模流分析案例

  1. 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
  2. 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
  3. 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。

1.3g
©INCOE® 2010
Summary
Part Details
Since 1958
Hot Runner Systems
©INCOE® 2010
Material Information
Since 1958
Material*
Company: BASF Polystyrol 495 F 8.9g/10min ---08-OCT-02
©INCOE® 2010
Fill Time
Since 1958
Hot Runner Systems
©Iห้องสมุดไป่ตู้COE® 2010
Pressure at VP Switchover
Since 1958
Hot Runner Systems
速度/压力切换时的压力:达到98%的充填体积切换压力为66.70MPa
Manifold:
Drops:
DFQ8
8mm
Gates:
1.2/2.5mm
75g Gate:2.5mm
1.3g
150g Gate:1.2mm
INLET: SPRUE : MF: NOZZLE : Hot Gate:
Ø5mm FD=10mm FD=10mm Ø8mm Ø1.2/2.5mm
由于左边小产品的壁厚比右边大产品的壁 厚薄,所以浇口比右边大产品的浇口大。
The predicted pressure does not include the pressure losses through the machine nozzle and screw conveyance losses. Studies have shown that pressure losses up to 4,000 psi can be expected.
220C
1.116S 98%
*Exact material was not characterized in MoldFlow, therefore a material with similar properties was used. Material accuracy can have significant results on the outcome of the flow analysis. If the exact material is required please provide a .udb file of the material which can be imported into Moldflow . This file can most often be obtained from your material supplier.
66.7MPa
104.9 t
Conclusion
1、通过分析显示,充填基本平衡,无迟滞和短射现像。
2 、注射压力为:66.70Mpa
3、最大锁模力:104.9 t 4、产品流动前沿温度降在合理范围内。
©INCOE® 2010
INCOE Moldflow Disclaimer
Since 1958
Hot Runner Systems
Pressure&Pressure at end of fill
Since 1958
Hot Runner Systems
The predicted pressure does not include the pressure losses through the machine nozzle and screw conveyance losses. Studies have shown that pressure losses up to 4,000 psi can be expected.
INCOE Mold Flow Report
Since 1958
Customer: 精模
Project : 2013129 Rev: A Date: 09-05-2013
Hot Runner Systems
Analysis Type: fill Analyst: Jinlian Liu
INCOE® North America INCOE® Europe INCOE® South America INCOE® Asia www.incoe.com
©INCOE® 2010
Temperature at Flow Front
Since 1958
Hot Runner Systems
©INCOE® 2010
Clamp force : XY Plot
Since 1958
Hot Runner Systems
Note: 最大锁模力是104.9 t。
©INCOE® 2010
It is understood and agreed that by accepting this proposal, it is the responsibility of the customer to interpret and evaluate all results from engineering calculations. Not included in this proposal are stress concentration factors due to manufacturing techniques, residual stresses due to molding and forming, and stresses due to other loadings not included in the proposed analysis. The use of engineering analysis and design tools in the design of injection molds requires engineering judgment and equipment field experience, as well as accurate understanding of manufacturing and operator factors. Engineering calculations are but one factor of many to be considered in the design and manufacture of injection molds. Thus, all decisions regarding the design and manufacture of injection molds and injectionmolded parts are the sole responsibility of the customer. Since the customer is responsible for the decisions effecting the design, manufacture and application of its products, it is understood and agreed that INCOE Corporation and its consultants are not responsible for any losses and/or damages to the customer, its customers, or any other third party resulting directly or indirectly from the use of the engineering work product defined in this proposal. The customer agrees to defend and hold INCOE Corporation and its consultants harmless in any event.
Hot Runner Systems
Trade Name: MFI: Material tested by: Data last updated:
Processing
Mold Temperature: 40C
Melt Temperature:
Injection Time: Pressure at VP Switchover:
©INCOE® 2010
Weld lines
Since 1958
Hot Runner Systems
©INCOE® 2010
Air traps
Since 1958
Hot Runner Systems
©INCOE® 2010
Conclusion &suggestion
Since 1958
Hot Runner Systems
The information and recommendations provided in this report are believed to be accurate and reliable as of the date of its preparation. It however makes no guarantee or warranty as to its accuracy, reliability or completeness. Process values provided are theoretical and will vary in actual molds and under actual molding conditions. Report Prepared by
Case
Drop number
Gate size
Mold Material Temperat temperatu ure(°C) re(°C)
Fill time
Injection pressure
Clamp force
8 series open gate
2
¢1.2&2.5 mm
40
220
1.116S
Summary
Part Details
Since 1958
Part Details
Hot Runner Systems
Part Name: Part weight:
2013129 150g+75g+1.3g*2
Nominal Wall Thickness: ~1.5&2.0mm
Runner Details
©INCOE® 2010
Pressure : XY Plot
Since 1958
Hot Runner Systems
最大注射压力是66.70MPa, 热流道压力损失18.79MPa。
The predicted pressure does not include the pressure losses through the machine nozzle and screw conveyance losses. Studies have shown that pressure losses up to 4,000 psi can be expected.
©INCOE® 2010
Material Information
Since 1958
Hot Runner Systems
*Exact material was not characterized in MoldFlow, therefore a material with similar properties was used. Material accuracy can have significant results on the outcome of the flow analysis. If the exact material is required please provide a .udb file of the material which can be imported into Moldflow . This file can most often be obtained from your material supplier.
©INCOE® 2010
Summary
Since 1958
Hot Runner Systems
Objective: 填充/压力
1、通过分析显示,充填基本平衡,无迟滞和短射现像。 2 、注射压力为:66.70Mpa 3、最大锁模力:104.9 t 4、产品流动前沿温度降在合理范围内。
©INCOE® 2010
相关文档
最新文档