建筑质量管理外文翻译文献

建筑质量管理外文翻译文献
建筑质量管理外文翻译文献

文献信息:

文献标题:Assessment of Total Quality Management in Construction Industry(建筑业全面质量管理评估)

国外作者:K Sathish Raja,Mubeena M

文献出处:《Imperial Journal of Interdisciplinary Research (IJIR)》, 2017,3(2):1850-1856

字数统计:英文1895单词,10348字符;中文3094汉字

外文文献:

Assessment of Total Quality Management

in Construction Industry

Abstract Total Quality Management (TQM) procedure is a current gadget within the area of quality. Lately many corporations have resorted to the software of total high-quality control, that allows you to assessing the extent of fine and to improve it. To be competitive in today’s marketplace, it is critical for construction groups to offer extra constant pleasant and price to their owners/customers. Its cause is to provoke extra teamwork on the jobsite, and to provide higher exceptional paintings. The motive of this paper is to look at the TQM in the construction industry. The have a look at appears at the relationship between the life of TQM coverage and frequency of consumer complaints and participation of personnel in designing exceptional control schemes. A survey of 30 respondents, primarily based on literature review and investigative approach become carried out the use of questionnaires. SPSS statistical device is to be applied for statistics analysis. The issues identified from the records analysis are evaluated and controlled by way of the usage of simplex technique. Eventually, take a look at whether or not the objective of gaining customer pride with the aid of enhancing the best inside the area may be done or not.

1.Introduction

1.1.Objective of the Study

QMS places emphasis on prevention, not correction. The goal which works that is 100% free of errors, free of accidents, and 100% free of waste. The aim of the work is to do things right at the first time, eliminating waste and rework. To gain this, it's miles essential to awareness on “tactics.”A process is a task or a series of tasks. The main objective of this study is to create the quality awareness to the construction company especially small scale industries. Because all the literature and statistics shows that small scale construction industries not that much aware of QMS (Quality Management System). Whenever the Quality Management System is implemented we can easily minimize the wastage of material, cost overrun, wastage of time, etc., Specifically, the aims and objectives of this research project includes, investigate the adoption and implementation of QMS in the construction industry. Determine the major factors that are mostly affecting the quality of construction during the construction particularly in execution phase. To create the quality awareness to the low level construction organisations. To minimize the indirect cost of the project and also reduce the wastage of wastage of materials, time, money, manpower, etc.

1.2.Need of the Study

In different production industries are organising the tqm (general high-quality management) device however in construction enterprise we can not establish even qms (great control system).The cause at the back of is every construction undertaking isunique and satisfactory is ever converting factor i.e. exceptional exchange time to time, region to area.But many common activities in construction project like the concrete work, Block work, plastering, etc. In those common works are affected by some major factors like quality of material, quality of manpower, construction detailing, concrete work, etc. In this work it is very much helpful for find out the major factors and give result with cost of poor quality. Also for creating cost oriented quality awareness to low level construction companies.

2.Quality

2.1.Total Quality Management

Total quality managementis the management technique of an corporation, which concentrates on quality based at the participation of its members and aims at long-term success through satisfaction and benefits to all members of the organization and society. It is the method by which management and employees can become involved in the continuousimprovement of the production of goods and services. It's miles a mixture of exceptional and control equipment aimed at growing enterprise and decreasing loses because of wasteful practices.

2.2.Factors affecting Quality of Construction

2.2.1.Limitation of Time

Some construction works had to be completed within a time limit such as in cases of urgent works. They caned limitation of work planning and they also caused other management problem. Therefore, contractor had to carefully consider this issue. Delays are the major problems that face the construction industryit may cause many poor consequences inclusive of cost overruns, and is of high concern to those who are involved in the construction industry.

2.2.2.Training Policies

Looking into the overall training coverage, the iso 9001 registered businesses have more challenge at the education in their personnel than the nonregistered ones. They now not most effective pay for the route expenses, but also allow them to get hold of schooling in the course of operating hours. For non-registered companies, the organization may additionally reimburse the course prices however employees must attend education periods out of doors of working hours. Furthermore, regular education programmes on technical and pc know- how were normally supplied in lots of organizations. The maximum famous training programme organized by means of iso 9001 registered groups changed into first-rate knowledge.

2.2.

3.Limitation of Weather

Weather became certainly one of several essential barriers as it occasionally cannot be prevented inclusive of flooding, typhoon, and many others. Climate situation seriously affects all rigging operations. Industries such as

marine,construction and others that involve out of doors production thoroughly need to bear in mind climate situations at the same time as planning and executing their operations. Weather situations affect the steadiness, design and overall performance of the shape. The construction enterprise wishes to make be aware of such conditions as most of its operation are performed inside the open and concern to all form of weather.

https://www.360docs.net/doc/c92994396.html,ck of co-ordination among departments

Coordination is very important for project successful. Because co-ordination between the departments is failed that may leads to wrong execution or may affect the sequence of work. For example consider the MEP (Mechanical Electrical Plumbing) department not properly co-ordinate with execution team, now execution team done the plastering work before plumbing works are not done due to lack of coordination. Here definitely rework required so automatically quality is misplaced.

2.2.5.Limitation of Construction Methodology

Construction works in some areas could not be performed by regular method because there were buildings around construction site, so the contractor had to find new methods that were suitable to construct and sometimes used specialist engineer when some construction works were in step of construction. Poor construction methods is responsible for the failure of the buildings and structure. It is caused due to negligence and inadequate quality control at work site.

3.Poor Quality Of Construction Work

Quality is the biggest risk in construction. Poor quality will produce unreliable output. Also improper quality may result in building collapse and hence people may die. Actually it is directly related to the cost and length of time for a project. Errors on construction sites occur frequently and can be costly for the contractors and owners of constructed facilities. In fact, 6-15% of the construction cost is found to be wasted due to rework that occurs with improper quality management. Therefore, thorough inspection of construction sites is needed and that needs to be improved in identifying defects in industry.

3.1.Impact of poor quality

Poor quality problems can occur at any stage of data warehousing either in the initial phase or at any other phase of data movement. It is not only the responsibility of users alone to check for the quality data.Behavour of the user who deals with the data is considered a significant factor that can increase the problem. typing mistakes , most common source of data inaccuracy.

3.1.1.Man

One of the main factors that affect the quality in construction includes man . The lack of training, lack of motivation , shortage of people, unqualified personnel and the shortcuts taken up by the workman may reduce the quality of work.

3.1.2.Material

The grading of the materials may vary the quality of work. The use of low grade material results in poor quality. Good standardisation of materials challenges the construction industry. If the specification of the material is poor then cases of rework and dissatisfaction may arrive.

3.1.3.Management

A great control allows in attaining organization goals. It arranges the elements of manufacturing, assembles and organizes the assets, integrates the sources in effective way to reap dreams. it directs institution efforts toward success of pre decided desires.

A very good control will provide ok vision, task, fee machine, process knowledge and proper selection making.

3.2.Methods to Improve Quality

Quality improvement is an important aspect of quality management. There are various methods used for quality improvement, each with its own distinctive role in the implementation of the process as an entire. They're:

3.2.1.Product Improvement

It is one of the main method used in quality improvement. The idea behind this is that the more products are improved, the better they will sell. As time evolves, so do important aspects of customer satisfaction. Customers expect the necessary changes to be made and will keep making purchases from a particular company if improvements

are thus made to products that enable them to be equipped with the latest features and elements that will help them continue to sell. Here, every aspect of the business is included and proper attention paid to the finestof details to ensure success.

3.2.2.People based Improvement Methods

This method includes everyone from managers down to the customers. Managers are there to guide employees. Products to those implemented to improve overall customer satisfaction. One of the improvement methods often used for utilizing various new processes is training. Both managers and their employees receive training on a regular basis to ensure the latest techniques are used in the development of products and implementation of services. Everyone must work together in order for it to be truly successful and for the organisation to thrive.

4.Results and Discussion

In this section the data are analyzed using the SPSS software and discussions were done based on the questionnaire survey. The objective of conducting the analysis is to do things right at the first time, eliminating waste and rework. To acquire this, it is important to focus on “processes” recognized from the literature review and ranking them in keeping with their have an effect on in construction challenge.The factors identified are:

(1)Lack of importance of TQM awareness from governmental departments.

(2)Some bad rumors inside and outside effect work.

(3)Employees and middle managers express their dissatisfaction by delaying or neglecting to do something.

(4)High employee absenteeism.

(5)Lack of supplier involvement in improvement.

5.Conclusion

The result of this thesis will reveal the principle factors which affect the construction high-quality and also boom in fee of production because of first-rate illness. This look at will create the first-class management consciousness to all degree

production corporations particularly small scale businesses. From this thesis we get the major elements and problems which affects the development excellent and that create a hazard for find out the remedial measure. This thesis is useful for minimizing the material wastage, workmanship wastage, time wastage and indirect value and increases the patron pleasure and employer recognition.

The changing way of life and policy of schooling plan, information acquisition method and distribution of duties are the key factors to the achievement oftqm implementation in creation corporations. It is was hoping that this take a look at has delivered colossal contributions to highlight the shortages and weak spot within the control practices in creation industry.

中文译文:

建筑业全面质量管理评估

摘要全面质量管理(TQM)程序是目前质量领域内的一个小工具。最近许多公司都采用了全面质量控制的软件,这使得能够评估罚款的程度并加以改进。为了在当今市场上具有竞争力,建筑集团必须为业主/客户提供更多的舒适和更低的价格。其原因是在工作场所激发更多的团队合作,并提供更高超的建筑作品。本文的目的是研究建筑业的全面质量管理,探讨一下全面质量管理的覆盖面和消费者投诉频率,以及参与设计异常控制方案的人员之间的关系。基于文献综述和调查方法,我们针对30名受访者进行了一项问卷调查。SPSS统计软件将用于统计分析。通过单纯形法的应用,对记录分析中发现的问题进行了评估和控制。最后,看看是否能在这一领域内达到提高客户满意度的目标,是否能做到最好。

1.简介

1.1.研究目的

质量管理体系强调预防,而不是纠正。其目标是零失误,无事故,零浪费。目的是第一时间做正确的事,避免浪费和返工。要做到这一点,对“战术”的认

识是必不可少的。流程是一项任务或一系列任务。本研究的主要目标是为建筑企业特别是小规模的企业创造质量意识。因为所有的文献和统计数据都表明,小规模的建筑企业对QMS(质量管理体系)不甚了解。只要实施质量管理体系,我们就可以很容易地减少材料损耗、成本超支、时间浪费等。具体来说,本研究的目的和目标包括,调查建筑行业质量管理体系的采用和实施情况。确定施工过程中影响施工质量的主要因素,特别是在施工阶段。为低层建筑组织创造质量意识。尽量减少工程的间接成本,同时减少材料、时间、金钱、人力等浪费。

1.2.研究需求

在不同的生产行业,都在组织全面质量管理(通用的高质量管理)设计,然而,在建筑企业,我们甚至不能建立质量管理体系(大控制系统)。其背后的原因是每一个建筑事业都是独一无二的,令人满意的是不断转换的因素, 即特殊的交换时间、区域面积。但是在建筑工程中有很多共同的活动,比如混凝土工程、砌块、抹灰等。这些共同的活动受到材料质量、人力素质、施工细节、混凝土工程等主要因素的影响。本研究非常有助于找出其中的主要因素,以及给出低质量成本造成的结果,也为低水平的建筑公司创造了成本导向的质量意识。

2.质量

2.1.全面质量管理

全面质量管理是一种企业的管理技术,它以其成员的参与为基础,以质量为目标,通过使组织和社会的所有成员得到满意和效益来获得长期成功。它是一种管理层和员工都可以参与到生产和服务的持续改进中的方法。这是特殊和控制设计的混合体,旨在扩大企业,并减少由于浪费而造成的损失。

2.2.影响建筑工程质量的因素

2.2.1.时间的限制

一些建筑工程如紧急工程必须在限期内完成。它们使工作计划受到限制,也造成了其他的管理问题。所以承包商不得不认真考虑这个问题。延误是建筑行业面临的主要问题,它可能会造成包括成本超支在内的诸多不良后果,是从事建筑行业人员高度关注的问题。

2.2.2.培训政策

纵观整体培训覆盖范围,ISO 9001注册企业在人员教育方面比非注册企业面临更大的挑战。他们不仅支付大部分的路费支出,而且还让员工在工作期间内获得学校教育。对于非注册公司,组织可以报销课程费用,但员工必须在工作之外的时间参加教育。此外,通常许多组织都提供关于技术和电脑知识的常规教育课程。通过ISO 9001注册组织举办的最著名的培训计划获得最先进的知识。

2.2.

3.天气的限制

天气成为必然的障碍之一,因为它有时是无法预防的,包括洪水、台风等。气候状况严重影响到所有的索具作业。包括海洋、建筑等在内的涉及户外生产的行业在规划和执行业务的同时,需要牢记气候条件。天气状况会影响建筑物形状的稳定性、设计和整体性能。施工企业要注意这样的情况,因为大部分作业都是在露天进行,涉及到各种形式的天气。

2.2.4.各部门之间缺乏协调

协调对项目的成功非常重要。因为各部门之间的协调失败,可能会导致执行错误或影响工作顺序。例如,考虑到机电管道部门与执行小组没有妥善协调,现在执行小组由于缺乏协调,在管道工程未完成之前就进行了抹灰工作。这里肯定需要返工,所以自动质量是错位的。

2.2.5.施工方法的限制

由于建筑工地周围有建筑物,部分地区的建筑工程不能按常规方法进行,所以当一些建筑工程处于施工阶段时,承包商不得不寻找适合施工的新方法,有时也要聘用专业工程师。施工方法不善是造成建筑物和结构失效的主要原因。这是由于工作现场的疏忽和质量控制不足造成的。

3.建筑工程质量差

质量是建设中最大的风险。质量差会产生不可靠的产出。质量不合格也可能导致建筑物倒塌,因此可能造成人员死亡。实际上,这与项目的成本和时间长短直接相关。施工现场的错误频繁发生,对建造设施的承包商和业主来说代价昂贵。事实上,由于质量管理不当,造成的返工浪费了6-15%的建设成本。因此,需要对施工现场进行全面的检查,在识别工业缺陷方面还有待进一步完善。

3.1.质量差的原因

在数据仓库的任何阶段,无论是在初始阶段还是在数据移动的其他阶段,都可能出现质量问题。检查质量数据不仅仅是用户的责任。处理数据的用户行为被认为是增加问题的一个重要因素。输入错误,是最常见的不准确数据来源。

3.1.1.人力

影响建筑质量的主要因素之一就是人。缺乏培训,缺乏动力,缺乏人才,不合格的人员和工人采取的捷径可能会降低工作质量。

3.1.2.材料

材料的分级可能会影响建筑质量。低等级材料的使用导致质量低下。材料的标准化对建筑行业构成了挑战。如果材料规格不好,那么返工和不满意的情况就会出现。

3.1.3.管理

一个强大的管理可以实现组织目标。它以制造、组装和组织资产为要素,以有效的方式整合资源,实现目标。它指导组织努力实现预先规划的愿景。一个良好的管理将提供确定的愿景、任务、收费机、工艺知识和进行适当的选择。

3.2.提高质量的方法

质量改进是质量管理的一个重要方面。质量改进有各种各样的方法,在整个过程的实施中各有其独特的作用。它们是:

3.2.1.产品改进

这是质量改进的主要方法之一。其背后的理念是,越多的产品得到改善,它们就会卖得越好。随着时间的推移,客户满意度的重要方面也在不断变化。客户期望做出必要的改进,如果对产品的改进能够使他们具备最新的特性和元素,并帮助他们继续销售,他们将继续从一家特定的公司进行采购。在这里,业务的每一个方面都被包括在内,并适当地关注细节,以确保成功。

3.2.2.以人为本的改进方法

这种方法包括从管理层到客户的每个人。管理层在那里指导员工。产品的实施,提高了客户的整体满意度。常用于各种新工艺的改进方法之一是培训。管理层及其员工均定期接受培训,以确保产品开发和服务实施方面采用了最新的技术。每个人都必须共同努力,才能真正取得成功,并使组织蓬勃发展。

4.结果与讨论

采用SPSS软件对数据进行分析,并在问卷调查的基础上进行了讨论。进行分析的目的是在第一时间做正确的事情,避免浪费和返工。要做到这一点,重要的是要从文献综述中认识到“过程”,并将其按照对建筑工程的挑战的影响程度进行排序。确定的因素是:

(1)政府部门对全面质量管理的重要性缺乏意识。

(2)一些内部和外部的坏消息影响工作。

(3)员工和中层管理人员通过拖延或忽视做某事来表达他们的不满。

(4)员工缺勤率高。

(5)缺乏供应商参与改进。

5.结论

本文的研究结果揭示了影响建筑质量的主要因素,以及由于先进顽疾而导致的生产费用上涨。这将给所有的生产型企业,尤其是小型企业创造一流的管理意识。本文从影响发展优势的主要因素和问题入手,并为造成的危害找出补救措施。本文有助于减少材料损耗、工艺损耗、时间损耗和间接成本,增加客户的愉悦感和雇主认可度。

生活方式的改变、学校教育政策的制定、信息的获取方式和职责的分配是创建企业全面实施全面责任管理的关键因素。我们希望这一研究能够为突出创意产业控制实践中的不足和薄弱环节做出了巨大贡献。

土木工程类专业英文文献及翻译

PA VEMENT PROBLEMS CAUSED BY COLLAPSIBLE SUBGRADES By Sandra L. Houston,1 Associate Member, ASCE (Reviewed by the Highway Division) ABSTRACT: Problem subgrade materials consisting of collapsible soils are com- mon in arid environments, which have climatic conditions and depositional and weathering processes favorable to their formation. Included herein is a discussion of predictive techniques that use commonly available laboratory equipment and testing methods for obtaining reliable estimates of the volume change for these problem soils. A method for predicting relevant stresses and corresponding collapse strains for typical pavement subgrades is presented. Relatively simple methods of evaluating potential volume change, based on results of familiar laboratory tests, are used. INTRODUCTION When a soil is given free access to water, it may decrease in volume, increase in volume, or do nothing. A soil that increases in volume is called a swelling or expansive soil, and a soil that decreases in volume is called a collapsible soil. The amount of volume change that occurs depends on the soil type and structure, the initial soil density, the imposed stress state, and the degree and extent of wetting. Subgrade materials comprised of soils that change volume upon wetting have caused distress to highways since the be- ginning of the professional practice and have cost many millions of dollars in roadway repairs. The prediction of the volume changes that may occur in the field is the first step in making an economic decision for dealing with these problem subgrade materials. Each project will have different design considerations, economic con- straints, and risk factors that will have to be taken into account. However, with a reliable method for making volume change predictions, the best design relative to the subgrade soils becomes a matter of economic comparison, and a much more rational design approach may be made. For example, typical techniques for dealing with expansive clays include: (1) In situ treatments with substances such as lime, cement, or fly-ash; (2) seepage barriers and/ or drainage systems; or (3) a computing of the serviceability loss and a mod- ification of the design to "accept" the anticipated expansion. In order to make the most economical decision, the amount of volume change (especially non- uniform volume change) must be accurately estimated, and the degree of road roughness evaluated from these data. Similarly, alternative design techniques are available for any roadway problem. The emphasis here will be placed on presenting economical and simple methods for: (1) Determining whether the subgrade materials are collapsible; and (2) estimating the amount of volume change that is likely to occur in the 'Asst. Prof., Ctr. for Advanced Res. in Transp., Arizona State Univ., Tempe, AZ 85287. Note. Discussion open until April 1, 1989. To extend the closing date one month,

土木工程外文翻译

转型衰退时期的土木工程研究 Sergios Lambropoulosa[1], John-Paris Pantouvakisb, Marina Marinellic 摘要 最近的全球经济和金融危机导致许多国家的经济陷入衰退,特别是在欧盟的周边。这些国家目前面临的民用建筑基础设施的公共投资和私人投资显著收缩,导致在民事特别是在民用建筑方向的失业。因此,在所有国家在经济衰退的专业发展对于土木工程应届毕业生来说是努力和资历的不相称的研究,因为他们很少有机会在实践中积累经验和知识,这些逐渐成为过时的经验和知识。在这种情况下,对于技术性大学在国家经济衰退的计划和实施的土木工程研究大纲的一个实质性的改革势在必行。目的是使毕业生拓宽他们的专业活动的范围,提高他们的就业能力。 在本文中,提出了土木工程研究课程的不断扩大,特别是在发展的光毕业生的潜在的项目,计划和投资组合管理。在这个方向上,一个全面的文献回顾,包括ASCE体为第二十一世纪,IPMA的能力的基础知识,建议在其他:显著增加所提供的模块和项目管理在战略管理中添加新的模块,领导行为,配送管理,组织和环境等;提供足够的专业训练五年的大学的研究;并由专业机构促进应届大学生认证。建议通过改革教学大纲为土木工程研究目前由国家技术提供了例证雅典大学。 1引言 土木工程研究(CES)蓬勃发展,是在第二次世界大战后。土木工程师的出现最初是由重建被摧毁的巨大需求所致,目的是更多和更好的社会追求。但是很快,这种演变一个长期的趋势,因为政府为了努力实现经济发展,采取了全世界的凯恩斯主义的理论,即公共基础设施投资作为动力。首先积极的结果导致公民为了更好的生活条件(住房,旅游等)和增加私人投资基础设施而创造机会。这些现象再国家的发展中尤为为明显。虽然前景并不明朗(例如,世界石油危机在70年代),在80年代领先的国家采用新自由主义经济的方法(如里根经济政策),这是最近的金融危机及金融危机造成的后果(即收缩的基础设施投资,在技术部门的高失业率),消除发展前途无限的误区。 技术教育的大学所认可的大量研究土木工程部。旧学校拓展专业并且新的学校建成,并招收许多学生。由于高的职业声望,薪酬,吸引高质量的学校的学生。在工程量的增加和科学技术的发展,导致到极强的专业性,无论是在研究还是工作当中。结构工程师,液压工程师,交通工程师等,都属于土木工程。试图在不同的国家采用专业性的权利,不同的解决方案,,从一个统一的大学学历和广泛的专业化的一般职业许可证。这个问题在许多其他行业成为关键。国际专业协会的专家和机构所确定的国家性检查机构,经过考试后,他们证明不仅是行业的新来者,而且专家通过时间来确定进展情况。尽管在很多情况下,这些证书虽然没有国家接受,他们赞赏和公认的世界。 在试图改革大学研究(不仅在土木工程)更接近市场需求的过程中,欧盟确定了1999博洛尼亚宣言,它引入了一个二能级系统。第一级度(例如,一个三年的学士)是进入

旅游服务贸易外文翻译文献

旅游服务贸易外文翻译文献(文档含英文原文和中文翻译)

旅游服务贸易的国际竞争力:罗马尼亚的案例 引言 旅游业是唯一的可以为任何发展水平的国家提供贸易机会的服务活动。然而,它也是一个很大程度因为国家的能力和在全球经济中的表现而又有明确的利益分配不均行业,而这又需要提高自己的竞争力。 自20世纪90年代初,罗马尼亚旅游业经历了出口量,生长速率和结构的重大变化。这些不同的波动都影响了罗马尼亚在国际旅游市场上相对的竞争地位并引起了其旅游贸易平衡的变化。同时,新的和更多的错杂的欧式建筑,引起了罗马尼亚的区域旅游竞争力的显著变化。 在此背景下,本文试图提出一个框架,以竞争力和旅游贸易表现之间的关系为重点,来评估罗马尼亚的旅游服务贸易的国际竞争力。 一、国际竞争力视角:国际竞争力之与国际旅游业的相关性 国际竞争力的概念,尽管有争议,难以捉摸,但现在已经得到认可,并继续吸引世界各地的学者和决策者的关注。 到目前为止,为提高国际竞争力已采取措施,都被认为是在经济层面进行的(加瑞利,2003)通常是指一个国家生产的商品和服务,以满足国际市场的考验,并同时保持和增加公民的收入的能力(欧洲委员会,2007)。 由于竞争力最终取决于一国企业在国内和国际的市场成功,所以对竞争力的注意力都集中在企业层面的竞争力上(波特,1990),对于此的普遍理解是指“……该公司保持,并更好的是,扩大其全球市场份额,增加和扩大利润的能力” (克拉克和盖,1998, 经济合作与发展组织,1993)。 因此,虽然广泛流传但是国际竞争力作为与国家经济和其国际贸易相关

的理论基础已经不太在学术文献进行分析。因此,一个国家国际竞争力的性质,效益和局限性仍然含糊不清(科尔德威尔,2000,克鲁格曼,1994, 1996)。 国际竞争力,是指一个国家在货物和服务贸易方面巩固和保持贸易优势相对于世界其他地区的贸易优势。 每当一个国家的经济福利通过贸易流量的增加,或通过从初始平衡状态的贸易条件的改变而增加,他的国际竞争力都会得到提高(科尔德威尔,2000)。 贸易理论表示,经济福利依赖于一个国家有比较优势的货物和服务的生产。这实际上意味着当生产符合一国的比较优势的情况时国际竞争力能得到保障。如果一国能在国际上表现良好并在出口市场竞争成功,这可能就是他们健全的国际竞争力的标志。 因此,在国际上,竞争力定义为一个经济体能够吸引其出口需求和投资供给需求的能力和在所有社会规范内提升公民生活水平的能力。这反过来又取决于宏观和微观经济政策,影响生产的经济生产率要素和经营成本的法规和制度。 一个可用的文献回顾和实证证据支持国际竞争力可以解释为在一定程度上,一个国家的出口能力这一观点(道乐和沃尔夫,1993, 格博格等. 2004)。还有就是,事实上,是出口表现和国际竞争力之间的循环关系。出口是国际竞争力的第一衡量指标。出口情况的改善会导致了一个国家的竞争力提升。这种效果是一个企业的技能,知识,创新和运用新技术并能够在一个成功的商业方式中利用技术机会等的结果。 另一方面,为了在竞争激烈的全球市场努力成功实现出口,一个国家被迫提高竞争力。更具竞争力的国家,它的经济更强大。因此,它更有能力在全球市场竞争,以吸引具有较高的知识,技能,水平人们去购买新技术等,

酒店服务质量管理外文文献翻译

文献出处:Borkar S, Koranne S. Study of Service Quality Management in Hotel Industry [J]. Pacific Business Review International, 2014, 6(9): 21-25. 原文 Study of Service Quality Management in Hotel Industry Borkar; Sameer Abstract It is an attempt to understand the role of quality improvement process in hospitality industry and effectiveness in making it sustainable business enterprise. It is a survey of the presently adopted quality management tools which are making the hotels operations better focused and reliable and meet the customer expectations. Descriptive research design is used to know the parameters of service quality management in hospitality industry. Exploratory research design is undertaken to dig out the service quality management practices and its effectiveness. Data analysis is done and presented; hypothesis is tested against the collected data. Since the industry continuously tries to improve upon their services to meet the levels of customer satisfaction; Study presents tools for continuous improvement process and how it benefits all the stake holders. It can be inferred from the study that the hotel implement continuous improvement process and quality management tools to remain competitive in the market. The study involves hotels of highly competitive market with limited number of respondents. This limits the study to hotel industry and has scope of including other hospitality service providers as well. Keywords:Customer Satisfaction, Perception, Performance Measurement, Continuous, Improvement Process. Introduction It has brought paradigm shifts in the operations of hospitality industry. The overall perspective of the industry is changed due to introduction of new techniques

土木工程岩土类毕业设计外文翻译

姓名: 学号: 10447425 X X 大学 毕业设计(论文)外文翻译 (2014届) 外文题目Developments in excavation bracing systems 译文题目开挖工程支撑体系的发展 外文出处Tunnelling and Underground Space Technology 31 (2012) 107–116 学生XXX 学院XXXX 专业班级XXXXX 校内指导教师XXX 专业技术职务XXXXX 校外指导老师专业技术职务 二○一三年十二月

开挖工程支撑体系的发展 1.引言 几乎所有土木工程建设项目(如建筑物,道路,隧道,桥梁,污水处理厂,管道,下水道)都涉及泥土挖掘的一些工程量。往往由于由相邻的结构,特性线,或使用权空间的限制,必须要一个土地固定系统,以允许土壤被挖掘到所需的深度。历史上,许多挖掘支撑系统已经开发出来。其中,现在比较常见的几种方法是:板桩,钻孔桩墙,泥浆墙。 土地固定系统的选择是由技术性能要求和施工可行性(例如手段,方法)决定的,包括执行的可靠性,而成本考虑了这些之后,其他问题也得到解决。通常环境后果(用于处理废泥浆和钻井液如监管要求)也非常被关注(邱阳、1998)。 土地固定系统通常是建设项目的较大的一个组成部分。如果不能按时完成项目,将极大地影响总成本。通常首先建造支撑,在许多情况下,临时支撑系统是用于支持在挖掘以允许进行不断施工,直到永久系统被构造。临时系统可以被去除或留在原处。 打桩时,因撞击或振动它们可能会被赶入到位。在一般情况下,振动是最昂贵的方法,但只适合于松散颗粒材料,土壤中具有较高电阻(例如,通过鹅卵石)的不能使用。采用打入桩系统通常是中间的成本和适合于软沉积物(包括粘性和非粘性),只要该矿床是免费的鹅卵石或更大的岩石。 通常,垂直元素(例如桩)的前安装挖掘工程和水平元件(如内部支撑或绑回)被安装为挖掘工程的进行下去,从而限制了跨距长度,以便减少在垂直开发弯矩元素。在填充情况下,桩可先设置,从在斜坡的底部其嵌入悬挑起来,安装作为填充进步水平元素(如搭背或土钉)。如果滞后是用来保持垂直元素之间的土壤中,它被安装为挖掘工程的进行下去,或之前以填补位置。 吉尔- 马丁等人(2010)提供了一个数值计算程序,以获取圆形桩承受轴向载荷和统一标志(如悬臂桩)的单轴弯矩的最佳纵筋。他们开发的两种优化流程:用一个或两个直径为纵向钢筋。优化增强模式允许大量减少的设计要求钢筋的用量,这些减少纵向钢筋可达到50%相对传统的,均匀分布的加固方案。 加固桩集中纵向钢筋最佳的位置在受拉区。除了节约钢筋,所述非对称加强钢筋图案提高抗弯刚度,通过增加转动惯量的转化部分的时刻。这种增加的刚性可能会在一段时间内增加的变形与蠕变相关的费用。评估相对于传统的非对称加强桩的优点,对称,钢筋桩被服务的条件下全面测试来完成的,这种试验是为了验证结构的可行性和取得的变形的原位测量。 基于现场试验中,用于优化的加强图案的优点浇铸钻出孔(CIDH)在巴塞罗那的

土木工程外文翻译.doc

项目成本控制 一、引言 项目是企业形象的窗口和效益的源泉。随着市场竞争日趋激烈,工程质量、文明施工要求不断提高,材料价格波动起伏,以及其他种种不确定因素的影响,使得项目运作处于较为严峻的环境之中。由此可见项目的成本控制是贯穿在工程建设自招投标阶段直到竣工验收的全过程,它是企业全面成本管理的重要环节,必须在组织和控制措施上给于高度的重视,以期达到提高企业经济效益的目的。 二、概述 工程施工项目成本控制,指在项目成本在成本发生和形成过程中,对生产经营所消耗的人力资源、物资资源和费用开支,进行指导、监督、调节和限制,及时预防、发现和纠正偏差从而把各项费用控制在计划成本的预定目标之内,以达到保证企业生产经营效益的目的。 三、施工企业成本控制原则 施工企业的成本控制是以施工项目成本控制为中心,施工项目成本控制原则是企业成本管理的基础和核心,施工企业项目经理部在对项目施工过程进行成本控制时,必须遵循以下基本原则。 3.1 成本最低化原则。施工项目成本控制的根本目的,在于通过成本管理的各种手段,促进不断降低施工项目成本,以达到可能实现最低的目标成本的要求。在实行成本最低化原则时,应注意降低成本的可能性和合理的成本最低化。一方面挖掘各种降低成本的能力,使可能性变为现实;另一方面要从实际出发,制定通过主观努力可能达到合理的最低成本水平。 3.2 全面成本控制原则。全面成本管理是全企业、全员和全过程的管理,亦称“三全”管理。项目成本的全员控制有一个系统的实质性内容,包括各部门、各单位的责任网络和班组经济核算等等,应防止成本控制人人有责,人人不管。项目成本的全过程控制要求成本控制工作要随着项目施工进展的各个阶段连续 进行,既不能疏漏,又不能时紧时松,应使施工项目成本自始至终置于有效的控制之下。 3.3 动态控制原则。施工项目是一次性的,成本控制应强调项目的中间控制,即动态控制。因为施工准备阶段的成本控制只是根据施工组织设计的具体内容确

中国服务贸易的国际竞争力探析——文献综述

中国服务贸易的国际竞争力探析 ——文献综述 随着世界经济进入服务经济时代,以产品为基础的竞争向以服务为基础的竞争转变,服务业在维护一国经济和政治利益方面处于重要的战略地位。据WTO发布的数据显示,全球服务贸易总体发展的趋势在不断加强,1980年到2007年间,世界服务贸易出口额从3650亿美元扩大到33000亿美元,27年间增长了8倍,占世界贸易出口的比重从1/7增长到近1/3。在2010年,世界服务贸易达到了36595亿美元,占当年世界贸易总额的1/3。由此可见,服务贸易势必成为全球经济发展的重要组成部分。 服务贸易在全球贸易比重不断增加,世界各国都从国际服务贸易中受益颇丰,此时,对我国服务贸易的竞争力进行研究,分析我国服务贸易发展不足的原因,发掘我国服务贸易的潜在优势以及探究提升我国服务贸易竞争力的策略便具有非常重要的意义。 1.服务贸易及其国际竞争力的定义 《服务贸易总协定》(General Agreements on Trade in Service,GATS,1994年4月15日),其中对服务贸易做出了明确的定义:第一,跨境提供(cross-border supply),即从缔约方境内向任何其他缔约方境内提供服务,这种服务无需人员、物资和资金流动,而是通过现代通讯、邮电、计算机网络实现的视听、金融、信息等服务;第二,境外消费(consumption abroad),即缔约方境内任何向其他缔约方消费者提供服务,如接待外国游客、提供旅游服务,为国外病人提供医疗服务,接受外国留学生等;第三,商业存在(commercial

Presence),即一缔约方在其他任何缔约方境内通过提供服务的商业存在而提供服务,如外国公司在中国开办银行、商店,设立会计、律师事务所等;第四,自然人流动(movement of natural persons),即一缔约方的自然人在其他任何缔约方境内提供服务,如一国的医生、教授、艺术家到另一国从事个体服务。 服务贸易国际竞争力是指一个国家或地区在经济全球化趋势下,以提高国民收入和生活水平为目的,服务业参与国际市场竞争,创造增加值并保持良好的国际收支平衡的能力。在此,不仅强调出口能力,更重要的是保持国际收支的平衡。 2.国外学者相关研究 2.1对于国际服务贸易竞争力理论方面的研究 迈克尔·波特(Michael E·Porter),1990年提出了国家竞争优势理论,将竞争力与产业结合起来进行研究。在《国家竞争优势》一书中,他提出了著名的“产业国际竞争力国家钻石模型”,用一个形似钻石的菱形图表示出国家竞争力的四大要素(生产要素;需求条件;相关与支持性产业企业战略、结构、同业竞争)和两个辅助因素(机会和政府)。后来,有人将这一理论引入国际服务贸易领域,发现该理论不仅能较为全面和系统地对服务贸易格局进行解释与总结,而且对一国服务贸易的未来发展有一定的前瞻性和预见性,因此能更好地适应国际服务贸易的发展要求。 对于国际贸易比较优势方面,联合国贸发会国际贸易高级专家Murry Gibbs和Michiko Hayashi作了一个较为全面的总结,认为自然资源要素禀赋固然是决定一国服务贸易比较优势的一个方面,但一国服务贸易的比较优势还要取决于该国的经济发展水平和发展类型,以

供应商质量管理文献翻译(外文翻译-中英对照)

互利共赢的供应商质量控制 前言 近年来,随着对供应链的重视,供应商管理正逐渐成为企业和学术界的关注对象,IS09000族标准以及QS 9000标准都对供应商的管理提出了相应的要求,与供应商管理有关的研究成果正逐渐增多,一些软件巨头也推出了供应商关系管理的软件,但是在这些研究成果和应用软件中,涉及到的供应商质量控制的内容只是一些最基本的要求,而供应商质量控制恰恰是供应商管理的最基本、最重要的内容。另一方而,质量管理界对质量控制的研究取得了大量的成果,遗憾的是这些成果大多依然局限于企业的内部控制,仅仅研究从企业内部各环节如何改善产品的质量,而基于供应链的角度来研究质量控制的成果尚不多见。因此,系统地研究经济全球化形势下供应商质量控制的理论与方法,将有助于推动我国企业产品质量的快速提高和供应链竞争优势的形成与巩固。 1、质量与企业共存 质量一直是一个随着时代的变化而不断变化的概念,人们对质量的认识也往往因关注点不同而有所不同。如,早在1908年,通用汽车公司的工程师们在皇家汽车俱乐部会员们的面前拆解了3辆凯迪拉克轿车,并把这些零件混在一起,而后从中选择零件重新组装成车,然后驾车绝尘而去。这令在场的会员极为震惊,认为凯迪拉克车质量之高令人惊叹。显然在当时,汽车零件具有互换性是一种了不起的质量特性,这也是福特公司的N型车和T型车取得辉煌成功的重要原因.时至今日,即使农用三轮车的零部件也具有极高的互换性,零部件的标准化和互换性已经是理所当然的事情,不再是吸引顾客的重要质量特性.可见质量的内涵是不断变化的.那么究竟什么是质量呢? (1)市场竟争就是企业间对“顾客”的争夺,在日益激烈的“顾客"争夺战中,质量、价格、交付(交付日期、方式和手段)和服务是企业常用的四个法宝,其中质量是根本,离开质量其他三项将变得毫无意义,因此可以说质量己成为市场竞争的焦点.它反映了产品是否能够反映顾客需求、能否满足顾客需求,从面决定了产品的市场前途。有鉴于此,质量己成为一项全球性运动,世界上所有优秀企业无一不把质量作为企业战略的关键内容,从战略的角度来规划质量。 (2)对于企业经营者来说,认识到质量对企业的重要意义只是经营企业的第一步,重要的是如何利用科学的方法来保证产品和服务的质量,使顾客满意,来保证过程和工作的质量来获互利共炭的供应商质量控制得良好的业绩。 众所周知,企业管理是社会生产力发展到一定程度的历史产物,质量管理作为企业管理的组成部分,同样也是社会发展的客观要求,特别是顾客处于主导地位的今天,要使顾客满意,就必须有过硬的产品质量和服务质量,这就要求企业积极推行先进的质量管理理论与方法,不断进行质量管理创新. 2、企业与供应商质量控制 随着生产社会化的不断发展,企业的生产活动分工越来越细,专业化程度越来越强,促使生产技术水平越来越高,产品质量得到大幅度改善。通常,某一产品不可能由一个企业从最初的原材料开始加工直至形成顾客最终使用的产品,往往是通过多个企业分工协作来完成.另外,先进生产方式的广泛应用,如准时生产、敏捷制造、零库存等,使企业与供应商的关系愈加紧密,企业与供应商的关系也由单纯的买卖关系向互利共底的合作关系演变。 ISO 9000族标准自1987年诞生以来受到了世界各国的一致追捧,全球约50多万家企业通过ISO9001质量管理体系认证足以说明这套管理标准在引领国际管理潮流方面的巨大成功。在备受企业欢迎的新版标准ISO9000:2000中,互利的供应商关系被作为八项质量管理原则之一,充分体现了供应商关系管理在企业经营实践中的作用和价值。企业要贯彻这一原则,就必须

土木工程专业外文文献及翻译

( 二 〇 一 二 年 六 月 外文文献及翻译 题 目: About Buiding on the Structure Design 学生姓名: 学 院:土木工程学院 系 别:建筑工程系 专 业:土木工程(建筑工程方向) 班 级:土木08-4班 指导教师:

英文原文: Building construction concrete crack of prevention and processing Abstract The crack problem of concrete is a widespread existence but again difficult in solve of engineering actual problem, this text carried on a study analysis to a little bit familiar crack problem in the concrete engineering, and aim at concrete the circumstance put forward some prevention, processing measure. Keyword:Concrete crack prevention processing Foreword Concrete's ising 1 kind is anticipate by the freestone bone, cement, water and other mixture but formation of the in addition material of quality brittleness not and all material.Because the concrete construction transform with oneself, control etc. a series problem, harden model of in the concrete existence numerous tiny hole, spirit cave and tiny crack, is exactly because these beginning start blemish of existence just make the concrete present one some not and all the characteristic of quality.The tiny crack is a kind of harmless crack and accept concrete heavy, defend Shen and a little bit other use function not a creation to endanger.But after the concrete be subjected to lotus carry, difference in temperature etc. function, tiny crack would continuously of expand with connect, end formation we can see without the

土木工程外文文献翻译

专业资料 学院: 专业:土木工程 姓名: 学号: 外文出处:Structural Systems to resist (用外文写) Lateral loads 附件:1.外文资料翻译译文;2.外文原文。

附件1:外文资料翻译译文 抗侧向荷载的结构体系 常用的结构体系 若已测出荷载量达数千万磅重,那么在高层建筑设计中就没有多少可以进行极其复杂的构思余地了。确实,较好的高层建筑普遍具有构思简单、表现明晰的特点。 这并不是说没有进行宏观构思的余地。实际上,正是因为有了这种宏观的构思,新奇的高层建筑体系才得以发展,可能更重要的是:几年以前才出现的一些新概念在今天的技术中已经变得平常了。 如果忽略一些与建筑材料密切相关的概念不谈,高层建筑里最为常用的结构体系便可分为如下几类: 1.抗弯矩框架。 2.支撑框架,包括偏心支撑框架。 3.剪力墙,包括钢板剪力墙。 4.筒中框架。 5.筒中筒结构。 6.核心交互结构。 7. 框格体系或束筒体系。 特别是由于最近趋向于更复杂的建筑形式,同时也需要增加刚度以抵抗几力和地震力,大多数高层建筑都具有由框架、支撑构架、剪力墙和相关体系相结合而构成的体系。而且,就较高的建筑物而言,大多数都是由交互式构件组成三维陈列。 将这些构件结合起来的方法正是高层建筑设计方法的本质。其结合方式需要在考虑环境、功能和费用后再发展,以便提供促使建筑发展达到新高度的有效结构。这并

不是说富于想象力的结构设计就能够创造出伟大建筑。正相反,有许多例优美的建筑仅得到结构工程师适当的支持就被创造出来了,然而,如果没有天赋甚厚的建筑师的创造力的指导,那么,得以发展的就只能是好的结构,并非是伟大的建筑。无论如何,要想创造出高层建筑真正非凡的设计,两者都需要最好的。 虽然在文献中通常可以见到有关这七种体系的全面性讨论,但是在这里还值得进一步讨论。设计方法的本质贯穿于整个讨论。设计方法的本质贯穿于整个讨论中。 抗弯矩框架 抗弯矩框架也许是低,中高度的建筑中常用的体系,它具有线性水平构件和垂直构件在接头处基本刚接之特点。这种框架用作独立的体系,或者和其他体系结合起来使用,以便提供所需要水平荷载抵抗力。对于较高的高层建筑,可能会发现该本系不宜作为独立体系,这是因为在侧向力的作用下难以调动足够的刚度。 我们可以利用STRESS,STRUDL 或者其他大量合适的计算机程序进行结构分析。所谓的门架法分析或悬臂法分析在当今的技术中无一席之地,由于柱梁节点固有柔性,并且由于初步设计应该力求突出体系的弱点,所以在初析中使用框架的中心距尺寸设计是司空惯的。当然,在设计的后期阶段,实际地评价结点的变形很有必要。 支撑框架 支撑框架实际上刚度比抗弯矩框架强,在高层建筑中也得到更广泛的应用。这种体系以其结点处铰接或则接的线性水平构件、垂直构件和斜撑构件而具特色,它通常与其他体系共同用于较高的建筑,并且作为一种独立的体系用在低、中高度的建筑中。

“我国际服务贸易存在的问题及对策”的文献综述

“我国际服务贸易存在的问题及对策”的文献综述 一、文献资料目录 【1】邓士燕浅谈当前中国服务贸易的现状与问题(期刊论文)-广东财经职业学院院报2007(06) 【2】孔祥荣加快发展我国服务贸易对策及研究2008(04) 【3】胡景岩中国发展服务贸易的战略思考(期刊论文)-国际贸易 【4】余道先中国服务贸易结构域贸易竞争的实证分析2008(10) 【5】肖雨洁我国服务贸易发展的现状与思路研究(期刊论文)-商场现代化2009(06)【6】陈娟服务贸易在我国的发展及存在的问题(期刊论文)-科学时代(上半月)2010(5) 【7】胡琴.HU Kin我国服务贸易发展的现状分析与对策研究(期刊论文)-武汉理工大学学报(信息与管理工程版)2010,32(5) 【8】徐婧.Xu Jing 我国服务贸易发展存在的问题与对策研究(期刊论文)-价值工程2008,27(1) 【9】辛娜我国服务贸易发展中存在的问题及对策研究(期刊论文)-教育教学论坛2010(9) 【10】王美伦浅谈我国服务贸易发展现状与对策(期刊论文)-才智2011(3) 【11】陈文玲.CHENG Wen-ling 推动服务贸易发展的政策选择(期刊论文)-商业研究2009(4) 【12】贾光宇我国服务贸易的现状及竞争力分析(期刊论文)-中国商贸2010(16)【13】孟建国我国服务贸易的现状及发展策略探讨(期刊论文)-商业时代2010(22)【14】杨慧华我国服务贸易发展存在的问题及对策(人文社会科学学刊)-南北桥2010(9)【15】季彬张欣我国服务贸易存在的问题及对策研究(期刊论文)-吉林农业科技学院2010(09) 二,文献综述 由于世界经济全球化和一体化带动了全球服务贸易的迅猛发展和改革开放以来特别是我国加入世贸组织后,服务业在整个国民产业中不断发挥着举足轻重的作用,党和政府高度重视以及服务贸易行业的不懈努力使得我国的服务贸易一直保持着高速增长的趋势。虽然我国的服务贸易现已取得了一些成绩,但是对其产业结构、分配发展方面、管理方面、法律法规方面等还存在着欠缺和不足。 毕业论文确定《我国国际服务贸易存在的问题及对策》这一选题,是希望通过整理和归纳各家所言,对我国国际服务贸易存在的问题进行全面性总结,并针对其存在的问题提出对策。 通过对相关文献资料的学习和分析,我发现绝大多数的学者所持的观点有: ﹙一﹚我国国际服务贸易存在的问题 ⑴我国服务贸易总体结构不合理:我国服务贸易出口仍然主要集中在传统的劳动密集

质量管理文献综述

关于企业质量管理文献综述 摘要:随着新世纪的到来,特别是我国加入WTO后,中国将进一步融入世界经济的主流,质量将成为我国广大企业抓住机遇、迎接严峻挑战的关键。要拓展海外市场,必须靠有竞争力的质量;要保护国内的市场,不再有高关税和政府的过渡保护,也要靠质量的较量。随着科学技术的进步,质量管理的理论和方法有了更大发展。本文综合了质量管理的发展历程,并简要评价,提出看法,以便为企业的质量管理和理论研究提供参考。 关键词:质量管理、管理改进 21世纪是质量的世纪”。随着经济全球化和信息革命的迅猛发展,竞争日益加剧。在“数量”问题已解决的今天,人们将越来越追求和依赖于高质量的产品和服务,而且质量的领域不断拓宽,生活的质量、环境的质量、文化的质量、经济增长的质量更加受到全社会的关注。质量已成为竞争的焦点,不仅关系到企业的生存发展,而且影响到国家经济实力的增强和民族的形象。质量已成为全球经济发展战略的核心问题。 一、质量管理理论的回顾 (一)、质量管理的发展阶段 (1)质量检验阶段(20世纪20-30年代) 生产力迅猛发展,生产过程分工细化、日益复杂,许多美国企业按照泰勒的管理模式,纷纷设立检验部门,使检验与生产分离开来,其最大特点为“事后把关”。(2)统计质量阶段(20世纪40-50年代) 早在20世纪20年代,美国贝尔实验室工程师休哈特就提出“控制与预防缺陷”的概念。主要是利用数理统计原理,预防产生废品并检验产品质量,在方式上由专业质量控制工程师和技术人员承担。但这种方法只是保证生产过程中的产品质量,而不能提高产品本身的质量。 (3)全面质量管理阶段(20世纪60年代至今) 美国的费根堡姆提出,“全面质量是为了能够在最经济的水平上,并考虑到充分满足顾客要求的条件下进行生产和提供服务,将企业各部门研制质量、维持质量和提高质量的活动构成为一体的一种有效体系”。 (二)、质量管理的理论流派 1、事后检验 20世纪,美国工程师泰勒提出“科学管理理论”,1911 年泰勒出版了专

土木工程毕业设计外文翻译最终中英文

7 Rigid-Frame Structures A rigid-frame high-rise structure typically comprises parallel or orthogonally arranged bents consisting of columns and girders with moment resistant joints. Resistance to horizontal loading is provided by the bending resistance of the columns, girders, and joints. The continuity of the frame also contributes to resisting gravity loading, by reducing the moments in the girders. The advantages of a rigid frame are the simplicity and convenience of its rectangular form.Its unobstructed arrangement, clear of bracing members and structural walls, allows freedom internally for the layout and externally for the fenestration. Rig id frames are considered economical for buildings of up to' about 25 stories, above which their drift resistance is costly to control. If, however, a rigid frame is combined with shear walls or cores, the resulting structure is very much stiffer so that its height potential may extend up to 50 stories or more. A flat plate structure is very similar to a rigid frame, but with slabs replacing the girders As with a rigid frame, horizontal and vertical loadings are resisted in a flat plate structure by the flexural continuity between the vertical and horizontal components. As highly redundant structures, rigid frames are designed initially on the basis of approximate analyses, after which more rigorous analyses and checks can be made. The procedure may typically inc lude the following stages: 1. Estimation of gravity load forces in girders and columns by approximate method. 2. Preliminary estimate of member sizes based on gravity load forces with arbitrary increase in sizes to allow for horizontal loading. 3. Approximate allocation of horizontal loading to bents and preliminary analysis of member forces in bents. 4. Check on drift and adjustment of member sizes if necessary. 5. Check on strength of members for worst combination of gravity and horizontal loading, and adjustment of member sizes if necessary. 6. Computer analysis of total structure for more accurate check on member strengths and drift, with further adjustment of sizes where required. This stage may include the second-order P-Delta effects of gravity loading on the member forces and drift.. 7. Detailed design of members and connections.

相关文档
最新文档