PMP 第二章习题
PMP项目管理PMBOK第五版第二章测试题

1.You have been assigned as project manager on what could be a "bet the company" project. If the project is successful, management will be carrying you around on a sedan chair, if it fails, you will be in the unemployment line. You realize that to be successful you need to exercise maximum control over project resources. Which form of project organization should you establish for this project?A. Strong matrixB. ProjectizedC. Project coordinatorD. Weak matrix1. 你负责管理的一个项目,这个项目对你来说是成败在此一举。
如果项目成功,那么你的前途无量;如果项目失败,那么你就要被炒鱿鱼。
你意识到: 为了使项目成功,你必须对项目资源具有最大程度的控制。
那么你预备建立哪一种项目组织形式来达到你的目的A.强矩阵B.项目型C.项目协调人D.弱矩阵2.Your project is managed under a projectized organization. It has just entered closure. Under the circumstances, which of the following should be your GREATEST concern?A. Setting yourself up to take over a large multi-year projectB. The team is not focused on completing the project.C. You will have extra pressure from the customer.D. Making sure your manager knows the project is almost completed2. 你的项目在项目型组织中执行,现在刚进入收尾阶段,在这种情形下你最应该关注的是:A.让自己能接受一个大的多年度的项目B.这个团队重心不在完成这个项目上C.你会受到来自客户的额外压力D.确定你的经理知道这个项目已几乎完成3. You have been assigned to a project in which the objectives are to direct customer calls to an Interactive Voice Response system before being connected to a live agent. You are in charge of the media communications for this project. You report to the project manager in charge of this project and the VP of marketing, who share responsibility for this project. Which organizational structure do you work in?A. Functional organizationB. Weak matrix organizationC. Projectized organizationD. Balanced matrix organization3. 你参与一个项目,该项目目标是在客户的电话在未被连接到代理之前,将其接到一个交互式的语音回应系统。
PMP-第二章习题

第二章项目生命周期与组织1.项目管理办公室对项目结果负有直接或间接的责任.以下哪个不是项目管理办公室的职责?< >A.给项目提供行政支持服务B.对项目经理进行业务培训和指导C.项目之间的人员协调 D.制定项目干系人之间的沟通计划2.下列关于项目生命周期、项目管理生命周期和产品生命周期的说法,正确的是< >.A.项目变化和发展时,项目生命周期通常随之变化和发展B.项目管理生命周期对于每个项目都是独特的C.项目管理生命周期就是项目生命周期D.典型的产品生命周期包括多个项目生命周期3.大多数项目的项目生命周期都具有以下特点< >.A.项目开始阶段,项目对资源的需求急剧增加;项目结束阶段,项目对资源的需求缓慢下降B.项目大部分的预算都花费在启动和规划阶段C.项目开始阶段,项目对资源的需求缓慢增加;项目结束阶段,项目对资源的需求急剧下降D.项目干系人对项目的影响力随项目的实施而逐渐提高4.哪个关于项目生命周期的说法是正确的?< >A.所有项目的项目生命周期都包括启动、规划、执行、监控和收尾等5个阶段B.干系人的职责和作用,在整个项目生命周期中通常保持不变C.随着项目接近完工,项目失败的可能性降低,负面风险的影响也降低D.即便同一类项目,也可以有不同的项目生命周期阶段划分5.在下列哪一种组织结构中,项目成员在收尾阶段最感到忧心忡忡?< >A.职能型B.矩阵型C.项目型D.弱矩阵型6.在项目阶段结束时,要对该阶段的可交付成果和绩效进行审查,其目的在于< >.A.做出项目变更<包括纠偏>、项目继续或不继续的决策B.获得客户对可交付成果的认可C.调整项目目标D.根据资源情况来决定是否需要补充资源7.以下哪一项包括在组织过程资产里?< >A.历史资料、经验教训B.组织文化C.项目管理信息系统 D.人力资源库8.客户是指< >.A.付钱购买项目产品的个人或组织B.将要使用项目产品的任何个人或组织C.直接使用项目产品的个人或组织D.项目发起人9.在项目阶段结束点,通常做出项目"继续"或"终止"的决定,以下哪个时点可设定为项目阶段结束点?< >A.项目经理更换时B.项目团队成员出现重大变化时C.一系列活动完成时 D.重要监控点10.高层管理者应当在以下哪个时候对项目进行审查?< >A.客户提出重要意见时B.项目出现不可接受的偏差时C.完成一个里程碑时 D.完成一个生命周期阶段时11.项目生命周期与产品生命周期的差别在于以下各项,除了< >.A.项目生命周期的阶段之间可能相互交叉,而产品生命周期的阶段之间通常不相互交叉B.项目生命周期其实就是项目管理过程,而产品生命周期则是产品导向过程C.项目生命周期的终点与产品生命周期的终点不同D.项目生命周期可以包括在多个产品生命周期中12.下列关于项目阶段的说法,正确的是< >.A.项目阶段就是项目管理过程组B.一个项目阶段的结束通常包括核准开始下一个阶段C.在可交付成果被确认符合技术要求后,就可以结束该项目阶段D.项目阶段的结束涉与到可交付成果的交接13.你和你的团队为了更好地制订项目计划,你们应该特别注意分析以下哪方的要求和期望?< >A.项目发起人B.项目高级管理层C.项目于系人D.项目客户14.把项目划分成通常顺序排列的多个阶段,阶段的名称和数量由项目所在组织根据管理与控制的需要确定.这些项目阶段的组合叫做< >.A.项目生命周期B.产品生命周期C.项目运营周期D.项目管理生命周期15.项目经理是< >.A.项目发起人派来实现项目目标的个人B.项目执行组织派来实现项目目标的个人C.通过竞争性投标,获得项目管理服务合同的个人D.通常是指卖方组织中的项目负责人16.一般来说,在处理干系人之间的利益冲突时,应优先考虑以下哪方的利益?< >A.发起人B.管理层C.客户D.项目经理17.大多数组织都形成了自己独特的组织文化,组织文化体现在以下几个方面,除了< >. A.大家应该遵守的标准和法规B.大家共同的愿景、价值观以与信念C.大家对工作伦理与工作时间安排的共同认识D.组织中的政策与程序18.维护和连续运营对项目至关重要< >.A.应该作为项目生命周期收尾阶段的一项活动B.生命周期成本的一大部分用于维护和运营,因此维护和运营应该作为项目生命周期中一个单独的阶段C.但不应看作项目的一部分D.所以应该看作整个项目中的一个子项目19.生命周期的哪个阶段具有最大的风险和不确定性?< >A.概念阶段B.计划编制阶段C.实施阶段D.收尾阶段20.运营与项目有许多共同点,除了< >.A.在各阶段都需要不同的人员或组织参与B.都受制于一些约束,包括资源约束C.都需要规划、执行和控制 D.都需要服务于组织的经营或战略目标21.项目治理是指< >.A.把权力集中在项目经理手中B.加大高级管理层对项目的控制力度C.在不划分项目阶段的前提下,把项目作为一个整体加以控制D.明确规定项目的决策点、决策人、决策过程和决策时间22.计划压缩中的快速跟进技术,相当于以下哪种阶段与阶段之间的关系?< > A.交叠关系B.顺序关系C.迭代关系D.螺旋关系23.复杂的项目,尤其是那些跨职能部门的项目,下列哪一种组织结构最有效?< > A.矩阵型B.项目型C.职能型D.不一定24.在项目启动阶段,谁领导着项目?< >A.项目经理B.高层管理人员C.公司首席执行官D.项目发起人25.下哪种项目组织中,项目经理将可能对项目资源进行最严格的控制?< >A.紧密式矩阵组织B.项目型组织C.平衡式矩阵组织D.强矩阵组织26.一般而言,房屋建设项目最不可能采用哪种阶段与阶段之间的关系?< >A.交叠关系B.迭代关系C.顺序关系D.螺旋关系27.以下哪个因素最有可能导致项目干系人管理中的困难?< >A.干系人数量多B.干系人对项目有不同的期望C.干系人对项目的参与程度不同D.干系人对项目的影响力不同28.强矩阵组织和弱矩阵组织之间的主要差别在于< >.A.组织的结构、文化、作风对项目产生的影响不同B.项目团队成员之间以与他们与项目经理之间的亲近度不同C.项目经理对项目资源的控制程度不同D.项目团队成员之间的凝聚力不同29.组织过程资产可以分为哪两大类?< >A.流程与程序、共享知识库B.标准与规范、项目管理信息系统C.模板与指南、基础设施D.控制程序、工作授权系统30.运营经理是< >.A.项目经理的助手 B.负责向项目提供技术支持的经理C.职能经理的代名词D.组织中负责直接用于销售的产品或服务的生产的经理31.一个项目经理遵循公司的国际项目程序,在项目阶段末对该阶段的可交付成果和绩效进行审查,其目的在于< >.A.与时发现和纠正错误,并决定项目能否进入下一个阶段B.获得客户对阶段可交付成果的认可C.对风险进行实时监控D.根据情况,调整项目计划32.各项目的项目生命周期具有以下哪个共性?< >A.项目生命周期是指项目从开始到结束的时间长短B.具有从启动、规划、执行到正式结束的总体结构C.大多数项目的项目生命周期都是相同的D.项目生命周期是循环往复的一段时间33.项目发起人主要为项目提供< >.A.项目范围说明书B.项目资金C.项目章程D.项目验收标准34.以下关于项目生命周期的说法,正确的是< >.A.通常相互交叉而有时又按顺序排列的各阶段的集合B.指启动、规划、执行、监控和收尾等五个过程组的集合C.不同的组织通常采用阶段名称相同、阶段数量相同的项目生命周期D.通常按顺序排列但也可能相互交叉的各阶段的集合35.以下关于项目阶段和项目生命周期的说法都是正确的,除了< >.A.阶段结束点是对项目进行检查、评估和控制的当然时点B.通常应该在重要可交付成果形成的时点,对项目分阶段C.项目生命周期可以包含在多个产品生命周期中D.随着项目接近完工,项目对资源的需求逐渐达到最高峰36.以下关于客户的说法,正确的是< >.A.将要购买项目产品、服务或成果的个人或组织B.将要使用项目产品、服务或成果的个人或组织C.为项目提供财务资源的个人或组织D.为项目提供专业技术或服务的个人或组织37.项目执行组织的组织文化< >.A.通常是相似的,会对项目实施产生影响B.通常是独特的,会对项目实施产生影响C.通常是相似的,不会对项目实施产生影响D.通常是独特的,不会对项目实施产生影响38.在项目型组织中,全职项目团队成员的比例通常是< >.A.很少B.几乎100% C.大约三分之一D.大约三分之二39.以下哪个经理负责直接用于销售的产品的生产或直接用于销售的服务的提供?< > A.项目经理B.项目管理办公室经理C.职能经理D.运营经理40.以下所有例子都是组织过程资产的例子,除了〔〕.A.标准化的工作指南B.过程测量数据库C.组织结构和组织文化D.配置管理知识库。
PMP第2-3章项目运行环境和项目经理的角色练习题

PMP第2-3章项目运行环境和项目经理的角色练习题第2-3章项目运行环境/项目经理的角色1.以下哪一项是内部事业环境因素?()A.基础设施B.市场条件C.商业数据库D.学术研究2.以下哪一项是组织过程资产?()。
A.流程、政策和程序B.商业数据库C.财务考虑因素D.法律法规3.关于组织过程资产,以下说法正确的是?()。
A.既有组织内部也有组织外部的信息B.所有内容都需要在整个项目期间不断更新C.第一类资产的更新主要由PMO完成D.第二类资产的更新主要由项目发起人完成4.以下哪个关于系统的原则的说法是不正确的?()A.系统是可以优化的B.系统及其组件不能同时优化C.系统呈现线性响应D.系统是动态的5.在下列哪一种组织结构中,项目成员在收尾阶段最感到忧心忡忡?()A.职能型B.矩阵型C.项目型D.弱矩阵型6.关于项目治理,以下说法不正确的是?()A.是用于指导项目管理活动的框架B.治理框架通常包含一致性、风险、绩效和沟通C.要通过数据和反馈提供指导和监督D.通常由项目管理团队来开展相关工作7.以下哪一项不包括在管理要素中?()A.统一指挥原则B.畅通的沟通渠道C.允许任何员工参与计划D.组织的总体目标与个人目标同样重要8.古典管理理论的代表人物之一亨利.法约尔提出的14条一般管理原则中,哪一条通常不适用于对项目进行管理?A.团队精神B.层级链C.工作主动性D.人员岗位的稳定性9.涉及多专业领域的项目,最好用什么组织形式加以管理?A.项目型组织B.矩阵型组织C.职能型组织D.直线型组织10.你被任命为一个新项目的项目经理。
虽然你做过很多项目,但新项目对你来说比较陌生。
现在你需要编制项目计划,你应该依据以下哪项资料?A.类似项目的历史资料B.你接受过的项目管理培训C.自己过去的经验D.高层的指示11.项目治理是指()。
A.把权力集中在项目经理手中B.加大高级管理层对项目的控制力度C.在不划分项目阶段的前提下,把项目作为一个整体加以控制D.高层次的项目决策机制12.在项目启动阶段,谁领导着项目?()A.项目经理B.高层管理人员C.公司首席执行官D.项目发起人13.在以下哪种项目组织中,项目经理将可能对项目资源进行最严格的控制?()A.紧密式矩阵组织B.项目型组织C.平衡式矩阵组织D.强矩阵组织14.强矩阵组织和弱矩阵组织之间的主要差别在于()。
PMP考试概要和习题解析项第二章练习题和答案

PMP考试概要及习题解析项第二章练习题及答案练习题1. One of the initial project documents, issued by senior management, which outline the authority of the project manager, is called a Project Charter. As a seller. what other document can be used in its phaseA)Work breakdown structure. B)Project scope.(c)Contract. D)Internet memo.项目章程是由高级治理层签署的项目初期文档之一,它列出了项目领导的权利范围。
作为卖方,在那个时期还能够利用什么文档A)工作分解结构。
B)项目范围。
C)合同。
D)网络备忘录。
2. Feasibility studies are performed in the process group of the project.A)initiating B)executingC)planning D)closing可行性研究在以下哪个时期实施A)启动时期。
B)执行时期。
C)打算时期。
D)扫尾时期。
3. In which process group do we examine alternative ways of accomplishing project objectivesA)Initiating. B)Executing. (c)Planning. D)Closing.在以下哪个时期咱们考虑完成项目目标的其他替代方法A)启动时期。
B)执行时期。
C)打算时期。
D)扫尾时期。
4. The man responsible for fund acquisition for concept research of a new project is ________.A)project manager B)presidentC)financial director D)project sponsor负责为新项目概念研究取得资金的人是____.A)项目领导B)总裁C)财务主管D)项目发起人5. Repeating the initiating processes at the beginning of each phase helps to keep the projcct focused on____.A)interaction between phasesB)the details of the project using rolling wave planningC)process group overlapping within each phaseD)business needs在每一个时期的开始,重复启动进程能够帮忙项目集中于____.A)时期间的交互作用B)利用转动打算项目的细节C)每一个项目间重叠的进程集体D)商业需求6. The seven primary characteristics that are common to all projects are____.A)objectives, schedules, complexity, resources, organizational structure,financial information, and control system budgetsB)objectives, functional reporting, information and control system, simplicity, resources. facilities, maintenance, and budgetsC)objectives, schedules, complexity, size and nature of task, resources, organizational structure, and integrated information control systemD)objectives, risk mitigation strategies, staffing, and WBS work package costs所有项目都具有的7个要紧特性是____.A)目标、进度、复杂性、资源、组织结构、财务信息及操纵系统预算B)目标、职能汇报、信息和操纵系统、简单化、资源、便利化、保护及预算C)目标、进度、复杂性、任务范围和特性、资源、组织结构及集成信息操纵系统D)目标、风险转移策略、员工及WBS工作包本钱7. Although your Internet start-up company has few project management policies and procedures in place, it made a healthy profit last year. Experience, however, has taught you that some controls are required. especially for projects that change frequently. You would like to establish a change control system for your company. but must convince a group ofmoney-hungry “20 something's‘” to useitto be effective. the change control system must include____.A)Procedures that define how project documents may be changedB)Specific change requests expected on the project and plan to respond to each one C)Performance reports that forecast project changesD) A description of the functional and physical characteristics of an item or system你有一个网络公司,目前公司方才起步,很少有适合的项日治理政策和规章,可是你的公司去年仍是有很可观的利润。
PMP1-13章章节练习加解释

PMP章节练习题第1-3章练习题题干:1.制定项目章程后,一名项目相关方表达对项目资金的担忧。
若要解决这个担忧,项目经理应该事先做什么?选项:A.使用事业环境因素B.在商业论证中包含成本效益分析C.查看组织过程资产D.检查服务水平协议(SLA)1.答案:B解析:项目资金由发起人或客户提供,是否提供资金其实就是是否批准这个项目的问题。
根据PMBOK第77页最后一段第1行最后“商业论证从商业视角。
是否值得所需投资。
高于项目级别的经理和高管们通常使用该文件作为决策依据。
一般情况下,商业论证包含商业需求和成本效益分析”()能向该相关方证明项目能获得更高收益,不用担心投资),可以当成本题的出处和答题依据。
题干:2.项目管理办公室(PMO) 收到项目经理的许多关于获取过去项目信息的投诉。
PMO 首先应该怎么办?选项:A.使用经过审查的项目文件创建数据库。
B.发布历史项目数据并分发给相关项目干系人。
C.审查和更新存档过程。
D.分享所有经验教训文件2.答案:C解析:项目经理无法获取过去的项目信息,该问题对于PMO而言,是组织过程资产总结和更新问题。
CD之间,D治标不治本,不能解决根本问题;另外,D不全面,组织过过程资产包括过程、政策、程序,和组织知识库(数据库和经验教训);C更直接、规范。
题干:3.提交项目管理计划供批准后,一些项目相关方认为该项目在保护员工个人信息方面不足。
由于不符合安全协议,这些相关方将不会批准该文件。
若要减轻这个问题,项目经理应事先做什么?选项:A.将项目范围说明书与法律要求保持一致C.遵循组织政策和程序B.在项目管理计划中识别这个风险D.执行质量审计3.答案:C解析:题干描述的问题应该源自项目资源管理计划。
事先应该做什么,可以理解为在制定资源管理计划时应该考虑什么来做好员工个人信息的保护工作?根据PMBOK 315页9.1.1.5组织过程资产下面第3个小黑点“安全政策”,选项中C比较好,本题选C。
PMP习题汇总及答案解析 第二章

PMP习题汇总及答案解析第二章项目运行环境1.以下哪项是对项目管理过程组和项目生命周期之间的关系的正确描述?A.每个项目管理过程组都可以在项目生命周期的任一阶段开展B.各项目管理过程组与项目生命周期的各阶段是一对一的对应关系C.启动过程组只能在“开始项目“阶段开展D.收尾过程组只能在“结束项目“阶段开展答案A【试题解析】B,C,D错误,因为项目管理过程组中的过程所包含的活动,可以在每个项目阶段火灾整体项目层面重复执行,因此并不是和阶段时一对一的关系,也不是只能在某个阶段开展。
A正确,符合定义。
2.PMO最基本的职责是?A.为项目制定项目管理计划B.执行某个具体的项目C.为项目提供咨询和知道D.项目变更控制答案C【试题解析】PMBOK第六版书P49:PMO向项目经理提供的支持中有指导、辅导、培训和监督。
其他三个都是项目经理的职责。
3.从组织过程资产中可以获得以下哪项信息?A.组织文化B.商业数据库C.组织模板、标准D.员工能力答案C【试题解析】PMBOK第六版书P40:组织过程资产的“过程、政策和程序”中有模板和标准。
4.在什么组织结构中可以见到全职的项目经理?A.紧密矩阵B.职能型C.项目型D.弱矩阵答案C【试题解析】PMBOK第六版书P47表2-1,强矩阵、项目型的有全职的项目经理。
另注意“紧密矩阵”不是组织结构,是集中办公的另外一种说法。
5.在下列哪一种组织结构中,项目成员在收尾阶段最感到忧心忡忡?A.职能型B.矩阵型C.项目型D.紧密矩阵型答案C【试题解析】项目型组织结构中,项目结束后,由于不是固定回到原本的职能部门,而未来去哪个项目并不确定,因此项目成员会在项目结束时有无所适从感。
6.在以下哪种项目组织中,项目经理能对项目资源进行最有力的控制?A.职能型组织B.项目型组织C.平衡式矩阵组织D.强矩阵组织答案B【试题解析】PMBOK第六版书P47表2-1,在项目型组织中,资源的可用性是高到几乎全部的,所以项目经理能对资源进行最有力的控制。
PMP习题汇总及答案解析第二章

PMP习题汇总及答案解析第二章PMP习题汇总及答案解析第二章项目运行环境1.以下哪项是对项目管理过程组和项目生命周期之间的关系的正确描述?A.每个项目管理过程组都可以在项目生命周期的任一阶段开展B.各项目管理过程组与项目生命周期的各阶段是一对一的对应关系C.启动过程组只能在“开始项目“阶段开展D.收尾过程组只能在“结束项目“阶段开展答案A【试题解析】B,C,D错误,因为项目管理过程组中的过程所包含的活动,可以在每个项目阶段火灾整体项目层面重复执行,因此并不是和阶段时一对一的关系,也不是只能在某个阶段开展。
A正确,符合定义。
2.PMO最基本的职责是?A.为项目制定项目管理计划B.执行某个具体的项目C.为项目提供咨询和知道D.项目变更控制答案C【试题解析】PMBOK第六版书P49:PMO向项目经理提供的支持中有指导、辅导、培训和监督。
其他三个都是项目经理的职责。
3.从组织过程资产中可以获得以下哪项信息?A.组织文化B.商业数据库C.组织模板、标准D.员工能力答案C【试题解析】PMBOK第六版书P40:组织过程资产的“过程、政策和程序”中有模板和标准。
4.在什么组织结构中可以见到全职的项目经理?A.紧密矩阵B.职能型C.项目型D.弱矩阵答案C【试题解析】PMBOK第六版书P47表2-1,强矩阵、项目型的有全职的项目经理。
另注意“紧密矩阵”不是组织结构,是集中办公的另外一种说法。
5.在下列哪一种组织结构中,项目成员在收尾阶段最感到忧心忡忡?A.职能型B.矩阵型C.项目型D.紧密矩阵型答案C【试题解析】项目型组织结构中,项目结束后,由于不是固定回到原本的职能部门,而未来去哪个项目并不确定,因此项目成员会在项目结束时有无所适从感。
6.在以下哪种项目组织中,项目经理能对项目资源进行最有力的控制?A.职能型组织B.项目型组织C.平衡式矩阵组织D.强矩阵组织答案B【试题解析】PMBOK第六版书P47表2-1,在项目型组织中,资源的可用性是高到几乎全部的,所以项目经理能对资源进行最有力的控制。
PMP(项目管理)练习题1-20答案解析

PMP(项目管理)练习题1-20答案解析答案与解析1.答案A.题目考查的是每个选项描述的是哪个过程的事情。
A,需要看鸟语,Team member,确定单个团队成员(而不是汉语描述的单个项目团队)的绩效,属于管理项目团队过程中“项目绩效评估”工具的作用,属于执行过程组B,在人力资源记录中增加信息,是一个时候总结行为,是更新组织过程资产的行为,通常属于收尾过程组C,确定验收标准,可能在售前阶段(还没有项目)编写SOW、可能在规划阶段的编写范围说明书D,确定如何做,这是个很明显的规划行为,属于规划过程组2.答案C.题目考查的是项目环境中各角色的作用。
A,发起人在启动阶段始终引领着项目,启动阶段后由被授权的项目经理来负责管理项目,发起人提供资金、解决超出项目经理权利范围的事情,以及参与重大评审及签字确认B,职能部门是培养专家的地方,提供专业化人才C,项目管理办公室,PMO是提供项目治理标准化的部门,提供项目管理所需的方法论、模板、工具等等D,项目经理是项目的第一责任人,对项目进行全方位的管理,确保项目成功3.答案C.题目考查的是项目制约因素的内容。
项目经理管理一个项目的主要工作之一就是平衡项目竞争的项目制约因素,制约因素之间的关系是“任何一个因素发生变化,都会影响至少一个其他因素”,C是全面的正确答案4.答案D.题目考查的是项目生命周期的特征。
典型的,或者说是通用的项目生命周期特征是,成本与人力投入在开始时较低,在工作执行期间达到最高,并在项目快要结束时迅速回落。
需要注意的是,以上说法并非代表了所有项目项目5.答案A.题目考查的是风险定义。
项目风险是一种不确定的事件或条件,一旦发生就会对一个或多个项目目标造成积极或消极的影响,如范围、进度、成本和质量。
风险可能有一种或多种起因,一旦发生就可能造成一项或多项影响6.答案C.题目考查的是变更控制系统如何建立。
变更控制系统是项目管理过程中的必备工具,是进行整体变更控制的主要阵地。
- 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
- 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
- 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。
第二章项目生命周期与组织
1.项目管理办公室对项目结果负有直接或间接的责任。
以下哪个不是项目管理办公室的职责?( )
A.给项目提供行政支持服务 B.对项目经理进行业务培训和指导
C.项目之间的人员协调 D.制定项目干系人之间的沟通计划
2.下列关于项目生命周期、项目管理生命周期和产品生命周期的说法,正确的是( )。
A.项目变化和发展时,项目生命周期通常随之变化和发展
B.项目管理生命周期对于每个项目都是独特的
C.项目管理生命周期就是项目生命周期
D.典型的产品生命周期包括多个项目生命周期
3.大多数项目的项目生命周期都具有以下特点( )。
A.项目开始阶段,项目对资源的需求急剧增加;项目结束阶段,项目对资源的需求缓慢下降
B.项目大部分的预算都花费在启动和规划阶段
C.项目开始阶段,项目对资源的需求缓慢增加;项目结束阶段,项目对资源的需求急剧下降
D.项目干系人对项目的影响力随项目的实施而逐渐提高
4.哪个关于项目生命周期的说法是正确的?( )
A.所有项目的项目生命周期都包括启动、规划、执行、监控和收尾等5个阶段
B.干系人的职责和作用,在整个项目生命周期中通常保持不变
C.随着项目接近完工,项目失败的可能性降低,负面风险的影响也降低
D.即便同一类项目,也可以有不同的项目生命周期阶段划分
5.在下列哪一种组织结构中,项目成员在收尾阶段最感到忧心忡忡?( )
A.职能型 B.矩阵型 C.项目型 D.弱矩阵型
6.在项目阶段结束时,要对该阶段的可交付成果和绩效进行审查,其目的在于( )。
A.做出项目变更(包括纠偏)、项目继续或不继续的决策
B.获得客户对可交付成果的认可
C.调整项目目标
D.根据资源情况来决定是否需要补充资源
7.以下哪一项包括在组织过程资产里?( )
A.历史资料、经验教训 B.组织文化
C.项目管理信息系统 D.人力资源库
8.客户是指( )。
A.付钱购买项目产品的个人或组织 B.将要使用项目产品的任何个人或组织C.直接使用项目产品的个人或组织 D.项目发起人
9.在项目阶段结束点,通常做出项目“继续”或“终止”的决定,以下哪个时点可设定为项目
阶段结束点?( )
A.项目经理更换时 B.项目团队成员出现重大变化时
C.一系列活动完成时 D.重要监控点
10.高层管理者应当在以下哪个时候对项目进行审查?( )
A.客户提出重要意见时 B.项目出现不可接受的偏差时
C.完成一个里程碑时 D.完成一个生命周期阶段时
11.项目生命周期与产品生命周期的差别在于以下各项,除了( )。
A.项目生命周期的阶段之间可能相互交叉,而产品生命周期的阶段之间通常不相互交叉B.项目生命周期其实就是项目管理过程,而产品生命周期则是产品导向过程
C.项目生命周期的终点与产品生命周期的终点不同
D.项目生命周期可以包括在多个产品生命周期中
12.下列关于项目阶段的说法,正确的是( )。
A.项目阶段就是项目管理过程组
B.一个项目阶段的结束通常包括核准开始下一个阶段
C.在可交付成果被确认符合技术要求后,就可以结束该项目阶段
D.项目阶段的结束涉及到可交付成果的交接
13.你和你的团队为了更好地制订项目计划,你们应该特别注意分析以下哪方的要求和期望?( )
A.项目发起人 B.项目高级管理层
C.项目于系人 D.项目客户
14.把项目划分成通常顺序排列的多个阶段,阶段的名称和数量由项目所在组织根据管理与控制的需要确定。
这些项目阶段的组合叫做( )。
A.项目生命周期 B.产品生命周期 C.项目运营周期 D.项目管理生命周期
15.项目经理是( )。
A.项目发起人派来实现项目目标的个人
B.项目执行组织派来实现项目目标的个人
C.通过竞争性投标,获得项目管理服务合同的个人
D.通常是指卖方组织中的项目负责人
16.一般来说,在处理干系人之间的利益冲突时,应优先考虑以下哪方的利益?( )
A.发起人 B.管理层 C.客户 D.项目经理
17.大多数组织都形成了自己独特的组织文化,组织文化体现在以下几个方面,除了( )。
A.大家应该遵守的标准和法规 B.大家共同的愿景、价值观以及信念
C.大家对工作伦理与工作时间安排的共同认识 D.组织中的政策与程序
18.维护和连续运营对项目至关重要( )。
A.应该作为项目生命周期收尾阶段的一项活动
B.生命周期成本的一大部分用于维护和运营,因此维护和运营应该作为项目生命周期中一个单独的阶段
C.但不应看作项目的一部分
D.所以应该看作整个项目中的一个子项目
19.生命周期的哪个阶段具有最大的风险和不确定性?( )
A.概念阶段 B.计划编制阶段 C.实施阶段 D.收尾阶段
20.运营与项目有许多共同点,除了( )。
A.在各阶段都需要不同的人员或组织参与 B.都受制于一些约束,包括资源约束C.都需要规划、执行和控制 D.都需要服务于组织的经营或战略目标
21.项目治理是指( )。
A.把权力集中在项目经理手中
B.加大高级管理层对项目的控制力度
C.在不划分项目阶段的前提下,把项目作为一个整体加以控制
D.明确规定项目的决策点、决策人、决策过程和决策时间
22.计划压缩中的快速跟进技术,相当于以下哪种阶段与阶段之间的关系?( )
A.交叠关系 B.顺序关系 C.迭代关系 D.螺旋关系
23.复杂的项目,尤其是那些跨职能部门的项目,下列哪一种组织结构最有效?( ) A.矩阵型 B.项目型 C.职能型 D.不一定
24.在项目启动阶段,谁领导着项目?( )
A.项目经理 B.高层管理人员 C.公司首席执行官 D.项目发起人
25.下哪种项目组织中,项目经理将可能对项目资源进行最严格的控制?( )
A.紧密式矩阵组织 B.项目型组织 C.平衡式矩阵组织 D.强矩阵组织
26.一般而言,房屋建设项目最不可能采用哪种阶段与阶段之间的关系?( )
A.交叠关系 B.迭代关系 C.顺序关系 D.螺旋关系
27.以下哪个因素最有可能导致项目干系人管理中的困难?( )
A.干系人数量多 B.干系人对项目有不同的期望
C.干系人对项目的参与程度不同 D.干系人对项目的影响力不同
28.强矩阵组织和弱矩阵组织之间的主要差别在于( )。
A.组织的结构、文化、作风对项目产生的影响不同
B.项目团队成员之间以及他们与项目经理之间的亲近度不同
C.项目经理对项目资源的控制程度不同
D.项目团队成员之间的凝聚力不同
29.组织过程资产可以分为哪两大类?( )
A.流程与程序、共享知识库 B.标准与规范、项目管理信息系统
C.模板与指南、基础设施 D.控制程序、工作授权系统
30.运营经理是( )。
A.项目经理的助手 B.负责向项目提供技术支持的经理
C.职能经理的代名词 D.组织中负责直接用于销售的产品或服务的生产的经理
31.一个项目经理遵循公司的国际项目程序,在项目阶段末对该阶段的可交付成果和绩效进行审查,其目的在于( )。
A.及时发现和纠正错误,并决定项目能否进入下一个阶段
B.获得客户对阶段可交付成果的认可
C.对风险进行实时监控
D.根据情况,调整项目计划
32.各项目的项目生命周期具有以下哪个共性?( )
A.项目生命周期是指项目从开始到结束的时间长短
B.具有从启动、规划、执行到正式结束的总体结构
C.大多数项目的项目生命周期都是相同的
D.项目生命周期是循环往复的一段时间
33.项目发起人主要为项目提供( )。
A.项目范围说明书 B.项目资金 C.项目章程 D.项目验收标准
34.以下关于项目生命周期的说法,正确的是( )。
A.通常相互交叉而有时又按顺序排列的各阶段的集合
B.指启动、规划、执行、监控和收尾等五个过程组的集合
C.不同的组织通常采用阶段名称相同、阶段数量相同的项目生命周期
D.通常按顺序排列但也可能相互交叉的各阶段的集合
35.以下关于项目阶段和项目生命周期的说法都是正确的,除了( )。
A.阶段结束点是对项目进行检查、评估和控制的当然时点
B.通常应该在重要可交付成果形成的时点,对项目分阶段
C.项目生命周期可以包含在多个产品生命周期中
D.随着项目接近完工,项目对资源的需求逐渐达到最高峰
36.以下关于客户的说法,正确的是( )。
A.将要购买项目产品、服务或成果的个人或组织
B.将要使用项目产品、服务或成果的个人或组织
C.为项目提供财务资源的个人或组织
D.为项目提供专业技术或服务的个人或组织
37.项目执行组织的组织文化( )。
A.通常是相似的,会对项目实施产生影响
B.通常是独特的,会对项目实施产生影响
C.通常是相似的,不会对项目实施产生影响
D.通常是独特的,不会对项目实施产生影响
38.在项目型组织中,全职项目团队成员的比例通常是( )。
A.很少 B.几乎100% C.大约三分之一 D.大约三分之二
39.以下哪个经理负责直接用于销售的产品的生产或直接用于销售的服务的提供?( ) A.项目经理 B.项目管理办公室经理
C.职能经理 D.运营经理
40.以下所有例子都是组织过程资产的例子,除了()。
A.标准化的工作指南 B.过程测量数据库
C.组织结构和组织文化 D.配置管理知识库。