material材料LRR:Lot Rejeet Rate批退率ATIN:Attention知会3C:Computer ,Communication , Consumer electronic消费性电子5W1H:When , Where , Who , What , Why , Ho5M: Man , Machine , Material , Method , Measurement人,机器,材料,方法,测量4MIE: Man,Material,Machine,Method,Environment人力,物力,财务,技术,时间(资源)7M1I: Manpower , Machine , Material , Method, Market , Management , Money , Information 人力,机器,材料,方法, 市场,管理,资金,资讯1 Accuracy 准确度2 Action 行动3 Activity 活动4 Analysis Covariance 协方差分析5 Analysis of Variance 方差分析6 Approved 承认7 Attribute 计数值8 Average 平均数9 Balance sheet 资产负债对照表10 Binomial 二项分配11 Brainstorming Techniques 脑力风暴法12 Cause and Effect Matrix 因果图(鱼骨图)13 CL:Center Line 中心线14 Check Sheets 检查表15 Complaint 投诉16 Conformity 合格(符合)17 Control 控制18 Control chart 控制(管制)图19 Correction 纠正20 Correlation Methods 相关分析法21 CPI: continuouse Process Improvement 连续工序改善22 Cross Tabulation Tables 交叉表23 CS: Customer Sevice 客(户)服(务)中心24 DSA: Defects Analysis System 缺陷分析系统25 Data 数据Description:品名26 DCC: Document Control Center 文控中心27 Decision 决策、判定28 Defects per unit 单位缺点数29 Description 描述30 Device 装置31 Do 执行32 DOE: Design of Experiments 实验设计33 Element 元素34 Engineering recbnology 工程技35 Environmental 环境36 Equipment 设备37 Estimated accumulative frequency 计算估计累计数38 E Equipment Variation 设备变异39 External Failure 外部失效,外部缺陷40 FA: Failure Analysis 失效分析41 Fact control 事实管理42 Fatigue 疲劳43 FMEA: Failure Mode and Effect Analysis失效模式与效果分析44 FP First-Pass Yield (第一次通过)合格率45 FQA: Final Quality Assurance 最终品质保证46 FQC: Final Quality control 最终品质控制47 Gauge system 测量系统48 Grade 等级49 Histogram 直方图50 Improvement 改善51 Initial review 先期审查52 Inspection 检验53 Internal Failure 内部失效、内部缺陷54 IPQC: In Process Quality Control 制程品质控制55 IQC: Incomming Quality Control 来料品质控制56 IS International Organization for Standardization 国际标准化组织57 LCL: Lower Control limit 管制下限58 LQC: Line Quality Control 生产线品质控制59 LSL: Lower Size Limit 规格下限60 Machine 机械61 Manage 管理62 Materials 物料63 Measurement 测量64 Median 中位数65 MSA: Measurement System Analysis 测量系统分析66 Occurrence 发生率67 Operation Instruction 作业指导书68 Organization 组织69 Parto 柏拉图70 PPM arts per Million (百万分之)不良率71 Plan 计划72 Policy 方针73 Population 群体74 PQA: Process Quality Assurance 制程品质保证75 Practice 实务(践)76 Prevention 预防77 Probability 机率78 Probability density function 机率密度函数79 Procedure 流程80 Process 过程81 Process capability analysis 制程能力分析(图)82 Process control and Process capability制程管制与制程能力83 Product 产品84 Production 生产85 Projects 项目86 QA: Quality Assurance 品质保证87 QC: Quality Control 品质控制88 QE: Quality Engineering 品质工程89 QFD: Quality Function Desgin 品质机能展开(法)90 Quality 质量91 Quality manual 品质手册92 Quality policy 品质政策(质量方针)93 Random experiment 随机试验94 Random numbers 随机数95 R:Range 全距(极差)96 Reject 拒收97 Repair 返修98 Repeatusility 再现性99 Reproducibility 再生性100 Requirement 要求101 Responsibilities 职责102 Review 评审103 Reword 返工104 Rolled yield 直通率105 RPN: Risk Priority Number 风险系数106 Sample 抽样,样本107 Sample space 样本空间108 Sampling with replacement 放回抽样109 Sampling without replacement 不放回抽样110 Scatter diagram 散布图分析111 Scrap 报废112 Simple random sampling 简单随机取样113 Size 规格114 SL: Size Line 规格中心线115 Stratified random sampling 分层随机抽样116 SOP: Standard Operation Procedure 标准作业书117 SPC: Statistical Process Control 统计制程管制118 Specification 规范119 SQA: Source(Supplier) Quality Assurance 供货商品质保证120 Stage sampling 分段随机抽样121 Standard Deviation 标准差122 Sum of squares 平方和123 Taguchi-method 田口(试验)方法124 Theory 原理125 TQC: Total Quality Control 全面品质控制126 TQM: Total Quality Management 全面品质管理127 Traceablity 追溯128 Training 培训129 UCL: Upper Control Limit 管制(控制)上限130 USL: Upper Size Limit 规格上限131 Validation 确认132 Variable 计量值133 Verification 验证134 Version 版本135 VOC: Voice of Customer 客户需求136 VOE: Voice of Engineer 工程需求137 Inventory stock report:庫存清单报告138 Sales order report:出货报告质量人员名称类QC quality control 品质管理人员FQC final quality control 终点质量管理人员IPQC in process quality control 制程中的质量管理人员OQC output quality control 最终出货质量管理人员IQC incoming quality control 进料质量管理人员TQC total quality control 全面质量管理POC passage quality control 段检人员QA quality assurance 质量保证人员OQA output quality assurance 出货质量保证人员QE quality engineering 质量工程人员质量保证类FAI first article inspection 新品首件检查FAA first article assurance 首件确认CP capability index 能力指数CPK capability process index 模具制程能力参数SSQA standardized supplier quality audit 合格供货商质量评估FMEA failure model effectiveness analysis 失效模式分析FQC运作类AQL Acceptable Quality Level 运作类允收质量水平S/S Sample size 抽样检验样本大小ACC Accept 允收REE Reject 拒收CR Critical 极严重的MAJ Major 主要的MIN Minor 轻微的Q/R/S Quality/Reliability/Service 质量/可靠度/服务P/N Part Number 料号L/N Lot Number 批号AOD Accept On Deviation 特采UAI Use As It 特采FPIR First Piece Inspection Report 首件检查报告PPM Percent Per Million 百万分之一制程统计品管专类SPC Statistical Process Control 统计制程管制SQC Statistical Quality Control 统计质量管理GRR Gauge Reproductiveness & Repeatability 量具之再制性及重测性判断量可靠与否DIM Dimension 尺寸DIA Diameter 直径N Number 样品数其它质量术语类QIT Quality Improvement Team 质量改善小组ZD Zero Defect 零缺点QI Quality Improvement 质量改善QP Quality Policy 目标方针TQM Total Quality Management 全面质量管理RMA Return Material Audit 退料认可7QCTools 7 Quality Control Tools 品管七大手法通用之件类ECN Engineering Change Notice 工程变更通知(供货商)ECO Engineering Change Order 工程改动要求(客户)PCN Process Change Notice 工序改动通知PMP Product Management Plan 生产管制计划SIP Standard Inspection Procedure 制程检验标准程序SOP Standard Operation Procedure 制造作业规范IS Inspection Specification 成品检验规范BOM Bill Of Material 物料清单PS Package Specification 包装规范SPEC Specification 规格DWG Drawing 图面系统文件类ES Engineering Standard 工程标准CGOO China General PCE龙华厂文件IWS International Workman Standard 工艺标准ISO International Standard Organization 国际标准化组织GS General Specification 一般规格部类PMC Production & Material Control 生产和物料控制PCC Product control center 生产管制中心PPC Production Plan Control 生产计划控制MC Material Control 物料控制DC Document Center 资料中心QE Quality Engineering 质量工程(部)QA Quality Assurance 质量保证(处)QC Quality Control 质量管理(课)PD Product Department 生产部LAB Laboratory 实验室IE Industrial Engineering 工业工程R&D Research & Design 设计开发部生产类PCs Pieces 个(根,块等)PRS Pairs 双(对等)CTN Carton 卡通箱PAL Pallet/skid 栈板PO Purchasing Order 采购订单MO Manufacture Order 生产单D/C Date Code 生产日期码ID/C Identification Code (供货商)识别码SWR Special Work Request 特殊工作需求L/N Lot Number 批号P/N Part Number 料号OEM Original Equipment Manufacture 原设备制造PC Personal Computer 个人计算机CPU Central Processing Unit 中央处理器A.S.A.P As Soon As Possible 尽可能快的E-MAIL Electrical-Mail 电子邮件N/A Not Applicable 不适用QTY Quantity 数量I/O input/output 输入/输出NG Not Good 不行,不合格C=0 Critical=0 极严重不允许APP Approve 核准,认可,承认CHK Check 确认ASS'Y Assembly 装配,组装T/P True Position 真位度5WIH When, Where, Who, What, Why, How to6M Man, Machine, Material, Method, Measurement, Message4MTH Man, Material, Money, Method, Time, How 人力,物力,财务,技术,时间(资源) SQA Strategy Quality Assurance 策略质量保证DQA Design Quality Assurance 设计质量保证MQA Manufacture Quality Assurance 制造质量保证SSQA Sales and service Quality Assurance 销售及服务质量保证LRR Lot Reject Rate 批退率SPS Switching power supply 电源箱DT Desk Top 卧式(机箱)MT Mini-Tower 立式(机箱)DVD Digital Video DiskVCD Video Compact DiskLCD Liquid Crystal DisplayCAD Computer Aided DesignCAM Computer Aided ManufacturingCAE Computer Aided EngineeringPCB Printed Circuit Board 印刷电路板CAR Correction Action Report 改善报告NG Not Good 不良WDR Weekly Delivery Requirement 周出货要求PPM Percent Per Million 百万分之一TPM Total Production Maintenance 全面生产保养MRP Material Requirement Planning 物料需计划OS Operation System 操作系统TBA To Be Assured 待定,定缺D/C Drawing ChangeP/P Plans & ProcedureEMI Electrical-Music Industry 电子音乐工业Electrical Magnetic Interference 电子干扰RFI Read Frequency Input 读频输入MMC Maximum Material ConditionMMS Maximum Material SizeLMC Least Material ConditionLMS Least Material SizeLED lighting-emitting diode 发光二极管QBR Quarter Business RecordCIP Continuous improvement processFGI Forecasted Goal InventoryCNC Computerized numeral controllerB2C Business to customerB2B Business to businessAVL Approved vendor listPOP Procedure of packagingEOL End of lifeVDCS Vender defect correcting sheetPDCS Process defect correcting sheet GRN Goods receiving noteA/R Accounting receivableA/P Accounting payable。
- 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
- 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
- 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。
CEM Contract Manufacture service 合约委托代工IBSC Internet Business Solution Center 国际互联网应用中心PCEG Personal Computer Enclosure group 个人计算机外设事业群(FOXTEQ)SABG system assembly business group 系统组装事业群Engineer standard 工标Document center (database center)资料中心Design Center 设计中心Painting 烤漆(厂) Assembly组装(厂) Stamping 冲压(厂)Education and Training教育训练proposal improvement/creative suggestion提案改善Technological exchange and study 技术交流研习会Technology and Development Committee 技术发展委员会BS Brain Storming 脑力激荡QCC Quality Control Circle 品质圈PDCA Plan Do Check Action 计划执行检查总结DCC delivery control center 交货管制中心Computer 计算机类产品Consumer electronics 消费性电子产品Communication 通讯类产品Core value(核心价值)Love 爱心Confidence 信心Decision 决心Corporate culture(公司文化)Integration 融合Responsibility 责任Progress 进步Time to market 及时切入生产Time to volume 及时大量生产Time to money 及时大量交货 中国最庞大的数据库下载FOUR CONTROL SYSTEM 四大管制系统Engineering control system 工程管制系统Quality control system品质管制系统Manufacturing control system生产管制系统Management control system经营管制系统Classification整理(sorting, organization)-seiri Regulation整顿(arrangement, tidiness)-seitonCleanliness清扫(sweeping, purity)-seisoConservation清洁(cleaning, cleanliness)-seiktsu Culture教养(discipline)-shitsukeSave 节约Safety安全二:英文缩写品质人员名称类QC quality control 品质管理人员FQC final quality control 终点品质管制人员IPQC in process quality control 制程中的品质管制人员OQC output quality control 最终出货品质管制人员IQC incoming quality control 进料品质管制人员TQC total quality control 全面质量管理POC passage quality contro l 段检人员QA quality assurance 质量保证人员OQA output quality assuranc e 出货质量保证人员QE quality engineering 品质工程人员品质保证类FAI first article inspectio n 新品首件检查FAA first article assurance 首件确认CP capability index 能力指数CPI capability process index 模具制程能力参数SSQA standardized supplier quality audi t 合格供货商品质评估FMEA failure model effectiveness analysi s 失效模式分析FQC运作类AQL Acceptable Quality Level 运作类允收品质水准S/S Sample size 抽样检验样本大小ACC Accept 允收REE Reject 拒收CR Critical 极严重的MAJ Major 主要的MIN Minor 轻微的Q/R/S Quality/Reliability/Service 品质/可靠度/服务P/N Part Number 料号L/N Lot Number 批号AOD Accept On Deviation 特采UAI Use As It 特采FPIR First Piece Inspection Repor t 首件检查报告PPM Percent Per Million 百万分之一制程统计品管专类SPC Statistical Process Control 统计制程管制SQC Statistical Quality Control 统计品质管制GRR Gauge Reproductiveness & Repeata bility 量具之再制性及重测性判断量可靠与否DIM Dimension 尺寸DIA Diameter 直径N Number 样品数其它品质术语类QIT Quality Improvement Team 品质改善小组ZD Zero Defect 零缺点QI Quality Improvement 品质改善QP Quality Policy 目标方针TQM Total Quality Managemen t 全面品质管理RMA Return Material Audit 退料认可7QCTools 7 Quality Control Tools 品管七大手法通用之件类ECN Engineering Change Notic e 工程变更通知(供货商)ECO Engineering Change Orde r 工程改动要求(客户)PCN Process Change Notice 工序改动通知PMP Product Management Plan 生产管制计划SIP Standard Inspection Procedur e 制程检验标准程序SOP Standard Operation Procedur e 制造作业规范IS Inspection Specification 成品检验规范BOM Bill Of Material 物料清单PS Package Specification 包装规范SPEC Specification 规格DWG Drawing 图面系统文件类ES Engineering Standard 工程标准IWS International Workman Standard 工艺标准ISO International Standardization Orga nization 国际标准化组织GS General Specification 一般规格部类PMC Production & Material Control 生产和物料控制PCC Product control center 生产管制中心PPC Production Plan Control 生产计划控制MC Material Control 物料控制DCC Document Control Cente r 数据控制中心QE Quality Engineering 品质工程(部)QA Quality Assurance 品质保证(处)QC Quality Control 品质管制(课)PD Product Department 生产部LAB Laboratory 实验室IE Industrial Engineering 工业工程R&D Research & Design 设计开发部生产类PCs Pieces 个(根,块等)PRS Pairs 双(对等)CTN Carton 卡通箱PAL Pallet/skid 栈板PO Purchasing Order 采购订单MO Manufacture Order 生产单D/C Date Code 生产日期码ID/C Identification Code (供货商)识别码SWR Special Work Request 特殊工作需求r 批号P/N Part Number 料号OEM Original Equipment Manufactur e 原设备制造PC Personal Computer 个人计算机CPU Central Processing Unit 中央处理器A.S.A.P As Soon As Possible 尽可能快的E-MAIL Electrical-Mail 电子邮件N/A Not Applicable 不适用QTY Quantity 数量t 输入/输出NG Not Good 不行,不合格C=0 Critical=0 极严重不允许APP Approve 核准,认可,承认CHK Check 确认ASS'Y Assembly 装配,组装T/P True Position 真位度5WIH When, Where, Who, What, Why, How t o6M Man, Machine, Material, Method, Measu rement, Message4MTH Man, Material, Money, Method, Time, How 人力,物力,财务,技术,时间(资源)SQA Strategy Quality Assurance 策略品质保证DQA Design Quality Assurance 设计品质保证MQA Manufacture Quality Assurance 制造品质保证SSQA Sales and service Quality Assurance 销售及服务品质保证LRR Lot Reject Rate 批退率DT Desk Top 卧式(机箱)T Mini-Tower 立式(机箱) DVD Digital Video DiskVCD Video Compact DiskLCD Liquid Crystal Display 液晶显示器CAD Computer Aided Design 计算器辅助设计CAM Computer Aided Manufacturing 计算器辅助生产PCB Printed Circuit Board 印刷电路板CAR Correction Action Report 改善报告NG Not Good 不良WDR Weekly Delivery Requirement 周出货要求PPM Percent Per Million 百万分之一TPM Total Production Maintenance 全面生产保养MRP Material Requirement Planning 物料需计划OS Operation System 操作系统TBA To Be Assured 待定,定缺D/C Drawing ChangeP/P Plans & ProcedureEMI Electrical-Music Industry 电子音乐工业Electrical Magnetic Interference 电子干扰RFI Read Frequency Input 读频输入MMC Maximum Material ConditionLED lighting-emitting diode 发光二极管CIP Continuous improvement process 持续改善过程B2C Business to customerB2B Business to businessAVL Approved vendor listPOP Procedure of packaging 包装程序三:专业词汇通用类president董事长operator作业员position职务general manager总经理special assistant 特助deputy manager |'depjuti| =vice manager副理deputy supervisor =vice supervisor副课长group leader组长line leader线长supervisor 课长responsible department负责单位Human Resources Department人力资源部Head count 人头数production department生产部门planning department企划部QC Section品管课stamping factory冲压厂painting factory烤漆厂molding factory成型厂administration/general affairs dept./总务部production unit生产单位meeting minutes会议记录distribution department分发单位subject主题conclusion结论decision items决议事项pre-fixed finishing date预定完成日Color management 颜色管理Visual management 目视管理production capacity生产力first count初盘first check初盘复棹second count 复盘second check复盘复核quantity of physical inventory second count 复盘点数量physical inventory盘点数量physical count quantity帐面数量difference quantity差异量spare parts physical inventory list备品盘点清单cause analysis原因分析waste materials废料description品名specification 规格model机种work order工令revision版次remark备注registration登记registration card登记卡to control管制application form for purchase请购单consume, consumption消耗to notify通知to fill in填写to collect, to gather收集statistics统计cosmetic inspection standard 外观检验规范computer case 计算机外壳(组件)personal computer enclosure 计算机机箱产品front plate前板rear plate后板chassis |'∫æsi| 基座bezel panel面板Hood 上盖base pan 基座bezel 面板riser card 扩充卡flat cable 排线pin header 排针TOP driver cage 上磁架bottom driver cage 下磁架resin film 树脂膜raw materials原料materials物料steel plate钢板roll/coil material卷料spare parts =buffer备品plastic parts塑料件sheet metal parts/stamping parts 冲件material check list物料检查表finished product成品semi-finished product半成品good product/accepted goods/ accepted parts/good p arts良品defective product/non-good parts不良品disposed goods处理品warehouse/hub仓库packing material包材plastic basket胶筐flow chart流程窗体production tempo生产进度现状lots of production生产批量manufacture procedure制程to revise, modify修订to switch over to, switch—to, switching over切换engineering bottleneck, project difficulty工程瓶颈glove(s)手套glove(s) with exposed fingers割手套Band-Aid创可贴Industrial alcohol工业酒精broom扫把mop拖把vacuum cleaner吸尘器rag 抹布garbage container灰箕garbage can垃圾箱garbage bag垃圾袋liaison联络单rags抹布lamp holder灯架to mop the floor拖地to clean a table擦桌子air pipe 气管delivery deadline交货期die worker模工production, to produce生产equipment设备resistance电阻beacon警示灯coolant冷却液crusher粉碎机plate电镀power button电源按键reset button重置键forklift*车Workshop traveler 天车trailer =long vehicle拖板车Hydraulic trolley手压车hydraulic hand jack油压板车casing = containerization装箱velocity速度patent专利coordinate坐标supply and demand供求career card履历卡barricade隔板carton box纸箱to pull and stretch拉深work cell/work shop工作间品质类qualified products, up-to-grade products良品defective products, not up-to-grade products不良品defective product box不良品箱poor processing 制程不良poor incoming part来件不良exposed metal/bare metal金属裸露excessive defect过多的缺陷critical defect极严重缺陷major defect主要缺陷minor defect次要缺陷not up to standard不合规格cosmetic defect外观不良lack of painting烤漆不到位slipped screw head/slippery slipped thread滑丝missing part漏件wrong part错件oxidation氧化defective threading抽芽不良poor staking铆合不良deficient purchase来料不良制程不良cosmetic inspection外观检查inner parts inspection内部检查blister 气泡angular offset 角度偏差dent 压痕scratch 刮伤deformation 变形filings 铁削defective label 不良标签abrasion 磨损Breaking. (be)broken,(be)cracked 断裂short射料不足nick缺口speck瑕疪shine亮班splay 银纹gas mark焦痕delaminating起鳞speckle斑点mildewed =moldy = mouldy发霉deformation变形burr(金属)flash(塑件)毛边poor staking铆合不良excessive gap间隙过大grease/oil stains油污inclusion杂质shrinking/shrinkage缩水mixed color杂色fold of packaging belt打包带折皱painting make-up补漆discoloration羿色water spots水渍impurity 杂质Mismatch 错位failure, trouble 故障deformation 变形rust 生锈peel 脱漆Shrink 缩水Contamination 脏污water spots 水渍Gap 间隙label error 标签错误Missing label 漏贴rejection criteria 拒收标准Suspected rejects 可疑庇abrasion 损伤、磨损Texture surface 印花纹表面Streak 条纹stains 污点Blotch 斑点discoloration 脱色Inclusion 杂质slug mark 压痕dirt grime 灰尘fr r ffgeer regegeegeg regebebeberebebebebe dfweff fdbe dfblush 毛边薄膜sink 下凹Hickey 漏漆labels and logos 贴纸与商标Configuration labels 组合贴纸corrugated container 瓦摆纸箱Delaminating 脱层splattering 散点Gouge 锉孔puckering 折痕。