水利水电工程标准施工招标文件技术标准和要求合同技术条款2009年版

(项目名称)(标段名称) 招标文件 (合同编号:) 第二卷技术标准和要求(合同技术条款) 招标人:(盖单位章) 年月日

目录 第1章一般规定 (1) 1.1工程说明 (1) 1.2主体工程项目及其工作内容 (1) 1.3发包人提供的施工图纸和文件 (2) 1.4承包人提交的文件 (3) 1.5发包人提供的材料和工程设备 (5) 1.6承包人提供的材料和设备 (6) 1.7进度计划的实施 (7) 1.8工程质量的检查、检验和验收 (9) 1.9验收 (10) 1.10工程量计量 (11) 1.11引用技术标准和规程规范的规定 (11) 1.12工程保险 (12) 1.13工程价款支付方法 (12) 第2章施工临时设施 (14) 2.1一般规定 (14) 2.2现场施工测量 (15) 2.3现场试验 (15) 2.4施工交通 (15) 2.5施工供电 (15) 2.6施工供水 (16) 2.7施工供风 (16) 2.8施工照明 (16) 2.9施工通信和邮政服务 (16) 2.10砂石料场开采加工系统 (17) 2.11混凝土生产系统 (17) 2.12临时工厂设施 (18) 2.13仓库和堆、存料场 (18) 2.14弃渣场 (18) 2.15临时生产管理和生活设施 (18) 2.16计量和支付 (19) 第3章施工安全措施 (22) 3.1一般规定 (22) 3.2施工安全措施 (23) 3.3应急救援措施 (25) 3.4计量和支付 (26) 第4章环境保护和水土保持 (27) 4.1一般规定 (27) 4.2施工环境保护 (29)

4.4水土保持 (31) 4.5环境清理 (31) 4.6环境保护工程的验收 (32) 4.7计量和支付 (33) 第5章施工导流工程 (35) 5.1一般规定 (35) 5.2施工期导流控制标准 (37) 5.3截流 (37) 5.4导流建筑物施工 (38) 5.5基坑排水 (38) 5.6安全度汛和排冰凌 (39) 5.7下闸封堵和下游供水 (39) 5.8施工期临时通航 (39) 5.9质量检查和验收 (39) 5.10计量和支付 (40) 第6章土方明挖 (42) 6.1一般规定 (42) 6.2场地清理 (43) 6.3土方开挖 (43) 6.4施工期临时排水 (44) 6.5土料场和砂砾料场开采 (45) 6.6开挖渣料的利用和弃渣处理 (45) 6.7检查和验收 (46) 6.8计量和支付 (47) 第7章石方明挖 (48) 7.1一般规定 (48) 7.2钻孔与爆破 (49) 7.3石方明挖 (50) 7.4施工期临时排水 (50) 7.5堆渣场地和渣料利用 (50) 7.6石料场 (51) 7.7质量检查和验收 (51) 7.8计量和支付 (53) 第8章地下洞室开挖 (54) 8.1一般规定 (54) 8.2施工期补充勘探 (56) 8.3地下洞室与洞群的开挖和支护 (56) 8.4钻孔与爆破 (57) 8.5开挖面的规格 (58) 8.6开挖面清理 (58)

安全技术规范最新版

第一章:生产厂房和生产工作场所的安全要求 1.生产厂房内外必须保持清洁完整。 2.在楼板和结构上有孔或在规定地点以外安装起重滑车或堆放重物等,必须事先经过有基建技术部门的审核许可。规定放置重物及安装滑车地点应有的明显的标记(标出界限和荷重限度)。 3. 禁止利用任何管道悬吊重物和起重滑车或进行铆焊操作。 4. 生产厂房内工作场所的井,坑,孔,洞或沟道,必须覆以与地面齐平的坚固盖板。 在修工作中如需将盖板取下,必须设临时围栏,临时打的孔,洞,施工结束后,必须恢复原状。 5 所有升降口,大小孔,洞,楼梯和平台,必须装设不低于1050毫米高栏杆和不低于 100毫米高的护板,如在维修期需要将栏杆拆除时,必须装设临时遮拦,并在检修结束时将栏杆立即撤除。 6. 所有楼梯,平台,通道,栏杆都应保持完整,铁板必须铺设牢固,铁板表面应有纹 路以防滑跌。 7. 门口,通道,楼梯和平台等处,不准放置杂物,以免阻碍通行,地板上临时放有容 易使人绊跌的物件时,必须设置明显的警告标志。地面有矿浆泥污,应及时清除,以防滑跌。 8. 生产厂房内工作场所的常用照明,应该保证足够的亮度。在装有水位计,压力表等 各种记录仪表等的仪表盘,楼梯,通道以及所有靠近机器转动部分和高温表面的狭窄地方的照明,必须要光亮充足。 9. 生产厂房及仓库应备有必要的消防设备。例如:消防栓,水龙带,灭火器,砂箱石 棉布和其他消防工具等。消防设备应定期检查和试验,保证随时可用,不准将消防工具移作他用。 10. 禁止在工作场所存储易燃物品,例如油漆,汽油,丙酮,香蕉水,酒精等。设备运 作中所需小量的润滑油和日常需用的油壶,油轮,必须存放在指定地点的储藏密室。 11. 对存储易燃物品和残留易燃物品,指定地点的库房场所必须备有必要的消防设备, 周边禁止电焊,气割,碳弧气刨,砂轮打磨,切割等明火作业。 12. 对存有残钛(铝,镁,锆等),钛(铝,镁,锆等)屑等易燃物品的场所,必须备有 砂箱,5米内禁止电焊,气割,碳弧气刨,砂轮打磨,切割等明火作业。确因工作需用必须做好防火安全措施。一旦着火严禁用水或灭火器灭火,只能用土或沙覆盖着火层使其与空气隔离进行灭火。 13. 生产厂房应备有带盖的铁箱,以便放置擦拭材料(带易燃液体或油污的抹布和棉纱 头等)用过的擦拭材料应另放在废棉沙箱内,定期清除销毁。 14. 油管应尽量少用法兰盘连接,在热件附近的法兰盘,必须装金属罩壳,禁止使用塑 料垫或皮垫。 15. 生产厂房内的电缆,进入控制室,控制柜,开关柜等处的电缆孔洞,必须用防火防 水材料。材料严禁封闭。 16. 生产厂房内的下水管路应保持畅通,无漏水现象,排水沟道应保证流畅,无堵塞状 况,沟道中的沉淀杂物污泥要定期清理干净。 17.生产厂房内的屋顶面,应定期进行检修维护,发现屋顶滴漏现象要立即进行维修整治。 18. 生产厂房内的通风除尘设备和装备,应由专人管理,定期检查保养。保证生产场所 通风明亮。 19.厂房必须定期检查,厂房的结构应无倾斜,裂纹,风化,下榻的现象,门窗及各项设施

《施工现场临时用电安全技术规范》

本页为作品封面,下载后可以自由编辑删除,欢迎下载! 精品文档 1 精品word 文档、可以自由编辑!】 建设部关于发布行业标准 《施工现场临时用电安全技术规范》的公告 第322 号 现批准《施工现场临时用电安全技术规范》为行业标

准,编号为JGJ46-205 ,自2005 年7 月1 日实施。其中,第1.0.3 、3.1.4 、3.1.5 、3.3.4 、5.1.1 、 5.1.2 、5.1.10 、5.3.2 、5.4.7 、 6.1.6 、6.1.8 、 6.2.3 、6.2.7 、 7.2.1 、7.2.3 、 8.1.3 、8.1.11 、8.2.10 、8.2.11 、8.2.15 、8.3.4 、 9.7.3 、 10.2.2 、10.2.5 、10.3.11 条为强制性条文,必须严格执行。原行业标准《施工现场临时用电安全技术规范》 JGJ46-88 同时废止。 本标准由建设部标准定额研究所组织,中国建设工业出版社出版发行。 中华人民共和国建设部 2005 年4 月15 日 中华人民共和国行业标准

施工现场临时用电安全技术规范 JGJ 46-2005 J 405-2005 1总则 1.0.1 为贯彻国家安全生产的法律和法规,保证施工现场用电安全,防止触电和电气火灾事故发生,促进建设事业发展,制定本规范。 1.0.2 本规范适用于新建、改建、扩建的工业与民用建设和市政基础设施施工现场临时用电工程中的电源中性点直接接地的220V/380V 三相四线制低压电力系统的设计、安装、使用、维修和拆除。 1.0.3 建筑施工现场临时用电工程专业的电源中性点直接接地的 220V/380V三相四线制低压电力系统,必须符合下列规定: 1采用三级配电系统; 2采用TN-S 接零保护系统; 3采用二级漏电保护系统。 1.0.4 施工现场临时用电,除应执行本规范的规定外,尚应符合国家现行有关强制性标准的规定。 2术语、代号 2.1术语 2.1.1低压 交流额定电压在1KV及以下的电压。 2.1.2高压 交流额定电压在1KV以上的电压。 2.1.3外电线路施工现场临时用电工程配电线路以外的电力线路。 2.1.4有静电的施工现场存在因摩擦、挤压、感应、接地不良等而产生对人体和环境有害静电的施工现场。 2.1.5强电磁波源辐射波能够在施工现场机械设备上感应产生有害对地 电压的电磁辐射波。 2.1.6接地设备的一部分为形成导电通路与大地的连接。 2.1.7工作接地 为了电路或设备达到运行要求的接地。 2.1.8重复接地设备接地线上一处或多处通过接地装置与大地再次连接 的接地。

简述信息化系统在水利技术标准管理工作中的应用 黄沃循

简述信息化系统在水利技术标准管理工作中的应用黄沃循 摘要:随着现代信息技术的发展和优良功能的作用,更加重视信息化系统在相 关产业或行业的使用,逐步推进信息技术在水利管理工作中的应用,可以改变落 后的管理手段,有效地提高水资源管理水平,提高管理能力。结合实践和其他部 门的经验,简述了信息技术在水利管理中的内容和应用。 关键词:信息;水利工程;应用 前言:在这样的竞争和充满风险的市场中,企业不断扩大生产规模,提高核 心竞争力,逐步提高企业素质,逐步提高管理水平,牢牢把握市场脉搏,调整其 生产销售模式。另外,要适应市场经济的变化,我们应该利用现代管理手段,建 立适合市场需求的企业管理体制。目前,一些先进企业已开始探索和应用计算机 控制和辅助管理系统进行水利施工组织和管理。随着水利行业计算机应用技术水 平的不断提高,计算机技术应用也逐渐成熟,利用信息技术改造传统建筑企业已 成为必然。 1、水利管理现状 新中国成立以来,社会经济和民生发展对水利建设有很多需要,水利得到高 度的重视,并形成了比较完善的体系,农田水利基本能满足农业生产用水需求, 结合防洪工程高标准的工程设施,保障人民生活的稳定和社会发展的稳定。近年来,各级政府高度重视水利工作,不断加大对水利工程的投资力度,不断更新和 改造水利设施。但由于各方面的原因,在水利工程管理中存在诸多问题,较为常 见的是粗放的管理水平,技术落后,水利工程不能充分发挥水利的作用,削弱了 给社会的发展和经济效益做出的贡献。落后的绩效管理技术的自动化、信息化程 度低,管理手段落后,甚至还停留在手工或半机械化操作水平;防洪决策仍然是 在书面水平;采集基本数据读仍采用手工测量传输;没有真正实现自动化和无纸化。信息技术在水利管理中的应用有助于水利事业快速、科学、规范化、制度化,进一步提高管理水平和技术水平。 2、水利信息技术的内容 水利相关相关部门的管理,具有很强的性,信息技术在水利工程管理中的应 用是一项复杂的系统工程,在PLC技术平台的支持下,建立和完善水利信息管理 系统。根据水利行业的特点,可以构建以下六大内容。 2.1信息采集与控制系统 主要包括数据采集系统、数据通信系统、数据控制系统和数据处理系统等。 它可以采集分散的数据信息,集中分析处理数据,进行统一的操作和控制。原来 的分布式数据信息采集和处理已经改变。同时,在现有的数据处理中加入了更多 的控制方法,可以实现设备的远程人工智能操作。远程数据采集与控制系统是基 于主数据,基于简单的单片机分析和收集信息,然后通过标准的串行接口发送到 上位机,通过上位机的整体分析,向下位机发送控制信息,按照相应的项目运作 方案,建立预警机制来控制项目进度并采取适当的急救操作措施。 2.2计算机网络与安全系统 计算机网络的安全问题越来越受到人们的重视。网络安全不仅是一个技术问题,也是一个安全管理问题。我们必须考虑到影响安全的各种因素,制定科学合 理的目标,并加以有效实施,为计算机网络提供强有力的安全服务。这对网络安 全的要求越来越高,也使得网络安全的地位越来越重要。网络安全必然随着网络 应用的发展而增长。根据计算机网络的特点、安全技术和相应的防范措施,对计

水利行业标准管理办法

年月号文发布 年月 年月起实施 水利行业标准管理办法 总则 对下列需要统一的技术要求应当制定标准 国家标准和行业标准 标准化工作的管理 为加强标准化工作管理成立水利部标准化委员 部标准化委员会由部总工程师担任主任委员设副主任委员一人委员由有 负责组织与管理有关的标准化 水利部标准化委员会的主要职能

部标准化委员会办公室的主要任务 办理水利行业标准报送国家技术监督局与建设部 认真总结生产建设的实践经验和科学研究成果博采

下列标准属于强制性标准 通用的试验方法和检验方法标准 标准的征求意见稿 并在此基础上广泛征求意征求意见稿 征求意见结束应整理意见汇总处理表 标准的送审稿征求意见稿 修改补充撰写成标准送审稿条文说明及意见汇总处理表等根据情况确定对标 由水利部为第一主管部门的水电 由水利部作为第一主管 部门的技术标准能源部应派员参加 单位的代表 汇总处理表 其所在单位的代表不能超过参加表决者的四

采用函审方式审查标准时应按以下规定办理 在函审结束时应填写函审单 标准的报批稿送审稿并应符合以下要求 产品国家标准及行业标准的报批稿应按国家技术监督局现行的 国家标准与行业标准报批稿如不一致应对改 标准的报批程序应按以下规定办理 送部标准化委员会主任 委员审核 含 议纪要意见汇总处理表或函审结论及其函审单一式三份经 送标准化委员会主任委员审核 水利部为第一主管部门的 制性或推荐性建议交部标准化委员会办公室登记编水利行业代号 两部有关司局会签 标准实施后 技术归口单位应提出复审报告 强制性行业标准编号

推荐性行业标准编号 标准实施过程中的总结材料 标准的实施与管理 强制性标准一经发布就是技术法规任何单 位和个人对违反标准的 凡不按强制性标准 设计和施工的工程不予验收推荐性标准鼓励 了解和收集标准的执行情 各种标准均属科技成果 从国外引进的先进技术和重要设备 经上级主管部门 审查同意 水利行业标准的出版发行要求如下 根据标准出版的有关规定统一要求统一格式 标准化经费 标准化经费应专款 由国务院标准化行政主管部门及有关行政主

施工临时用电安全技术规范(正式版)

施工临时用电安全技术规范 Through the process agreement to achieve a unified action policy for different people, so as to coordinate action, reduce blindness, and make the work orderly. 编制:___________________ 日期:___________________

施工临时用电安全技术规范 温馨提示:该文件为本公司员工进行生产和各项管理工作共同的技术依据,通过对具体的工作环节进行规范、约束,以确保生产、管理活动的正常、有序、优质进行。 本文档可根据实际情况进行修改和使用。 一、总则 为加强施工现场的安全管理, 保障正常的供、用电秩序, 保证项目部施工用电管理规范化、制度化, 根据《中华人民共和国电力法》、《全国供用电管理规定》、《电力供应与使用条例》、《供用电监督管理办法》和《施工现场临时用电安全技术规范》等, 特规定本办法。 二、施工现场临时用电技术、组织管理 1 技术措施 (1)临时用电系统采用TN-S供电系统。 它是把工作零线N和专用保护线PE在总供电电源处严格分开的供电系统, 也称三相五线制。它的优点是正常情况下PE专用保护线上无电流, 此线专门承接故障电流, 确保其保护装置动作。应该特别指出, PE线不许断线。在距离较远的供电干线末端应将PE线做重复接地。 (2)设置漏电保护器, 坚持三级保护和一机一闸、一漏一箱的原则。 漏电保护器的选择应符合国标GB6829―86《漏电电流动作保护器(剩余电流动作保护器)》的要求。施工现场的总配电箱和分配电箱应至少设置两级漏电保护器, 而且两级漏电保护器的额定漏电动作电流和额定漏电动作时间应合理

安全技术标准、规范和操作规程管理制度参考文本

安全技术标准、规范和操作规程管理制度参考文本 In The Actual Work Production Management, In Order To Ensure The Smooth Progress Of The Process, And Consider The Relationship Between Each Link, The Specific Requirements Of Each Link To Achieve Risk Control And Planning 某某管理中心 XX年XX月

安全技术标准、规范和操作规程管理制 度参考文本 使用指引:此管理制度资料应用在实际工作生产管理中为了保障过程顺利推进,同时考虑各个环节之间的关系,每个环节实现的具体要求而进行的风险控制与规划,并将危害降低到最小,文档经过下载可进行自定义修改,请根据实际需求进行调整与使用。 1、有关安全生产的安全技术标准、规范和操作规程及 公司内部的规程制度等,都是确保安全生产和重要文件资 料,企业全员都要认真贯彻执行,并由安全科专人负责管 理归档。所有的文件资料应登记、编号保存。项目部的文 件资料由项目部安全员负责登记、编号保存。 2、安全管理科应做好文件资料的宣传、贯彻执行、收 发、归档等工作,并做好收发记录,项目部安全员做好收 文记录工作。 3、做好新老规范、文件的交换工作,新的法律、法 规、规范、规程、规章制度出台后,旧的应上报封存或销 毁,不得再使用。

4、做好规范、文件的外借工作,外借文件按规范登记,写明归还日期,以免影响他人借阅。 5、做好规范、文件的防火、防虫、防灾等的保存工作,以免损坏。 请在此位置输入品牌名/标语/slogan Please Enter The Brand Name / Slogan / Slogan In This Position, Such As Foonsion

施工现场临时用电安全技术规范(JGJ46-2005)

中华人民共和国行业标准 施工现场临时用电安全技术规范 Technical code for safety of temporary electrification on construction site JGJ 46-2005 J 405-2005 批准部门:中华人民共和国建设部 施行日期:2005年7月1 日 中华人民共和国建设部公告 第322号 建设部关于发布行业标准 《施工现场临时用电安全技术规范》的公告 现批准《施工现场临时用电安全技术规范》为行业标准,编号为JGJ 46-2005,自2005年7月1日起实施;其中,第l.0.3、3.l.4、3.1.5、3.3.4、5.1.l、5.1.2、5.l.10、5.3.2、5.4.7、6.1.6、6.l.8、6.2.3、6.2.7、7.2.l、7.2.3、8.1.3、8.1.11、8.2.10、8.2.11、8.2.15、8.3.4、9.7.3、10.2.2、10.2.5、10.3.11条为强制性条文,必须严格执行。原行业标准《施工现场临时用电安全技术规范》JGJ 46-88同时废止。 本标准由建设部标准定额研究所组织中国建筑工业出版社出版发行。 中华人民共和国建设部 2005年4月15 日 1 总则 1.0.1为贯彻国家安全生产的法律和法规,保障施工现场用电安全,防止触电和电气火灾 事故发生,促进建设事件发展,制定本规化。 1.0.2 本规范运用于新建、改建和扩建的工业与民用建筑和市政基础设施施工现场临时用 电工程中的电源中性点直接接地的220/380V三相四线制低压电力系统的设计、安装、使用、维 修和拆除。 l.0.3 建筑施工现场临时用电工程专用的电源中性点直接接地的220/380V三相四线制低压 电力系统,必须符合下列规定: 1 采用三级配电系统; 2 采用TN-S接零保护系统; 3 采用二级漏电保护系统。 1.0.4 施工现场临时用电,除应执行本规范的规定外,尚应符合国家现行有关强制性标准 的规定。 2 术语、代号 2.1 术语 2.1.1低压low voltage 交流额定电压在1kV及以下的电压。 2.1.2高压high oltage 交流额定电压在1kV以上的电压。 2.1.3 外电线路external circuit 施工现场临时用电工程配电线路以外的电力线路。

水利工程技术标准和要求

probl ems that cannot be ignored. Some lea ders unwilling t o do masses w ork, masse s concept weak, on masses feeli ngs not deep, pe ndulum not are with masses of relationshi p, thi nk masses w ork is rev oluti onary w ar era of thi ngs, now obsolete ha s, buried busine ss w ork, ig nore d masse s work of situation compare d Ge neral; some lea ders not do ma sses work, old met hod regardl ess of with, new not with, not understand masse s psychologi cal, not understand masse s wishes, not sai d masse s lang uage, w ork method simple stiff, cause d masse s of conflict and anti pathy; some lea ders can't do masses w ork, Face d with a lot of contradi ctions among the pe ople worry a bout fear, pani c set i n e ncounter group eve nts, a nd some are even misma naged, inflame, so w ork ha s suffered heavy l osse s, a nd so on. These pr oblems we are soberly aware, enhancing t he party's ruli ng ca pability, the maintenance and development of the party's adva nce d nat ure a nd purity, and to enhance the ability of part committees and leadi ng ca dres are good people. Attach great importance to a nd is g ood at doi ng mass w ork, has become the new urgent situati on stre ngthe ning t he party's gov erning capa city-buil ding task s. Combined pra ctice of maintaini ng flesh-and-blood ties with the masses, urged the broad masses of party members and ca dres, espe cially all levels ... Pr oce ssing t o improve a s a guide to the country. "" What I di d is summed up these new things, be pr omoted. "This is a vivi d manifestation of the De ng Xia opi ng's mass. De ng also put people "support does not su pport", "agreed not to agree", "happy happy", "promise not to pr omise" as a starting poi nt and desti nation of devel opi ng guid eline s, policie s, and as the only standard for measuri ng complia nce wit h the wi she s of the masses of the people. Under the gui dance of De ng Xi aoping the ory, Central Governme nt adopted a series of important measure s to stre ngthen li nks wit h the masses. In De cember 1989, t he CPC Ce ntral Committe made on a dhering to and perfecti ng the system of multi-party cooperati on a nd politi cal consultation under t he leadershi p of the Chi nese Communist Part y, cl osely for CPC and t he dem ocrati c parties and the relati onship betwee n the part of the masses t hat they conta ct, effectively carryi ng out t he mass line, played a positive role. In March 1990, t he 13 ple nary session adopte d the deci sion on strengtheni ng contacts with the masses of the Party noted t hat "created a nd developed in the long struggle of the party's mass line, is to real ize the party's ideol ogical li ne, t he fundamental politi cal and organizational w ork route", can al ways maintain fle sh-and-blood ties and devel opme nt of the masses, is directly relate d to the rise a nd fall of the ri se a nd fall of the party and State. In Se ptember 1994, 14 adopted by the ple nary session of the Party on strengthe ning decision on several major issue s of party buil ding. The requirements of the decisi on of the party's leadi ng bodie s and leadi ng ca dres should develop a dem ocratic styl e of work, come from the masse s, to the masses, t ogethe r, stick to t he mass li ne. Party of 13 sessi on four in the ple nary yihou, to Jia ng comra de for core of party (1)2000年颁发的《水利水电工程施工合同和招标文件示范文本下册"技术条款"》(GF 2000--0208)(以下简称原范本)实施10年来,已在水利水电工程建设领域广泛应用。它对水利水电工程的施工招标、工程合同管理以及施工质量控制起到了良好的作用。不少建设、设计、监理、施工和科研等单位在工程招投标、建设管理和施工实践过程中,对原范本有关内容提出了不少改进意见。因此,需要对原范本的内容进行更薪完善。 (2)随着我国建设管理体制的改革、科学技术进步、施工装备水平的提高、国外先进技术的引进,以及我国很多大中型水利水电工程的建设和投入运行,积累了极其丰富的施工技术经验,提供了新的科学数据。再加上近几年来,原颁布的许多国家与行业标准及规程规范的修订再版,迫切需要更新原范本的技术条款内容,以适应当前水利水电工程建设发展的需要。 (3)《水利水电工程标准施工招标文件技术标准和要求(合同技术条款)》(2009年版)(以下简称新技术条款)将原范本技术条款第1章分解为"一般规定"、"施工临时设施"、"施工安全措施"、"环境保护和水土保持"四章。第1章"一般规定"除具体划分发包人和承包人各自的工作责任外,还详细说明发包人进行合同管理的工作内容、工程验收程序和合同的计量支付规则;第2章"施工临时设施"说明发包人与承包人对建设施工临时设施的分工,以及施工临时设施的工作内容;第3章"施工安全措施"提出承包人应承担的施工安全责任和应采取的安全措施;第4章"环境保护和水土保持"强调承包人应遵守的国家法律、法规,以及要求承包人采取的环境保护和水土保持措施;第5~24章则按专业工程的施工顺序和不同的施工技术内容,以大型水利水电工程各类建筑物的施工为基本目标,并按各专业工程技术独立成章的方式,根据国家与行业新颁布的标准及规程规范,修编各章的施工技术内容。 (4)施工招标文件的主要任务是根据国家法律法规确立的公开、公正、公平和诚实信用原则,制定招投标的工作规则,以及约定合同双方的责任、权利和义务。而技术条款则是针对具体工程项目,将合同双方的责任、权利和义务延伸为实物操作内容,通过指导招标文件编制人员对技术标准的引用。新技术条款旨在指导工程项目编制好安全、经济的项目实物标准,通过合同约定的支付规则以及施工监理,以期有效地按合同要求进行监督管理,确保工程的质量和安全。 f third generati on Central led coll ective, banner De n g Xia o-ping's the ory great flag, insiste d liberation t hought, and facts, a nd times, i n bot h at home and abr oad polit i cal storm, a nd e conomic ri sk, severe test before, relie s on party and pe opl e, defende d Chi na features S ociali st, created socialist market new system, created full open new sit uation, adva nce party of construction new of great engineering, founded "thre e a representative" importa nt thought, Conti nue t o steer the shi p of reform and ope ning up forwar d on the right. Comrade Jiang Zemin said: "stre ngthe ning a nd impr oving the part y's mass work in t he new situati on, it is of de cisive significa nce t o consolidati ng the r uling Foundation of the party. "Thr oug h our party and some of the worl d's major lessons learne d from the success of the old party of the party, Comra de Jiang Zemin poi nted out:" the biggest political a dv antage of our party is in close conta ct with the ma sses, t he most danger ous after the ruli ng party was divorce d from the masses. "He sai d:" our reform and construction, only the understanding, support and partici pation of the people, people's e nthusiasm a nd creativity into full play in order to a dvance; t he leadershi p of the party, only t he tie and wi n the masses embra ced, can be consoli dated a nd stre ngthe ne d. "He pointed out t hat strengtheni ng and improvi ng the party's work style construction, maintai ning the party's flesh-a nd-bl ood ties wit h the masses is t he core pr oblem, t he key is to do soli d work, im plement, resolutely oppose and over come formalism. Comrade Jia ng Zemin stressed t hat all the work and policie s of the party, are i n complia nce with the f undamental intere sts of the overwhelming majority of the pe opl e to the highe st degree, t o the maj ority of pe ople are not satisfied wit h the fundame ntal gui deline s, strive to make our w orkers, farmers, intelle ctual s and ot her pe opl e enjoy ... Si ngle, everyone seemed to k now. But w ell known doe s not mea n perfe ct. Some party members and lea ding cadres, consi der contacti ng their small de partments, within a small cir cle of people, or contact i ndivi dual owners, the entrepre ne ur, is t he masses, thi s ide a is obviously not correct. T he Communist Party of China, pe ople shoul d have t hree characteristi cs. First, the people should be the most social, is a Department withi n the scope of the majorit y. Specific to the party a nd Governme nt de partments, e spe cially the cadre s worki ng in t he Ce ntral and State organs, mass i s the 1.3 bill ion Chi nese pe ople, work for the party members and cadre s, masse s are the l and withi n the jurisdicti on of the common people. T he se cond chara cteristic of the masses, is t hat we have common interest s. Masses are manifestations of each specific people, but t he cr owd is a comprehe nsive politi cal concept, refers to pe opl e with common political a nd e conomi c interests i n the period of social transformation, social differentiation between t he intere sts of the masses i s large, if you do not find the i nterest i n doing mass work, t he party member s and cadre s, will be in a pa ssive positi on. T he thir d characteristi c of the masses

施工临时用电安全技术规范标准版本

文件编号:RHD-QB-K6779 (管理制度范本系列) 编辑:XXXXXX 查核:XXXXXX 时间:XXXXXX 施工临时用电安全技术规范标准版本

施工临时用电安全技术规范标准版 本 操作指导:该管理制度文件为日常单位或公司为保证的工作、生产能够安全稳定地有效运转而制定的,并由相关人员在办理业务或操作时必须遵循的程序或步骤。,其中条款可根据自己现实基础上调整,请仔细浏览后进行编辑与保存。 一、总则 为加强施工现场的安全管理,保障正常的供、用电秩序,保证项目部施工用电管理规范化、制度化,根据《中华人民共和国电力法》、《全国供用电管理规定》、《电力供应与使用条例》、《供用电监督管理办法》和《施工现场临时用电安全技术规范》等,特规定本办法。 二、施工现场临时用电技术、组织管理 1 技术措施 (1)临时用电系统采用TN-S供电系统。

它是把工作零线N和专用保护线PE在总供电电源处严格分开的供电系统,也称三相五线制。它的优点是正常情况下PE专用保护线上无电流,此线专门承接故障电流,确保其保护装置动作。应该特别指出,PE线不许断线。在距离较远的供电干线末端应将PE线做重复接地。 (2)设置漏电保护器,坚持三级保护和“一机一闸、一漏一箱”的原则。 漏电保护器的选择应符合国标GB6829―86《漏电电流动作保护器(剩余电流动作保护器)》的要求。施工现场的总配电箱和分配电箱应至少设置两级漏电保护器,而且两级漏电保护器的额定漏电动作电流和额定漏电动作时间应合理配合,使之具有分级保护的功能。漏电保护器应装设在配电箱电源隔离开关的负荷侧和分配电箱电源隔离开关的负荷侧。设备的机旁

(技术规范标准)安全技术操作标准全部

一.金属切削 1.机床工一般安全操作标准 1. 工作前按规定穿戴好防护用品。应扎好袖口,不准围围巾、戴手套,女工长发应挽在帽内,高 速切削时要戴好防护眼镜。 2.要检查设备的防护、保险、信号装置,机械传动部分、电气部分有可靠的防护装置,否则不准 开动。 3.工、夹、刀具及工件必须装夹牢固。 4. 机床开动前要观察周围动态,机床开动后,要站在安全部位,以避开机床运动部位和金属屑飞 溅。 5. 机床开动后,不准接触运动着的工件刀具和传动部分。禁止隔着机床转动部分传递或拿取工具 等物品。 6. 调整机床速度、行程、装夹工具和刀具,以及擦拭机床时都要停车。 7. 机床导轨面上,工作台上禁止放工具或其他东西。 8. 不准用手直接清除金属屑,应使用专门工具清扫。 9. 凡两人或两人以上在同一台机床上工作时,必须有一人负责安全统一指挥,防止事故发生。使 用吊车时必须和司机配合好。 10. 发现异常现象,应立即停车请有关人员进行检查。 11.不准在机床运转时离开岗位,因故要离开时,必须停车并切断电源。 2.普通车工安全操作标准(普通、六角) 1.装卸卡盘及大的工具、夹具时,床面要垫木板,不准开车装卸卡盘,卡盘上要装有安全螺丝。 装卸工件后立即取下扳手禁止用手刹车。 2.床头小刀架,床面上不得放置工、量具或其他东西。 3.装夹工件要牢固,禁止用手捶敲打,卡盘卡爪滑丝不准使用。 4.加工细长工件要用顶针、跟刀架,顶针一般针芯滑面不得伸出全部的二分之一,床头前面伸出 部分不得超过工件直径的20~2倍、超长时,必须应用顶针或中心架。床头后面伸出超过300毫米时,必须加托架,必要时装设防护栏杆。 5.用锉刀光工件时,锉刀必须有手柄。应右手在前面,左手在后,身体离开卡盘。禁止用砂布裹 在工件上砂光。车内孔时不准用锉刀倒角。用砂布光内孔时,不准将手指或手臂伸进去打磨。 6.加工偏心工件时,必须加平衡铁,并要坚固可靠,刹车不要过猛。 7.攻丝或套丝必须用专用工具,不准一手扶攻丝架(或板梯)一手开车,机床开动时,禁止用布 或用手试横内孔,及内外螺纹等。 8.切大料时,应留有足够余量,卸下砸断,以免切断时掉下伤人。小料切断时,不准用手接。 9.机床需要变速、挂轮、修理、调节工卡具、及使用测试量具时必须停车或切断电源。 3.数控工安全操作标准 1.必须熟练设备的结构和性能。掌握正确的操作程序及维护和一级保养的职责和方法。 2.工作前穿戴好防护用品。 3.开机前检查油标是否合格,电压是否稳定。 4.开机后首先进行回零操作。

水利行业常用规范

水利行业常用规范 1、农田排水工程技术规范(SL/T4-1999) 2、小水电建设项目经济评价规程(SL16-95) 3、水利基础建设项目竣工财务决算编制规程(SL19-xx) 4、农村水电供电区电力发展规划导则(SL22-92) 5、渠系工程抗冻胀设计规范(SL23-xx) 6、水闸施工规范(SL27-91) 7、水利水电工程启闭机设计规范(SL41-93) 8、水利水电工程设计洪水计算规范(SL44-xx) 9、混凝土面板石坝施工规范(SL49-94) 10、水利水电工程施工测量规范(SL52-93) 11、水工碾压混凝土施工规范(SL53-94) 12、农村水电电力系统调度自动化规范(SL/T53-93) 13、中小型水利水电工程地址勘察规范(SL55-xx) 14、地表水资源质量标准(SL63-94) 15、水利建设项目经济评价规范(SL72-94) 16、水利水电工程制图标准基础制图(SL 73、1-95) 17、水利水电工程制图标准水工建筑图(SL 73、2-95) 18、水利水电工程制图标准勘测图(SL

73、3-95) 19、水利水电工程制图标准水力机械图(SL 73、4-2) 20、水利水电工程制图标准电气图(SL 73、5-95) 21、水利水电工程制图标准水土保持图(SL 73、6-2001) 22、防汛抗旱用图图式(SL 73、7-2003) 23、水利水电工程钢闸门设计规范(SL74-95) 24、水闸技术管理规程(SL75-94) 25、小水电水能设计规程(SL76-94) 26、小型水利发电站水文计算规范(SL77-94) 27、水工钢闸门和启闭机安全检测技术规程(SL101-94) 28、水利工程水利计算规范(SL104-95) 29、水工金属结构防腐蚀规范(SL105-xx) 30、水库工程管理设计规范(SL106-96) 31、小水电供电区农村电气化规划编制规程(SL145-95) 32、水库渔业资源调查规范(SL167-96) 33、水闸工程管理设计规范(SL170-96) 34、堤防工程管理设计规范(SL171-96) 35、小型水电站施工技术规范(SL172-96)