建筑给排水 外文翻译 外文文献 英文文献 多层住宅建筑给排水设计的几个问题

合集下载

建筑给排水英文文章

建筑给排水英文文章

建筑给排水英文文章一、IntroductionIn the field of architecture, plumbing systems play a crucial role in providing clean water and removing waste from a building. Effective and efficient building plumbing systems are essential for the health and safety of occupants. This article will explore the various aspects of building plumbing systems, including design principles, materials used, installation methods, and maintenance requirements.二、Design PrinciplesA well-designed plumbing system in a building relies on several key principles:1. Water Supply DesignThe design of a water supply system involves determining the source of water, calculating the required flow rate, and sizing the pipes accordingly. Factors such as building size, occupancy, and water demand must be considered. Additionally, backflow prevention devices are installed to prevent contamination of the water supply.2. Drainage System DesignThe drainage system design focuses on removing wastewater from the building and ensuring proper disposal. Gravity is commonly used to move wastewater through a series of pipes and drains. Proper slope, pipe diameter, and venting are important considerations to prevent blockages, odors, and sewer gas leaks.3. Fixture LayoutThe layout of plumbing fixtures, such as sinks, toilets, and showers, should be carefully planned to optimize water usage, convenience, andaccessibility. Adequate space and accessibility for maintenance should be considered during the design phase.三、Materials UsedVarious materials are used in the construction of plumbing systems. The choice of materials depends on factors such as the type of water supply, budget, and local regulations. Common materials used include:1. PipesPipes are typically made of materials such as copper, galvanized steel, PVC (polyvinyl chloride), and PEX (cross-linked polyethylene). Each material has its advantages and disadvantages, such as durability, cost, ease of installation, and resistance to corrosion.2. Fittings and ValvesFittings and valves connect and control the flow of water within the plumbing system. They are available in materials like brass, copper, and plastic. The choice of fittings and valves depends on the specific requirements of the system and its intended use.四、Installation MethodsProper installation of plumbing systems is crucial to ensure their functionality and longevity. Different installation methods are used depending on the building structure and plumbing system design. Some common installation methods include:1. Traditional Open-Cut MethodThis method involves excavating trenches for the placement of pipes. It allows for easy access and repair but can be time-consuming and disruptive, especially in existing buildings.2. Trenchless TechnologyTrenchless technology, such as pipe bursting and pipe lining, is gaining popularity due to its minimal disruption and cost-effectiveness. It involves using specialized equipment to repair or replace pipes without the need for extensive excavation.五、Maintenance RequirementsRegular maintenance is essential to keep building plumbing systems in optimal condition. Neglecting maintenance can lead to leaks, blockages, and water damage. Some important maintenance requirements include:1. Regular InspectionsPeriodic inspections of the plumbing system can help identify any potential issues before they escalate into costly repairs. Inspections should include checking for leaks, proper drainage flow, and functioning of valves and fixtures.2. Clearing BlockagesBlockages in drains and pipes should be promptly cleared to prevent backups and plumbing system failures. This may involve using mechanical tools or chemicals, depending on the nature of the blockage.3. Water Heater MaintenanceWater heaters should be inspected and serviced regularly to ensure efficient and safe operation. This includes checking for leaks, sediment buildup, and testing the pressure relief valve.六、ConclusionBuilding plumbing systems are vital for the functionality and comfort of a building. Proper design, choice of materials, installation methods, and regular maintenance are key factors in ensuring the performance and longevity of these systems. By following the principles discussed inthis article, architects, engineers, and building owners can createreliable and efficient plumbing systems that meet the needs of occupants while adhering to relevant regulations.。

浅谈建筑给排水施工中的常见问题及解决(中英文互译)

浅谈建筑给排水施工中的常见问题及解决(中英文互译)

Discussion on building water supply and drainage construction of commonproblems and Solutions浅谈建筑给排水施工中的常见问题及解决孙峰Abstract:Building water supply and drainage construction quality directly affects the building use function. In this paper, combined with the supervision of water supply and drainage engineering practice, for building water supply and drainage of common problems in construction were summarized and analyzed.Key words: building water supply and drainage construction qualityOur country national economy actual strength increases ceaselessly, construction industry develops rapidly, and constantly improve the level of overall construction of buildings. Construction equipment perfection degree and design level is the embodiment of building construction quality and an important symbol of modernization level, inside of the building water supply and drainage engineering is an important part of construction equipment, its technical level and advanced directly affects the using function of building, and people life, health, the environment, security. With the improvement of people's living standard, people in addition to the building safety, durability and economy have certain requirements, at the same time on the construction of the comfort, use requirements are also more attention, especially for the residential building energy saving and new energy utilization, Chuwei technology, pipeline technology, environment and security technology etc have higher requirements, these requirements in addition to the design and materials, equipment selection, construction greatly need assurance of installation quality. The quality of construction quality, directly affects the normal operation of the building water supply and drainage system. China's economic construction and development, various types of residential lots, building water supply and drainage technology of rapid development. However, with the increase of water supply and drainage engineering, also appeared some problems needed to be paid attention to, if not handled properly, will give householder brings a lot of unnecessary trouble. Therefore, the study on how to avoid water supply and drainage construction problems easy to occur is verynecessary. In the actual construction of water supply and drainage engineering construction, except in the raw materials and so on the objective factor to control the quality of water supply and sewerage works, improve employees' professional level, in strict accordance with the rules and regulations, standard operation, can be less problems, control of water supply and drainage project construction quality. Due to the level of management of construction enterprises, construction of personnel quality, building water supply and drainage construction quality is put in very big difference. Here in the construction process should pay attention to the problem is discussed:1 Living water supply systemAt present construction is widely used in aluminum-plastic composite pipe and polypropylene random copolymerization polypropylene ( PP - R ) tube. Plastic pipe has the advantages of light weight, no rust, scale, manufacturing, low energy consumption, smooth inner wall, hydraulic condition is superior, quality health, no pipeline two pollution, low labor intensity, saving installation of comprehensive construction cost advantages. PP - R water pipe connecting method is the use of fusion welding, aluminum-plastic composite pipe made of copper connection. The former applies for surface mounting, the latter applies to the dark. But there are some problems in the construction of which need special attention.(1) In the vertical tube lead-out branch tube three through parts arranged at the supporting point, the intermediate support is still in accordance with the provisions set. In the installation of pipelines should be considered in the pipeline of linear expansion, PP - R plastic water supply pipe expansion coefficient than the metal tube, wall concealed piping due to wall finally with cement mortar cement mortar filling pipeline, friction and plastic pipe special good creep effect, so that the shaft extension into radial change, therefore, block wall pipeline, can be considered linear expansion. For the pipeline, when the distance is longer, should consider adopting a telescopic device and the angle of natural compensation(2) Outdoor installed plastic water supply pipe must have reliable shading or heat preservation measures, through the pipeline settlement joints for compensating treatment. Because plastic pipe anti aging performance have certain limit, when exposed to install, long-term sun exposure can accelerate aging of plastic material, it should be considered to take effective shading or insulation measures. In addition the pipeline settlement joints shall be taken compensation measures, or easy to make pipeline rupture, appeared the phenomenonof water leakage(3)In the kitchen, Wei bovine apparatus for concentrating bathrooms, should adopt the water separator. Using plastic tube as a cold, hot water pipe concealed in floor slab of concrete in plastic pipe, due to the linear expansion coefficient of metal pipe to relatively large, because the water temperature or the ambient temperature changes, the expansion and contraction of the length change of large value. For branch pipe or pipe joint pipe, the higher chance of leakage. Water separator is a kind of multiple branch joint water distribution, it uses multiple unidirectional cloth tube, each a water distribution pipe through the water and sanitary ware and the tap connection, to reduce or cancel the concealed pipes used in branch pipe or pipe joint.(4) pipeline crossing roof slab should be set casing, through the roof should be used when the metal casing, height must meet the standard requirements. The casing and the cracks without perfusion of fine stone concrete, shall not use the asphalt in Yau Ma Tei wire packing seal. Otherwise, if the floor area of water sewage easily along the pipe wall infiltration into the submucosa.(5) the role of automatic exhaust valve. In no time delay self-closing valve of the squat toilet building water supply system, such as schools, hotels, office buildings and other force in water supply pipe system, if the top with self-closing valve can well control the flow of water, but not very good control of airflow. When the system is cut off, water pipes often accumulate a large amount of air. System after water supply pipe, air may be compressed to the tube at the top of water to form a compressed air zone. When someone is pressed delay self-closing valve button, then the compressed air with water gushing out of the closet, often within the dirt blowing to above ground, even spilled onto the clothes closet.2 Drainage system(1)The UPVC pipe wall is white, very susceptible to pollution, so the use of the process should pay attention to protection, in the pipeline in place should be promptly after the plastic packaging bag, to be removed after the completion of the project.(2) Drainage pipe out door horizontal pipe and vertical pipe connection should be used when the two45. Elbow instead of90. Elbow, which is beneficial to the drainage. There are also some engineering design for the three plus examination export method. In some projects, product quality, leading to the three links are often damaged, inconvenient repair. So in thevertical pipe and main pipe is connected with the fixed support, parts. Vertical pipe through floor roof should be fixed as supporting points, and with sheath.(3) In the legislative branch, floor, to do the protection work. For UPVC tube light weight, should be timely plugging holes in floors, planted bracket. There are a number of projects, because there was no time to fill the hole plugging holes, civil engineering, causing destruction and pipeline slope and verticality of affected. The correct approach is to stand pipe after completion of construction, straightening and planted bracket, with a good fine stone concrete plugging hole. Branch floor, planted set hanger and plugging holes. Because the floor, floor drain and the straight tube exposed to the ground, easily damaged, precautions should be taken. The specific approach is: in the floor drain and the straight tube around the100arm UPVC tube saw small short circle in the floor drain and straight around, with a fine stone concrete protection, height of not more than civil screed. For ease of maintenance, pipe water trap should be above the floor slab, for apparatus with water storing bend. Because the UPVC pipeline is light weight, thin tube wall, should pay attention to using a muffler noise reduction function fitting.(4)Installed to meet the requirements. The interior floor is mounted high above the surface, will cause the water leakage is too low, on the ground to form a pit, affect the surface clean and inconvenience in walking.(5)Air nozzle shall be located in a building ( such as eaves cornice took part, balcony and canopy ) above, otherwise cause odor accumulation. In accordance with the relevant standard requirements, the people often activity of roof, roof vent pipe extends the height of not less than 2m, and try to set bracket.(6)High-rise building in the UPVC ~ B pipe, without taking the measures to prevent fire from spreading. According to the" hard vinyl chloride building drainage pipeline engineering" ( cJJ / T29 - 98) Regulations: high-rise buildings indoor drainage pipelines that apply settings and big diameter or equal to 11Omm, in vertical pipe through the floor should be set to fire the casing or fire blocking ring, to prevent the fire spreading to the upper layer through a pipeline.(7)The floor drain and trap with. No provisions for floor drain must set up a trap, but it can affect users. The general water supply and drainage standard atlas will take seal circular bell type floor drain to a, B, C, Ding Si, although the standard of water seal section height to makespecific provision, but there is a water storage, water due to water evaporation and destroyed. Manufacture and installation and often fails to meet the design requirements. All indoor undertake a fecal sewage drainage floor drain, shall be set the trap, this can effectively prevent odor phenomenon.(8) Sewage emergency discharge tube. For kitchen and toilet adjacent residential, kitchen, toilet is if separate drainage system, is straight at the bottom of two system for emergency discharge unicom. The correct approach is to lead a floor drain from the kitchen and toilet pipe or by a toilet to kitchen pipe system. Its purpose is to once - side discharge pipe suddenly jam, still discharge sewage overflows when the ground floor drain into another system from the outside, but not to the other indoor room large area sewage soaks inundates.3 Fire water supply system(1) The design of automatic sprinkler system for pipeline connection made the trench should be used to clamp connections, or wire joint, flange connection. The current widespread use of the automatic sprinkler system, generally with galvanized steel pipe galvanized pipe, and larger in diameter than the5Omm, pipe parts of poor quality, construction difficulty. Diameter of1OOmm welding work, will destroy the galvanized layer, causing the two galvanized, the effect is not ideal. As the hoop connection parts, to avoid the above problem, and the construction is simple, without welding, and the grooves can be precast. Now the groove type clamps connecting piece is stereotypes products, mature technology, spare parts complete, quality assurance. When the proposed pipeline diameter is larger than 50mm, the groove type clamps connecting piece.(2) As the applicator interface diameter is 15mm, so some construction spaces using15ram galvanized steel pipe small vertical tube connected with the nozzle, effects of fire extinguishing water ability, should adopt the25mm diameter pipe with different diameter pipe hoop. Some engineering support, support installation is not standardized, not according to the specified distance setting, defenseless and Akira bracket, directly affect water effect, should be strictly in accordance with the relevant standard, set Branch hanger.(3) Network to carry out maintenance and leakage test of strength test is performed in two steps. Some construction unit only to the network leakage test or test the pressure does not meet the requirements of design and codes, this will give the normal operation of the system brings hidden trouble.(4) Banned the use of plastic water supply pipe for fire water supply pipe, or in a building plastic water supply pipeline and fire water supply pipeline. Because plastic pipe heating after reduced intensity, fire will cause the pipeline damage, will not play the role of fire water supply. Plastic water supply pipe and fire pipes, fire, damage to the plastic pipe, easy leakage, there is no guarantee that a fire water and hydraulic pressure.(5) Must be in conformity with the requirements of fire hydrant installation. Some concealed in brick wall of fire hydrant boxes above the hole without lintel, by loading body is deformed, causing the box door is open. In addition the construction of some units to randomly change the fire hydrant at the end position of a preformed hole, and welding and cutting hole, leading to the installation, hydrant mouth can not be with the wall into 45or 90degree angle; or with the surrounding distance is too small, causing the fire hose cannot be installed to a fire hydrant or the tape to form bending effect of water.4 Water supply and drainage noise solutionIn addition to the requirements of water supply and drainage pipe and equipment layout should be consistent and building structure, water supply and drainage noise reduction. During construction, attention to details, can effectively reduce the noise generation.(1) In order to reduce the water hammer occurrence possibility, the outlet valve Shuizui and not using the rapid opening and closing of the water supply fittings.(2) In order to reduce the flow induced vibration noise, according to the condition of the water supply pipe and selection of density of sanitary ware, and according to the standard setting of pipe support and hanger. Different pipes with different support spacing requirements; design pipeline fixing bracket, also should consider from pipeline temperature changes caused by the expansion and contraction force.(3) To reduce the cavitation noise of ascending and descending pipe, for heating system of water distribution pipe top and to elevation of the pipe section should be equipped with automatic exhaust valve; downfeed system can use the highest water distribution point when a branch is deflated splitting meter, in the water vertical tube top with automatic exhaust valve.(4) Drainage system reduces the vertical pipe and horizontal branch connection angle, or a branch connecting the upper part special parts, reduce the horizontal branch pipe to water flow, to avoid the water jump phenomenon, thereby reducing the drainage noise.(5) Drainage pipe and drainage standpipe connection should be45 degrees,60 degreeselbow, three links, or set up a special accessories. Connections of the elbow should be composed of 2to 45 degrees elbow, and shall be on the elbows set supporting pier or bracket. In this way, can slow down the drain pipe and the drain pipe of the water flow in the water flow and vertical draining pipe wall impact noise.(6) To increase the horizontal trunk pipe and vertical pipe and horizontal trunk pipe connecting bend radius of curvature, or installed with reduced height of hydraulic jump, stable drainage pipe pressure function lower special accessories, to improve the horizontal trunk pipe drainage condition.5 Conclusion:Living, live as the mankind indispensable material conditions, is restricted by social productivity, at the same time, is also the social productivity development level indicates one of. From the initial human ancestor looking for natural caves and trees do sacrifice body are today a multi-storey and high-rise residential buildings and supporting a full range of public facilities of residential area, residential construction technology, marked the social productive forces to a new level. Today, our life has stridden to well-off, residential construction quality, indoor and outdoor environment improvement, so that our country's housing situation in recent years have varying degrees of change. In residential construction, although our country starts later, but the government has pledged, formulate corresponding policies, government departments to organize and mobilize all aspects involved in residential development plan, planning, design, construction and management. No doubt, this is a huge task, need government, the construction industry and the vast majority of the practitioners, down-to-earth to make unremitting efforts. Upgrade and improvement of our people 's living environment and living conditions. With the water supply and drainage pipe of continuous improvement, we should constantly sum up the design and installation of the experience lesson in the process, improve the general level of the installation. Professional supervision engineer shall be in this play a greater role in the. In the new century, building water supply and drainage will shoulder the historical responsibility, facing new challenges. Building water supply and drainage will be more prominent in the people-oriented principle, and will focus on the adjustment to the civil and industrial construction to pay equal attention to both, public buildings and residential buildings, water supply and water supply and water, water pressure, and water quality to pay equal attention to, direction, into a comprehensive, balanced,practical, safe development road.References[1] Li Wenqing, Shao Zhuang. Building fire water supply and some problems in construction. Heilongjiang water conservancy science and technology,2006(4).[2] Chen Zhentie. Building water supply and drainage specialty on the coordination [J ]. Water supply and drainage, l996(11).[3] king growth. Building water supply and sewerage engineering ( Fifth Edition ) [ M]. Beijing: China Building Industry Press,2005[4] GBJ242 82heating and sanitary engineering code for construction and acceptance of.[5] CJJ / T29 - 98building drainage pipeline project technical specification of hard vinyl chloride.[6] GB5026l96automatic sprinkler systems code for construction and acceptance of.浅谈建筑给排水施工中的常见问题及解决孙峰摘要:建筑给排水施工质量的好坏直接影响建筑物的使用。

中东别墅给排水设计说明中英文对照WORD板

中东别墅给排水设计说明中英文对照WORD板

中东别墅给排水设计说明中英文对照WORD板Middle East Villa Plumbing Design Instructions设计目的:本文旨在阐述中东别墅给排水系统设计的要点和注意事项,以确保系统工作稳定可靠,并满足居民的日常生活需求。

Design Objective: This document aims to elucidate the key points and considerations in the design of plumbing systems for Middle East villas, ensuring the stability, reliability, and satisfaction of daily living requirements for residents.一、设计原则1. Design Principles1)保证供水安全:运用符合国家标准的材料,确保供水水质符合卫生要求,防止水质被污染。

1) Ensure Water Safety: Use materials in accordance with national standards to ensure that the water supply meets hygiene requirements and prevent water contamination.2)节约水资源:设计合理的给水系统,减少水的浪费,提高水资源利用效率。

2) Conserve Water Resources: Design a reasonable watersupply system to minimize water waste and improve water resource utilization efficiency.3)防止交叉感染:合理布置给排水管道,防止污水与饮用水交叉,确保居民健康。

给排水工程屋顶排水中英文对照外文翻译文献

给排水工程屋顶排水中英文对照外文翻译文献

中英文对照外文翻译(文档含英文原文和中文翻译)Short and Long Term Advantage roof drainage design performance Decade has witnessed great changes in the design of the roof drainage system recently, particularly, siphon rainwater drainage system has been gradually improved, and there is likely to be the key application. At the same time these changes, urban drainage system design has undergone tremendous changes, because the scope of a wider urban drainage system design for sustainable development, as well as people for climate change flooding more attention. The main contents of this article is how to design roof drainage systems and make a good performance. Special attention is how to get rid of bad habits already formed the design, but also need to consider innovative roof drainage system, such as green roofs and rainwater harvesting systems.Practical application: In the past few years, the design of the roof rainwater drainage system has undergone tremendous changes. On large buildings, siphon rainwater drainage technology has been very common, as well as green roofs because it is conducive to green development, being more and more applications. Taking into account the ongoing research, this article focuses on how to effectively design a variety of roof rainwater drainage system, and make it achieve the desired design effect.1. IntroductionIn the past decade, the city and the water drainage system design has been widely accepted thinking about sustainable urban drainage system, or the optimal management direction. The main principles of the design of these systems is both a local level in line with the quality of development, but also to create some economic benefits for the investors. This principle has led to the development of new changes in the sump. Although the application of such a device isgradually reduced, but the urban environment relatively high demand areas still require 100% waterproof and rapid drainage, such as the roof. Typically roof drainage system in the design, construction and maintenance has not been given due attention. Although the drainage system investment costs account for only a small portion of the total construction investment, but not able to judge the loss caused by poor design.There are two different forms of roof drainage system design methods, namely the traditional and siphon method. Traditional systems rely on atmospheric pressure work, the drive ram affected sink flow depth. Therefore, the conventional roof drainage systems require a relatively large diameter vertical drop tube, prior to discharge, all devices must be connected to the groundwater collection pipe network. In contrast, siphonic roof drainage pipe systems are generally designed to full flow (turbulent flow means that require less exhaust pipe), which will form a negative pressure, the larger the higher flow rate and pressure head. Typically siphon system requires less down pipe work under negative pressure to the water distribution network can mean higher altitude work, thereby reducing the amount of underground pipe network.Both systems consists of three parts: the roof, rainwater collection pipes, pipe network.All of these elements are able to change the water pressure distribution system. This section focuses on the role and performance of each part. Due to the principle of siphon system has not been well understood, resulting argument is relatively small, this article will highlight siphon system.2. RoofThe roof is usually designed by the architect, designer and not by the drainage design. There are three main roof.2.1 Flat roofFlat roofs are used in industrial buildings less rainfall regions and countries. This roof is not completely flat, but lower than the minimum roof slope may require. For example, the United Kingdom require maximum slope of 10 °. Setting minimum slope in order to avoid any unnecessary water.Despite the flat roof if it is not properly maintained will have more problems, but it will reduce the dead zone within the building, and the ratio of sloping roofs in favor of indoor air.2.2 sloping roofsMost residential and commercial buildings are pitched roof, inclined roof is the biggest advantage can quickly drain, thereby reducing leakage. In temperate regions, we need to consider carrying roof snow load. Once it rains, rainfall through the sloping roofs can be determined by calculation. When rainfall data can be used, you can use the kinematic theory to solve such problems.2.3 green roof (flat or inclined)It can prove roof is the oldest green roofs, including rainfall can reduce or disperse roof planted with plants. It can be planted with trees and shrubs roof garden, it can also be a vegetated roof light carpet. Wherein the latter technique has been widely used. Some of these applications tend to focus on aesthetic requirements and are often used in green development. Since the aesthetic requirements and pressure requirements, as well as green roofs thermal insulation function, reduce the heat island effect, silencer effect, extend the life of the roof.Green roofs in Germany, the most widely used, followed in North America, but to consider the impact on the aesthetics. Germany is by far the most experienced countries in the 19th centuryhave practical application, then as an alternative to reduce the risk of fire tar roof an option in urban areas. Germany is currently the main research question on the cultivation of other issues to consider smaller cities. A study from 1987 to 1989, was found packed with 70 mm thick green roof can be reduced by 60% -80% of heat loss. In a Canadian work computer model based on the roof indicates that as long as the sump, the area can reach 70% of the roof area can be reduced by 60 percent in one year, the same model was also used for artificial rainfall, which the results indicate that rainfall in the catchment season helps to drain away rainwater.However, none of these studies show that green roofs can play a useful role in the rainfall season, or how high collection efficiency of water supply. The United States did some tests, as long as the green roofs regular watering, can reduce 65 percent of the runoff in a rainfall. America's most authoritative green roof guidelines by the New Jersey state environmental agencies promulgated. The main principle is to solve the structural problems of light, and how can the normal drainage after two years.Rainfall period is based on the probability of failure is determined. The system is typically based on rainfall during rainstorms two minutes, two minutes, have a choice. Although this model will get more traffic, but there is no other better alternative. Studies have shown that the traditional model is applied to study green roofs are premature.Loss factor than traditional roof records should be small, about 98.7%.Peak flow will be reduced, although not penetrate, the surface roughness but also have a significant impact.Concentrated rainfall than two minutes for a long time, especially for large roof areas, such as public buildings, commercial buildings, industrial buildings.Urban drainage design should also consider other factors, for a complex system, a green roof in a rain is not enough. Water flow duration curve shows a longer than traditional systems. And two independent and will affect between is possible, which requires a more precise time period. 3. Rainwater CollectorBasic requirements rainwater collector is designed to be able to accommodate rainfall rainstorms. Although it is possible to make a slightly inclined roof drainage purposes, but the nature of the construction industry and building settlement will become flat roof Typically, the tank is placed in a horizontal, sectional view of the water is outwardly inclined, which the role of hydrostatic.3.1 drain outletAnalyzing rainwater collector has sufficient volume is the key to the sump outlet external setting conditions. Also affect the flow rate into the storm water drainage system piping, but also affect the depth of the water catchment. Although the depth of the sump will not bring any particular problems, but too deep can cause excessive sump.Numerous studies in the 1980s showed that the flow of conventional roof drainage system outlet can be divided into two cases. It depends on the size of the depth and size of the outlet. When the water depth is less than half the diameter of the outlet, the flow of the first type, and the outlet of the flow can be calculated by an appropriate equation; water depth increases, exports are slowly clogging the flow will become another form forms, at the same time, the flow of exports can be obtained through other equations. While conventional roof drainage systems are designed to be free-draining, but may cause limitations encountered in the design of the flow is not free. In this case, it will require additional depth.Siphon roof drainage systems, the outlet is designed to be submerged stream. In this case, the depth of the outlet of the decision is more complicated, because the design of the sump depends on the flow. Recent studies have shown that conventional roof drainage systems use a variety of non-standard catchment, their depth and height, bigger than the diameter of the outlet. This will eventually result in a siphon effect. For a given catchment, the flow depends on the starting end of the drop tube diameter. A similar phenomenon has also been used to study the standard catchment, in these circumstances, only limited siphon action occurs within relatively close distance from the exit.3.2 tank flow classificationIn the complex flow sump outlet flow classification, can be seen from Table 2a, the flow will be uniform layering, regardless of whether the same inlet flow. Table 2b and 2c show, export distribution will greatly influence the flow.When the outlet is not a free jet, sump outlet complex flow classification is difficult to describe. Because each catchment tank pressures are likely to be merged. For example, the siphon tube system design point is at near full jet outlet flow classification depends on the energy loss of each branch.3.3 hydrostatic sectionalSump shape of the water surface in the canal can be classified according to the flow equation. In most cases, a low flow rate means that there is less friction loss, if exports are free jet, the friction loss is negligible cross-section through the hydrostatic equation 1 to determine the horizontal distance.Where Q-- flow (m3 / s)T- surface width (m)g- acceleration of gravity (m / s2)F- flow area (m2)Equation 1 can not be ignored when the friction required to correct (or very long pipe velocity is large), or not a free jet.3.4 The current design methodsThe previous discussion has highlighted the main factors that should be considered with sink design. However, without the help of a certain number of models, computing hydrostatic sectional roof drainage system, the volume of the sump is possible. This large commercial and manufacturing industry, is a development opportunity, you can merge several kilometers of water routes. Thus, the conventional drainage system sump design methods are mainly based on experience, and assume that exports are free jet.Sump location in the building, it may cause the example to fail.Different interface sumpExcept in the case cited above, but also allows designers to use empirical data.3.5 Digital ModelLarge number of digital models can be used to accurately describe the flow of any form of catchment tank, regardless of whether the roof flows stable. An example of this model is a combination of roof space model. This model enables users to classify different aspects of the data indicated, includes: details of the rains, the roof surface drainage and other details. Kinematics have also been used to study rainwater tank to flow from the research collection. A typical method is based on open system to solve a basic problem of spatial mobility. This model automaticallyresolve the sump outlet flow situation, but also to deal with the case of free jet can also be simulated space limited mobility and submerged discharge. Output values include depth and flow rate.Currently, the model is essentially just a variety of research tools, but also through practical engineering test. However, we should face up to the various role models.4 pipe systems groupComposition in the form and scope of the tube group determines the roof drainage system relies mainly on the traditional system or siphon action.4.1 Traditional stormwater systemsConventional roof drainage systems, the ground plane is generally vertical pipe-line network, connected to the sump outlet and underground drainage systems, critical systems as well as compensating tube. It should be emphasized that the angle between the ground and the compensating tube is less than 10 °. Capacity of the entire system relies mainly on the outlet tube instead of down.Flow vertical tube is usually free-flowing, full of only 33%, the efficiency depends on the excess length of the tube. If the drop tube long enough (typically greater than 5m), there may be an annular flow. Similarly, under normal circumstances flow compensation pipe is free-flowing, full of up to 70%. Such designed process both for the design, various equations can also be used.4.2 Siphon roof drainage systemIn contrast with the traditional drainage systems, Siphon roof drainage system relies on air flow outside the system, and the tube is full pipe flow stream.The designs are usually made on the assumption that the design of heavy rain, the system can quickly siphon discharge rainwater. This assumption allows the application of hydrostatic siphon system theory. Often used steady flow energy equation. While this approach ignores the small amount of energy loss at the entrance, but after the experiment showed that there are still conducive to practical use.However, steady-state design methods in the siphon system is exposed to rain when the system does not meet the standard requirements or changes in rainfall intensity is large is not applied. In the first case, there will be some mixing of air quality, annular flow occurs. These problems are not integrated in the system when more serious. Because usually designed rains are common, it is clear now design methodology over time may not apply to siphon system. This is a major disadvantage, because the design of the main problem is the noise and vibration problems.Despite the disadvantages of the prior design approach, but a lot of the world's very few engineering failure reports. When a failure occurs, most likely for the following reasons: An incorrect understanding of the operation pointsSubstandard materials listInstallation defectsMaintenance mismanagementTo overcome these disadvantages, we have recently launched a series of research projects, to discuss the siphon system, and the development of digital models. From this work we learn a lot. In contrast with conventional design methods of some assumptions, siphon system mainly has the following aspects:1) non-flow system of full flow2) levels of certain pipe-flowing full pipe flow3) full pipe flow downstream propagation through a vertical pipe, riser, etc.4) the inner tube flow occurs over the vertical section, the system to reduce the pressure5) downward tube is full pipe flow, there will be air lock6) appears completely siphon action until well into the air system is lower than a certain levelTable 4a column data indicate that below the design point, the system will siphon unstable flow, depth of the water collecting tank is insufficient to maintain the siphon action. Table 4b show that the unsteady flow in siphon system when it will appear.Table 5 lists the data output of a digital model. It can be seen that the model can accurately describe the siphon action, siphon and steady state, the data also show that the model can accurately describe the complex siphon action.5 ConclusionThis article has illustrated the critical roof drainage systems, but these are often overlooked in the urban drainage system design. This article also shows that the design process is a complex process, rely mainly on the performance of exports. The following conclusions are based on the design summed up:1) Run depend on three interacting parts: the roof, sump, water pipes2) Green roofs can reduce traffic and beautify the city3) the export performance of the system is essential4) siphon drainage system have a greater advantage in large-scale projects, but must be considered high maintenance costs5) Design siphon drainage system should consider additional capacity and operational issuesAlthough the green roof is a more attractive option, but the traditional roof of a building in the country will continue to dominate. Green roofs will be gradually developed, and gradually been widely accepted. Similarly, the roof drainage system shown effective that it will continue to play a huge role in the commercial building drainage systems.Roof drainage system of the greatest threats from climate change, existing systems tend to be not simply aging; rainfall patterns of change will result in inefficient operation, self-cleaning rate will be reduced. Changes in wind speed and the roof will also accelerate the aging of the roof, it is necessary to carry out maintenance. Taking into account the climate change, the increase in materials, roof collected rainwater will be more extensive. Currently, the amount of rain around the globe per person per day 7-300 liters in the UK, with an average consumption of 145L / h / d, of which only about one liter is used by people, about 30 per cent of the toilet, study shows If water shortage, rainwater collected on the roof of developed and developing countries are recommended approach.屋顶排水设计性能的近期与远期优势最近十年见证了屋顶排水系统设计方面的巨大变化,特别的是,虹吸雨水排水系统已经得到逐步改善,并且有可能得到重点应用。

给水排水中英文对照外文翻译文献

给水排水中英文对照外文翻译文献

中英文对照外文翻译文献(文档含英文原文和中文翻译)原文:Optimum combination of water drainage,water supply and eco-environment protection in coal-accumulated basin of North ChinaAbstract The conflict among water drainage,water supply and eco-environment protection is getting more and more serious due to the irrational drainage and exploitation of ground water resources in coal-accumulated basins of North China.Efficient solutions to the conflict are tomaintain long-term dynamic balance between input and output of theground water basins,and to try to improve resourcification of the mine water.All solutions must guarantee the eco-environment quality.This paper presents a new idea of optimum combination of water drainage,water supply and eco-environment protection so as to solve theproblem of unstable mine water supply,which is caused by the changeable water drainage for the whole combination system.Both the management of hydraulic techniques and constraints in economy,society,ecology,environment,insustuial structural adjustments and sustainable developments have been taken into account.Since the traditional and separate management of different departments of water drainage,water supply and eco-environment protection is broken up these departments work together to avoid repeated geological survey and specific evaluation calculations so that large amount of national investment can be saved and precise calculation for the whole system can be obtained.In the light of the conflict of water drainage,water supply and eco-environment protection in a typical sector in Jiaozuo coal mine,a case study puts forward an optimum combination scheme,in which a maximum economic benefit objective is constrained by multiple factors.The scheme provides a very important scientific base for finding a sustainable development strategy.Keywords combination system of water drainage,water supply and eco-environment protection,optimal combination,resourcification of mine water.1Analyses of necessity for the combinationThere are three related problems in the basin.It is well known that the major mine-hydrogeological characteristics of the coal accumulated basin in North China display a stereo water-filling structure,which is formed by multi-layer aquifers connected hydraulically together with various kinds of inner or outer boundaries.Mine water hazards have seriously restricted the healthy development of coal industry in China because of more water-filling sources and stronger water-filling capacity in coal mines of the basin.Coal reserves in the basin are threatened by the water hazards.In Fengfeng,Xingtai,Jiaozuo,Zibao,Huaibei and Huainan coal mine districts,for example,it is estimatedthat coal reserves are threatened by the water hazards up to 52%,71.%40,%,60%,48%and 90%of total prospecting reserves respectively.It is obvious that un-mining phenomenon caused by the water hazards is serious.Water-bursting accidents under coal layers have seriously influenced safe production.Some statistical data show that there were 17 water-bursting accidents with over 1 m3/s inflow from 1985.Water drainage is an increasing burden on coal mines threatened by water hazards:high cost of water drainage raises coal prices and reduces profits of the enterprise.On the other hand,it is more and more difficult to meet the demand of water supply in coal mine districts in the basin.The reasons are not only arid and semi-arid weather conditions,but also a large amount of water drainage with deep drawdown in coal mines and irrational water exploitation.The deterioration of eco-environment is another problem.Phenomena of land surface karst collapse can be found.Many famous karst springs,which are discharge points for the whole karst groundwater syatem,stop flowing or their discharge rates decrease on a large scale.Desert cremophytes in large areas in west China die because of falling groundwater level.These three problems are related and contradictory.In order to solve the problems while ensuring safe mining,meeting water resource demands and slowing down the pace of eco-environment deterioration,it is necessary to study the optimum combination of water drainage,water supply and eco-environment protection in the basin.2The state of the art of research and the problemsAlthough research into the combination of water drainage and water supply started much earlier in some countries,their conception is simple and some shortcomings remain in their study on the theory and pattern of combination.China’s research history on the combination can be divided into three stages.The first stage is the utilization of mine water.A century ago mine water started to be used as water supply for mines.But the utilization scale and efficiency were quite limited at that time.The second stage is a comprehensive one:mine water was used while water hazards were harnessed.Great progress was made both in theory and practice of the combination.For example,the combination of water drainage and water supply not only means the utilization of mine water,but also means that it is a technique of preventing water hazards.It is unfortunate,however,that the combination research in this stage offered less sense ofeco-environment protection.Optimum combination management of water drainage,water supply and eco-environment protection is the third stage.Main features in this stage are to widen traditional research,and to establish an economic-hydraulic management model,in which safe mining,eco-environment protection and sustainable development demands,etc.are simultaneously considered as constraint conditions.3Trinity systemThe trinity system combines water drainage,water supply and eco-environment quality protection.The water-collecting structures of the system consist of land surface pumping wells in the mines,shallow land surface well in groundwater recharge areas and artificial relief wells under the mines.Both integration and coordination for the trinity system are distinguished according to the combination.The integration for the system means to utilize drainage water under the mines and pump water onto the land surface as water supply for different purposes without harming the eco-environmental quality.The coal mines are not only drainage sites,but also water supply sources.The purpose of drilling pumping wells on the land surface is to eliminate special influences on different consumers,which are caused by terminating drainage processes under the mines due to unexpected accidents in mining.The coordination for the system means to bulid some water supply sources for different consumers while ensuring eco-environmental quality in groundwater recharge positions,where pumping groundwater is quite effective on lowering groundwater heads in the mine areas.Itintercepts in advance the recharging groundwater flow towards the mines,which may not only provide consumers with good quality groundwater,achieve the goal of dropping down groundwater heads in the mines,but also effectively reduce the high costs of drainage and water treatment,which are needed by traditional dewatering measures with large drainage flow rates under the mines.The coordination changes the traditional passive pattern of preventing and controlling groundwater hazards under the mines into that of active surface interception.Both very developed karst flow belts and accumulated groundwater recharge ones under the ground are relatively ideal interceptive coordination positions in the system.For the integration of the trinity system,artificial relief wells under the mines and the land surface pumping wells mainly penetrate into direct thin bedded karst aquifers interbedded with the mining coal layers,while for the coordination of the system,the shallow land surface wells mainly penetrate into very thick karst aquifer.Therefore,hydrogeological conceptual model for the system involves the multi-layer aquifers connected hydraulically by different inner boundaries.Setting up stereo hydrogeological conceptual models and corresponding mathematical models is a prerequisite for solving the managemental problems for the system.Management of the trinity system not only considers the effects of lowering groundwater heads and safe operation for water drainage subsystem,but also pays attention to the water demands for water supply subsystem and quality changes for eco-environment protection subsystem.They play the same important role in the whole combination system.It controls the groundwater heads in each aquifer to satisfy the conditions of safe mining with certain water head pressures in the mines,and to guarantee a certain amount of water supply for the mines and near areas,but the maximum drawdown of groundwater must not be ex ceded,which may result in lowering eco-environmental quality.4Economic-hydraulic management modelIn the trinity system management,groundwater resources in the mines and nearby areas,which are assessed on the premise of eco-environment qualities and safe operation in the mines,may be provided as water supply prices,drainage costs,transportation costs(including pipeline and purchasing the land costs)and groundwater quality treatment costs for the three different waterconsumers,the optimum management models may automatically allocate to each consumer a certain amount of groundwater resources and a concrete water supply scenario based on comparisons of each consumer’s economic contribution to the whole system in objective function.Therefore the management studies on the optimal combination among water drainage,water supply and eco-environment protection involve both the management of groundwater hydraulic techniques and the economic evaluations,eco-environment quality protection and industrial structure programs.In addition to realizing an economic operation,they also guarantee a safe operation which is a key point for the combination of the whole system.5The management model for the trinity system can reach water supply goals with drainage water under the mines and the land surface pumping water on the premise of ensuring eco-environmental quality.And it can make use of one model to lay down comprehensively optimum management scenarios for each subsystem by means of selecting proper constraints and maximum economic benefit objective produced by multiple water consumers.The model can raise the security and reliability of operation for the whole trinity system,and the drainage water can be forecast for the mines and the management of water supply resource and the evaluation of eco-environment quality can be performed at the same time so as to respectively stop the separate or closed management,of departments of drainage water,water supply and eco-environment protection from geological survey stage to management evaluation.This,in economic aspect,can not only avoid much geological survery and special assessment work which are often repeated by the three departments,and save a lot of funds,but also ,in technical aspect,make use of one model to simultaneously consider interference and influence on each other for different groundwater seepage fields so as to guarantee calculating precision of the forecast,the management and the evaluation work.The economic-hydraulic management model can be expressed as follows.6 A case studyA typical sector is chosen.It is located in the east of Jiaozuo coal mine,Henan Province,China.Itconsists of three mines:Hanwang Mine,Yanmazhuang Mine and Jiulishan Mine.The land surface is flat,and the whole area is about 30 km2.An intermittent river Shanmen flows through the sector from the north to the south.Average annual precipitation in the sector is about 662.3mm.Theprecipitation mainly concentrates inJune,July,August and September each year.Strata in the sector consist of very thick limestone in Middle Ordovician,coal-bearing rock series in Permo Carboniferous and loose deposits in Quaternary.There are four groups of faulted structures.The first is in northeast-southwest direction such as F3 and F1..The second is in the northwest-southeast direction such as Fangzhuang fault.The third is in the east-west direction such as Fenghuangling fault.The last is almost in north-south.These faults are all found to be normal faults with a high degree of dip angle.Four major aquifers have been found in the sector.The top one is a semi-confined porous aquifer.The next one is a very thin bedded limeston aquifer.The third is a thin bedded limestone aquifer.The last one at the bottom is a very thick limestone aquifer.Objective function of the management model is designed to be maximum economic benefit produced by domestic,industrial and agricultural water supply.Policy making variables of the model are considered as the domestic,industrial and agricultural groundwater supply rates in every management time step,and they are supplied by artificial relief flow wells under the mines,the land surface pumping wells in the mines and the shallow land surface wells in the groundwater recharge areas.All the 135 policy making variables are chosen in the model,27 for drainage wells under the mines in aquifer,27 for the land surface pumping wells in the mine districts in aquifer 27 in aquifer 27 in aquifer O2 27 for the shallow land surface wells in aquifer O2Based on the problems,the following constraint conditions should be considered:(1)Safe mining constraint with groundwater pressure in aquifer L8.There are altogether three coalmines in the typical sector,i.e.Hanwang Mine,Yanmazhuang Mine and Jiulishan Mine.Elevations of mining level for these mines are different because it is about 88-150 m in the second mining level for Hanwang Mine,and -200m in the second mining level for Yanmazhuang Mine,and-225 m in the first mining level for Jiulishan Mine.According to mining experiences,pressure-loaded heights for groundwater heads in safe mining state are considered as about 100-130m.Therefore,the groundwater level drawdowns in the three management time steps for aquifer L8 at three mines have to be equivalent to safe drawdown values at least in order to pervert groundwater hazards under the mines and to guarantee their safe operation.(2)Geological eco-environment quality constraint.In order to prevernt groundwater leakage fromupper contaminater porous aquifer into bottom one and then to seepage further down to contaminate the thin bedded limestone aquifer in the position of buried outcrop,the groundwater heads in the bottom porous aquifer must keep a certain height,i.e.the groundwater drawdowns in it are not allowed to exceed maximum values.(3)Groundwater head constraint at the shallow land surface wells in aquifer O2,The shallow landsurface wells should penetrate in aquifer O2 in order to avoid geological environment hazards,such as karst collapse and deep karst groundwater contamination.Groundwater head drawdowns in aquifer O2 for the shallow land surface wells are not allowed to exceed criticalvalues.(4)Industrial water supply constraint for the groundwater source in aquifer O2 .The rate ofindustrial water supply needed by the planned thermal power plant in the north of the sectoris designed to be 1.5 m3/s according to the comprehensive design of the system in thesector.In order to meet the demands of water,the rate industrial water supply for thegroundwater source in aquifer O2 in every management time step must be equivalent at leastto 1.5 m3/s.(5)Maximum amount constraint of groundwater resource available for abstraction.In order tomaintain the balance of the groundwater system in the sector for a long time and to avoid anyharmful results caused by continuous falling of groundwater head,the sum of groundwaterabstraction in each management time step is not allowed to exceed the maximum amount ofgroundwater resource available for abstraction.Since there is not only water drainage in the mines,but also water supply in the whole combination system,management period for the model is selected from June 1,1978 to May 31,1979,in which annual average rate of precipitation is about 50%.Management time steps for the period are divided into three.The first one is from June to September,the second from October to next January,and the last one from next February to May.According to comprehensive information about actual economic ability,economic development program and industrial structure adjustment in the sector at present and in the near future,and different association forms of water collecting structures among the land surface pumping wells,the shallow land surface wells and artificial relief flow wells under the mines,this paper designs 12 management scenarious,all of which take the safe operation in the trinity system as the most important condition.After making comparisons of optimum calculation results for the 12 scenarious,this paper comes to a conclusion that scenarios is the most ideal and applicable one for the typical sector.This scenario not only considers the effective dewatering advantage of the artificial relief flow wells under the mines and safe stable water supply advantage of the land surface pumping wells,but also pays attention to the disadvantage of low safe guaranty rate for the relief flow wells under the mines for water supply and of large drilling investment in the land surface pumping wells.Meanwhile,eh shallow land surface wells inaquifer O2in this scenario would not only provide water supply for the thermal power plant as planned,but also play an important role in dewatering the bottom aquifer,which is major recharge source of groundwater for the mines.If the drainage subsystem under the mines runs normally,this scenario could fully offer the effective dewatering functions of the artificial relief flow wells under the mines,and makes the trinity system operate normally.But if the drainage subsystem has to stop suddenly because of unexpected accidents,the scenario could still fully utilize the land surface pumping wells and the shallow land surface wells,and increae their pumping rates in order to make up for temporary shortage of water supply for the trinity system and to make its economic losses reduced to a minimum extent.Increasing groundwater abstraction rate for the land surface pumping wells and the shallow land surface wells,in fact,is very favorable for harnessing the water-accidents under the mines and for recovery production of the mines.To sum up,this scenario sets up a new pattern for the combination of water drainage,water supply and eco-environment protection.It solves quite well the conflicts between the low safe guaranty rate and the effective dewatering result for the artificial relief flow wells under the mines.It makes full use of beneficial aspect of the conflicts,and meanwhile compensates for the unbeneficial one by arranging the land surface pumping wells in the coal mine districts.Therefore,this scenario should be comprehensive and feasible.In this scenario,Hanwan Mine,Yanmazhuang Mine and Jiulishan Mine are distributed optimally for certain amount of domestic and industrial water supply,but not for much agricultural water supply.The land surface pumping wells are also distributed for different purposes of water supply.The water supply for the thermal power plant (1.5 m3/s) is provided by the shallow land surface prehensive effects,produced by the above three kinds of water collecting structures,completely satisfy all of the constraint conditions in the management model,and achieve an extremely good economic objective of 16.520551million RMB yuan per year.In order to examine the uncertainty of the management model,12management scenarios are all tested with sensitive analysis.7Conclusion(1)The optimum combination research among water drainage,water supply and eco-environmentprotection is of great theoretical significance and application value in the basin of North China for solving unbalanced relation between water supply and demands,developing new potential water supply sources and protecting weak eco-environment.(2)The combination research is concerned not only with hydraulic technique management but alsowith constraints of economic benefits,society,ecology,environment quality,safe mining and sustainable development in the coal mines.(3)The combination model,for the first time,breaks up the closed situation existing for a longtime,under which the government departments of drainage water,water supply and eco-environment protection from geological survey stage to management evaluation work respectively.Economically,it can spare the repeated geological survey and special assessment work done by the three departments and save a lot of funds;technically,one model is made use of to cover the interference and influence each other for different groundwater seepage fields soas to guarantee a high calculating precision of the forecast,the management and the evaluation work.(4)The management scenario presented in the case study is the most ideal and applicable for thetypical sector.This scenario not only makes full use of the effective dewatering advantages of the artificial relief flow wells under the mines and safe stable water supply advantages of the land surface pumping wells,but also pays attention to the disadvantages of low safe guaranty rate for the relief flow wells under the mines for water supply and of large drilling investment for the land surface pumping wells.References1.Investigation team on mine-hydrogeology and engineering geology in the Ministry ofGeology and Mineral Resources.Investigation Report on Karst-water-filling Mines(inChinese).Beijing:Geological Publishing House,19962.Liu Qiren,Lin Pengqi,Y u Pei,Investigation comments on mine-hydrogeological conditionsfor national karst-water-filling mines,Journal of Hydrogeology and Engineering Geology(in Chinese),19793.Wang Mengyu,Technology development on preventing and curing mine water in coalmines in foreign countries,Science and Technology in Coal(in Chinese),19834.Coldewey,W.G.Semrau.L.Mine water in the Ruhr Area(Federal Republic of Germany),inProceedings of 5th International Mine Water Congress,Leicestershire:Quorn SelectiveRepro Limited,19945.Sivakumar,M.Morten,S,Singh,RN,Case history analysis of mine water pollution,inProceedings of 5th International Mine Water Congress,Leicestershire;Quorn SelectiveRepro Limited,19946.Ye Guijun.Zhang Dao,Features of Karst-water-filling mines and combination betweenwater drainage and water supply in China,Journal of Hydrogeology and EngineeringGeology(in China),19887.Tan Jiwen,Shao Aijun,Prospect analyses on Combination between water drainage andwater supply in karst water basin in northern China,Jounnal of Hebei College ofGeology(in Chinese),19858.Xin Kuide,Yu Pei,Combination between water drainage and water for seriouskarst-water-filling mines in northern China,Journal of Hydrogeology and Engineering Geology(in Chinese),19869.Wu Qiang,Luo Yuanhua,Sun Weijiang et al.Resourcification of mine water andenvironment protection,Geological Comments(in Chinese),199710.Gao Honglian,Lin Zhengping,Regional characteristics of mine-hydrogeological conditionsof coal deposits in China,Journal of Hydrogeology and Engineering Geology(in Chinese),198511.Jiang Ben,A tentative plan for preventing and curing measures on mine water in coal minesin northern China,Geology and Prospecting for Coaofield(in Chinese),1993中国北方煤炭积聚区的最佳组合排水,供水和生态环境保护摘要为了开采中国北方煤炭资源丰富的区域,不合理的排水使排水、供水和保护生态环境之间的冲突日趋严重。

建筑给排水工程设计外文翻译--水表设置

建筑给排水工程设计外文翻译--水表设置

外文资料翻译On setting the metersetting the meter. Long-term since, our country residence water meter are arranged on the indoor kitchen or toilet water concentration, the water more and scattered residences, sometimes even a indoor set more than one meter. In recent years, water meter is arranged on the indoor and caused many problems cause the attention of people increasingly: Home meter reading disturbs people 's normal life and may lead to residential burglary, privacy and safety not guaranteed: management of meter reading meter reading is not easy and large labor intensity: individual user steals water management departments to prevent and punish and so on. Because of these problems, water production has become an inevitable choice. Therefore, the newly revised national standard ( code for design of building water supply"GBJ15--88article 2.5.8: residential building should be installed in household water meter, household water meter or household water meter digital display should be located outdoors. Meter households generally have the following ways: Household water meter concentrated in the roof ( water supply ) or the underlying space ( water supply ). This mode is often used for multi-stormy residential. In general a unit provided with a ladder of water meter water meter well ( box ), household water pipe along the interior tube or building wall into the indoor. The utility model has the advantages of convenient reading; reading, low labor intensity of workers, can avoid users water behavior. Disadvantages are: material consumption, head loss of pipeline, occupying larger space pipeline well, such as a wall is easy to affect the appearance of the building, the user branches not easy maintenance.Meter is arranged on the stair landing platform. Vertical water supply pipe is arranged on the platform, each provided with a water tank; the water meter box embedded platform resting on both sides of the wall. The utility model has the advantages of: user branches short, saving material, low head loss of pipeline, the shortcoming is: water dispersed settings, meter reading personnel of great labor intensity; usually indoor fire hydrant box is installed on a platform, so that the already crowded rest platform more cramped, traffic inconvenience to the residents.Each layer isMeter centralized meter room, household water meter on the wall. The utility model has the advantages of the same with B, the disadvantages are: household pipeline must follow the public walkway under floor into interior and corridors, ceiling requirements.Will be the traditional ordinary mechanical water meter changes for telemetering water meter or IC card intelligent water meter. Remote water meter accurate calculation without reading, this form must be a deposit a certain amount of water, will recharge after insertion of the IC card water meter reading can be water. Because the remote water meter and IC card table relatively expensive and technically still exist certain problems, hence in practice has not been widely applied.Above a few kinds of water-meter, each has its advantages and disadvantages, concrete in practical engineering design in which way, by the design staff according to residential properties, grades and local industry management department requirement.1.2water supply pipe arrangement and laying. At present, to build the house in one hutch two defend very general already, even with some houses one hutch three defend one hutch four defend, kitchen, toilet, the balcony, and each water using point locations are more dispersed. User branches to water points along the interior floor pipeline such as hanging, inevitable requirement set indoor ceiling, wall should also have the anti-condensation measures to bring inconvenience, household decoration, after all, not all tenants wanted to ceiling. ( the building water supply and drainage design specification ) GB15 2000(manuscript ) as specified in article 3.6.18, water supply pipe should be laid in the floor ( ground ) surface of the leveling layer or along the wall laying pipe groove, laying the leveling layer or the tube groove water supplying pipe outside diameter is less than 25mm. In fact, if connected to two or more than two water points, water supply branch pipe are connected together in series, the pipe diameter is more than 25mm. Therefore, in order to meet the specification requirements, water supply branch door after access water separator, a water segregator dark kitchen or bathroom wall, through the diversion device connected to each water using point branch pipe diameter can be controlled under 25mm. But it should be noted: a leveling layer water supply pipe after completion of construction, should be in the position to do the obvious markers, lest the household decoration, destruction of water supply pipeline.水表设置关于水表设置。

高层建筑给排水文献综述范文

高层建筑给排水文献综述范文

高层建筑给排水文献综述范文英文回答:In this literature review, I will discuss the topic of drainage in high-rise buildings. Drainage systems play a crucial role in ensuring the proper disposal of wastewater and preventing flooding or water damage in tall buildings. There are several key aspects to consider when designingand implementing drainage systems in high-rise buildings.Firstly, the selection of suitable materials is essential. High-rise buildings often require pipes and fittings that can withstand high water pressure and are resistant to corrosion. For example, PVC (polyvinyl chloride) pipes are commonly used due to their durability and affordability. Stainless steel pipes are also a popular choice for their strength and resistance to corrosion.Secondly, the design of the drainage system should consider the vertical height and complexity of the building.Gravity plays a significant role in draining water from higher floors to lower floors, so the system must be designed to ensure smooth flow and prevent blockages. This can be achieved through the use of properly sized pipes, adequate slope, and the inclusion of air vents to prevent the formation of vacuum pockets.Furthermore, the installation of sump pumps can be beneficial in high-rise buildings. These pumps help to remove water from lower levels or basements and prevent flooding. They are particularly useful in areas with a high water table or during heavy rainfall. Sump pumps are typically installed in a sump pit and automaticallyactivate when water levels rise.Maintenance is another critical aspect of drainage systems in high-rise buildings. Regular inspections and cleaning of pipes, as well as the removal of any debris or blockages, are necessary to ensure the system functions properly. Additionally, periodic checks of sump pumps and other drainage equipment are essential to identify any potential issues and prevent failures.In conclusion, the design and implementation ofdrainage systems in high-rise buildings require careful consideration of various factors, including material selection, system design, installation of sump pumps, and regular maintenance. By addressing these aspects, the riskof water damage and flooding can be minimized, ensuring the effective and efficient disposal of wastewater.中文回答:在这篇文献综述中,我将讨论高层建筑的给排水问题。

中英文对照的建筑给排水设计说明

中英文对照的建筑给排水设计说明

中英文对照的建筑给排水设计说明MECHANICAL PRELIMINARY DESIGN REPORTSTADIUM1.给排水设计饮用水和污水1.Sanitary DesignWater and sewage water.设计基础- 甲方提供的设计任务书和市政管网综合图- 建筑专业提供的条件图- 国家现行的设计规范及有关规定设计简章.Design basesDesign Brief and Municipal integrated network drawing offered by the client. Condition drawings from architectural discipline.Current national design codes and related stipulations2. 给水系统通过一根DN200的进水管将水引入.水表安装在进水管上,离红线1米处.供水管在红线内连成环路管网,并接到供应楼的消防水池和给排水水池.由环路管网向必需的室外消火栓和绿化带的喷淋器供水.2. Water supply systemFor water supply of this project, DN200 water intake pipes are led in. Water meters are installed on the intake pipes 1.0 m away from the red line. The water supply pipes are connected into loop networks in the red line and then led to the fire pool and sanitary water pool in the supply buildings respectively. Necessary number of outdoor hydrants and sprinklers for green area will be provided on the loop networks. 设计范围包括红线内的饮用水,污水,雨水,建筑消防.Design scopeDesign scope of this project includes water, sewage water, rainwater, fire-protection in the building, and water and sewage water within the red line. 给排水水池与消防水池分开,容量为100m3 .体操馆供水管埋地敷设.Sanitary water pool is separated from fire water pool, volume of sanitary water pool is 100m3. Water supply pipes for the stadium will be laid in the earth.3.用水量标准- 体育馆: 15升/顾客·日 K=2.0- 宾馆: 150升/人·日 K=2.0- 餐厅: 50升/顾客·日 K=2.0- 工作人员: 25升/人·日 K=2.0- 地面冲洗用水: 3升/m2日- 冷却塔补水量:按用水量的2%计- 未预见水量: 按日用水量20%计- 消防用水:消火栓:室内40升/秒,室外30升/秒,火灾延续时间为3小时;自动喷洒按22升/秒,火灾延续时间为1小时卷帘水幕用水0.5升/秒·米,火灾延续时间为3小时;Water consumption standard- Stadium: 15L/visitor·day K=2.0- Hotel: 150L/visitor·day K=2.0- Restaurant: 50L/customer·day K=2.0- Staff 25L/perso n·day K=2.0- Floor cleaning: 3L/m2·dayMake-up water for cooling tower: 2% of theactual cold water consumption.Unforeseen water consumption: 20% of the dailywater consumption.Water for fire protectionHydrant: 40L/s indoor, 30L/s outdoor, fireduration time is 3h;Sprinkler: 22L/s, fire duration time is 1h;Drencher for rolling shutter: 0.5L/s·m, fire duration time is 3h;在适当的位置设置饮用水机,在主进口为残障人设置两个饮用水机.为此饮用水系统安装循环泵.机房设在地下室的水除了机房.当饮用水机不被使用时,应排空,以免水质腐败.在客房和餐厅内设置电热水器,同时亦为热水供应设置循环泵.在更衣间旁设置电热水器,为淋浴和洗盥供应热水.为楼板清洁安装一定数量的水龙头.Some suitable places are supplied with portable water drinking units, two drinking units for disable people are provided at main entrances, for this portable water system, circulating pumps are adopted, the equipment room is located in water treatment center in the basement. When there is no use, portable water will be drained completely to avoid deterioration.Electric water heaters are installed in guest rooms and restaurant, also hot watercirculating pumps will be provided for supplying hot water.Electric water heaters are installed near the changing and clothing rooms for supplying hot water for shower and washing.Certain number of water taps are installed for floor-cleaning.4.用水量最大日用水量:2.200m3/日最大时用水量:220m3/时Water consumption demandMaximum daily water consumption: 2.200m3/dayMaximum hourly water consumption: 220m3/hour却循环系统冷却水循环系统采用机械循环系统.总冷却水用量为460m3/h.在供应楼顶设置三台超低噪音冷却塔(230 m3/h, 2x 115 m3/h).进水温度37Co,出水温度32Co .补充水量9,6 m3/h.补充水由市政供水网直接提供.Cooling water circulation systemThere are cooling water circulation system in this project, cooling water for the refrigerators adopts mechanical circulation system. Total water consumption of cooling towers is 460m3/h. On roof of the supply building there are 3 ultra-low noise cooling towers (230 m3/h, 2x 115 m3/h), inlet temperature of 37Co, outlet temperature of 32Co, with make-up water of 9,6 m3/h. Make-up water of the cooling towers will be supplied directly by the municipal network.在消防泵房内有消火栓泵(一个运行,一个备用),喷淋泵(一个运行,一个备用),卷帘雨淋泵(一个运行,一个备用).用于地下车库的泡沫喷淋设备,如报警阀,泡沫压缩罐,化学药剂泵安装在消防设备中心.30.0m3 消防水箱和消防稳压装置分别安装在车库的四面墙.In the fire water pump room, there are hydrant pumps (one operation, one standby), sprinkler pumps (one operation, one standby) and rolling shutter drencher pumps (one operation, one standby).Fire equipment, which are used for the foam sprinkler system in underground garage, such as fire alarm valves, foam concentrated tank and chemical dosing pump, etc. are provided in fire equipment centers. Four 30.0m3 fire water tanks and fire protection stabilized pressure devices are respectively located at four sides next to the garages.消防用水消火栓:室内按40升/秒,室外按30升/秒,火灾延续时间按3个小时计自动喷洒按22升/秒,火灾延续时间按1小时计卷帘水幕用水量 0.5升/秒·米,火灾延续时间按3个小时计消火栓:室内,室外用水量皆为756m3;自动喷洒用水量为79.2 m3;卷帘水幕用水量为 270m3;一次火灾用水量为1.861,2;Water for fire protectionWater consumption standard for fire protectionHydrant: 40L/s indoor, 30L/s outdoor, fire duration is 3hSprinkler: 22L/s, fire duration is 1hDrencher for rolling shutter: 0.5L/s·m, fire duration is 3hWater consumption for fire protectionHydrant: indoor and outdoor water consumptions are 756m3 respectively Sprinkler: 79.2 m3Drencher for rolling shutter: 270m3Water consumption for one fire: 1.105,2 m3消火栓的布置在整个建筑物内沿墙,沿柱,沿走廊,风塔上及楼梯附近设有必要数量的室内消火栓,消火栓间距小于30米.消火栓管网水平,竖向皆成环状布置,消火栓箱内配有DN65消火栓一支,25米衬胶水龙带一条,φ19毫米喷咀水枪一支,并配消防卷盘(DN25消火栓一支,30米胶管,φ9毫米喷咀水枪一支)且设有可直接启动消火栓泵的按钮;在室内消火栓箱下设有磷酸铵盐手提式灭火器箱.室内消火栓系统在室外设有三组水泵接合器.Hydrant arrangementNecessary number of hydrants are installed indoors along the wall, columns, corridors, and staircases, at intervals of less than 30m. Hydrant networks are connected as a loop both horizontally and vertically. Inside each hydrant box, a DN65 hydrant, a 25m long rubber lined hose, a water nozzle of φ19mm, hose reel (a DN25 hydrant, a 30m long rubber lined hose and a water nozzle ofφ9mm), and a direct starting button for the hydrant pump are provided.Under each indoor hydrant box, a portable ammonium phosphate powder extinguisher box is installed. There are three sets of pump adopters being installed outdoors for the indoor hydrant system.消防系统防水泵房及消防水池供水管DN200在红线内连成环路管网,管网上安装一定数量的消火栓.两根DN200供水管分别引入供应楼内两个消防泵房内的消防水池.消防水池总容量不应小于4000m3, 每个为2.000m3.Fire protection systemWater pump room and water pool for fire protectionThe lead-in pipes (DN200) are connected as a loop inside the red line, on the loop, certain number of hydrants are installed.Two water supply pipes (DN200) are led into the fire water pools at each fire water pump room in supplybuilding. In consideration of the importance of the project, the volume of the fire water pools should be not less than 4000m3, each is 2.000m3.自动喷淋系统自动喷淋系统安装在全建筑范围,除了室外和高于10 米的房间.喷淋泵安装在地下的消防泵房内.报警阀设置在地下的消防泵房内和中间的消防设备中心内,水流显示器设在每个防火分区内.Sprinkler systemSprinkler systems will be provided inside the whole building except outside areas and roomshigher than 10m, with sprinkler pumps installed in the underground fire water pump rooms. Alarming valves installed in underground fire water pump rooms and four fire equipment centers in the middle, water flow indicators are installed by fire compartments.除了安装一个封闭喷淋系统,将为地下车库设置一个泡沫喷淋系统.餐厅内安装93oC启动的自动喷淋头,但在其它房间,仅安装93oC启动的普通和快速反应自动喷淋头.三组泵接合器安装在室外.Besides an enclosed sprinkler system, a foam sprinkler system composed of a proportioning mixer and a foam concentrated tank is provided for the underground garage. Sprinkler actuated at 93oC are provided in the restaurants, but in other rooms, only ordinary sprinklers and fast response sprinklers actuated at 68oC are provided.Three sets of pump adaptors for this system will be installed outdoors.排水系统为排水系统设置污水主立管和特别垂直排气管.排气管与污水管在每层连接,污水排出体操馆.餐厅的污水首先在油脂分离池中处理,然后排入室外排水网.给排水污水将被在化粪池收集和处理,然后排入市政排水管网.化粪池在输送区旁.最大天排水量为870m3/天.9. Drainage systemMain vertical sewage pipes and special vertical vent pipes are provided for the drainage system. The vent pipes are connected with sewage pipe at each floor; sewage water is drained out of stadium. Sewage water in the restaurants and garage are treated in the grease and oil separation tank, and then discharged into the outdoor drainage networks. Sanitary sewage water is collected and treated in the septic tank,then drained into the municipal drainage. The septic tanks are located besides the deliverycircle. Maximum daily drainage amount is 870m3/day.卷帘水幕系统地下车库设置有卷帘水幕系统.水幕泵安装在消防水泵房内,采用开式雨淋头,电动或手动控制.十组泵接合器安装在室外Drencher system for rolling shuttersRolling shutter protected by drenchers are provided for the underground garage, the drencher pumps are installed in the fire water pump rooms, open drencher heads are selected, and are controlled both by electrically and manually. Ten pump adapters will be installed outdoors for this system.地下室内污水设有污水坑,废水设有废水坑,生活污水,废水经潜污泵提升排至室外排水管网,潜污泵的启停皆由磁性浮球控制器的控制.地下汽车库废水设有废水坑,废水经潜污泵提升排至室外,经隔油池处理后排入室外雨水管网.There are cesspits for sewage water and wastewater pits for wastewater in the basement, the sewage and wastewater is sucked up and drained to the outdoor drainage networks by submerged sewage pumps.Operation of the pumps is controlled by the magnetic floating ball controllers. Wastewater pits are provided for the underground garage, wastewater is sucked up and drained to outdoor oil separation tank by submerged sewage pumps, after treated, wastewater is drained to the outdoors rainwater networks.在柴油发电机房,变配电房和通讯设备机房设低压二氧化碳气体灭火系统.Low pressure CO2 extinguisher systems are provided in diesel generator rooms, transformer substations and telecommunication equipment rooms.在本建筑内按"建筑灭火器配置设计规范"在每个消火栓箱下设手提式灭火器箱,箱内设有必要数量的磷酸铵盐手提式灭火器.According to the Code for Design of Extinguisher Disposition in Buildings, portable fire extinguisher box, in which there are necessary number of portable ammonium phosphate powder extinguishers, will be installed under every hydrant box.在每个消防电梯井底旁设有消防排水坑,废水经潜污泵提升排至室外.Fire water drain pit is provided at side of bottom of each fire elevator well, waste water will be sucked up and drained out by the pumps.雨水系统雨水排水屋顶采用压力流排水.雨水设计重现期按P=10年计算,降雨历时为5分钟,暴雨强度公式按Q=998.002(1+0.568lgP)/(t+1.983)0.465计算.沿柱在屋面设置雨水沟.雨水通过雨水沟收集,然后进入雨水头和下排管,然后到室外雨水观察井.10. Rainwater systemPressurized drainage system is adopted for roof rainwater drainage system. Here, return period P=10 years, rainfall duration is 5 minutes, stormwater amount is calculated by the following formula:Q=998.002(1+0.568lgT)/(t+1.983)0.465Rainwater gutters are provided on roof along columns, skylight. Rainwater is collected in the gutter, then to rainwater heads and downpipes, and to the outdoors rainwater inspection wells.11.管材- 生活给水管,冷却塔补水管采用铜管,氩弧焊接.- 直饮水管采用不锈管.- 消火栓管,冷却循环管,水幕管,水泵吸水管采用焊接钢管,焊接.- 自动喷洒水管,雨淋水管采用热镀锌钢管,丝扣连接或卡压连接.-二氧化碳管采用无缝钢管焊接.- 地下车库泡沫喷淋水管采用不锈钢管,卡压连接.Pipe materialCopper pipes connected by argon arc welding are adopted for the sanitary water pipes, make-up water pipes for cooling towers.Stainless stell pipes are adopted for portable water pipes.Welded steel pipes connected by welding are selected for hydrant pipes, cooling circulating pipes, drencher pipes, pump suction pipes.Hot-galvanized steel pipes connected by threads or compression-seizing are selected for sprinkler and deluge sprinler pipes.Seamless steel pipes connected by welding are selected for CO2 pipes. Stainless steel pipes connected by pressed clamp is selected for the pipes of foam sprinklers in the underground garage.当雨水两超出雨水沟设计量时,雨水可沿屋檐自由排放.雨水被收集,然后排入市政集水池. When the amount of rainwater is more than the design value of the gutters, water is discharged naturally along the eaves. Rainwater is collected, and then drained to the municipal catch basins.围绕体育馆的循环池将用于喷洒运动场和作为室外绿化带的储水池.此池将作为一个循环过滤设施,可容水约7.500 m .喷洒压力设备和其它必须的过滤设备安装在供应楼里.The circular senic pool surround stadium will be used for spraying sportsfield andas reservoir for outdoor greening.The pool will be used as a circular filtering facility and will be adopted with a water volume of about 7.500 m .The spray water pressurizing equipment as well as further necessary filtering equipment will be adopted in the supply building.2.0 制冷2.0 Cooling冷源:空调冷负荷(估算):本工程建筑面积共50.000平方米,包括观众区,休息室,更衣室,小会议室,餐厅,办公室和其它附属房.空调设计日峰值冷负荷为2.4MW,设计日总冷负荷为3 kW.Refrigerating sourceCooling load of air conditioning systemTotal floor area for this building is 50,000sqm, which includes spectator areas, lounges, Clothing and changing rooms small meeting rooms, restaurant, office and other auxiliary rooms. Designed dayly peak cooling load is 2,4MW, designed total dayly cooling load is 3kW.每台1200kW制冷机配一台流量为206m3/h离心泵.各配一台备用泵一次泵采用压差旁路控制.通过埋地敷管,向游泳体操馆供应冷冻水.A centrifugal pump with a flow rate of 103m3/h is provided for each 1200kW chiller. One operation pump with a standby corresponds to one chiller.Pressure difference branch control is adopted for primary pumpVia earth laid pipes from supply building to gymnasium chilled water supply will be deliverded.冷源的选择:根据建筑的实际情况,3台制冷机将安装在供应楼内的冷冻机房.设计容量为4800kW. 为了实现能量的效率化使用,设计方案为,1台制冷机的出力为总设计容量的50%.而另2 台.每台出力为总设计容量的25%.冷冻水系统的主要设备包括3台电动制冷机,一级冷冻泵,二级冷冻泵,自动控制阀等等.冷冻水的供/回水温度为-7/ 12°C.Selection of refrigerating sourceAccording to the real condition of the building, 3 chillers are located in the refrigerating plant rooms in the supply building, designed capacity is 2400kW. For actuing in an energy efficient way one chiller about 50% of total capacity (1.200 kW) and two chillers with 25% of total (600 kW each)capacity each are adopted.Main equipment of chilled water system includes 3 electrical chiller, primary cool water pump, secondary chilled water pump and automatic controlled valve, etc. supply/return temperature of the chiller is-7/ 12°C.二次泵系统:根据使用功能,各制冷机房又分成不同的循环支路.二次泵采用变频调速控制.根据负荷侧供回水管的压差,控制水泵的转速.二次泵循环支路的管道采用异程式.Secondary pump system:Each refrigerating plant room is subdivided into different circulation branch loops according to use functions.Variable-frequency speed-regulating control is adopted for secondary pumps. The rotating speed of a water pump is controlled according to the pressure difference between water supply and return pipes.Direct return system is adopted for the pipes of circulating branch of secondary pumps空调冷冻水系统由于本工程占地面积大,功能复杂,有连续使用,也有间歇使用,为了达到运行灵活,节能的目的,空调冷冻水系统采用两管制二次泵系统.Chilled water systemDue to the large occupied area of this project, the complicated functions and the combination of continuous utilization and intermittent utilization, in order to accomplish the purpose of flexible operation and energy saving, the chilled water system is of two-pipe secondary pump system.管材:水管采用焊接钢管及无缝钢管.本工程的风管除土建风道外,均采用镀锌铁皮咬口制作.每节风管之间用法兰连接.Pipe and duct materialsThe water pipes adopt welded steel pipes and seamless steel pipes.Air ducts for this project are made of galvanized sheet steel by seaming except ducts by civil construction. Air ducts are connected together by flanges.一次泵系统:供应楼冷冻机房2400kW制冷机配一台离心泵, 流量为412m3/h.配一台备用泵.Primary pump system:Chiller room supply buildingA centrifugal pump with a flow rate of 412m3/h is provided for 1200kW chiller. Oneoperation pump with a standby corresponds to one chiller.保温材料:空调供,回水管,冷凝水管采用酚醛管壳保温.空调送,回风管以及处理后的新风管采用外贴铝箔的离心玻璃棉板保温.- 管道穿防火墙的空隙处采用岩棉材料等非燃材料填充.Thermal materialsphenolic pipes are adopted for thermal insulation of water supply and return pipes for air conditioning, as well as air-conditioning condensate pipes.Aluminum foil faced glass fiber boards are adopted for thermal insulation of air-conditioning air supply and return ducts as well as fresh air ducts after chillers.Non-flammable material will be selected to fill the interspace in the fire protection wall where the ducts go through.消声与隔振:冷水机组,水泵等设备采用减振台座,弹簧减振器或橡胶减振垫减振降噪.在空调机组,新风机组,通风机的进出口采用涂胶帆布软管连接.- 水泵进出水管上采用可曲挠橡胶接头,使设备振动与配管隔离.Noise reduction and vibration isolationShock absorption bases, spring shock absorbers on rubber shock absorption pads are adopted for equipment, such as water chiller units, pumps, etc to reduce vibration and lower noise.Flexible rubber-coated canvas hoses are adopted far connections of inlets and outlets of air-conditioning units, fresh air handling units and ventilators. Flexible rubber couplings are adopted for the water intake and delivery pipes of the pumps to isolate equipment vibration from their pipes.3.0空调和通风系统3.0 Air Conditioning and Ventilation Systems方案设计范围Scope of schematic design空调设计Air Conditioning Design在体育馆内,一些区域设置空调系统.这些区域划分为:西侧地下二层的贵宾休息室东侧地下二层酒店门廊地下一层的输送区,技术机房,运动员更衣间,医务服务,热身区,裁判区,健身中心,酒店大堂,会议室,厨房,特许区和贵宾大堂混合区.首层的酒店大堂,酒店区,贵宾门廊,急救In the stadium, in some ranges air conditioning systems are used. These ranges subdividethemselves as follows:VIP – Lobby in West of levelel -2Hotel lobby in the east of level –2Delivary Circle, technical Plantrooms, Changingrooms for the athletes, Medical Service and warm up area, Judges Area, Fitness Center, Hotel Lobby, Conferenz, Kitchen and Concession, Vip lobby- Mixed Zone in level -1Hotel lobby, Hotel area, Vip lobby, Vip Area, First aid in 0空调和通风机组设置于靠近地下一层楼梯底部的机防.新风从楼梯底的风室被引入机房而被空调处理器吸入.从此,通过水平和垂直风道送至使用区.用于以上区域的空调机组分为12 台暖通空调机组,具有以下特点The air conditioning and ventilation units for the using ranges are placed in die mechanical plantroom nearby the stairs in the bottom of the stadium in Level -1. The outside air will be brought into the Plantrooms from fresh air chambers under these stairs and let to the air handling units. From here, the will be led via horizontal an vertical duct to the using ranges.The air conditioning units for the ranges specified above will be devided into 12 HV AC- units (drawings) with the following characteristics:以下区域仅设置排风系统:地下二层停车区域地下二层电气机房地下一层卫生间首层卫生间一层卫生间宾馆客房设置分散式风机盘管加新风系统.贵宾室设置风机盘管.For the following ranges, only exhaust air systems are planed:Parking area in Level –2Electrical Plantrooms in Level –2Toilets in Level –1Toilets in Level 0Toilets in Level +1For the guestrooms of the Hotel decentralized Fancoil Units with ourside air connection are planed. The VIP- boxes will be equiped with Fancoil Units.AC1, AC6, AC7, AC12地下一层的附属用房(储存,机房,楼层,观众区 )换气次数 2 – 6 次/小时; 新风100%, 通过螺旋风口送出双风机,全空气系统排风机同时作为机械排烟用AC1, AC6, AC7, AC12Siderooms ( Storage, Plantrooms, Floors, Spectaors area) in Level -1Air Changing rate 2- 4 times/ h; supply via spiral outlets, outdoor air 100% Dual- fan- all- air system.Exhaust air fan is also be used for mechanical removal of smoke.AC 2地下一层的医务服务,热身区,运动员更衣间,裁判区换气次数 2 – 4 次/小时; 新风100%, 通过螺旋风口送出夏季最高室内温度29°C, 相对湿度 65 %冬季最高室内温度 22 –24°C室内发热量:- 照明 20 W/m- 机器 10 W/ m- 人员 50 W/ m双风机,全空气系统排风机同时作为机械排烟用AC 2Medival Service Area, Warm up Area, Changing rooms Athletes, Judges Are in Level- 1Air Changing rate 2- 4 times/ h; supply via spiral outlets, outdoor air 100% Room temperature 29°C max, 65 % humidityin SummerRoomtemperatur 22 –24 °C in WinterIndoor heat loadLighting 20 W/mMachines 10 W/ mPersonnel 50 W/ mDual- fan- all- air system.Exhaust air fan is also be used for mechanical removal of smoke.AC 4地下一层的医务中心,办公室换气次数 4 次/小时; 新风100%, 通过螺旋风口送出最高室内温度29°C, 相对湿度 65 %室内发热量:- 照明 35 W/m- 机器 30 W/ m- 人员 50 W/ m双风机,全空气系统排风机同时作为机械排烟用AC 4Media Center, Offices in Level –1Air Changing rate 4 times/ h; supply via spiral outlets, outdoor air 100% Room temperature 29°C max, 65 % humidityIndoor heat loadLighting 35 W/mMachines 30 W/ mPersonnel 50 W/ mDual- fan- all- air system.Exhaust air fan is also be used for mechanical removal of smoke.AC 3地下二层的贵宾休息室,地下一层的贵宾大堂,混合区,首层的贵宾办公室和贵宾区换气次数 4 次/小时; 新风100%, 通过螺旋风口送出最高室内温度29°C, 相对湿度 65 %室内发热量:- 照明 20 W/m- 机器 10 W/ m- 人员 50 W/ m双风机,全空气系统排风机同时作为机械排烟用AC 3VIP Lobby in Level –2, VIP Lobby, Mixed zone in Level –1, VIP Offices and VIP area in Level 0Air Changing rate 4 times/ h; supply via spiral outlets, outdoor air 100% Room temperature 29°C max, 65 % humidityIndoor heat loadLighting 20 W/mMachines 10 W/ mPersonnel 50 W/ mDual- fan- all- air system.Exhaust air fan is also be used for mechanical removal of smoke.AC 5地下一层的厨房,服务和特许区厨房的换气次数 100m /m 小时,新风100%, 通过螺旋风口送出服务和特许区的换气次2-4数次/小时, 新风100%, 通过螺旋风口送出双风机,全空气系统最高室内温度29°C, 相对湿度 65 %室内发热量:- 照明 35 W/m- 机器 30 W/ m- 人员 80 W/ m双风机,全空气系统排风机同时作为机械排烟用AC 5Kitchen, Service and Concession area in Level -1Air Changing rate 100 m /m h for the Kitchen; supply via spiral outlets, outdoor air 100%Air Changing rate 2-4 times/h for the Service and Concession area; supply via spiral outlets, outdoor air 100%Room temperature 29°C max, 65 % humidityIndoor heat loadLighting 35 W/mMachines 30 W/ mPersonnel 80 W/ mDual- fan- all- air system.Exhaust air fan is also be used for mechanical removal of smokeAC 8地下一层的健身中心,员工更衣间,特许区换气次数 2 – 4 次/小时; 新风100%, 通过螺旋风口送出最高室内温度29°C, 相对湿度 65 %室内发热量:- 照明 35 W/m- 机器 30 W/ m- 人员 80 W/ m双风机,全空气系统排风机同时作为机械排烟用AC 8Fitness Center, Changingrooms Staff, Concessio in Level -1Air Changing rate 2-4 times/h; Fitness Center 6 times/ h; supply via spiral outlets, outdoor air 100%Room temperature 29°C max, 65 % humidityIndoor heat loadLighting 35 W/mMachines 30 W/ mPersonnel 80 W/ mDual- fan- all- air system.Exhaust air fan is also be used for mechanical removal of smokeAC 10地下二层地的宾馆走廊,地下一层的宾馆走廊和餐厅,首层的宾馆区换气次数 4 次/小时; 新风100%, 通过螺旋风口送出最高室内温度29°C, 相对湿度 65 %室内发热量:- 照明 35 W/m- 机器 30 W/ m- 人员 50 W/ m双风机,全空气系统排风机同时作为机械排烟用AC 10可能亦用于人防区的送风.此部分的设计由人防技术设备设计工程师审核.AC 10Hotel Lobby in Level- 2, Hotel Lobby and Restaurant in Level -1, Hotel area in Level 0Air Changing rate 4 times/h; Restaurant 8 times/h;supply via spiral outlets, outdoor air 100%Room temperature 29°C max, 65 % humidityIndoor heat loadLighting 35 W/mMachines 30 W/ mPersonnel 50 W/ mDual- fan- all- air system.Exhaust air fan is also be used for mechanical removal of smoke.The AC- unit No. 10 might also be used as a supply air unit for the shelter. This has to be checked by the engeneers who will plan the technical equipment for the shelter.AC 9通风地下车库:设计一个换气次数 6次/小时的排气排烟通风系统.由地下一层的空调机组送风,送风经过车库顶棚的垂直风口进入水平风道,然后送至各处.输送区:输送区设置一个隧道通风系统.空气通过北侧被吸入建筑物,然后通过轴流风机输送到输送区.空气通过南侧的就近道路排出.VentilationUnderground Garage:For the underground garage an air exhaust an smoke exhaust ventilation system with an air exchange rate of 6 times/h is provided. The supply air for the garage will be delivered from the AC- Units in Level- 1 an brougt into the garage via vertical openings in the ceiling of the garage and distributed over horizontal ducts. Delivery Circle:For the delivery circle a tunnel ventilation system is installed. Air is sucked at the south side of the stadium into the building and transported by axial jet fan through the delivery zone.各功能区的规划包括水平管道和竖井.各区域无异味和污染物的排风将被作为送风送入车库. 剩余的排风和排烟将通过一个地下风道送到供应楼,并通过屋顶排出.排烟内部区域均设置机械排烟.通风系统的管道亦即排烟道. 在空调机房内,烟气通过一条旁通风道送至车库排风机,亦为排烟机(300°/ 30 分).The development of the functional areas is made by horizontal ducts and vertical pits. The exhaust air from ranges which are not smell-loaded or contained pollutants are brought as supply air into the garage.The remaining exhaust air and the removal of smoke exhaust air are led over an underground channel to the supplying building and blown out there over roof. Smoke ExhaustionAll ranges on the inside are exhaustet from smoke mechanically.The duct system of the existing ventilation systems is used. In the HVAC plant rooms, the flue gases are led over a bypass channel to the exhaust air fan for the garage, which have to be designed to be used as smoke- exhaust fan (300°/ 30 min).室内储存和技术房:此区内,设置简单的送排通风系统.卫生间:地下一层和首层的卫生间由临近区域的通风系统供应新风.一层卫生间通过向外开口进风.地下一层卫生间排气排入输送区.首层和一层卫生间将通过独立的排气扇将废气排入在看台下部.Indoor storing and technical plant rooms:For this ranges simple supply- and exhaust ventilationsystem will be installed Toilets:The WCs in level -1 and level 0 are supplied with fresh air by the ventilation systems of the adjacent ranges.The WCs in level +1 receive the fresh air over opening to the outside.The WC in level -1 is aired out separately into the range of the delivary circle. The exhaust air of the WC ranges in level 0 and level +1 will be led by separate exhaust fans into the ranges underneath the grandstand.车库的排气和烟气被加压,通过地下风道送至供应楼,而通过其屋顶排出.停车场有烟雾时,空调机组的送风量是不足的.在这种情况下,新风将通过阀门从新风室(在体育馆底层楼梯下)直接向车库进风.The exhaust air of the garage and the smoke will be pressed through the circularly air duct and then through the underground channel to the supplying building and will there be led over roof into the free.In case that smoke is detected in Parking garage, the supply air from the AC- Units which is normaly used for the supply of the garage is not sufficient.In this case the fresh air will be brought directly into the garage via dampers from the freshair chamber, placed underneath the stairs in the bottom of the stadium. 主送风和回风道均设防火阀. 当温度超过70°C, 防火阀将自动关闭,同时风机停止运行,关闭信号将被传送.自动转换防火阀安装于排风排烟共用系统.Both, the main air supply and return ducts of all AHUs are provided with fire dampers. Then a temperature over 70°C happens, the fire dampers wil l be closed automatically and at the same time the fan stops operation and cut-off signal is transmitted. Automatic changeover fire damper is provided for the system used both return air and smoke exhaust.空调和通风系统的电力供应控制与消防控制中心相连. 当某个防火分区火灾报警, 而且消防中心对此信号经过分析确认后,此防火分区内的通风系统停止运行,而同时排烟系统和加压送风系统启动.The power supply controls for the air conditioning and ventilation systems are connected to the fire control center. When fire alarm occurs in a certain fire compartment, the ventilation system in this fire compartment stops operation and at the same time the smoke exhaust system and pressurized air supply system are started after judgement and confirmation by the fire control center.被其它房间包围的楼梯间将设置有加压通风系统.The staircases that are surounded by other rooms will be provided with overpressure ventilation systems.空调机组的详细技术参数集合在被报告末的技术数据报告.The exact technical datas of the AC- units are summarized in the " Technivcal Data Report at the end of the Report.。

  1. 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
  2. 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
  3. 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。

建筑给排水外文翻译外文文献英文文献多层住宅建筑给排水设计的几个问题译文来源:美国PE杂志建筑给排水工程师2010年第10期The multilevel residential housing is given and drains off water several questions designedSummary : This text give and drain off water on multilevelresidential housing design supply water the exertion of the tubular product , Way of laying of pipeline, water gauge produce family set up, establishment and air conditioner condensation water of pot-type boiler discharge issue goes on the discussion , And put forward some concrete views.Keyword: Skyscraper, supply water the tubular product , the pipeline is laid, The water gauge, the solar water heaterThe skyscraper is simple with its auxiliary facility, thefabrication cost is low, the characteristic such as being convenient of estate management, Receive the welcomes of the real estate developer and vast resident of small and medium-sized cities very much. How project planning and design of inhabited region, scientific and technological industry of comfortable house, lead the request according to 2000, Improve the design level of the house, build out a comfortable living space for each household, It is each designers duty. As the heart of the house --The kitchen, bathroom, is that the function is complicated, hygiene, safe and comfortable degree are expected much, It ismiscellaneous to build, the space expecting much in technology. So, the designer must consider synthetically with the idea and method of global design that the kitchen, bathroom give installation of the drainage pipeline and equipment,etc. . Give and drain off water on skyscraper design supply water exertion, to lay pipeline of tubular product, water gauge produce family set up, establishment and empty of pot-type boiler now Transfer condensation water discharge issue discuss together with colleagues.( 1)supply water tubular product select problem for use Traditional watersupply tubular product adopt zinc-plated steel tube generally, because zinc-plated steel tube exchange the corrosion, Use short-lived , use for and send domestic water can satisfied with water qualitysanitary standard shortcoming, Ministry of Construction is popularizing the application of the feed pipe of plastics energetically . A lot of districts and cities have already expressed regulations: Forbiddesigning and using the zinc-plated steel tube , use widely the feedpipe of plastics. The plastics supply water In charge of compared with metal pipeline, light, it is fine to able to bear the intensity of keeping, Send obstruction little liquid , able to bear chemistry better to corrode performance, it is convenient to install, The steel energy-conservation of the province, merit of having long performance life etc.. Supply water and use plastics pipeline: Hard polyvinyl chloride( PVC-U), high density polyethylene( HDPE), pay and unite polyethylene( PEX) , modify the polypropylene( PP-R, PP-C), gather butene( PB),aluminium mould and compound and in charge of and the steel is moulded and compound and is managed etc.. Choice of tubular product economic comparative course of technology, technology should from pressure, temperature, environment for use, install method,etc. go on and consider, Combine owners at the same time request and the house of grade,carry on and fix after being consider synthetically technology not economic. The above plastics supply water tubular product can supply water tubular product as house life. The economic and functional house conciliating Strand room in the face of the masses of with low- and medium-level incomes resident, can select for use hygiene grades of hard polyvinyl chloride in charge of as feed pipe mainly, In order to reduce the fabrication cost; Medium-to-high grade commodity apartment available aluminium Mould and compound and in charge of or other plastics supply water the tubular product as the feed pipe. House mix hot water temperature that water order exceed 600 C, so above-mentioned tubular product in charge of except hard polyvinyl chloride and aluminium plastics compound and in charge of( PE-AL-PE), Mostly the tubular product can be regarded as the hot water pipeline of the house.( 2) pipeline lay problem 1. give and drain off water it set upthere arent one that in charge of1)Will install it in the corner place of the kitchen, bathroom tomorrow. Adopting this kind of way of laying more in the design of house in the past, it is convenient for it to construct, But will reveal the pipeline and hinder the room beautifully tomorrow Watch, thehouseholds will mostly be hidden with the light quality material in the equipment two times.2)Will install it in the overcast angle place of the outer wall of the building tomorrow. Way this suitable for southern weather warm district only, the minimum temperature in winter cant be lower than zero degrees Centigrade, In case water pipe water-logging freeze ice is bloated to split pipeline, influence household use. Pipeline lay in outer wall, influence building to be beautiful, too inconvenient on manage and maintain in the future.3)Lay it in the pipeline well. This way makes the room clean and beautiful , but the pipeline well has taken up the area of the bathroom, And pipeline construct, maintain relatively more difficult. Bathroom set up concentrate pipeline well, concentrate pipeline on assign in the well feed pipe, drain pipe, This is that the civilized importance lives in the kitchen of comfortable house, bathroom Embodiment. I think : Should consider the establishment of the pipeline well of the bathroom in the medium-to-high grade building conceptual design of commodity apartment, Improve quality of using of bathroom promptly so , can solve hard polyvinyl chloride drain pipe rivers noise heavy problem, Improve the environmental quality level of the room; Whether for bathroom in the areas for little economic and functional house and Overcome difficulties room, warm area give and drain off water and set up and in charge of and can consider and lay in the outer wall in the South, In order to increase using the space of the bathroom; Pipeline install and in theroom, should influence kitchen, bathroom every sanitary equipment use of function tomorrow2. supply water and prop up there arent tube House supply water prop up and in1charge of pipe diameter one ? 32mm, de of battle,, little plastics feed pipe of pipe diameter is the crooked state, So the house supplies water and is propped up and in charge of being recommended and adopted and set up secretly. Supply water to prop up to manage darkly There are thes way had:1)Set up in the brick wall secretly. Wall turn on and in charge of trough in brick when constructing, in charge of trough width tube +20 mm, de of external diameter,, degree of depth tube external diameter de, The pipeline is imbedded and managed directly Trough, and with in charge of card fix in trough of inning charge of son.2)Whether pipe diameter supply water and prop up and last de ?20mm,can setup at floor secretly piece make level by layer. Turn on and incharge of trough in floor( ground) the board when constructing, it wides trough have to be de +10 mm deeply 1/2 of the de, Half pipeline imbedand in charge of trough, and with in charge of card fix in trough of inning charge of tube. Aluminium mould compound and in charge of and pay and unite polypropylene in charge of pipeline adopt metal pipe fittings connection, Must strengthen and in charge of trough size when adoptingand set up secretly, and rivers some flood peak loss relatively heavy. Assign the relative house that concentrated to the kitchen, bathroom interior hygiene utensil, Can adopt and divide Water device go on andjoin , divide water device whether one more than branch in charge of and connect, every hygiene utensil supply water and prop up and in charge of and connects and publishes from the water dividing device separately. Can already prevent the tube burying the pipeline secretly from being connected like this Permeate the question. Can reduce some flood peak lost, decrease the fabrication cost of pipe networks3)Drain off water and prop up the tube to lay House room drain off water and in charge of and should set up at the time of inning this each, drain off water and in charge of permeating sideways like this canning prevent the sewage from waiting for the pollutant to enter the neighbor family sideways, Will not influence the neighbor either when thepipeline is maintained Normal life of one. Kitchen wash water drainageof basin propped up and in charge of generallying inserts draining off water to stand to manage this layer of floor sideways; Floor drain drain off water propped up and in charge of laying the room of lower floor. A lot of colleagues think now: Whether kitchen the ground it lay ceramic tile of,whose name is clean in when need develop with water,not strongin meaning to set up floor drain, So kitchen set up ground floor drain, avoid and drain off water and prop up and in charge of and enterneighbor family sideways already so, Can increase using the space of thekitchen . Bathroom drain off water and prop up and in charge of and lay concrete measure have in this layer sideways inside:1)Improve the bathroom ground . Ground tendency high 150mm, adopt back row type take stool pot, washing basin, bath tub, water drainage of floor drain in charge of and bury in cushion layer secretly sideways.2)Adopt the sinking type bathroom. Bathroom sink 350mm the floor, hygiene utensil drain off water and in charge of and bury on sinking space secretly sidewaysTwo method these can realize water drainage of bathroom prop up and in charge of earths surface to bury underground this one without entering the neighbor2family sideways. Bury pipeline when installing, construction quality must check on strictly, can construct bathroom ground after confirming qualified secretly, So as not to leave the hidden danger in giving in the future using. Bathroom ground construct and can pack coal ash light quality material , also can adopt and lay bricks impracticable to lay plate making construct ground, Ground must make waterproof to deal with, method can waterproof to deal with according to roofing, make two oil one rubber and plastic ointment waterproof cloth.3) water gauge the open air set up problem The water gauge is had indoors, not only the work load of checking meter is very heavy , but also make the security and privacy of the house reduce greatly . So house divide into households of water gauge or divide households offigure of water gauge Show that should be set up in the open air. Skyscraper water gauge the open air set up following several kinds of forms: Whether 1.adopt far it pass by water gauge Change the ordinary water gauge into and pass the water gauge far, is joined the water gauge and data gathering machine by a signal line, And then reach intelligence to manage( the computer). Its merit lies in saving a large amount of people Strength comes to check meter, the data are accurate, the shortcoming is that the fabrication cost is high. Whether 2.adopt magnetic stripe card of by water gauge Users buy the electronic card of the running water Company in advance , then insert it in the storing device of the water gauge, Card amount of money deduct automatically on the water, this way user need to prepay the water rate, The price of the water gauge is relatively high.3. adopt it set up at the open air water gauge not ordinary1)The water gauge is set up in the stair have a rest in the alcoveof the platform. Household watersupply to prop up and manage and enter the kitchen, bathroom after the water gauge is measured. Way thisrealize water gauge produce room set up, equivalence low project have , supply water and set up and in charge of and set up with water gauge office results in aesthetic problems in stair. It suitable for the South warm district kitchen, bathroom assign close to the houses of positions of staircase.2)The water gauge concentrates on being set up among the water gauges( meter box). Person who give when supplying water, set up watergauge in ground floor( meter box) on falling, every household watersupply to prop up and is in charge of applying having in the pipeline well, Southern area can overcast horn place lay along the outer wall in building too; Person who give when supplying water, can set up water gauge in roof( meter box) under upgoing. This way increases and supplies water to prop up In charge of and lay length, pipeline lay and influence building to be beautiful along outer wall. Water gauge produce way choice that family assign, must combine house kitchen, bathroom plane assign characteristic and concrete request of developer, Carry on to several feasibility scheme the above economic technology fix after comparing. Property well-managed medium-to-high grade commodity apartment of housing district, can adopt and pass the water gauge far , It is that the water gauge will use the developing direction in the future; Estate management perfect medium- to-high grade commodity apartment of housing district, can adopt magnetic stripe card water gauge( Company have this kind district of business can design in running water) Or concentrate on setting up it among the water gauges( case); Southern area3unit type house can set up rest platform office in stair with ordinary water gauge, In order to reduce the fabrication cost.4) establishment question of the pot-type boiler Should reserve and install hot water supply terms of facility, set up hot water supply facilities with when the design of house. Have and concentrate housethat hot water supply on , should consider house assign withinstallation position and cold hot water pipeline of hot water device. The pot-type boiler generally has three kinds, such as gas, electricity, solar energy,etc.. Whether last kitchen gas heater and electric heater or Bathroom inside, give when draining off water design shoulding reserve installation position and cold hot water interface of pipeline of water heater in advance in building, Install by oneself when convenient users fit up. Solar energy and hot water It is simple and convenient and safe for device to use, need fuel and electric power is low to run the expenses, Have long performance life, pollution-free, received by the masses of users favourably very much, Many houses have been small in recent years The district all install the solar water heater at the time of designing and construct. Solar water heaterinstall and at the roof, need to set up the cold hot water pipeline among bathroom and water heater of the roofing like this generally, Consider installation of solar water heater when the design of house, household can only lay cold and hot pipeline along the building outer wall when installing in the future, Increase household degree of difficulty when installing like this , increase pipeline make the investment, influence building beautiful. Give when draining off water the design needing to solicit the developers suggestion first in building, Interconnected system one design, construct the solar water heater in unison; Reserve solar water heater and cold hot water installation position of pipeline in advance only. The cold hot waterpipeline of the solar water heater can be laid In the pipeline well; Set up pipeline house of well , can set up one UPVC drain pipe of de110 as solar water heater hot water sleeve pipe of pipeline close to corner of person who take a shower in bathroom, Set up a de110 *75 three direct links in each hygiene interval ground, as connecting the entry of cold and hot water pipe( 5) air conditioner condensation ink discharge the issue In recent years, air conditioner enter huge numbers of families gradually, condensation water amorphous to discharge the building outer wall of pollution air conditioner have, Have influenced a beautiful important problem of biotope already. Building give when draining off water design shoulding consider air conditioner condensation ink discharge in a organized way. Concrete method can machine set up the water drain pipe of the condensation by the position outside reserving air conditioner, Drain off water and set up and in charge of and select PVC-U drain pipe de40 for use , reserve three direct links of draining off water highly in each air conditioner, It is convenient for air conditioner to drain off water hose insert directly.4多层住宅建筑给排水设计的几个问题摘要:本文就多层住宅建筑给排水设计中给水管材的选用,管道的敷设方式,水表出户设置,家用热水器的设置及空调冷凝水排放等问题进行探讨,并提出一些具体看法。

相关文档
最新文档