注塑专业英语
注塑专业英语手册

气辅 冷却系统 流道系统 浇口系统
Manufacture and method
铣床
车床 火花机 刨模机 磨床 磨光,磨削
Turning
车削
Tapping Reaming
攻丝 扩孔, 铰孔 第7页 共25页
The worker is spraying the Television outer shell
定位环 浇口衬套/主流道衬套 浇道拉杆 热固性塑料浇口衬套 导柱 导套
Slideway
导轨
Straight guide bush Eyebolt
直导套 第4页 共25页
吊环
Ejector guide pin Ejector guide bush Push pillar Ejector rob Angular pin Return pin
Thermo plastic
注塑部分
Injection moulding machine Clamping force Opening force Platen size Distance between tie bare Minimum mold height Opening stroke Maximum opening distance Ejector force Ejector stroke Screw diameter Injection pressure Theoretical shot volume Four-stage holding pressure Proportional back pressure Maximum shot weight Injection rate Plasticizing
注塑机专业英语

注塑机专业英语Revised on November 25, 2020钣金 machine cover / upper cover/ side cover锁模部分 clamping unit射胶部分 injection unit机架 machine frame / base电气系统 electric system液压系统 hydraulic system机械系统 mechanical system机门safety door / fixed door / movable door锁模部分 clamping unit电脑控制器 computer controller机械安全锁 mechanical safety interlock射胶部分 injection unit液压系统 hydraulic system电箱 electrical cabinet / cable机架分体线 stand split line机架螺丝孔 foundation bolt hole机架machine base / supporting frame理论注射容积 theoretical shot volume 实际注射量 shot weight螺杆直径 screw diameter注射压力 injection pressure注射速度 injection speed注射速率 injection rate螺杆长径比screw L/D ratio螺杆行程 screw stroke螺杆转速 screw speed熔胶能力plasticizing capacity锁模力 clamping force开模/锁模行程 mold clamping / opening stroke模板尺寸 platen size拉杆间距 distance between tie bars / rods模板最大距离 max. daylight容模量 mold thickness (min. & max.)顶出行程 hydraulic ejection stroke顶出力hydraulic ejection force顶针数 nos. of ejector pin液压系统压力hydraulic system pressure油泵马达 pump motor电热量 heating capacity 温度控制区数 nos. of temp control zones射嘴接触力 nozzle contact forceInjection射出Cooling time 冷却时间Holding time 锁模时间Injection alarm time 射出警报时间Injection start delayFinal cushion minimum valueChange-over to holding by valuePlasticizing end valueHydrarlic change-over pressure holdingScrewvalue for change-over to holdingChange-over to holding by enable valueHydraulic pressure in holding 锁模压力Filling stage pressure limitInjection speed 射出速度Injection注射Cooling time冷却时间Holding timeInjection alarm time注射报警时间Injection start delay注射开始延时Final cushion minimum value最后段位置Change-over to holding by value切换到锁模Plasticizing end value预塑重终点Hydrarlic change-over pressure holding切换到保压Screwvalue for change-over to holding加料Change-over to holding by enable valueHydraulic pressure in holding锁模力Filling stage pressure limit充模压力Injection speed注射速度Plasticizing delay预塑延时1st suck-back speed储料一速度1st suck-back pressure储料一压力Screwrotation speed螺杆转速Decompression value at end of injection注射终点Decompression value at end of plasticizing预塑终点Mould closing关模Mould close force关模压力Mould closing safety time.. 时间Mould closing pressure.. 压力1st closing safety stage pressure合模一段压力1st mould closing speed ...成型速度1st stage mould closing speed1st stage mould closing safety position.....位置High pressure start position高压锁模位置Number of repeat mould closing movement..重复次数Holding time 保压时间Injection start delay 注射延迟Injection注射Cooling time冷却时间Holding time保压时间Injection alarm time注射报警时间Injection start delay注射开始延时(注射延时启动延时)Final cushion minimum value最后段位置(最小余量)Change-over to holding by value切换到锁模(保压由位置切换)Plasticizing end value预塑重终点(熔胶终止)Hydrarlic change-over pressure holding切换到保压Screwvalue for change-over to holding加料Change-over to holding by enable value保压由位置切换Hydraulic pressure in holding锁模力(保压)Filling 填充Injection alarm time 射胶时间Injection start delay 延迟射胶Final cushion minimum value 不知道这个是在哪个页面或项目下,如果是射胶那应该是:最小射胶终点(应该是品质项目设置的)Change-over to holding by value不知道这个是在哪个页面或项目下,如果是射胶那应该是:最大射胶终点(应该是品质项目设置的)Plasticizing end value终点位置。
注塑专业英语

注塑专业英语Surface Appearance 外观Matt finish/matt surface 毛面Glossiness/gloss finish 光洁度Glass fiber rich surface/glass emergence on the surface 玻纤外露Blooming/surface blooming 表面析出White patches on surface 表面白斑Silver marks/silver streak 银纹Splay mark 水纹Flow mark 流纹Weld line 溶结纹Brittle/brittleness 脆Bubbles/trapped gas 气泡Void 孔Burn marks 烧伤FR failed 阻燃不合格Flame rating V-2 阻燃V-2Poor dispersion 分散不好FR/PTFE …agglomerates etc 阻燃剂/PTFE…结块Pellet porous 粒子不密/蜜蜂窝Low impact/tensile etc 物理性能低High flow/filler content etc 流动性/填充…过高Longs/fines/doubles 长粒/碎屑/连粒Poor cut 粒形不好Bristle/voids 表面有小气泡/孔Glass bundles 玻纤结团Product was rejected due to 产品不能接受因为…High moisture level 高水分Warpage/warped 翘曲Shrinkage/shrink 收缩Sink marks 缩影Short shot/short molding 打不满Distortion 变形Over dimension 尺寸过大Under dimension 尺寸过小Flashing 飞边Discoloration 变色Off color 颜色差异Flow rate 流动率Viscous 粘High flow 高流动Low flow 低流动Sticky 粘Mold release 脱模Antioxidant 抗氧剂Flame retardant agent 阻燃剂Heat stabilizer 热稳定剂Chopped glass fiber 短切玻纤Roving glass fiber 粗纱/长玻纤Glass beads 玻璃微珠Milled fiber 碾磨纤Molybdenum disulfide/moly/MoS2 二硫化钼Colorant 着色剂Pigment 颜料Dye 染料Accepted product specification 接受产品规格Approved our product 认可我们的产品Re-set spec 重新定标准Add in extra … 添加多一点…Reduced … content 减少…含量Dropped/reduced … by x%减少…含量…%Confirmed color standard 确认颜色标准Approved color standard 认可颜色标准Re-confirmed color standard 重新确认颜色标准Qualified our product 认可我们的产品Undergoing heat aging test 在做热老化实验Product is under testing 产品在测试当中Received first order 接了第一个定单Expected to finish by … 预计在…完成Expected order is xMT 预计定单量…吨Estimated annual/monthly consumption 预计年/月用量Holding time 保压时间Delay time 滞后时间Cavity pressure 空腔压力Residual stress 残余应力Injection time 注射时间Injection pressure 注射压力Injection rate 注射速率Plasticizing 塑化Injection 注射Die 冲模Plasticizing capacity 塑化能力Plasticizing volume 塑化量Pressure loss 压力损失Feed cylinder(barrel)料筒Nozzle 喷嘴Runner system 浇注系统Gate 浇口??Runner 流道Premould 预塑Clamping force 合模力模具工程类词汇英语翻译plain die简易模pierce die冲孔模forming die成型模progressive die连续模gang dies复合模shearing die剪边模riveting die铆合模pierce冲孔forming成型(抽凸,冲凸)draw hole抽孔bending折弯trim切边emboss凸点dome凸圆semi-shearing半剪stamp mark冲记号deburr or coin压毛边punch riveting冲压铆合side stretch侧冲压平reel stretch卷圆压平groove压线blanking下料stamp letter冲字(料号) shearing剪断tick-mark nearside正面压印tick-mark farside反面压印模具词汇英语翻译(冲压)extension dwg展开图procedure dwg工程图die structure dwg模具结构图material材质material thickness料片厚度press specification冲床规格die height range适用模高die height闭模高度burr毛边gap间隙punch wt.上模重量模具词汇英语翻译(五金零件类)inner guiding post内导柱inner hexagon screw内六角螺钉dowel pin固定销coil spring弹簧lifter pin顶料销eq-height sleeves=spool等高套筒pin销lifter guide pin浮升导料销guide pin导正销wire spring圆线弹簧outer guiding post外导柱stop screw止付螺丝located pin定位销outer bush外导套模具词汇英语翻译(塑件与模具)compre sion molding压缩成型flash mold溢流式模具plsitive mold挤压式模具split mold分割式模具cavity型控母模core模心公模taper锥拔leather cloak仿皮革shiver饰纹flow mark流痕welding mark溶合痕post screw insert螺纹套筒埋值self tapping screw自攻螺丝striper plate脱料板piston活塞cylinder汽缸套chip细碎物handle mold手持式模具(移转成型用模具)encapsulation molding低压封装成型(射出成型用模具)two plate两极式(模具)well type蓄料井insulated runner绝缘浇道方式hot runner热浇道runner plat浇道模块valve gate阀门浇口band heater环带状的电热器spindle阀针spear head刨尖头slag well冷料井cold slag冷料渣air vent排气道welding line熔合痕eject pin顶出针knock pin顶出销return pin回位销反顶针sleave套筒stripper plate脱料板insert core放置入子runner stripper plate浇道脱料板guide pin导销eject rod (bar)(成型机)顶业捧subzero深冷处理three plate三极式模具runner system浇道系统stress crack应力电裂orientation定向sprue gate射料浇口,直浇口nozzle射嘴sprue lock pin料头钩销(拉料杆) slag well冷料井side gate侧浇口edge gate侧缘浇口tab gate搭接浇口film gate薄膜浇口flash gate闸门浇口slit gate缝隙浇口fan gate扇形浇口dish gate因盘形浇口diaphragm gate隔膜浇口ring gate环形浇口subarine gate潜入式浇口tunnel gate隧道式浇口pin gate针点浇口Runner less无浇道(sprue less)无射料管方式long nozzle延长喷嘴方式sprue浇口;溶渣根据国家标准,以下为部分塑料模具成形术语的标准翻译。
注塑机专业英语

钣金 machine cover / upper cover/ side cover 锁模部分 clamping unit射胶部分 injection unit机架 machine frame / base电气系统 electric system液压系统 hydraulic system机械系统 mechanical system机门 safety door / fixed door / movable door 锁模部分 clamping unit电脑控制器 computer controller机械安全锁 mechanical safety interlock射胶部分 injection unit液压系统 hydraulic system电箱 electrical cabinet / cable机架分体线 stand split line机架螺丝孔 foundation bolt hole机架 machine base / supporting frame理论注射容积 theoretical shot volume实际注射量 shot weight螺杆直径 screw diameter注射压力 injection pressure注射速度 injection speed注射速率 injection rate螺杆长径比 screw L/D ratio螺杆行程 screw stroke螺杆转速 screw speed熔胶能力 plasticizing capacity锁模力 clamping force开模/锁模行程 mold clamping / opening stroke 模板尺寸 platen size拉杆间距 distance between tie bars / rods模板最大距离 max. daylight容模量 mold thickness (min. & max.)顶出行程 hydraulic ejection stroke顶出力 hydraulic ejection force顶针数 nos. of ejector pin液压系统压力 hydraulic system pressure油泵马达 pump motor电热量 heating capacity温度控制区数 nos. of temp control zones射嘴接触力 nozzle contact forceInjection射出Cooling time 冷却时间Holding time 锁模时间Injection alarm time 射出警报时间Injection start delayFinal cushion minimum valueChange-over to holding by valuePlasticizing end valueHydrarlic change-over pressure holding Screwvalue for change-over to holdingChange-over to holding by enable valueHydraulic pressure in holding 锁模压力Filling stage pressure limitInjection speed 射出速度Injection注射Cooling time冷却时间Holding timeInjection alarm time注射报警时间Injection start delay注射开始延时Final cushion minimum value最后段位置Change-over to holding by value切换到锁模Plasticizing end value预塑重终点Hydrarlic change-over pressure holding切换到保压Screwvalue for change-over to holding加料Change-over to holding by enable valueHydraulic pressure in holding锁模力Filling stage pressure limit充模压力Injection speed注射速度Plasticizing delay预塑延时1st suck-back speed储料一速度1st suck-back pressure储料一压力Screwrotation speed螺杆转速Decompression value at end of injection注射终点Decompression value at end of plasticizing预塑终点Mould closing关模Mould close force关模压力Mould closing safety time.. 时间Mould closing pressure.. 压力1st closing safety stage pressure合模一段压力1st mould closing speed ...成型速度1st stage mould closing speed1st stage mould closing safety position.....位置High pressure start position高压锁模位置Number of repeat mould closing movement..重复次数Holding time 保压时间Injection start delay 注射延迟Injection注射Cooling time冷却时间Holding time保压时间Injection alarm time注射报警时间Injection start delay注射开始延时(注射延时启动延时)Final cushion minimum value最后段位置(最小余量)Change-over to holding by value切换到锁模(保压由位置切换)Plasticizing end value预塑重终点(熔胶终止)Hydrarlic change-over pressure holding切换到保压Screwvalue for change-over to holding加料Change-over to holding by enable value保压由位置切换Hydraulic pressure in holding锁模力(保压)Filling 填充Injection alarm time 射胶时间Injection start delay 延迟射胶Final cushion minimum value 不知道这个是在哪个页面或项目下,如果是射胶那应该是:最小射胶终点(应该是品质项目设置的)Change-over to holding by value不知道这个是在哪个页面或项目下,如果是射胶那应该是:最大射胶终点(应该是品质项目设置的)Plasticizing end value终点位置。
注塑机专业英语

钣金 machine cover / upper cover/ side cover 锁模部分 clamping unit射胶部分 injection unit机架 machine frame / base电气系统 electric system液压系统 hydraulic system机械系统 mechanical system机门 safety door / fixed door / movable door 锁模部分 clamping unit电脑控制器 computer controller机械安全锁 mechanical safety interlock射胶部分 injection unit液压系统 hydraulic system电箱 electrical cabinet / cable机架分体线 stand split line机架螺丝孔 foundation bolt hole机架 machine base / supporting frame理论注射容积 theoretical shot volume实际注射量 shot weight螺杆直径 screw diameter注射压力 injection pressure注射速度 injection speed注射速率 injection rate螺杆长径比 screw L/D ratio螺杆行程 screw stroke螺杆转速 screw speed熔胶能力 plasticizing capacity锁模力 clamping force开模/锁模行程 mold clamping / opening stroke 模板尺寸 platen size拉杆间距 distance between tie bars / rods 模板最大距离 max. daylight容模量 mold thickness min. & max.顶出行程 hydraulic ejection stroke顶出力 hydraulic ejection force顶针数 nos. of ejector pin液压系统压力 hydraulic system pressure油泵马达 pump motor电热量 heating capacity温度控制区数 nos. of temp control zones 射嘴接触力 nozzle contact forceInjection 射出Cooling time 冷却时间Holding time 锁模时间Injection alarm time 射出警报时间Injection start delayFinal cushion minimum valueChange-over to holding by value Plasticizing end valueHydrarlic change-over pressure holding Screwvalue for change-over to holding Change-over to holding by enable value Hydraulic pressure in holding 锁模压力Filling stage pressure limitInjection speed 射出速度Injection注射Cooling time冷却时间Holding timeInjection alarm time注射报警时间Injection start delay注射开始延时Final cushion minimum value最后段位置Change-over to holding by value切换到锁模Plasticizing end value预塑重终点Hydrarlic change-over pressure holding切换到保压Screwvalue for change-over to holding加料Change-over to holding by enable valueHydraulic pressure in holding锁模力Filling stage pressure limit充模压力Injection speed注射速度Plasticizing delay预塑延时1st suck-back speed储料一速度1st suck-back pressure储料一压力Screwrotation speed螺杆转速Decompression value at end of injection注射终点Decompression value at end of plasticizing预塑终点Mould closing关模Mould close force关模压力Mould closing safety time .. 时间Mould closing pressure .. 压力1st closing safety stage pressure合模一段压力1st mould closing speed ...成型速度1st stage mould closing speed1st stage mould closing safety position.....位置High pressure start position高压锁模位置Number of repeat mould closing movement..重复次数Holding time 保压时间Injection start delay 注射延迟Injection注射Cooling time冷却时间Holding time保压时间Injection alarm time注射报警时间Injection start delay注射开始延时注射延时启动延时Final cushion minimum value最后段位置最小余量Change-over to holding by value切换到锁模保压由位置切换Plasticizing end value预塑重终点熔胶终止Hydrarlic change-over pressure holding切换到保压Screwvalue for change-over to holding加料Change-over to holding by enable value保压由位置切换Hydraulic pressure in holding锁模力保压Filling 填充Injection alarm time 射胶时间Injection start delay 延迟射胶Final cushion minimum value 不知道这个是在哪个页面或项目下;如果是射胶那应该是:最小射胶终点应该是品质项目设置的Change-over to holding by value不知道这个是在哪个页面或项目下;如果是射胶那应该是:最大射胶终点应该是品质项目设置的Plasticizing end value终点位置。
注塑模具专业英语-Tooling_English讲解

模具专业英语培训——注塑模English Training——Injection Mold(一)模具专业基本用词Professional Terms1.塑料—plastic, resin2.样件—sample3.钢料—steel4.注塑机—injection machine, press5.产品—part, product, moulding6.模具—mold, mould, toolA 简易模(样板模)—prototype moldB 量产用模具—production mold 7.三维造型(数模)—model, 3D data8.二维产品图—2D part drawing9.设计—design10.制造—manufacture, build up, construction11.检验—check, inspection12.测量—measure, inspection13.修改—change, modify, correction14.工程更改—engineer change15.质量—quality16.数量—quantity17.基准—datum, reference(二)如何解析2D 产品图?How to read 2D part drawing?一.产品几何Geometry1.点—point2.线(边)—line, edge3.面faceA 侧面—sideB 表面—surfaceC 外观面—appearance surface 4.壁厚—wall thickness, stock thickness5.加强筋(骨位)—rib6.孔—hole7.细长的槽—slot8.柱位—boss9.角—cornerA 圆角—filletB 倒角—chamferC 尖角—sharp corner 10.斜度—angle, taper11. 凹槽—recess , groove二.分模信息Splitting1.分型线—parting line (P/L), splitting line2.主分模方向—main direction, line of draw3.浇口设定—gating三.产品标识Part Identification1.产品名称—part name (P/N)2.产品编号+版本号—part number + revision (Rev.)3.型腔号—cavity number4.材料标记—material symbol5.模具编号—mold number (no.)6.日期印—dating insert, date code7.循环印—cycling code8.公司标志—company logo四.技术要求Specification (Special Requirement)1.项目启动表Kick-off sheet1)项目名称—program name, project name2)产品名称—part name, product name, part description3)产品编号—part number (P/N)4)客户模号—customer mold no.5)项目启动日期—kick off date, start date6)项目完成日期—due date,lead time7)内模件用钢—tool steel8)型腔数量—number of cavities9)数模文件编号—data file no.10)注塑材料—resin, plastic, raw material11)收缩率—shrink, shrinkage, shrink factor12)注塑机吨位—molding machine size, injection machine size 13)成型周期—cycle time14)型腔光洁度—cavity polish15)型芯光洁度—core polish16)皮纹(晒纹)—texture, grain17)拔模斜度—draft angle, removal taper18)注塑件颜色及光泽—molded color & gloss19)模具加工地—manufacturing facility20)热流道供应商—manifold manufacturer, manifold supplier 21)浇口位置—gate location / position22)浇口类型—gate type23)产品标识—stamp information, part identification24)特殊要求—special instructions2.产品质量及外观要求Part Quality & Appearance1)尺寸及公差Dimension & Tolerance①重要尺寸—critical dimension, important dim., key dim.②理论尺寸—nominal dimension③实际尺寸—actual dimension④公差—tolerance⑤公差带—tolerance range⑥尺寸超差—dimension deviation⑦接受(合格)—accept, OK⑧拒绝(不合格)—reject, refuse, obsolete, NG⑨让步接受—concession, special admit⑩返工—re-work2)产品缺陷(较常见)Defects (normal)①缩印—sink mark, shrinkage②飞边—flash, burr③段差—mismatch discrepancy④银丝纹—snake marks, streak⑤弯曲—warpage, distortion⑥打不足(缺料)—short shot⑦熔接线—weld line3.产品外观Part Appearance①产品颜色—part color②产品光泽—gloss③皮纹粒度—grain4.常用词汇、词组及短语Normal Word, Short Sentence1)单边—per side2)双边—both sides3)加入,添加—add, incorporate4)去除,取消—remove, cancel5)满足…的要求,符合,与…要求一致—according to, conform to, satisfy, meet 6)要求,需要—require, need, demand7)确认—be approved, agreed by …8)允许—permit, allow9)在…范围之内—within10)不可以,不允许,禁止—free from, prevent, avoid11)…,除非有另指—…unless otherwise specified12)…或少于—…or less13)自动化运作—automatic operation14)未注尺寸(详细形状)见三维造型Non dimensioned contour (detailed shape) see 3D model.15)分型线上的飞边(披缝)或段差应小于…Burrs and discrepancy on the P/L shall be … or less.五.标题栏Title Block1.产品名称—part name2.图纸编号 + 版本号(索引号)—drawing no. + level (index)3.一般公差[的标准] —general tolerance(三)如何阅读制模标准?How to read tooling standard? 一.模具结构术语Mold Construction TerminologyA.模架Mold Base1.模架量化特征Measurement Feature①长X 宽X 高—Length X Width X Height②模具推高尺寸(模厚)—stack height of mould③模具重量—total weight of mould, mould thickness2.定模底板—front plate, top clamping plate, clamp plate, clamping plate 3.定模板—cavity plate, fixed mould plate, A – plate4.动模板—core plate, moving mould plate, B – plate5.支撑板—support plate, backing plate6.模脚—support blocks, rails, risers, spacer block7.顶杆固定板—retaining plate, ejector retaining plate8.顶板—ejector plate9.动模底板—back plate10.导柱—guide pillar, leader pin, guide pin11.导套—guide bush, leader pin bush12.复位杆—return pin, push-back pin13.弹簧—spring14.撑头—support pillar15.推板导柱、导套—ejection guide pin / bush16.挡钉—stop pin, stop button17.站立脚—standing-off pillars18.标牌—plaque scutcheonB.成型零部件moulding components19.型芯—core20.型腔—cavity21.镶针—core pin22.镶块—insert, split23.滑块—slide, sliding split24.斜顶—lifter, angled-lift splitA 斜顶头—lifter headB 斜顶杆—lifter rod, lifter shaft 25.成型顶杆—moulding face pin, form pinC.浇注系统Feed System1.塑料Mouldinga.主流道—sprueb.分流道runner①主分流道—main runner②二级分流道—branch runner分流道断面形状cross-sectional shape of runner①圆形—full round②半圆形—semicircular③梯形—trapezoidalc.浇口gate常用浇口形式normal gate type :①边缘浇口(J型浇口)—edge gate, J – gate②侧浇口—side gate③潜伏式浇口—sub-gate, cashew gate, subsurface gate, submarine gate④潜伏式二次浇口(隧道式浇口) —tunnel gate onto feeder post⑤点浇口—pin gate⑥直接浇口(主流道型浇口) —sprue gate, direct gate⑦护耳式浇口—tab gated.模腔—impressione.冷料井—cold slug wellf.热流道—hot runner2.模具零件mold componentsa.定位圈—locating ring, location ring, register ringb.浇口套—sprue bushc.挡圈—stop ringd.浇口镶块—gate inserte.热流道板—manifoldf.热嘴—hot dropD.分型面及其锁紧、排气Parting Surface, inter-locking & venting 1.分型线—parting line ( P/L )2.镶拼线—bodyline, joint line3.平/ 不平的分型面—flat / non – flat parting surface4.封胶面—shut off surfaces, seal-off surfaces5.擦位—shut off6.碰穿位—kiss-off7.管位—parting line lock8.分型面的释放(避空) —relief of parting surface9.分型面的平衡—balancing of parting surface10.锁紧角度—locking angle11.锁紧力—clamping force12.锁模板—safety strap13.精定位—Interlock, die lock14.困气—air trap15.排气槽—vent, vent slotE.滑块机构Slide1.驱动Actuation①斜导柱—angled pin, horn pin, cam pin②弹簧—spring③油缸—hydraulic cylinder2.制动Detention①滑块固定器—slide retainer②弹簧制动器—spring-loaded detention (plunger)③挡钉、挡板—stop pin, stop plate, slide stop3.导轨—gib, guide strip4.锁紧块(楔紧块)—heel block, locking heel, wedge block, chase block 5.耐磨片—wear plate, wear strip6.压板—retainer7.螺钉—screw8.定位销—dowelF.斜顶机构Lifter1.斜顶头—lifter head2.斜顶杆—lifter rod, lifter shaft3.开口销—split pin4.固定板(压板)—retainer plate5.耐磨片—wear plate6.铜导套—bronze bushing7.衬套—spacer8.导轨—L – gib9.滑动块—slideG.顶出系统Ejection System1.基本词汇Basic Word①顶出行程—ejection stroke②模具开档—daylight③粘模—stick④产品脱模—part is push off from, clear part of mould, separation of part 2.顶板机构Ejector plate assembly①顶板(推板)—ejector plate②顶板固定板—retaining plate③推板导柱—ejector guide pin④推板导套—ejector guide bush⑤撑头—support pillar, pillar support3.复位机构Return System①复位杆(回程杆)—return pin, push – back pin②挡钉—stop pin, stop button③压簧—compressed spring④碟簧—a stack of “Belleville” washers⑤早复位机构—early return system⑥强制复位机构—positive return system4.顶出方法Ejection Techniques1)顶杆顶出—pin ejection2)顶管顶出—sleeve ejection3)顶块顶出—bar ejection4)扁顶顶出—blade ejection5)顶板顶出—stripper ejection6)油缸顶出—hydraulic ejection7)气顶—air ejection8)阀门顶出—valve ejection5.顶出元件Ejection Elements1)拉料杆—sprue puller, sucker pin2)顶杆—ejector pin3)阶梯式顶杆—stepped ejector pin4)顶管—ejection sleeve, sleeve5)扁顶—ejector blade, slabbed off ejector pin6)顶块—stripper bar7)顶环—stripper ring8)推板—stripper plate9)加速顶—accelerated ejection6.顶出辅助机构Supplementary operating system1)弹簧柱塞器—spring – loaded plunger2)弹珠定位器—ball catch system3)插销式锁扣—Latch – lock4)尼龙拉杆装置—friction puller device7.电器元件Electric Components1)压力传感器—pressure transducer2)限位开关—limit switchF.冷却系统Cooling System1.基本词汇Basic Word1)温差—temperature variation2)水孔(水道)—waterlines, water-ways, flow-way, channel3)水路—cooling circuit4)水路示意图—water schematic, schematic circuit5)冷却液—coolant, coolant fluid6)内连接—interconnect7)外连接—external connection8)出口、入口—outlet、inlet9)漏水—water leakage2.水路分布Circuits1)阶梯式水路—stepped system2)喷淋—baffled hole system3)斜孔式水路—angled hole system3.水路元件Components1)闷头(螺塞、止水栓)—(threadless)brass pressure plug : female plug & male 2)隔水片—baffle3)密封圈—O – ring4)快插水路接头—quick disconnect fitting, quick connection adaptor5)弯头—elbow6)偶合器(连接器、接头)—adaptor (including a plug & a socket)7)橡皮管—rubber hose8)分水板—water manifoldG.螺纹、螺纹孔& 螺钉Thread, thread hole & screw1.螺纹—thread2.管螺纹—pipe thread3.螺纹孔—screw hole, tapped hole4.起吊孔—handling hole, jack screw hole, eye bolt hole5.螺钉—screw6.内六角螺钉—socket headed cap screw (s.h.c.s.)7.沉头螺钉—flat headed cap screw (f.h.c.s)8.螺栓—bolt, eye bolt9.螺母—nut10.锁紧螺母—locknut11.螺纹标准Thread Standard①公制标准—Metric②英制标准—Imperial③英制管螺纹标准—British Standard Pipe thread (BSP)④美制管螺纹标准—NPT⑤美制粗螺纹标准—United Coarse thread (UNC)⑥美制细螺纹标准—United Fine thread (UNF)H.润滑Lubrication1.润滑槽—grease groove2.加油管—grease line3.油杯—lubrication fittingI.测量仪器Measuring Instruments1.游标卡尺—vernier caliper2.千分尺—micrometer3.高度规—height gauge4.刻度规—dial gauge5.三坐标测量仪—Coordinate Measure Machine(CMM)6.塞规—pin gauge7.圆角量规—radii gauge8.輪廓投影機—profile projectorJ.注塑机参数Injection Machine Parameter1.注塑机规格参数Injection Machine Specification①锁紧类型clamp typea.油缸—hydraulic b.肘杆式—toggle②垂直注塑机导柱间距—tie bar vertical clearance③水平注塑机导柱间距—tie bar horizontal clearance④台板尺寸—platen dim.⑤最小/ 最大模厚—mold height Min. / Max., Min. / Max. mold thickness⑥最小/ 最大注塑机开档—open daylight Min. / Max.⑦锁紧行程—clamp stroke⑧锁紧力—clamping force⑨顶出行程—ejector stroke⑩顶出力—ejector force2.试模工艺参数Moulding Process Parameter, machine setting①时间Timer(TM), seca.注塑(充填)时间—filling time, injection timeb.冷却时间—cooling timec.补缩时间—packing timed.保压时间—holding timee.成型周期—cycle time②速率、速度Velocity, %、speed, in/seca.注塑(充填)速度—injection speedb.保压速率—hold pressure velocityc.螺杆转速—screw rotation speed③压力Pressure(Prs.), psia.注塑压力—injection pressureb.保压压力—hold pressurec.回压(背压)—back pressure④温度Temperature(Temp.), °Fa.注塑机喷嘴温度—nozzle temp.b.料筒前段、中段、后段温度—barrel front、middle、rear temp.c.模温—mould temp.d.料温—purged resin melt temp.e.空射料温—air shot melt temp.关于注塑成型对产品造成的各种缺陷及解决方法(一)熔接痕熔接痕是由于来自不同方向的熔融树脂前端部分被冷却、在结合处未能完全融合而产生的。
注塑专业英语用语

成型工艺流程及条件介绍Molding technique procedure and parameter introduction 第一節成型工艺Section 1 molding technique.1.成型工艺参数类型Sorts of molding parameter.(1).注塑参数Injection parameter.a.注射量Injection rate.b.计量行程Screw back positionc.余料量Cushiond.防诞量Sucking back ratee.螺杆转速Screw speedf.塑化量Plastic0 rateg.预塑背压Screw back pressureh.注射压力和保压压力Injection pressure and holding pressure i.注射速度Injection speed(2)合模参数Clamping parametera.合模力Clamping forceb.合模速度Clamping speedc.合模行程.Clamping stroked.开模力Opening forcee.开模速度Opening speedf.开模行程Opening positiong.顶出压力Ejector advance pressureh.顶出速度Ejector advance speedi.顶出行程Ejector advance position2.温控参数Temperature parametera.烘料温度Dry resin material temperatureb.料向与喷嘴温度Cylinder temperature and nozzle temperature c.模具温度Mold temperatured.油温Oil temperature3.成型周期Molding cyclea.循环周期Cycle timeb.冷却时间Cool timec.注射时间Injection timed.保压时间Holding pressure timee.塑化时间Plant timef.顶出及停留时间Knocking out and delay timeg.低压保护时间Mold protect time成型工艺参数的设定须根据产品的不同设置.Molding technique parameter setting differs depending on type of product 第二节成型条件设定Section 2 Molding parameter Setting按成型步骤:可分为开锁模,加热,射出,顶出四个过程.Molding steps: mold opening/closing, heating injection and knocking out.开锁模条件:Mold opening parameter:快速段中速度低压高压速度High-speedmid-speedLow pressure high pressure speed锁模条件设定:Mold closing parameter setting1锁模一般分:快速→中速→低压→高压Mold closing: high-speed →low-speed →low pressure→high pressure2.快锁模一般按模具情况分,如果是平面二板模具,快速锁模段可用较快速度,甚至于用到特快,当用到一般快速时,速度设到55-75%,完全平面模可设定到80-90%,如果用到特快就只能设定在45-55%,压力则可设定于50-75%,位置段视产品的深浅(或长短)不同,一般是开模宽度的1/3.In high-speed section, Mold closing speed depends on type of mold. For two –plate mold it can set quick and even especially quick usually, it set speed within 55-75%. For full-plate mold it set speed within80-90% while using especially high speed it set speed within 45-55% and pressure within 50-75% position distance setting differs depending on the volume of product and usually it can be set 1/3 of mold opening position.3.中速段,在快速段结束后即转换成中速,中速的位置一般是到模板(包括三板模,二板模)合在一块为止,具体长度应视模板板间隔,速度一般设置在30%-50%间,压力则是20%-45%间.In mid-speed section: Mold closing speed changes into mid-speed after high-speed section finish. Mid-speed start position is where two plates meet (include three-plate mold and two-plate mold ) Distance of mid-speed is up to distance of two plates plate it speed within 30-50% and pressure 20-45%.4.低压设定,低速设定一般是在模板接触的一瞬间,具体位置就设在机台显示屏显示的一瞬间的数字为准,这个数字一般是以这点为标准,,即于此点则起不了高压,高于此点则大,轻易起高压.设定的速度一般是15%-25%,视乎不同机种而定,压力一般设定于1-2%,有些机则可设于5-15%,也是视乎不同机种不同.Low-pressure section: Mold closing sets low-pressure when plates meeting. This position is set to the data of machine screen on this time. This point is the gage of the data. Data lower the point there is no high-pressure. Data higher the point there is high-pressure easily. It set speed within 15-25% and pressure within 1-2% depending on type within 1-2% depending on type of injection molding machine.5.高压设定,按一般机台而言,高压位置机台在出厂时都已作了设定,相对来讲,是不可以随便更改的,比如震雄机在50P.速度相对低压略高,大约在30-35%左右,而压力则视乎模具而定,可在55-85%中取,比如完全平面之新模,模具排气良好,甚至于设在55%即可,如果是滑块较多,原来生产时毛边也较多,甚至于可设在90%还略显不足.High-pressure section: To normal injection molding machine,high-pressure position had been set before they were sent to customer. It can not be modified. For example high-pressure position of CHENHSONG machine is 50P.The speed of high-pressure section is about 30-35% and higher than that of low-pressure. The pressure is up to mold, it can setwithin 55-85% For full-plate mold, it’s eject air well, it can set pressure 55% .If mold has a lot of slides and flash rate high in production, pressure can set 90%.加热工艺条件设定Heating technique parameter setting1.加热段温度设定必须按照产品所使用的原料的不同而不同,但却必须遵循一个这样的规则,即由射口筒到进科段温度是逐步递减的.且递减温度是以10.度为单位.The proper temperature setting differs depending on type of resin material, but it must be abide by a rule that temperature setting should diminish in step 10.C from nozzle to feeding resin material position.2特殊情况下.如料头抽丝,则射口筒温度应降低,如果是比较特殊的原料冷凝比较快的.则射口筒温度则不止比第二节法兰温度高10度.比如PPS.尼龙等.Nozzle temperature setting should low if product line. If resin material such asPPS, PA, cool very soon , Nozzle temperature should higher more 10.C than the second cylinder temperature.3.机台马达启动温度视乎机台不同而不同,一般出于对机台油路中的油封保护需要,油温最好能控制在40度-60度,以免油封长期高压而变化,缩短使用寿命,造成成型不稳定.Pump turning on temperature is different depending on type of injection molding machine. To protect oil seal of machine it set oil temperature within 40.C-60.C, If oil seal work on condition that high pressure and damaged It’s work time will be shorter, it can cause molding stable.第三节注射及熔胶(加料)工艺条件设定Injection and plastic Technique parameter setting一.注射Injection第四节常见塑料原料的有关温度值.原料Resin名称Name熔点℃Melt’s成型温度℃Molding Temperature(’c)分解温度℃Decomposing Temperature(‘C)模具温度℃Mold Temperature(‘c)干燥温度℃Resin dry temperature(‘c)注射是把塑料原料经加热后射进模腔的过程,它一般可分为第一级,第二级,第三级,第四级及保压几段:Injection is a step which inject melt resin material into mold. It consists of stepl,step2 ,step3,step4 and holding pressure step:1.第一级注射一般是注射料头段.具注射量一般可根据料头的轻重来估计其行程,当然也可以依据公式来计算,如公式:Step l injects usually tunnel material, Injection Volume can be estimated according to the weight of course it can be calculated by formula:L=Si=Vi/0.785Ds2L:注射行程; Si:注射行程;L: injection stroke Si: injection strokeVi:理论注射容积; Ds:螺杆直径;Vi: injection volume of theoretical Ds: diameter of screw0.785:是Ω/4的值.0. 785: value ofΩ/4.当然,如果我们在成型时每设定一个参数都要计算一次,要成型出一个产品就要几个小时才能完成了.But it cost a lot of time to produce one product if every time molding parameter is setting by calculation.2.第二级是注塑产品约2/3的阶段,当然,根据产品特殊需要,也允许成型不到2/3阶段,比如避免结合线问题,这一阶段的成型速度及压力一般是整个成型段的最大值段,如果排的产品与机台基本是相吻合的.模具结构合理,排气良好,这一段的压力一般也不会超过80%.速度侧视产品需变,可能大到95%也可,自然一般都是在55%-80%间.Step 2 inject 2/3 of product. It can lower 2/3 of product according to requirement of product. For example to prevent weld line. Molding speed and pressure on this step is the maximum of whole molding section. If Mold suit the injection molding machine and mold structure reasonable and eject air well, pressure of this step should lower 80%. Molding speed setting within 55-80% but it may setting 95% for especial product.3.第三段是注射余下的1/3段,其速度和压力根据产品的需要,一般是小于第二段,速度和压力存在于一个往下降的过程.主要是为了防止产品毛边的产生,但同时又必须把产品充填饱满.Step3 inject remain 1/3 of product. According to product molding speed and pressure lower than that of step2 To prevent flash speed and pressure should decrease but it can’t shot short.4.第四段:一般有机台还有第五,第六段,这段的成型速度和压力相同前,都存在两段一个递减过程.其作用都是起到一个再次充满的作用.Step4 section: Some injection machines have step5,step6 which are same as former molding speed and pressure this step should diminish and inject once more.5.保压段:不论成型什么产品,都存在一个保压过程.任何产品都不同程度的存在一个厚薄不一的问题,正常情况下,较厚的部分都可能存在一个收缩凹陷的现象,为了解决这种现象,就应应用到保压,保压一般来讲都应用较慢的射速,而压力的设置则应看缩水的情况如何,小到25%,大到80%都有可能.Holding pressure step: No matter what product there is a holding pressure step. Any product can’t molding a same thickness. Usually the deeper section may sink mark . To prevent this defect it should set holding pressure, The injection speed of holding pressure step is slow but holding pressure setting within 25-80% depending on sink mark.二.熔胶段工艺Plastic Technique1.再复杂的熔胶旋转过程最多不会超过三段,因为熔胶本身就是存在于把胶熔进料筒的过程,如果原料粘度大,熔胶压力则大,但速度则应取决于原料的分解温度,熔胶速度越快,原料中的剪切力则会越大,料管温度则越高,局部原料产生分解的可能性则会越大,故一般熔胶会采用中速为宜,如45%-75%,熔胶同时会碰到一个比较重要的环节,那就是背压的使用,产品精度要求越大,背压的使用则更大,背压可使原料分子间结构更紧密,成型出的产品则尺寸更稳定,外观越好.当然,背压太大,则会产生流涎,所以背压的使用又应考虙到其它原因.Plastic should lower 3 steps, because plastic is a step to add melt resin material to cyclinder , Higher stick of resin material ,higher screw back pressure. Screw speed differs depending on decomposing temperature of resin material ,Higher screw speed ,Higher trim force of resin, higher cyclinder temperature. Some resin material may decomposes so it set screw speed in mid-speed such as 45-75%, In plastic step setting screw back pressure is very important, Higher screw back pressure ,higher quality of product screw back pressure make resin structure order, Molding product is beautiful and volume stable. But ,it maybe flow if screw back pressure too high . So all factors should be considered when using screw back pressure.2.熔胶过程还有一个比较重要的环节,那就是松退,松退分前松退和后松退,其作用一般是为了防止流涎和抽丝,设定值速度和压力都在20%-50%间,设定的行程一般在2-5cm间,太长的行程可能会使料筒里面贮存空气,导致下一模出现不期望的气泡.In plastic step sucking back is very important too. Sucking back include front sucking back and back sucking back It setting sucking back to prevent flow and line. It sets sucking back speed and pressure within 20-50% and distance within 2-5cm. TOO long distance make cyclinder reserve air and cause bubble at next molding.顶出的工艺设定knocking out technique setting产品经冷却定型后则有一个开模的过程,开模基本上是合模的反过程.开模的未段则有一个慢速设置,开模完成后,产品必须顶出的过程.There is a mold opening step after product cooling taking shape. Mold opening is a reverse step of mold closing. The last step of mold opening speed set slow. Product should be knocked out after mold opened.一.顶前:Knocking out顶前最好分两个阶级,第一阶可分为中压慢速,即是把产品轻轻顶出一部分,然后是中压中速顶,中压中速一般指的是35%-55%,而低速则有可能低到5%,这需视产品不同而言,顶出行程设定是顶出长度稍比产品垂直深度大1-2cm即可.Knocking out includes two steps, Step1 section setting mid-speed, knocks product out partly step2 section setting mid-pressure and mid-speed . Depending on different product, mid-pressure and mid-speed sets within 35-55% but low-speed can set 5%. Distance of knocking out longer 1-2cm than the vertical thickness of product.二.退针Back顶退包括两个过程与顶落的过程基本一致,顶退的终点应预留1-3cm的空间,以保护顶针油管不被顶坏.The same as knocking out, ejector back includes 2 steps. To protect the ejector oil jar, it should make a 1-3mm distance in the ending point of ejector back.三.顶针方式还包括一个多次顶,单次顶及顶针停留的选择,机械手取产品,脱模顺利的情况都采取多项,为了顶针油缸寿命的延长,多次顶就以不超过三次为宜,顶针停留一般用在顶针带着产品退回有可能对增品产生损伤的模具,同时为配合机械手使用,有时也需要较短的顶针停留.The way of knocking out includes knocking out once, Knocking out repeat and ejector delay. Take product by manipulator or take product easy, it should select knocking out once. To longer the work time of ejector oiljar, times of knocking out lower 3 times. Ejector delay used when product will be damaged if ejector back or suit manipulator.成型时间的设定Molding time setting在保证产品质量的前提下,周期时间是越短越好,周期时间又包括如下几项:射胶时间,保压时间,熔胶时间,冷却时间,顶出时间,锁模低压时间,甚至乎关系到时间因素的还有还开模与锁模,及顶出的快慢.Cycle time should shorter on condition that product quality well. Cycle time includes: injection time , holding pressure time, plastic time, cure time, knocking out time and mold protect time. Even mold opening closing sopeed and knocking out speed affect cycle.1.射胶时间包含保压时间,一般看起来,射胶时间越长,产品越饱和,但我们在讲求质量时,同时也须考虑产能,更何况,射胶时间过长,有可能会造成产品过于饱满而寻致粘模顶的变形呎寸偏大等一系列问题,故我们在设置射胶时间时应综合考虑,尽量在合乎质量要求时缩短射胶时间.Injection time consists holding pressure time. Longer injection time, fuller product, we should consider production quantity when we suit for quality. If injection time too long, it may cause a series of defects suck as flash strain. So all sorts of factors should be considered, injection time should be shout if quality suit for requirement.2.熔胶时间的长短取决于熔胶速度设定的快慢,背压设定的大小,但有一点,熔胶时间控制的长短一定要比冷却时间短.Plastic time depends on plastic speed and screw back pressure, but plastic time must shorter than cure time.3.冷却时间:冷却时间的长短直接影响到成型的周期,冷却时间越长,成型时间就越长,造成产能就越低,故我们在设定高压冷却时间时,只要能保证到产品成型顺利,不会直接影响到变形等问题,设定的时间也是越短越好.Cure time: Cure time affects molding cycle. Longer cure time, longer molding cycle, lower production quantity. So it sets cure time short on condition that product molding succed and can’t deformation..4.在大量使用机械手的塑胶公司,我们的顶出时间一般是与机械手配合为宜,全自动使用机械手时顶出停留时间一般保持1.5-2秒,半自动生产,如因顶针退回会导致产品掉落或卡紧,而取不下产品,停留时间则应保持5秒左右.In PCE company, for using manipulator in abundence , knocking out time suits manipulator, Knocking out delay keeps 1.5-2 second when using manipulator full-manipulator, knocking out delay keeps about 5 second when using manipulator semi-manipulator and product will fall or can’t be taken off if ejector back.5.低压保护时间对保护我们人身安全,模具安全起很大作用,配合好模具低压位置和低压压力的调整,低压保护的时间应取1-3秒,保护时间越短,可能造成的危害则越小.Low-pressure protect is very important for safety and protect mold, Mold protect time should adjust within 1-3 second suit low pressure and position of mold protect, shorter protect time, make damaged.。
注塑专业英语

Injection machine 啤机Shot size(weight)实际射胶量injection volume 理论射胶量min mold height 最小容模厚度Max mold height 最大容模厚度Tie bar clearance 拉杆间距Die plate size 模板尺寸Ejector stroke 顶出行程barrel 炮筒,机筒clamp force 锁模力non-return valve 止回阀shear 剪切opening 开模行程Injection pressure 射胶压力back pressure 背压nozzle size 射咀尺寸Cycle time 循环周期down time 停机时间hopper 料筒Mold release 脱模剂lubrication 润滑work horse 主力,主要设备Reserve pressure / packing pressure保压mold trial 试模shot (一)啤Decompress 减压oven 烤炉,烘灶shrinkage rate 收缩率Residence time 滞留时间injection speed 注射速度booster time 增压时间Compression ratio 压缩比mold close time 合模时间Resin 胶料/.Plastification 塑化,增塑viscosity 粘性,粘度contamination 污染,杂物Thermoplastic 热塑性塑料thermosetting plastics 热固性塑料Booster time 增压时间feed 喂料,填充purge 净化Flame retardant 阻燃degradation 降解,软化regrind 再粉碎Water absorption 吸水reinforce 增强,加固specific gravity 比重Elongation 延伸率density 密度melting point 熔点Polystyrene 聚苯乙烯(PS).m,k.bn 苯乙烯Acrylonitrile 丙烯腈Polypropylene 聚丙烯(PP)Polyethylene 聚乙烯glass fiber 玻纤Condensation 凝固,浓缩crystalline resin 结晶形塑料Mold materials 模具General-purpose steel 多用途钢tool steel 模具钢Free-cutting steel 高速切削钢case hardening steel 表面硬化钢Pre-hardened steel 预硬钢ball and roller bearing steel 滚珠轴承钢Nonferrous steel 非铁合金high speed steel 高速钢cast iron 铸铁Steel specification 钢材规格steel certification 钢材合格证明书Stainless steel 不锈钢nickel 镍chrome 铬aluminum 铝Copper 铜brass 黄铜bronze 青铜titanium 钛Processing 钢材的加工方法Harding / quench 淬火nitride 氮化temper 回火anneal 退火Roll 轧制abrasive 研磨,磨损的finish 精加工,抛光(polish)Case-hardening 表面硬化milling machine 铣(锣)床Lathe车床drill 钻床wire cut 线割NC(numerical control ) 数控材料EDM (Electrical discharge machine) 电火花加工Cut steel 开料Precision ground 精密研磨heat treatment 热处理tap 丝锥,攻牙Texture 蚀纹weld 焊接forge 锻压deformation 变形Spraying 喷涂die-cast 压铸Properties 性能Resistance 电阻,抵抗能力abrasion / wear磨损erode / corrode 腐蚀Toughness 韧性yield strength 屈服强度tensile strength 拉伸强度Fatigue strength 疲劳强度break 断裂stress 应力hardness 硬度Humidity / moisture 潮湿,湿气roughness 粗糙度parameter 参数Thermal conductivity 导热系数manufacture 制造,加工drawback 缺点Ductility 延展性grain 晶粒property 性能,财产brittleness 脆性GD&T (Geometric Dimensions and Tolerance )形位尺寸公差Flexural strength 挠曲强度impact 冲击conductivity 传导性,导电性Optical 光学的transparent 透明的insulation 绝缘Mechanical 机械的processability 可加工性能timeyield 蠕变Physical 物理的flow rate 流动速率compressive strength 压缩强度Adhesive 粘附的,胶合durability 耐用性Mold design 模具设计Tooling specification 模具规格mould flow 流动模拟sprue nozzle 唧咀孔Clearance 避空,间隙undercut 倒扣flush 插入,埋入legend 图例Groove 凹槽latch 插销class 类型,种类plan 平面图Orifice 孔,口column 柱位boss 凸台standard 标准,规格Rib 骨位tapered interlock 锥形管位块Bubbler 炮隆Bolt 螺钉,销顶identification mark 铭牌P/L strip 锁模片Overflow well / cold-slug well 冷料井V ent 排气pocket 槽Gate location 入水点full line 实线broken line 虚线Retainer 固定,支撑operator 操作者(啤工)receptacle 插座Lifting hole 吊令孔insulation plate 隔热板cavity number 型腔号Bolster 支撑,垫子vent channel 排气槽leak / filter 渗漏Leak test 试运水stamp / engrave 雕刻,印记(打字唛)Clamp slot 码模槽support button / pin 垃圾钉cut steel 开料Lodge 安装,放置inlay 镶嵌,插入cam / lifter 斜顶Stripper推方lifting bar 吊模方sprue 唧咀tolerance 公差Counter bore 沉孔slant 倾斜,斜面conical 圆锥的,圆锥形的Bolt 螺栓manifold 热流道板prototype tooling 原型试验Gusset 角撑reverse mold 倒装模constrain / restrict约束,限制Counter lock 反锁thermocouple 热电偶moldmaker 模具制造商Asset / property number 资产编号tool product destination 模具生产地点Accelerating ejection 加速顶出hydraulic 液压的pneumatic 气动的Trapezoid 梯形的semi-round 半圆形format 格式baffle 隔水片Electrode 电极,铜公spare part 配件gall 磨伤,插伤Cable 电缆,电线plating / coating (电)镀bonding / joint 接头Wall transition 壁厚过渡Product problem 产品问题塑胶产品的不良缺陷:Molding defects Troubleshoot 故障处理reduce(add) plastic 减(加)胶Burr/flash披峰Burn mark 烧焦ejector mark 顶针印,顶白black specs 黑点,黑斑Discoloration 混色,污点gloss 光泽jetting/worming 走水纹Sink mark 缩水void / bubble 气泡,夹气distortion 变形Warpage 翘曲short molding / non-fill缺胶,未走齐Weld line / knit line 夹水线discarded as useless 报废Split line 夹线stick in sprue bushing / cavity / core 粘唧咀/前模/后模Break / crack 顶裂brittleness 脆性,易脆毛边:Stringiness/Fragments水口:Flash 或Burrs/Drainage opening披锋:Delamination/Throws over the front气纹:Silver streaks缩水:Sink marks 或Shrink marks变形:Warping 或Twisting色差:Colour streaks燒焦:Burn marks气孔:V oids水口料degraded material1焦痕(RURNS):由热引起的材料分解。
- 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
- 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
- 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。
注塑专业英语
Surface Appearance 外观
Glossiness/gloss finish 光洁度
Matt finish/matt surface 毛面
Glass fiber rich surface/glass emergence on the surface 玻纤外露 Blooming/surface blooming 表面析出
White patches on surface 表面白斑
Silver marks/silver streak 银纹
Splay mark 水纹
Flow mark 流纹
Weld line 溶结纹
Brittle/brittleness 脆
Bubbles/trapped gas 气泡
Void 孔
Burn marks 烧伤
FR failed 阻燃不合格
Flame rating V-2 阻燃V-2
Poor dispersion 分散不好
FR/PTFE …agglomerates etc 阻燃剂/PTFE…结块
Pellet porous 粒子不密/蜜蜂窝
Low impact/tensile etc 物理性能低
High flow/filler content etc 流动性/填充…过高
Longs/fines/doubles 长粒/碎屑/连粒
Poor cut 粒形不好
Bristle/voids 表面有小气泡/孔
Glass bundles 玻纤结团
Product was rejected due to 产品不能接受因为…
Re-confirmed color standard 重新确认颜色标准
Qualified our product 认可我们的产品
Undergoing heat aging test 在做热老化实验
Product is under testing 产品在测试当中
Received first order 接了第一个定单
Expected to finish by …预计在…完成
Expected order is xMT 预计定单量…吨
Estimated annual/monthly consumption 预计年/月用量Approved color standard 认可颜色标准 High moisture level 高水分
Warpage/warped 翘曲
Shrinkage/shrink 收缩
Sink marks 缩影
Short shot/short molding 打不满
Distortion 变形
Over dimension 尺寸过大
Under dimension 尺寸过小
Flashing 飞边
Discoloration 变色
Off color 颜色差异
Flow rate 流动率
Viscous 粘
High flow 高流动
Low flow 低流动
Sticky 粘
Mold release 脱模
Antioxidant 抗氧剂
Flame retardant agent 阻燃剂
Heat stabilizer 热稳定剂
Chopped glass fiber 短切玻纤
Roving glass fiber 粗纱/长玻纤
Glass beads 玻璃微珠
Milled fiber 碾磨纤
Molybdenum disulfide/moly/MoS2 二硫化钼 Colorant 着色剂
Pigment 颜料
Dye 染料
Accepted product specification 接受产品规格 Approved our product 认可我们的产品
Re-set spec 重新定标准
Add in extra …添加多一点…
Reduced … content 减少…含量
Dropped/reduced … by x%减少…含量…% Confirmed color standard 确认颜色标准。