The stage of the project cost managementFrom The Engineering IndexAbstract:Project cost management is the basic contents to determine reasonable and effective control of the project cost. Described the current stage of the project cost management situation on the strengthening of the various stages of construction cost management of the importance of and raised a number of key initiatives. Keywords:Cost of the construction project, Cost management status investment decision, Phase of the design, phase of the implementation, phase of the cost management in a market economyEven under the WTO and China's accession to the world community,China's construction industry how to effectively control construction cost of the construction and management of an important component part. However, the current budget for the construction projects –estimate budget,Super budget accounts for the "super three" is still widespread and that eventually led to a serious loss of control of project investment. Project cost management is the basic contents to determine reasonable and effective control of the project cost.As the project cost to the project runs through the entire process,stage by stage can be divided into Investment Decision stage,the design and implementation phases. The so-called Project Cost effective control is the optimization of the construction plans and design programs on the basis of in the building process at all stages, use of certain methods and measures to reduce the cost of the projects have a reasonable control on the scope and cost of the approved limits.Engineering and cost management work of the current status of project cost management system was formed in the 1950s,1980s perfect together. Performance of the country and directly involved in the management of economic activities. Provisions in the design stage to different estimates or budget preparation as well as government; Nothing relevant departments to formulate a budget,content, methodsIand approval, the budget will provide the fixed cost of equipment and materials and fixed price of the budget preparation, approval, management authority, and so on. With the historical process,after recovery,reform and development, formed a relatively complete budget estimate of quota management system. However, as the socialist market economic development,the system's many problems have also exposed. Generally speaking,the budget estimate is based on direct participation in the management of national economic activity as a precondition. Enterprise is not the actual economic entities. Due to the characteristics of the planned economy, and, at the time under the conditions of productivity,will inevitably become a shortage in the economy.In severe shortage of commodities under the conditions,as long as a certain level of investment, will be certain outputs. In this environment, the project planning and technical argumentation there can be no economic analysis. State control of the project cost constitute key factors equipment and materials prices,wages and taxes of artificial distribution. In this relatively stable economic environment,the budget estimate for the system approved project cost,help the government to carry out investment plans to play a major role.As the socialist market economic system established, requires us to predict project investment and control. In recent years,international investment project developed to the requirements of prior pre-control and in the middle of control. China,the traditional practice in an objective light on the cause decision-making, implementation heavy,light the economy and technology,First,the consequences of victimization,Due to the technical personnel of the project technical and economic concepts and a weak awareness of cost control, cost management makes the quality difficult to raise. Project Cost control is difficult to achieve long-term goals.Second,the various stages of the project management view of the above circumstances,My first academia in the 1980s made the whole process of cost management and control concept,building departments will study the feasibility ofIIprojects and the budgets and final accounts to two extended at the request of the corresponding regulations put our cost management concepts and methods referred to a new height.Our task now is to be modern and cost management in line with China's national conditions of the market economy system goal,learn from the advanced experience of the developed countries,and establish sound market economic laws of project cost management system,efforts to increase the project cost levels. An investment decision-making phase of the project cost management construction project investment decision-making stage is proposed project proposals; conduct a feasibility study to determine investment estimation and the final preparation of design task. At this stage,the project's technical and economic decision-making, of the construction project cost of the project after the completion of the economic benefits have a decisive influence,The construction cost is an important stage control.China's current stage of the project cost for the project management for the purpose of clearing price,and focusing only on the construction process of cost control, neglected before the start of the project investment decision-making stage of cost control. Investment decision-making phase of investment projects is estimated an important basis for decision-making. It has a direct impact on national economic and financial analysis of the results of the reliability and accuracy. Because of this phase is the preliminary work of projects,the information cannot be fully,comparable works more or less that information accumulated relatively small, estimated inadequate and unscientific. Makes project cost management and cost workers is difficult at this stage do something.The various stages of the project cost control in the decision-making phase project cost control. Right project planning phase of the cost,many owners have the wrong understanding that the lower the cost the better. Cost control is not a unilateral issue, and should be a number of factors,a combination of practical,comprehensive consideration. The construction project investment decision-making stage,the project's technical and economic decision-making,Cost of the project after theIIIcompletion of the project and the economic benefits,with a decisive role in project cost control is an important stage,rationally define and control the direction of the project cost of accurate positioning and building Optimization guiding role.In the decision-making phase of the most important is to do a good job feasibility study, the work is done well, returns on investment and can form a good proportion. Otherwise,invest more,less effective,resulting in loss of control and waste of investment.At present,some of the projects planned the owners of departure from the subjective desires of a feasibility study on the lack of scientific proof. Feasibility Study untrue,false or engineering functions obtaining the approval of their superiors, actually put into the feasibility study will be awarded in the study for the project after the smooth functioning buried a lot of hidden problems,lead to insufficient follow-up funds for the project and had to extend the time limit so that the project could not have planned the use of cost-effective,even become hopeless completion of the beard works.Therefore, in order to phase in the investment decision-making effectively control construction costs,we must do the following aspects:ⅰImplementation of the construction project and corporate accountability, Construction of the project from planning to implementation of the entire process and the use of the funds to repay responsibilities to the people. in addition to establishing a legal system and the project supervision matching mechanism by the departments in charge of the industry and supervision departments for setting up a monitoring group to oversee the use of funds.ⅱA realistic approach to market analysis,to avoid the blindness of the project decision-making, reduces and reduces investment risk. Fully consider building projects in the future market competitiveness,design task more scientific and reliability.ⅲCapital financing must have a formal commitment document, the parties must do investment funds in place,and funds must have documents to ensure that theIVproject can be approved after the scheduled implementation. To the various loan conditions should be carefully analyzed to minimize the burden of interest and repayment pressure.ⅳTo strengthen the engineering geology, hydrology, geology and land, water, electricity, transport, environmental projects such as external conditions for the work of depth to make the investment estimate there are sufficient grounds.Taking extensive investigation and research, comparison of similar projects, seriously functional analysis, multi-program comparison and choice. After full technical appraisal and economic evaluation, and the final technologically advanced, functional and reliable. Reasonable economic projects, thus calculate a more accurate and realistic estimation of the amount of investment, so that the project cost from the start positioning in a more reasonable level.The design phase of the project cost control for a long time, China's building control very effective, - investment projects is not uncommon, this will affect owners of investment returns, it adds to the owners and within budget, as well as difficulties in fund owners, the impact on the future management or the owners make payments in arrears, and so on. Hence, the control of the project cost is of great significance, however the project cost is the primary means of control design,Currently most of the property owners in the design stage seldom works on cost control, and they found that the cost of the design will not have a great impact, it is wrong, on the contrary, Design phase of the project cost control is the most important step. Because it determines engineering design, construction methods, materials and equipment types, models of the project cost is of critical significance, design optimization phase of the program or minor changes, project cost will have a significant impact, Design phase of the project cost control of the total project cost of 70%. Following is how to control the project from design to create the Law:ⅰAs the owners must design, the design selected on the quality level is a direct impact on the quality of product design level, and the design quality products in the level of direct influence on the pricing of the works. Different design units on theVsame project design are different. the same item of different design institute works between certain aspects of the project cost on the existence of differences between, We assume that with a design from two different design institute to design, Construction plans after the completion of a requested advisory unit cost to do the budget, certainly different design institute the total cost of the project is absolutely not the same, and most of the difference between the two over 10% even more than 30%, and not necessarily high cost than the design of low cost, and good design is often low cost, We all know that different people have different design styles and different levels, the design works naturally, therefore chosen to design units is the control on the first step. Through tender to select the design of the units is a good method, the tender documents to elaborate on this particular aspect of the requirements, cost control targets, and so on.Otherwise, in the subsequent design process design units will put an increase in the cost of the design requirements; through tendering the project design into the market, compared to select the best design units.ⅱPromoting the design bidding and design optimization campaign mode design units assessed by experts using scientific group France, in accordance with applicable, economic, aesthetic principles and advanced technology, reasonable structure to meet building energy efficiency and environmental requirements, comprehensive assessment of the merits of the program design, selection of the best determination of the successful program.Successful investment program estimated to be close to the general construction project scope of investment. This means two design contracts will help design the program of choice and competition to ensure that the selected design advanced technology, unique novelty, adaptability, as well as to control the cost of the project. Design units should strive to improve their quality of the project design clever idea, contemporary reducing the project cost on to rack their brains to improve design quality, strive to put the design phase of the project cost control approval of the investment ceiling.VIⅲStrengthening the design stage of the design phase to strengthen supervision of the Commissioner to determine a reasonable design, mature technology, reduction in the construction phase major design changes and changes in the program, in the effective control of the project cost will play a role. 1 to the design of the project if the project supervision to get involved, excluding unfavorable factors may generally is excluded from the 80% errors. In the entire process of building cost control, construction began at best to save and invest 20%, the key lies in the construction phase of the identification and control costs. Supervision of the design phase include : Design Institute under the design drawings and notes help owners deal with different design options for the economy, capital expenditure to develop the preliminary estimates, to ensure that the investment can be most effectively utilized. With the owners of the Commissioner include:According to the Design Institute to provide design drawings and notes to help owners deal with different design options for the economy, capital expenditures to develop the preliminary plan to ensure that investment can be most effectively used; with the owners of different design options, the need to calculate their own materials and equipment to conduct a cost analysis and study, to the design staff costs, to assist them in the investment limit within limits designed to save and invest. To seek a one-time small investment and economic good design program made the most rational economic indicators.ⅳDesign actively promote the so-called cap limit design, even with the approval of the design task and investment estimates, guarantee the functional requirements of the premise. The preliminary design and control budget, according to the preliminary approval of the total budget for the design and construction design control. Limits, and every one professional, each of whom have a design threshold of a target. In the design process, designers should progress to more programs, design optimization, ensuring that the design is technically advanced and reasonable, innovative, stylish, and do not break the limit investment objectives, thus eliminating the engineering design raise the factor of safety and design standards, or only consider the technicalVIIfeasibility of the program, rather than economic rationality phenomenon, the project cost to ensure effective control.Also known as the value of value engineering analysis, is a modern scientific management technique, is a new techno-economic analysis, is the product of functional analysis to conserve resources and reduce the cost of the purpose of an effective method. It made up for the traditional cost management simply focus on cost reduction and quality management only emphasizes improving the quality deficiencies, construction is conducive to resolving the long-standing long period, a lot of wastage, poor quality, high-cost problems. Value Engineering laws generally divided into three steps: assessment of the design of object technology and economic Score; Calculation of the target group of technical and economic indicators; calculate the geometric design of the object, on average; From comparison choose the best design.Construction phase of the project implementation unit construction cost management to control the cost of the project is reasonable in the project to meet quality standards premise, in the investment decision-making stage, the design phase and construction phase of the project put the project approval occurred in the control limits, strive in various construction projects rational use of human, material and financial resources to achieve good investment returns and social benefits.The project cost control and management is a dynamic process. The dynamic market economy, to make the investment in the identification and control become more complex, this will require the construction units to the management of project cost to the project runs through the entire process, it is necessary to have a comprehensive focus. The implementation phase of the projects. The implementation phase of the project cost management is the implementation of the entire process of project management. Project implementation phase of the project cost management can be divided into three parts: the tender management, construction management and settlement management.VIIIBidding for the construction phase of the construction units Bidding system control engineering cost effective means, bid organization can improve the cost-effectiveness of construction projects and ensure the quality of construction projects, shortening the construction cycle return on the investment, construction units can take full advantage of bidding for the effective means of cost control.Construction No. 10 on the 7th ministerial decree issued a "contract with the Construction Contract Pricing Management." clearly pointed out in bidding for projects using inventories. This requires the building of units conducting the tender exercise, in the tender document to include not only the usual content, like tender notes before schedule, tender notes, the conditions of the contract, the contract terms of the agreement, contract format, technical specifications, drawings, tender documents and other reference format, it is also necessary to provide the engineering inventory, Bidding as a reference document of the important components. Construction units in the tender document for the project inventory, in accordance with state or local rules promulgated by the calculation that the reunification of the divided projects, unified measurement units and the reunification of the engineering calculation rules, according to design drawings to be calculated and statistical arranged, obtain the list. Quantities to be followed in the preparation of an objective, impartial, scientific, and rational principle. Compilers must have strong manly budget, and should have certain knowledge of the engineering design and construction experience, and the material and mechanical construction technology for comprehensive scientific knowledge, in order to calculate the volume of the works without heavy missed. The basis of which must be in accordance with state regulations engineering calculation rules, and the sub-projects division engineering units, and in accordance with design drawings, design essential Love tender documentation requirements are calculated.Quantities of the project should have a testing general, the entries must be simple, while not appear Lousing wrong items Pricing should guarantee the correctness of the project. Should the requirements of the different grades separate engineering division,IXthe situation was different; We may have different prices for the items separately. This requires the preparation of the list compilers, seriously study design drawings, Analysis of the tender documents include the elements of the work and the different technical requirements, all familiar with the process, and to the scene of serious investigation, is forecast to make possible the construction of the case, right will have an impact on the Price of projects to be broken down. In addition, because the project inventories to calculate the amount of the project is not complete engineering and consider the interests of the construction units, clearly paying the price for the same overall price, the quantity list by the number of actual construction is a practical terms.In the evaluation and review of the tender offer should do the units total individual Price quotations and the comprehensive assessment. Price does not meet the requirements of individual shows Price meets the requirements, and the lowest total Price could not explain the single lowest bidder. Bidders often know the total cost to maintain the same circumstances; the project is likely to change smaller projects to lower the price.Changes may be larger projects price increases to achieve the completion of clearing works will be added for the purpose. We would also do price and the corresponding quantity of comprehensive engineering assessment of the large volume of projects to focus on the price analysis. Price will do with the contents of the work, construction program, a comprehensive technical evaluation process, thereby preferred choice of a construction unit. Construction of the construction phase of the contract cost control basis. Signed tight construction contract, while strengthening the construction contract management can guarantee that the contract price is reasonable, legitimacy and reduce the performance of the contract A, B in disputes and safeguard the interests of both the contract, effective control of the works investment costs. After the signing of the contract, to do the management contract documentation, contract and the supplementary contract agreement until the regular meeting site in minutes. Work contacts such as a single content of a contract extension and explainedXthat the integrity must be preserved, in addition to establishing a technical files, Implementation of the contract for dynamic analysis, results of the analysis to take proactive measures.Construction phase in the construction phase construction plan is based on the budget or Ken works contract price of the target, Ken control the cost of the project. At this stage of conservation has room for a small, but the possibility of waste is great. Thereby to control the cost of the project to give sufficient attention.ⅰConstruction program to strengthen the comparative technical and economic construction program is construction design of a re - to the contents of the work, a reasonable construction plan, shorten the construction period and ensure the quality of the project, improving economic efficiency, Construction of the program right from the technical and economic evaluation were compared, through qualitative and quantitative analysis, the quality, time, Cost three technical and economic indicators, be rational, and effective use of manpower, material and financial resources, achieve better economic efficiency, good construction management relations, a comprehensive cost management is an important way.ⅱStrictly related changes to the project budget control in the proposed budget. Construction of the changes caused by many reasons, including works poorly designed, so that the engineering contract with the drawings provided inconsistent; The current market supply of materials does not meet the standard specifications of the design requirements. These issues have to leave breadwinner project cost factors. Therefore, in the construction process, we must tighten customs change, through no design changes to expand the scale and improve the design standards; increase the construction and contents, the best implementation of the "grade control, visa quota" system. Right to change the design, particularly as it relates to the cost of the design changes must be approved by the design units, construction units scene representatives, supervision engineers common signature, and should be ahead of this type of change, reduce losses, because it has been completed or partially completed project will entail the demolition of the contents, it is bound to cause major changesXIto the loss. Therefore, the construction units should be assigned to the project cost management professionals Permanent construction site, to grasp at any time. Control project cost of the changes.ⅲWorks on the scene visa formalities through strict control of the construction project supervision system, the establishment of specialized departments, Professional use of the professional management of projects and to avoid project management personnel just visas, not economic account of the phenomenon. Investment out of control caused serious consequences. To serious change visa procedures to be taken to the building, Supervisor, the construction site together representatives signed the way to ensure that change, visa authenticity, legitimacy, economic and avoid fraud and the resulting phenomena arising from the dispute.In the course of construction, the construction units to enhance on-site construction management, supervision and construction side according to the drawings, and strictly control the change of the negotiations, materials substitution, the scene visas, and various additional extra budgetary labor costs for the necessary changes should be done first afterwards, after money, Change event on the timely change in the calculation of the workload and the cost of change occurred to grasp at any time cost of the project level, things to avoid a backlog of work that the true cost of the project. Construction unit representatives to the scene to supervise doing a good job record, particularly concealed records and visas, reduce clearing the passing phenomenon. Many works visa scene is not as serious, works to bring a very large settlement of the trouble, lead to considerable economic losses, the scene strict visa management of the construction phase of the project cost control key.ⅳOf project list rigorous review of the project on the review of inventories, Engineers’ monitor list of measures to control the project. BOQ to provide the list of measures is to complete construction projects, occurred in the pre-construction engineering and construction process technology, life and safety aspects of non-engineering projects entities. At this stage because many projects are in construction plans and the construction site of the imperfections on the tender waitXIIuntil the construction tender of the project design and actual scene have better access. Management Engineer addresses the gathering first-hand information on the original, itemized checking identification, inconsistent make revisions.ⅴControl material consumption, rationally define material prices. Cost of the project control materials price control is the main, the cost of materials in engineering often holds substantial proportion, usually accounts for the estimated costs of 70%, representing the direct costs of 80%. It is necessary in the construction phase in strict accordance with the contract amount of material control; material set reasonable prices, so as to effectively control the cost of the project. Market economy material supply a variety of channels, variety and price range materials, construction unit budget management and field personnel should pay close attention to market rates, with the progress of the scene, the market, hand in the construction of the information and materials for the completion of the accounts provide a strong basis.ⅵTechnology and economic integration, strengthening investment control. Effective control of the investment, from organizational, technical, economic, contracts, and other measures. Therefore, the construction units must strengthen management, engineering and technical personnel of the "economy" concept, the quality of education, Training pragmatic working style, the construction side to help improve construction design, reasonable security, financial, and material resources. Accelerate the pace of work to improve the quality of the projects. Construction should encounter problems in a timely manner with the designer linked to choose both economic and scientific potential solutions, overcome the waste caused by command, to give due attention to the importance of investment in conservation, is responsible for the engineering technician with the combination of economic officers from the tender, contract negotiations, costing the budget, signed paid to the progress of the completion of the accounts, a cost analysis, the whole process management and strictly control the cost of the project.Do a good job clearing price completion of the assessment project is the completion of settlement construction enterprises in accordance with the provisions ofXIII。

工程管理英语

工程管理英语
Conceptuai planning 概念规划
Multistory building 多层建筑
Bottom-up design 自下而上的设计
Suborganization 次级组织
Functional organization 职能式组织
Project organization 项目式组织
Shop drawing 施工图
Day-to-day 日常
Evaluate 估价
subcontractor 分包商
value engineering 价值工程
Single-family house 独户住宅
Strategic planning 战略规划
Long-term 长期
Competitive bidding 竞争性招标
Evaluation stage 评估阶段
Job-site productivity 工地生产率
Contractual agreement 合同
Monitoring and control 监督和控制
Facility design 设施设计
Estimate stage 估算阶段
Bids and quotations 投标和报价
Off-the-shelf material 现货材料
Earthwork to be excavated 土方开挖
Bulk material 大宗材料
Overlapping and rehandling 搭接和再处理
Semi-processible 半成品
Risk-reward 风险回报
Prebid site 标前现场
Nominated subcontractor 指定的分包商

工程管理专业外语

工程管理专业外语

Ch1, THE OWNER'S PERSPECTIVE, ,1.1, project life cycle, 项目全生命周期,, acquisition, 获得,取得, p1.acquisition of a constructed facility; acquisition process, alternative, 备选方案,, architect, 建筑师,, assign risks to , 向…分配风险,, award contracts, 授予合同,, blueprint, 蓝图,, cash flows, 现金流量,, conceptual planning, 概念规划,, constructed facility, 建造设施,, conversion, 改作它用,, cost control, 成本控制, p2.baseline for cost control成本控制基准, cost estimate, 成本估算,, delegate responsibility to, 向…分派责任,, demolition, 拆除, p2.the facility that lives out its useful life is designated for demolition or conversion, disposal of facility, 设施的处置,, feasibility study, 可行性研究,, financing schemes, 财务计划,融资方案, p1.financing schemes for the proposed alternatives; financing 融资, market demands, 市场需要, p1.the commitment of resources is motivated by market demands or perceived needs;meet market demands 适应市场需要, on site, 在现场,, owner, 业主,, perceived needs, 预期需求,, private corporation, 私人公司,, procurement, 采购,, project scope, 项目范围,, real estate developer, 房地产开发商,, shake-down, 调适期,适应期,, specification, 技术规范,施工详图,详细设计,规格说明书,, speculative housing market, 投机性住宅市场,, sponsor, 发起人,赞助商, p1.the "owner" and "sponsor" are synonymous because both have the ultimate authority to make all important decision, start-up, 启动/启用, p2.a brief period of start-up or shake-down of the constructed facility, the timing for the project's completion, 完成项目的时间计划,, ultimate authority, 最终权利,1.2, types of construction, 工程建设类型,, bond, 债券,, capital intensive, 资金密集型的,, chemical processing plant, 化工厂,, coal-fired plant, 燃煤发电厂,, construction contract, 建设合同,施工合同,, drainage system, 排水系统,, functional requirement, 功能性要求,, general economic conditions, 总体经济条件,, high-rise apartment, 高层公寓式住宅,, infrastructure and heavy construction, 基础设施和重型项目建设,, institutional and commercial building, 公共及商用建筑,, labor intensive, 劳动密集型的,, large shopping-center, 大型购物中心,, light manufacturing plants, 轻工业制造厂,, litigation, 诉讼,, mechanization, 机械化,, monetary and fiscal policies of the government, 政府的货币和财政政策, , mass transit systems, 公共交通运输系统,, multi-family dwellings, 多户联排住宅,, nuclear power plant, 核电厂,, oil refinery, 炼油厂,, oligopoly, 寡头垄断,, pipeline, 管线,管道,, quality inspection, 质量检查,, recreational facilities, 娱乐设施,, residential housing construction, 住宅类房屋建设,, retail chain store, 连锁零售店,, risks and rewards, 风险与回报,, single-family houses, 单户独立式住宅,, skyscraper, 摩天大楼,, sewage treatment plant, 污水处理厂,, specialized industrial construction projects, 专业化工业建设项目,, steel mill, 轧钢厂,, subcontractor, 分包商,, tunnel, 隧道,, work force, 劳动力,, warehouse, 库房,1.3, professional services, 专业服务,, Architectural and Engineering(A/E) firms, 建筑工程设计公司,, at stake, 处于危险之中,在紧要关头,, brief, 项目建议书,任务纲要,, budgeting, 编制预算,, competitive bidding, 竞争性招标,, consortium, 联合体,, constructibility, 可建造性,, construction management, 施工管理,, contractual agreement, 合同协议,, CPA(certified public accountant), 注册会计师,, CPA(certified public accounting)firms, 注册会计师事务所,, design/construct firm, 设计/施工公司,, design/construct process, 设计/施工过程,, disclaimer of reponsibilities, 免责申明,, facilities management, 设施管理,, financial planning consultants, 财务计划顾问,财务规划咨询,, follow-up, 后续,, general contractor, 总承包商,, in-house capacities, 机构内部的人才能力,, in-house staff, 内部员工,, initial construction cost, 基本建设成本,初始建造成本,, investment decision, 投资决策,, lease, 租约,出租,, line manager, 一线管理者,, negotiation, 谈判,协商,, operation and maintenance, 运营与维护,, operation cost, 运行成本,, periodic field inspection, 定期现场检查,, planning and programming stages, 规划和设计阶段, p3.the owner retains direct control of work in the planning and programming stages, process plants, 加工厂,, professional consultant, 专业咨询顾问,, project management, 项目管理,, provisions, (法律)条款,, qualification, 资质,, real estate holdings, 物业,, rental properties, 租赁物业,, technical consultant, 技术咨询单位,, tenant, 租户,承租人,, turnkey approach, 交钥匙方式,, value engineering, 价值工程,Ch8, CONSTRUCTION PLANNING, ,8.1, a natural hierarchy, 关系自然的层次结构,, borrowing expense, 借款费用, p114.borrowing expense for project financing, categories of expenditure, 支出分类,, computerized database, 计算机化的数据库,, concrete debris, 混凝土残渣,, construction defect, 施工缺陷,, cost oriented, 成本导向的,, critical path scheduling, 关键线路进度计划,, decision node, 决策节点,, dimension, 维度,, direct costs, 直接成本,, durations, 工作持续时间, p113. durations for individual tasks, indirect costs, 间接成本,, individual tasks, 单位工程,, install reinforcing steel, 绑扎钢筋,, interactions, 相互作用, p113.interactions among the different work tasks, job shop scheduling , 施工现场进度安排,, manpower, 劳动力,人力资源,, on-site inspection, 现场检查,, parallel, 并行的,, plumbing, 管道装置技术,, pouring concrete, 浇注混凝土,, relationships between project participants, 项目参与者间的关系,, remove formwork, 拆除模板,, schedule control, 进度控制,, schedule oriented, 进度导向的,, scheduling, 进度计划,, site clearance, 现场清理,, sub-tasks, 子任务,, synthesize, 综合,合成, p113.synthesize the steps required to yield this result , the choice of technology, 技术选择,, the definition of work tasks, 工作任务的确定,, trench, 沟渠,, work breakdown, 工作分解,8.2, concrete placement, 混凝土施工,, finishing the concrete, 混凝土养护,, fore-runner, 先驱,, grading, 放坡,, iteration, 迭代,反复,, milestone, 里程碑事件,, nomenclature, 术语,命名系统,, place forms, 支护模板,制模,, remove forms, 拆模,, remove vegetation, 清除植被,, resource allocations, 资源分配,, signpost, 路标,指示牌,8.3, activity network, 工作网路图,, checking precedence, 核对先导关系,, excavation, 开挖,, precedence relations, 先导关系, p116.proper precedences among activities 工作间适当的前导关系Ch10, COST CONTROL FOR CONSTURCTION PROJECT,, bill of quantities (BQs), 工程量清单,, fabricated components, 预制构件,, laws of supply and demand, 供求规律,, quantity surveyor, 工料测量师,, re-evaluation, 重新评估,, re-work, 反工,, the setting of a budget, 编制预算,, unforeseen circustances, 不可预见事件,, whole-life cost, 全寿命周期成本,, working drawings, 施工详图,, Chapter 1 THE OWNER'S PERSPECTIVE, 中文, 英文,1, 设计/施工过程, design / construct process ,2, 房地产开发商, real estate developer,3, 投机性住宅市场, speculative housing market,4, 项目管理, project management,5, 项目全寿命周期, project lifecycle,6, 项目范围, project scope,7, 专业化服务, professional services,8, 重大基础项目建设, major infrastructure construction,9, 住宅类房屋建设, residential housing construction ,10, 办公和商业用房建设, office and commercial building construction, 11, 专业化工业项目建设, specialized industrial construction,12, 专业咨询师, professional consultants,13, 总承包商, general contractor,14, 价值工程, value engineering,15, 竞争性招标, competitive bidding,16, 建筑和工程设计公司, Architectural and Engineering firms,17, 运营与维护管理, operation and maintenance management,18, 设计/施工公司, Design/Construct firms,19, 分包商, sub-contractor,20, 设施管理, facilities management,Chapter 11 ExercisesI. Translate following English into Chinesehard hat 安全帽safety shoes 安全鞋first-aid supplies 急救用品water main给水总管sewer line污水管four lane street(不知道)pre-qualification_资格预审asbestos石棉parapets胸墙、女儿墙building code建筑规范individual falls高空坠落railing栏杆、扶手opportunity costs机会成本cranes起重机fatalities意外的死亡事故passer-bys_路人jobsite工地现场safeguards保障措施workmanship手艺、工艺、技巧compliance依从,顺从,遵从,听从random samples随机样本statistical methods统计方法non-conformance不符合violation违反design specifications设计规范Unforeseen circumstances无法预计的情况•re-evaluation复评、再评估the course of construction建筑施工过程中preliminary stages初始阶段component configurations 组件配置material specifications材料规范书functional performance功能性能construction zones建设区域roadway rehabilitation道路恢复issue citations问题引用rework重做、返工procurement采购field inspection现场勘查final checkout最终结算人员伤亡casualtiesII. Translate following Chinese into English1. 施工过程中的意外事件同样会导致人身伤害和成本代价。

工程管理专业英语第二版

工程管理专业英语第二版
工程管理专业英语
Professional English for Construction Management
主编:徐勇戈
Contents (continued)
Chapter 8 Construction Planning Chapter 9 Time Control for Construction Projects Chapter 10 Cost Control for Construction Projects
Unit 1 The Owner’s Perspective
1.1 The Project Life Cycle
Since an owner is essentially acquiring a facility on a promise in some form of agreement, it will be wise for any owner to have a clear understanding of the acquisition process in order to maintain firm control of the quality, timeliness and cost of the completed facility.
Owners must recognize that there is no single best approach in organizing project management throughout a project's life cycle. All organizational approaches have advantages and disadvantages, depending on the knowledge of the owner in construction management as well as the type, size and location of the project.

工程管理专业英语词汇

工程管理专业英语词汇

专业英语词汇一. 综合类1.geotechnical engineering岩土工程2.foundation engineering基础工程3.soil, earth土4.soil mechanics土力学cyclic loading周期荷载unloading卸载reloading再加载viscoelastic foundation粘弹性地基viscous damping粘滞阻尼shear modulus剪切模量5.soil dynamics土动力学6.stress path应力路径7.numerical geotechanics 数值岩土力学二. 土的分类1.residual soil残积土groundwater level地下水位2.groundwater 地下水groundwater table地下水位3.clay minerals粘土矿物4.secondary minerals次生矿物ndslides滑坡6.bore hole columnar section钻孔柱状图7.engineering geologic investigation工程地质勘察8.boulder漂石9.cobble卵石10.gravel砂石11.gravelly sand砾砂12.coarse sand粗砂13.medium sand中砂14.fine sand细砂15.silty sand粉土16.clayey soil粘性土17.clay粘土18.silty clay粉质粘土19.silt粉土20.sandy silt砂质粉土21.clayey silt粘质粉土22.saturated soil饱和土23.unsaturated soil非饱和土24.fill (soil)填土25.overconsolidated soil超固结土26.normally consolidated soil正常固结土27.underconsolidated soil欠固结土28.zonal soil区域性土29.soft clay软粘土30.expansive (swelling) soil膨胀土31.peat泥炭32.loess黄土33.frozen soil冻土三. 土的基本物理力学性质 compression index2.cu undrained shear strength3.cu/p0 ratio of undrained strength cu to effective overburden stress p0(cu/p0)NC ,(cu/p0)oc subscripts NC and OC designated normally consolidated and overconsolidated, respectively4.cvane cohesive strength from vane test5.e0 natural void ratio6.Ip plasticity index7.K0 coefficient of “at-rest ”pressure ,for total stressesσ1 andσ28.K0‟ domain for effective stressesσ1 … andσ2‟9.K0n K0 for normally consolidated state10.K0u K0 coefficient under rapid continuous loading ,simulating instantaneous loading or an undrained condition11.K0d K0 coefficient under cyclic loading(frequency less than 1Hz),as a pseudo- dynamic test for K0 coefficient12.kh ,kv permeability in horizontal and vertical directions, respectively13.N blow count, standard penetration test14.OCR over-consolidation ratio15.pc preconsolidation pressure ,from oedemeter test16.p0 effective overburden pressure17.p s specific cone penetration resistance, from static cone test18.qu unconfined compressive strength19.U, Um degree of consolidation ,subscript m denotes mean value of a specimen20.u ,ub ,um pore (water) pressure, subscripts b and m denote bottom of specimen and mean value, respectively21.w0 wL wp natural water content, liquid and plastic limits, respectively22.σ1,σ2 principal stresses, σ1 … andσ2‟ denote effective principal stresses23.Atterberg limits阿太堡界限24.degree of saturation饱和度25.dry unit weight干重度26.moist unit weight湿重度27.saturated unit weight饱和重度28.effective unit weight有效重度29.density密度pactness密实度31.maximum dry density最大干密度32.optimum water content最优含水量33.three phase diagram三相图34.tri-phase soil三相土35.soil fraction粒组36.sieve analysis筛分37.hydrometer analysis比重计分析38.uniformity coefficient不均匀系数39.coefficient of gradation级配系数40.fine-grained soil(silty and clayey)细粒土41.coarse- grained soil(gravelly and sandy)粗粒土42.Unified soil classification system土的统一分类系统43.ASCE=American Society of Civil Engineer美国土木工程师学会44.AASHTO= American Association State Highway Officials美国州公路官员协会45.ISSMGE=International Society for Soil Mechanics and Geotechnical Engineering 国际土力学与岩土工程学会四. 渗透性和渗流1.Darcy‟s law 达西定律2.piping管涌3.flowing soil流土4.sand boiling砂沸5.flow net流网6.seepage渗透(流)7.leakage渗流8.seepage pressure渗透压力9.permeability渗透性10.seepage force渗透力11.hydraulic gradient水力梯度12.coefficient of permeability渗透系数五. 地基应力和变形1.soft soil软土2.(negative) skin friction of driven pile打入桩(负)摩阻力3.effective stress有效应力4.total stress总应力5.field vane shear strength十字板抗剪强度6.low activity低活性7.sensitivity灵敏度8.triaxial test三轴试验9.foundation design基础设计10.recompaction再压缩11.bearing capacity承载力12.soil mass土体13.contact stress (pressure)接触应力(压力)14.concentrated load集中荷载15.a semi-infinite elastic solid半无限弹性体16.homogeneous均质17.isotropic各向同性18.strip footing条基19.square spread footing方形独立基础20.underlying soil (stratum ,strata)下卧层(土)21.dead load =sustained load恒载持续荷载22.live load活载23.short –term transient load短期瞬时荷载24.long-term transient load长期荷载25.reduced load折算荷载26.settlement沉降27.deformation变形28.casing套管29.dike=dyke堤(防)30.clay fraction粘粒粒组31.physical properties物理性质32.subgrade路基33.well-graded soil级配良好土34.poorly-graded soil级配不良土35.normal stresses正应力36.shear stresses剪应力37.principal plane主平面38.major (intermediate, minor) principal stress最大(中、最小)主应力39.Mohr-Coulomb failure condition摩尔-库仑破坏条件40.FEM=finite element method有限元法41.limit equilibrium method极限平衡法42.pore water pressure孔隙水压力43.preconsolidation pressure先期固结压力44.modulus of compressibility压缩模量45.coefficent of compressibility压缩系数pression index压缩指数47.swelling index回弹指数48.geostatic stress自重应力49.additional stress附加应力50.total stress总应力51.final settlement最终沉降52.slip line滑动线六. 基坑开挖与降水1 excavation开挖(挖方)2 dewatering(基坑)降水3 failure of foundation基坑失稳4 bracing of foundation pit基坑围护5 bottom heave=basal heave (基坑)底隆起6 retaining wall挡土墙7 pore-pressure distribution孔压分布8 dewatering method降低地下水位法9 well point system井点系统(轻型)10 deep well point深井点11 vacuum well point真空井点12 braced cuts支撑围护13 braced excavation支撑开挖14 braced sheeting支撑挡板七. 深基础--deep foundation1.pile foundation桩基础1)cast –in-place灌注桩diving casting cast-in-place pile沉管灌注桩bored pile钻孔桩special-shaped cast-in-place pile机控异型灌注桩piles set into rock嵌岩灌注桩rammed bulb pile夯扩桩2)belled pier foundation钻孔墩基础drilled-pier foundation钻孔扩底墩under-reamed bored pier3)precast concrete pile预制混凝土桩4)steel pile钢桩steel pipe pile钢管桩steel sheet pile钢板桩5)prestressed concrete pile预应力混凝土桩prestressed concrete pipe pile预应力混凝土管桩2.caisson foundation沉井(箱)3.diaphragm wall地下连续墙截水墙4.friction pile摩擦桩5.end-bearing pile端承桩6.shaft竖井;桩身7.wave equation analysis波动方程分析8.pile caps承台(桩帽)9.bearing capacity of single pile单桩承载力teral pile load test单桩横向载荷试验11.ultimate lateral resistance of single pile单桩横向极限承载力12.static load test of pile单桩竖向静荷载试验13.vertical allowable load capacity单桩竖向容许承载力14.low pile cap低桩承台15.high-rise pile cap高桩承台16.vertical ultimate uplift resistance of single pile单桩抗拔极限承载力17.silent piling静力压桩18.uplift pile抗拔桩19.anti-slide pile抗滑桩20.pile groups群桩21.efficiency factor of pile groups群桩效率系数(η)22.efficiency of pile groups群桩效应23.dynamic pile testing桩基动测技术24.final set最后贯入度25.dynamic load test of pile桩动荷载试验26.pile integrity test桩的完整性试验27.pile head=butt桩头28.pile tip=pile point=pile toe桩端(头)29.pile spacing桩距30.pile plan桩位布置图31.arrangement of piles =pile layout桩的布置32.group action群桩作用33.end bearing=tip resistance桩端阻34.skin(side) friction=shaft resistance桩侧阻35.pile cushion桩垫36.pile driving(by vibration) (振动)打桩37.pile pulling test拔桩试验38.pile shoe桩靴39.pile noise打桩噪音40.pile rig打桩机八. 地基处理--ground treatment1.technical code for ground treatment of building建筑地基处理技术规范2.cushion垫层法3.preloading预压法4.dynamic compaction强夯法5.dynamic compaction replacement强夯置换法6.vibroflotation method振冲法7.sand-gravel pile砂石桩8.gravel pile(stone column)碎石桩9.cement-flyash-gravel pile(CFG)水泥粉煤灰碎石桩10.cement mixing method水泥土搅拌桩11.cement column水泥桩12.lime pile (lime column)石灰桩13.jet grouting高压喷射注浆法14.rammed-cement-soil pile夯实水泥土桩法15.lime-soil compaction pile 灰土挤密桩lime-soil compacted column灰土挤密桩lime soil pile灰土挤密桩16.chemical stabilization化学加固法17.surface compaction表层压实法18.surcharge preloading超载预压法19.vacuum preloading真空预压法20.sand wick袋装砂井21.geofabric ,geotextile土工织物posite foundation复合地基23.reinforcement method加筋法24.dewatering method降低地下水固结法25.freezing and heating冷热处理法26.expansive ground treatment膨胀土地基处理27.ground treatment in mountain area山区地基处理28.collapsible loess treatment湿陷性黄土地基处理29.artificial foundation人工地基30.natural foundation天然地基31.pillow褥垫32.soft clay ground软土地基33.sand drain砂井34.root pile树根桩35.plastic drain塑料排水带36.replacement ratio(复合地基)置换率九. 固结consolidation1.Terzzaghi‟s consolidation theory太沙基固结理论2.Barra on‟s consolidation theory巴隆固结理论3.Biot‟s consolidation theory比奥固结理论4.over consolidation ration (OCR)超固结比5.overconsolidation soil超固结土6.excess pore water pressure超孔压力7.multi-dimensional consolidation多维固结8.one-dimensional consolidation一维固结9.primary consolidation主固结10.secondary consolidation次固结11.degree of consolidation固结度12.consolidation test固结试验13.consolidation curve固结曲线14.time factor Tv时间因子15.coefficient of consolidation固结系数16.preconsolidation pressure前期固结压力17.principle of effective stress有效应力原理18.consolidation under K0 condition K0固结十. 抗剪强度shear strength1.undrained shear strength不排水抗剪强度2.residual strength残余强度3.long-term strength长期强度4.peak strength峰值强度5.shear strain rate剪切应变速率6.dilatation剪胀7.effective stress approach of shear strength 剪胀抗剪强度有效应力法8.total stress approach of shear strength抗剪强度总应力法9.Mohr-Coulomb theory莫尔-库仑理论10.angle of internal friction内摩擦角11.cohesion粘聚力12.failure criterion破坏准则13.vane strength十字板抗剪强度14.unconfined compression无侧限抗压强度15.effective stress failure envelop有效应力破坏包线16.effective stress strength parameter有效应力强度参数十一. 本构模型--constitutive model1.elastic model弹性模型2.nonlinear elastic model非线性弹性模型3.elastoplastic model弹塑性模型4.viscoelastic model粘弹性模型5.boundary surface model边界面模型6.Duncan-Chang model邓肯-张模型7.rigid plastic model刚塑性模型8.cap model盖帽模型9.work softening加工软化10.work hardening加工硬化11.Cambridge model剑桥模型12.ideal elastoplastic model理想弹塑性模型13.Mohr-Coulomb yield criterion莫尔-库仑屈服准则14.yield surface屈服面15.elastic half-space foundation model弹性半空间地基模型16.elastic modulus弹性模量17.Winkler foundation model文克尔地基模型十二. 地基承载力--bearing capacity of foundation soil1.punching shear failure冲剪破坏2.general shear failure整体剪切破化3.local shear failure局部剪切破坏4.state of limit equilibrium极限平衡状态5.critical edge pressure临塑荷载6.stability of foundation soil地基稳定性7.ultimate bearing capacity of foundation soil地基极限承载力8.allowable bearing capacity of foundation soil地基容许承载力十三. 土压力--earth pressure1.active earth pressure主动土压力2.passive earth pressure被动土压力3.earth pressure at rest静止土压力4.Coulomb‟s earth pressure theory库仑土压力理论5.Rankine‟s earth pressure theory朗金土压力理论十四. 土坡稳定分析--slope stability analysis1.angle of repose休止角2.Bishop method毕肖普法3.safety factor of slope边坡稳定安全系数4.Fellenius method of slices费纽伦斯条分法5.Swedish circle method瑞典圆弧滑动法6.slices method条分法十五. 挡土墙--retaining wall1.stability of retaining wall挡土墙稳定性2.foundation wall基础墙3.counter retaining wall扶壁式挡土墙4.cantilever retaining wall悬臂式挡土墙5.cantilever sheet pile wall悬臂式板桩墙6.gravity retaining wall重力式挡土墙7.anchored plate retaining wall锚定板挡土墙8.anchored sheet pile wall锚定板板桩墙十六. 板桩结构物--sheet pile structure1.steel sheet pile钢板桩2.reinforced concrete sheet pile钢筋混凝土板桩3.steel piles钢桩4.wooden sheet pile木板桩5.timber piles木桩十七. 浅基础--shallow foundation1.box foundation箱型基础2.mat(raft) foundation片筏基础3.strip foundation条形基础4.spread footing扩展基础pensated foundation补偿性基础6.bearing stratum持力层7.rigid foundation刚性基础8.flexible foundation柔性基础9.embedded depth of foundation基础埋置深度 foundation pressure基底附加应力11.structure-foundation-soil interaction analysis上部结构-基础-地基共同作用分析十八. 土的动力性质--dynamic properties of soils1.dynamic strength of soils动强度2.wave velocity method波速法3.material damping材料阻尼4.geometric damping几何阻尼5.damping ratio阻尼比6.initial liquefaction初始液化7.natural period of soil site地基固有周期8.dynamic shear modulus of soils动剪切模量9.dynamic magnification factor动力放大因素10.liquefaction strength抗液化强度11.dimensionless frequency无量纲频率12.evaluation of liquefaction液化势评价13.stress wave in soils土中应力波14.dynamic settlement振陷(动沉降)十九. 动力机器基础1.equivalent lumped parameter method等效集总参数法2.dynamic subgrade reaction method动基床反力法3.vibration isolation隔振4.foundation vibration基础振动5.elastic half-space theory of foundation vibration基础振动弹性半空间理论6.allowable amplitude of foundation基础振动容许振幅7.natural frequency of foundation基础自振频率二十. 地基基础抗震1.earthquake engineering地震工程2.soil dynamics土动力学3.duration of earthquake地震持续时间4.earthquake response spectrum地震反应谱5.earthquake intensity地震烈度6.earthquake magnitude震级7.seismic predominant period地震卓越周期8.maximum acceleration of earthquake地震最大加速度二十一. 室内土工实验1.high pressure consolidation test高压固结试验2.consolidation under K0 condition K0固结试验3.falling head permeability变水头试验4.constant head permeability常水头渗透试验5.unconsolidated-undrained triaxial test不固结不排水试验(UU)6.consolidated undrained triaxial test固结不排水试验(CU)7.consolidated drained triaxial test固结排水试验(CD)paction test击实试验9.consolidated quick direct shear test固结快剪试验10.quick direct shear test快剪试验11.consolidated drained direct shear test慢剪试验12.sieve analysis筛分析13.geotechnical model test土工模型试验14.centrifugal model test离心模型试验15.direct shear apparatus直剪仪16.direct shear test直剪试验17.direct simple shear test直接单剪试验18.dynamic triaxial test三轴试验19.dynamic simple shear动单剪20.free(resonance)vibration column test自(共)振柱试验二十二. 原位测试1.standard penetration test (SPT)标准贯入试验2.surface wave test (SWT)表面波试验3.dynamic penetration test(DPT)动力触探试验4.static cone penetration (SPT) 静力触探试验5.plate loading test静力荷载试验teral load test of pile 单桩横向载荷试验7.static load test of pile 单桩竖向荷载试验8.cross-hole test 跨孔试验9.screw plate test螺旋板载荷试验10.pressuremeter test旁压试验11.light sounding轻便触探试验12.deep settlement measurement深层沉降观测13.vane shear test十字板剪切试验14.field permeability test现场渗透试验15.in-situ pore water pressure measurement 原位孔隙水压量测16.in-situ soil test原位试验abrasiveness 磨耗度absolute datum 绝对基面abutment 桥台abutment pier制动墩acceleration lane加速车道accidental load 偶然荷载accommodation lane 专用车道acoustic barrier 隔音墙acting circles of blasting 爆破作用圈additional stake 加桩adjacent curve in one direction 同向曲线admixture 外加剂admixture 反坡安全线aerial photogrammetry 航空摄影测量aerophoto base 航摄基线aerophoto interpretation 航摄像片判读ageing 老化aggregate 集料(骨料)air hardining 气硬性alignment design (城市道路)平面设计,线形设计alignment element 线形要素alligator cracking 路面龟裂allowable rebound deflection 容许(回弹)弯沉alternative line 比较线anchored bulkhead abutment 锚锭板式桥台anchored bulkhead abutment 锚锭板式挡土墙anchored retaining wall 锚杆式挡土墙anionic emulsified bitumen 阴离子乳化沥青annual average daily traffic 年平均日交通量anti-creep heap (厂矿道路)挡车堆anti-dizzling screen 防炫屏(遮光栅) antiskid heap (厂矿道路)防滑堆approach span 引桥aquitard 隔水层arch bridge 拱桥arch culvert 拱涵arch ring 拱圈arterial highway 干线公路arterial road (厂内)主干道,(城市)主干路asphalt distributor 沥青洒布车asphalt mixing plant 沥青混合料拌和设备asphalt remixer 沥青混合料摊铺机asphalt remixer 复拌沥青混合料摊铺机asphalt sand 沥青砂asphalt sprayer 沥青洒布机asphaltic bitumen 地沥青at-grade intersection 平面交叉auxiliary lane 附加车道average consistency (of soil) 土的)平均稠度average gradient 平均纵坡aximuth angle 方位角balance weight retaining wall 衡重式挡土墙base course 基层base line 基线basic traffic capacity 基本通行能力beam bridge 梁桥beam level deflectometer 杠杆弯沉仪bearing 支座bearing angle 象限角bearing pile 支承桩bearing platform 承台bed course 垫层bench mark 水准点benched subgrade 台口式路基bending strength 抗弯强度Benkelman beam 杠杆弯沉仪(贝克曼弯沉仪) bent cap 盖梁berm 护坡道binder 结合料binder course 联结层bitumen 沥青bitumen (沥青混合料)抽提仪bitumen-aggregate ratio 油石比bituminous concrete pavement 沥青混凝土混合料bituminous concrete mixture 沥青混凝土路面bituminous concrete moxture 沥青碎石混合料bituminous macadam pavement 沥青碎石路面bituminous moxture 沥青混合料bituminous pavement 沥青路面bituminous penetration pavement 沥青贯入式路面biuminous surface treatment (沥青)表面处治blasting crater 爆破漏斗blastion for loosening rock 松动爆破blasting for throwing rock 抛掷爆破blasting procedure 土石方爆破bleeding 泛油blind ditch 盲沟blind drain 盲沟block pavement 块料路面block stone 块石blow up 拱胀boring 钻探boring log (道路)地质柱状图boring machine 钻孔机borrow earth 借土borrow pit 取土坑boundary frame on crossing 道口限界架boundary frame on road 道路限界架boundary line of road construction 道路建筑限界bowstring arch bridge 系杆拱桥box culvert 箱涵branch pipe of inlet 雨水口支管branch road (城市)支路,(厂内)支道bridge 桥梁bridge decking 桥面系bridge deck pavement 桥面铺装bridge floor expantion and contraction installation traction installation 桥面伸缩装置bridge gerder erection equpment 架桥机bridge on slope 坡桥bridge site 桥位bridle road 驮道broken chainage 断链broken stone 碎石broken back curve 断背曲线buried abutment 埋置式桥台bus bay 公交(车辆)停靠站bypass 绕行公路cable bent tower 索塔cable saddle 索鞍cable stayed bridge 斜拉桥(斜张桥)Cableway erecting equipment 缆索吊装设备California bearing ratio (CBR) 加州承载比(CBR) California bearing ratio tester 加州承载比(CBR)测定仪camber cruve 路拱曲线cantilever beam bridge 悬臂梁桥cantilever beam bridge 悬臂式挡土墙capacity of intersection 交叉口通行能力capacity of network 路网通行能力capillary water 毛细水carriage way 车行道(行车道)cast-in-place cantilever method 悬臂浇筑法cationic emulsified bitumen 阳离子乳化沥青cattle-pass 畜力车道cement concrete 水泥混凝土cemint concrete pavement 水泥混凝土混合料cement concrete pavement 水泥混凝土路面center-island 中心岛center lane 中间车道center line of raod 道路中线center line survey 中线测量center stake 中桩central reserve 分隔带channelization 渠化交通shannelization island 导流岛channelized intrersection 分道转弯式交叉口chip 石屑chute 急流槽circular curve 圆曲线circular curve 环路circular test 环道试验city road 城市道路civil engineering fabric 土工织物classified highway 等级公路classified highway 等级道路clay-bound macadam泥结碎石路面clearance 净空clearance above bridge floor 桥面净空clearce of span 桥下净空climatic zoning for highway 公路自然区划climbing lane 爬坡车道cloverleaf interchange 苜蓿叶形立体交叉coal tar 煤沥青cobble stone 卵石coefficient of scouring 冲刷系数cohesive soil 粘性土cold laid method 冷铺法cold mixing method 冷拌法cold-stretched steel bar 冷拉钢筋column pier柱式墩。

(完整版)工程管理专业英语词汇短语

(完整版)工程管理专业英语词汇短语

Part1market demand 市场需求facility 设施the speculative housing market 投机性住宅市场the real estate developer 房地产开发商government agency 政府机构public project 公共项目project management 项目管理the conceptual planning stage 概念规划阶段feasibility 可行性in-house 内部的,内业的the project life cycle 项目生命周期from cradle to grave 从开始到结束knowledge domain 知识领域construction industry 建筑业spectrum 波普,光谱,范围residential housing construction 房屋住宅建设subcontractor 分包商institutional and commercial building construction 办公与商业用房建设specialized industrial construction 专业化工业项目建设infrastructure and heavy construction 重大基础项目建设architectural and engineering(A/E)firm 建筑与工程设计公司consortium 财团,株式会社preliminary design 初步设计general contractor 总承包商on site quality inspection 现场质量监督litigation 法律诉讼shop drawings 施工图constructability 可建造性,可施工性value engineering 价值工程construction contract 施工合同design/construct firm 设计、施工公司turnkey 交钥匙(承发包)模式facility maintenance 设施维护Part2project integration management 项目综合管project scope management 项目范围管理project time management 项目时间管理project cost management 项目成本管理project quality management 项目质量管理project human resource management 项目人力资源管理project communications management 项目沟通管理project risk management 项目风险管理project procurement management 项目采购管理contractual relationships 合同关系changes 工程变更claims 施工索赔mega-projects 巨型项目“functional”organization “职能式”组织“project”organization “项目式”组织suborganizations 次级组织strong matrix-type suborganization 强矩阵式次级组织interpersonal influence 人际间影响力formal authority 正式的授权reward and/or penalty power 奖励和/或惩罚的权利matrix organization 矩阵式组织hierarchical structure 层级结构Part3job-site productivity 工作现场生产率non-productive activities 非生产性工作temporary work stoppage 临时性工作暂停union activities 工作活动performance analysis 绩效分析base labor productivity 基准劳动生产率labor productivity index 劳动力生产指数non-local labor 非当地用工productive labor yield 劳动力产出requisitions 询价purchase orders 订购单subcontracts 分包合同shipping and receiving documents 装船与接收文件invoices 发票bulk materials 大众材料standard off-the-shelf materials 现货材料fabricated members or units 预制构件或单元semi-processed state 半成品状态pre-processed 预加工的pressure vessels 压力容器field assembly 现场装配skilled craftsmen 熟练技工crawler mounting 履带式底盘claim shell 抓铲挖土机`dragline 拉铲挖土机backhoe 反铲挖土机shovel 正铲挖土机bulldozer 推土机rotary-percussion drills 旋转冲击钻bituminous 沥青Part4economic evaluation 经济评价the planning horizon 规划期cash flow profile 现金流量图minimum attractive rate of return(MARR) 最低收益率sensitivity or uncertainty analysis 敏感性或不确定性分析annual benefit 年收益annual cost 年费用net annual cash flow 年净现金流量opportunity cost 机会成本social rate of discount 社会贴现率profit measure利润指标值private corporations 私营股份制公司public agencies 公共机构net future value(NFV) /净终值net present value(NPV) 净现值equivalent uniform annual net value (NUV)等额净年值capital recovery factor 资金回收因子benefit-cost ratio(BCR) 收益-费用比profitability index 盈利指数saving-to-investment ratio(SIR) 存款投资比率absolute numerical measure 绝对指数internal rate of return(IRR) 内部收益率marginal efficiency of capital 边际资本收益return on investment(ROI) 投资收益payback period(PBP) 投资回收期profit maximization利润最大化public sector 公共领域basic principle 基本原理nonnegative 非负的budget constraint 预算限制incremental analysis 追加分析internal rate of return method 内部收益率法Part5Word Bank-financed projects 世界银行融资贷款项目foreign bidders 海外投标人civil works 土木工程I nternational Competitive Bidding(ICB) 竞争性国际招标Limited International Bidding 有限国际招标National Competitive Bidding 国内竞争性招标International Shopping 国际订购Direct Contracting 直接签约General Procurement Notice 通用采购公告prequalification 资格预审bidding documents 招标文件domestic contractors 国内承包商instructions to bidders 投标人须知conditions of contract 合同条件specifications of drawings 技术规范与图纸bill of quantities 工程量清单payment terms 支付条件minutes of the conference 会议纪要pre-bid conferences 标前会议site visits 现场踏勘substantially responsive 实质性响应the lowest evaluated cost 经评审的最低造价Part6the sealed bids 密封的投标报价construction company 建筑公司marketing strategy 市场营销策略long-term goals 长期目标client relationships 客户关系short-term goal 短期目标direct costs estimate 直接费估算mark-up 涨价溢价company or head office overheads 公司或总部管理费unrealistic bids 不切实际的报价owner-contractor agreement 业主与承包商之间订立的合同standard form of agreement 标准合同形式American Institute of Architects(AIA) 美国建筑师协会bonus and penalty clauses 奖励与惩罚条款lump-sum agreement 总价合同changer order 变更单written authorization 书面授权unit-price agreement 单价合同quantity takeoff 工程量清单cost-plus-fee agreements 成本加酬金合同equity partners 股权伙伴rental rates 出租比例percentage fee 百分百酬金合同fixed fee 固定酬金合同changes 工程变更contract award 合同授予changes clause 变更条款publicly financed project 公共融资项目extra work 附加工作the prime contractor 主承包商Part7the International Federation of Consulting Engineering 国际咨询师联合会the FIDIC Conditions of Contract for Constructions FIDIC施工合同条件the General Conditions (FIDIC)通用条件the Particular Conditions (FIDIC)专业条件the Appendix to Tender (FIDIC)投标附录arbitration 仲裁,裁决Dispute Adjudication Board(DBA)争议仲裁委员会Conditions of Contract for Works of Civil Engineering Construction 土木工程施工合同条件Conditions of Contract for Electrical and Mechanical Work 机电安装工程合同条件Conditions of Contract for Design-Build and Turnkey设计-建造于交钥匙合同条件Client/Consultant Model Services Agreement 客户/咨询师服务协议Conditions of Subcontract for Works of Civil Engineering Construction 土木工程分包合同条件Guides to the Use of the Different FIDIC Conditions of Contract 各种FIDIC合同条件应用指南Amicable Settlement of Construction Disputes 施工争端友好解决方式Insurance of Large Civil Engineering Projects 大型土木工程保险The Conditions of Contract for Plant and Design-Build (FIDIC)安装与设计-建造合同The Conditions of Contract for EPC/Turnkey Projects (FIDIC)EPC/交钥匙项目合同条件The Short Form of Contract (FIDIC)简短格式合同The Form of Contract for Dredging and Reclamation Works (FIDIC)疏浚与防洪工程合同格式priced contract with activity schedule 总价合同priced contract with bill of quantities 单价合同target contract with activity schedule 目标总价合同target contract with bill of quantities 目标单价合同cost reimbursable contract 成本补偿合同performance bond 履约保函parent company guarantee 母公司担保advance payment 预付款retention (工程)留置权bonus for early completion 工期提前奖delays damages 误期损害surety 担保financial loan 商业贷款insurance policy 保险政策in breach of contract 合同违约bid bond 投标担保justification (正当的)理由labor and material bond 劳动力与原材料担保lien bond 留置权担保comprehensive general liability insurance 综合责任险professional liability insurance职业责任险workers’compensation insurance 工人补偿险builder’s risk fire insurance 施工方火灾险Part8construction planning 施工计划the choice of technology 施工技术的选择the definition of work tasks 工作任务的定义the estimation of the required resources and durations for individual tasks 所需资源和各项工作持续时间的估算reasoning backward 逆向推理normative problem 规范性问题cost control 成本控制schedule control 进度控制critical path scheduling procedures 关键线路进度控制程序job shop scheduling procedures 工作现场进度控制程序work breakdown 工作分解manufacturing terminology加工制造业术语resource allocations 资源分配fore-runner 先行者laborious and tedious process 复杂和枯燥的过程general models 通用模型databases and information systems 数据库和信息系统the storage and recall of the activities工作活动的存储于记忆manpower 人力,劳动力the duration of the activity 工作活动的持续时间placing concrete on site 现场浇筑混凝土placing forms 支设模板installing reinforcing steel 绑扎钢筋pouring concrete 浇筑混凝土finishing the concrete 混凝土养护removing forms 模板拆除position forms on the cleaning station 在清理场所码放的模板hierarchical structure 层级结构work breakdown structure 工作结构分解precedence relations 先导顺序关系structural integrity结构整体性design drawings 设计图纸milestone events 里程碑事件lag 时间间隔computer based simulation 基于计算机的模拟excavation equipment 开挖机械\Part9critical path method(CPM) 关键路线发predecessor/successor activities先导/后续工作resource constraint 资源约束artificial precedence constraint 人为先导关系约束activity-branch network 双代号网络图dummy activity 虚工作earliest time schedule 最早时间进度latest time schedule 最迟时间进度float 时差,机动时间maneuvering room 可调整的余地free float 自由时差independent float 独立时差total float 总时差inter-relationships 相互关系graphical presentations of project schedules 项目进度的图形表达network diagrams 网络图time-scaled network 时标网络bar or Gantt chart 横道或甘特图horizontal axis 横轴,横坐标vertical axis 纵轴,纵坐标S-curves S型曲线resource graphs 资源图uncertainty associated with the actual durations与实际持续时间相关的不确定性regulatory approval 行政许可adverse weather 不利的天气contingency allowance 应急准备probabilistic perspective概率的角度independent random variables 相互独立的随机变量random fluctuations 随机波动positive correlations正相关over-optimistic 过于乐观的Part10e-construction 工程返工personal injuries 人身伤害conformance 遵守,服从re-evaluation of design decisions设计决策的重要评估tunneling methods 隧道开掘方法actual site conditions 现场的实际状况roadway rehabilitation 公路路面返修quality assurance 质量保证n-site inspections 现场监督检查US Occupational Safety and Health Administration(OSHA)美国职业安全与健康署violation of existing standard 违反现行规范标准employee participation in quality control 质量控制的员工参与statistical methods 统计方法batches of materials 材料批implicit assumption 隐含的假设total quality control 全面质量控制zero defects goal 零缺陷目标quality circles 质量环“optimum”proportion “最佳”的比例non-destructive techniques 非破坏性技术x-ray inspection of welds 焊接的X光检测exhaustive or 100% testing 全数或100%检测lot 母体,总体sampling by attributes 特征抽样sampling by variables 变量抽样direct costs 直接成本indirect costs 间接成本construction accidents 工程事故insurance premiums 保险赔偿unsecured railings 未经保护的围栏on-board electronics面板电子元器件asbestosis 矽肺,石棉肺sewer line 排污管道four lane street 四车道道路Part11construction yard and warehouse management information 施工仓储管理信息concrete pumps 混凝土泵warehouse clerks 仓储管理员daily rental charge 日租金tedious manual task 繁琐的手工作业application programs 应用程序duplicate 复制verbal description 文字描述warehouse inventory database 仓储清单数据库relational data model 关系数据模型data dictionary 数据字典numerical code 数据编码redundancy 冗余aggregate 集料,骨料external models of the information 外部信息模型algebraic theory 代数理论projection 映射advantages of distributed processing 分散式处理的优点dynamic changes in information needs 信息需求的动态变化untidy information 凌乱的信息information flow 信息流preprocessor system 预处理系统independent systems 独立系统geometric information 图形信息。

工程管理专业英语

工程管理专业英语

工程管理专业英语词汇A a specific point in time 具体时点American Society of Civil Engineers 美国土木工程师协会architect 建筑师allocation 分摊、分配alternative 备选方案assemble 安装、装配B backhoe 反铲挖土机beam 梁BCR benefit cost ratio 成本收益率bid 投标bill of quantities 工程量清单bitumeni 沥青blast 爆破bluepoint 蓝图bricklayer 泥瓦匠budget 预算budget estimate 预算估价bulk material 大宗材料bulldozer 推土机C caliber 品质carpenter 木匠cash flow 现金流cash flow profile 现金流量图CEO(Chief Executive Officer) 首席执行官changed condition 已变更条件characteristic 特性claim 索赔claim shell 抓铲挖土机clause 条款client 客户compaction and grading 压实和平整场地competitive bidding 竞争性投标compound 复利计算communication 沟通conceptual design 概念设计conceptual estimate 概念估算conceptual planning 概念规划concrete mix 混凝土拌合物contingency 突发事件,不可预见事件column 柱、栏consolidate 加固container 容器、集装箱contract 合同contractor 承包商consultant 咨询工程师construction planning 施工计划、施工组织设计construction procedure 施工方法construction operation 施工作业coordinate 协调cost estimation 成本估算cost engineer 估算师、造价工程师cost engineering 工程估价creativity 创新性craftsman 工匠D deflation 通货紧缩derrick 起重机design estimate 设计估算detailed design 详细设计detailed estimate 详细估算delivery 运输demolition 拆毁、破坏discounte 折现dragline 拉铲挖土机drill 钻孔duration 持续时间dynamite 炸药E earthwork to be excavated 土方开挖economic evaluation 经济评价engineer's estimate 工程师估算、标底erection 建立、安装estimate 估算estimate stage 估算阶段evaluate 评价evaluation stage 评估阶段excavation 挖掘、开挖execute 执行expenditure 支出F facility 设施facility design 设施设计facilities management 设施管理factor 系数、因素false work 脚手架feasibility 可行性field management 现场管理financing 融资formwork 模板formula 公式formulation 构思framework 框架freight delivery 货物运输function 功能、公式fuctional design 功能设计"functional" organization “职能式”组织fundation 基础furnaces 锅炉G GDP(Gross Domestic Product) 国内生产总值general contractor 总承包商general office overhead 总部管理费GNP(Gross National Product) 国民生产总值grout 水泥浆、灌浆H hierarchical structure 层次结构分解high-rise apartment 高层公寓I implementation 执行、实施incentive 动机incremental analysis 增量分析index 指数inflation 通货膨胀infrastructure 基础设施infrastructure and heavy construction 重大基础设施建设ingenuity 灵活性ingredient 组成部分initiation 启动inspire 鼓励installation contractors 安装承包商integration 整合interest period 计息期interstate roadway 州际公路innovation 革新institutional and commercial building 写字楼interpersonal 人际的investment consideration 投资分析IRR internal rate of return 内部收益率J job-site productivity 工地生产率L labor characteristic 劳动力特征labor efficiency 劳动效率labor jurisdiction 劳动仲裁labor productivity 劳动生产率lease 租约、契约lift 举起、电梯linear interpolation 线性插值法linear programming 线性规划load 荷载loan security 贷款担保logistic 后勤、物流long-term 长期M MARR minimum attractive rate of return 最低收益率maintenance 维持、维护marginal efficiency of capital 资本边际收益率matrix 矩阵methodology 方法论monitor 监督、班长mortgage 抵押motivation 动机、激励multistrory building 多层建筑mutually exclusive proposals 互斥方案Nnet benefit 净收益NFV net future value 净终值NPV net present value 净现值O off-the-shelf material 现货材料oligopoly 垄断onset 开始on site 现场on-site installation 现场安装operation 运营、操作opportunity cost 机会成本overlap 重叠overdraft 透支overseer 监督者owner 业主P parameter 参数PBP payback period 投资回收期pension 养老金performance 绩效piled river 打桩机pipeline 管道planning horizon 规划期platform 平台prebid site 投标前现场preliminary estimate 初步估算prequalify 资格预审prequalified 通过资格预审的prestressed concrete member 预应力混凝土构件processing plant 加工厂procurement 采购production function 生产函数profitability 盈利Project Management Institute 项目管理协会"project" organization “项目式”组织public agency 公共机构pump 泵Q quasi-governmental corporation 国营企业quotation 报价R ratio 比率real estate 房地产real estate investmental corporation 房地产信托基金receipt 收据reimbursement 偿还reinforcing bars 钢筋、钢筋束residential housing construction 住宅建筑retail 零售renovation 翻修resource 资源review 复习、检查、审核revenue 收入reward 回报risk 风险ROI return on investment 投资回收率rotary-percussion drill 旋转冲击钻S safety consciousness 安全意识schedule 进度scheduling 进度计划scheme 计划scope 范围screening estimate 匡算security sensitivity 安全敏感性sensitivity analysis 灵敏度分析semi-processed 半成品的sewage 下水道shop drawing 施工图shovel 正铲挖土机single-family house 独户住宅site manager 现场经理skyscraper 摩天大楼slab 楼板slippage or contraction 延误或提前socially desirable programs 社会公益项目social rate of discount 社会折现率solvency 清偿specialty contractor 专业承包商specification 规范、说明statute 法规stadium 体育场staff (全体)职员stockpile 储存strategy 策略strike 罢工structural design 结构设计subcontractor 分包商subgrade 路基suborganization 次级组织supervise 监督superintendent 监督、指挥syndicator 辛迪加T term 术语terminal 终端the rate of return 收益率time value of money 资金时间价值transfer 移交transportation 运输tunnel 隧道turnkey 交钥匙U unforeseen expense 不可预见费用utilities building 公用事业建筑utilization 利用V value engineering 价值工程vendor 商贩、供货商W weld 焊接work package 工作包。

工程管理专业英语(全部单元都在里面)

工程管理专业英语(全部单元都在里面)
工程管理专业英语
Specialized English for Construction Management
Lectured by Yiyi Mo 主讲:莫懿懿 Email:myy_11@
本课程学习目的
□ 通过该课程的学习,要求学生完成100,000单词 的阅读量, □ 掌握或熟悉1000个工程管理常用专业词汇, □ 达到每小时250单词的英译中速度, □ 具备工程管理科技论文的译/写能力, □ 初步具备专业英语的对话能力, □ 为毕业设计的专业阅读和以后从事科学研究及工 程打下坚实的基础。
另:科技文体所述的是客观规律,尽量避免使用第一、第二 人称。 Exam. 炉壁采用耐火砖可大大降低热耗。 译文1:If you use firebricks round the walls of the boiler, the heat loss can be considerably reduced. 译文2:The heat loss can be considerably reduced by the use of firebricks round the walls of the boiler. 译文3:the use of firebricks round the boiler can considerably reduce the heat loss.
2、广泛使用被动句
□ 科技文章侧重叙事推理,强调客观准确。 □ 使用被动句的情况:不必说出主语、不愿说出主语或说不 出主语。科技文体往往是前后两种。 Exam. Attention must be paid to the working temperature of the machine. You must pay attention to the working temperature of the machine. 译文:要注意机器的工作温度。 Exam. 中美之间已经建立了外交关系。 译文:Diplomatic relations have been established between China and the United States of America. Exam. 他提议各班之间开展友谊竞赛。 译文:He proposed that a friendly emulation drive be started among the different classes.
  1. 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
  2. 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
  3. 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。
相关文档
最新文档