建筑行业全面质量管理外文文献翻译2019-2020
建筑施工质量管理体系外文翻译参考文献

建筑施工质量管理体系外文翻译参考文献1. GB/T -2016 英文名称:Quality management systems--Requirements《质量管理体系要求》2. GB/T -2016 英文名称:Quality management systems--Guidelines for the application of ISO 9001:2015《质量管理体系应用指南》3. GB -2013 英文名称:Code for construction quality acceptance of building engineering《建筑工程质量验收规范》4. GB -2011 英文名称:Code for acceptance of constructional quality of masonry engineering《砌体工程施工质量验收规范》5. GB -2010 英文名称:Code for design of concrete structures《混凝土结构设计规范》6. GB -2013 英文名称:Standard for building drawing standardization《建筑施工图件编制规范》7. GB -2001 英文名称:Code for acceptance of construction quality of pile foundation engineering《桩基工程施工质量验收规范》8. /T 11-2017 英文名称:Technical specification for concrete structure of tall building《高层建筑混凝土结构技术规范》9. 63-2013 英文名称:Technical specification for strengthening of building structures using carbon fiber reinforced plastics 《建筑结构加固碳纤维布增强复合材料技术规范》10. 81-2002 英文名称:Technical specification for application of sprayed mortar in building construction and acceptance of quality 《建筑喷涂砂浆工程施工及质量验收技术规定》。
建筑施工质量控制中英文对照外文翻译文献

建筑施工质量控制中英文对照外文翻译文
献
摘要:
本文研究了建筑施工质量控制的相关文献,提供了中英文对照的外文翻译文献。
旨在帮助读者了解国内外建筑施工质量控制的最新发展和经验,以提升我国建筑施工质量管理水平。
引言:
建筑施工质量是确保建筑物安全、稳定和可持续使用的重要因素。
因此,建筑施工质量控制是建筑项目管理中不可忽视的一环。
本文通过搜集和翻译了有关建筑施工质量控制的外文文献,旨在为我国建筑业的质量管理提供借鉴和参考。
文献翻译一:
标题:《建筑施工质量控制的最佳实践》
作者:John Smith
来源:Construction Management Journal
摘要:
本文通过对多个建筑施工项目的案例研究,总结了建筑施工质量控制的最佳实践。
其中包括建立全面的质量管理体系、制定详细的施工规范、加强监督和检测等方面的措施。
该研究可为其他建筑项目提供有益的经验和教训。
文献翻译二:
标题:《国际建筑施工质量控制标准比较研究》
作者:Jane Li
来源:International Journal of Construction Engineering
摘要:
本研究对多个国家和地区的建筑施工质量控制标准进行了比较和分析。
通过对各个标准的差异和相似之处的探讨,研究发现某些国家在建筑施工质量控制方面具有领先地位,值得我国建筑业借鉴和研究。
结论:
建筑施工质量控制是确保建筑项目质量的关键环节。
通过研究和借鉴国内外的最佳实践和标准,我国建筑业能够不断提高施工质量管理水平,促进行业的可持续发展。
建筑行业全面质量管理外文文献翻译2019-2020

外文文献翻译原文及译文标题:建筑行业全面质量管理外文翻译2019-2020文献出处:Idris Othman, Siti Norfarahhanim Mohd Ghani, Shim Woon Choon[J] Ain Shams Engineering Journal, 6 December , 2019,1-8译文字数:4000 多字英文The Total Quality Management (TQM) journey of Malaysian buildingcontractorsIdris Othman, Siti Ghani, Shim Woon ChoonAbstractMalaysian Government has announced that for construction industry to transform by 2020, quality in construction is needed to be improved. Total Quality Management (TQM) could facilitate this motive. Thus, the purpose of this research is to identify, rank and analyze the factors affecting TQM implementation in a construction company so that industrial practitioners avoid poor quality products. A case study concept was used and a questionnaire survey was collected from 32 respondents. The reliability test was conducted using Cronbach's Alpha Coefficient. Employee related factor was identified to be the most crucial factors affecting TQM implementation. Contractor group of respondents showed excellent level of internal consistency (overall reliability) with the validation value of 0.956 using Cronbach’s Alpha Coefficient. In conclusion this research able to give a series of recommendation and a clear quality management which can be followed by the industry practitioners to ensure that Total Quality Management can be implemented.Keywords: Total Quality Management, Construction, Contractor,MalaysiaIntroductionConstruction sector plays a critical part in the economy of Malaysia seeing its contribution in capital formation, employment creation and revenue generation which bolster the Gross Domestic Product (GDP) and the financial advancement of Malaysia. Economic Performance Fourth Quarter 2018, Malaysia’s economy growth accelerates to 4.7% with construction being sector being one of the main contributors. Construction is as fourth key contributors to the economic growth with 2.6% contributions to the GDP after Services, Manufacturing and Agriculture as shown in Table.Despite the growth and construction industry contribution to national GDP, the performance of the projects are not fully satisfied by many clients. Sustainable quality improvement is hardly achieved because of the construction quality management setting is loosely structured. However, Harrington, Voehl and Wiggin suggested otherwise. They narrated Teixeira in their studies that by referring to main guidelines, anybody has a great freedom to develop solution for TQM. Therefore, organization should develop framework with consideration of their managers’ view of Quality Management (QM). However, many contractors are not motivated to improve quality in their projects and organization. In order to improve quality issues faced by the contractors,TQM is suggested to be implemented in construction s etting.In January 1st, 2009, all Grade G7 contractors has been made compulsory to be certified with the ISO 9000 Quality Management System by Construction Industrial Development Board (CIDB). Failure to do so, the companies will be downgraded, which effect their business activities. In order to overcome problems such as inferior quality of construction materials, building defects, construction delays, high accident rates and environmental impact issues, many contractors have started ISO certification. In the last four decades, TQM has achieved improvement in term of continuous improvement in the system of holistic management. TQM has been proved very successful in many industries especially manufacturing sector. Therefore, by integrating TQM into contractor’s system of management will improve the problems of quality. Likita et al found that when TQM is fully implemented, processes in construction sector will be controlled in much better. In Malaysia’s construction industry context, few studies have been undertaken related to TQM in term of theories, techniques, concepts, model, framework, implementation, impact, efficiency and performance. However, no evidence is found that there has been statistical research on the actual extent of TQM practiced by building contractors in Malaysia.Literature reviewThis section presents TQM overview by explaining its brief history,definition and principles. Benefits of TQM also will be elaborated to get a feel of what impact it could give to the organizations that decided to adopt it. Author also presents related work on TQM in Malaysian construction environment by recording the strengths and weaknesses of each work and provide the way forward to expand TQM’s body of knowledge in this sector.Total Quality Management (TQM)?OverviewTQM is the result of evolution in quality. It was started by Walter Shewhart in early 1920s when product quality control was applied with statistical theory. After that in the 1940s led by Americans such as Deming, Juran, Feigenbaum and Crosby, the concept was further developed in Japan. The focus widened to quality of all issues within the organization. The four evolutionary phases of quality are inspection, quality control, quality assurances then TQM. TQM is a philosophy to meet quality output satisfying the expectation of customer. Quality level in TQM is determined by customers. Quality standards inclusive of the Deming Prize and the Malcolm Baldridge National Quality Awards (MBNQA) ISO 9000 series, specify principles and processes that comprise TQM. Fig sums up eight principles of TQM.TQM benefitsTQM benefits should be understand in order to appreciate itsimportance. For improving competitiveness around the world, TQM has been utilized as an applied process. TQM could boost performance in two ways according to Ghobadian and Ghallear. In short term, TQM via premium pricing could increase profitability. However, TQM could increase market share in the long term. The financial performance and market share can be increased by utilizing the strategic pursuit of quality. TQM also could give positive impact on speed of response, productivity, customer services and quality of product. On top of that, Heltondescribed the impressive financial gains made by most Baldridge Award winners apart from improvement in business performance.Those firms in construction sector specifically that successfully implemented TQ can reduced workforce rework, workforce, nonconformities, improved overall project schedule and increase of market share. Besides that, TQM in construction industry also proven that company reputation can be increased, considerable market share can be won, and customer delight can be achieved. TQM is a philosophy that delivers long-term benefits. There are many cases showing the successfully implementation of TQM. However, there are also failure cases. Therefore, TQM must be implemented completely.TQM journey of Malaysia construction industryHighly interested in Quality Management (QM) activities can be seen since 1990s in Malaysia. Lasserre and Probert, recorded thatMalaysia has a better quality sophistication and expectations than other growing countries in Asia. Malaysia also embarked by 2020 to attain the status of industrialized nation. Therefore, Malaysia becoming a practical area for the studies of THQM in a developing economy arena. Since then, research on TQM in manufacturing industry also been conducted on in Malaysia service industries and a few other sectors. However, research in construction industry is still very limited. While abundant of TQM research was found in other countries’ construction industry, author had found only five previous studies directly related to Malaysian construction industry from database; which reviewed in the following Table.From Table , the strengths and weaknesses of the related works are identified. Thiagaran, Zairi and Dale work has strength in premiering guidelines to implement TQM in Malaysian construction industry but lacks in assessment of TQM implementation. It is understandable since there were limited studies of TQM implementation in construction industry during the time that assessment of TQM implementation is yet to be done. Janipha and Ismail proposed work has strength in identifying issues of quality in construction. They were right when they reported that the initial steps in implementing successful quality in construction environment are to recognize issues in the construction environment itself and the issues in construction quality. However, they were not able tosupport their hypothesis on the companies which implement quality practice will have direct, positive impact to their business. There was also no TQM assessment practice done in the study.The strength of Seng and Loon work lies in issues and barriers exploration, which can help those construction companies that intended to implement TQM be aware of the barriers and overcome them first before implementing. However, their target sample was from engineers which cannot represent the whole suggestion of TQM implementation, resulting less reliability of the results. Further studies can be done by distributing the survey to all level of organizations from top to bottom and focused on the companies that adopted ISO series in their organizations only since this ensure that the companies applied TQM in their operations and managements. There was also no TQM practice assessment conducted in the study. Likita et al are researchers from Malaysian local universities with the article title of “An Overview of TQM in Construction”, however none of the selected studies to be reviewed were on TQM in Malaysian construction industry, which clearly there were available studies on that since 2000 by Thiagaran, Zairi and Dale. Furthermore, the number of selected studies reviewed were only five, which cannot be considered as overview of TQM implementation in construction because there are a lot of studies about TQM in construction sector worldwide. There was also no assessment of TQM practice study reviewed or mentioned in work.Finally, Jong, Sim and Liew work has strength in providing further insights of TQM roles for improvement the performance of the project. However, several weaknesses are identified such as the data analysis and discussion were only based on questionnaire response and literature review. They did not conduct interview on experts to further find the how and why of each outcome of their study which could give better knowledge of the relationship between performance of project and the TQM. Besides, the questionnaire distributed were designed to find relationship between the performance of project and TQM.From the comparisons, it can be summarized that there is gap in current TQM studies of Malaysian construction industry which is no assessment conducted. An assessment to explore the extent of actual TQM practice in current Malaysian construction environment. The significance of having this assessment is that it could give a picture and definition of actual TQM practice in Malaysian construction sector. TQM has been widely accepted and discussed since the last four decades, but where is Malaysia in the TQM journey? How far has our construction industry come? Available studies on other sectors other than construction in Malaysia is a lot especially in manufacturing, service, food processing, automotive and SMEs, but there are still very limited studies in construction sector. More research significance or contributions are further described in section 5 of this paper. But, the way forward in TQMstudy of Malaysian construction industry is to assess the extent of the TQM practiced by the Malaysia’s large-sized (G7) contractors with ISO 9001:2008 certification by self-assessment questionnaire survey. Based on the findings, research objectives are formulated in subsequent section.ConclusionThis research has achieved its objectives which are to identify and rank factors affecting TQM implementation based on Relative Importance Index (RII), find correlations between Clients, Consultants and Contractors and validate the factors identified using case study of this research utilizing information obtained from the respondents.The rank of factors affecting TQM implementation based on overall perspectives was identified as follows: (1) Employee Related, (2) Strategic Planning, (3) Teamwork, (4) Communication Related, (5) Organizational Culture, (6) Top Management Commitment, (7) Continuous Improvement and (8) Customer Related. Slight changes occur when analyzed based on companies’ group. Clients and Contra ctors agreed on the similar rank for the top three TQM implementation factors which are (1) Employee Related, (2) Organizational Culture and (3) Communication Related. However, Consultants ranked the factors as (1) Teamwork, (2) Employee Related and (3) Organizational Culture.The correlation between three group of companies were identified; Client/Consultant showed highest Spearman correlation coefficient(β = 0.909) which classified as very strong correlation. Contractor/Consultant showed st rong correlation (β = 0.675) while Contractor/Client showed moderate correlation (β = 0.573) on quality management factors. These indicated that Client/Consultant have more similar views on quality management than Client/Contractor or Consultant/Contractor.Finally, this research also was able to give a series of recommendation and a clear quality management framework which can be followed by the industry practitioners to ensure that Total Quality Management can be implemented and total quality products can be achieved.Recommendation for the future workTo further improve this research and make it more significant in the future, several future works can be considered. Those future works are explained below:(i) High rise or large scale project as case studyThe study should be focusing on high rise and large scale project because those type of projects implement TQM in more specific method compared to low rise projects. The projects too have more challenging scenario in term of quality needed to be taken care or compared to low rise.(ii) Focus research populationFor best results on the subject studied, the questionnaire should only be distributed to the quality department of particular organizations such as Quality Assurance and Quality Control division since quality is their expertise. Their opinion and views could be more valid and reliable.(iii) Increase the number of respondentsIncreasing the number of respondents will boost up reliability and validity obtained from the questionnaire survey. Larger sample will give more discrete and focused results.(iv) Incorporate TQM with Quality Assessment and ISOFor bigger scope in quality management, research on quality assessment such as QLASSIC and CONQUAS and ISO 9001 can be done and the researcher could try to find the point of correlation between them and develop framework out of it.中文马来西亚建筑承包商的全面质量管理摘要马来西亚政府宣布,要使建筑业在2020 年之前完成转型,要实现这一目标,就必须提高建筑质量。
建筑施工质量控制技术外文翻译参考文献

建筑施工质量控制技术外文翻译参考文献1. Zhang, H., Yu, S., & Yang, C. (2019). Research on Quality Control Technology of Construction Engineering. Journal of Wuhan University of Technology. 41(9), 28-33.2. Li, J., & Wang, Y. (2018). Application of Quality Management Technology in Construction Projects. China Construction Science and Technology. 45(2), 60-64.3. Chen, X., & Li, Z. (2017). Quality Improvement Measures and Evaluation Index System for Construction Projects. Construction Engineering Technology and Design. 28(4), 65-70.4. Zhao, Y., & Liu, W. (2016). Study on Quality Control Technology of Construction Engineering based on BIM. Modern Construction Technology. 57(1), 38-42.5. Wang, L., & Zhang, Y. (2015). Application of Lean Construction in Quality Control of Construction Projects. Construction Technology and Economy. 36(6), 45-49.6. Wu, Q., & Xu, H. (2014). Research on Quality Control Technology Innovation of Construction Projects. Journal of Building Materials and Structures. 35(8), 51-55.7. Li, H., & Zhu, L. (2013). Application of Six Sigma in Quality Control of Construction Engineering. China Construction Economy.40(3), 70-75.8. Tang, J., & Guan, J. (2012). Analysis of Quality Control Measures in Construction Engineering. Construction Engineering and Technology. 33(5), 32-37.9. Zhang, G., & Zhang, Q. (2011). Study on Quality Control of Construction Engineering based on PDCA Cycle. Construction Science and Management. 51(9), 47-51.10. Liu, Y., & Wang, X. (2010). Key Points and Methods for Quality Control of Construction Engineering. Building Construction. 42(4), 34-38.。
施工项目质量控制中英文对照外文翻译文献

施工项目质量控制中英文对照外文翻译文献本文献主要介绍了施工项目质量控制方面的重点问题,并提出了一些解决方案,其中包括以下几个方面:- 质量控制的重要性:在施工过程中调整和优化流程,以确保项目顺利进行,并达成预期目标。
- 质量控制的主要内容:施工前的准备、施工中的监督、施工后的检查和验收。
- 质量控制的具体措施:建立质量监督系统、加强施工现场管理、合理分配资源、保证人员素质等。
- 质量控制的评价标准:包括外观质量、机械性能、使用寿命等。
文章重点介绍施工项目质量控制的重要性和具体措施,以及评价标准,并提供了对应的英文翻译。
Construction Project Quality Control Foreign Translation Literature in Chinese and EnglishThis literature mainly introduces the key issues in construction project quality control and proposes some solutions, including the following aspects:- The importance of quality control: Adjusting and optimizing the process during construction to ensure the smooth progress of the project and achieve the expected goals.- The main content of quality control: Preparation before construction, supervision during construction, inspection and acceptance after construction.- Specific measures of quality control: Establishing a quality supervision system, strengthening on-site management, reasonably allocating resources, and ensuring personnel quality.- Evaluation criteria for quality control: including appearance quality, mechanical performance, service life, etc.The article focuses on the importance and specific measures of construction project quality control, evaluation standards, and provides corresponding Chinese and English translations.。
建筑施工质量管理外文翻译

CONSTRUCTION PROJECT QUALITY MANAGEMENTWith the development of our national economy, the construction industry has been moving in the direction of diversification development, the construction industry in China's economic development plays a very important role. Construction project management is directly related to the project quality, cost management, personnel security, business efficiency, matter to an enterprise even of vital importance, but our country architectural engineering management at present there exist many deficiencies: management system is not perfect. Most of our construction in order to save personnel expenses, reduce construction engineering administration personnel quantity and quality. Management system development of. Construction industry management system are from some famous construction industry experts to jointly study the development, but in the construction units in just a piece of paper, and they are just to cope with the higher level examination, and cannot be applied to construction project management.In our construction management, to establish a comprehensive project of our country construction management system, mainly because of a lack of management theory and experience in china. Establishment of construction project management system is a specialized and professional issues, its implementation must by the senior building subject experts and has extensive experience in management to organize, the only way to achieve. Foreign construction industry in both technology and theory are more advanced, so our country in construction project management system in establishing a procedure, must draw lessons from foreign advanced concept, in addition, also must absorb the advanced project management method, and information on all aspects of the comprehensive and integral. In short, to ensure that our construction management is orderly undertake, must be in sound engineering management system as construction overall management level of the underlying securityStrengthen the construction of quality management, establishing the quality assurance system, the quality of Engineering work. Engineering construction enterprise according to the quality assurance system, form effective quality assurance system, establish the quality policy, so as to make it more prescriptive, systematization and maneuverability. To be human, material and machinery of various elements of an effective combination of. First of all, one is to control the quality of the core, take them as the control force, fully mobilize the enthusiasmof people, establish quality first concept. Secondly, construction materials building as the main product, the material quality control is the key of project quality control. Finally, construction machinery and construction mechanization is the main mark of modernization, plays an indispensable role in project construction, which directly affects the construction project progress and quality, therefore, select and use of construction machinery equipment is very important. So, should the specific characteristic according to project project, a comprehensive consideration of various factors, the implementation of effective control of the construction site, in order to ensure the construction quality and safety and create good external conditions.At this stage of construction project management has been paid more and more attention, project cost management is project management indispensable content. Project management essential characteristic can be reflected by the project cost management. First, establish project cost management responsibility system. Project management cost responsibility, unlike the responsibility, responsibility is not equal to the cost responsibility complete complete. At the completion of work responsibility at the same time, should also consider the cost responsibility implementation, further clarify the responsibility cost management, make every manager has cost management consciousness, so be very careful in reckoning. Secondly, the construction team to execute subcontract cost control. Project department and construction team is established between specific labor contract relationship, project department have the right to the construction team schedule, quality, safety and site management standard of supervision and management, at the same time according to the contract to pay service charges. Once again, teams of construction cost control, the construction team management, project department should not intervene too much.In order to ensure the government supervision effectiveness and authority, should improve the overall quality of the supervision team. Therefore, strengthening the construction of quality supervision of construction quality management study, so that the supervision and professional qualities. In addition, quality supervision means also to continue to improve, increase the detection equipment, make supervision work has greatly the content of science and technology, to realize the modernization of supervision work. From theconstruction of the overall market, market operation rule is not perfect. Lax enforcement of the law, the phenomenon of impunity will often appear. Project quality risk is largely due to the construction market confusion caused by. Therefore, the government must establish and improve the operating rules, these rules can really implement service guarantee.Any construction projects and other construction projects recently, in size, degree of technical complexity, or engineering properties may have many differences, but the project management has a lot in common. In the current fierce competition in the market, some engineering company in maintaining and developing the original market areas can also continue to develop and adapt to the new market. In the competition continue to grow and develop, while others stagnate before, continued to shrink, and even exit the market decline, the reason is not built up a set of advanced, scientific. Agile project management mechanism.Effects of many factors on the quality of construction projects, such as building structure mismatch, tilt, collapse, destruction, crack, seepage, water leakage, poor rigidity, strength is insufficient, section size is accurate, however, investigate its reason, can be summarized as follows:( 1) against the building program. If not through feasibility argumentation, make investigation on decided yet; not clear engineering geology, hydrology geology brash start; undocumented design; without any modifications to the design, construction; not according to the drawings; the completion of the project is to test running, without acceptance on delivery of some phenomenon, cause many project save the serious hidden danger, house collapse accidents have also occurred.Engineering geological investigation of reason ( 2 ). Not serious geological investigation, provide geological data, data error. Geological exploration, borehole spacing is too big, can not fully reflect the actual situation foundation, such as when the bedrock surface fluctuation is large, soft soil lay er thickness is also very big; geological exploration drilling depth is not enough, did not find underground soft soil, landslide, grave, hole formation; geological survey report in detail, such as inaccurate, will lead to the error based scheme, caused by the uneven settlement of foundation, instability, the upper structure and wall crack,damage, collapse.( 3) without reinforcement treatment of foundation. On the weak soil, dredger fill, miscellaneous soil, collapsible loess, expansive soil, rock outcropping, lava, soil hole uneven foundation reinforcement treatment or not handled properly, that led to the great cause of quality problems. According to different characteristics of foundation engineering, foundation treatment should be in accordance with the superstructure and combination, make its work principle, from the foundation treatment measures, design, structural measures, waterproof measures, construction measures considering management.( 4 ) design calculation problem. Inadequate design, structure unreasonable, the calculation sketch is not correct, computational load is too small, internal force analysis is incorrect, settlement joint and the expansion joint is arranged properly, the overhanging structure without overturning inspection, are induced by the quality problems. Such as a retaining wall engineering design without a clear understanding of the engineering geological conditions, construction and not on site verification, coupled with the construction team in the foundation excavation of the site geological conditions failed to timely feedback to the design staff, therefore, although the upper structure design, the construction of good quality, but the basic design is not reasonable, so that the use of design value of load has not yet reached the half, retaining wall appeared to slip and fall. Another example of a silo cracking accident, but also because design personnel negligence, in the pilot when Jian Bi crack, cause construction completion can not meet the basic requirements for the use of.Project management measures. 1 must be built and perfect engineering management responsibility system, make clear a key, fulfil responsibilityThe establishment and improvement of project management responsibility system, engineering management is smooth, responsibility is clear, whether the operation is effective, is to strengthen project management must first solve the problem. Salaried qualification standard limit, such as seventeen bureau of China railway construction enterprises, in the future for quite a period, the survival and development of the field of railway, highway, located in the municipalengineering construction market, the enterprise must do the business strong, do well the project, enhance core competitiveness. The company changes after making, group company and subsidiary to the market main body. It is ligament with asset, is no longer the relationship of administrative subordination, through the establishment and improvement of project management responsibility system, the project management effectively to form an overall, coordinated operation, more important.. 2 to establish and improve the engineering department ( a subsidiary company) as the main body of the construction management system.This kind of system requirement engineering department or subsidiaries must be to establish the construction scheme, the configuration of factor of production, heavy and difficult engineering monitor. The project is mainly responsible for the Ministry of construction program implementation, design changes, the daily management and all internal and external relations; company headquarters mainly grasps the organization and coordination, heavy and difficult engineering breakthrough and supervision, to create the external environment, pay attention toGood with the owner, design units and local government relations; company mainly grasps the policy measures, difficult technical advisory services, key and difficult engineering supervision and inspection. Engineering management department especially scheduling, always grasp the situation, unobstructed information feedback channel, solve the problems that cannot be solved.随着我国经济的发展,建筑行业已经朝着多元化方向发展,建筑行业在我国经济发展中起着非常重要的作用。
建筑施工质量管理中英文对照外文翻译文献

建筑施工质量管理中英文对照外文翻译文献中英文资料翻译Building construction quality managementAbstract:adhere to the quality first, improve the management level, improve the quality of construction is the key, only to meet the required quality standards and user requirements under the premise of quality, time limit for a project, cost, to meet the requirements, to provide more high-quality, safe, economical and applicable building products. Based on this, the building construction quality management of.Key words: housing construction building construction quality management1 strengthen training, selection of construction personnel is laying the quality control personnel foundationEngineering quality were all participants in the project construction technology management, operating personnel coordination work results, so construction workers is to form the main factor of project quality. To control the engineering quality first is the training and selection of construction personnel, improving their comprehensive quality. We should improve their quality awareness, according to comprehensive quality regardless of idea construction personnel must establish five concepts: the concept of quality first, pre-control priority idea, talk with data concept and social benefit and enterprise benefit and comprehensive benefit idea. The second is the construction of the technical quality of personnel, management, construction personnel should have higher quality planning and management capacity, production personnel should have superb technical ability, be strict in one's demands of the style of work, strictimplementation of quality standards and procedures of the legal concept, service personnel should do good technology and service life, can be with excellent service indirectly to ensure engineering quality.2 give full play to QC quality control functionAccording to "the anti-seizure combination, prevention first " principle is carried out actively " tell, help, anti, card" scientific examination method, and the constructionpersonnel together, common to the owners of construction process, responsible, quality control personnel, users, the construction personnel to establish new relations of cooperation, quality inspection staff and the construction site operations personnel is consistent, it is to provide users with high quality, satisfaction of building products. But the construction production is busy, to snatch the project schedule is loosen quality management tendency occurs. This led to check the quality of the project is checked with contradictions between. To give full play to the initiative of the staff to check the quality of the project, it is necessary to establish the authority of the quality inspection personnel, it is very necessary and important.3 following a case analysis gradually quality management, engineering survey:The territory of Hechi a building for the underground layer, on the ground twenty-two, twenty-five buildings, covers an area of 2550.4 square meters, building a total height of 79.950 meters, construction area of 4008 square meters underground, on the ground 36855 square meters, balcony area is 1570.1 square meters; the main design reasonable service life is 50 years; building fire grade two, seismic fortification intensity is 7 degrees, frame aseismic grade two; the ground floor to the ground floorthree layer 2-A axis 2-6 axis and2-17 axis short limb shear wall seismic rating for a class, the rest of shear wall seismic grade two. The project uses the base form of prestressed high-strength concrete pipe pile, structure type for the cast-in-place reinforced concrete frame shear wall structure.4 construction managementOn the construction quality management, mainly involves three aspects, one is about the design, survey and document review management. On design, reconnaissance unit quality behavior and results of the activities of the supervision, the emphasis is placed on the design, survey and document review supervisory control. If the violation of the relevant laws, regulations and mandatory standards for the design and survey documents, can be through direct economic penalties and legal sanctions, enabling direct responsibility assumed by the error caused by negligence or intentional quality responsibility. Two of the activities of the bidding management, focuses on the construction bidding supervision, market supervision and quality supervision the effective integration, through the quality supervision to promote the market competition and standardization of the benign operation, effectively through market operation, to ensure the validity of quality supervision. Three isthe text of the contract supervision, is the focus of construction contract supervision, quality management standardization and legalization to fulfil the terms of the contract, the legal effect of contract binding the construction quality and results. By analyzing the three aspects of examination and supervision, to achieve the government's construction qualityof the implementation process control and supervision. Before the construction, in the final analysis is the emphasis of quality management for owners of quality behavior management, because the owner of all these activities of the organizers, decision makers, which is the standard construction owner quality behavior and results of the activities of the important measures.5 construction management5.1 Lraw materials quality controlMaterial quality engineering construction quality is the key, use of raw materials does not meet the requirements of engineering, engineering quality can not meet the requirements. Therefore, in the construction quality control of stop before construction on material quality control, to ensure the quality of materials, in order to improve construction quality. For the control of materials, first of all to the common material supply necessary audit, select qualified suppliers for the supply of materials. Secondly, to approach the necessary inspection of raw materials, including: quality inspection report of the inspection, the inspection of appearance, physical and chemical inspection inspection. Through a series of tests to ensure the quality of the raw materials entering.5.2 procedures and time limit controlTo implement the handover inspection system, on the procedures of unqualified shall enter into next working procedure construction. At the same time construction quality affected by seasons, the reasonable arrangement of construction schedule is to ensure the engineering quality are important measures, and blindly rush period will inevitably lead to serious consequences. Quality control step is to establish quality control,selected key and key technology to undertake the key is checked, the two is to strengthen the operation of the management, project quality is good or bad, depends to some extent on the construction of personnel operation level.5.3 increase on-site inspectionsQuality management in the construction site should strive to grasp first-hand information, and strive to achieve the timely control, for the occurrence of the problemmust accomplish early discovery, early correction of bad old practices die hard, avoid, avoid large loss. For example, in the masonry tie bar examination, if taken after the completion of a masonry opening examination, is not easy to check, and to identify the problems are also difficult to remedy, but in the on-site inspection in a timely manner to solve, can avoid bigger loss, but also easy to get the cooperation.The entity quality inspection methods should adopt scientific monitoring instruments and equipment, to provide accurate, reliable and convincing data, strengthen the government engineering quality supervision and inspection of scientific and authoritative. Through the supervision, to ensure the implementation of mandatory standards, ensure the construction of law, regulations and standard carry out, from macroscopical overall grasp the construction project quality and structure safety. In addition, in strengthening program management at the same time, we must strengthen the technical control. Technology control method using standard evaluation method is better. Evaluation of standard methods are mainly as follows: one is the on site quality assurance condition examination and evaluation, two is the completion of the project the detection results of the examination and evaluation, three ison site quality assurance data examination and evaluation, four of engineering entity size deviation of the measured, five is for the completion of engineering the macro visual inspection evaluation.5.4 after the completion of the managementAfter the completion of the quality management of construction projects is put into use check management. First of all to ensure that do not meet the quality standards of the project can not be put into use, avoid inferior project to the state and public users cause direct harm and influence. The second is the decoration, repair and maintenance of quality supervision in construction project whole life quality management category : one is to eliminate or reduce due to renovation, maintenance process caused by irregularities on the construction engineering foundation, body structure and environmental quality, damage, cause quality accident. Two is prevented due to repair, maintenance quality is not up to the requirements to the state and public users production and living environment caused by direct damage. At this stage of the supervision should be emphasized good two close: it is strictly for its completion and acceptance review, supervision, to ensure that the registration of the reliability, authority and effectiveness. Two is to enhance the decoration, maintenance of quality management in the process, so that construction project whole lifequality objectives are effective implementation, for users to create a safe, comfortable, healthy production, living environment, so that the construction quality and realizing the sustainable development. Advocating and implementing project quality insurance, the project quality management into economic management category, to solve engineering after the delivery ofquality problem tenants to find the responsible party for any menace from the "rear".This phase is the project by construction to use or production of mark; is on engineering quality inspection the necessary link; is the guarantee contract task is finished in the round, improve project quality level of final checks. The unit after the completion of the project, must undertake the final inspection and test. Unit engineering technical person in charge should be prepared for the demands of information collected materials, equipment, component quality certificate of materials, a variety of material test data, record of concealed work, construction records records. By the technical director of project organization project technology, quality, production and other relevant professional and technical personnel to the scene inspection and evaluation. To identify the construction quality defects should be corrected, and should be corrected once again after the verification to demonstrate conformity. T o ensure engineering quality accord with mandatory standard design documents and the requirements of the contract, the employer, the Ministry of supervision of the project completion report. Attended by the construction unit of the organization of the main parties involved in the completion of initial inspection, acceptance procedure.endingProject, quality, the quality of housing construction related to people's daily life and the safety of life and property. In recent years, the housing quality problems have already become the focus of public attention, annual 3.15 consumer rights day, China Consumers Association published by consumer complaints the largest of the ten major categories of commodities, the housing quality problems at the front. Therefore, constructionmanagement in many aspects, quality management is the key and core. Only do a good job in building engineering construction quality planning and housing construction quality control, to create more quality engineering.Reference.[1 ] Building Engineering ( Construction Management ) [ J]. Journal of Taizhou Polytechnic College.[2 ] Wang Yan. Paying attention to construction management" two pieces of skins" phenomenon [J ]. Management of construction enterprises.[3 ] Lin Yihong, Li Yuanying. To improve construction quality several ponders [J ]. Shanxi building, 2005, 31 ( 1): 127-128.[4 ] Bu Narui, Wang Liwen, Li Wanqin. Discussion on construction management [ J]. Journal of Hebei Institute of Architecture and Civil Engineering, 2002, ( 02).Hu Zhenghua[ 5]. The era of knowledge economy the construction management [J ]. Parathion design and powder engineering, 2005, ( 06).[ 6].Zheng Jingqiu.Infuluencing the contrcution qulity of Engineering five fsctors[J ]. Shanxi building.2005,31( 1):135-136.浅谈房屋建筑施工中的质量管理摘要:坚持质量第一、提高管理水平,是提高建筑工程质量关键之所在,只有在符合规定的质量标准和用户要求的前提下,满足质量、工期、成本等要求,才能为社会提供更多的优质、安全、经济适用的建筑产品。
土木工程质量管理中英文对照外文翻译文献

中英文资料(文档含英文原文和中文翻译)中英文资料外文翻译文献On civil engineering construction project quality management1 IntroductionCivil engineering building project success lies in the quality of quality, separate, other everything is out of the question. Therefore, to take civil engineering construction quality management in the construction project implementation plan and implementation process.In practice, no more than the use of engineering quality of care. But to ensure the construction quality, using the party there is a need for the organization experienced professional quality management team, design of the whole construction process, including engineering design, construction units, building material, construction process and supervision and other aspects of the management, but also guide the construction unit of the construction personnel to timely and effectively encourages training. This article from the above several aspects to discuss.2.construction of the effective surveillance on the use of unit, design unit as a design once, is the work of supervisors, why should I organize the quality surveillance team? Because our country construction there are still many unsatisfactory objective or objective aspects, the unit is necessary to hire have thesense of responsibility, have management experience, familiar with the policies and regulations, have good communication ability quality management, set up quality management team, the construction design and construction process for effective management monitoring. The management team, can according to the engineering build pause status stop adjustment, implementation of compulsory system. On ordinary civil construction, quality management is relatively easy, with the possible exception of new information on the use of new technology, the whole quality management more rule-based. On special request of civil building engineering, quality management will be arranged to stop.First of all, on the quality of project design management. This stage, mainly for the design units in strict accordance with the unit can the fundamental request stop design, to check whether reasonable design plan, design intent can and the surrounding geographical environment as well as local humane environment of harmony, in the technology and the budget is feasible, can be advanced technology, reliable structure can safely, whether the unit in charge of construction appropriate technology request etc..These aspects of the management and inspection, in relation to the whole building after project completion, in the use of function, quality, human physical performance and other aspects whether can reach certain degree of satisfaction of the big issue.At this stage, management personnel more to listen to designers to design the idea", a lot of advisory application unit in macroscopical and microcosmic staff views oninitiative, make design to perfection.In addition, to check the design drawings can correctly reflect the design plan, calculated correctly, drawing dimensioning can have mistakenly, selection of materials and construction request whether reasonable, the overall design of various departments such as can harmonious design. Because our country is in the design and supervision work still is lacked very much, in the aspects of management and examination must be careful, in order to prevent subsequent quality disputes.Secondly, to the construction supervision supervision.Construction supervision is the key to guarantee the construction quality. Quality management departments should promptly to supervision departments to key local construction quality monitoring report, implement supervision duty. At the same time, but also in a timely manner, sampling test, certain construction technology can fit design request. On construction supervision departments, to check its supervision can improve the supervision work procedure, to check whether supervision report specification, not in conformity with the requests of construction operation can be corrected in a timely manner.Again, on the construction equipment and construction personnel basic quality supervision and inspection construction can stop, with safe and reliable, can satisfy the design request and to complete construction; construction team consisting of whether reasonable, the construction of the technical staff to whether accord with basic request, especially on special request link, can have the equivalent level technical personnel in charge of participating in the construction process. Payattention to the quality of construction unit, it progresses to the legal view. On raw materials procurement and construction of test procedures are detailed records.In addition, to stop the construction effect of sampling, discover a problem, timely and inspect manage personnel contact, stop the rectification, to prevent the engineering dispute, avoid engineering quality formation of waste.3construction of the various communication quality management work is not a design and construction method for cubic, but the entire project important constituent, it is designed with all relevant units of the divergent interests of. Present quality problems, the parties involved have the duty, have loss. At this point, the quality management must communicate with relevant parties, won the understanding and support. In addition, in the process of construction, also often encounter the construction side of the design request of doubt problem. The generation of these problems, sometimes due to the use of units of detailed request, some are the result of the design concept and design thoughts of the reasons, some due to the construction process the request of different caused. These problems cannot be ignored, should be promptly to communicate, understand the request, the timely adjustment. Not conscious construction, so that the practical results and design request is betrayed, and the use of units of the basic request of betrayal, unnecessary disputes and losses.4construction personnel training and encourage civil engineering buildingoperators is worker of a gleam of. From the present situation, the construction team of individual technical quality is also very important. Some construction unit, construction personnel activity, the construction of personnel practice degree no true assessment, making the construction quality to sell at a discount greatly.Then, is it right? A start to construction personnel examination, request to high level? At least from the now situation, which is not ideal. First, each building project on the detailed construction technology has different request. In the organization of the construction process, request a certain proportion of with some degree of worker technician, another local can have initial operation skills of construction workers. During the construction process, to guide the construction of a reasonable distribution of work, make the workers work in practice to further mature some basic types of operational procedures and technical requirements, and on this basis, the organization staff to stop training, make the understanding of the new technology, become established during the construction of the backbone. Then let them in the work of a scheme to other construction personnel to impart technical.In this respect, the construction unit according to the detailed status of layout. There has been a reasonable training mechanism, the construction personnel to understand the practical operation level, and improve their technical level of power. In the long run, the overall quality of the progress of the construction unit is also very important.On the other hand, effective encouragement and improve construction workerjob enthusiasm and learning enthusiasm of the necessary measures. Frontline workers mostly from rural, energy consumption, the low pay, the mood is stable. Therefore, to establish effective encouraging mechanism. To ensure that the wage Qing month, labor safeguard measures, management of human nature, care workers and Ankang. In addition, to organize the workers involved in the construction management and technology research, fully adjustable open invention enthusiasm of workers. Technology progress leads to an increase in income, so as to promote the stable construction team, the construction quality is very important. It is hard to imagine that a majority of people full of grievances of the construction team can achieve the task.5ConclusionIt is often said, should be " a matter of expediency in construction, quality first", however, the quality problem is emerge in an endless stream. If in the construction process of some links, quality difference, these difference basically from accumulated will change the whole engineering quality. Therefore, do not let every link of the quality monitoring, on the problem of construction promptly corrected, is to use units, design units, as for as to construction unit as, namely to society as. With such a sense of duty, our engineering degree will gradually progress, can form the good work habits. Constitute the benign development of building construction environment. On the other hand, quality management can't think ofwhat to do what, to systematic, procedural, design the whole management process, all the data, project compilation record, best to establish a computer database, stored in the computer. Management of examination conclusions, text, image, and correcting the situation chart problem timely records. This is the construction quality management informatization is the inevitable trend of development. This is my civil engineering construction quality management shortcomings, to be further developed.译文:关于土木工程施工项目的质量管理1.引言土木工程建立项目的成败在于质量,分开质量,其他一切都无从谈起。
- 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
- 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
- 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。
建筑行业全面质量管理外文翻译2019-2020英文The Total Quality Management (TQM) journey of Malaysian buildingcontractorsIdris Othman, Siti Ghani, Shim Woon ChoonAbstractMalaysian Government has announced that for construction industry to transform by 2020, quality in construction is needed to be improved. Total Quality Management (TQM) could facilitate this motive. Thus, the purpose of this research is to identify, rank and analyze the factors affecting TQM implementation in a construction company so that industrial practitioners avoid poor quality products. A case study concept was used and a questionnaire survey was collected from 32 respondents. The reliability test was conducted using Cronbach's Alpha Coefficient. Employee related factor was identified to be the most crucial factors affecting TQM implementation. Contractor group of respondents showed excellent level of internal consistency (overall reliability) with the validation value of 0.956 using Cronbach’s Alpha Coefficient. In conclusion this research able to give a series of recommendation and a clear quality management which can be followed by the industry practitioners to ensure that Total Quality Management can be implemented.Keywords: Total Quality Management, Construction, Contractor, MalaysiaIntroductionConstruction sector plays a critical part in the economy of Malaysia seeing its contribution in capital formation, employment creation and revenue generation which bolster the Gross Domestic Product (GDP) and the financial advancement of Malaysia. Economic Performance Fourth Quarter 2018, Malaysia’s economy growth accelerates to 4.7% with construction being sector being one of the main contributors. Construction is as fourth key contributors to the economic growth with 2.6% contributions to the GDP after Services, Manufacturing and Agriculture as shown in Table.Despite the growth and construction industry contribution to national GDP, the performance of the projects are not fully satisfied by many clients. Sustainable quality improvement is hardly achieved because of the construction quality management setting is loosely structured. However, Harrington, V oehl and Wiggin suggested otherwise. They narrated Teixeira in their studies that by referring to main guidelines, anybody has a great freedom to develop solution for TQM. Therefore, organization should develop framework with consideration of their managers’ view of Quality Management (QM). However, many contractors are not motivated to improve quality in their projects andorganization. In order to improve quality issues faced by the contractors, TQM is suggested to be implemented in construction setting.In January 1st, 2009, all Grade G7 contractors has been made compulsory to be certified with the ISO 9000 Quality Management System by Construction Industrial Development Board (CIDB). Failure to do so, the companies will be downgraded, which effect their business activities. In order to overcome problems such as inferior quality of construction materials, building defects, construction delays, high accident rates and environmental impact issues, many contractors have started ISO certification. In the last four decades, TQM has achieved improvement in term of continuous improvement in the system of holistic management. TQM has been proved very successful in many industries especially manufacturing sector. Therefore, by integrating TQM into contractor’s system of management will improve the problems of quality. Likita et al found that when TQM is fully implemented, processes in construction sector will be contr olled in much better. In Malaysia’s construction industry context, few studies have been undertaken related to TQM in term of theories, techniques, concepts, model, framework, implementation, impact, efficiency and performance. However, no evidence is found that there has been statistical research on the actual extent of TQM practiced by building contractors in Malaysia.Literature reviewThis section presents TQM overview by explaining its brief history, definition and principles. Benefits of TQM also will be elaborated to get a feel of what impact it could give to the organizations that decided to adopt it. Author also presents related work on TQM in Malaysian construction environment by recording the strengths and weaknesses of each work and provide the w ay forward to expand TQM’s body of knowledge in this sector.Total Quality Management (TQM)?OverviewTQM is the result of evolution in quality. It was started by Walter Shewhart in early 1920s when product quality control was applied with statistical theory. After that in the 1940s led by Americans such as Deming, Juran, Feigenbaum and Crosby, the concept was further developed in Japan. The focus widened to quality of all issues within the organization. The four evolutionary phases of quality are inspection, quality control, quality assurances then TQM. TQM is a philosophy to meet quality output satisfying the expectation of customer. Quality level in TQM is determined by customers. Quality standards inclusive of the Deming Prize and the Malcolm Baldridge National Quality Awards (MBNQA) ISO 9000 series, specify principles and processes that comprise TQM. Fig sums up eight principles of TQM.TQM benefitsTQM benefits should be understand in order to appreciate its importance. For improving competitiveness around the world, TQM has been utilized as an applied process. TQM could boost performance in two ways according to Ghobadian and Ghallear. In short term, TQM via premium pricing could increase profitability. However, TQM could increase market share in the long term. The financial performance and market share can be increased by utilizing the strategic pursuit of quality. TQM also could give positive impact on speed of response, productivity, customer services and quality of product. On top of that, Heltondescribed the impressive financial gains made by most Baldridge Award winners apart from improvement in business performance.Those firms in construction sector specifically that successfully implemented TQ can reduced workforce rework, workforce, nonconformities, improved overall project schedule and increase of market share. Besides that, TQM in construction industry also proven that company reputation can be increased, considerable market share can be won, and customer delight can be achieved. TQM is a philosophy that delivers long-term benefits. There are many cases showing the successfully implementation of TQM. However, there are also failure cases. Therefore, TQM must be implemented completely.TQM journey of Malaysia construction industryHighly interested in Quality Management (QM) activities can beseen since 1990s in Malaysia. Lasserre and Probert, recorded that Malaysia has a better quality sophistication and expectations than other growing countries in Asia. Malaysia also embarked by 2020 to attain the status of industrialized nation. Therefore, Malaysia becoming a practical area for the studies of THQM in a developing economy arena. Since then, research on TQM in manufacturing industry also been conducted on in Malaysia service industries and a few other sectors. However, research in construction industry is still very limited. While abundant of TQM research was found in other countries’ construction industry, author had found only five previous studies directly related to Malaysian construction industry from database; which reviewed in the following Table.From Table , the strengths and weaknesses of the related works are identified. Thiagaran, Zairi and Dale work has strength in premiering guidelines to implement TQM in Malaysian construction industry but lacks in assessment of TQM implementation. It is understandable since there were limited studies of TQM implementation in construction industry during the time that assessment of TQM implementation is yet to be done. Janipha and Ismail proposed work has strength in identifying issues of quality in construction. They were right when they reported that the initial steps in implementing successful quality in construction environment are to recognize issues in the construction environment itselfand the issues in construction quality. However, they were not able to support their hypothesis on the companies which implement quality practice will have direct, positive impact to their business. There was also no TQM assessment practice done in the study.The strength of Seng and Loon work lies in issues and barriers exploration, which can help those construction companies that intended to implement TQM be aware of the barriers and overcome them first before implementing. However, their target sample was from engineers which cannot represent the whole suggestion of TQM implementation, resulting less reliability of the results. Further studies can be done by distributing the survey to all level of organizations from top to bottom and focused on the companies that adopted ISO series in their organizations only since this ensure that the companies applied TQM in their operations and managements. There was also no TQM practice assessment conducted in the study. Likita et al are researchers from Malaysian local universities with the article title of “An Overview of TQM in Construction”, however none of the selected studies to be reviewed were on TQM in Malaysian construction industry, which clearly there were available studies on that since 2000 by Thiagaran, Zairi and Dale. Furthermore, the number of selected studies reviewed were only five, which cannot be considered as overview of TQM implementation in construction because there are a lot of studies about TQM in construction sector worldwide. There was alsono assessment of TQM practice study reviewed or mentioned in work.Finally, Jong, Sim and Liew work has strength in providing further insights of TQM roles for improvement the performance of the project. However, several weaknesses are identified such as the data analysis and discussion were only based on questionnaire response and literature review. They did not conduct interview on experts to further find the how and why of each outcome of their study which could give better knowledge of the relationship between performance of project and the TQM. Besides, the questionnaire distributed were designed to find relationship between the performance of project and TQM.From the comparisons, it can be summarized that there is gap in current TQM studies of Malaysian construction industry which is no assessment conducted. An assessment to explore the extent of actual TQM practice in current Malaysian construction environment. The significance of having this assessment is that it could give a picture and definition of actual TQM practice in Malaysian construction sector. TQM has been widely accepted and discussed since the last four decades, but where is Malaysia in the TQM journey? How far has our construction industry come? Available studies on other sectors other than construction in Malaysia is a lot especially in manufacturing, service, food processing, automotive and SMEs, but there are still very limited studies in construction sector. More research significance or contributions arefurther described in section 5 of this paper. But, the way forward in TQM study of Malaysian construction industry is to assess the extent of the TQM practiced by the Malaysia’s large-sized (G7) contractors with ISO 9001:2008 certification by self-assessment questionnaire survey. Based on the findings, research objectives are formulated in subsequent section.ConclusionThis research has achieved its objectives which are to identify and rank factors affecting TQM implementation based on Relative Importance Index (RII), find correlations between Clients, Consultants and Contractors and validate the factors identified using case study of this research utilizing information obtained from the respondents.The rank of factors affecting TQM implementation based on overall perspectives was identified as follows: (1) Employee Related, (2) Strategic Planning, (3) Teamwork, (4) Communication Related, (5) Organizational Culture, (6) Top Management Commitment, (7) Continuous Improvement and (8) Customer Related. Slight changes occur when analyzed based on co mpanies’ group. Clients and Contractors agreed on the similar rank for the top three TQM implementation factors which are (1) Employee Related, (2) Organizational Culture and (3) Communication Related. However, Consultants ranked the factors as (1) Teamwork, (2) Employee Related and (3) Organizational Culture.The correlation between three group of companies were identified;Client/Consultant showed highest Spearman correlation coefficient (β = 0.909) which classified as very strong correlation. Contractor/Consultant showed strong correlation (β = 0.675) while Contractor/Client showed moderate correlation (β = 0.573) on quality management factors. These indicated that Client/Consultant have more similar views on quality management than Client/Contractor or Consultant/Contractor.Finally, this research also was able to give a series of recommendation and a clear quality management framework which can be followed by the industry practitioners to ensure that Total Quality Management can be implemented and total quality products can be achieved.Recommendation for the future workTo further improve this research and make it more significant in the future, several future works can be considered. Those future works are explained below:(i) High rise or large scale project as case studyThe study should be focusing on high rise and large scale project because those type of projects implement TQM in more specific method compared to low rise projects. The projects too have more challenging scenario in term of quality needed to be taken care or compared to low rise.(ii) Focus research populationFor best results on the subject studied, the questionnaire should only be distributed to the quality department of particular organizations such as Quality Assurance and Quality Control division since quality is their expertise. Their opinion and views could be more valid and reliable.(iii) Increase the number of respondentsIncreasing the number of respondents will boost up reliability and validity obtained from the questionnaire survey. Larger sample will give more discrete and focused results.(iv) Incorporate TQM with Quality Assessment and ISOFor bigger scope in quality management, research on quality assessment such as QLASSIC and CONQUAS and ISO 9001 can be done and the researcher could try to find the point of correlation between them and develop framework out of it.中文马来西亚建筑承包商的全面质量管理摘要马来西亚政府宣布,要使建筑业在2020年之前完成转型,要实现这一目标,就必须提高建筑质量。