德马格电动葫芦说明书

合集下载

德马格FDR电动葫芦参数

德马格FDR电动葫芦参数

Technical dataDemag FDR-Bas rope hoistFDR-Bas 3 - 5 - 10 foot-mounted hoist121211 en CN203 735 44714 IS 813220373544_e n _121211 © D e m a g C r a n e s & C o m p o n e n t sContentsDesign overview3Explanation of size designations/type assignment 3Selection criteria 4Selection table 5FDR-Bas 3- 2/1, H12, H20, H30 foot-mounted hoist, m ounting p osition A 6- 4/1, H12, H20 foot-mounted hoist, m ounting p osition A 7- 4/1, H30 foot-mounted hoist, mounting position A8- 4/1, H12, H20, H30 foot-mounted hoist, m ounting p osition B 9FDR-Bas 5- 2/1, H12, H20, H30 foot-mounted hoist, m ounting p osition A 10- 4/1, H12, H20 foot-mounted hoist, m ounting p osition A 11- 4/1, H30 foot-mounted hoist, mounting position A12- 4/1, H12, H20, H30 foot-mounted hoist, m ounting p osition B 13FDR-Bas 10- 2/1, H12, H20, H30 foot-mounted hoist, m ounting p osition A 14- 4/1, H12, H20 foot-mounted hoist, m ounting p osition A 15- 4/1, H30 foot-mounted hoist, mounting position A16- 4/1, H12, H20, H30 foot-mounted hoist, m ounting p osition B 17DR 3 - 5 - 10 motor data with pole-changing hoist drives18320373544_e n _121211© D e m a g C r a n e s & C o m p o n e n t sDesign overviewExplanation of size designations/type assignment1) Code CC - with contactor controlNC - without contactor control420373544_e n _121211© D e m a g C r a n e s & C o m p o n e n t s Selection criteriaExampleLoad capacity 5 t Load spectrum “Medium” from table Lifting speed 6 m/min Creep lifting speed 1 m/min Reeving 4/1Average hook path 3 m No. of cycles/hour 20Working time/day 8 hoursThe average operating time per working day is estimated or calculated as follows:The size of the hoist is determined by the loadspectrum, average operating time per working day, load capacity and reeving.L o a d c a p a c i t yOperating time L o a d c a p a c i t yOperating timeL o a d c a p a c i t yOperating time Operating timeVery heavy dead loadSmall partial load Small dead loadLarge partial load Medium partial load Medium dead loadHeavy dead loadL o a d c a p a c i t y4 Very heavyHoist units which are usually subject to maximum or almost maximum loads.3 HeavyHoist units which are usually subject to medium loads but frequently to maximum loads.2 MediumHoist units which are usually subject to small loads but rather often to maximum loads.The load spectrum(in most cases estimated) can be evaluated ac-cording to the definitions below:1 LightHoist units which are usually subject to very small loads and in exceptional cases only to maximum loads. 1. What are the operating conditions?2. What is the specified safe working load?3. To what height must the load be lifted?4. What is the required lifting speed?5. Do the loads need to be lifted and lowered withgreat accuracy?6. Is horizontal load travel necessary?7.How is the hoist to be controlled?For the medium load spectrum and an average daily operating time of 2,66 hours, the table above shows group 2m. For a load capacity of 5 t and 4/1 rope reeving, the following table indicates hoist size DR-Bas 5 - 5.Operating time/day = 2 · average hook path · no. of cycles/hour · working time/day=60 · hoist speedOperating time/day =2 ·3 · 20 · 8= 2,66 hours60 · 6The group is determined by the load spectrum and operating time.Load spectrum Average operating time per working day in hours 1Light 2-44-88-16more than 163Heavy 0,5-11-22-44-84Very heavy0,25-0,50,5-11-22-4Group of mechanisms toFEM1Am 2m 3m 4m ISOM4M5M6M71) Gearbox service life 20 % higher than the FEM full-load service life520373544_e n _121211© D e m a g C r a n e s & C o m p o n e n t s Selection tableNote:If no specifications for the mounting position or rope lead-off are included in an order, mounting position A with rope lead-off 1 is supplied as standard.Range Group of mechanisms Load capacityHook pathLifting speed vLifting Motor sitzFEMISO[t][m][m/min]DR-Bas 32/1MH-Bas 112A1Am M4212; 20; 3010/1,62m M51,612/23mM61,254mM714/11Am M446; 10; 155/0,8MH-Bas 112A2m M53,26/13m M62,54mM72DR-Bas 52/11Am M43,212; 20; 3010/1,6MH-Bas 132A2m M52,512/23mM624mM71,64/11Am M46,36; 10; 155/0,8MH-Bas 132A2m M556/13m M644mM73,2DR-Bas 102/11Am M46,312; 20; 308/1,2MH-Bas 160A2m M5510/1,63mM644mM73,24/11Am M412,56; 10; 154/0,6MH-Bas 160A2m M5105/0,83m M684mM76,3620373544_e n _121211© D e m a g C r a n e s & C o m p o n e n ts FDR-Bas 3 - 2/1, H12, H20, H30 foot-mounted hoist, m ounting p osition A43414444.epsGroup of mechanisms to FEM/ISO 1Am/M4, 2m/M5, 3m/M6, 4m/M7Dimensions in mmC1240d2 2)180FDR-Bas 3 dimensions in mm1) Weight data including rope, motor and bottom block2) In root of grooveSee page 21 for motordimensions F, G and LRope drum H12H20H30Foot distance R 590,5815,51095,5Hook travel n2168280,5421Rope lead-off point at highest hook position m2/centre R144256,5396,5Main dimension l1, limit-switch side/centre R 367,0479,5619,5Main dimension l2, gearbox side/centre R 357,5470,0610,0Distance l3, bracket frame bore hole 6118361116Rope dia. D 7Pitch P 7,8Weight 1) [kg]227242266720373544_e n _121211© D e m a g C r a n e s & C o m p o n e n tsFDR-Bas 3 - 4/1, H12, H20 foot-mounted hoist, m ounting p osition A43414544.epsFDR-Bas 3 dimensions in mmRope drum H12H20Foot distance R 590,5815,5Hook travel n484140Rope lead-off point at highest hook position m4/centre R23135Main dimension l1, limit-switch side/centre R 367,0479,5Main dimension l2, gearbox side/centre R 357,5470,0Distance l3, bracket frame bore hole 611836Rope dia. D 7Pitch P 7,8Weight 1) [kg]246264Group of mechanisms to FEM/ISO 1Am/M4, 2m/M5, 3m/M6, 4m/M7Dimensions in mmC1240d2 2)1801) Weight data including rope, motor and bottom block 2) In root of grooveSee page 21 for motordimensions F, G and L820373544_e n _121211© D e m a g C r a n e s & C o m p o n e n ts FDR-Bas 3 - 4/1, H30 foot-mounted hoist, mounting position AFDR-Bas 3 dimensions in mmRope drum H30Foot distance R 1095,5Hook travel n4210Rope lead-off point at highest hook position m4/centre R 275,5Rope dia. D 7Pitch P 7,8Weight 1) [kg]295Group of mechanisms to FEM/ISO 1Am/M4, 2m/M5, 3m/M6, 4m/M7Dimensions in mmC1240d2 2)1801) Weight data including rope, motor and bottom block2) In root of grooveSee page 21 for motor dimensions F, G and L43414744.eps920373544_e n _121211© D e m a g C r a n e s & C o m p o n e n tsFDR-Bas 3 - 4/1, H12, H20, H30 foot-mounted hoist, m ounting p osition BFDR-Bas 3 dimensions in mmRope drum H12H20H30Foot distance R 590,5815,51095,5Hook travel n484140210Rope lead-off point at highest hook position m4/centre R23135275,5Main dimension l1, limit-switch side/centre R 367479,5619,5Main dimension l2, gearbox side/centre R 357,5470610,0Distance l3, bracket frame bore hole 6118361116Distance l4, bracket frame bore hole 5587831063Rope dia. D 7Pitch P 7,8Weight 1) [kg]246264295Group of mechanisms to FEM/ISO 1Am/M4, 2m/M5, 3m/M6, 4m/M7Dimensions in mmC1240d2 2)1801) Weight data including rope, motor and bottom block 2) In root of groove1020373544_e n _121211© D e m a g C r a n e s & C o m p o n e n ts FDR-Bas 5 - 2/1, H12, H20, H30 foot-mounted hoist, m ounting p osition A43413944.epsFDR-Bas 5 dimensions in mm1) Weight data including rope, motor and bottom block2) In root of grooveSee page 21 for motordimensions F, G and LRope drum H12H20H30Foot distance R 619,5854,51149,5Hook travel n2174291436Rope lead-off point at highest hook position m2/centre R151268416Main dimension l1, limit-switch side/centre R 381,5499646,5Main dimension l2, gearbox side/centre R 376493,5641Distance l3, bracket frame bore hole 6408751170Rope dia. D 9Pitch P 10Weight 1) [kg]351381439Group of mechanisms to FEM/ISO 1Am/M4, 2m/M5, 3m/M6, 4m/M7Dimensions in mmC1256d2 2)2251120373544_e n _121211© D e m a g C r a n e s & C o m p o n e n tsFDR-Bas 5 - 4/1, H12, H20 foot-mounted hoist, m ounting p osition AFDR-Bas 5 dimensions in mm1) Weight data including rope, motor and bottom block 2) In root of grooveSee page 21 for motordimensions F, G and LRope drum H12H20Foot distance R 619,5854,5Hook travel n487145,5Rope lead-off point at highest hook position m4/centre R37,8133Main dimension l1, limit-switch side/centre R 381,5499Main dimension l2, gearbox side/centre R 376493Distance l3, bracket frame bore hole 640875Rope dia. D 9Pitch P 10Weight 1) [kg]394429Group of mechanisms to FEM/ISO 1Am/m4, 2m/M5, 3m/M6, 4m/M7Dimensions in mmC1256,5d2 2)22583414044.eps1220373544_e n _121211© D e m a g C r a n e s & C o m p o n e n ts 43414244.epsFDR-Bas 5 - 4/1, H30 foot-mounted hoist, mounting position AFDR-Bas 5 dimensions in mmGroup of mechanisms to FEM/ISO 1Am/M4, 2m/M5, 3m/M6, 4m/M7Dimensions in mmC1256,5d2 2)2251) Weight data including rope, motor and bottom block2) In root of grooveSee page 21 for motor dimensions F, G and LRope drum H30Foot distance R 1149,5Hook travel n4218Rope lead-off point at highest hook position m4/centre R276Main dimension l1, limit-switch side/centre R 646,5Main dimension l2, gearbox side/centre R 641Rope dia. D 9Pitch P 10Weight 1) [kg]4961320373544_e n _121211© D e m a g C r a n e s & C o m p o n e n tsFDR-Bas 5 - 4/1, H12, H20, H30 foot-mounted hoist, m ounting p osition BFDR-Bas 5 dimensions in mm1) Weight data including rope, motor and bottom block 2) In root of grooveRope drum H12H20H20Foot distance R 619,5854,51149,5Hook travel n487145,5218,5Rope lead-off point at highest hook position m4/centre R37,8133276Main dimension l1, limit-switch side/centre R 381,5499646,5Main dimension l2, gearbox side/centre R 376493,5641Distance l3, bracket frame bore hole 6408751170Distance l4, bracket frame bore hole 5788131108Rope dia. D 9Pitch P 10Weight 1) [kg]399429496Group of mechanisms to FEM/ISO 1Am/M4, 2m/M5, 3m/M6, 4m/M7Dimensions in mmC1256,5d2 2)2251420373544_e n _121211© D e m a g C r a n e s & C o m p o n e n ts FDR-Bas 10 - 2/1, H12, H20, H30 foot-mounted hoist, m ounting p osition A43413544.epsFDR-Bas 10 dimensions in mmGroup of mechanisms to FEM/ISO 1Am/M4, 2m/M5, 3m/M6, 4m/M7Dimensions in mmC1452d2 2)3151) Weight data including rope, motor and bottom block2) In root of grooveSee page 21 for motordimensions F, G and LRope drum H12H20H30Foot distance R 76910291359Hook travel n2195325488Rope lead-off point at highest hook position m2/centre R162,5292,5457,5Main dimension l1, limit-switch side/centre R 473,5603,5768,5Main dimension l2, gearbox side/centre R 471,5601,5766,5Distance l3, bracket frame bore hole 79510551385Rope dia. D 13Pitch P 14Weight 1) [kg]5976427001520373544_e n _121211© D e m a g C r a n e s & C o m p o n e n tsFDR-Bas 10 - 4/1, H12, H20 foot-mounted hoist, m ounting p osition A43413644.epsFDR-Bas 10 dimensions in mm1) Weight data including rope, motor and bottom block 2) In root of grooveSee page 21 for motordimensions F, G and LGroup of mechanisms to FEM/ISO 1Am/M4, 2m/M5, 3m/M6, 4m/M7Dimensions in mmC1343d2 2)315Rope drum H12H20Foot distance R 7691029Hook travel n497,5162,5Rope lead-off point at highest hook position m4/centre R33163,5Main dimension l1, limit-switch side/centre R 473,5603,5Main dimension l2, gearbox side/centre R 471,5601,5Distance l3, bracket frame bore hole 7951055Rope dia. D 13Pitch P 14Weight 1) [kg]7227801620373544_e n _121211© D e m a g C r a n e s & C o m p o n e n ts FDR-Bas 10 - 4/1, H30 foot-mounted hoist, mounting position A43413844.epsFDR-Bas 10 dimensions in mm1) Weight data including rope, motor and bottom block2) In root of grooveSee page 21 for motor dimensions F, G and LGroup of mechanisms to FEM/ISO 1Am/M4, 2m/M5, 3m/M6, 4m/M7Dimensions in mmC1343d2 2)315Rope drum H30Foot distance R 1359Hook travel n4244Rope lead-off point at highest hook position m4/centre R325Main dimension l1, limit-switch side/centre R 768,5Main dimension l2, gearbox side/centre R 766,5Rope dia. D 13Pitch P 14Weight 1) [kg]7001720373544_e n _121211© D e m a g C r a n e s & C o m p o n e n tsFDR-Bas 10 - 4/1, H12, H20, H30 foot-mounted hoist, m ounting p osition BFDR-Bas 10 dimensions in mm1) Weight data including rope, motor and bottom block 2) In root of grooveGroup of mechanisms to FEM/ISO1Am/M4, 2m/M5, 3m/M6, 4m/M7Dimensions in mmC1343d2 2)315Rope drum H12H20H30Foot distance R 76910291359Hook travel n497,5162,5244Rope lead-off point at highest hook position m4/centre R33163,5325Main dimension l1, limit-switch side/centre R 473,5603,5768,5Main dimension l2, gearbox side/centre R 471,5601,5766,5Distance l3, bracket frame bore hole 79510551385Distance l4, bracket frame bore hole 6939231253Rope dia. D 13Pitch P 14Weight 1) [kg]7227808531820373544_e n _121211© D e m a g C r a n e s & C o m p o n e n t s DR 3 - 5 - 10 motor data with pole-changing hoist drivesDesign is in accordance with the VDE regulations and the FEM design rules to meet the high demands made on electric hoists.FDR-Bas 3: Main/creep lifting F6Motor sizeNo. of polesLifting speedPNCDFnStarts/hRated current IN and start-up current I Afor 50 Hz 380 - 415 V cos cos[kW]%[rpm]I N [A]I A [A]φN φA MH-Bas 112A - 12/21210/1,6;12/2;5/0,8; 6/10,6204501604,69,20,360,4823,7402790807,947,10,940,87Required supply cable conductor cross sections and fuse linksMotor sitzMains connection delay fusefor 50 Hz 1)Supply lines 2) for 5% voltage drop ∆U and start-up current I A for 50 Hz380 V 380 V (∆U 20 V)[A][mm²][m]MH-Bas 112A - 12/232454MH-Bas 132A - 12/2 32653MH-Bas 160A - 12/250636Motor sizeNo. of polesLifting speedPNCDFnStarts/hRated current IN and start-up current I Afor 50 Hz 380 - 415 V cos cos[kW]%[rpm]I N [A]I A [A]φN φA MH-Bas 132A - 12/21210/1,6;12/2;5/0,8; 6/11,0204651607,717,400,350,5425,84028208011,974,730,930,81FDR-Bas 5: Main/creep lifting F6Motor sizeNo. of polesLifting speedPNCDFnStarts/hRated current IN and start-up current I Afor 50 Hz 380 - 415 V cos cos[kW]%[rpm]I N [A]I A [A]φN φA MH-Bas 160A - 12/2128,0/1,310/1,64,4/0,65/0,81,62046516012,528,50,310,4729,84028208021,5130,010,810,76FDR-Bas 10: Main/creep lifting F61) Fuse links also apply in conjunction with a cross-travel motor.2) The lengths of the supply lines are calculated on the basis of an earth-loop impedance of 200 m Ω.1920373544_e n _121211 © D e m a g C r a n e s & C o m p o n e n t sMotor dimensionsHoist motor sizeMH-Bas 112A - 12/2MH-Bas 132A - 12/2MH-Bas 160A - 12/2Dimensions in [mm]F109,2119,7148,7G 109,2119,7148,7L439514,5533Motor weight [kg]557690Required cross-section =Known cross-section · required length= 4 mm² · 70 m= 5,2 mm²Known cable length54 mselected cross-section = 6 mm²Modification of conductor c ross-sectionsExample for calculating the cross-sections Q of the conductors of cables exceed-ing the length indicated in the table:The current addresses of the sales offices and the regional subsidiaries and agencies worldwide can be found on the Demag Cranes & Components homepage at/ContactDemag Cranes & Components (Shanghai) Co., Ltd125 Ye Zhuang Road, European Industrial ZoneZhuanghang Town, Fengxian DistrictShanghai 201415, P.R. ChinaTelephone (86-21)3718 2222 · Telefax (86-21)5756 4558E-mail: info@Reproduction in whole or in part only with prior consent of Demag Cranes & Components No liability for errors or omissions. Subject to change.。

电动葫芦使用说明

电动葫芦使用说明

电动葫芦安装操作说明1.将主电源接入群控器。

将主电源插头插入群控器的主电源插孔
注:安装、插接主电源插头时应断开电源,在无电情况下进行操作。

2.用连接电缆将电葫芦与群控器连接。

3.将电动葫芦上吊钩直接安装在固定吊点上,或者通过吊装带、卸甲固定。

注:长期固定安装不可采用吊装带固定,短期安装上吊钩可以直接钩在吊装带或卸甲上。

4.将群控器电源接通,搬动电动葫芦的控制开关,按下启动按钮,将电动葫芦吊起。

主电源开关电动葫芦上下运转开关电动葫芦操控主开关
急停开关
注:控制多台电动葫芦时,应先点按电动葫芦操控主开关试运行,观察所有电动葫芦的运行方向是否一致。

5.安装下吊钩。

电动葫芦下吊钩
6.安装集连带。

集连带
7.将剩余链条装入集连带,
链条末端链坠
注:应先将链条末端链坠放入集连带,再依次将链条放入链带内,避免链条缠绕、打结。

进行升降操作时现场必须有一个指挥人员,观察灯架或音响在上升和下降过程中的运行情况,发现问题及时停车。

在控制器运行过程中,上下运转开关和操控主开关不能同时操作。

8.用吊装带将需要起重的物品用吊装带固定在电动葫芦的下吊钩上。

注:应保证起重物品的起重吊点牢固,避免断裂、滑脱。

9.用群控器操作一台或多台电动葫芦起降!
群控器
控制电源线。

电动葫芦使用说明书

电动葫芦使用说明书

电动葫芦使用说明书一、产品介绍电动葫芦是一种用电动机驱动的起重设备,广泛应用于工业生产领域。

本说明书将详细介绍电动葫芦的使用方法、安全操作要点和维护保养事项,以确保用户正确、安全地操作设备。

二、安全须知在使用电动葫芦之前,请务必阅读并理解以下安全须知:1. 本产品必须由受过培训并具备合法操作资质的人员操作。

2. 在使用前,请检查电动葫芦及其相关附件是否完好,如有损坏应及时修理或更换。

3. 不得超过电动葫芦标明的最大额定载荷使用,严禁超载操作。

4. 使用过程中应保持周围环境清洁,并避免在潮湿或易燃环境中使用电动葫芦。

5. 在起重操作时,请确保起重点与吊钩的连接牢固可靠。

6. 禁止以电动葫芦作为人员的起升工具使用。

7. 使用完毕后请切断电源,确保设备处于停止状态。

三、使用方法1. 设备接通电源后,按下启动按钮,电动葫芦开始运行。

如需停止,松开按钮即可。

2. 将负载通过吊钩连接到电动葫芦上。

3. 操作手柄可用于控制负载的升降和移动。

向上推动手柄可使负载升起,向下拉动手柄则可使负载下降。

4. 若需调整工作速度,可通过手柄旁的调速钮进行调节。

向左旋转调速钮可降低速度,向右旋转可提高速度。

5. 在起重操作中,可以使用紧急停止按钮来立即停止设备的运行。

四、维护保养1. 电动葫芦在使用前后应进行检查,确保关键零部件的完好并进行必要的润滑。

2. 定期清洁设备外表面,避免灰尘和杂物进入内部机构。

3. 如发现设备异常或故障,应立即停止使用,并由专业技术人员进行维修检查。

4. 长时间不使用时,请切断电源并进行适当的防尘、防腐等保护措施。

5. 定期对电动葫芦进行维护保养,确保设备的安全可靠性。

五、常见问题解答1. 为什么电动葫芦无法启动?答: 请检查电源是否正常连接,判断电源开关是否开启,以及手柄是否处于停止状态。

2. 如何进行速度调节?答: 可通过手柄旁的调速钮进行调节,向左旋转调速钮可降低速度,向右旋转可提高速度。

3. 电动葫芦吊钩如何连接负载?答: 将负载通过吊钩连接到电动葫芦的吊钩上,并确保连接牢固可靠。

德马格电动葫芦说明书

德马格电动葫芦说明书

尊敬的顾客:
感谢您选用德马格电动葫芦。

为了方便您的选择和链条组的进一步简化,从2006年4月起我们将会对现有的几个方面实行新的构建方案。

1.规格标识:取消DC20标准。

未来将会把DC10和DC20统一称为DC10。

两者的区别在于下料的长度。

2.速度方面:消除V1,V2和VS之间的差异。

V后面的数字直接代表最大和平均提升速度,DCS型号代表额定和最大速度。

3.FEM分级:与载荷跃变递减相适应。

很抱歉我们现在不能为您提供最新的链条组资料。

请参阅本页后面的新旧模型代码。

感谢您的合作。

安全检验证书
德马格环链电动葫芦DC-Pro,DCS-Pro,DC-Com
德马格手控葫芦DSM-Pro,DCMS-Pro
操作人员必须仔细阅读使用说明
产品型号:DCS-PRO
生产年份:2008
驱动机构总成2m+/M5+
起重量:0.25吨
工厂代码:93992338
运行速度
德马格起重机械有限公司
邮政专用信箱67 D-58286
电话(02335)92-0
传真(02335)927676
CE认证附在使用说明中。

本款产品属于德马格最新型产品。

本产品的安装,生产和技术规定已经得到权威人士的签字认证。

(通过德国《伤害保险》“电动设备和生产手段”第4章,第5条认证)。

电动葫芦说明书和外包装设有T址

电动葫芦说明书和外包装设有T址

电动葫芦说明书和外包装设有T址一、产品介绍电动葫芦是一种通过电能驱动的起重设备,它可以用于吊装货物或物体。

本产品采用高品质材料制造,结构紧凑,重量轻,操作方便。

本说明书将为用户提供使用电动葫芦的详细指导和注意事项。

二、产品规格1. 最大起重量:根据不同型号可选,通常为500kg、1000kg、2000kg等。

2.起升高度:根据不同型号可选,通常为3m、6m、9m等。

3. 牵引速度:根据不同型号可选,通常为8m/min、10m/min、12m/min等。

4.额定电压:通常为220V、380V等。

三、产品特点1.安全可靠:本产品采用高品质电机和电线设备,可确保运行过程中的安全可靠性。

2.灵活多用途:电动葫芦可用于吊装货物、维修设备、安装等多种场景,适应性强。

3.起重能力强:产品最大起重重量较大,可满足大部分货物的吊装需求。

4.操作简单:本产品操作简单,只需按下相应的按钮即可实现上下运行。

四、使用方法1.使用前检查:确保电动葫芦的外观完好无损,各部件连接紧固,电源线接线正确。

2.电源连接:将电源线连接到适配器或电源插座,并确保电源电压与设备额定电压相匹配。

3.操作顺序:首先按下启动开关,然后使用上升和下降按钮控制物体的升降。

4.注意事项:使用过程中注意保持清洁卫生,避免水或其他液体进入设备内部。

五、安全使用注意事项1.严禁在不正常工作环境下使用电动葫芦,如高温、潮湿等。

2.在使用过程中应保持设备周围通风良好,避免长时间工作导致设备过热。

3.严禁将电动葫芦用于超出额定起重重量的物体,以免危险发生。

5.使用过程中应保持设备稳定,避免碰撞和摔落,以免导致设备损坏。

六、产品维护与保养1.定期检查设备各部件的连接紧固情况,确保设备正常运行。

2.定期清洁设备外表面,避免灰尘和脏物进入设备内部。

3.如果设备存放时间较长,请拔掉电源线,避免设备长时间待机。

七、故障排除1.如果电动葫芦不能正常启动,请检查电源线是否连接正确。

电动葫芦 操作教程

电动葫芦 操作教程

电动葫芦电动葫芦开箱使用前,首先应该应该详细了解电动葫芦的详细说明书,对电动葫芦的性能和使用方法有大概的了解。

电动葫芦的常识:1、开动前应认真检查设备的机械、电气、钢丝绳、吊钩、限位器等是否完好可靠。

2、不得超负荷起吊。

起吊时,手不准握在绳索与物件之间。

吊物上升时严防撞顶。

3、起吊物件时,必须遵守挂钩起重工安全操作规程。

捆扎时应牢固,在物体的尖角缺口处应设衬垫保护。

4、使用拖挂线电气开关起动,绝缘必须良好。

正确按动电钮,操作时注意站立的位置。

5、单轨电动葫芦在轨道转弯处或接近轨道尽头时,必须减速运行。

6、凡有操作室的电动葫芦必须有专人操作,严格遵守行车工有关安全操作规程。

操作规程第一条:带有驾驶室的起重机械必须设有专人驾驶。

严禁非驾驶人员操作。

第二条:起重机司机须持有特殊工种操作证,方能按指定机型独立操作。

第三条:起重机械凡有下列情况之一者,禁止使用。

1、钢丝绳达到报废标准。

2、吊钩、滑轮、卷筒达到报废标准。

3、制动器的制动力矩刹不住额定载苛。

4、限位开关失灵。

5、主要受力件有裂纹、开焊。

6、主梁弹性变形或永久变形超过修理界限。

7、车轮裂纹、掉片、严重啃轨或"三条腿"。

8、电气接零保护挂靠失去作用或绝缘达不到规定值。

9、电动机温升超过规定值。

10、转子、电阻一相开路。

11、车上有人(检查、修理指定专人指挥时除外)。

12、露天起重机当风力达六级及以上。

13、新安装、改装、大修后未经验改合格。

14、轨道行车梁松动、断裂、物件破碎、终点车档失灵。

第四条:一般通用桥式起重机操作规程:1、工作前严禁饮酒。

2、不准带无关人员上车。

3、开车前先检查机械、电气、安全装置是否良好;车上有无可碰、卡、挂现象;确认一切正常,打铃告警后,再送电试车。

4、检查试车中发现有第三条规定情况之一时,应立即停车。

5、操作中必须精力集中,与下面密切配合。

操作时不准吸烟、吃东西和与他人谈话。

7、操作中严格执行"十不吊":①超过额定负苛不吊。

LH型电动葫芦双梁桥式起重机说明书(德马格)

LH型电动葫芦双梁桥式起重机说明书(德马格)

LH型电动葫芦双梁桥式起重机使用说明书安徽江淮起重运输机械有限公司一、概述LH型电动葫芦桥式起重机(简称葫双)系列,是以固式的电动葫芦(座式或挂式)作为起升机构(主钩和副钩),安装在小车上的桥式起重机。

本系列产品设有地面操纵和司机室操纵两个品种,144个规格。

该产品结构简单、重量轻、价格便宜,主要用于机械制造车间、仓库、装配及水电钻检修等场所的一般吊重、装卸作业。

本产品的工业环境温度为-25~40℃。

不适于用有爆炸危险、火灾危险的介质中和相对温度大于85%,充满腐蚀性气体的场所,也不适用于吊运溶化金属和有毒、易燃、易爆物品。

二、结构特征与工作原理本系列产品由桥架、小车、大车运行和电气四个主要部分组成。

采用固定式的钢丝绳或链条电动葫芦作为起升机构。

起重机装配试验应符合JB/T3695-2008《电动葫芦双梁桥式起重机》之规定,安装起重机时,必须按附图的规定进行安装。

起重机在拆卸运输和产品安装时,端梁的连接必须按图纸规定拆装。

(一)、桥架桥架有主梁、端梁、走台、导电架、大车导电线挡架、栏杆等部件组成。

本系列采用四梁结构,主梁与端梁用螺栓连接,非导电侧设一通长走台,小车馈电采用柔性扁电缆供电系统。

为了防止小车行驶到极限位置时,吊具或钢丝绳与电源滑线相碰,在桥架的两根主梁间,靠近电源一端设置了导线挡架。

(二)、小车本系列小车上的起升机构采用德马格钢丝绳电动葫芦,小车运行机构采用德马格驱动。

小车架采用纵梁和横梁均由H型钢焊接制成,各梁之间采用焊接连接。

(三)、大车大车运行机构采用分别驱动,采用SEW三合一减速电机RF系列。

(四)、电气系统1、概述起重机采用变频器调速,电器采用施耐德品牌。

起重机各个机构的运转,分别有遥控器或由地面控制按钮盒进行操作。

遥控器或地面控制按钮盒与电控设备相配合,对各机构电动机实现启动、调速、换向制动。

电控系统保证大车运行机构操作的主令控制器或地面控制按钮盒从慢速到快速还是直接操作到高速,都使运行电机从慢速启动而平稳地过渡到快速运行。

电动葫芦使用说明书

电动葫芦使用说明书

一、型号、用途和适应范围本系列电动葫芦是在CD1型电动葫芦的基础上改进设计的轻小型起重设备,有 CD和MD种型号。

CD型0.5t-5t电动葫芦起升速度(8m/min);MD型0.5t-5t 起升速度(8m/min)和(0.8 m/min),CD型10t 起升速度 (7 m/min);MD型10t起升速度 (7 m/min)和(0.7 m/min),CD104型16(20)t 起升速度 (3.5 m/min);MD104型16(20)t起升速度 (3.5 m/min)和(0.35 m/min)。

(二)用途CD和MD电动葫芦( 以下简称葫芦)用于安装在架空工字钢轨道(直线、曲线)上或固定在构架上,吊运各种重物。

常与电动单梁、电动双梁桥式、葫芦门式起重机等配套。

广泛使用于工厂、矿山、铁路、码头、仓库及服务性行业。

是一种能适应多种工况使用的起重设备,它尤能胜任下列工作:1、用于公共设施、建筑起吊搬运……2、用于机械加工工厂,设备安装、机床上零部件的装卸,成品的搬运……3、用于流水线生产……4、用作简单的升降设备,搬运物品、提升货物……(三)适应范围CD、MD 型电动葫芦是一般用途的钢丝绳式电动葫芦,基准工作级别M3,接电持续率为25%,每小时的等效起动次数不超过120次。

葫芦主电路的额定电压为交流380伏,额定频率为50赫。

葫芦的工作环境温度为–25℃~+40℃。

葫芦不适应于充满腐蚀性气体或相对湿度大于85%的场所,不能代替防爆葫芦,不宜吊运熔化金属或有毒、易燃易爆物品。

二、结构原理本电动葫芦由锥形转子电动机、减速器、卷筒装置、联轴器、导绳器、吊钩装置、电动小车、驱动装置和电器等部件组成。

各部件在结构上可以相对独立,维修调整方便。

1、ZD 1型三相交流锥形转子电动机为本电动葫芦起升的原动力,ZDY1型三相交流锥形转子电动机为电动小车的原动力,其转子、定子均为锥形结构。

本系列电动机为断续额定工作方式,负荷持续率为25%,每小时等效起动次数为120次。

  1. 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
  2. 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
  3. 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。

德马格
起重机械有限公司DCS-PRO环链电动葫芦检测证书共2页识别号:
235 309 44版本:0104第1页分类号:787 4115
XB检测符合出厂证明
2."1DIN EN 10204标准
生产商:
德马格起重机械有限公司
订货方:
hisINDUSTRIEHANDLING订单号:550901
客户号:
C8."064
设备型号:
DCS-PRO 2-250 1/1 H5 VS16-30
工厂编号:
最大行程:
最小速度:
0."15米/分
电压:380-480V50/60Hz/cs链条数:1/1安全工作负荷:0."25吨
防护等级:
IP55精行程:16米/分
额定速度:16米/分部分负载最大速度:30米/分检测电压:400V50/60Hz
控制器
以95%的额定电压和25%的过载测试德马格电动葫芦DCS-PRO,无任何异常,防滑离合器正常运转。

电机工厂检测证书
电机型号:
ZNK 71 B 43相鼠笼型异步电动机
功率因数:
0."5接通时间:60转数(1分钟):2480是否连接:
是频率:50/60功率(kW):
0."73电压(V):380-480电流(A):
3."1最高环境温度(℃):40可承受绕组温度(K):105绝缘等级:
F绝缘电阻定子:
≧1MOhm温度监控:M绝缘强度:
1."2×(2U+1000V)≦30m A约1秒
备注:
德马格
起重机械有限公司DCS-PRO环链电动葫芦检测证书共2页
识别号:
235 309 44版本0104第2页分类号:787 4115
XB起重吊钩检测证书
吊钩类型:
简易吊钩
起重吊钩标识
供应商商标:
PS
起重吊钩检测
最大测试力(k N):
(变形<
0."25%)
材料特性:34CrMo4 EN10083
化学成分在-20℃的性能RelA(
≥)J(≥)MPa
(≥)
强度等级:
V起重吊钩号码:2标准:
DIN15400融化编号:
吊钩最大承受力:
C(≤)Si(≤)MnP(≤)S(≤)Cr(≤)Mo(≤)R me
MPa
0."
370."
400."60-
0."
900."
0350."
0350."90-
1."
200."15-
0."30
实际功率在额定功率范围内
精确性:
所有数据都在允许误差范围之内
起重吊钩无影响使用的表面裂纹和裂痕。

起重链检测证书
商标:
RDC
特性值
偏差尺寸:
4."2×
额定厚度(mm):
4.2
0.05/-
0."2热处理:
正火
承载能力(kg):250重量(kg/m):0."38
节距(mm):
12."2
0.1/-
0."2外周长(mm):
20."6
焊接工艺:
压焊供货长度(m):
5.45宽度(mm):
13."7热处理:
表面淬火回火热处理根据德马格技术标准生产,同时符合FEM
9671,ISO3077-Grade
T,DIN EN 818,part 7
生产测试力(k N):
1
3."8
链条应纵向负载原材料
镍钼特种钢
最小致断力(k N):
22最大伸长量L
0=5t(%)链条表面涂层:10铬蓝DCC-Spezifikation检测结果;无缺陷
备注
检测证书由电脑制作,若无人工签字,也可生效。

日期:
2008年12月10日质量保证部门:2233 Hr.Erstergerling尊敬的顾客:
感谢您选用德马格电动葫芦。

为了方便您的选择和链条组的进一步简化,从
2006年4月起我们将会对现有的几个方面实行新的构建方案。

1.规格标识:
取消DC20标准。

未来将会把DC10和DC20统一称为DC
10。

"两者的区别在于下料的长度。

2.速度方面:
消除V1,V2和VS之间的差异。

V后面的数字直接代表最大和平均提升速度,DCS型号代表额定和最大速度。

3.FEM分级:
与载荷跃变递减相适应。

很抱歉我们现在不能为您提供最新的链条组资料。

请参阅本页后面的新旧模型代码。

感谢您的合作。

安全检验证书
德马格环链电动葫芦DC-Pro,DCS-Pro,DC-Com
德马格手控葫芦DSM-Pro,DCMS-Pro
操作人员必须仔细阅读使用说明
产品型号:
DCS-PRO
生产年份:2008
驱动机构总成2m+/M5+
起重量:
0."25吨
工厂代码:
运行速度
德马格起重机械有限公司
邮政专用信箱67 D-58286
电话
(02335)92-0
传真
(02335)9276
CE认证附在使用说明中。

本款产品属于德马格最新型产品。

本产品的安装,生产和技术规定已经得到权威人士的签字认证。

(通过德国《伤害保险》“电动设备和生产手段”第4章,第5条认证)。

相关文档