002-何庄煤矿反程序开采

合集下载

副斜井井筒施工组织设计

副斜井井筒施工组织设计

国投哈密能源开发有限责任公司副斜井井筒及配套巷道、硐室施工组织设计河南煤炭建设集团有限责任公司二O一一年八月九日施工组织设计会审表施工组织设计、方案、措施会审表表号:GC-002/A 编号:GTHMNY/GC/HS/ /2021目录前言··································································1、工程概况·····························································································································································································································································································2、施工准备···········································································································································································································································································································································3、施工方案及施工顺序····················································································································································································································4、施工关键技术······································································································································································4.3冬、雨季施工措施···················································5、施工辅助系统·························································································································································································································································································5.5通风、降尘系统····················································································································5.7通讯、信号、照明系统·····························································································5.9测量······························································6、劳动组织····························································································································································································································7、施工排队和工期···················································································································································································································································································8、质量保证体系与质量保证措施········································································································································································································9、平安保证体系和平安技术保证措施·······································································································································································································10、文明施工及环境保护措施························································································································································11、提高工程质量、保证工期及降低造价的合理化建议······················12、副斜井井筒工程施工机械设备配备一览表······························前言国投哈密能源开发有限责任公司为国家开发投资公司下属国投煤炭公司的全资子公司,于2021年4月在哈密注册成立。

综采工作面作业规程完整

综采工作面作业规程完整

第一章概况第一节工作面位置及井上下关系第二节煤层一、煤层赋存10#煤层结构简单,煤厚相对稳定,有不稳定的夹矸出现,平均煤厚为,硬度系数f约为~,上距4#煤层约61m;直接顶为L1灰岩,厚4m左右,中部常夹薄层砂质泥岩或泥岩,坚硬不易垮落;局部发育黑色泥岩伪顶,厚左右,结构疏松,极易破碎,多随煤层开采而冒落,给管理带来困难并增大煤的灰分。

二、储量第三节煤层顶底板顶、底板岩性特征表:附图1:煤层顶底板综合柱状图第四节地质构造一、断层及其对回采的影响根据10101运输、回风顺槽掘进揭露情况分析,该综采工作面地质构造简单,煤层走向为东北—西南,倾向西南,煤层倾角4°~16°,平均14°左右,经过掘进巷道揭露,本工作面回采范围内共有2条断层,构造详细情况见下表:二、褶曲情况及其对回采的影响该工作面的回风顺槽掘进至260米,运输顺槽掘进至280m时,煤层出现较大起伏,褶曲发育,倾角局部在20°左右,煤层厚度变薄,长约220m,渡过后,煤层厚度恢复原样。

该段影响将来回采的正常推进,需对工作面采取防滑、防窜矸措施。

三、其它地质因素对回采影响1、煤层直接顶为L1灰岩,硬度系数在之间,在回采过程中顶板不易自然垮落,需采取强制性放顶措施。

2、10101回风顺槽掘进1670m时,揭露分氧化带,顶板发生变化无层理,均为黄土与碎块石,不定时的向下冒落。

故在初采放顶的过程中,工作面可能有黄土、碎石涌入,影响正常的回采推进,需编制初采、初放专项安全技术措施。

附图2:10101综采工作面地质剖面图第五节水文地质一、水文地质概况根据山西地宝能源有限公司为我矿编制的《矿井水文地质类型划分报告》确定我矿水文地质类型划分为中等。

10101综采工作面位于石炭系上统太原组,主要含水层为岩溶裂隙水,含水层主要为间夹碎屑岩中的3~4层石灰岩,赋存段距40m左右,含水层主要接受大气降水补给,富水性较弱,单位涌水量约为 L/s·m,渗透系数为d,水质一般为HCO3·SO3-Ca·Mg·Na型,硬度小于150mg/L,矿化度L,预计不会影响回采工作正常施工。

22602工作面采用垂直支护文档

22602工作面采用垂直支护文档

22602工作面采煤采用平行支护方式,经煤矿仔细研究改用垂直支护方式,这样有利于采面顶板管理和提高工效,为保证安全,特制定本安全措施。

一、支护方式垂直采煤工作支护,采用“三梁五柱”支护形式排距0.9米,柱距0.8米。

二、回采工艺1、掏梁窝、支柱、背顶。

用挖斧煤钎靠顶掏一个0.2×0.2米,深1.0米的梁窝,放入梁子,并贴帮打好支柱,再挖靠近顶板的煤,挖好后用杂柴、茅柴或竹廉背好顶。

若顶板破碎,必须边掏梁窝就用杂柴背好顶,再往里逐步掏到位,背好顶。

2、落煤,采用人工手镐落煤,铲煤放刮板运输出来。

3、关胸子。

靠煤壁用茅、杂柴关好胸子。

三、特种支护1、密柱支柱。

回柱前沿切顶线使用木密柱切顶,具体为,用直径不小于Φ160mm的边块打成长0.6m的木料做梁子,用液压支柱沿切顶线支护,即采用打点戴帽方式,密集支柱除有2-5°的迎山角外,还应向老塘方向倾斜3-5°。

2、倾向抬棚。

当工作面顶板破碎,走向裂隙发育时,顶板压力大及支架失稳时,应增设三排一栌、一栌三点倾向抬棚。

3、上下出口及超前支护。

采煤的同时必须派人做好上下出口,必须保证超前二排杠子,高度不低于1.8m,机巷风巷20 m 内必须抬栌支护,巷道高度1.6 m以上。

四、回柱放顶1、正常放顶最大控顶距4 m,最小控顶距2 m。

2、回柱放顶工具,手动回柱器。

3、回柱操作程序。

①当支护被浮煤、浮矸淹埋较深时,必须先清理干净,使淹埋深度不超过200mm。

②卸压回柱。

先卸下靠老塘侧的一支支柱在切顶线上,并挂好挡矸帘,再卸另一根支柱及顶梁,用作采煤时支架。

③用手动回柱器拉出支柱、π梁。

五、安全技术措施1、此次采煤支护由平行支护改垂直支护,相关股队必须高度重视,采煤队必须将此安全技术措施贯彻到每个管理生产人员,在熟练操作前,生产业务股室和中队跟班盯岗,确定能顺利安全进行。

2、必须严格采面支护质量,支柱须成排,且打在实底上,严禁打短点,煤层底板松散,压力大、煤湿时,应穿木鞋,木鞋规格为200mm×200mm×50mm的方木。

煤矿开采方案设计 精品

煤矿开采方案设计 精品

前言山西和顺天池能源有限责任公司矿井(以下简称天池煤矿)位于山西省和顺县城南17km的喂马乡古窑村附近。

现隶属山西和顺天池能源有限责任公司,矿井设计生产能力1.20Mt/a。

根据山西省国土资源厅颁发的天池能源有限责任公司采矿许可证(证号:1400000722364),批准开采3号、15号煤层,井田面积为17.9103km2。

天池煤矿原为古窑煤矿,1956年建矿,1958年投产,属地方国营煤矿。

2003年7月,由兖矿山西能化有限责任公司、和顺县古窑煤炭企业集团和晋中市国有资产经营公司共同出资,成立了新的山西和顺天池能源有限责任公司。

山西省煤炭工业局下发了晋煤办基发[2006]789号文进行了矿井竣工验收的批复。

天池煤矿均依法取得煤矿安全生产所需“六证”:采矿许可证(证号:1400000722364)、安全生产许可证(编号:(晋)MK安许证字[2008]D3482Y1B2)、煤炭生产许可证(编号:201424230129)、企业法人营业执照(注册号:140000105961137 2-2)、矿长资格证(编号:MK140400096)、矿长安全资格证(编号:08014010400098),六证均在有效期内。

矿井现生产采区为二采区,三采区位于井田北部,与一采区毗邻,为二采区的接替采区,原设计二采区南北平均长4.22km,东西平均宽1.74km,总面积7.35km2。

设计修改后二采区南北平均长2.11km,东西平均宽1.74km,总面积 3.86km2。

矿井采用“一井、一区、一面”模式生产,因此二采区设计生产能力应该与矿井设计生产能力相一致。

二采区目前已经施工了一部分胶带下山、回风下山、首采面(201)顺槽,采区轨道下山上部车场和采区煤仓也已完工。

二采区的开采要利用一采区的准备巷道作为矿井开拓系统。

根据核算,矿井主提升系统能力满足120万吨/年生产的需要;对于辅助提升系统,由于人员与材料设备共用一套系统,存在相互之间的干扰,因此矿井正准备再建一个专用行人斜井;在转入二采区生产时,由于埋深较大,瓦斯涌出量呈上升趋势,届时矿井主扇无法满足生产要求,需要更换主扇。

年产量20万吨煤矿采矿设计

年产量20万吨煤矿采矿设计

年产量20万吨煤矿采矿设计摘要近年来,煤炭行业的发展势头一直很好,越来越多的人力和资金投入到了煤矿的建设和生产中。

本设计就是在这样的的前提下对河南集团鹤壁六矿进行实地考察和实习后,经过认真而详细的分析,计算后撰写的。

本设计的井田面积为11.4万平方千米,年产量120万吨。

井田内煤层赋存比较稳定,煤层平均倾斜角度为20°,平均煤厚7.5m,整体地质条件比较简单,在井田范围中部有断层发育,矿井瓦斯和二氧化碳含量相对不高,涌水量也不大。

根据实际的地质资料情况主要对矿井开拓方式、准备方式和采煤方法进行了初步设计,该矿井设计采用立井两水平的开拓方式,综合机械化放顶煤回采工艺,走向长壁采煤法,用全部跨落法处理采空区。

矿井采用对角式通风,井底车场为刀把式环行车场,并对矿井运输、矿井提升、矿井排水和矿井通风等各个生产系统进行设备选型计算。

设计时根据现有经济技术条件,尽可能采用先进的开采技术和设备,以及对矿井安全技术措施和环境保护提出要求,完成整个矿井的初步设计。

矿井全部实现机械化,采用先进技术和借鉴已实现高产高效现代化矿井的经验,实现一矿一面高产高效矿井从而达到良好的经济效益和社会效益。

关键词:立井采区式走向长壁放顶煤AbstractIn recent years, the coal industry has gooddevelopment momentum, then more and more human and financial resources into the mine's construction and production. This design is the premise of this group of Henan Hebi Coal Mine six field visits and internship after careful and detailed analysis, written by calculation.The design of the mine covers an area of 114,000 sq km, annual output of 1,200,000 tons. Occurrence within the coal mine is relatively stable, the average tilt angle of coal seam 20 °, the average coal thickness 7.5m, the overall relatively simple geological conditions in the mine development of the scope of central fault, mine gas and relatively low carbon dioxide, water, not Chung . Geological data in accordance with the actual situation of the main ways to develop the mine, mining methods and methods to prepare a preliminary design, design of the mine shaft to open up the way the two-level, integrated mechanized top coal caving mining technology, to longwall mining method, using All cross-charged goaf treatment. Mine the use of diagonal ventilation, shaft ring road for Dao field, mine and transport, mine hoist, mine drainage and mine ventilation systems and other production equipment selection calculation. Designed in accordance with the existing economic and technological conditions, as far as possible the use of advanced mining technology and equipment, as well as mine safety technology and environmental protection measures required to complete the preliminary design of the entire mine. All mine mechanization, use of advanced technology and high production and high efficiency have been achieved from the modernization of the experience of mine, to achieve a high yield and efficiency of a mine shaft so as to achieve good economic and social benefits.Key word: The vertical shaft picks the area type to move towards the long wall Puts goes against the coal.本次毕业设计是据在河南煤化集团鹤壁六矿进行的毕业实习中所收集的矿井生产图纸和资料,并作了一些改动以后,对矿井进行的初步设计。

煤矿智能化采煤工作面作业规程(精编)

煤矿智能化采煤工作面作业规程(精编)

目录第一章地质概况 (1)第一节工作面位置及井上下关系 (1)第二节煤层情况 (1)第三节煤层顶底板情况 (2)第四节地质构造 (3)第五节水文地质概况 (5)第六节瓦斯地质 (6)第七节影响回采的其它地质情况 (6)第八节储量及服务年限 (7)第二章采煤方法和回采工艺 (9)第一节采煤方法的选择 (9)第二节巷道布置 (10)第三节回采工艺 (11)第四节设备配备 (13)第三章顶板控制 (15)第一节支护设计 (16)第二节控顶方法 (21)第三节矿压观测 (39)第四章一通三防 (42)第一节通风系统 (42)第二节瓦斯防治 (49)第三节综合防尘系统 (50)第四节防灭火系统 (53)第五节通风安全监控系统 (61)第五章生产系统 (65)第一节出煤系统 (66)第二节运料系统 (66)第三节液压系统 (66)第四节供水系统 (66)第五节排水系统 (67)第六节供电系统 (67)第七节通讯信号系统 (71)第六章生产组织 (74)第七章煤质及资源管理 (77)第八章职业病防治 (78)第九章安全技术措施 (83)第一节一般规定 (83)第二节顶板管理 (85)第三节防治水 (96)第四节爆破及爆破器材管理 (98)第五节一通三防及安全监控 (102)第六节安全设施及安全管理 (105)第七节工作面运料及材料管理 (106)第八节上下出口及两巷超前管理 (109)第九节运输 (111)第十节机电 (113)第十一节煤眼管理 (145)第十二节其它 (147)第十章灾害应急措施与避灾路线 (149)第十一章其它内容 (157)第一章地质概况第一节工作面位置及井上下关系一、工作面位置及井上下关系(表1)第二节煤层情况一、工作面煤层情况(表2)二、煤质情况(表3)第三节煤层顶底板情况一、煤层顶底板情况(表4)二、工作面综合柱状图(图1)第四节地质构造该工作面地质构造复杂,主要构造为断裂构造和褶曲构造。

山西乡宁焦煤集团台头煤焦公司矿井兼并重组整合项目初步设计安全专篇

山西乡宁焦煤集团台头煤焦公司矿井兼并重组整合项目初步设计安全专篇山西乡宁焦煤集团台头煤焦公司矿井兼并重组整合项目初步设计安全专篇前言山西乡宁焦煤集团台头煤焦有限责任公司位于山西省乡宁县管头镇胡村一带,为乡宁县国有股份制企业,行政区划属山西省乡宁县管头镇管辖。

矿井位于乡宁县城东北12km处,乡宁--管头--台头县级公路由井田南部边缘通过,向西南可与吉县--乡宁--襄汾干线公路连通。

南同蒲铁路和大(同)—运(城)高速公路均在乡宁县城东73~82km处通过,井田东距南同蒲铁路襄汾车站约65km,交通运输条件较为便利。

2009年11月26日,山西省国土资源厅颁发了《采矿许可证》,证号C100000200971110028184,批准井田面积18.0842km2,批准开采1-9号煤层。

2011年8月委托山西地宝能源有限公司编制完成了《山西省乡宁县台头煤焦有限责任公司兼并重组整合矿井地质报告》。

山西省煤炭工业厅文件晋煤规发【2011】1361号“关于山西乡宁焦煤集团台头煤焦有限责任公司兼并重组整合矿井地质报告的批复”。

根据山西省煤矿企业兼并重组整合工作领导组办公室文件晋煤重组办发【2009】85号《关于临汾市乡宁县煤矿企业兼并重组整合方案(部分)的批复》,山西省乡宁县台头煤焦有限责任公司胡村煤矿重组整合后作为单独保留矿井,名称变更为山西乡宁焦煤集团台头煤焦有限责任公司,矿井生产能力1.5Mt/a。

2011年9月9日山西省煤炭工业厅晋煤规函【2011】1296号“关于山2西乡宁焦煤集团台头煤焦有限责任公司等2处矿井调整变更产能的批复”,同意山西乡宁焦煤集团台头煤焦有限责任公司的矿井产能由150万吨/年调整变更为120万吨/年。

受台头煤焦有限责任公司委托,我公司于2011年10月编制完成《山西乡宁焦煤集团台头煤焦有限责任公司矿井兼并重组整合矿井初步设计》。

山西省煤炭工业厅文件晋煤办基发【2011】1406号“关于山西乡宁焦煤集团台头煤焦有限责任公司矿井兼并重组整合项目初步设计的批复”;矿井设计生产能力1.2Mt/a。

煤矿110“工法”设计说明

XX煤矿XX工作面运输顺槽切顶卸压自成巷无煤柱开采设计说明新疆XX矿业开发有限公司编制时间:2019年4月5日总论一、“110”工法的推行背景为缓解XX公司所属煤矿采掘接续紧张局面、减少资源浪费,提高煤炭销售收入,XX公司党委、XX公司高度重视、具体部署,要求在XX煤矿、XX煤矿进行“110”工法采煤技术的可行性论证;为加快该技术的推进进度,于2018年11月13日-15日,XX公司总工程师张总带队,到鸡西城山矿进行了“110”工法的现场学习,利用2019年春节假期期间XX 公司董事长再一次组织相关人员到双鸭山东荣二矿进行了“110”工法实地学习,进一步了解“110”工法的实际推行情况。

二、XX煤矿推行“110”工法的工作面概况XX煤矿推行“110”工法的巷道为XX工作面皮带顺槽,该顺槽全长1550m,已于2017年12月份施工结束,巷道尺寸(净)4.0*3.0m,支护方式为锚网索联合支护。

巷道顶板为煤岩互层的复合型顶板,顶板煤层累计厚度平均1.5m。

巷道其它地质条件简单。

该巷道若推行“110”工法要在2019年5月份就开始施工(进行顶板加强支护和预裂切缝眼施工)。

三、经济效益(一)加强支护总费用1374022元,折合每米单价886.5元。

(二)施工切缝眼总费用1346440元,折合每米单价868.7元。

(三)爆破材料总费用463476元,折合每米单价299元。

(四)挡矸设施及材料总费用3320311元(可回收3145471元),折合每米单价2142.1元。

(五)喷浆支护总费用178454元,折合每米单价115元/米。

(六)注氮总费用203904元,折合每米单价147元(暂不考虑灌浆)。

(七)人工总费用2015000元,单价1300元/米。

一次性投入总费用8697703元,若不考虑回收材料每米单价5611元,若考虑部分材料可以回收,消耗材料及人工费用总共3968816元(不包含灌浆费用),折合每米单价2560元。

煤矿安全评估自查报告

江苏天能集团***煤矿平安评估自查报告第一章评估概况第一节矿井概况***煤矿位于徐州市北22公里的铜山县***乡境内,东距津浦铁路和104国道10公里,西邻京杭运河,北濒微山湖,有运煤公路与104国道相通,交通十分便利。

***煤矿原为城子河煤矿,1992年6月由铜山县***乡投资兴建,1996年7月投产。

1996年江苏省地质矿产厅和江苏省煤炭工业管理办公室同意将景山勘探区0线至04线间资源划归城子河煤矿开采,定名为铜山县***乡城子河煤矿。

2001年7月岗子村事故发生后,被列为停产整顿矿井。

2002年8月江苏天能集团公司按照省、市政府有关文件精神,接收景山煤矿进行整顿,改扩建。

2004年2月14日通过改扩建验收。

***煤矿位于景山煤田中部,南自第一勘探线,北至04勘探线,浅部以-80为界,深部以各煤层-500煤层底板等高线为界。

井田走向长3000米,倾斜长700米左右,井田面积2.549平方公里。

***万吨,动用可采储量〔111〕153吨,矿井剩余可采储量477.74万吨。

矿井原设计井型9万吨/年,矿井为立井、暗斜井多水平开拓方式,混合井直径5.2m,落底标高-220m;风井直径为3.5m,落底标高-110m。

矿井改扩建后,混合井提升能力为15万吨/年。

本区位于徐州煤田九里山含煤盆地的东北边缘,为景山向斜的东南翼,井田呈单斜构造,地层走向NE55度,倾向NW,向斜东南翼产状陡立,地层倾角600˚~750˚,向深部变缓,最小倾角100~150˚˚,区内有一条F3正断层,走向NE25˚,倾角750˚,落差0~6m,西南端延至0线至02线间尖灭。

目前,生产二水平〔-420水平〕延伸工作正在进行,-420水平的两条主下山已完成,并在-420水平通过联络巷联通。

***煤矿自2002年8月改建以来,平安状况良好,没有发生轻伤及轻伤以上人身事故和大的生产事故。

到目前为止,***矿现有职工938人,现有采煤区队一个〔采煤三区〕、掘进区队二个〔掘进一、综掘队〕、辅助区队三个〔机电科、运输工区、通防科〕。

新集二矿防治水规定培训(三)

新集二矿防治水规定培训(三)第一篇:新集二矿防治水规定培训(三)国投新集能源股份有限公司新集二矿《煤矿防治水规定》2010年3月第四章矿井防治水为了防止地表水体在雨季洪水季节期间倒灌矿井,煤矿企业要全面查清矿区及其附近地面水流系统的汇水和渗漏情况,了解河流上游和下游水库的蓄水情况,对河道中障碍物影响矿井安全的,要进行全面清障;因管理权限无法清障的,要书面报告有关部门。

煤矿企业还要收集矿区近百年来当地最大降雨量和最高洪水位资料,据此建立疏水、防水和排水系统。

(一)疏水系统。

疏水系统即在矿区内部修筑疏水渠道。

四面环山的工业场地选择可利用的地形构筑泄洪隧道,将矿区内汇集的水引至矿区以外。

严禁在河道中堆积矸石等杂物,影响泄洪,致使河流水位抬高,河流通过废弃老井倒灌矿井。

(二)防水系统。

在编制矿井设计时,井口和工业场地应选择在不受洪水威胁的地点,矸石、炉灰及施工土方必须避开山洪和河流的冲刷方向,以免冲到工业场地和建筑物附近或淤塞沟渠和河道;对沿河布置的低于当地历年最高洪水位且受河水威胁的建筑物,应修筑防洪堤坝;对于坡面汇水应修挖防洪沟截住山洪,防止内侵或通过露头渗入矿井,封堵地面水渗入井下的塌陷裂缝和塌陷洞等通道;漏水的沟渠和河流应整铺河底或改道;加强地面在用钻孔及不良钻孔的管理。

(三)排水系统。

对于内涝区和洪水季节河水有倒灌现象的矿区及工业场地,应在矿区周围或井田内泄洪总沟的出水口处建立水闸,设置排洪站,以备河水倒灌时向外排水;如果塌陷区范围太大无法填平时,可以水泵排水,防止水渗入井下。

第四十二条矿井井口和工业场地内建筑物的标高,应当高于当地历年最高洪水位。

如果在山区,除符合本条第一款的规定外,还应当避开可能发生泥石流、滑坡的地段。

矿井井口及工业场地内建筑物的标高低于当地历年最高洪水位的,应当修筑堤坝、沟渠或者采取其他防排水措施。

本条是关于矿井井口和工业场地内建筑物标高及其防水措施的规定。

矿井井口及工业场地的是煤矿生产的咽喉和腹地,在任何情况下均应保证井口和其他地面设施不至于被洪水淹没。

  1. 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
  2. 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
  3. 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。
相关文档
最新文档