零序保护系统试验记录J519

合集下载

inspection form list(检查表格汇总表)

inspection form list(检查表格汇总表)
29
Extra 228
Cover-ups Inspection and Acceptance Record of Drilled Cast-in Place Concrete Pile
钻孔灌注桩隐蔽工程检查验收记录表
30
Extra 229
Concrete Pouring Record of Drilled Cast-in Place Concrete Pile
39
Extra 238J
Underwater Concrete Pouring Record
水下砼灌注记录表
40
Extra 239J
Concealed work inspection record
隐蔽工程验收记录
41
Extra 240J
Drilling Record
钻孔记录表
42
Extra 241J
J207
Tolerance Re-Survey Record of Spheric Tank Foundation
球罐基础允许偏差项目复测记录
13
J208
Survey Record of Foundation Settlement
基础沉降观测记录
14
J209
Hoisting Acceptance Record of Reinforced Concrete Component
地下管道检查记录
17
Extra 417
Above Ground Pipe Inspection Record
地上管道检查记录
18
Extra 418
Visual Inspection of Flanges, Gaskets and Bolting

中石化A-SH3503交工表格

中石化A-SH3503交工表格

建设单位(公章) 监理单位(公章) 施工单位(公章)
项目经理:
项目总监:
项目经理:
审 核 人:
审 核 人:
审 核 人:
年月日
年月日
年月日
.
.
工程名称:
SH3503- J103
交工技术文件目录 单元名称:
第2页共2页
序号 编 码
资料名称
31
J606
32
J610
33
J620
34
J622
35
J624
36
J624
37
38
物位仪表调校记录 就地指示仪(直读式压力计、温度计)调校记录
电缆(线)敷设及绝缘电阻测量记录 主电缆安装检查记录 仪表安装检查记录 就地仪表安装检查记录 产品合格证 施工方案
页次 138 139 143 147 149 156 160 164-175
.
SH3503- J103
序号 1 2 3 4 5 6 7 8 9
.
编号 J201 J202 J203 J204 J205 J206-1 J206-2 J207 J208 J209 J210 J211 J212 J213 J214 J215 J216 J217 J218 J219
编号 J301 J302 J303 J304 J305 J306 J307 J308 J309 J310-1 J310-2 J311 J312
13 绝缘油试验记录
14 电流(压)继电器试验记录
15 GL型电流继电器试验记录
16 时间继电器试验记录
17 中间、信号继电器试验记录
18 电测量指示仪表检验记录
19 零序保护系统试验记录
20 接地电阻测量记录

中石化A-SH3503交工表格

中石化A-SH3503交工表格
《现场设备、工业管道焊接工程施工及验收规范》(GB50236-97)
《工业设备及管道绝热工程、施工及验收规范》(GB50236-97)
《石油化工仪表工程施工技术规范》(GBJ126-89)
《电气装置安装工程电缆线路施工及验收规范》(GB50236-97)
《石油化工施工安全技术规程》(SH3505-99)
SH3503- J105
开工报告
工程名称:
合同号
设计单 位
计划开工日 期



计划竣工日 期



工 程 内 容
开 工 条 件
审 查 结 果 建设单位 (公章)
监理单位 (公章)
施工承包单位 (公章)
项目经理:
项目总监:
项目经理:
年月日 年月日
年月日
SH3503- J106
工程中间交接证书
工程名称: 单元名称:
序 未完工程项目内容 号
工程量 未完原因
处理意见
建设单位
监理单位
施工承包单位
14
DCS基本功能检测记录
J614
15
报警、联锁系统及可编程序控制器(PLC) J615
调试记录
16
检测、调节系统及DCS调试记录
J616
17
DCS机柜、仪表盘、操作台安装检查记录 J617
18
仪表管路强度、泄漏性、真空度试验、脱脂、 J618
酸洗记录
19
节流装置安装检查记录
J619
20
电缆(线)敷设及绝缘电阻测量记录
审 核 人:
审 核 人:
审 核 人:
年月日
年月日
年月日
SH3503- J103

SH3503表格

SH3503表格

35 电缆敷设及绝缘检测记录
36 电气照明安装检查记录
37 火灾报警系统安装检查记录
38
电气安装检查记录
A.6 仪表工程
序号 1 2 3 4
名称 变送器、转换器调校记录 调节器调校记录 调节阀、执行器、开关阀调校记录 指示、记录仪调校记录
J507 J508 J509 J510 J511 J512 J513 J514 J515 J516 J517 J518 J519 J520 J521 J531 J532 J533 J534 J535 J536 J537 J538 J539 J540 J541 J542-1 J542—2 J543 J544 J545 J546
A.2 建筑工程
序号 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
名称 地基验槽(坑)记录 工程定位测量记录 基础复测记录 块体式设备基础允许偏差项目复测记录 整体框架式设备基础允许偏差项目复测记录 储罐基础允许偏差项目复测记录(一) 储罐基础允许偏差项目复测记录(二) 球罐基础允许偏差项目复测记录 基础沉降观测记录 钢筋混凝土构件吊装验收记录 水池满水试验记录 钢结构安装记录 钢吊车梁安装记录 钢桁架安装记录 钢网架安装记录 塔架及管筒安装记录 高强螺栓连接检查记录 建筑工程防腐蚀施工检查记录 防水工程试水检查记录 防火层施工检查记录
年月日
年月日
年月日
工程名称:
SH3503- J102
交工技术文件总目录
第 页共 页
卷号 册号
资料名称
页数
工程名称:
SH3503- J103
交工技术文件目录 单元名称:
第 页共 页
序号

中石化ASH交工表格

中石化ASH交工表格

编制。
2. 本册为设备安装、管道安装包括交工技术文件和竣工图两大部分,其中交工技
术文件一式 3 份,正本 1 份,副本 2 份;竣工图 1 式 2 份,正本 1 份,副本 1
份。
3. 验收规范:
《石油化工有毒、可燃介质管道工程施工及验收规范》(SH3501-97)
《工业金属管道工程施工及验收规范》(GB50235-97)
编号 J201 J202 J203 J204 J205 J206-1 J206-2 J207 J208 J209 J210 J211 J212 J213 J214 J215 J216 J217 J218 J219
编号 J301 J302 J303 J304 J305 J306 J307 J308 J309
J115 J116 J118 J123-1
J201 J202 J301 J302 J303 J311 J313 J317-B J407 J409 J531 J543 J544 J603
工程名称:苯汽体部分改造 单元名称:06.07 单元精致车间
交工技术文件目录
第1页共2页
资料名称
页次
交工技术文件说明
A.3 设备安装工程 名称 设备开箱检验记录 立式设备安装记录 卧式设备安装记录 塔盘安装记录 设备填充记录 现场设备组焊记录 催化反应(沉降)器附件安装记录 催化再生器附件安装记录 衬里施工质量检查记录 空冷器构架安装记录 空冷器风机安装记录 机器安装记录 机器拆检及组装记录 联轴器对中记录 机器单机试车记录(一) 机器单机试车记录(二)通用类
1
开工报告
2
工程交工证书
3
设计变更一览表
4
设计变更通知单
5
隐蔽工程记录

继保综合实验

继保综合实验

华北电力大学继电保护与自动化综合实验报告院系电气与电子工程学院班级姓名学号同组人姓名日期2014 年 1 月15 日教师肖仕武成绩Ⅰ。

微机线路保护简单故障实验一、实验目的通过微机线路保护简单故障实验,掌握微机保护的接线、动作特性和动作报文.二、实验项目1、三相短路实验投入距离保护、零序电流保护,记录保护装置的动作报文。

2、单相接地短路实验投入距离保护、零序电流保护,记录保护装置的动作报文.三、实验方法1、实验设备序号型号名称数量1 MRT 继电保护测试仪1台2 CSL161微机线路保护装置1台2、三相短路实验1)实验接线2)实验中短路故障参数设置I=5。

0A,X=1。

8(ohm),R=5。

0(ohm),a=03) 保护动作情况记录第一次跳闸时间/s 重合闸时间/s 第二次跳闸时间/s A相 3.333 未动作未动作B相 3.333 未动作未动作4)报文及保护动作结果分析报文:三相故障电流5A,PT断线后过电流,I段出口5。

15故障电流为三相5A,过电流故障,电流1段动作。

3、单相接地短路实验1)实验接线2)实验中短路故障参数设置I=5.0A,X=1.8(ohm),R=5。

0(ohm),a=03) 保护动作情况记录第一次跳闸时间/s 重合闸时间/s 第二次跳闸时间/sA相3。

449 未动作未动作B相 3.449 未动作未动作C相 3.449 未动作未动作4) 报文及保护动作结果分析报文:单相,故障电流5A,PT断线后过流,一段出口5。

03单相电流故障,故障电流为1A,电流一段动作.四、思考题1、微机线路保护装置161B包括哪些功能?每个功能的工作原理是什么?与每个功能相关的整定值有哪些?2、做一个区内三相短路实验,投入距离保护、零序保护,记录保护装置的动作报文,并1.功能:距离保护,零序保护,高频保护,重合闸距离保护是反应保护安装处到故障点的距离,并根据这一距离远近而确定动作时限的一种动作距离保护三段1段:Z1set=(0.8~0。

施工交工文件的编写中英文

施工交工文件的编写中英文

施工交工文件的格式及编号Format and Number of Technical Document for ConstructionCompletion of ProjectA.1 综合与通用A.1 Comprehensive and General序号S/No. 名称Title编号No.1封面Front coverJ101A 2封面Front coverJ101B3 交工技术文件总目录General contents of Technical Document for Construction Completion ofProjectJ1024交工技术文件目录Contents of Technical Document for Construction Completion of ProjectJ1035 交工技术文件说明Explanation to Technical Document for Construction Completion ofProjectJ1046开工报告(work commencement report)Work Commencement ReportJ105 7工程中间交接证书Interim Project Handover CertificateJ106 8联动试运行合格证书Joint Commissioning Conformity CertificationJ107 9工程交工证书Project Handover CertificateJ108 10 交工技术文件移交证书J109Handover Certificate of Technical Document for Construction Completionof Project未完工程项目明细表J110 11List of Uncompleted Items重大质量事故处理鉴定报告12J111 Appraisal Report on Severe Quality Failure工程联络单J112 13Work Liaison Form设计变更一览表J113 14List of Design Alteration工程联络单一览表15J114 List of Work Liaison Form隐蔽工程记录16J115 Record of Concealed Works合格焊工登记表J116 17Registration Form of Qualified Welder防腐工程施工质量检查记录J117 18Record of Workmanship Inspection of Anti-corrosion Works隔热工程施工质量检查记录19J118 Record of Workmanship Inspection of Heat Shielding Works防腐绝缘层电火花检测报告J119 20Test Report on Electric Spark in Anti-corrosive Insulation安全阀调整试验记录21J120 Record Of Safety Valve Tune-up Test安全附件安装检查记录J121 22Inspection Record of Installation of Relieving Attachment热处理报告23J122 Thermal Treatment Report24射线检测报告(一)Radiographic Test Report (I)J123-1 25射线检测报告(二)Radiographic Test Report (II)J123-2 26超声波检测报告Ultrasonic Wave Test ReportJ124 27超声波检测报告(续表)Ultrasonic Wave Test Report (Continued)J124-F 28超声波测厚报告Ultrasonic Thickness Test ReportJ125 29磁粉检测报告Magnetic Particle Test ReportJ126 30磁粉检测报告(续表)Magnetic Particle Test Report (Continued)J126-F 31渗透检测报告Permeation Test ReportJ127 32渗透检测报告(续表)Permeation Test Report (Continued)J127-F33安装检查记录Inspection Record of Installation ofJ128A.2 建筑工程A.2 Construction Works序号S/No. 名称Title编号No.1地基验槽(坑)记录Record of Inspection of Foundation Subsoil (Pit)J201 2工程定位测量记录Record of Engineering Positioning SurveyJ202 3基础复测记录Record for Repetition Measurement of FoundationJ2034 块体式设备基础允许偏差项目复测记录Repetition Measurement Record for Allowable Deviation in Block-type Equipment FoundationJ2045 整体框架式设备基础允许偏差项目复测记录Repetition Measurement Record for Allowable Deviation in Integral Framing Equipment FoundationJ2056 储罐基础允许偏差项目复测记录(一)Repetition Measurement Record for Allowable Deviation in Tank Foundation (I)J206-17 储罐基础允许偏差项目复测记录(二)Repetition Measurement Record for Allowable Deviation in Tank Foundation (II)J206-28 储罐基础允许偏差项目复测记录Repetition Measurement Record for Allowable Deviation in Tank FoundationJ2079基础沉降观测记录Observational Record of Foundation SettlementJ208 10钢筋混凝土构件吊装验收记录Record of Acceptance for Vertical Loading of Reinforced ConcreteJ209Member11水池蓄水试验记录Water Tank Conservation Test Data SheetJ210 12钢结构安装记录Steel Structure Erection RecordJ211 13钢吊车梁安装记录Steel Crane Beam Erection RecordJ212 14钢桁架安装记录Steel Truss Erection RecordJ213 15钢网架安装记录Steel Net Rack Erection RecordJ214 16塔架及管筒安装记录Tower Mast And Pipe Barrel Erection RecordJ215 17高强螺栓连接检查记录Inspection Record of High-tensile Bolt ConnectionJ21618 建筑工程防腐蚀施工检查记录Inspection Record of Corrosion Protection Construction in ConstructionWorksJ21719防水工程试水检查记录Inspection record of Water tightness of Waterproofing WorksJ21820 防火层施工检查记录Inspection Record of Construction of Fire-resisting LayerJ219A.3 设备安装工程A.3 Equipment Installation Works序号S/No. 名称Title编号No.1设备开箱检验记录Equipment Unpacking Inspection RecordJ301 2立式设备安装记录Vertical Equipment Installation RecordJ302 3卧式设备安装记录Horizontal Equipment Installation RecordJ303 4塔盘安装记录Tower Tray Erection RecordJ304 5设备填充记录Equipment Filling RecordJ305 6现场设备组焊记录Welding Record of Field ApparatusJ306 7催化反应(沉降)器附件安装记录Erection Record of Accessory to Catalytic (settlement) ReactorJ307 8催化再生器附件安装记录Erection Record of Accessory to Catalytic RegeneratorJ308 9衬里施工质量检查记录Inspection Record of Lining WorkmanshipJ309 10空冷器构架安装记录Record Of Erection of Framing to Aerial CoolerJ310-1 11 空冷器风机安装记录J310-2S/No. Title No.Record Of Erection of Fan to Aerial Cooler12机器安装记录Machine Erection RecordJ311 13机器拆检及组装记录Record for Overhaul Inspection and Assembly of MachineJ312 14联轴器对中记录Shaft Coupling Alignment RecordJ313 15机器单机试车记录(一)Record of Single Machine Test Run (I)J314-1 16机器单机试车记录(二)通用类Record of Single Machine Test Run (I) for General TypeJ314-2A17 机器单机试车记录(二)往复式压缩机(2页)Record of Single Machine Test Run (II) for Reciprocating Compressor (2pages)J314-2B18 机器单机试车记录(二)离心式压缩机(2页)Record of Single Machine Test Run (II) for Centrifugal Compressor (2pages)J314-2C19 机器单机试车记录(二)汽轮机(燃气轮机)(2页)Record of Single Machine Test Run (II) for Steam Turbine(GasTurbine)(2 pages)J314-2D20湿式气柜几何尺寸检查记录Inspection Record of Physical Dimension of Wet Storage HolderJ315 21储罐总体试验记录Record of Integrated Test on Storage TankJ316 22设备强度和严密性试验记录Equipment Strength and Leak Test RecordJ317-AS/No. Title No.23 换热设备强度和严密性试验记录Heat-exchange Equipment Strength and Leak Test RecordJ317-B24 工业炉管板、管架安装检查记录Inspection Record of Erection of Pipe Sheet and Pipe Support for IndustrialFurnaceJ31825 工业炉砖架安装检查记录Inspection Record of Erection of Brick Rack for Industrial FurnaceJ31926工业炉筑炉施工质量检查记录Inspection Record of Construction Workmanship of Industrial FurnaceJ320 27工业炉安装质量检查记录Quality Inspection Record of Erection of Industrial FurnaceJ32128 烘炉记录Drying Furnace RecordJ32229火炬安装质量检查记录Quality Inspection Record of Erection of TorchJ323A.4 Piping installation Works序号S/No. 名称Title编号No.1阀门试验记录Valve Test Data SheetJ401 2管道补偿器安装记录Erection Record for Pipeline CompensatorJ402 3管道组成件校验性检查记录Verification Inspection Record for Pipeline ComponentsJ403 4SHA级管道管螺纹、密封面加工记录Processing Record of Class SHA Conduit Pipe Thread and Sealing SurfaceJ404 5高压、SHA级管道弯管加工记录Processing Record of Class SHA High Pressure Pipeline ElbowJ405 6管道静电接地测试记录Test Record of Pipeline Electrostatic GroundingJ406 7管道系统安装检查与压力试验记录Record for Installation, Inspection and Pressure Test of Piping SystemJ407 8管道系统泄漏性/真空试验记录Piping System Leak/Vacuum Test RecordJ408 9管道吹洗、清洗(脱脂)记录Pipeline Purging and Washout(Degreasing) RecordJ40910 给排水压力管道强度及严密性试验记录Strength and Leak Test Record for Water Supply and Drainage PressurePipelineJ41011给排水无压力管道严密性试验记录Leak Test Record for Water Supply and Drainage Non-pressure PipelineJ411A.5 Electrical Installation Works序号S/No. 名称Title编号No.1电气设备交接试验记录首页Head Page of Record for Acceptance Trial Test of Electric InstallationJ501 2交流电动机试验记录Test Data Sheet of AC MotorJ502 3直流电机试验记录Test Data Sheet of DC MotorJ503 4电力变压器试验记录Test Data Sheet of Power TransformerJ504 5电压互感器试验记录Test Data Sheet of Voltage TransformerJ505 6电流互感器试验记录Test Data Sheet of Current TransformerJ506 7断路器试验记录Test Data Sheet of Circuit BreakerJ507 8电力电缆试验记录Test Data Sheet of Power CableJ508 9并联电容器试验记录Test Data Sheet of Shunted CondenserJ509 10阀式避雷器试验记录Test Data Sheet of Valve Type ArresterJ510 11氧化锌避雷器试验记录Test Data Sheet of Zinc Oxide Lightning ArresterJ511 12交流耐压试验记录AC Voltage Withstand Test Data SheetJ512S/No. Title No.绝缘油试验记录J513 13Insulating Oil Test Data Sheet电流(压)继电器试验记录J514 14Electric Current (Voltage) Relay Test Data SheetGL型电流继电器试验记录15J515 GL Current Relay Test Data Sheet时间继电器试验记录16J516 Time Relay Test Data Sheet中间、信号继电器试验记录17J517 Intermediate and Signal Relay Test Data Sheet电测量指示仪表检验记录J518 18Inspection Record of Electrical Measurement Indicating Instrument零序保护系统试验记录J519 19Zero-sequence Protection System Test Data Sheet接地电阻测量记录20J520 Earthing Resistance Measurement Record试验记录J521 21Test Data Sheet of __________________________交流电动机安装检查及空载运行记录J531 22Record for Installation, Inspection and No-load Operation of AC Motor电机抽芯检查记录23J532 Inspection Record for Loose Core of Electrical Motor电机干燥记录J533 24Electrical Motor Drying Record25 变压器安装检查记录J534S/No. Title No.Inspection Record of Installation of Transformer26变压器器身检查记录Transformer Body Inspection RecordJ535 27变压器干燥记录Transformer Drying RecordJ536 28断路器安装调整记录Breaker Installation and Adjustment RecordJ53729 隔离开关、负荷开关安装调整记录Installation and Adjustment Record for Disconnector Switch and LoadSwitchJ53830高、低压开关柜安装检查记录Installation and Inspection Record for LV & HV PanelJ539 31保护、控制盘(屏)安装检查记录Installation and Inspection Record for Protection & Control PanelJ540 32直流系统、不间断电源(UPS)安装检查记录Installation and Inspection Record for DC System and UPSJ541 33蓄电池充放电记录(一)Battery Charging & Discharging Record (I)J542-1 34蓄电池充放电记录(二)Battery Charging & Discharging Record (II)J542-2 35电缆敷设及绝缘检测记录Cable Laying and Insulation Test RecordJ543 36电气照明安装检查记录Installation and Inspection Record for Electric LightingJ544 37火灾报警系统安装检查记录Installation and Inspection Record for Fire Alarm SystemJ545S/No. Title No.安装检查记录38J546 Installation and Inspection Record for ________________________A.6 仪表安装工程A.6 Instrument Installation Works序号S/No. 名称Title编号No.1变送器、转换器调校记录Adjustment and Verification Record for Transducer And TransformerJ601 2调节器调校记录Adjustment and Verification Record for GovernorJ6023 调节阀、执行器、开关阀调校记录Adjustment and Verification Record for Regulator Valve, Actuator andSwitch ValveJ6034 指示、记录仪调校记录Adjustment and Verification Record for Indicating and Recording InstrumentJ6045热电偶、热电阻调校记录Calibration records for Thermocouple and ThermistorJ605 6物位仪表调校记录Adjustment and Verification Record for Potential InstrumentJ606 7计算器调校记录Adjustment and Verification Record for CalculatorJ607 8积算器调校记录Adjustment and Verification Record for IntegratorJ6089 安全栅、分配器、选择器调校记录Adjustment and Verification Record for Safety Fence, Distributor andSelectorJ60910 就地指示仪(直读式压力计、温度计)调校记录Adjustment and Verification Record for Local Indicating Instrument(Direct-reading Manometer and Thermometer)J61011 工艺开关调校记录J611S/No. Title No.Adjustment and Verification Record for Process Switch12分析仪调校记录Adjustment and Verification Record for AnalyzerJ612 13调校记录Adjustment and Verification Record for ____________________J613 14DCS基本功能检测记录Record of Detection of DCS Basic FunctionsJ61415 报警、联锁系统及可编程序控制器(PLC)调试记录Commissioning Record of Alarming, Interlocking System and Programmable Controller (PLC)J61516检测、调节系统及DCS调试记录Commissioning Record of Detecting, Regulating and DCSJ61617 DCS机柜、仪表盘、操作台安装检查记录Installation and Inspection Record for DCS Cabinet, Instrument Panel andConsoleJ61718管路强度、泄漏性、真空度试验、脱脂、酸洗记录Record for Pipeline Strength, Leak, Vacuum Test, Deoiling and Acid WashJ618 19节流装置安装检查记录Installation and Inspection Record for Throttling DeviceJ619 20电缆(线)敷设及绝缘电阻测量记录Record For Cable (Wire) Laying and Insulation MeasurementJ62021 接地极、接地电阻安装测量记录Installation and Measuring Record of Grounding Electrode and Earthing ResistanceJ62122主电缆安装检查记录Installation and Inspection Record for Main CableJ622S/No. Title No.23 主汇线槽、主桥架安装检查记录Installation and Inspection Record for Main Wire Duct and Main Framework of BridgeJ62324就地仪表安装检查记录Installation and Inspection Record for Local InstrumentJ624。

零线、保护(防雷)接地电阻的检验测试记录

零线、保护(防雷)接地电阻的检验测试记录
市政基础设施工程
零线、保护(防雷)接地电阻的检验测试记录
市政验·照-5-2
第页,共页
工程名称
单位工程名称
施工单位
分包单位
项目负责人
项目技术负责人
分部(子分部)
工程名称
分项工程名称
验收部位/区段
检验批容量
施工及验收依据
《城市道路照明工程施工及验收规程》CJJ89
柜(箱)、Leabharlann 号Ro(Ω)柜(箱)、杆号
Ro(Ω)
柜(箱)、杆号
Ro(Ω)
配电柜(箱)
高(中)杆灯
其它路灯
测试结论
配电柜(箱)
合格:点
不合格:点
合格率:%
高(中)杆灯
合格:点
不合格:点
合格率:%
其他路灯
合格:点
不合格:点
合格率:%
施工
单位
检查
结果
专业工长:(签名)项目专业质量检查员:(签名)年月日
监理
单位
验收
结论
专业监理工程师:(签名)年月日
说明:1、配电柜(箱)、高杆灯、中杆灯应全部测试,其它路灯的测试比例应不小于30%。
2、检测仪器应有有关计量部门认可的有效合格证。
  1. 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
  2. 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
  3. 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。
相关文档
最新文档