施工图深化设计要求标准

施工设计提交成果

Deliverables of Construction Drawings

灯光照明

Lighting

对于灯光照明专业施工图设计深度标准及技术深度文件现规定如下:

The design depth and technical scope of special lighting working drawing are specified as follows: 一.各区域,各房间的照度计算书及灯具选型、灯位布置;

I.Illumination calculation sheet and type selection and positioning of lights each in room in all areas;

二.照明控制系统中所采用设备的说明书;

II.I nstructions of equipment used in the lighting control system;

三.灯具资料表(用EXCEL表格做出,格式如下,第一行内容为示范);

III.Data sheet of lighting (in EXCEL, with the format as follows; contents in the first row are filled in as an example);

四. 对施工图纸的要求如下:

IV. Requirements for Construction Drawings

用于设计方案阶段的一套完整的图纸至少应包括封面、图纸目录、工程设计说明及图例、设备材料清单、系统图、平面图。

A complete set of drawings used in the design stage shall at least include the cover, drawing content, engineering design instructions and graphic symbols, list of equipment and materials, system diagram, and plan view.

用于施工阶段的图纸至少应包括封面、图纸目录、工程设计说明及图例、设备材料清单、系统图、平面图及设备的安装大样图。

A complete set of drawings used in the construction stage shall at least include the cover, drawing content, engineering design instructions and graphic symbols, list of equipment and materials, system diagram, plan view, and the detail drawing of equipment installation.

照明专业图纸范围如下:

Scope of drawings for lighting is as follows:

必须包括封面、图纸目录、工程设计说明及图例、设备材料清单、系统图、平面图、机房设备布置图、安装大样图。安装详图根据项目情况,应由设计师根据项目的可实现性和各专业分项工程的配合决定绘图深度,设计出满足项目需求的可实施的拓展性安装详图。

It shall include the cover sheet, drawing content, engineering design instructions and graphic symbols, list of equipment and materials, system diagram, plan view, layout of equipment in equipment room, and detail drawing of equipment installation. Feasible and extendable detail drawing for equipment installation shall be designed according to the project situations by the designer who shall decide the depth of drawing according to the project feasibility and coordination between all subdivisional works of each discipline to satisfy the project requirements.

4.1封面Cover

封面应包含项目名称、图纸性质(初步设计、施工图、竣工图等)、公司名称、日期。

-可编辑修改-

The cover shall bear the project name, drawing property (preliminary design, construction drawing, as built drawing, etc.), company name, and date.

4.2图纸目录Drawing content

图纸目录应包含以下内容:项目名称、项目编号、设计公司名称、专业、图纸名称、图纸编号、图幅、出图日期、制图人及审核人等内容。

The drawing content shall include the following: project name, project ID, name of design corporation, discipline, drawing name, drawing number, sheet, drawing finishing date, the person who draws, and the auditor.

4.3工程设计说明及图例Engineering design instructions and graphic symbols

设计总说明须包括但不限于:工程概况、设计依据、各子系统施工内容、施工要求和注意事项、设计特殊要求和施工配合要点、设计范围内智能化系统与相关专业的技术接口要求、图例符号等。

The general design instructions shall include, without limitation to: Project profile, design basis, construction contents of each sub system, construction requirements and notices, special design requirements and key points in construction cooperation, technical interface requirements for the intelligent system and relevant disciplines within the scope of design, graphic symbols, and so on. 4.4设备材料清单List of equipment and materials

在材料表中的图形符号图例应采用国标,其次是部标、行标。未予规定的自拟图形图例,应在图例中标出且加以说明。当使用国标图形图例,又给予不同含义时也应加以说明,一套图纸的图例符号应前后一致。

Graphic symbols in the list of materials shall adopt those in national standards, followed by ministerial standards and industry standards. Self made graphic drawings not specified shall be marked in the graphic symbols with explanations. Explanations shall also be given when graphic symbols in national standards are given different meanings. The graphic symbols used in one set of drawings shall be in consistence with each other.

-可编辑修改-

设备材料清单,按系统开列组成系统主要设备和材料,应标明设备名称、规格型号、主要技术指标、品牌(产地)、数量。非标设备、材料应备注说明技术要求。

The list of equipment and materials shall list the major equipment and materials constituting the system, with an indication of the equipment name, specification and model, key technical indicators, brand (origin), and quantity. Technical requirements for nonstandard equipment and materials shall be marked.

各个平面图、设备房图应随附图例并标注数量。包括电脑、软件、编程工具、机柜、电源、变压器等设备材料都必须在图纸上或设备材料中体现出来,并且注明型号、规格、数量总和。

All plan views and equipment room drawings shall be attached with graphic symbols and quantity. Equipment and materials including computers, software, programming tools, cabinets, power supply and transformers shall be indicated in the drawings or list of equipment materials, with clear indication of the model, specification and total quantity.

4.5系统图

System diagram

4.5.1照明供配电系统图:应注明系统结构、主要配置、终端分布、主干线缆、供电要求、文字说明等。具体设计原则请参考《民用建筑电气设计规范》JGJ 16-2008第3章,第4章。当有类似5D剧场有人员参与演出涉及舞台照明时,舞台照明的供电与负荷计算应参照《民用建筑电气设计规范》JGJ 16-2008第9章9.6节的相关规定。

Drawing of lighting power supply and distribution system: With clear indication of the system structure, major configuration, terminal distribution, trunk cables, power supply requirements, explanatory notes, etc. For detailed principles for design, please refer to chapters 3 and 4 of JGJ 16-2008 Code for Electrical Design of Civil Buildings.When there are personnel participating in the stage show in likely-to-be 5D theater with stage illumination involved, power supply and load calculation of stage illumination shall refer to the related regulations of Section 9.6, Chapter 9 of JGJ 16-2008 Code for Electrical Design of Civil Buildings.

注意:

Notes:

1.当采用可控硅做调光设备时,其电源变压器宜采用接线方式为△/Y0的变压器。

When SCR components are used as dimmer device, the supply transformer shall be △/ Y0 transformer.

-可编辑修改-

2.为抑制高次谐波对照明控制装置及其它系统设备的干扰,除应满足《民用建筑电气设计规范》JGJ 16-2008第22章第22.3节的规定外,还应注意:电声,电视转播设备的电源不宜接在照明用电变压器上。To restrain the interference of ultraharmonics on illumination control devices and other system equipments, except that the regulations of Section 22.3, Chapter 22 of JGJ 16-2008 Code for Electrical Design of Civil Buildings shall be met, shall take note of the following: the power supply of electroacoustic and television relay equipment shall not connect to the transformers for illumination.

4.5.2配电箱系统图:应标注配电箱编号、型号、进线回路编号;标注各开关(或熔断器)型号、规格;标注出线回路编号、导线型号规格;负荷量;对于单相应标明相别;并标明负荷名称。具体设计原则请参考《民用建筑电气设计规范》JGJ 16-2008第7章,《建筑照明设计标准》GB 50034-2004第7章。System diagram of switch box: It shall indicate the switch box No., model, and lead-in loop No.; it shall also indicate the model and specification of switches (or fuses), outgoing line loop No., and model and specification of leads, as well as the load capacity; the phase sequence shall be marked for single-phase wire; the load name shall also be marked. For details, please refer to chapter 7 of JGJ 16-2008 Code for Electrical Design of Civil Buildings and chapter 7 of GB 50034-2004 Standard for Lighting Design of Buildings.

4.5.2.1配电箱系统图须考虑三相平衡,三相配电干线的各相负荷宜分配平衡,最大相负荷不宜超过三相负荷平均值的115%,最小相负荷不宜小于三相负荷平均值的85%。

In making the system diagram of switch box, equilibration of the three-phase system shall be considered; load on each wire of the three-phase distribution trunk shall be distributed in equilibration; the maximum phase load shall not exceed 115% of the mean loads of the three-phase system, and the minimum phase load shall not be smaller than 85% of the mean loads of the three-phase system.

4.5.2.2如有供给气体放电灯的三相配电线路,其中性线截面应满足不平衡电流及谐波电流的要求,且不应小于相线截面。

If there is three-phase power distribution line for the gas discharge lamp, its neutral line section shall meet the requirements of unbalance current and harmonic current and shall not be smaller than the phase line section.

4.5.2.3照明配电箱应保留备用回路,备用回路的数量不应低于配电箱回路数量的30%。

The light distribution box shall have a backup loop, and the number of backup loops shall not be smaller than 30% of the number of switch box loop.

4.5.2.4照明设备的接电方法,应采用专用接插件连接,接插件额定容量应有足够余量。

Power connection of lighting equipments shall adopt the dedicated connectors and the rated capacity shall be enough.

4.5.2.5由晶闸管调光装置配出的舞台照明线路宜采用单相配电。当采用三相配电时,宜每相分别配置中性导体,当共用中性导体时,中性导体截面不宜小于相导体截面的2倍。

For the stage lighting lines distributed by thyristor light-controlling device, single-phase distribution shall be adopted. When adopting three-phase distribution, it is appropriate to distribute neutral conductor respectively in

-可编辑修改-

each phase; when neutral conductor is used in common, its cross section shall be not less than 2 times that of phase conductor.

4.5.2.6照明设备应根据低压配电系统的接地形式确定采用接地保护措施。

Lighting equipments shall determine ground protection measures according to the earthing form of low-voltage distribution system.

4.5.3.照明控制系统图:应标注控制箱编号、型号;标注控制回路编号、导线型号规格、通讯协议、接口界面、控制系统若与其它设备有接口,须标明接口类型。

Lighting control system diagram: It shall indicate the controlling box No. and model; control loop No., model and specification of leads, communication protocol, and interface; if the control system has an interface with other equipment, mark the type of interface.

4.5.3.1控制系统采用专用接地装置时,接地电阻值不应大于4Ω。采用共用接地装置时,接地电阻值不应大于1Ω。

When the control system adopts special earthing device, the resistance to earth shall not be greater than 4Ω. When a common earthing device is used, the resistance to earth shall not be greater than 1Ω.

4.5.3.2乙级及乙级以上电影院观众厅(主演区,预演区)的照明应能渐亮渐暗平滑调节或分档调节。Lighting in the audience hall of class B or above cinemas (performance area and rehearse area) shall be capable of changing from bright to dim state gradually and smoothly or can be adjusted by different grades.

4.5.3.3入口、排队区、上客区、下客区、主演区、预演区等直接为观众服务的地区的照明控制开关应集中单独控制。

The lighting control switches in the areas directly serving the audiences, such as the entry, queue area, load on/off areas, performance area and rehearse area shall be intensively and independently controlled.

4.5.3.4 当采用调光设备时,每一照明回路的可载容量,应与所选用的调光设备的回路输出容量相适应。When using the light-controlling devices, the load capacity for each lighting loop shall be compatible with the output capacity of the selected light-controlling device.

4.5.3.5类似5D剧场有人员参与演出的舞台调光控制装置的选择和安装应符合下列要求:

The selection and installation of stage light-controlling devices withpersonnel’s participation in the stage show in the likely-to-be 5D theatershall conform to the follwing requirements:

1. 舞台照明调光控制器的选型:小型剧场,可选用带预选装置的控制器,中型及以上规模的剧场,宜选用带计算机的控制器。

Model selection of stage illumination light-controller: for small-sized theater, the controller with pre-elected device could be selected; for the theater with middle size and above, the controller with computer could be selected.

2. 舞台照明调光控制台宜安装在观众厅后部的灯控室内,并应符合下列规定:

Stage illumination lighting console shall install in the lighting control room in the back of auaditorium and conform to the following regulations:

(1)调光柜和舞台配电设备应设在靠近舞台的单独房间内;

Dimmer cabinet and stage distribution equipment shall be set up within the single room close to the stage;

(2)舞台表演区应在灯光控制人员的视野范围内;

-可编辑修改-

Stage acting area shall be in the field of view of light-controlling personnel;

(3)灯控人员应能容易的观察到观众席的情况;

Light-controlling personnel shall be able to easily observe the auditorium;

(4)应与舞台布灯配光联系方便;

Shall be in convenient contact with lamp collocation and light distribution of the stage.

(5)调光设备与线路应安装敷设方便。

Light-controlling equipments and pipelines shall be conveniently installed and laid.

4.6平面图

Plan view

4.6.1总体要求

General requirements

(1)照明配电箱宜设置在靠近照明负荷中心便于操作维护的位置。

The light distribution box shall be placed in the place which is near to the lighting load center and convenient for operation and maintenance.

(2)其他具体设计标准参考我国电影行业标准«电影院建筑设计规范»JGJ58-2008中对于电气及照明方面的要求。

Other detailed design criteria shall conform to the relevant requirements about electricity and lighting in China's cinema industry standard JGJ58-2008 Code for Architectural Design of Cinema.

4.6.2线槽设计

Trunking design

由强、弱电竖井或控制机房引向用电负荷的电气线路,在回路众多的情况下应采用线槽布线。

The electric wiring drawn from vertical shaft for light-current and strong-current or control cabinet shall adopt trunking when there are numerous loops.

4.6.2.1灯光专业线槽种类按走向通常分为:水平线槽、垂直线槽。灯光专业线槽种类按系统通常分为:弱电控制信号线综合线槽、强电电缆线槽。强、弱电线槽应分别设置,不允许共用。具体设计原则请参考《民用建筑电气设计规范》JGJ 16-2008第8章。

According to the trend, special lighting trunking can usually be divided into: horizontal trunking and vertical trunking. According to the system, special lighting trunking can usually be divided into: integrated trunking for light-current control signal lines and trunking for strong-current cables. Trunking for strong-current and light-current shall be set respectively and shall not be shared. For detailed principles for design, please refer to chapter 8 of JGJ 16-2008 Code for Electrical Design of Civil Buildings.

4.6.2.2灯光专业线槽绘制时,原则上应按线槽实际宽度按图纸比例绘制,线槽截面应采用空心闭合图形。

In principle, the special lighting trunking shall be drawn according to the actual width of trunking and the drawing, and the trunking section shall be a hollow closed figure.

4.6.2.3在进行对线槽的标注时,应能清楚地分辨出线槽的型号、规格、敷设方式。

When marking the trunking, the model, specification and laying method shall be clearly distinguished.

-可编辑修改-

4.6.3管线图

Piping plan

具体设计原则请参考《民用建筑电气设计规范》JGJ 16-2008第8章。《建筑照明设计标准》GB 50034-2004第7章。

For details, please refer to chapter 8 of JGJ 16-2008 Code for Electrical Design of Civil Buildings and chapter 7 of GB 50034-2004 Standard for Lighting Design of Buildings.

以下所述在设计时应特别注意:

Special attention shall be paid to the following during design:

4.6.3.1标明或注明设备的类别、编号、平面位置、安装高度、安装方式,管线、线槽走向、管线规格,敷设方式、引上引下、图例、数量、文字说明等。

Indicate or note equipment type, S/N, plan position, mounting height, mounting method, pipeline and trunking trend, pipeline specification, laying method, leading up/down, graphic symbols, quantity, explanatory note, etc.

4.6.3.2每一照明单相分支回路的电流不宜超过16A,所接光源数不宜超过25个;连接建筑组合灯具时,回路电流不宜超过25A,光源数不宜超过60个;连接高强度气体放电灯的单相分支回路的电流不应超过30A。

Current of each single-phase subcircuit for lighting shall not exceed 16A, and there shall be less than 25 illuminants; when connecting the combined lights, the loop current shall not exceed 25A, and there shall be less than 60 illuminants; current of the single-phase subcircuit connecting high capacity gas discharge lamp shall not exceed 30A.

4.6.3.3照明配电干线及分支线,应采用铜芯绝缘电线或电缆,分支线截面不应小于1.5mm2。

Trunk lines and branch lines for light distribution shall be copper core insulated conductor or cable; section of branch line shall not be smaller than 1.5mm2.

4.6.3.4观众厅及放映机房等处墙面及吊顶内的照明线路应采用阻燃型铜芯绝缘导线或铜芯绝缘电缆穿金属管或金属线槽敷设。

Illuminating lines inside the walls and suspended ceiling in audience halls and projector chambers shall adopt flame retardant copper core insulated conductor or copper core insulated cable wrapped with metal tube or metal raceway.

4.6.3.5插座不应和照明设备接在同一回路。

Sockets shall not be connected with lighting equipment in the same loop.

4.6.3.6原则上采用不同发光原理的光源的灯具不要接在同一回路上,特别是以气体放电灯为光源的灯具不要和其他类型光源的灯具接在同一回路上。

In principle, lighting fixtures using different illuminants shall not be connected in the same loop; in particular, lighting fixtures with gas discharge lamp as the illuminant shall not be connected with the lighting fixtures using other illuminants in the same loop.

4.6.3.7照明电气管线布线平面图上应注明其管线来自配电箱的编号和回路编号以便于审查是否与配电

-可编辑修改-

箱系统图的回路编号相对应,且是否回路连接的负荷总量与配电箱系统图上标明的相符。

The pipeline wiring diagram of lightings shall indicate the No. of switch box from which the pipeline is drawn and the No. of loop, so as to check whether it coincides with the No. of loop of the switch box system diagram, and whether the total load connected with the loop coincides with that on the switch box system diagram.

4.6.3.8图纸中管线的走向应考虑现场施工条件及后期检修维护的便利,并尽可能与实际的排管布线方向一致。

Trend of pipelines in the drawing shall consider the site operation conditions and provide convenience for future repair and maintenance, and shall be the same as the actual pipeline trend as much as possible.

4.6.3.9为抑制高次谐波对照明控制装置及其它系统设备的干扰,除应满足《民用建筑电气设计规范》JGJ 16-2008第22章第22.3节的规定外,还应满足以下要求:需要调光的回路应选用金属导管、槽敷设,并不宜于电声等电信线路平行敷设。当调光回路与电信线路平行敷设时,其间距应大于1米;当垂直交叉时,其间距应大于0.5米。

To restrain the interference of ultraharmonics on illumination control devices and other system equipments, except that the regulations of Section 22.3, Chapter 22 of JGJ 16-2008 Code for Electrical Design of Civil Buildings shall be met, shall conform to the following requirements: the loop that needs light control shall select metal conduit and trunking for lay-up, and parallel lay-up of electroacoustics etc. telecommunication lines is not suitable. When light-controlling loop are in parallel lay-up with telecommunication lines, the distance shall be more than 1m; when in squre crossing, the distance shall be more than 0.5m.

4.6.4机房、竖井布置平面图

Plane arrangement drawing of equipment room and vertical shaft

照明设备机房和竖井布置平面中的电气设备、管线布置应遵循以下原则:

The electric installation and pipeline layout in the plane arrangement drawing of lighting equipment room and vertical shaft shall conform to the following principles:

(1)机房布置图中应包括配电柜/控制箱平面位置布局、局部立面图,注明管线、线槽走向,写出文字说明等。

The equipment room arrangement drawing shall include the plane layout and partial elevation of the power distributing cabinet and controlling box, giving clear indication of the trend of pipelines and trunking, explanatory notes, and so on.

(2)平面图上的设备位置、数量、编号,缆线规格、管线与线槽走向应与立面图上的设备位置、数量、编号,缆线规格、管线与线槽走向相对应。

The equipment position, quantity, No., and cable specification, pipeline and trunking trend on the plan drawing shall coincide with those on the elevation drawing.

(3)机房内的控制箱、柜等设备应注明尺寸,间距、并标明设备型号。

The controlling box and cabinet inside the equipment room shall be marked with the dimension, spacing and equipment type.

(4)机房布置图应注明机房空间内各设备安装位置、相互关系及安装工艺要求。

-可编辑修改-

______________________________________________________________________________________________________________

The equipment room arrangement drawing shall give clear indication of the installation position, correlations between equipment, and technical requirements of installation of the equipment inside the equipment room.

(5)控制信号的强、弱电井布置图应具体反映强、弱电井内所有线槽、管路、设备箱等的位置、尺寸The arrangement drawing of strong and weak electricity well of control signals shall specifically reflect the position and dimension of all trunkings, pipelines and equipment boxes inside the strong and weak electricity well.

4.7安装大样图

Detail drawing of installation

安装大样图是明确灯具安装与建筑关系的说明图。

The detail drawing of installation is the explanatory drawing which defines the relationship between lighting installation and the structure.

当采用一些特殊形式或定制灯具时采用安装大样图来介绍这些灯具的安装方法。安装大样图中应包括设备安装固定方式、设备尺寸、材料名称、型号、规格、在单张大样图中的设计使用数量、开孔/留洞尺寸、接线端子图、接线颜色、接线序号、线缆型号、线缆规格、回路编号、文字说明等。

When special or customized lightings are used, the detail drawing of installation shall be used to introduce the installation method of these lightings. The detail drawing of installation shall include the equipment installation and mounting form, equipment dimension, material name, model and specification, designed use quantity in each detail drawing, opening/hole dimension, connecting terminal drawing, color and serial number of connection, cable model, cable specification, loop No. and explanatory notes.

扩声

Sound reinforcement

扩声专业施工图设计深度标准及技术深度文件的标准扩声部分现规定如下:

The design depth of sound reinforcement working drawing and the standard sound reinforcement part in the technical scope documents are specified as follows:

一、提供各区域(包括排队区、预演区、主演区)扩声系统形式:使用单声道、立体声或者环绕声扩声。

I. Provide the form of sound-reinforcement system in each area (including the queue area, rehearse area and performance area): use single track, stereophonic sound or surround sound for sound reinforcement.

二、提交各区域(包括排队区、预演区、主演区)扩声系统的直达声声压级(Direct

SPL)、总声压级(Total SPL)。

II. Provide sound pressure level of direct sound (Direct SPL), total sound pressure lever (Total SPL) in each area (including the queue area, rehearse area and performance area).

三、提交扩声系统中所采用设备的说明书。

III. Provide instructions of the equipment used in the sound-reinforcement

system.

四、提供扩声系统设备资料表。(用EXCEL表格做出,格式如下,第一行内容为示范)。

IV. Provide the equipment data sheet of the sound-reinforcement system (in EXCEL, with the format as follows; contents in the first row are filled in as an example).

五、对施工图纸的要求如下:

V. Requirements for construction drawings are as follows:

用于设计方案阶段的一套完整的图纸至少应包括封面、图纸目录、工程设计说明及图例、设备材料清单、系统图、平面图。

A complete set of drawings used in the design stage shall at least include the cover, drawing content, engineering design instructions and graphic symbols, list of equipment and materials, system diagram, and plan view.

用于施工阶段的图纸至少应包括封面、图纸目录、工程设计说明及图例、设备材料清单、系统图、平面图及设备的安装大样图。

A complete set of drawings used in the construction stage shall at least include the cover, drawing content, engineering design instructions and graphic symbols, list of equipment and materials, system diagram, plan view, and the detail drawing of equipment installation.

扩声专业图纸范围如下:

Scope of drawings for sound reinforcement is as follows:

必须包括封面、图纸目录、工程设计说明及图例、设备材料清单、系统图、平面图、机房设备布置图、安装大样图。安装详图根据项目情况,应由设计师根据项目的可实现性和各专业分项工程的配合决定绘图深度,设计出满足项目需求的可实施的拓展性安装详图。

It shall include the cover, drawing content, engineering design instructions and graphic symbols, list of equipment and materials, system diagram, plan view, equipment layout in equipment room, and detail drawing of equipment installation. Feasible and extendable detail drawing for equipment installation shall be designed according to the project situations by the designer who shall decide the depth of drawing according to the project feasibility and coordination between all subdivisional works of each discipline to satisfy the project requirements.

5.1封面Cover

封面应包含项目名称、图纸性质(初步设计、施工图、竣工图等)、公司名称、日期。

The cover shall bear the project name, drawing property (preliminary design, construction drawing, as built drawing, etc.), company name, and date.

5.2图纸目录Drawing content

图纸目录应包含以下内容:项目名称、项目编号、设计公司名称、专业、图纸名称、图纸编号、图幅、出图日期、制图人及审核人等内容。

The drawing content shall include the following: project name, project ID, name of design corporation, discipline, drawing name, drawing number, sheet, drawing finishing date, the person who draws, and the auditor.

5.3工程设计说明及图例Engineering design instructions and graphic symbols 设计总说明须包括但不限于:工程概况、设计依据、各子系统施工内容、施工要求和注意事项、设计特殊要求和施工配合要点、设计范围内智能化系统与相关专业的技术接口要求、图例符号等。

General engineering design instructions shall include, without limitation to: project profile, design basis, construction contents of each sub system, construction requirements and notices, special design requirements and key points in construction cooperation, technical interface requirements for the intelligent system and relevant disciplines within the scope of design, graphic symbols, and so on.

5.4设备材料清单List of equipment and materials

在材料表中的图形符号图例应采用国标,其次是部标、行标。未予规定的自拟图形图例,应在图例中标出且加以说明。当使用国标图形图例,又给予不同含义时也应加以说明,一套图纸的图例符号应前后一致。Graphic symbols in the list of materials shall adopt those in national standards,

followed by ministerial standards and industry standards. Self made graphic drawings not specified shall be marked in the graphic symbols with explanations. Explanations shall also be given when graphic symbols in national standards are given different meanings. The graphic symbols used in one set of drawings shall be in consistence with each other.

设备材料清单,按系统开列组成系统主要设备和材料,应标明设备名称、规格型号、主要技术指标、品牌(产地)、数量。非标设备、材料应备注说明技术要求。

The list of equipment and materials shall list the major equipment and materials constituting the system, with an indication of the equipment name, specification and model, key technical indicators, brand (origin), and quantity. Technical requirements for nonstandard equipment and materials shall be marked.

各个平面图、设备房图应随附图例并标注数量。包括电脑、软件、编程工具、机柜、电源、变压器等设备材料都必须在图纸上或设备材料中体现出来,并且注明型号、规格、数量总和。

All plan views and equipment room drawings shall be attached with graphic symbols and quantity. Equipment and materials including computers, software, programming tools, cabinets, power supply and transformers shall be indicated in the drawings or list of equipment materials, with clear indication of the model, specification and total quantity.

5.5系统图System diagram

系统图应将弱电流、小功率设备(如话筒、音源、音频处理器)与强电流、大功率设备(如功率放大器、有源音箱、无源音箱)用不同的颜色区分标示、注释。

On the system diagram, light-current and small-power equipment (such as microphones, sources of sound and audio processors) and strong-current and heavy duty equipment (such as power amplifier, active loudspeaker and passive loudspeaker) shall be distinguished with marks and notes in different colors.

系统图中要求体现所有音频设备的输入、输出接口形式,以便统计接口规格与数量。

The system diagram is requested to show the input and output interface form of all audio equipment, so as to be convenient to make statistics about the interface specification and quantity.

系统图中涉及到强电流、大功率设备,需标注有效输出功率。

The system diagram shall mark the useful output of strong-current heavy duty equipment.

5.6平面图Plan view

5.6.1总体要求General requirements

参考我国扩声行业标准《电气装置安装工程电缆线路施工及验收规范》(GB50168-92)、《电声系统设备互联的优选电气配接值》(SJZ112-86)中

对于扩声及电气方面的要求。

Please refer to the requirements for sound reinforcement and electricity specified in the sound reinforcement industry standard Code for Construction and Acceptance of Cable Levels Electric Equipment Installation Engineering (GB50168-92) and Prefered Electrical Matching Values for Interconnection of Electroacoustic Systems (SJZ112-86).

5.6.2线槽设计Trunking design

由强电、弱电、音频&控制竖井或控制机房引向用电负荷的电气线路,在回路众多的情况下应采用线槽布线。

The electric wiring drawn from vertical shaft for light-current and strong-current and audio & control shall adopt trunking when there are numerous loops.

5.6.3管线图Piping plan

具体设计原则请参考《电气装置安装工程施工及验收规范》(GBJ232-92)。For detailed design principles, please refer to Specifications for Construction and Acceptance of Electrical Apparatus Installation Work (GBJ232-92).

5.6.4机房、竖井布置平面图Plane arrangement drawing of equipment room and vertical shaft

扩声设备机房和竖井布置平面中的电气设备、管线布置应遵循以下原则:The electric installation and pipeline layout in the plane arrangement drawing of sound reinforcement facility room and vertical shaft shall conform to the

following principles:

(1)机房布置图中应包括配电柜/控制箱平面位置布局、局部立面图,注明管线、线槽走向,写出文字说明等。

The equipment room arrangement drawing shall include the plane layout and partial elevation of the power distributing cabinet and controlling box, giving clear indication of the trend of pipelines and trunking, explanatory notes, and so on.

(2)平面图上的设备位置、数量、编号,缆线规格、管线与线槽走向应与立面图上的设备位置、数量、编号,缆线规格、管线与线槽走向相对应。The equipment position, quantity, No., and cable specification, pipeline and trunking trend on the plan drawing shall coincide with those on the elevation drawing.

(3)机房内的控制箱、柜等设备应注明尺寸,间距、并标明设备型号。The controlling box and cabinet inside the equipment room shall be marked with the dimension, spacing and equipment type.

(4)机房布置图应注明机房空间内各设备安装位置、相互关系及安装工艺要求。

The equpiment room arrangement drawing shall give clear indication of the installation position, correlations between equipment, and technical requirements of installation of the equipment inside the equipment room.

工程图纸深化设计审查要点【公开版】

工程深化图纸审查要点工程图纸深化设计审查要点 1/37

工程深化图纸审查要点 目录 一、概论(综述) 二、工程图纸深化设计审查要点 三、工程施工图深化设计管理 四、其它相关信息 五、案例分享 2/37

工程深化图纸审查要点 一、概论(综述) 1.1.本规程适用用于凯德中国项目; 1.2.本规程针对设计、招采、成本、工程施工、物业/ 客服等相关部门制定; 1.3.本规程适用于住宅、商业、办公楼等建筑类型的工程深化图纸的审查; 1.4.本要点包含:常规深化设计的审查要点、深化设计管理、资料管理、案例等;’ 1.5.本规程是针对目前凯德中国区各项目深化设计图纸的审查中存在的审查没有目标、审查没 有固定的要点、审查的深度不统一而进行统一规范的文件。在对多个区域对审查深化图纸要求进行了分析、归纳、总结后,结合以往审查深化设计图纸的经验总结而形成本工程深 化图纸要点; 1.6.深化设计——是指以甲方或设计顾问提供的招标图纸(或者方案图纸、初步设计图纸、正 式施工图纸)为依据,结合施工现场实际情况,对图纸进行细化、补充和完善。深化设计 后的图纸满足业主及设计顾问的技术要求、符合相关地域的设计规范和施工规范并通过审 查,图形合一,能直接指导现场施工。工程深化设计图纸根据不同设计深度可分为三个层 面: 1.6.1.在方案设计单位完成方案设计的前提下,由施工单位或专业深化设计单位完成施工图及 深化设计; 1.6. 2.已有施工图但不完备,不能完全指导施工。如结点大样只给出所用材料而未给出具体做 法等,由施工单位或专业深化设计单位按照招标图纸及要求完成补充深化设计; 1.6.3.设计图纸已达施工图深度要求,但具体实施过程中仍需继续施工细化,主要体现在钢结 构深化设计、门窗深化设计、幕墙深化设计、精装修施工深化设计及较专业的分包工程 等方面,如建筑装饰材料排版方案、加工工艺设计、安装/ 施工工艺设计、水电空调等 安装专业末端定位设计等方面。 1.7.深化设计图纸分类(包含但不限于)( 仅供参考用,以防深化设计的遗漏): 分类深化图纸名称范围/注释备注基坑工程深化设计地下室深基坑支护结构深化设计 主体结构钢结构、附属钢结构如 钢结构深化设计雨棚、车库入口钢结构、空中钢 结构连廊、游泳池钢结构等 钢结构和混凝土结构加固深化设 结构改造、加固深化设计计,包括钢梁、钢柱和混凝土梁 柱以及楼板的加固深化设计 钢骨柱、楼面组合梁、钢管混凝 结构钢 - 混凝土组合结构深化设计土柱 CFT以及相关梁柱节点的深 化设计 包括构造柱或芯柱的布置、圈梁二次砌筑结构的深化设计的布置以及配合家具吊挂所需的 混凝土带的设置等 网架自身的强度 / 刚度、基础、表网架深化设计面处理及效果、达到各项理化性 能的节点设计等; 大空间内的夹层深化设计如:钢制 LOFT 空中连廊深化设计常规是以钢结构为主 3/37

精装修施工图深化内容及要求

精装修施工图深化内容及要求 精装修施工图深化:内容及要求 在建筑设计和施工过程中,精装修施工图深化是一个至关重要的环节。它旨在完善和细化施工图纸,提高施工质量和效率,确保建筑物的实用性和美观度。本文将详细介绍精装修施工图深化的主要内容和相关要求。 一、前期准备 在开始精装修施工图深化之前,设计团队需要充分了解建筑项目的相关信息,包括设计标准、材料选用、空间规划等。同时,还需要与结构、电气、给排水等专业团队进行协调,确保施工图的协同性和可行性。 二、深化设计 1、细节处理:精装修施工图深化需要注重细节处理,包括材料选择、色彩搭配、收口处理等。设计团队应充分考虑实际施工条件,确保施工图的精细度和完整性。 2、材料搭配:根据设计风格和项目要求,选择合适的材料搭配。注 意材料之间的协调性和施工质量,同时考虑环保性能和成本预算。3、功能完善:在设计过程中,要充分考虑建筑物的实用性和功能性。

合理布局空间,优化功能区域,提高空间的舒适度和使用率。 三、技术要求 1、3D设计软件:精装修施工图深化需要运用3D设计软件,如SketchUp、Revit等,以便更直观、全面地展示设计效果。 2、施工图绘制:施工图的绘制应遵循相关规范和标准,确保清晰、 准确、完整地表达设计意图。 四、质量控制 1、审查规范:在施工图深化过程中,应严格遵守相关审查规范,确 保施工图的合规性。 2、施工检查:在施工过程中,设计团队应与施工方保持密切沟通, 对施工情况进行检查与评估,确保施工质量和设计效果的实现。 五、注意事项 1、避免犯错:在设计过程中,要充分考虑可能出现的问题,避免犯错。例如,避免图纸之间的冲突、遗漏或错误解释等。 2、保证施工质量:设计团队应与施工方密切合作,确保施工过程严 格按照设计要求进行,提高施工质量。 3、考虑成本:在选择材料和设备时,需要在保证设计效果和质量的

bim深化设计标准

bim深化设计标准 一、BIM深化设计整体目标 在工程各阶段应用BIM技术,提高项目策划能力,增强项目过程管控能力,提高施工深化设计质量和效率,提升项目各阶段的精细化管理水平,实现工程实体与BIM模型的同步交付。 二、BIM深化设计管理体系 1.BIM内部管理组织架构 由BIM项目总负责人负责对项目整体工作进度、工作方向及成果质量进行总体把控;BIM设计主管对外及对内进行协调沟通,随时跟进项目参与各方设计进度并给予BIM技术支持;BIM各专业负责人及设计人员负责各专业建模及技术问题,反馈并解决本专业内部问题的同时与BIM设计主管及其他专业配合解决专业间冲突问题;全过程中由专人提供软件技术支持,以保证各项技术工作的顺利进行。 2.外部配合模式 与项目参与各方紧密联系,主动加强信息互通,确保项目全过程中BIM成果能够随时服务于参与各方。 通过实时的信息互通和快速的响应速度,使BIM成为项目各方的信息汇总平台,同时为各方提供优质高效的信息服务。 3.BIM深化设计工作职责

4.BIM工作流程 4.1 BIM工作整体流程

4.2 BIM模型搭建工作流程 4.3 管线综合及空间优化工作流程

4.4 施工节点模拟工作流程 4.5 竣工模型的整理和移交工作流程 不通过

5.BIM工作制度 5.1 专业间协调管理 各专业BIM工程师按规划及计划完成本专业BIM模型后,由甲方组织提交本专业模型至总包方进行整合,根据整合结果,定期或不定期进行审查。由审查结果反推至目标模型,图纸进行完善。 各专业间参与方依据管理体系、职能对信息模型进行必要的调整,并反馈最新的信息模型至顾问方。 5.2 BIM数据共享管理 由顾问方收集并集成包括模型、图纸、设备信息等BIM相关的数据,并按照一定的规则进行分类,并尽可能将数据与模型进行匹配,达到利用模型来查找数据的目的。 根据分包的要求进行数据的提供与更新,并反馈图纸中出现的问题,将数据在平台上进行共享。 顾问方定期对数据进行检查,并将模型信息、施工信息及其他信息进行定期发布,供各分包进行查阅与修正。 分包方若需顾问方提供相应数据,必须提交数据请求表,在顾问方认可情况下进行数据提取。 5.3 BIM会议制度 在项目例会上,BIM工作列为讨论议项。BIM工作在例会上的议程包括:对上一次例会中关于BIM工作要求落实情况的检视;本例会中出现的BIM问题及落实解决要求;对下一阶段BIM工作的要求;其他关于BIM的工作。 项目里程碑节点时,召开专项BIM工作会议,对BIM工作进行相关内容的讨论和决议:项目总承包管理BIM实施方案审议;各专业分包方招标采购文件编制时;主要专业承包单位进场时;工程重大里程碑节点开始及结束时;主体结构完工封顶时;幕墙安装工程完工时;各机电主要设备、管道安装完成时;各机电系统调试完成时;工程整体竣工时。 6.BIM工作平台

施工图深化设计要点

施工图深化设计 1.施工图设计现状 1.1问题的产生 建筑设计包括方案设计、扩初设计和施工图设计。方案设计和扩初设计需要长时间的思考和积累,需要智慧和创造力。施工图设计尽管图纸数量较多,工作量较大,但创造性相对较少,机械性较强,主要是要求配合施工全过程,重点处理设计与施工的协调,根据施工需要不断补充和修改图纸,及时解决施工现场问题。 按理说:设计单位应专注于工程项目的方案设计、效果设计、扩初设计。施工单位应充分发挥现场经验丰富的优势,往前延伸到施工图设计,并与设计单位紧密配合,共同进行施工图深化设计。 但现状是:(1)在“设计-招标-建造”(dbb)模式下,施工图设计阶段,施工单位和监理公司尚未确定,业主管理人员往往缺乏专业知识或专业不专,一般施工图都是设计单位独家完成。(2)设计单位最关心的是工程项目的技术风险,不注重工程造价,设计人员不愿下工地,不了解施工工艺和现场需求,缺乏施工行业的实践经验,设计单位独家完成的施工图往往是:不够完善,不尽人意。(3)目前的设计取费中,工用项目(民建项目)施工图设计取费占总设计取费的40%(50%)。因此,大部分设计单位还比较注重施工图设计,不愿意将施工图设计环节下移到施工单位。(4)施工单位最为关心的是利润,为压低成本,不愿多聘请专业技术人员,施工管理人员对

设计规范的把握不熟悉,参与深化施工图设计能力不足。 综上,目前施工图设计主要障碍,一是dbb建造模式体制不顺;二是施工企业没有足够能胜任的施工图设计人员,设计单位缺乏施工行业的实践经验;三是设计单位主要依靠施工图设计取得经济收入。其结果是施工图设计深化不够,与工程造价、施工方案一体化考虑不够,施工过程中设计变更较多,工期长,造价高,实用性不强,“可建造性”较差,有的甚至无法建造。 1.2为解决上述问题,当期实践主要做法 首先,设计交底之前甲方(代建)、监理、施工单位详细审图,然后把问题汇总,在设计交底时把图纸中存在的问题尽可能的找出来、解决掉。但是对一些工程浩大、设计复杂、问题较多、时间仓促的工程,一次设计交底末必能够把问题全部解决掉,所以设计交底后还要继续审图,直到把在施工之前能够找出的问题全部找出解决为止。 其次,对于一些设计不完善的工程,要把这些问题提出来,写成书面材料,详细说明这些问题的存在对工程造成的负面影响,尽快与相关部门联系,完善设计,为施工铺平道路。 在整个施工过程中,还不断地会有设计中存在的问题出现,所以甲方(代建)、监理、施工单位要与设计方保持良好的沟通与联系及时解决施工中出现的问题。 上述做法,设计方处于主动地位。实践中为设计变更设计施工双方往往会持截然相反的立场,为统一思想,牵扯了各方大量资源和

工程图纸深化设计审查要点【公开版】

工程图纸深化设计审查要点 目录 一、概论(综述) 二、工程图纸深化设计审查要点 三、工程施工图深化设计管理 四、其它相关信息 五、案例分享

一、概论(综述) 1.1.本规程适用用于凯德中国项目; 1.2.本规程针对设计、招采、成本、工程施工、物业/客服等相关部门制定; 1.3.本规程适用于住宅、商业、办公楼等建筑类型的工程深化图纸的审查; 1.4.本要点包含:常规深化设计的审查要点、深化设计管理、资料管理、案例等;’ 1.5.本规程是针对目前凯德中国区各项目深化设计图纸的审查中存在的审查没有目标、审查没 有固定的要点、审查的深度不统一而进行统一规范的文件。在对多个区域对审查深化图纸要求进行了分析、归纳、总结后,结合以往审查深化设计图纸的经验总结而形成本工程深化图纸要点; 1.6.深化设计——是指以甲方或设计顾问提供的招标图纸(或者方案图纸、初步设计图纸、正 式施工图纸)为依据,结合施工现场实际情况,对图纸进行细化、补充和完善。深化设计后的图纸满足业主及设计顾问的技术要求、符合相关地域的设计规范和施工规范并通过审查,图形合一,能直接指导现场施工。工程深化设计图纸根据不同设计深度可分为三个层面: 1.6.1.在方案设计单位完成方案设计的前提下,由施工单位或专业深化设计单位完成施工图及 深化设计; 1.6. 2.已有施工图但不完备,不能完全指导施工。如结点大样只给出所用材料而未给出具体做 法等,由施工单位或专业深化设计单位按照招标图纸及要求完成补充深化设计; 1.6.3.设计图纸已达施工图深度要求,但具体实施过程中仍需继续施工细化,主要体现在钢结 构深化设计、门窗深化设计、幕墙深化设计、精装修施工深化设计及较专业的分包工程等方面,如建筑装饰材料排版方案、加工工艺设计、安装/施工工艺设计、水电空调等安装专业末端定位设计等方面。 1.7.深化设计图纸分类(包含但不限于)(仅供参考用,以防深化设计的遗漏):

施工图设计深度要求

施工图设计深度要求 一、总则 1、1为了规范施工图设计文件编制工作,保证施工图设计质量,满足工程建设及安全、适用、经济、绿色等方面的要求,制定本规范。 2、2本规范适用于房屋建筑工程、市政基础设施工程和仿古建筑及古建筑修缮工程的施工图设计。 3、3施工图设计文件编制应贯彻国家和地方的相关法律、法规、规范、规程及标准,严格执行工程建设标准强制性条文。 4、4施工图设计文件编制应符合国家及地方的相关规定,以及项目批准文件的相关要求。 二、施工图设计文件的组成 2、1房屋建筑工程的施工图设计文件应包括:设计说明书,包括工程概况、设计依据、设计规模、工程结构形式与特点、材料及设备选用等;施工图纸,包括总平面图、建筑平面图、立面图、剖面图、大样详图等;结构施工图纸,包括基础平面图、基础详图、结构平面图、屋面结构平面图等;设备施工图纸,包括给排水、暖通空调、电气等

施工图纸;以及节能专篇(或节能专篇说明书)。 21、2市政基础设施工程的施工图设计文件应包括:设计说明书,包括工程概况、设计依据、规模与标准等;施工图纸,包括路线平面图、纵断面图和横断面图;结构施工图纸,包括桥梁、隧道等结构施工图纸;设备施工图纸,包括给排水、燃气、供热等施工图纸;以及节能专篇(或节能专篇说明书)。 211、3仿古建筑及古建筑修缮工程的施工图设计文件应包括:设计说明书,包括工程概况、设计依据、规模与标准等;施工图纸,包括总平面图、建筑平面图、立面图、剖面图等;结构施工图纸,包括基础平面图、基础详图等;设备施工图纸,包括给排水、电气等施工图纸;以及节能专篇(或节能专篇说明书)。 三、施工图设计深度要求 3、1施工图设计深度应符合下列规定: (1)满足工程施工各阶段的需要,如采购材料、加工制作、运输及安装等; (2)满足工程质量要求;

深化设计制图标准

深化设计制图标准 总则 1、为了统一公司深化设计制图规则,保证制图质量,提高制图效率, 便于规范化管理,使图面表达规范化、标准化,符合设计、施工、存档 的要求,适应工程建设的需要,特制定本标准。 2、适用范围:公司所有深化设计图纸。 二、基本规定 1、本标准主要引用《房屋建筑制图统一标准》(GB/T50001-2001)和 《建筑结构制图标准》(GB/T50105-2001)。 2、深化设计图纸应包含一下内容: A.图纸目录 B.钢结构深化设计总说明 C.焊接通图 D.构件布置图(含安装定位数据) E.总装图 F.成品构件图、异形零件图及零件材料表 G.成品构件清单 H.螺栓清单 3、深化设计流程 (1)根据深化设计任务委托部门的《项目深化设计联系单》及其提供的正式施工图、设计补充文件、设计变更单等进行设计前准备工作;(2)召集工程项目部、制造工厂进行图纸会审,并形成会审纪要。

(3)深化前期必须进行的准备工作: A.对图纸中存在疑问、不清楚的地方以联系单的形式跟设计院进行沟通 确认; B.制作工厂以书面形式确定构件的加工顺序及要图计划; C.详图设计部门应进行图纸图号编号原则、构件编号原则、零件编码原则 的编定。 (4)深化设计展开 A.深化设计图纸目录、钢结构深化设计总说明、焊接通图 B.构件布置图 C.总装图、成品构件图、零件图 D.成品构件清单、螺栓清单 (5)深化图纸经自检、校对、审核并修改完成后,即可送交设计院或业主审核(送审图纸可不包括零件图、成品构件清单、螺栓清单)。 (6)经设计院或业主送审确认的图纸,方可作为发往计划部门安排生产的正式文件。同时将有关清单发往计划部门并做好发放记录。(如因工程进度紧急,为配合生产进度,可在送审期间通知设计院或业主并发图制作) (7)工程深化制图工作完成后,收集整理好工程所有输入、输出文件 及有关记录后存档,并作为工程结算的依据。 4、深化设计要点 (1)深化设计人员应以认真、负责、仔细的态度作好每项工程的深化设计。(2)深化设计人员须认真、仔细的读懂工程施工图中每一项内容,并及时提

施工图深化设计要求标准

施工设计提交成果 Deliverables of Construction Drawings 灯光照明 Lighting 对于灯光照明专业施工图设计深度标准及技术深度文件现规定如下: The design depth and technical scope of special lighting working drawing are specified as follows: 一.各区域,各房间的照度计算书及灯具选型、灯位布置; I.Illumination calculation sheet and type selection and positioning of lights each in room in all areas; 二.照明控制系统中所采用设备的说明书; II.I nstructions of equipment used in the lighting control system; 三.灯具资料表(用EXCEL表格做出,格式如下,第一行内容为示范); III.Data sheet of lighting (in EXCEL, with the format as follows; contents in the first row are filled in as an example);

四. 对施工图纸的要求如下: IV. Requirements for Construction Drawings 用于设计方案阶段的一套完整的图纸至少应包括封面、图纸目录、工程设计说明及图例、设备材料清单、系统图、平面图。 A complete set of drawings used in the design stage shall at least include the cover, drawing content, engineering design instructions and graphic symbols, list of equipment and materials, system diagram, and plan view. 用于施工阶段的图纸至少应包括封面、图纸目录、工程设计说明及图例、设备材料清单、系统图、平面图及设备的安装大样图。 A complete set of drawings used in the construction stage shall at least include the cover, drawing content, engineering design instructions and graphic symbols, list of equipment and materials, system diagram, plan view, and the detail drawing of equipment installation. 照明专业图纸范围如下: Scope of drawings for lighting is as follows: 必须包括封面、图纸目录、工程设计说明及图例、设备材料清单、系统图、平面图、机房设备布置图、安装大样图。安装详图根据项目情况,应由设计师根据项目的可实现性和各专业分项工程的配合决定绘图深度,设计出满足项目需求的可实施的拓展性安装详图。 It shall include the cover sheet, drawing content, engineering design instructions and graphic symbols, list of equipment and materials, system diagram, plan view, layout of equipment in equipment room, and detail drawing of equipment installation. Feasible and extendable detail drawing for equipment installation shall be designed according to the project situations by the designer who shall decide the depth of drawing according to the project feasibility and coordination between all subdivisional works of each discipline to satisfy the project requirements. 4.1封面Cover 封面应包含项目名称、图纸性质(初步设计、施工图、竣工图等)、公司名称、日期。 -可编辑修改-

工程图纸深化设计审查要点【公开版】

- 工程图纸深化设计审查要点 ~

目录 一、概论(综述) 二、工程图纸深化设计审查要点 三、) 四、工程施工图深化设计管理 五、其它相关信息 六、案例分享

一、概论(综述) 1.1.本规程适用用于凯德中国项目; 1.2., 1.3.本规程针对设计、招采、成本、工程施工、物业/客服等相关部门制定; 1.4.本规程适用于住宅、商业、办公楼等建筑类型的工程深化图纸的审查; 1.5.本要点包含:常规深化设计的审查要点、深化设计管理、资料管理、案例等;’ 1.6.本规程是针对目前凯德中国区各项目深化设计图纸的审查中存在的审查没有目标、审查没 有固定的要点、审查的深度不统一而进行统一规范的文件。在对多个区域对审查深化图纸要求进行了分析、归纳、总结后,结合以往审查深化设计图纸的经验总结而形成本工程深化图纸要点; 1.7.深化设计——是指以甲方或设计顾问提供的招标图纸(或者方案图纸、初步设计图纸、正 式施工图纸)为依据,结合施工现场实际情况,对图纸进行细化、补充和完善。深化设计后的图纸满足业主及设计顾问的技术要求、符合相关地域的设计规范和施工规范并通过审查,图形合一,能直接指导现场施工。工程深化设计图纸根据不同设计深度可分为三个层面: 1.7.1.在方案设计单位完成方案设计的前提下,由施工单位或专业深化设计单位完成施工图及 深化设计; 1.7. 2.已有施工图但不完备,不能完全指导施工。如结点大样只给出所用材料而未给出具体做 法等,由施工单位或专业深化设计单位按照招标图纸及要求完成补充深化设计; 1.7.3.设计图纸已达施工图深度要求,但具体实施过程中仍需继续施工细化,主要体现在钢结 构深化设计、门窗深化设计、幕墙深化设计、精装修施工深化设计及较专业的分包工程等方面,如建筑装饰材料排版方案、加工工艺设计、安装/施工工艺设计、水电空调等安装专业末端定位设计等方面。 1.8.; 1.9.深化设计图纸分类(包含但不限于)(仅供参考用,以防深化设计的遗漏):

施工图纸深化设计要点

施工图纸深化设计要点 一、概述 在建筑工程中,施工图是建筑设计的最后一步,也是建筑师和施工方之间的重 要桥梁。它包含了建筑设计的具体实施方案、精确的尺寸和细节要求。深化设计是指对原设计方案进行进一步的优化和完善,以确保建筑工程的顺利进行。本文将探讨施工图纸深化设计的要点。 二、建筑方案的优化 深化设计的第一步是对原有建筑方案进行优化。在优化过程中,需要考虑建筑 的整体布局、空间划分和功能要求。建筑师应该根据实际需求,调整建筑的尺寸和比例,使其更符合用户的需求和审美要求。 三、结构设计的完善 施工图纸中的结构设计是确保建筑安全和稳定的关键。在深化设计过程中,结 构工程师需要对原有结构方案进行详细的设计和计算。尤其是在复杂的建筑结构中,需要特别注重各构件之间的连接和承重能力,以确保整体结构的牢固性。 四、细节的精确表达 施工图纸是建筑施工的依据,因此必须对细节要求进行精确的表达。这包括墙 体的厚度、地板的材料和厚度、门窗的型号和尺寸等。此外,还应注明各种设备的位置和尺寸,以及电气走向和管道布置等细节要求,以便施工方能够准确地进行施工。 五、材料的选用与规范

施工图纸中的材料选择和规范是确保施工质量的重要环节。建筑师和工程师应 根据建筑的功能和使用要求,选择合适的材料,并明确规定其使用标准和质量要求。此外,还需要考虑到可持续发展和环保要求,选择符合节能环保标准的材料。 六、施工工艺和工序的规划 施工工艺和工序的规划对于工程进展的顺利进行至关重要。在深化设计中,需 要对施工工艺和工序进行详细规划,明确各施工单元之间的关系和施工顺序。这有助于避免施工过程中的冲突和各种不必要的问题。 七、安全和环保措施 施工过程中的安全和环保措施是施工图纸深化设计的重要内容。建筑师和工程 师应考虑到施工过程中可能存在的安全风险,并采取相应的措施来保障施工人员的安全。此外,还需要明确环保要求,采取相应的措施来减少对环境的影响。 八、施工图纸的审核和审查 施工图纸的审核和审查是确保施工质量和建筑安全的重要环节。在深化设计过 程中,需要建立严格的审核和审查机制,确保施工图纸的准确性和合理性。这包括对施工图纸的尺寸、细节要求、材料规范以及工艺流程等方面进行全面审核和审查。 总结: 施工图纸深化设计是建筑工程中不可或缺的一环。通过优化建筑方案、完善结 构设计、精确表达细节、选择合适的材料和规范施工工艺,可以确保建筑工程的质量和安全。同时,注重安全和环保措施,并进行严格的审核和审查,也是深化设计的重要内容。只有通过深化设计,我们才能实现建筑设计的完美实施,为人们创造更美好的生活环境。

精装修工程深化设计要求

精装修工程深化设计要求 1.1.深化设计原则及基本要求 在严格遵循设计意图的前提下建立BIM模型,根据BIM模型,依据现场实际情况进行施工图纸的深化和材料下单,做到所有现场施工必须有图可依、有图可查,对施工现场的施工给出明确做法、准确的尺寸、确定的材料标注,尽可能在同一张图纸中反映多种信息,便于一线施工人员现场使用和操作。具体要求为:(1)对目前所有方案的图纸进行核查,根据现场实际尺寸绘制平面图、剖面图、节点大样图; (2)根据现场尺寸和强弱电点位绘制准确的立面图、剖面图、节点大样图; (3)根据现场尺寸和机电现场安装情况核对天花图后调整绘制准确的天花图、剖面图、节点大样图; (4)所有深化图纸中的设计均需满足当地规范要求; (5)深化设计时应充分考虑现场实际条件,熟悉建筑专业及机电、给排水、空调、消防等各专业图纸。 (6)深化设计图纸应加盖承包人设计专用章,同时应提供所有深化图纸的电子文件。 (7)深化设计图纸必须经报消防局审批后方可施工,此工作由承包人负责提供及修改并承担相关一切费用,此部分需在投标报价中体现。 (8)承包人须按照发包人审核批准的施工方案及深化设计图纸进行施工,未经发包人书面签字认可,承包人不得随意更改施工方法。如未经发包人书面同意,承包人擅自改变施工方案,发包人有权要求承包人进行返工。承包人应无条件的进行施工图深化工作,将深化后的施工图上报发包人审核,经发包人审核通过后方可作为施工指导的依据,否则发包人有权下发停工指令,工期不予顺延、不予索赔,且深化费用包含在本次报价中。 (9)承包人在深化设计阶段需将深化图中深化后的部位采用云线标出,否

则不算变更,费用由承包人自行承担。 1.2.BIM要求 1.2.1.BIM的资质和能力要求 承包人需具有BIM深化设计能力,且有大型会议、会展场馆项目(超高、超大空间)项目设计经验。 施工期间驻场1名BIM设计负责人,不少于7名从事BIM深化设计师且设计人员从事BIM工作经历3年以上。 投标文件中需包含BIM实施团队的工作人员名单,职责及相关经验或背景。(拟派驻场相关人员不得擅自离开本地,离开本地一天及以上应向发包人书面请假批准,未经批准擅自离开按如下方式进行处罚:项目经理(含副经理)、技术负责人、BIM及深化设计负责人等主要负责人按照10000元/人/天予以处罚,其他人员擅自离开按照5000元/人/天予以处罚。) 投标文件中需详细介绍已拥有的BIM技术系统,及其他工程应用BIM完成施工的成功案例,并评估承包人的模型与其他供应商的模型相整合的技术可行性。 阐述承包人完成上述工作任务的技术方案。 1.2.2.BIM深化计划 投标单位应提供BIM模型的深化和更新等应用计划,以及BIM人力资源计划,作为投标文件的组成部分。 作为发包人在施工阶段的服务者,建立专业的BIM深化设计服务团队; 针对发包人方需求,及时准确完成BIM设计服务内容; 施工阶段,完成自身工作的相关模型(要强调施工应用性),为装饰施工提供便利,方便解决各专业间的碰撞。 承包人BIM建模完成后,对面层材料的排版、尺寸、数量、编号及细部收口材料下单必须完成,对接材料生产厂家进行排产,并将下料单明细签字盖章后留存监理、发包人各一份。 1.2.3.工作内容

施工图深化设计标准

施工图深化设计标准 施工图深化设计是建筑工程设计的重要环节,它直接关系到工程施工的质量和 进度。因此,制定施工图深化设计标准对于规范施工图设计、提高设计质量具有重要意义。本文将从施工图深化设计标准的概念、内容要求、实施步骤以及注意事项等方面进行详细介绍。 首先,施工图深化设计标准是指在初步设计方案确定后,对施工图进行进一步 的细化和完善,以满足施工实际需要的设计标准。其内容主要包括建筑结构、给排水、电气、暖通等专业的施工图细化设计。在进行施工图深化设计时,需要充分考虑工程的实际施工情况,保证设计方案的科学性和合理性。 其次,施工图深化设计标准的内容要求包括,符合国家相关建筑设计规范和标准、满足工程施工的实际需要、保证设计方案的安全性和可行性、合理利用建筑材料和节约成本、保证施工图的清晰、准确、完整。在进行施工图深化设计时,设计人员需要充分理解并遵循这些内容要求,确保设计方案的质量和可行性。 接下来,施工图深化设计标准的实施步骤主要包括,对初步设计方案进行全面 审查和分析、确定施工图深化设计的具体内容和要求、进行施工图的细化设计和完善、组织专业人员进行设计方案的审核和评审、最终确定施工图深化设计方案。在实施步骤中,需要严格按照程序和要求进行,确保设计方案的科学性和合理性。 最后,施工图深化设计过程中需要注意的事项主要包括,充分了解工程的实际 施工情况、与施工单位和监理单位充分沟通、及时调整设计方案以满足实际需要、保证设计方案的合理性和安全性。在设计过程中,设计人员需要密切关注这些事项,确保设计方案的质量和可行性。 总之,施工图深化设计标准对于规范施工图设计、提高设计质量具有重要意义。设计人员需要充分理解和遵循施工图深化设计标准的内容要求和实施步骤,确保设计方案的科学性和合理性,从而为工程施工提供可靠的设计支持。

关于施工图纸深化的规范

关于施工图纸深化的规范 在建筑设计中,施工图纸是将设计方案具体落地实现的关键步骤,其准确性和详尽度直接影响着建筑施工的效率和质量。为规 范施工图纸深化的相关工作,建筑行业积极推进相关标准和规范 的制定和实施。本文将探讨施工图纸深化规范的必要性、主要内 容和实践操作。 一、必要性 施工图纸是建筑设计的落地实现,其中详细而准确的图纸和相 关数据是建筑施工过程的基础,也是建筑质量和安全的重要保障。因此,对施工图纸的深化规范要求,有以下几个方面的必要性: 1.提高建筑施工的效率和质量 施工图纸的详尽准确度直接影响着施工过程的效率和质量,符 合规范的图纸可以有效降低施工中出现的问题和纠纷。这不仅可 以提高施工安全性和工程质量,还可以节省施工时间和成本,提 高整体效益。

2.规范行业标准 施工图纸深化规范的制定和实践可以促进建筑行业标准化的发展,助力行业技术水平的提高和创新能力的增强。规范的实践有利于推进建筑行业标准的保障和互通,确保建筑质量和安全性达到更高的水平。 3.提高行业声誉和竞争力 通过对施工图纸的深化规范实践,可以提高企业和行业的声誉和竞争力。符合规范和标准的施工图纸可以增强客户对企业技术和管理的信任和认可,有利于企业推出新的项目和产品,提高市场竞争力和盈利能力。 二、主要内容 施工图纸深化规范的主要内容可以包括以下几个方面: 1.建筑施工的基础参数

在施工图纸的深化规范中,需要规定建筑施工的基础参数和数据,包括建筑的尺寸、结构、安全设施、通讯和储存设备等。这些数据需要具备准确、详细和易读性等特点,保证施工的准确性和安全性。 2.制图和格式要求 在施工图纸深化规范中还需要规定具体的制图和格式要求,包括图纸标准、色彩、比例、字体等。这些规范可以确保图纸的规范化和标准化,降低施工中的信息歧义和误解,提高施工效率和质量。 3.工作流程和环节 施工图纸深化规范的制定中还需要考虑到施工过程的工作流程和环节。需要规定相关工程人员的职责、工作流程和信息沟通等环节,确保合理的信息传递和双向沟通,降低施工中出现的问题和瑕疵。 三、实践操作

深化设计要求

系统描述 一、深化设计要求 1.概述: 深化设计中的设计方案是经甲方确认的设计意向图。深化设计是标识生产实施的重 要步骤,深化设计图的设计应遵循设计效果完成图纸深化,深化施工图须经甲方及 设计方审核通过后,方可生产实施。 2.字体、标志基本要素:深化设计中所有使用的中英文及图标仅为示意,供定位和确 认体量使用。具体中英文及图标需由甲方提供。 3.标识规划布点设计要素:标识施工方须根据深化设计的规划布点方案,完成现场踏 勘。经甲方、设计方确认无误后方可生产实施。 4.信息版面内容、图形设计要素:标识施工方须根据深化设计进行现场验证,经甲 方、设计方确认无误后方可生产实施。 5.规范与审批:标识施工方须向甲方确认项目所在地要求的相关标准及技术规范。并 与甲方协调、配合完成有需要政府部门审批的工作。 6.施工图深化设计:标识施工方必须对项目工程中所有标识的外形、外观、电气及结 构设计负全部责任,包括所有的结构部分和扣件。所有的关于结构计算部分,需标 识施工方和相关结构设计院现场核实标识机构及机构部分基座。所有关于电器部 分,标识施工方除符合相关规范要求外并按可以隐藏的尽量隐藏,不能隐藏的按 整齐理性的原则进行布置。 7.修改与变更:标识施工方应做好准备以应对所有可能发生的修改或变更,如标识的 版面内容、设置位置及朝向等。并且紧密配合甲方工作,不得延误工期。 8.施工协调:标识施工方全权负责与工作有关的所有其它专业协调,以确保操作有 序。根据要求提供所需的预埋、锚固、扣件和嵌装等项目,不得延误工期。 二、性能要求 1、设计修改:只允许符合设计标准而需要的修改。标识施工方必须递交修改后的详图及 相关材料样板供甲方、设计方审批。深化设计必须保持总体的设计概念,而不能更改外观,必须保证材料强度及标识的耐久性。 2、热胀冷缩:必须保证标识在(周围温度40摄氏度和表面温度82摄氏度范围内 3、伸缩而不会产生褶皱,承受压力或变形,以及其它不良影响。 1、设计安全系数:各种材料及工艺应按照行业标准设计程序及安全系数来完成。 并保证在设计荷载下限的1.5倍时,不能出现永久变形、焊接或扣件失效,组成结构脱线或破损。注:永久变形指破损、脱离或位移而不能恢复原状。 三、提交文件: 1、产品资料:提供深化设计图纸供项目公司、设计方审核,除深化设计图 纸外,需包括但不限于材料说明书、检验报告、数据、产品性能和工作中使用 产品的安装指南; 2、深化图纸:包括但不限于平面图、立面图、尺寸、剖面图详图和固定方 法;所有标识及其组成部分的固定位置、颜色和材料。显示锚固、加固、附件、 布局和安装详图。标识施工方应踏勘标识规划位置的现场条件,并在编造深化 图纸前进行现场测量。 四、维护计划书 标识施工方必须在投标时提供甲方整个导向系统的运营维护计划。包 括但不限于: 1、标识制造、安装的竣工图纸;电器设计图纸;

施工图设计要求内容

奔业•沁园施工图设计要求 一、设计原则: 1、施工图设计按送审规划图深化设计,除不满足相关规或结构不合理处作 适当修改外,原则上不再做大的调整。 2、各专业设计,在满足本使用功能的前提下,应尽量考虑工程的成本,兼顾 实用、安全、美观、经济的设计原则。 3、住宅群房的商铺开间基本按住宅自身柱距考虑。商铺要考虑上、下水管; 强、弱电接线盒。 4、地下室不设人防,按普通地下室设计。 二、围: 建筑、结构、给排水、强弱电、暖通〔防排烟、总图。 三、设计接口: 1、建筑:室外及公共部分装修到位,套毛坯房标准;墙粉搓砂灰收光、平顶 刷白、留门洞、不装门框;进户门安装防盗门。 2、结构:到位。 3、给排水:给水至每户的厨房或者卫生间;排水接至户立管;卫生间采用 同层排水。 4、消防给水:商业消防设计到位,住宅走道考虑消火栓。 5、强弱电:强、弱电至用户室配电箱,每户进门处设置一个开关,平顶上配 白炽灯一盏。 6、暖通〔防排烟:按要求设置。 7、总图:道路、外管外线、电缆沟、化粪池;

排水〔雨污分流房陵大道接口,上水从房陵大道接入。 四、各专业的设计要求: 1、平面功能、立面造型、建筑层高、层数:见方案平、立、剖面图。 2、结构形式及墙体材料:结构形式采用框架剪力墙结构。商业外墙及分户 墙采用200mm厚加气砼砌块,住宅墙及分户墙采用200mm厚加气砼砌块,其余采用100mm厚加气砼砌块。 3、外墙保温:采用无机保温砂浆保温方式,无机保温砂浆厚度根据计算确 定。 4、墙上空调冷媒管穿墙留洞〔附表一 住:浴霸换气孔位置应尽量避开上层外窗的开启扇。 5、电梯: 6、层高: ⑴商业裙房底层:3.9M; ⑵商业裙房二层:3.6M;