煤矿地面35KV变电所的设计
煤矿地面35KV变电所的设计

摘要本设计初步设计了煤矿地面35KV变电所的设计。
其设计过程主要包括负荷计算、主接线设计、短路计算、电气设备选择、防雷与接地等。
通过对煤矿35KV变电所的负荷统计,用需用系数法进行负荷计算,根据负荷计算的结果确定主变压器的台数、容量及型号。
用标幺值法对供电系统进行短路电流计算,为电气设备的选择及校验提供了数据。
根据煤矿供电系统的特点,制定了矿井变电所的主接线方式、运行方式。
其中35KV侧为全桥接线,6KV主接线为单母分段接线。
两台主变压器采用分列运行方式。
并根据电流整定值以及相关数据,选择了断路器、隔离开关、互感器等电气设备,并进行校验。
关键词:负荷计算;短路计算;变电所;运行方式AbstractThe coal mine ground 35KV transformer substation was designed. Design process is mainly including load calculate, the design of main electrical connection, short out calculate, electric equipment choose,lightning protection and grounding, etc. According to load statistics and the result of load calculation determine the quantity ,capacity and mode of the main voltage transformer .According to the characteristic of the coal electric system determine the main electrical connection and operation mode of the ground transformer substation .The side of 35KV is Full –bridge Connection and the bus of 6KV is single bus section .The two voltage transformers adopt the mode of split run .And according to the check–up of whole definite value and relevant data of the electric current , have chosen such electric equipment as the relay, voltage transformer ,etc.Keywords:Load calculation; short-circuit calculation; substations; operation mode目录1概述 (1)1.1矿井简介 (1)1.2十二矿供电系统简介 (1)1.3原始负荷资料 (1)2负荷计算 (3)2.1负荷计算目的 (3)2.2负荷计算方法 (3)2.3负荷计算过程 (5)2.3.1各用电设备组负荷计算 (5)2.3.2各低压变压器的选择与损耗计算 (10)2.3.3计算6KV母线上补偿前的总负荷并初选主变压器 (12)2.3.4功率因数补偿与电容器柜的选择 (12)3变电所主变压器的选择与校验 (15)3.1变压器选择原则 (15)3.2变压器选择计算 (15)3.3变压器的损耗计算 (16)3.4 35KV侧全矿负荷计算及功率因数校验 (16)3.5变压器经济运行方案的确定 (17)4电气主接线设计 (18)4.1对电气主接线的基本要求 (18)4.2本所电气主接线方案的确定 (18)4.2.1电源进线与主接线 (18)4.2.2负荷分配 (19)5短路计算 (21)5.1短路电流计算的目的 (21)5.2三相短路计算的方法与步骤 (21)5.3短路电流计算过程 (21)5.3.1选择计算各基准值 (23)5.3.2计算各元件的标幺电抗 (23)5.3.3计算各短路点的短路参数 (24)5.4短路参数汇总表 (28)6高压电气设备选择 (29)6.1高压电气设备选择原则 (29)6.2 35KV电气设备选择及校验 (30)6.2.1高压断路器的选择 (30)6.2.2隔离开关的选择 (31)6.2.3电流互感器的选择 (32)6.2.4电压互感器的选择 (33)6.2.5 35KV避雷器的选择 (33)6.3 6KV电气设备选择 (34)6.4电力线路的选择 (39)6.4.1 35KV输电线路及母线的选择与校验 (39)6.4.2 6KV电缆及架空线的选择 (40)6.4.3电力线路选择计算汇总表 (47)7防雷与接地 (48)7.1 雷电过电压的保护 (48)7.2 接地装置 (49)7.2.1 接地装置的分类 (49)7.2.2接地装置的布置 (50)总结 (51)参考文献 (52)致谢 (53)1概述1.1矿井简介本矿井为年产150万吨的矿井,三水平可采储量为3108.4万吨,考虑1.3的备用储量系数,三水平的服务时间为15.9年。
杭来湾煤矿采空区35 kV架空输电线路基础设计

文章编号:1009 6825(2020)10 0082 02杭来湾煤矿采空区35kV架空输电线路基础设计收稿日期:2020 03 04 作者简介:吕 振(1984 ),男,硕士,工程师吕 振 李小利(中煤西安设计工程有限责任公司,陕西西安 710054)摘 要:杭来湾煤矿输电线路基础设计首次采用独立基础+槽型筏板,中间采用HDPE材料分隔,预埋钢管和槽型筏板内填充粗砂。
这种基础型式对较小的不均匀沉降有一定自我调节能力;当沉降量较大时,铁塔可能发生整体倾斜,槽筏可作为支撑结构,采用千斤顶对独基进行复位,结合管理维护措施有效降低采空区对输电线路的影响,保证基础安全稳定。
关键词:煤矿采空区,输电线路基础,管理维护中图分类号:TM726文献标识码:A 我国幅员辽阔,矿产资源丰富,已探明的矿产有159种,矿山10万多处,其中煤炭储量为1145亿t。
如此丰富的资源背景下,矿区开采后地面的沉陷问题则备受关注。
受煤矿采空区地表沉降的影响,输电线路基础往往发生沉降、水平位移、倾斜、不均匀沉降等破坏,使铁塔的根开和各塔腿高差发生变化,塔体结构产生较大的附加应力,直接威胁铁塔安全和线路的稳定运行[1]。
目前国内对煤矿采空区架空输电线路基础的设计、施工及运行维护有一定的研究[1 10]。
采空区输电线路基础型式应用最广的有复合大板基础、联合式基础、大板基础+垫板。
复合大板基础不会由于独基的不均匀沉降造成铁塔破坏,但基础根开可能发生变化。
联合基础的整体性较好,铁塔会随地基不均匀沉降整体倾斜,只能纠偏扶正,基础不易复位,但基础根开不发生变化。
大板基础+垫板对地基沉降有一定的自我调节能力,大板不随着地基的不均匀沉降发生倾斜,垫板作为千斤顶的支撑结构,对基础进行复位,且具备前两种基础的优点。
前两种基础型式都会使铁塔发生倾斜,对铁塔运行造成了一些安全隐患,第三种基础型式适用于采空区沉陷量较小的地区,基础复位有一定难度。
结合工程实例,设计出一种适用于煤矿采空区沉降量较大地区的基础,为采空区架空输电线路基础的设计提供参考。
最新煤矿35KV及10KV供电系统继电保护整定方案

兴隆煤矿35K V及10K V供电系统继电保护整定方案编制:日期:审核:日期:批准:日期:二零一四年三月2014年继电保护整定方案审查意见继保审查意见:审查人签名:年月日领导意见:领导签名:年月日目录第一章概述 0第二章编制依据 (2)第三章数据统计 (4)第四章供电系统短路电流计算 (6)一、35KV变电所35KV母排短路参数 (6)二、矿内各场所10KV母排短路参数 (6)第五章系统各开关柜继电保护整定计算 (14)一、35KV变电所35KV系统继电保护整定 (14)二、35KV变电所10KV系统继电保护整定 (15)1、05#、12#电容器柜 (15)2、15#、16#主扇柜 (15)3、13#、14#压风柜 (16)4、11#、20#瓦斯抽放站柜 (16)5、17#、22#机电车间 (17)6、18#、19#动力变压器 (17)7、8#、21#主平硐胶带机变电所柜 (18)8、23#地面箱变 (19)9、6#、7#下井柜 (19)10、24#矿外供水泵房 (20)三、10KV系统继电保护整定 (20)1、风井通风机房 (20)2、风井绞车房 (22)3、风井瓦斯抽放泵站 (23)4、机修车间 (23)5、压风机房 (24)6、主平硐变电所 (25)7、+838水平中央变电所 (25)第六章继电保护定值汇总表 (27)附录一:阻抗图附录二:矿井35KV及10KV供电系统图第一章概述一、矿内35KV变电所矿内35/10KV变电所双回路35kV电源均引自容光110 kV变电站,架空导线型号为LGJ-120,线路全长Ⅰ回为13.8公里,Ⅱ回为13.6公里,全程线路采用两端架设架空避雷线及接地模块形式,避雷线型号为GJ-35。
双回线路的运行方式为一路工作,另一回路带电热备用。
两台主变型号为SF11-6300/35,正常运行方式为一台运行,一台热备用。
10KV馈出线路21回,其中包括电容器无功补偿两路、风井主扇通风机房两路(带主通风机和轨道上山绞车房)、风井瓦斯抽放泵站两路、下井两路(去+838水平中央变电所)、主平硐井口变电所两路(带主平硐皮带及地面生产系统)、压风机房两路路、机修车间变电所两路、动力变压器两路、矿外水泵房一路、工广箱式变压器一路、所用变压器一路、消弧线圈一路、备用一路。
35KV供电设计毕业论文

35KV供电设计毕业论文目录1 绪论 (1)1.1灵北基本情况简介 (1)1.2灵北煤矿原始情况 (1)1.2.1 地面用电负荷统计 (1)1.2.2 井下采区设计原始资料 (2)2 灵北35KV煤矿供电设计方案及论证 (5)2.1灵北煤矿总体设计方案 (5)2.2方案的可行性论证 (5)2.2.1 技术方面论证 (5)2.2.2 经济方面论证 (6)3 矿井地面变电所设计 (7)3.1地面用电负荷计算 (7)3.2地面变电所位置选择 (10)3.3地面变电所的主接线 (11)3.3.1 35kV侧主接线 (11)3.3.2 10kV侧主接线 (12)4 井下中央变电所及供电设计 (15)4.1井下电力负荷计算 (15)4.1.1 井下负荷的计算方法 (15)4.2.2 井下负荷的计算 (16)4.3井下中央变电所位置选择原则 (17)4.4井下中央变电所主接线 (18)5 短路电流计算 (20)5.1短路电流计算选择 (20)5.2计算短路电流的目的 (20)5.3三相短路电流的计算方法 (21)5.3.1 电源为无限容量时的短路电流计算 (21)5.3.2 电源为有限容量时的短路电流计算 (22)5.4短路电流计算 (23)6 设备选择 (30)6.1一般的选择方法 (30)6.2短路动、热稳定性校验原则 (31)6.3变压器选择 (31)6.4地面设备选择举例 (31)6.4.1 35kV设备的选择 (32)6.4.2 10kV设备的选择 (34)6.5井下设备选择 (35)6.5.1 电缆选择计算 (35)6.5.2 井下开关选择 (37)7 保护装置 (38)7.1继电保护装置 (38)7.2防雷保护及接地 (39)7.2.1 变电所防雷装置 (39)7.2.2 地面变电所保护接地网 (40)7.2.3 井下保护接地网 (40)8 结论 (43)致谢 (44)参考文献 (45)摘要本设计是在煤矿实习的基础上完成的。
35KV变电站的选型设计.

毕业设计(论文)(说明书)题目: ____________姓名: ____________学号: ____________XXXXXR业技术学院2014年5月8日XXXX X只业技术学院毕业设计(论文)任务书姓名__________________________________专业班级______________________________任务下达日期2014 ____________ 年上_____ 月18 _______ 日设计(论文)开始日期2014 年2 月25 日设计(论文)完成日期2014 _年4 —月30 —日设计(论文)题目:________________________________________指导教师_______________________________院(部)主任___________________________XXXX X只业技术学院毕业设计(论文)任务书2014年5月8日XXXX XR业技术学院毕业设计(论文)答辩委员会记录电力工程学院专业,学生于2014年6 月」0 日进行了毕业设计(论文)答辩。
设计题目:__________________________________________________________ 专题(论文)题目:__________________________________________________ 指导老师:______________________答辩委员会根据学生提交的毕业设计(论文)材料,根据学生答辩情况,经答辩委员会讨论评定,给予学生毕业设计(论文)成绩为。
答辩委员会人,出席人答辩委员会主任(签字):答辩委员会副主任(签字):答辩委员会委员:, , ,XXXX XR业技术学院毕业设计(论文)评语第页毕业设计(论文)及答辩评语:_______________________________________________________摘要电力是当今世界使用最为广泛、地位最为重要的能源。
煤矿35KV变电所出线方案

窑街煤电集团天祝煤业有限责任公司关于旧35KV变电所6KV供电线路负荷转移改造工程的请示窑街煤电集团公司:天祝三号井改扩建项目35KV变电所计划于11月投入运行,旧变电所停用,旧变电所6KV出线负荷转移改造工程亟待解决。
新变电所6KV出线口共33个,实际设计场区动照网供电系统时只考虑了入井及生产系统、地面辅助生产系统、福利设施等的供电,对外供部分的衔接未作设计。
实际外供出线共11趟,其中一采区方向619#、620#、617#、616#、621#、股份矿六趟,三采区方向603#、606#、615#、618#、王支良沟炸药总库五趟,炸药库为低压供电。
这11趟线路在新变电所投运后要一并转接新系统,改造工程量大,尤其三采区方向五趟线路都建在新征的储煤场中,无出线走廊。
为此,我公司根据现场情况初步拟定了两个改造方案,恳请集团公司派相关部门现场确认、审定,进一步优化方案,请集团公司审查优化,并将此项费用列入2010年天祝三号井改扩建投资计划中。
妥否,请批示。
附件:天祝煤业公司新建35KV变电所6KV电缆出线布置方案二0一0 年九月三十日天祝煤业公司新建35KV变电所6KV电缆出线布置方案一、往三采区方向:车娄沟主扇风机一、二回路及三采区地面变电所一、二回路(按现在的编号分别为603#、606#、615#、618#)出线方案:方案一:将上述四趟线路采用电缆出线,通过电缆地沟将电缆敷设至贮煤场区外的架空线路基杆,以外的线路仍采用现有的架空导线供电,同时拆除贮煤厂区内的供电基杆。
采用此方案需沿贮煤场边界开挖并捣制1000×900的电缆地沟340米,需重新敷设高压电缆共计1400米。
方案二:将上述四趟线路仍采用架空出线,利用钢管杆或铁塔同(杆)塔双回直接跨越贮煤场区,以外的线路仍采用现有的架空导线供电,同时拆除场区内的供电基杆。
采用此方案,需架设钢管杆或铁塔4基,而且长远考虑,为防止存煤量过大时,影响线路的对地安全距离,需采用绝缘导线(约1680米)供电。
煤矿35KV地面变电所供电系统设计

李庄煤矿35KV地面变电所供电系统设计摘要该地域变电所所涉及方面多,考虑问题多,分析变电所担负的任务及用户负荷等情形,选择所址,利用用户数据进行负荷计算,肯定用户无功功率补偿装置。
同时进行各类变压器的选择,从而肯定变电站的接线方式,再进行短路电流计算,选择送配电网络及导线,进行短路电流计算。
选择变电站高低压电气设备,为变电站平面及剖面图提供依据。
本变电所的初步设计包括了整体方案的肯定、负荷分析、短路电流的计算、高低压配电系统设计与系统接线方案选择、继电保护的选择与整定、防雷与接地保护等内容。
随着电力技术高新化、复杂化的迅速进展,电力系统在从发电到供电的所有领域中,通过新技术的利用,都在不断的发生转变。
变电所作为电力系统中一个关键的环节也一样在新技术领域取得了充分的进展。
关键词:变电站、负荷、输电系统、补偿装置、负荷分析35 KV substation ground coalpower supply system design of li zhuangABSTRACTThe substation is an importance part of the electric power system, it is consisted of the electric appliances equipments and the Transmission and the Distribution. It obtains the electric power from the electric power system, through its function of transformation and assign, transport and safety. Then transport the power to every place with safe, dependable, and economical. As an important part of power’s transport and control, the transformer substation must change the mode of the traditional design and control, then can adapt to the modern electric power system, the development of modern industry and the of trend of the society life.The region of 110-voltage effect many fields and should consider many problems. Analyse change to give or get an electric shock a mission for carrying and customers carries etc. circumstance, choose the address, make good use of customer data proceed then carry calculation, ascertain the correct equipment of the customer. At the same time following the choice of every kind of transformer, then make sure the line method of the transformer substation, then calculate theshort-circuit electric current, choosing to send together with the electric wire method and the style of the wire, then proceeding the calculation of short-circuit electric current. This first step of design included: ascertain the total project 、load analysis、the calculation of the short-circuit electric current 、the design of an electric shock the system design to connect with system and the choice of line project、the choice and the settle of the protective facility 、the contents to defend the thunder and protection of connect the earth. Along with the high and quick development of electric power technique, electric power system then can change from the generate of the electricity to the supply the power. ordsKEY WORDS:substation ,load ,transmission system , correction equipment.load analysis目录摘要 (1)ABSTRACT (2)目录 (I)第一章概述 (1)电源 (1)大体地质气象资料 (1)第二章负荷计算及变压器选择 (1)负荷分析 (1)2.1.1负荷分类 (1)负荷曲线 (1)矿井用电负荷计算 (2)2.3.1设备容量肯定 (2)2.3.2需用系数的含义 (3)2.3.3本系统的负荷计算 (3)2.3.4原始资料 (5)2.4.1计算负荷: (9)2.4.2全矿负荷统计 (13)无功功率的补偿 (13)主变压器的选择 (15)2.6.1主变压器容量的肯定 (15)2.6.2主变压器台数的肯定 (15)全矿总负荷的计算 (16)2.7.1变压器损耗计算 (16)2.7.2全矿总负荷 (16)第三章电气主接线的设计 (17)电气主接线的概述 (17)电气主接线的设计原则和要求 (17)3.2.1电气主接线的设计原则 (17)3.2.2电气主接线设计的大体要求 (18)电气主接线方案的比较 (19)第四章短路电流的计算 (22)短路电流计算的一般概述 (22)4.1.1短路的原因 (22)4.1.2短路的危害 (22)4.1.3短路的类型 (23)短路电流计算 (23)第五章电气设备的选择与校验 (29)高压电器设备选择的一般原则 (29)5.1.1按正常工作条件选择高压电气设备 (30)5.1.2按短路条件校验 (31)电气设备的选择和校验 (32)5.2.1高压断路器的选择和校验 (32)5.2.2低压隔离开关的选择和校验 (33)5.2.3电流互感器的选择及校验 (34)5.2.4母线 (35)5.2.5高压开关柜的选择 (37)第六章导线的选择与敷设 (39)导线选择的条件 (39)电缆型号的含义 (39)导线截面的选择 (40)电缆的选择与计算 (41)第七章主变压器的继电保护 (44)继电保护的任务和大体要求 (44)保护的装设原则 (45)7.2.1电力变压器应装设的保护装置 (45)7.2.2保护形式 (45)7.2.3变电所的室内外布置 (50)第二部份采区变电所 (52)第一章采区变电所的负荷统计 (52)第二章变压器的选择 (54)变压器的选择 (54)第三章采区电缆的选择 (57)电缆型号的肯定 (57)3.1.1电缆选择的大体原则 (57)3.1.2型号的肯定 (57)电缆截面的选择 (57)3.2.1采区变电所6kv电源,电缆的选择 (57)3.2.2按长时允许电缆流校验电缆截面: (58)3.2.3按电压损失校验。
【精品】煤矿采区供电系统设计设计

矿业工程学院毕业设计题目:某C煤矿采区供电设计专业:采矿工程作者:袁龙龙指导老师:曹金燕摘要本设计初步设计了煤矿地面35kV变电系统.用需用系数法进行全矿负荷计算,再进行无功率补偿,根据补偿后的负荷结果确定出该站主变压器的台数、容量及型号。
对供电系统进行了短路电流计算,选择了电缆型号及长度,制定了矿井变电所的主结线方式、运行方式、继电保护、防雷与接地保护方案。
选择了断路器、隔离开关、继电器、变压器等电气设备,绘制了供电系统图。
对矿山企业进行可靠、安全、经济、合理的供电,对提高经济效益及保证安全生产方面都十分重要。
关键字:负荷计算;负荷统计;变电站;运行方式;经济;安全AbstractThedesignofthecoalmineground35kVsubstationdesign。
Accordingtotheresultsofloadcalculation,themaintransformerofthesubstationisdeterminedbytheloadstatisticsof35KVsubst ation。
.Theshort-circuitcurrentforpowersupplysystemiscalculated,andthemainknotlinemode,operationmodeandrelayprotectionschemeofthesubstation areformulated.。
Selectthecircuitbreaker,isolatedswitch,relay,transformerandotherelectricalequipment.Itisveryimportantforthemineenterprisetocarryonthereliable,safe,economicalandreasonablepowersupply,whichisveryimportanttoimprovetheeconomicbenefitandguaranteethesafety。
- 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
- 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
- 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。
摘要
本设计初步设计了煤矿地面35KV变电所的设计。
其设计过程主要包括负荷计算、主接线设计、短路计算、电气设备选择、防雷与接地等。
通过对煤矿35KV变电所的负荷统计,用需用系数法进行负荷计算,根据负荷计算的结果确定主变压器的台数、容量及型号。
用标幺值法对供电系统进行短路电流计算,为电气设备的选择及校验提供了数据。
根据煤矿供电系统的特点,制定了矿井变电所的主接线方式、运行方式。
其中35KV侧为全桥接线,6KV主接线为单母分段接线。
两台主变压器采用分列运行方式。
并根据电流整定值以及相关数据,选择了断路器、隔离开关、互感器等电气设备,并进行校验。
关键词:负荷计算;短路计算;变电所;运行方式
Abstract
The coal mine ground 35KV transformer substation was designed. Design process is mainly including load calculate, the design of main electrical connection, short out calculate, electric equipment choose,lightning protection and grounding, etc. According to load statistics and the result of load calculation determine the quantity ,capacity and mode of the main voltage transformer .According to the characteristic of the coal electric system determine the main electrical connection and operation mode of the ground transformer substation .The side of 35KV is Full –bridge Connection and the bus of 6KV is single bus section .The two voltage transformers adopt the mode of split run .And according to the check–up of whole definite value and relevant data of the electric current , have chosen such electric equipment as the relay, voltage transformer ,etc.
Keywords:Load calculation; short-circuit calculation; substations; operation mode
目录
1概述 (1)
1.1矿井简介 (1)
1.2十二矿供电系统简介 (1)
1.3原始负荷资料 (1)
2负荷计算 (3)
2.1负荷计算目的 (3)
2.2负荷计算方法 (3)
2.3负荷计算过程 (5)
2.3.1各用电设备组负荷计算 (5)
2.3.2各低压变压器的选择与损耗计算 (10)
2.3.3计算6KV母线上补偿前的总负荷并初选主变压器 (12)
2.3.4功率因数补偿与电容器柜的选择 (12)
3变电所主变压器的选择与校验 (15)
3.1变压器选择原则 (15)
3.2变压器选择计算 (15)
3.3变压器的损耗计算 (16)
3.4 35KV侧全矿负荷计算及功率因数校验 (16)
3.5变压器经济运行方案的确定 (17)
4电气主接线设计 (18)
4.1对电气主接线的基本要求 (18)
4.2本所电气主接线方案的确定 (18)
4.2.1电源进线与主接线 (18)
4.2.2负荷分配 (19)
5短路计算 (21)
5.1短路电流计算的目的 (21)
5.2三相短路计算的方法与步骤 (21)
5.3短路电流计算过程 (21)
5.3.1选择计算各基准值 (23)
5.3.2计算各元件的标幺电抗 (23)
5.3.3计算各短路点的短路参数 (24)
5.4短路参数汇总表 (28)
6高压电气设备选择 (29)
6.1高压电气设备选择原则 (29)
6.2 35KV电气设备选择及校验 (30)
6.2.1高压断路器的选择 (30)
6.2.2隔离开关的选择 (31)
6.2.3电流互感器的选择 (32)
6.2.4电压互感器的选择 (33)
6.2.5 35KV避雷器的选择 (33)
6.3 6KV电气设备选择 (34)
6.4电力线路的选择 (39)
6.4.1 35KV输电线路及母线的选择与校验 (39)
6.4.2 6KV电缆及架空线的选择 (40)
6.4.3电力线路选择计算汇总表 (47)
7防雷与接地 (48)
7.1 雷电过电压的保护 (48)
7.2 接地装置 (49)
7.2.1 接地装置的分类 (49)
7.2.2接地装置的布置 (50)
总结 (51)
参考文献 (52)
致谢 (53)
1概述
1.1矿井简介
本矿井为年产150万吨的矿井,三水平可采储量为3108.4万吨,考虑
1.3的备用储量系数,三水平的服务时间为15.9年。
年平均气温为15C ︒,
最高气温为42.3C ︒,最低气温为15C ︒-,土壤最高温度30C ︒。
1.2十二矿供电系统简介
目前十二矿工业场地有一座35KV 变电所,共有四回35KV 供电电源,其中来自平煤集团矸石电厂的两回35KV 电源作为主供电源,长度为320m ;来自十矿地面变电所的两回35KV 电源作为备用电源,长度为2.3km 。
正常情况下,只允许十二矿使用矸石电厂的电源,只有在矸石电厂停止供电的情况下,才允许十矿地面变电所向十二矿供电,而且只能保证十二矿的矿井通风、排水、提升等安全用电,不准许十二矿生产。
平煤集团矸石电厂位于十二矿西北方向约200m 处,装机容量为3x6MW ,发出的电力扣除厂用电及十二矿用电外全部通过联网线送向月台35KV 变电站。
月台35KV 变电站通过35KV 输电线路与贾庄110KV 变电站联接。
因此平煤集团矸石电厂的35KV 电源安全、可靠。
1.3原始负荷资料
负荷资料见表1-1全矿电力负荷统计表。
表1-1 全矿电力负荷统计表
设备名称电压
(V)
电机
类型
单机容
量(KW)
安装台
数/工
作台数
工作设
备总容
量(KW)
需用
系数
()
d
K
功率因
数
cos
离变电
所的距
离()
km
主井
提升
6000 Y 1200 1/1 1200 0.90 0.85 0.30
副井
提升
6000 Y 800 1/1 800 0.85 0.82 0.15
主扇
风机
6000 T 1000 2/1 1000 0.85 -0.90 1.50
压风
机
6000 T 250 4/2 500 0.80 -0.90 0.32
矿综
合厂
380 320 0.65 0.75 0.50
机修
厂
380 580 0.55 0.78 0.20
洗煤
厂
380 650 0.72 0.77 0.47
地面
低压
380 750 0.72 0.76 0.05
主排
水泵
6000 X 500 5/3 1500 0.88 0.85 0.65
一采
区
6000 850 0.65 0.70
二采
区
6000 950 0.70 0.76
井底
低压
660 2378 0.70 0.756
工人
镇
380 550 0.85 0.81 2.2 支农380 330 0.82 0.85 2.6 注电机类型:Y表示绕线异步;X表示鼠笼异步;T表示同步。