[学士]重力坝毕业设计

[学士]重力坝毕业设计

第一部分重力坝毕业设计第一章基本资料设计洪水位(P = 5 %)上游:510.15m下游:480.12m校核洪水位(P = 1 %)上游:510.64m下游:481.10m正常蓄水位上游:509m死水位:488m可利用河底高程478.5m混凝土容重:24 KN/m3坝前淤沙高程:486m泥沙浮容重 10 KN/m3,内摩擦角为20°混凝土与基岩间抗剪断参数值:f `= 0.6c `= 0.3Mpa坝基基岩承载力:[f]=1000Kpa坝基垫层混凝土:C15坝体混凝土:C15= 22m/s50年一遇最大风速为:v`= 16m/s多年平均最大风速为:v吹程 D =1000m第二章重力坝的断面选取与荷载计算第一节流量-水位关系曲线计算流量-水位关系曲线计算表注:流量-水位关系曲线河谷断面图第二节重力坝坝体断面1.坝顶高程的确定①. 正常水位时gD/v2=9.81×1000/222=20.279.81h/222=0.0076×22-1/12×(9.81×1000/222)1/3h=0.79m当gD/v2=20~250时,h为累计频率h5%的波高∴h1%=h=1.24h5%=0.98m9.81Lm/222=0.331×22-1/2.15×(9.81×1000/222)1/3.75Lm=8.65mh z =π×0.982/8.65×cth(2πH/ Lm)hz=0.35m△h=h1%+h z+h c=0.98+0.35+0.4=1.73m根据公式Q=δsεmB(2g)1/2H3/2 得H={Q/[δsεmB(2g)1/2]}2/3={66.18/[1×1×0.502×24×(2×9.81) 1/2]}2/3 =1.15m设计洪水位=509+1.15=510.15m坝顶高程=509+1.73=510.73m②校核洪水位时gD/v2=9.81×1000/162=38.329.81h/162=0.0076×16-1/12×(9.81×1000/162)1/3h=0.53m当gD/v2=20~250时,h为累计频率h5%的波高∴h1%=h=1.24h5%=0.66m9.81Lm/162=0.331×16-1/2.15×(9.81×1000/162)1/3.75Lm=6.29mh z =π×0.662/6.29×cth(2πH/ Lm)hz=0.22m△h=h1%+hz+hc=0.66+0.22+0.3=1.18m根据公式Q=δsεmB(2g)1/2H3/2 得H={Q/[δεmB(2g)1/2]}2/3={112.56/[1×1×0.502×24×(2×9.81) 1/2]}2/3s=1.64m校核洪水位=509+1.64=510.64m坝顶高程=510.64+1.18=511.82m,故取坝顶高程为512m而该坝的开挖深度为1.5m ∴坝高=512-478.5=33.5m2.坝顶宽度的确定坝顶宽度取坝高的9%,则坝顶宽度=33.5×9%=3.015m,故坝顶宽度取3.5m3.坝面坡度的确定下游面的坡度采用1:0.84.坝基防渗与排水设施的拟订距距坝踵5m处设一个帷幕灌浆断面图如下:第三节荷载计算摩檫系数f 'Γk 、粘聚力C 'ΓK 的材料性能分项系数分别为1.3、3.0, 则相应的设计值:摩檫系数f 'Γ=0.6/1.3=0.46 粘聚力C 'Γ=300/3=100 Kpa选用砼为C15,抗压强度性能分项系数为1.5,则设计值 fc=15000/1.5=10000 Kpa 扬压力系数α为0.2(查表得出) 1.设计洪水位W 1W 2W 3⑴.浪压力P 1=1/2γHL m /2=1/2×9.81×(0.98+0.35+8.65/2)×8.65/2=119.97 KNP 2=1/2γL m 2/4=1/2×9.81×8.652/4=91.75 KNP n = P 1+P 2 =119.97-91.75=28.22 KN P=1.2×P n =1.2×28.22=33.86 KNM 1n =-P 1×[1/3×(h 1%+h z +L m /2)+H 1-L m ]=-119.97×[1/3×(0.98+0.35+8.65/2)+31.65-8.65/2]=-3504.32 KN ·NM1=1.2M1n=1.2×(-3504.32)=-4205.18 KN·NM2n =P2×(1/3×Lm/2+H1-Lm/2)=91.75×(1/3×8.65/2+31.65-8.65/2)=2639.34 KNM2=1.2M2n=1.2×2639.34=3167.21 KN·N⑵.泥沙压力Psk =1/2γsbhs2tan2(45°-φs/2)=1/2×10×7.52×tan2(45°-20°/2)=137.89 KNPn =1.2Psk=1.2×137.89=165.47 KNM=-PnL=-165.47×1/3×7.5=-413.68 KN·N⑶.自重W1=γV1=24×3.5×33.5=2814 KNW2=γV2=24×23.3×29.1×1/2=8136.36 KNW3=γV3=9.81×1/2×1.62×1.62×0.8=10.30 KNW=W1+W2+W3=10960.66 KNM1=W1L1=2814×(26.8/2-3.5/2)=32783.1 KN·NM2=W2L2=8136.36×(26.8/2-3.5-23.3/2)=17357.57 KN·NM3=-W3L3=-10.30×(26.8/2-1/3×1.62×0.8)=-133.57 KN·N⑷.水压力上游:P1=1/2γH12=1/2×9.81×31.652=4913.45 KNM1=-P1L1=-4913.45×1/3×31.65=-51836.90 KN·N下游:P2=1/2γH22=1/2×9.81×1.622=12.87 KNM2=P2L2=12.87×1/3×1.62=6.95 KN·N⑸.浮托力P浮=γH2LB=9.81×1.62×26.8=425.91 KNM=0 KN·N⑹.渗透压力W1=γA1=9.81×1/2×5×[31.65-1.62-0.2×(31.65-1.62)=589.19 KNW2=γA2=9.81×5×0.2×(31.65-1.62)=294.59 KNW3=γA3=9.81×1/2×(26.8-5)×0.2×(31.65-1.62)=642.22 KNWK =W1+W2+W3=1526 KNW=1.2×1526=1831.2 KNM 1K =-W 1L 1=-589.19×(26.8/2-5/3)=-6913.17 KN ·N M 1=1.2 M 1K =8160.35 KN ·NM 2K =-W 2L 2=-1.2×294.59×(26.8/2-5/2)=-3211.03 KN ·N M 2=1.2 M 2K =-3853.24 KN ·NM 3K =-W 3L 3=-1.2×642.22×[26.8/2-5-(26.8-5)/3] =-727.85 KN M 3=1.2 M 3K =-873.42 KN ∑P=5099.91 KN ∑W=8284.51 KN∑M=-16296.96 KN ·N 2.校核洪水位W 1W 2W 3⑴.浪压力P 1=1/2γHL m /2=1/2×9.81×(0.66+0.22+6.29/2)×6.29/2=62.09 KN P 2=1/2γL m 2/4=1/2×9.81×6.292/4=48.52 KNP n = P 1+P 2 =62.09-48.52=13.57 KN P=1.2×P n =1.2×13.57=48.52 KNM1n =-P1×[1/3×(h1%+hz+Lm/2)+H1-Lm]=-62.09×[1/3×(0.66+0.22+6.29/2)+32.14-6.29/2]=-1883.60 KN·NM1=1.2M1n=1.2×(-1883.60)=-2260.32 KN·NM2n =P2×(1/3×Lm/2+H1-Lm/2)=48.52×(1/3×6.29/2+32.14-6.29/2)=1457.70KNM2=1.2M2n=1.2×1457.70=1749.24 KN·N⑵.泥沙压力Psk =1/2γsbhs2tan2(45°-φs/2)=1/2×10×7.52×tan2(45°-20°/2)=137.89 KNPn =1.2Psk=1.2×137.89=165.47 KNM=-PnL=-165.47×1/3×7.5=-413.68 KN·N⑶.自重W1=γV1=24×3.5×33.5=2814 KNW2=γV2=24×23.3×29.1×1/2=8136.36 KNW3=γV3=9.81×1/2×2.6×2.6×0.8=26.53 KNW=W1+W2+W3=10976.89 KNM1=W1L1=2814×(26.8/2-3.5/2)=32783.1 KN·NM2=W2L2=8555.4×(26.8/2-3.5-23.3/3)=17357.57 KN·NM3=-W3L3=-26.53×(26.8/2-1/3×2.6×0.8)=-337.11 KN·N⑷.水压力上游:P1=1/2γH12=1/2×9.81×32.142=5066.76 KNM1=-P1L1=-5066.76×1/3×32.14=-54281.89 KN·N下游:P2=1/2γH22=1/2×9.81×2.62=33.16 KNM2=P2L2=33.16×1/3×2.6=28.74 KN·N⑸.浮托力P浮=γH2LB=9.81×2.6×26.8=683.56 KNM=0 KN·N⑹.渗透压力W1=γA1=9.81×1/2×5×[32.14-2.6-0.2×(32.14-2.6)=579.57 KNW2=γA2=9.81×5×0.2×(32.14-2.6)=289.79 KNW3=γA3=9.81×1/2×(26.5-5)×0.2×(32.14-2.6)=631.74 KNWK =W1+W2+W3=1501.1 KNW=1.2×1501.1=1801.32 KNM1=-1.2W1L1=-1.2×579.57×(26.8/2-5/3)=-8160.35 KN·NM2=-1.2W2L2=-1.2×289.79×(26.8/2-5/2)=-3790.45 KN·NM3=-1.2W3L3=-1.2×631.74×[26.8-5-(26.8-5)/3] =-859.17 KN∑P=5215.35 KN∑W=8072.97 KN∑M=-18184.32 KN·N3. 抗滑稳定极限状态⑴基本组合时,取持久状况对应的设计状况系数ψ=1.0,结构系数γd=1.2γ0ψs(·)= γψ∑P=1.0×1.0×5099.91 =5099.91 KN1/γd R(·)= 1/γd(f'Γ∑W+ C'ΓA)=1/1.2(0.46×8284.51+100×26.8) =5409.06 KN∴γ0ψs(·)<1/γdR(·)即基本组合时满足设计要求⑵偶然组合时,取偶然状况对应的设计状况系数ψ=0.85,结构系数γd=1.2γ0ψs(·)= γψ∑P=1.0×0.85×5215.35 =4433.05 KN1/γd R(·)= 1/γd(f'Γ∑W+ C'ΓA)=1/1.2(0.46×8911.05+100×26.8) =6837.38 KN∴γ0ψs(·)<1/γdR(·)即偶然组合时满足设计要求4. 坝址抗压强度极限状态⑴基本组合时,设计状况系数ψ=1.0,结构系数γd=1.8γ0ψs(·)= γψ(∑W/T-6∑M/T2)×(1+m2)=1.0×1.0×[8284.51/26.8-6×(-16296.96)/26.82] ×(1+0.82) =730.23 Kpa≈0.73 Mpa1/γdR(·)=1/1.8×10000=5555.56 Kpa≈5.56 Mpa∴γ0ψs(·)<1/γdR(·)即基本组合时满足设计要求⑵偶然组合时,设计状况系数ψ=0.85,结构系数γd=1.8γ0ψs(·)= γψ(∑W/T-6∑M/T2)×(1+m2)=1.0×0.85×[8072.97/26.8-6×(-18184.32)/26.82] ×(1+0.82) =631.68 Kpa≈0.63 Mpa1/γdR(·)=1/1.8×10000=5555.56 Kpa≈5.56 Mpa∴γ0ψs(·)<1/γdR(·)即偶然组合时满足设计要求5.上游坝踵不出现拉应力极限状态因上游坝踵不出现拉应力极限状态属正常使用极限状态,故设计状况系数,作用分项系数和材料性能分项系数均采用1.0,扬压力系数直接用0.2代入计算,此处,结构功能的极限值C=0。

重力坝毕业设计 (1)

重力坝毕业设计 (1)

目录摘要: (1)前言 (2)第一部分设计说明书 (3)1基本资料 (3)1.1自然条件及工程 (3)1.2坝址与地形情况 (3)1.3工程枢纽任务与效益 (4)2枢纽布置 (5)2.1枢纽组成建筑物及其等级 (5)2.2坝线、坝型选择 (5)2.3枢纽布置 (8)3洪水调节 (10)3.1基本资料 (10)3.2洪水调节基本原则 (13)3.3调洪演算 (14)3.4调洪计算结果 (17)4非溢流坝剖面设计 (18)4.1设计原则 (18)4.2剖面拟订要素 (19)4.3抗滑稳定分析与计算 (21)4.4应力计算 (22)5溢流坝段设计 (24)5.1泄水建筑物方案比较 (24)5.2工程布置 (25)5.3溢流坝剖面设计 (25)5.4消能设计与计算 (28)6细部构造设计 (32)6.1坝顶构造 (32)6.2廊道系统 (33)6.3坝体分缝 (34)6.4坝体止水与排水 (35)6.5基础处理 (36)6.6混凝土重力坝的分区 (38)第二部分计算说明书 (39)1洪水调节 (39)1.1调洪演算 (39)1.2调洪计算结果及分析 (55)2非溢流坝段计算 (57)2.1非溢流坝段经济剖面尺寸拟定 (57)2.2抗滑稳定分析 (60)2.3 应力分析计算 (65)3消能防冲设计 (68)3.1消力池的水力计算 (68)3.2辅助消能工设计 (71)致谢........................................................ 错误!未定义书签。

参考文献. (73)宁溪水利枢纽毕业设计摘要:宁溪水库枢纽为江北河开发的第一梯级,流域面积共3200km2。

该工程开发任务以发电为主,兼顾防洪。

设计中,基于给定的地质及水文气象等资料,首先进行了重力坝的坝型选择,选取了混凝土实体重力坝坝型;然后进行了水库水位调洪演算,调得设计洪水位345.6m,校核洪水位349.3m;还对挡泄水建筑物的剖面进行设计,确定坝高为54.7m,采用m3⨯表孔溢流,并对挡水坝段进行了抗滑稳定分析及坝体应力分析,结果均满足要求;14最后还对大坝进行细部构造设计,并阐述了关于消能防冲的方案。

水利工程重力坝毕业设计

水利工程重力坝毕业设计

第一章金河金水水利枢纽毕业设计基本资料1.1 流域概况及枢纽任务万江是我国大河流之一,其干流全长1200公里,流域面积25400平方公里,上游95%为山地,河床狭窄,水流湍急;中游大部分为丘陵地带,河床较宽;下游岸为冲积平原,人口最密,农产丰富,为重要农业区域,且有一个中等工业城市,但下游河床淤高,主要靠堤防挡水,每当汛期,常受洪水威胁。

万江流域内物产以农产为主,有稻谷、小麦、玉米、甘薯等,矿产较少,燃料很缺乏。

金河是万江的重要支流,流经万江的上、中游地带,全长250公里,平均坡降为0.0009,流域面积为9200平方公里,河道两岸为山地丘陵,河道狭窄,水流较急,能量蕴藏甚大,但洪水涨落迅速,对万江中下游防洪相当不利。

金河开发计划是配合万江而制定的,为减轻金河洪水对万江中下游农田的威胁,且开发金河能够供应万江中下游工农业日益增长的动力需要,拟在金河与万江汇流处的金水兴建水利枢纽。

本枢纽的主要任务是防洪、发电等综合利用效益。

1.2 坝址地形在本坝址地区,河床狭窄,仅一百多米宽,但随着高程之增高两岸便趋于平坦。

两岸高度在200米以上,海拔高程在400米以上,在坝址处右岸较左岸为陡,右岸平均坡度为0.5左右,左岸为0.4左右。

坝址位于河湾的下游,在坝址上游十余公里有一开阔地带,为形成水库的良好条件。

1.3 坝址地质该区地质构造比较简单,主要岩层为黑色硅质页岩和燧石,上有3-9米左右的覆盖层,系河沙卵石,近风化泥土层及崩石。

其岩层性质为:黑色硅质页岩:属沉积岩,为硅质胶结物之页岩,根据勘测结果,该岩层性质坚硬致密,仅岩石上层10-18米深度存在有裂缝和节理,不很严重,但须加以处理,经过压水试验,岩石之单位吸水量为0.1公升/分钟。

燧石:其岩层不宽,分布于左岸,岩性较黑色硅质页岩为弱。

岩层走向:左岸为南300西,右岸为南50东,倾角为500-700,倾向正向上游:在坝址处,据目前资料尚未发现断层。

硅质页岩的力学性质:(1)天然含水量时的平均容重: 2600公斤/立方米(2)基岩抗压强度: 1000-1200公斤/平方厘米(3)牢固系数 12~15(4)岩石与混凝土之间的的抗剪断摩擦系数为f’=0.85,抗剪断凝聚力系数c’=7.0kg/cm2;抗剪摩擦系数f=0.65。

[混凝土重力坝毕业设计计算书]混凝土重力坝毕业设计

[混凝土重力坝毕业设计计算书]混凝土重力坝毕业设计

[混凝土重力坝毕业设计计算书]混凝土重力坝毕业设计混凝土重力坝毕业设计计算书目录目录1第1章非溢流坝设计21.1坝基而高程de确定21. 2坝顶高程计算21. 2. 1基木组合情况下:21.2.2特殊组合情况下:31. 3坝宽计算41. 4坝而坡度41. 5坝基de防渗与排水设施拟定5第二章非溢流坝段荷载计算52.1计算情况de选择52. 2荷载计算52. 2. 1自重62. 2. 2静水压力及其推力62. 2. 3扬压力de计算72. 2. 4淤沙压力及其推力102. 2. 5波浪压力112. 2. 6 土压力12第3章坝体抗滑稳定性分析133. 2抗滑稳定计算153. 3抗剪断强度计算16第4章应力分析174. 1总则174. 1. 1大坝垂直应力分析174. 1. 2大坝垂直应力满足要求184. 2计算截而为建基面de情况194. 2.1荷载计算194. 2. 2运用期(计入扬压力de情况)204. 2. 3运用期(不计入扬压力de情况)214. 2. 4施工期21第5章溢流坝段设计225. 1泄流方式选择225. 2洪水标准de确定235. 3流量de确定235. 4单宽流量de选择235. 5孔口净宽de拟定235. 6溢流坝段总长度de确定245. 7堰顶高程de确定245. 8闸门高度de确定255. 9定型水头de确定255. 10泄流能力de校核265.11.1溢流坝段剖面图265.11. 2溢流坝段稳定性分析27 (1)正常蓄水情况27 (2)设计洪水情况27 (3)校核洪水情况28第6章消能防冲设计286.1洪水标准和相关参数de 选定296. 2反弧半径de确定296. 3坎顶水深de确定306. 4水舌抛距计算316. 5最大冲坑水垫厚度及最大冲坑厚度32第7章泄水孔DE设计337.1有压泄水孔de设计347. 11孔径Dde拟定347. 12进水口体形设计347. 13 闸门与门槽357. 14渐宽段357. 15出水口357. 15通气孔和平压管35参考文献36毕业设计(论文)任务书题目车家坝河水利枢纽(碾压重力坝设计)(任务起止日期20XX年3月29 ET20XX年6月18 H)院水利水电专业班学生姓名学号指导教师教研室主任院领导第一章非溢流坝设计1. 1坝基而高程de确定由《混凝土重力坝设计规范》可知,坝高100~50米时,重力坝可建在微风化至弱风化中部基岩上,本工程坝高为50~100m,由于本坝址岩层分布主要为石英砂岩,故可确定坝基面高程为832.0m。

水电站重力坝毕业设计

水电站重力坝毕业设计
1.1 流域概况和电站位置.................................................................................... 4 1.2 水文与气象.................................................................................................... 4
本次设计主要完成了拦河大坝剖面设计及大坝细部构造设计,剖面设计主要 包括大坝稳定验算及强度复核计算;最后对溢流坝工作桥进行了结构布置和配筋 计算。
关键词:梧桐口水电站;拦河大坝;剖面设计;细部构造;工作桥;结构布 置;配筋计算。
Abstract
Wutongkou hydropower station is located in Zhejiang Province, Wuxijiang Hu nanzhen.The geological condition of the general, the main building project by concrete non overflow dam, spillway, diversion structures and power house.
I
西华大学毕业设计说明书
3.2.4 横梁.................................................................................................. 40 3.2.5 活动铺板.......................................................................................... 40 3.3 配筋.............................................................................................................. 41 3.3.1 活动铺板配筋设计........................................................................... 41 3.3.2 悬臂板配筋设计.............................................................................. 43 3.3.3 横梁配筋设计.................................................................................. 47 3.3.4 纵梁配筋设计.................................................................................. 49 第四章 结论................................................................................................................57 总结与体会.................................................................................................................. 58 谢辞.............................................................................................................................. 59 参考文献...................................................................................................................... 60

碾压混重力坝毕业设计

碾压混重力坝毕业设计

碾压混重力坝毕业设计碾压混重力坝设计前言某水库工程是河北省和水利部“八·五”重点工程建设项目之一。

该工程是以供水、灌溉、养殖等综合利用为主的大型控制枢纽工程。

青龙河流域水量充沛,控制流域面积6340km2,,多年平均径流量9.6亿m3,是滦河流域较大的一条支流。

但由于降雨、径流的年际年内分配极不均匀,必须修建大型控制工程调节水量,丰富的水资源才能得以充分开发利用。

水库按满足秦皇岛市生活、工业用水和滦河中下游农业用水的需要设计,工程规模是:正常蓄水位141 m,调节库容7.09亿m3,水库库容系数0.77,水量利用系数为70%。

坝后式电站装机容量20Mw。

根据《水利水电枢纽工程等级划分及设计标准》SDJ12-78的规定,一期工程为二等工程,大坝为2级建筑物,正常应用洪水为100年一遇,非常运用洪水为1000年一遇。

辅助建筑物按Ⅲ级设计,临时建筑物按Ⅳ级设计。

枢纽建筑物包括电站坝段,溢流坝段、两岸非溢流坝段。

坝型为碾压混凝土重力坝坝。

底孔坝块两个,孔口进口后接,深式压力管道,进口底高程90.0m,最大单孔泄流量900m3/s。

溢流坝共5孔,孔宽20m,装设8x8m弧形钢闸门。

溢流面采用WES曲线,堰顶高程130,最大泄量3200m3/s,下游防洪允许单宽流量160m3/s,泄水建筑物按100年一遇洪水设计,采用宽尾墩与消力池联合消能方式,枢纽工程总泄量5000m3/s。

水电站为3级建筑物,正常运用洪水为30年一遇,非常运用洪水为200年一遇,电站装机容量20MW,多年平均发电量为6275x104kwh.。

水库上游设计洪水位为142.0m,相应下游水位为92.0m,库容为8.32×108m3,溢流坝相应的泄量为15243m3/s;上游校核洪水位为143.3m,相应下游水位为92.4m,库容为8.70×108m3,溢流坝相应的泄量为19857m3/s;上游正常蓄水位为141m(与汛限水位同高),相应下游水位为86.1m;死水位为90.0m,相应的库容为0.78×108m3。

龙潭水利枢纽(重力坝)毕业设计——西安理工大学

龙潭水利枢纽(重力坝)毕业设计——西安理工大学

9
表 2—5 分期设计洪水


H6
面雨量
177.2 161.1 138.8 122.7 105.8 84.4 67.9 51.7 23.0
(mm)
点雨量 H3 面雨量
165.6 150.5 129.7 114.7 98.9 78.8 63.4 48.3 21.5 138.5 125.9 108.5 95.9 82.7 65.9 53.0 40.4 17.9
2
1.2.2 区域经济发展的需要。
根据《铜川市城市商业网点规划》,全市正全面打造“一城双心”和“北市 区(老城)—黄堡—董家河—耀州区—新区—坡头‘六点一线’”的城市格局,确 定在全市规划建设新区南部装备制造和食品加工、坡头煤电联营、董家河 铝业、黄堡水泥陶瓷、耀州区惠塬水泥等八大工业园区,以拉动全市经济 持续快速增长。然而随着铜川市城市化和工业化进程的加快,水资源短缺 的矛盾已日益突显。作为未来铜川政治、经济、文化、商贸中心的新区, 其人口、工业、商贸已进入一个快速发展时期。全市 80%以上的工业都集中 在铜川新区和工业带所在的石川河流域,缺水矛盾更是显著。因此,为促 进铜川新区和工业带的经济可持续发展,开发龙潭水利枢纽工程势在必行。
1.2 工程特性表
工程名称
表 1-1 龙潭水利枢纽工程特性表 龙潭水利枢纽工程
建设地点
陕西省铜川市耀州区
所在河流
赵氏河
Ⅰ.水文特征 设计洪峰流量(100 年一遇) 校核洪峰流量(1000 年一遇)
Ⅱ.水库特征
669m3/s 1210m3/s
Ⅳ.枢纽主要建筑物
一.挡水建筑物
坝顶高程
717.24m
最大坝高
6
项目
时段

水工建筑物重力坝毕业设计模板

水工建筑物重力坝毕业设计模板

水工建筑物重力坝毕业设计模板××水力发电枢纽工程重力坝设计一、前言1、流域概况及枢纽任务××是罗江上的一条南北向大支流,河流全长295公里,流域面积850平方公里。

流域形状略呈菱形,上下游狭窄,中游宽大,河道坡陡流急,具有暴涨暴落的特性。

本枢纽工程以发电为主,兼顾防洪、灌溉,对航运和木材筏运也适当加以解决。

水库总库容22.6亿立方米,装机容量24.8万千瓦,灌溉上游农田130万亩,确保减免昌州市(福州市)及附近50万亩农田和南江县(南平县)的洪灾。

2、经水文、水利调洪演算确定:死水位200.15m;发电正常水位215.5m,相应下游水位163.88m;设计洪水位216.22m,相应下游水位169.02m,通过河床式溢洪道下泄流量5327.70m3/s;校核洪水位217.14m,相应下游水位169.52m,通过河床式溢洪道下泄流量6120.37 m3/s;泥沙淤积高程174.6m,淤沙干容重14.1KN/m3(浮容重=8.71 KN/m3),孔隙率n=0.45内摩擦角为φ=15o;电站进水口底板高程为186.20m(坝式进水口)。

3、气象资料相应洪水季节50年重现期最大风速的多年平均值为17.3m/s,相应设计洪水位时吹程2.54km,相应校核洪水位时吹程2.66km。

4、地质勘测资料坝址处河床地面高程为146.10m,河床可利用基岩高程为140m,坝与基岩之间摩擦系数为0.7,基岩允许抗压强度为6.3Mpa ,坝基渗透系数(扬压力折减系数或剩余水头系数)α1α2可分别取0.25,0.34。

5、建筑材料有关数据5.1 龄期为90天,强度等级C15标号的混凝土允许抗压强度为4.3Mpa。

5.2 砂石料有3个主要料场:5.2.1 房村料场位于坝上游右岸22公里处,与公路边小山丘相连,附近河岸地形开阔,可供加工堆存之用,分布呈长方形,长1350m,宽234m,表土层3~4m,露出水面0~7m。

  1. 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
  2. 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
  3. 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。

目录摘要........................................................ 错误!未定义书签。

前言........................................................ 错误!未定义书签。

第一某些设计阐明书1 工程概况.................................................. 错误!未定义书签。

1.1 工程地理位置........................................ 错误!未定义书签。

1.2 流域概况............................................ 错误!未定义书签。

1.3 工程任务与规模...................................... 错误!未定义书签。

2 基本资料.................................................. 错误!未定义书签。

2.1 水文气象............................................ 错误!未定义书签。

2.2 坝址与地形状况...................................... 错误!未定义书签。

2.3 工程枢纽任务与效益.................................. 错误!未定义书签。

3 枢纽布置.................................................. 错误!未定义书签。

3.1 枢纽构成建筑物及其级别.............................. 错误!未定义书签。

3.2 坝线、坝型选取...................................... 错误!未定义书签。

3.3 枢纽布置............................................ 错误!未定义书签。

4 洪水调节.................................................. 错误!未定义书签。

4.1 基本资料............................................ 错误!未定义书签。

4.2 洪水调节基本原则.................................... 错误!未定义书签。

4.3 调洪演算............................................ 错误!未定义书签。

4.4 调洪计算成果........................................ 错误!未定义书签。

5 非溢流坝剖面设计.......................................... 错误!未定义书签。

5.1 设计原则............................................ 错误!未定义书签。

5.2 剖面拟订要素........................................ 错误!未定义书签。

5.3 抗滑稳定分析与计算.................................. 错误!未定义书签。

5.4 应力计算............................................ 错误!未定义书签。

6 溢流坝段设计.............................................. 错误!未定义书签。

6.1 泄水建筑物方案比较.................................. 错误!未定义书签。

6.2 工程布置............................................ 错误!未定义书签。

6.3 溢流坝剖面设计...................................... 错误!未定义书签。

6.4 消能设计与计算...................................... 错误!未定义书签。

7 细部构造设计.............................................. 错误!未定义书签。

7.1 坝顶构造............................................ 错误!未定义书签。

7.2 廊道系统............................................ 错误!未定义书签。

7.3 坝体分缝............................................ 错误!未定义书签。

7.4 坝体止水与排水...................................... 错误!未定义书签。

7.5 基本解决............................................ 错误!未定义书签。

7.6 混凝土重力坝分区.................................... 错误!未定义书签。

第二某些计算阐明书1 洪水调节.................................................. 错误!未定义书签。

1.1 调洪演算............................................ 错误!未定义书签。

1.2 调洪计算成果及分析.................................. 错误!未定义书签。

2 非溢流坝段计算............................................ 错误!未定义书签。

2.1 非溢流坝段经济剖面尺寸拟定.......................... 错误!未定义书签。

2.2 重力坝非溢流坝段重要荷载............................ 错误!未定义书签。

2.3 抗滑稳定分析........................................ 错误!未定义书签。

2.4 抗剪断强度计算...................................... 错误!未定义书签。

2.5 应力分析计算........................................ 错误!未定义书签。

3 溢流坝段设计.............................................. 错误!未定义书签。

3.1 顶部曲线............................................ 错误!未定义书签。

3.2 反弧段.............................................. 错误!未定义书签。

4 消能防冲设计.............................................. 错误!未定义书签。

4.1 洪水原则和有关参数选定.............................. 错误!未定义书签。

4.2 水舌抛距计算........................................ 错误!未定义书签。

4.3 最大冲坑水垫厚度及最大冲坑厚度...................... 错误!未定义书签。

致谢.................................................. 错误!未定义书签。

参考文献................................................. 错误!未定义书签。

BJ重力坝毕业设计学生:晁阳指引教师:蒋定国三峡大学水利与环境学院摘要:BJ一级水电站位于鹤峰县北佳镇柳月坪,流域面积共303.4km2。

该工程开发任务以发电为主,兼顾防洪。

设计中,基于给定地质及水文气象等资料,一方面进行了重力坝坝型选取,选用了混凝土实体重力坝坝型;然后进行了水库水位调洪演算,调得设计洪水位647.8m,校核洪水位649.8m;还对挡泄水建筑物剖面进行设计,拟定坝高为117m,采用3×12m表孔溢流,并对挡水坝段进行抗滑稳定分析及坝体应力分析,成果均满足规定;最后还对大坝进行细部构造设计,并阐述了关于消能防冲方案。

Abstract:BJ river hydropower is located of Hefeng month County town of North JiaLiu Ping,the basin area of 303.4km2.This project development,giving priority to the task to power of flood control.The design of this project is based on the data of geological and hydrological and meteorological which is given,first select the solid concrete gravity dam to be the type of gravity,and then make the calculus of floodind the reservoir water level ,the result is the design flood level 647.8m and Check flood level 649.8m;also design the water discharge structure with surface hole which size 3×12m overflow and water retaining structure to determine the dam height is 117m and water retaining dam stability analysis for the dam and stress analysis,the results are satisfied Requirements;Finally,detailed structural design of the dam,and elaborated on the energy dissipation of the program.核心词:枢纽布置混凝土重力坝剖面设计荷载计算稳定分析应力分析Keywords:Ground-handling project layout concrete gravity dam Profile design the loadcalculation stability analysis stress analysis前言本次毕业设计是依照依照教学规定,对水利水电专业本科毕业生进行最后一项教学环节。